Loading...
HomeMy WebLinkAboutSW8080937_CURRENT PERMIT_20220715STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 0 % Oal 3'1 DOC TYPE ® CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2 0 22 01 15 YYYYMMDD ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director July 15'", 2022 NORTH CAROLINA £nvtronmer ral Quality Thomas Concrete of South Carolina, Inc. Attn: Jim Ryder, Vice -President / General Manager 124 Moats Fowler Road Anderson, SC 29626 Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8 080937 Benton Rentals, LLC Brunswick County Dear Mr. Ryder: The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on July 15th, 2022. The Division is hereby notifying you that permit SW8 080937 has been renewed, updated, and re -issued on July 15', 2022, as attached. Please be aware that the renewal and re -issuance of this stonmwater permit does not imply that the site is currently in compliance. This permit shall be effective until December 30", 2029 and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Wilmington Regional Office. If you have any questions concerning this permit, please contact Dylan McPeake in the Wilmington Regional Office, at (910) 796-7215 or dylan.mcpeake@ncderir.gov. Sincerely, AZ Brian Wrenn, tree or Division of Energy, Mineral and Land Resources Enclosures: Attachment C — Permitting History Renewal Application Documents DES/DM: \\\Stormwater\Permits & Projects\2008\080937 HD\2022 07 permit 080937 cc: Wilmington Regional Office Stormwater File 10"K E QJM North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 �� 910.796.7215 Post -Construction Stormwater Management Permit No. SW8 080937 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Thomas Concrete of South Carolina, Inc. Benton Rentals, LLC 197 Barnhill Road NW, Brunswick County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until December 30t", 2029 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 148,700 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. Page 1 of 6 Post -Construction Stormwater Management Permit No. SW8 080937 7 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. CORRECTIONS NEEDED and SCHEDULE OF COMPLAINCE. To bring this project into compliance with the Stormwater Regulations and design criteria, these deviations will be corrected within the proposed schedule of compliance as documented in Attachment D. The schedule must be adhered to unless an extension or revised plan of action is submitted and approved by the Division. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: Onsite, ft2: Offsite, ft': b. Total Impervious Surfaces, ft': C. Design Storm, inches: d. Pond Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMSL: g. Permanent Pool Surface Area, ft': h. Permitted Storage Volume, ft': i. Temporary Storage Elevation, FMSL: j. Controlling Orifice: k. Permitted Forebay Volume, ft': I. Fountain Horsepower, HP M. Receiving Stream/River Basin: n. Stream Index Number: o. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 5.90 257,000 None 148,700 1.5 7ft (4ft avg) 90 41 13,322 19,236 42.2 2.5"0 pipe 8,965 1/6 UT to Williams Branch / Lumber 15-25-2-9-3 "C;Sw,HQW' The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. Page 2 of 6 Post -Construction Stormwater Management Permit No. SW8 080937 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. Decorative spray fountains are allowed in the pond, subject to the following criteria: a. The minimum permanent pool volume is 30,000 cubic feet. b. The fountain must draw its water from less than 2' below the permanent pool surface. C. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. d. The fountain may not be placed into the forebay. e. The falling water from the fountain must be centered in the main pond, away from the shoreline. f. The maximum horsepower for a fountain in this pond is 1/6horsepower. 6. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s). BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. Page 3 of 6 Post -Construction Stormwater Management Permit No. SW8 080937 13. It is the responsibility of the permit holder, Thomas Concrete of South Carolina, Inc. ("Lessee"), to notify the Division of any changes in ownership and request an ownership/name change for the stormwater permit. However, if the lease agreement or contract between the Lessee and Benton Rentals, LLC ("Property Owner") is dissolved, cancelled or defaults, and the Division is not notified by the Lessee to transfer the permit, then the responsibility for permit compliance reverts to the Property Owner. A complete transfer request must be submitted to the Division within 30 days as described below otherwise the Property Owner will be operating a stormwater treatment facility without a valid permit which is a violation of NC General Statue 143-215.1. Failure to transfer the permit may result in appropriate enforcement action in accordance with North Carolina General Statute §143-215.6A through §143-215.6C being taken against the Property Owner. 14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 15. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. III. GENERAL CONDITIONS 1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: Page 4 of 6 Post -Construction Stormwater Management Permit No. SW8 080937 i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur; V. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2), b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. Page 5 of 6 Post -Construction Stormwater Management Permit No. SW8 080937 OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit modified and reissued this the 15'1 day of July, 2022. NORTH CAR•O,L(IINNA ENVIRONMENTAL MANAGEMENT COMMISSION — li� .�Xnan r nn, ecto Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 6 of 6 Attachment C - Permitting History Benton Rentals, LLC Permit No. SW8 080937 Approval Date Permit Action BIMS Version Description of the Changes 10/13/2008 Original Approval 1.0 10/19/2020 Transfer 1.1 Transferred from Benton Ready Mix of Brunswick to Thomas Concrete of South Carolina, Inc. (lessee) and Benton Rentals, LLC (property owner) 7/15/2022 Renewal 2.0 Expires 12/30/2029 Date R ceiv Fee Paid Permit Number �15aa 15 — su)�" 0Xo3 NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 080937 2. Project name: Benton Rentals. LLC 3. Project street address: 197 Barnhill Road NW City: 28462 County: Brunswick ZIP : 4. What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 fora Major Modification or Minor Modification Application form available at: https://deq,nc.gov/abouttdivisions/energy- min eral-land-resources/energy-mineral-land-ru les/stormwater-prop ram/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https //deq nc goy/abouVdivisions/energy-mineral-land- resnurceslenerav-mineral-land-rules/stormwater-Droaram/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: Thomas Concrete of South Carolina, Inc. 2. Signing Official's Name: Jim Ryder 3. Signing Official's Title: Vice -President / General Manager 4. Mailing Address: 124 Moats Fowler Road City: Anderson State: SC ZIP: 29626 5. Street Address: 124 Moats Fowler Road City: Anderson State: SC ZIP, 29626 6. Phone: (770) 431-3300 x950 Email: iim ryderCaDthomasconcrete.com z JUL 15 2022 Stormwater Permit Renewal For Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: i� 1. A permit application processing fee of $505.00 payable to NCDEQ. 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions TIC and protective covenants will be submitted at a later date. `r, \ 4. O&M Agreements, Please select one: ® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or A �/� ❑ The project has not yet been built. v fn 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been n I inspected, and that they have been built and maintained in accordance with the permit. ' 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). his://www.sosnc.gov/online services/search/by title/ Business Registration JUL 15 ZD22 Slonnwater Perini( Renewal Application Form Page 2 of 3 May 11, 2018 7 PERMITTEE'S CERTIFICATION the person legally responsible for the permit, certify that I have a copy of the Permitand 0&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, correct and complete. 11 Signature Date:o`— NOTARIZATION: I h GLYI y 1 ri C I Cur V , a Notary Public for the State of e County of F-F'Pt 17 4 %, om , do hereby certify that ^r personally appeared before me this the day of t A \ 20—zz and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) Notary Signature: r'Jvla I Y 7 1 l -z'k. My commission expires Apr I I 19. Zy 23 ,111111111111" �1NON C4 ''.. 10, ��i�d'n Coun��l•`.��. '�ttnnnll`` JUL 15 2022 BY. L", Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 ,tea ,........q. .1AaT�a. ,J .i�.IQ:�6 `,� f lr::�o7 o�i;. �rrn���i���e�- Permit Number: 5(. e O o43 -�L (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity Of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: The inlet device: pipe or The pipe is clogged. Swale 'rhe pipe is cracked or otherwise damaged. Erosion is occurring in the Swale. The forebay Sediment has accumulated to a depth greater than the original design depth for sediment storage. The vegetated shelf Erosion has occurred are present. Best professional practices show that pruning is needed to maintain optimal plant health. riants are oeao, ctiseasect or dying. Weeds are present. treatment area Sediment has accumulated to a depth greater than the original design sediment storage depth. Algal growth covers over 50%, of the area. Cattails, phragmites or other invasive plants cover 50%, of the basin surface. How I will remediate the probl Unclog the pipe. Dispose of the sediment off -site. Replace the pipe. Regrade the swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Prune according to best professional practices Determine die source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Consult a professional to remove and control the algal growth. Remove the plants by wiping them with pesticide (do not spray). Form SW401-Wet Detention Basin O&NI-Rev.4 Page 2 of 4 4 Permit Number: (to he provided by OWQ) Drainage Area Number: BM element: Potentialproblem: How 1 will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 37.0 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 38.0 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 41.0' 39.0 Pe mancn Pool ------------ -- Volume Sediment Removal Elevation 37.0 37.0 -ft Min. ---------------------------- ------------- Sediment Bottom Elevation 33.0 Storage FOREBAY M.UN POND I -ft Storage Form SW401-Wet Detention Basin O&M-Rcv.4 Page 3 of 4 Permit Number: P� ._ (to be providedby'DWQ.) VE ' i 1 acknowledge and agree by my signature below that I am responsible for the I FEB r 12929 1 performance of the maintenance procedures listed above. I agree to notify DWQJo'f any problems with the system or prior to an changes to the system or responsibleparty..- Project P Y p Y b Y p nume:Benton Ready Mix of Brunswick SW8 080937 BMP drainage area number: Print name: Title:Vice President, Coastal Division, Thomas Concrete of South Carolina, Inc. Address: 1 18 Pipemakers Circle, Suite 100, Pooler, GA 31322 Note: 'rhe legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. 1, S h an n 0 A G o r k , a Notary Public for the State of i n County of y F t �j �O�Yy� , do hereby certify that 1 / Y\(— personally appeared before me this day of br uca_r _, 2020, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SKORMOLAIN NOTARV PU" W AOMM SEAL My commission expires A Dr I I 17 tZOZ3 Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 „> .., IT Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC -Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and 6ot'readily penetrate into accumulated sediments. , When the permanent pool depth reads 37.0 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 38.0 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM Oill in the blanks)RAiJGTQ:PI9At� Permanent Pool Sediment Removal . 38.0 Pe manes Pool -------------- -- Volume Sediment Removal Elevation 37.0 V01ume Bottom Elcvatio 37.0 S Min. ---------------------------------------- �------ Scdimcnt Bottom Elevation 33.0 I-ft n. Storage Sediment Storage FOREBAY AMAIN POND Form SW401-Wet Detention Basin O&M-Rcv.4 Page 3 of 4 61 Permit No.- -qAri ne6b A17 (to be provided by D WQ) Ar NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Pad III) must be printed, filled out and submitted along with all of the required information PROJECT INFORMATION Project name Benton Ready Mix of Brunswick, Inc. Contact person Donald M. Covil, P.E. Phone number (910)575-5872 Dale 23-Sep-08 Drainage area number (only one) IL'DESIGN INFORMATION' Site Characteristics Drainage area 257,000.00 ft' Impervious area 148,700.00 f? %impervious 57.86 % Design rainfall depth 1.50 in Storage Volume: Non -SR Waters Minimum volume required 18,335.00 it' Volume provided 19,236.00 fP Storage Volume: SR Waters 1-yr, 24-hr runoff depth (n/a) in Pre -development 1-yr, 24-hr runoff it, Post -development 1-yr, 24-hr runoff to Minimum volume required It' Volume provided it, Peak Flow Calculations 1-yr, 24-hr rainfall depth (n/a) in Rational C, pre -development (unitless) Rational C, post -development (unitless) Rainfall intensity: 1-yr, 24-hr storm inmr Pre -development 1-yr, 24-hr peak flow ft'/sec Post -development 1-yr, 24-hr peak Flow ft'/sec Pre/Post 1-yr, 24-hr peak flow control ft'/sec Basin Elevations Basin bottom elevation 33.00 It Sediment cleanout elevation 34.00 If Bottom of shelf elevation 40.50 It Permanent pool elevation 41.00 ft SHWT elevation //II '', ft �V6ricf 7•s r Top of shelf elevation 41.50 it Temporary pool elevation 42.20 ft 6W A TF'� C: O ��Oi Y Form SW401-Wet Detention Basin -Rev 4 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWDJ II.%DESIGN INFORMATION 4 j. Volume and Surface Area Calculations SA/DA ratio 0.58 limitless) Surface area at the bottom of shelf 10,589.00 fe Volume at the bottom of shelf 38,120.00 fl' Permanent pool, surface area required 13,081.00 ft' Permanent pool, surface area provided 13,322.00 ft' OK Permanent pool volume Average depth for SA/DA tables 44,098.00 —3.31 ft' ft ( \ OK 4,0 CStt 4-fe_) Surface area at the top of shelf 16,205.00 ft' Volume at the top of shelf 51,479.00 it ! Forebay volume 8,965.00 it' Forebay % of permanent pool volume 20.33 % OK Temporary pool, surface area provided 17,666.00 f" Drawdown Calculations Treatment volume drawdown time 2.50 days OK Treatment volume discharge rate (n/a; routed Bow) ft'/s Pre -development 1-yr, 24-hr discharge 4.00 ft'/s Decrease rate to < pre -development 1yr,24hr storm Post -development 1-yr, 24-hr discharge 0.00 ft'/s OK Additional Information Diameter of orifice 2.32 in Design TSS removal 90 % Basin side slopes 3.00 :1 OK Vegetated shelf slope 10.00 :1 OK Vegetated shelf width 10.00 ft OK Length of flowpath to width ratio 6.00 :1 OK Length to width ratio 6A0 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided Y It OK Vegetated filter provided? N (Y or N) Design must be based on 90% TSS removal Recorded drainage easement provided? (n/a) (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies Y (pump down) Form SW401-Wel Detention Basin -Rev 4 Parts I. a II. Design Summary, Page 2 of 2 State Stormwater Management Systems Permit No. SW8 080937 Benton Ready Mix of Brunswick Stormwater Permit No. SW8 080937 `r) Brunswick Countv I I X /I U Designer's Certification] I, A elb' e�L AVOK nllvl , as a duly registered in the State of North Carolina, having been authorized to observe eriodica � eekly/ full time) the construction of the project, BENfU.✓ .�FADY-/Y1lY pG fiRtl/VSis/C/[ (Project) for &t- n REA-py xhr " i a1ysY✓!CK , GLC (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature!" Registration Number e2s Date 9 By. R i 7oog Page 6 of 7 ' State Stormwater Management Systems _ Permit No. SW8 080937 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. A4*,l 3. All the built -upon area associated with the. project is graded such that the runoff drains to the system. �4.. All roof drains are located such that the runoff is directed into the system. -L�W`6_ The outlet/bypass structure elevations are per the approved plan. -A" 6. The outlet structure is located per the approved plans. 2_/ Trash rack is provided on the outlet/bypass structure: -A �'8. All slopes are grassed. with permanent vegetation. -44Z9. Vegetated slopes are no steeper than 3:1. -M�10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. �,l 2: Required drawdown devices are correctly sized per the approved plans. -Aa4n./ 13. All required design depths are provided. ✓14.All required parts of the system are provided, such as a vegetated shelf, and a;forebay. 5. The"'required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Brunswick County Building Inspections Page 7 of 7