Loading...
HomeMy WebLinkAbout20141246 Ver 1_Approval Letter_20141110AYNTWA 74* A North Carolina Department of Environment and Natural Resource,%, Fat McCrory Donald van der Vaart Governor Secretary January 21, 2015 Mitchell County NCDWR Project No. 2014-1246 Bridge 84moSBL1349 APPROVAL ny401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS J.J. Swain, Jr., P.B., Division Engineer NCDO[7 Division 13 North Carolina DeparUouu1ofTransportation 55 Orange Street Asheville, North Carolina 2880i Dear Mr. Swain: You have our approval, in accordance with the conditions listed below, for the following innpoc{ for the purpose of road widening in Mitchell County. This approval shall replace the approval isaundDoocu6pr 22, 2014: Type of Impact Amount Approved Amount Approved Permanent Temporary Site I - Strearn 18 (linear feet) 70 (linear feet) Site 2 — Strearn 47 (linear Feet) Total Stream Impact for Project: 2%4Qncwr0eet Total Temporary Stream Impacts: 158 linear feet. The project shall ho constructed io accordance with your application dated dated Novommhcr|0,2Ul4. After reviewing your application, v/ have decided that these impoc1 are covered 6v General Water Quality Certification Nunmhor3*86. This certification corresponds to Nationwide Pell 14,issued by the Corps of Engineers. Iu addition, You Should acquire any other federal, state m,local permits before you proceed with your project iou|uding(hutnoi|inaiiedtm)GedinzomtundEoomiouConrrol`Non- UimcbargeondVYaterSupP|vYYn1e,shcdn:gu|u(ioom. This approval will expire with the uocnmpooylog 4O4pormi1. This approval is valid solely for the purpose and design described in Your application (umlessrnodified behow). Should your project change, you mostnotify thuNCDWR and submit unew application, If the property im sold, the new owner noos1be given u copy m[ this Certification and approval letter, and is thereby responsible for oomnpiyjng with all the conditions. Kf total wetland fi||mfor- this project (now urill the ftiture) exceed one acre, or of total inipacts to strearris (now or in the ftiture) exceed )50 linear feet, conmpemmatarymmidga(ion mayhe required mydescribed in 15/\NC/\C 2B .O50v(h)(6) and (7). For this approval to rernain valid, you must adhere to the conditions listed in the attached certification(s) and any additional conditions listed below. 1617 Mail Service Center, Raleigh, Noah Carolina 27699-1617 Phone: 9,19-807-6300 � Internet www.ncdenr.gov An Equal Opportunity � Affirmative Action Employer 11. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. [I 5A NCAC 02H.0506(b)(3)] 12. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. [15A NCAC 02B.0200] 13. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification. [15A NCAC 02H.0506(b)(2)] 14. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on -site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H.0506 (b)(2) and (c)(2)] 15. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. [I 5A NCAC 02H.0501 and .0502] 16. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc. 17. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery. [ 15A NCAC 02B.0506(b)(2)] 18. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division Engineer) shall complete and return the enclosed "Certification of Completion Form" to notify the NCDWR when all work included in the 401 Certification has been completed. [15A NCAC 02H.0502(f)] 19. Native riparian vegetation must be reestablished in the riparian areas within the construction limits of the project by the end of the growing season following completion of construction. [ 15A NCAC 02B.0506(b)(2)] 20. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities.[15A NCAC 02H.0506(b)(3) and (c)(3)] 21. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards [15A NCAC 02H.0506(b)(3) and (c)(3]): a. The erosion and sediment control o'comureu for tile project must be designed, installed, and maintained in mocu,dmnue with the moow( n:oeot ve,mkm of the /Vorlh Carolina Sediment and Eros/on Control Planning and Design Man/al. b. The design, installation, operation, and maintenance ofthe sediment and erosion control measures must be such that they equal, or exceed, Nc requirements specified in the most recent version o{the North Carolina &,m0men/ and Erosion Control Manual. Tile devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned nrleased borrow pits associated with tile project, c. For borrow pd sites, the erosion and sediment control mexmorom must be designed, installed, operated, and maintained in ucoocdunoo with rhe most rsopat version of the JVorlh Carolina Surface Mining Mxnmal. d. The reclamation nuoasunom and implementation nnont comply with the rcc)eolmdoo in accordance with the requirements o[the 3udirnumLudnn Pollution Control /\c1. 22. Sediment and erosion control mcasunes shall not be placed in wetlands n, waters unless otherwise approved 6v this Certification. [l5ANCAC 020.0506(6)(3)uud (c)(3)l If you wish to contest any statement in the attached Certification you must file o petition for an administrative hearing. You may obtain the petition form fronn the office ofAdministrative hearings. You must file the petition with the office nfAdministrative Hearings within sixty (60) days ofreceipt of this notice. /\ petition im considered filed when it is received im the office ofAdministrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00ain and 5:00pm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be the original and one copy of the doo nflcn is received by the Office of Administrative 1--learings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Centel, Raleigh, NC27699-67i4 Telephone: (919)-431-3000, Facsimile: (919)-431-3 100 A copy of the petition must also be served oil DENR as follows: Mr. John Evans, General [omusd Department of Environment and Natural Resources l6Ol Mail Service Center This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Ac. If you have any questions, please contact Kevin Barnett a102V-2g6-4657nr Sincerely, S. Jay Zimmerman Acting, Director Division ofWater Rexuunomx Electronic copy only distribution: Roger Bryant, Division 13 Environmental Office (electronic copy only) Lori Beckwith, US Army Corps of Engineers, Asheville Field Office (electronic copy only) Marla Chambers, NC Wildlife Resources Commission Kevin Barnett, NCDWR Asheville Regional Office File Copy A WWA ,#) X CC� CDEN North Carolina Department of Environment and Natural Resources Pat McCrary Governor NCDWR Project No.: Applicant: Project Name: Date of issuance of 401 Water Quality Certification: County:. Donald van der Vaart. Secretary Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 "Transportation Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Appliewirl's Certifreralion 11 ....... _, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification 11 . .._ hereby state that, to the best of my abilities, due care and diligence was used in . the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plaits and specifications, and other supporting materials, Signature: ___ ___ bate: Engineer's Certification Partial Final 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date 1617 Mail Service Center, Raleigh, North Carolina 276991.1617 Phone: 919- 807 -6300 t Internet: www.nodenr.gov An Equal Opportunity 1 Affirmative Aden Employer