Loading...
HomeMy WebLinkAboutSW8051128_CURRENT PERMIT_20220725STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 051122 DOC TYPE ® CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2 o 22 o-12-5 YYYYMMDD ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director July 25`s, 2022 St. James Development Co., LLC Attn: John Atkinson, Manager PO Box 10879 Southport, NC 28461 NORTH CAROLINA EnArorunental Quaftty Subject: Permit Renewal Post -Construction Stormwater Management Permit No. SW8 051128 St. James Plantation — Bancroft Forest Brunswick County Dear Mr. Atkinson: The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for the subject permit on July 19', 2022. The Division is hereby notifying you that permit SW8 051 128 has been renewed, updated, and re -issued on July 25'h, 2022, as attached. Please be aware that the renewal and re -issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until September 6'", 2029 and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OA14 with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Wilmington Regional Office. If you have any questions concerning this permit, please contact Dylan MCPeake in the Wilmington Regional Office, at (910) 796-7215 or dylan.mcpeake@iicdenr.gov. Sincerely, 5�; Brian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: Attachment A — Designer's Certification Form Attachment C — Permitting History Renewal Application Documents DES/DM: %Siormwater\Permits & Projects\2005\051128 HD\2022 07 permit 051128 cc: Tim Clinkscales, PE; Paramounte Engineering, Inc., 122 Cinema Drive; Wilmington, NC 28403 Wilmington Regional Office Stonnwater File D_E�,� North Carolina Department of Environmental I Division Q ,/ Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405 Nommra.a•+.� / 910.796.7215 Post -Construction Stormwater Management Permit No. SW8 051128 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws. Rules, and Regulations PERMISSION IS HEREBY GRANTED TO St. James Development Co., LLC. St. James Plantation — Bancroft Forest Neighborhood inside St. James Plantation, Southport, Brunswick County FOR THE construction, operation and maintenance of a wet detention pond and an infiltration basin in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until September 61', 2029 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 of this permit. The subdivision is permitted for 59 lots, each allowed a maximum of 6,000 square feet of built -upon area. Page 1 of 9 Post -Construction Stormwater Management Permit No. SW8 051128 The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. 4. The tract will be limited to a maximum of 439,422 square feet of built -upon area. The wet pond designated as Pond #1 and the infiltration basin have been designed to treat the runoff from 277,814 and 161,608 square feet of Built -Upon Area, respectively. 5. The following design elements have been permitted for this stormwater treatment system which utilizes a wet detention pond stormwater and an infiltration basin and must be provided in the system at all times. Wet Detention Pond Pond #1 a. Drainage Area, acres: Onsite, ft2: Offsite, ft2 18.36 799,762 N/A b. Total Impervious Surfaces, ft2: Onsite, ft2: Offsite ft2 277,814 277,814 N/A c. Design Storm, inches: 1.5 d. Average Pond Design Depth, feet: 7.5 e. TSS removal efficiency: 90% f. I Permanent Pool Elevation, FMSL: 28 q. Permanent Pool Surface Area, ft2: 76.730 h. Permitted Storage Volume, ft: 40,382 i. Temporary Storage Elevation, FMSL: 27.49 Pre-dev. 1 r-24 hr. discharge rate, cfs: N/A k. Controlling Orifice, in: 3 I. Orifice flowrate, cfs: 0.1 m. Permitted Forebay Volume, ft3: 108,775 n. j Fountain Horsepower 3 o. Receiving Stream/River Basin: Beaverdam Creek / Cape Fear p. Stream Index Number: 18-88-9-1- 0.5 q. Classification of Water Bod SC;SW,HQW Page 2 of 9 Post -Construction Stormwater Management Permit No. SW8 051128 Infiltration Basin Infiltration Basin #1 a. Drainage Area, acres: Onsite, ft2: Offsite, ft2 10.07 438,649 0 b. Total Impervious Surfaces, ft2: Onsite, ft2: Offsite, ft2 161,608 161,608 0 c. Design Storm, inches: 1.5 Basin Dept , feet: 5 e. Bottom Elevation, FMSL: 24 f. Permitted Surface Area Bottom, ft2: 20,323 pi.d. Permitted Storage Volume, ft3: 76,359 h. Storaqe/Bypass Elevation, FMSL: 24.98 Type of Soil: Wando Fine Sand Expected Infiltration Rate, in/hr: 6.9 k. I Time to Draw Down, hours: 5.8 I. Receivin Stream/River Basin: Beaverdam Creek / Cape Fear m. Stream Index Number: 18-88-9-1- 0.5 n. Classification of Water Body SC;SW;HQW II. SCHEDULE OF COMPLIANCE The permittee is responsible for verifying that the proposed built -upon area for the entire lot does not exceed the maximum allowed by this permit. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Energy, Mineral and Land Resources, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 4. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Page 3 of 9 Post -Construction Stormwater Management Permit No. SW8 051128 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, the permittee shall cause a certification from an appropriate designer for the system installed to be submitted, certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 10. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 051128, as issued by the Division of Energy, Mineral and Land Resources under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Energy, Mineral and Land Resources. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Energy, Mineral and Land Resources. f. The maximum built -upon area per lot is 6,000 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. In. Built -upon area in excess of the permitted amount will require a permit modification. 11. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 4 of 9 Post -Construction Stormwater Management Permit No. SW8 051128 12. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 13. Decorative spray fountains are allowed in the pond, subject to the following criteria: a. The minimum permanent pool volume is 30,000 cubic feet. b. The fountain must draw its water from less than 2' below the permanent pool surface. C. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. d. The fountain may not be placed into the forebay. e. The falling water from the fountain must be centered in the main pond, away from the shoreline. f. The maximum horsepower for a fountain in this pond is 3 horsepower. 14. Prior to transfer of the permit, the stormwater facilities will be inspected by DEMLR personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 15. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. Adding the option to use permeable pavement or #57 stone within the lots as a permeable surface. The request may require a proposed amendment to the deed restrictions and protective covenants for the subdivision to be submitted and recorded. g. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. h. Other modifications as determined by the Director. III. GENERAL CONDITIONS CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. Page 5 of 9 Post -Construction Stormwater Management Permit No. SW8 051128 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased; ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur, except in the case of an individual residential lot sale that is made subject to the recorded deed restrictions and protective covenants; V. The assignment of declarant rights to another individual or entity, vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. Page 6 of 9 Post -Construction Stormwater Management Permit No. SW8 051128 C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the projects conformance with permit conditions e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit renewed and reissued this the 251 day of July, 2022. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION C&L� VA Brian Wrenn, DireCtor Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 7 of 9 Post -Construction Stormwater Management Permit No. SW8 051128 Attachment A St. James Plantation — Bancroft Forest Stormwater Permit No. SW8 051128 Brunswick County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 8 of 9 Post -Construction Stormwater Management Permit No. SW8 051128 Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. .11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDEQ-DEMLR Wilmington Regional Office Brunswick County Building Inspections Page 9 of 9 Attachment C - Permitting History St. James Plantation - Bancroft Forest Permit No. SW8 051128 Approval Date Permit Action BIMS Version Description of the Changes 3/3/2006 Original Approval 10 9/6/2013 Modification 1.1 Bumped from Low -Density to High -Density; Treated using 2 Wet Detention Ponds 5/20/2014 Modification 1.2 Traded out Wet Detention Pond #2 for an Infiltration Basin 7/25/20221 Renewal 1 2.0 1 Expires 9/6/2029 Permit Number: SG�BU����z 8- (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basni. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be ntitumized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. r�'E0E-:gI f.---'� A BMP element: Potentialproblem: How I will remediate the ro @ The entire BMP Trash/debris is present. Remove the trash debris. 11 The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessny tom_ detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. 5 2014 bij; Form SW.401-Wet Detention Basin O&M-Rev3 +riti­i i; : n ..,';Page'I of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMI' element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the Swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the Swale if necessary to Swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BM P. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. =r.�B�'� MAY 0 5 2014 Porin SW401-Wet Detention Basin O&M -Rev. ,:ria BY:ge_2_o�4_ r Permit N (to be provided by DWQ) Drainage Area Number: BMI' element: Potentialproblem: Flow 1 will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 10.0 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 10.0 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 27.00 I7_10 1 Pe maven Pool ----------- Volume Sediment Removal Elevation 1700 Volume 16.00 -ft Min.------------------------------------------I----- ----------------------------------------- ----- Sediment Bonom Elevation 16.00 I-ft n Storage Sedimei Storage FOREBAY MAIN POND ECEEOV'i �1 MAY 0 5 201a BY. — Form SW401 -Wet Detention Basin O&M-Rev.3 i`r:r:,: '.Page3'of4 Permit Number: (to be provided by DWQ) 1 acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Prgject name:Bancroft Forest BMP drainage area number: Print name:Robert Masters Address:P.O. Box 10879 Southport, NC 28461 Date: —1 V Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. 1, tNA'--; x , a Notary Public for the State of K104"L (a-et;na County of cic , do hereby certify that V%5,.} 0'AJ.Ee-1 personally appeared before me this S day of 6 , , Zoe, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, .ra,nuw"'un ��a�GNEN C a,4 F (9 NOTARY X z3 PUBLIC c) -Z 2 a ''•Q,nnunNPO�� SEAL My commission expires M4r110 U k� N0=OEV�� MAY 0 5 2014 BY: Form SW401=Wet Detention Basin O&M-Rev.3 ...2 11..1 .. � - .Page 4 of 4 X, VI a Pennit Number. (to be provided by DVVQ) Drainage Area Number: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the 'initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or 'Che pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise clamaged (if applicable). Erosion is occurring in the Regrade the Swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. �IECEIV E1 MAY 0 5 2014 Form SW401-Infiltration Basin Oa&M-Rev.3 f.'r '� .:.Pagel Of BY: .. r BMP element: Potentialproblem: How I will remediate theproblem: The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment Search for the source of the has accumulated. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of filter 5 days after a storm event. media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. spray). The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. tG �1.0 � rt ��" .` F p MAY 0 5 2014 Form SW401-Infiltration Basin O&M-Rev.3 ;-I k*.:' 1•:YIiX+, Page 2 of 3'{ Permit Number: i (to be provided by DIVA) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Prqjecl name:St. James Plantation - Bancroft Forest BAIP drainage area number:Section 6B - Drainage Area 2 Print name:Robert Masters (St. James Development Co, LLC) Title:vice President Address:PO Box 10879 Southport, NC 28461 Dater Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. I, C-tvr}r_AF^ L- CyVV,x , allotary Public for the State of _IV 4-*X C 0LeVV'1,A- , County of r,(c , do hereby certify that k6f.-k- F. MO.S.\,4 personally appeared before me this S day of DA,j , ku q and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand Lind official seal, ���GNEN C ���•. C9 NOTARY X tP PUBLICICKU S 0. SEAL My commission expires mrn� l� , Za it,4 MAY 0 5 2014 BY:------ rorm SW401-Infiltration Basin.O&M-Rev.3 t: Page 3 of 3, _•: ` :` _ r ULMLK UJt UNLY Date Re'eive Fee Paid Permit Nber I DU 73& 05- S 0.5l Ium NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 051 128 2. Project name: St James Plantation -Bancroft Forest 3. Project street address: Neighborhood inside St James Plantation City: Southport County: Brunswick ZIP 28461 4. What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 fora Major Modification or Minor Modification Application form available at: https://deg.nc.gov/about/divisions/energy- mineral-land-resou rces/ene rgy-mi neral-land-rules/stormwater-program/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https://deg.nc.gov/about/divisions/energy-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not . automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: St .lames Development Co, L LC 2. Signing Official's Name: John Atkinson 3. Signing Official's Title: Manager I ' 4. Mailing Address: PO Box 10879 City: Southport State: NC ZIP: 28461 5. Street Address: 4006 St James Drive, SE City: Southport State: NC ZIP: 28461 6. Phone: (910) 253-3001 Email: latkinson(a stlames-properties.com JUL 19 2022 By: C� Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: L 1. A permit application processing fee of $505.00 payable to NCDEQ. ZG 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act," c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor, or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 4. 23PKAgreements, Please select one: I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. ner Certifications, Please select one: DeE A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or /I ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/bv title/ Business Registration tCF1.o�U'49 �_ JUL 19 2022 BY: Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: 1. A permit application processing fee of $505.00 payable to NCDEQ. �ZG 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 'V6(4/, 4. O )Agreements, Please select one, I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ 1 do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. De ner Certifications, Please select one: [� A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the cerification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). JUL 19 2021� Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION JB ti,-) P-t("3 '-- , the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, correct and complete. Signature: G C Date: NOTARIZA a Notary Public for the State of AIp<A , County of �� n v<tiJLJir A_ , do hereby certify that :Y& 4�4±16 personally appeared before me this the I qitl-- day of It t 202.1—_, and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, NOTARY MY JUL 19 2022 Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 '.fir b �y �:7, 1�: ��``i i7 CG•;'.����1q ih'�.iY�� ... �h :,} l Permit No. ✓:4 (to ee provicad by 0v✓0) 1 ©wL� O�pE W A 7 7,9 r NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Pad III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Bancroft Forest Contact person Tim Clinkscales, PE Phone number 910-791-6707 Dale 5/2I2014 Dminage area number 1 111. DESIGN INFORMATION Site Characteristics Dminage area 799,762 fe Impervious area, post -development 277,814 fl' %impervious 34.74 % Design rainfall depth 1.5 in Storage Volume: Non -SA Waters Minimum volume required 36,215 ft' Volume provided 40,382 ft' Storage Volume: SA Waters 1.5' runoff volume it, Pro -development 1-yr, 24-hr runoff it, Post -development 1-yr, 24-hr runoff it, Minimum volume required to Volume provided ft' Peak Flow Calculations Is the prettiest control of the 1yr 24hr storm peak flow required? N (Y or N) 1-yr, 24-hr rainfall depth in Rational C, pre -development (unittess) Rational C, post -development (unitless) Rainfall intensity: l-yr, 24-hr storm iNhr Pre -development 1-yr, 24-hr peak flow nla fl'Isec Post -development 1-yr, 24-hr peak flow hard ft'Isec Pre/Post 1-yr, 24-hr peak flow control kVALIJEI ft'tsec Elevations Temporary pool elevation 27.49 fasl Permanent pool elevation 27.00 fall SHWT elevation (approx. at the perm. pool elevation) fasl Top of 1011 vegetated shelf elevation 27.50 fmsl Bottom of 10ft vegetated shelf elevation 26.50 fmsl Sediment cleanout, top elevation (bottom of pond) 17.00 fmsl Sediment Geanout, bottom elevation 16.00 fmsl Sediment storage provided 1.00 it Is there additional volume stored above the state -required temp. pool? Y (Y or N) Elevation of the lop of the additional volume 27.5 first OK, volume provided is equal to or in excess of volume required. }1��€ a V EE_ MAY 0 5 2014 OK BY: - Form SW401.Wet Detention BasirvAAev.94H8/12 . ' .. I .. - Parts 1. 811, Design Summery; Page 1.of 2 I Permit 1 provided by DWD) II. DESIGN INFORMATION Surface Areas Area, temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, A.,, Area, bottom of 1011 vegetated shelf, A, r Area, sediment cleanoul, top elevation (bottom of pond), A._,. Volumes Volume, temporary pool Volume, permanent pool, VP.-" Volume, forebay (sum of forebays if more than one forebay) Fombay %of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-21b) Volume, permanent pool, Vp,,,, ova Area provided, permanent pool, A._,, Average depth calculated Average depth used in SAIDA, dr,., (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-21b) Area provided, permanent pool, Aa,,,, " Area, bottom of 1 Oft vegetated shelf, Aw, v,m, Area, sediment cleanout, top elevation (bottom of pond), Aya v. 'Depth' (distance btw bottom of 10ft shelf and top of sediment) Average depth calculated Average depth used in SAIDA, d.., (Round to down to nearest 0.51) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Co) Driving head (Hw) Drawdown through weir! Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak now Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time 103,529 ft2 7,598 ft' 0.95 (unitless) 76,730 ft' OK 49,500 ft' 32,210 ft' 40,382 (f' OK 503,616 ft' 108,775 ft' 21.6% % OK 90 % Y (Y or N) N (Y or N) 0.95 (unitless) N (Y or N) 503,616 ft' 76,730 ft' If ft Y (Y or N) 76,730 ft' 49,500 ft' Need 3 It min. 32,210 f? 9.50 ft 7,84 It OK 8.0 ft OK Y (Y or N) 3.00 in in' 0.60 (unitless) 0.13 ft N (Y or N) (unitless) (unitless) It it Na ft'/sec n/a (f'Isec 0.10 ft'Isec 4.34 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 If OK Length of flowpoth to width ratio 3 :1 OK Length to width ratio 3.0 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 3.6 If OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: Pump out MAY052014 11 Form SW401 Met Detention Basin-Rev.9.4/1 e/12 - . I+ Parts I. a II. Design summary, Page 2 of 2 Permit No. (to be provided by DWQ) 'F W A rCH �! STORMWATER MANAGEMENT PERMIT APPLICATION FORM o — NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project Name St. James Plantation - Bancroft Forest Contact Person Tim Clinkscales, PE Phone Number (910) 791.6707 Date 5/2/2014 Drainage Area Number 2 II. DESIGN INFORMATION Site Characteristics Drainage area 438,649.00 h2 Impervious area 161,608.00 ft' Percent impervious 36.84 % Design rainfall depth 1.50 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.70 in 1-yr, 24-hr intensity inlhr Pre -development 1-yr, 24-hr discharge ft'/sec Post -development 1-yr, 24-hr discharge ft'/sec Pre/Post 1-yr, 24-hr peak Flow control ff'Isec Storage Volume: Non -SA Waters Minimum design volume required ft3 Design volume provided It, SlorageVolume: SAWaters 1.5' runoff volume 24696.00 ft' Pre -development 1-yr, 24-hr runoff volume 7,984.00 ft3 Post -development 1-yr, 24-hr runoff volume 30,918.00 h' Minimum required volume 24696.00 113 Volume provided 76,359.00 ff3 Soils Report Summary Soil type Wando Fine Sand (WaB) Infiltration rate 6.90 inlhr SHWT elevation 20.50 fmsl Basin Design Parameters Drawdown time 0.27 days Basin side slopes 3.00 :1 Basin bottom elevation 24.00 fmsl Storage elevation 24.98 fmsl Storage Surface Area 22,215.00 ft' Top elevation 29.00 fmsl Basin Bottom Dimensions Basin length 255.00 ft Basin width 80.00 fit Bottom Surface Area 20,323.00 ffz OK OK OK OK MAY 0 5 20114 11 i It Form SW401-Infiltration Basin-Rev.S 11Apr2011 ..... - Parts I. S 11. Design Summary, Paget or 2 Permit No. (to be provided by DWQ) -Additional Information Maximum runoff to each inlet to the basin? ac-in Length of vegetative filter for overflow ft Distance to structure ft Distance from surface waters ft Distance from water supply well(s) ft Separation from impervious soil layer ft Naturally occuring soil above shwl It Bottom covered with 4-in of clean sand? (Y or N) Proposed drainage easement provided? (Y or N) Capures all runoff at ultimate build -out? (Y or N) Bypass provided for larger storms? (Y or N) Pretreatment device provided Forebay MAY 0 5 2014 ' BY: — Form SW401-Infittretion Basin-Rev.5. 11Apr2a11 _ - -" ` 1'.' i :... , •.Parts 1. a II. Design Summary, Page 2 of 2 - ` High Density Residential Subdivisions Deed Restrictions & Protective Covenances In accordance with Title 15 NCAC 2H.1000 and S.L. 2006-246, the Stormwater Management Regulations, deed restrictions and protective covenants are required for High Density Residential Subdivisions where lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the design criteria used to size the stormwater control facility. I, Robert Masters , acknowledge, affirm and agree by my signature below, that I will cause the following deed restrictions and covenants to be recorded prior to the sale of any lot: 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 051128 , as issued by the Division of Water Quality under the Stormwater Management Regulations. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. The maximum allowable built -upon area per lot is see below square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. OR, if the proposed built -upon areas per lot will vary, please REPLACE #6 above with the following: 6. The maximum built -upon area per lot, in square feet, is as listed below: Lot # BUA Lot # BUA Lot # BUA Lot # BUA 1-59 6000 This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 7. Each lot will maintain a 30** foot wide vegetated buffer between all impervious areas and surface waters. **50 foot for projects located in the 20 coastal counties. 8. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them into a component of the stormwater collection system. Lots that will naturally drain into the system are not required to provide these additional measures. SC E UV E MAY 0 5 1014 BY: Form DRPC-3 Rev.2 05Nov2009 Page 1 ,of 2 L High Density Residential Subdivisions Deed Restrictions & Protective Covenances Signature:_�� ��//(G'.(,{ /� P c . Date: I, 6ve.•471-11%t^ l - tVlev k a Notary Public in the State of t to/tt. Cvw-nC ru. County of �wnf�ai,tik do hereby certify that L,kvt- tAadNr'-1 personally appeared before me this the 5 day of lb,14 2014 , and acknowledge the due execution of the foregoing instrument. Witness my hand and official seal, 67- etO4r'). A ---- Signature My Commission expires Lila., I a. Za W- ,�,.G�EN c� .Fp+ 4 X NOTARY � PUBLIC C o GNWIC6-v a, 1 MAY 0 5 2014 BY: Fonn DRPC-3 Rev.2 05Nov2009 Page 2 of 21 �,, P :z=e ? •> d