Loading...
HomeMy WebLinkAbout20221650 Ver 1_6143 - Stormwater Report - 05-24-2022 - Signed_20221121STORMWA TER MANAGEMENT AND EROSION CONTROL DESIGN PA TRICK PLACE INDIAN TRAIL, NORTH CAROLINA For R.D. HARRELL CO. EAGLE ENGINEERING MATTHEW C. KIRCHNER, P.E. EAGLE ENGINEERING, INC. 2013 Van Buren Ave. Indian Trail, NC 28079 EEI PROJECT NO.: 6143 MAY 24, 2022 Initials Date \\\\IIIiiI/// .���� CN CARD ��''� _\ �o�oFEssio SEAL = 04550 = �; �• N .. tiFW C 5-24-2022 Patrick Place 6143-C-NC Stormwater Management Report May 24, 2022 1.0 Project Address and Summary The project is located on Potter Road (SR 1357), at the intersection with Fincher Road (SR 1361), approximately 0.60 miles south of the intersection of Potter Road (SR 1357) and Chestnut Lane (SR 1362). The proposed development will include the construction of 148 single family attached homes with a community pool and clubhouse, along with its associated site grading, roadways, utilities, stormwater management facilities, and landscaping. Site improvements will include; site grading, paving, storm drain systems, storm culverts, private roadways and one wet pond storm water BMP device. This device will treat the entirety of the development to meet state and town requirements. As mentioned above, the site will include the construction of a stormwater BMP located at the topographically low point of the overall drainage shed. The development of the site must comply with the City of Indian Trail Stormwater Management Ordinance and therefore will provide stormwater quality and provide peak controls for stormwater runoff of the 2-, 10-, 25-, 50-, and 100-year storm events. The BMP chosen was a wet ponds to provide for both WQv and detention designed per the NCDEQ Stormwater BMP Manual. Runoff calculations were performed following the procedures outlined in the NCDEQ Stormwater BMP Manual and by the SCS method. The receiving drainage system for this site is an existing channel located along the eastern property line at the rear of the adjacent residential properties. This channel drains in a southerly direction and eventually ties into the Davis Mine Creek approximately 0.75 miles south of the site. Soils on the site consist o£ TuB: Tarrus-Urban land complex, 2 to 8% slopes TcB2:Tarrus gravelly silty clay loam, 2 to 8% slopes This soil is labeled as hydrologic soil group (HSG) "B" for the entire drainage shed. A USDA NRCS soils map and supporting information can be found in the Appendix A. 2.0 Water Quality Volume Control and Peak Flow Control Water Quality Volume and Release Rate calculations were performed as outlined in Appendix B. 3.0 Predeveloped Conditions Under existing conditions, the site is a mostly undeveloped property consisting primarily of brush and woods in good condition. A portion of the site is also made up of grassed field in good condition. The site was, at one time, utilized as a mobile home park but has since been cleared of any structures. A couple of gravel or asphalt drives remain, however. Patrick Place 6143-C-NC Stormwater Management Report May 24, 2022 The site consists of two main areas, one to the north and one to the south of the existing adjacent nursery property. Each portion of the site sits at a general highpoint and drains towards the property lines. The overall drainage, however, all makes its way to an existing channel located along the eastern property line and runs through the adjacent residential properties in that area. For this reason, we've counted the entire site as one pre -development drainage area since the entire site makes its way to the same channel. This channel drains in a southerly direction and eventually makes its way into the existing Davis Mine Creek, approximately 0.75 miles south of the site. The predevelopment drainage from the site was delineated as indicated on the Pre Development Drainage Area Map included in Appendix B. The pre -development time of concentration calculations utilize a combination of overland sheet flow and shallow concentrated flow to determine the longest possible scenarios with a minimum 5 minute time interval. These calculations are outlined in Appendix B. The Curve Number (CN) for the pre -development basins were computed as a combination of brush, woods and grass with some impervious. These calculations resulted in predevelopment CN's of 73 for PRE DA-A. A NRCS soil data table (Table 8.03e) from the NCDEQ Erosion and Sediment Control Planning and Design Manual depicting the soils designation for the site is included in Appendix A. 4.0 Post Developed Conditions The proposed development will include the construction of 148 single family attached homes, pavement and hardscape with associated site grading. DA-A will utilize one BMP within the drainage basin, near the topographical low point of the site, to provide the required water quality and detention volumes. This pond measures approximately 280' x 100' and contains a single forebay and outfall control structure. This pond will capture and treat the runoff from the entire developed site, both north and south portions, through the use of an underground storm drain system. This BMP will outfalls directly at the head of the channel mentioned in the outfall description of section 3.0. This devices is being utilized as the primary means of detention as well as water quality treatment. It has been modeled to mitigate the sites requirements for post development flow and water quality. Calculations in Appendix B (see Hydrograph Return Period Recap, Page 1) have been provided to show that the detention system is adequately sized for the 1-year, 2-year, 10-year, 25-year, 50-year, and 100-year 24-hour storm events. Any increase in peak flow in the bypass drainage sheds from Pre and Post development conditions has been accounted for with the over -detention of the flow from the development onsite within each wet pond. The composite Curve Numbers were calculated for each post developed basins and are summarized below. Post Development Area A: 86 Post Development Area A -Bypass: 67 See Post Development Drainage Area Map. A comparison of pre -developed, post -developed, and detained peak flows is shown below. The pre - development peak flow (Hyd. No. I) should be compared to its respective total post -development peak flow (Hyd. No. 5). This shows a reduction in peak flow rates from pre -developed to post -developed conditions utilizing the wet pond detention. This BMP has been oversized to account for the un-detained flows from the bypass drainage shed (Hyd. No. 4). Complete calculations including time of concentration and full hydrographs for the 1-year, 2-year, 10-year, 25-year, 50-year, and 100-year 24-hour storm events are included in Appendix B. Patrick Place Stormwater Management Report 6143-C-NC May 24, 2022 Hyd. No. Hydrograph type (origin) Inflow hydjsj Peak Outflow Ids) Hydrograph Description 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff --- 16.98 26.08 54.20 72.76 88.15 104.40 PRE-DEV A 2 SCS Runoff — 42.17 55.56 92.32 114.59 132.49 151.00 POST-DEV A 3 Reservoir 2 2.135 6.022 27.15 44.26 67.68 79.36 WET POND A 4 SCS Runoff — 2.597 4.499 10.61 14.74 18.30 22.11 POST-DEV A BYPASS 5 Combine 3,4 2.834 9.378 37.07 59.00 85.90 101.29 POST-DEV A TOTAL 5.0 Stormwater System The storm water system consists of proposed reinforced concrete pipes, ranging in size from 15" up to 36", conveying runoff to the proposed BMP through a combination of underground pipes and catch basins. HDPE pipes are also being utilized, primarily to convey the roof leaders from several of the single family homes and the "courtyard" type driveways to the main storm drain system or directly to the BMP. These pipe sizes range from 8" to 20". Adequate cover has been provided for all pipes and all pipes are proposed as class 3 or class 4 reinforced concrete pipe. The system has been modeled for a 10-year storm event for capacity and HGL. The results of the system have been provided in Appendix C. 6.0 Erosion Control Erosion control will be provided by utilizing temporary sediment basins, perimeter silt fence, temporary diversion ditch, and inlet protection where necessary. These mechanisms will be in place until the project is stabilized. Upon approval of the NCDEQ inspector, these mechanisms can be removed and the final storm drain measures can be put in place. Calculations for the sediment traps and sediment basins have been provided in Appendix D. Patrick Place Stormwater Management Report Appendix A Hydrologic Soils Map and Summary Report Curve Number Determinations 6143-C-NC May 24, 2022 � OU_ _ m. » _ 8 & m. a _ § OU_ _ � _ ` �- , -� 2-.IOE®- /} CD � �/ � § § § � § �\ �? /a )k r k �qk � �( g � � k § 2 2 f 2 \ Ln co §2 § 2 b j J R ® 7 \ R ; �© _cc \ & L §� CL ) z .iiiic )� _ ( z O Q O LL Ca C G z W 0 W J IL O O j O )N N O � 7 N � U O 0 00 O U O 01 U E C U a7 a7 07 CL a7 a7 N E W N C N w 01 a7 0 .L.. 0 C " N a) 0. 3 O y E L a) E N � > 'L d_ C > N a C�'DOL C N 0 a 7 cc d E U N E � w w E O a) Laa E c N i o o .— C N N fA d E rn a) c E (`a 7 CL N a) C w E Loy O .Ly ca ca U N a)) Vy y a) Co a) a) v y a) I N U 3 o N ao E E N a) U N O 7 c '0 r U O a) N a0 C Y a) U 0 E O C O LO =L ca N Q c N U ca NL N a) N C. y 7 N ca Ur- ._ O r r .: C O. a) N D @ ZQ U N a) :O L C -Lyp 0 U o E U w �m�00 U) m t 3�aso 0Lh E fO L o aoi 3 �� a tm 0 mD aE O f0n N N a) O 0 C v. a) y E a) a 7 N O y L o @ N a) E a) 7 y U 0 -0 U O `� N a) L a) a) CL fa Z N L N Q U C a) L a) O N N a) — L6 a) a3 O N 00 L .O C i p C a) N a) Z >' U L a3 f6 U Co O1 O y C idca N@ Q❑ a) ca 0) a3 E O N O "O 7 CL 0 "O Co a) >,E i=a2i .Ly. EdccoD0 E 0" g mo a) o.myE a) 7 y O C U% 'O O O U y f6 U 2> 7 >+ a) O _ N O L t.+ N L' 0) a) a) ` 7 L O C CL a) a) 7 O. N y N '0 j E O '0 O Y N a) C O O. 0) ._ Ep a) a) a E 0 0 0 m�U a) 0 y L U i avQ a) t w H o U) U) 4n m— a3 O 0m co L r H 00. N m m m N c 3 L O @ 0. @ N o w E N m a)w o LD a 2 O a @ @ W O L� Q O f0 Co 0 0 0 Z CZo - 7 i v Q ❑ ❑ ❑ ❑ m UZ 0 c � Y I c 3 � m A? .0s a? CO CO CO CO y O O C C O N c O O _ C 0 OI N U) N .. Q O T N al �p C W d a 0 0 0 YO C J 0 0 0 YO a 0 0 LD a a m m U 0 z cma a m m U 0 z IM a m m �a + s❑❑❑❑ to Ns❑❑❑❑❑❑❑❑off d 0 47 47 47 Q y N �a 0 O O N N O N L� n a a) Z 7 U) 0 z 0 g Hydrologic Soil Group —Union County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI ScA Secrest-Cid complex, 0 C 1.1 1.2% to 3 percent slopes TbB2 Tarrus gravelly silty clay B 21.8 23.9% loam, 2 to 8 percent slopes, moderately eroded TbC2 Tarrus gravelly silty clay B 5.8 6.4% loam, 8 to 15 percent slopes, moderately eroded TuB Tarrus-Urban land B 61.0 66.8% complex, 2 to 8 percent slopes W Water 1.6 1.7% Totals for Area of Interest 91.3 100.0% USDA Natural Resources Web Soil Survey 7/30/2021 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Union County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method. Dominant Condition Component Percent Cutoff. None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 7/30/2021 Conservation Service National Cooperative Soil Survey Page 4 of 4 4/15/22, 11:33 AM Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 ' Location name: Matthews, North Carolina, USA* Al Latitude: 35.060, Longitude:-80.6980 T Elevation: 699.82 ft* ' source: ESRI Maps "source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parcybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 0.415 0.490 0.569 0.627 0.692 0.738 0.779 0.815 0.857 0.886 5-min (0.383-0.450) (0.452-0.534) (0.523-0.619) (0.575-0.680) (0.633-0.750) (0.670-0.798) (0.705-0.843) (0.734-0.883) (0.765-0.930) (0.785-0.963) 0.663 0.784 0.912 1.00 1.10 1.18 1.24 1.29 1.36 1.40 10-min (0.612-0.719) (0.722-0.853) (0.838-0.992) (0.920-1.09) 11 (1.01-1.20) 1 (1.07-1.27) 1 (1.12-1.34) 1 (1.16-1.40) 1 (1.21-1.47) 1 (1.24-1.52) 1. 1. 15-min 0.765-0 899 0. 08--1.07 1.06 1525 1. 621738 1.2841051 1.3541961 1.42--1669 1.47-61377 1.527.85 1.557590 1.14F 1.36 1.64 1.84 2.07 2.24 2.40 2.54 2.71 2.84 30-min 1 (1.25-1.48) (1.51-1.78) (1.69-1.99) (1.89-2.24) (2.04-2.42) (2.17-2.59) (2.29-2.75) (2.42-2.95) (2.51-3.08) 1.42 1.71 2.10 2.39 2.76 3.04 3.30 3.56 3.89 4.14 60-min (1.31-1.54) (1.57-1.86) (1.93-2.29) (2.19-2.60) (2.52-2.99) (2.76-3.29) (2.99-3.57) (3.21-3.86) (3.48-4.22) (3.67-4.50) 1.64 1.99 2.46 2.82 3.29 3.64 4.00 4.35 4.81 5.16 2-hr (1 .50-1.79) (1.82-2.17) (2.25-2.69) (2.57-3.08) (2.99-3.59) (3.30-3.97) (3.60-4.36) (3.89-4.74) (4.25-5.25) (4.52-5.64) 1.74 2.10 2.62 3.03 3.57 4.00 4.43 4.88 5.49 5.97 3-hr 1 (1.93-2.31) (2.40-2.88) (2.76-3.31) (3.23-3.90) (3.61-4.37) (3.97-4.83) (4.33-5.32) (4.81-5.99) (5.17-6.51) 2.09 2.52 3.15 3.65 4.32 4.85 5.40 5.96 6.74 7.35 6-hr (1.92-2.30) (2.32-2.77) (2.89-3.46) (3.33-3.99) (3.92-4.70) (4.37-5.28) (4.83-5.87) (5.28-6.48) (5.89-7.32) (6.35-8.00) 2.48 2.99 3.75 4.36 5.20 5.88 6.58 7.32 8.36 9.20 12-hr (2.27-2.71) (2.75-3.29) (3.44-4.11) (3.98-4.77) (4.71-5.67) (5.28-6.40) (5.86-7.16) (6.45-7.95 ) ( 7.25-9.07 ) ( 7.87-9.99) 2.92 3.52 4.43 5.14 6.12 6.91 7.73 8.57 9.75 10.7 24-hr (2.71-3.16) (3.27-3.82) (4.10-4.79) (4.75-5.56) (5.64-6.62) (6.35-7.47) (7.07-8.36) (7.81-9.28) (8.84-10.6) (9.64-11.6) 3.44 4.14 5.17 5.98 7.09 7.98 8.90 9.85 11.2 12.2 2-day (3.19-3.72) (3.84-4.49) (4.78-5.59) (5.52-6.47) (6.53-7.67) (7.33-8.63) (8.14-9.64) (8.98-10.7) (10.1-12.1) (11.0-13.3) 3-day 3.65 (3.38-3.93) 4.38 (4.07-4.73) 5.43 6.27 7.42 1 (6.84-8.01) 8.34 (7.67-9.01) 9.29 (8.52-10.0) 10.3 (9.39-11.1) 11.6 (10.6-12.6) 12.7 (11.5-13.8) 4-day 3.85 (3.58-4.15) 4.62 (4.30-4.98) 5.70 (5.30-6.15) 6.56 (6.08-7.07) 7.75 (7.16-8.36) 8.71 (8.02-9.39) 9.68 (8.89-10.5) 10.7 (9.79-11.6) 12.1 (11.0-13.1) 13.3 (12.0-14.4) 4.46 5.31 6.48 7.40 8.68 9.71 10.8 11.8 13.4 14.6 7-day (4.17-4.77) (4.97-5.69) (6.06-6.94) (6.91-7.92) (8.07-9.30) (9.00-10.4) (9.95-11.5) (10.9-12.7) (12.3-14.4) (13.3-15.7) 5.10 6.07 7.31 8.27 9.59 10.6 11.7 12.7 14.2 15.4 10-day (4.79-5 45) (5.69-6.49) 1 (8.93-10.2) (9.87-11.4) (10.8-12.5) (11.8-13.6) (13.1-15.2) (14.1-16.5) 6.83 8.05 9.51 10.7 12.2 13.4 14.7 15.9 17.6 19.0 20-day (6.43-7.26) (7.59-8.57) (8.95-10.1) (10.0-11.3) (11.5-13.0) (12.6-14.3) (13.7-15.6) (14.8-17.0) (16.4-18.8) (17.5-20.3) 30-day 7- 7 91 8787 9.31-610.4 1 .8- 2.1 12.0- 3.5 1315- 5.2 14 6.6 15.8-1�7.9 17.0-19.3 1815-21.1 19 6122.5 10.5 12.3 14.1 15.5 17.3 18.6 19.9 21.2 22.9 24.2 45-day (100-11.1) 1(11.7-13.0) (13.4-14.8) (14.7-16.3) (16.4-18.1) (17.6-19.6) (18.8-20.9) (20.0-22.3) (21.5-24.1) (22.6-25.5) 12.5 14.6 16.5 18.0 20.0 21.4 22.8 24.1 25.9 27.2 60-day (120-13.1) (14.0-15.3) (15.8-17.3) (17.2-18.9) (19.0-20.9) (20.3-22.4) (21.6-23.9) (22.8-25.3) (24.4-27.2) (25.6-28.6) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc. nws.noaa.gov/hdsctpfds/pfds_printpage.html?lat=35.0600&Ion=-80.698O&data=depth&units=english&series=pds 1 /4 4/15/22, 11:33 AM Precipitation Frequency Data Server MIS] 25 C t 20 4- a Ul U 0 15 49 ,a 10 a y 30 25 c L 20 41 L1 a 15 49 'a �, 10 C' rz PDS-based depth -duration -frequency (DDF) curves Latitude_ 35.0600', Longitude:-80.6980° - ---l---L-----L-----J-----J----------------------L-----L-----J----- ................... N A tb Ly A -? �{ -Y -Y -Y -Y -Y La•5 O La1 O O L—I C'V A q r, O O O Ln O L� ri rn Lp rl N rn ITLG Duration 0 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAAAtla,3 14, Volume 2, Version 3 Created fGMTY Fri Apr 15 15:34-00 2022 Back to Top Maps & aerials Small scale terrain Average recurrence interval f years} — 1 2 — 5 — 10 — 25 50 100 200 500 1000 Duration — 5-min — 2-day — 1D-min — 3-day 15-min — 4-day — 30anin — 7-day — 60-min — 1"ay — 2-hr — 20-day — 3fir — 30-day — "r — 45-day — 12-hr — 60-day - 24-hr https://hdsc.nws.noaa.gov/hdsctpfds/pfds_printpage.html?lat=35.0600&Ion=-80.698O&data=depth&units=english&series=pds 2/4 4/15/22, 11:33 AM Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Matthews, North Carolina, USA* ' Latitude: 35.06*, Longitude:-80.6980 Elevation: 699.82 ft** 1 ' source: ESRI Maps " source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parcybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 4.98 (4 .60-5.40) 5.88 (5.42-6.41) 6.83 (6.28-7.43) 7.52 (6.90-8.16) 8.30 (7.60-9.00) 8.86 (8.04-9.58) 9.35 (8.46-10.1) 9.78 (8.81-10.6) 10.3 (9.18-11.2) 10.6 (9.42-11.6) 3.98 4.70 5.47 6.02 6.62 7.05 7.43 7.76 8.13 8.37 10-min (3.67-4.31) (4.33-5.12) (5.03-5.95) (5.52-6.52) (6.05-7.17) (6.41-7.63) (6.72-8.03) (6.98-8.40 ) ( 7.25-8.82 ) ( 7.41-9.10) 3.31 3.94 4.61 5.07 5.59 5.95 6.26 6.52 6.82 7.00 15-min (3.06-3.60) (3.63-4.29) (4.24-5.02) (4.65-5.50) (5.11-6.06) (5.41-6.44) (5.66-6.77) (5.87-7.07) (6.09-7.40) (6.20-7.62) 2.27 2.72 3.28 3.68 4.14 4.48 4.79 5.08 5.43 5.67 30-min (2.10-2.47) (2.51-2.96) (3.01-3.56) (3.37-3.99) (3.79-4.49) (4.074.85) (4.34-5.19) (4.57-5.50) (4.84-5.89) (5.02-6.17) 1.42 1.71 2.10 2.39 2.76 3.04 3.30 3.56 3.89 4.14 60-min (1 .31-1.54) (1.57-1.86) (1.93-2.29) (2.19-2.60) (2.52-2.99) (2.76-3.29) (2.99-3.57) (3.21-3.86) (3.484.22) (3.67-4.50) 0.820 0.992 1.23 1.41 1.64 1.82 2.00 2.17 2.40 2.58 2-hr (0.752-0.896) (0.909-1.09) 1 (1.12-1.35) 1 (1.29-1.54) 11 (1.49-1.79) 1 (1.65-1.98) 1 (1.80-2.18) 11 (1.94-2.37) (2.13-2.62) (2.26-2.82) 0.580 0.700 0.874 1.01 1.19 1.33 1.48 1.63 1.83 1.99 3-hr (0.531-0.637) (0.641-0.770) (0.798-0.959) (0.918-1.10) (1.08-1.30) 1 (1.20-1.45) 1 (1.32-1.61) 11 (1.44-1.77) 1 (1.60-1.99) 1 (1.72-2.17) 0.350 0.422 0.526 0.609 0.721 0.810 0.901 0.995 1.13 1.23 6-hr (0.321-0.384) (0.387-0.463) (0.482-0.577) (0.556-0.666) (0.654-0.786) (0.730-0.882) (0.806-0.980) (0.882-1.08) (0.984-1.22) (1.06-1.34) 12-hr 0.189-0 225 0.228-0 273 0.285-0.341 0.330-0.396 0.391---0 471 0.439-0 531 0.487---0 594 0.535-0 660 0.601---0753 0.653-0 829 0.122 0.147 0.184 0.214 0.255 0.288 0.322 0.357 0.406 0.445 24-hr (0.113-0.132) (0.136-0.159) (0.171-0.200) (0.198-0.232) (0.235-0.276) (0.264-0.311) (0.295-0.348) (0.326-0.387) (0.368-0.440) (0.402-0.483) 0.072 0.086 0.108 0.125 0.148 0.166 0.185 0.205 0.233 0.255 2iiay (0.066-0.077) (0.080-0.093) (0.100-0.117) (0.115-0.135) (0.136-0.160) (0.153-0.180) (0.170-0.201) (0.187-0.223) (0.211-0.253) (0.230-0.277) 0.051 0.061 0.075 0.087 0.103 0.116 0.129 0.143 0.162 0.177 3�iay (0.047-0.055) (0.057-0.066) (0.070-0.082) (0.081-0.094) (0.095-0.111) (0.107-0.125) ( 0.118-0.140) ( 0.130-0.154) ( 0.147-0.175) ( 0.160-0.192) 0.040 0.048 0.059 0.068 0.081 0.091 0.101 0.111 0.126 0.138 aiiay (0.037-0.043) (0.045-0.052) (0.055-0.064) (0.063-0.074) (0.075-0.087) (0.083-0.098) (0.093-0.109) (0.102-0.120) (0.115-0.137) (0.125-0.150) 7iiay 0.025-0 028 0. 30-0 034 0. 36-0 041 0.041- 047 0.048-0 055 0.054-0 062 0.059-0 069 0. 65-0 076 0.073-0 086 0.079-0 094 0.021 0.025 0.030 0.034 0.040 0.044 0.049 0.053 0.059 0.064 10-day (0.020-0.023) (0.024-0.027) (0.028-0.033) (0.032-0.037) (0.037-0.043) (0.041-0.047) (0.045-0.052) (0.049-0.057) (0.054-0.063) (0.059-0.069) 0.014 0.017 0.020 0.022 0.025 0.028 0.031 0.033 0.037 0.040 20-day (0.013-0.015) (0.016-0.018) (0.019-0.021) (0.021-0.024) (0.024-0.027) (0.026-0.030) (0.029-0.033) (0.031-0.035) (0.034-0.039) (0.037-0.042) 0.012 0. 114 0.016 0.018 0. 220 0.022 0.023 0. 225 0.027 0.029 30-day (0.011-0.012) (0.013-0.014) (0.015-0.017) (0.017-0.019) (0.019-0.021) (0.020-0.023) (0.022-0.025) (0.024-0.027) (0.026-0.029) (0.027-0.031) 0.010 0. 111 0.013 0.014 0. 116 0.017 0.018 0. 220 0.021 0.022 45-day (0.009-0.010) (0.011-0.012) (0.012-0.014) (0.014-0.015) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.019-0.021) (0.020-0.022) (0.021-0.024) 60-day 0. 08-0 009 0.010-0 011 0.01100.012 0.01 -0 013 0.013-0 015 0.014-0 016 0.015-0 017 0.016-0 018 0.017--0 019 0.018-0 020 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsctpfds/pfds_printpage.html?lat=35.0600&Ion=-80.698O&data=intensity&units=english&series=pds 1/4 4/15/22, 11:33 AM Precipitation Frequency Data Server PDS-based intensity -duration -frequency (IDF) curves Latitude: 35.06001, Longitude:-80.69801 100.000 ° 0.100 CL a 0.010 T I I I I I I I I --- --- - 0.001 • E t t s t t Ap i i ,�y O O 'i 11 Duration 0.100 9- a 0.010 ---- -- -- --------- ---- - --- .------. - ...... 0.001 1 I I I I I I I I 1 2 5 10 25 50 100 200 500 1000 Average (recurrence interval (years) NOAA Atlas 14, Volume 2, Version 3 Created (GMT): Fri Apr 15 15:34:38 2022 Back to Top Maps & aerials Small scale terrain Average recurrence interval {years} — 1 2 — 5 — 1a 25 50 100 200 500 1000 Duration — 5-min — 2-day — 10-min — 3-day 15-min — 4-day — 30-min — 7-day — 60-min — 10-day — 2-hr — 20-day — 3-hr — 30-day — 6-hr — 45-day — 12-hr — 60-day — 24^hr https://hdsc.nws.noaa.gov/hdsctpfds/pfds_printpage.html?lat=35.0600&Ion=-80.698O&data=intensity&units=english&series=pds 2/4 4/15/22, 11:33 AM Precipitation Frequency Data Server 4 h)(liar I 3km 2mi Large scale terrain .- - ,. ,s * +; 15Qn C11LY Ylinstan Salem �y Greensboro • :4 (} lAt Kitchell Ra *Asheville NORTH C.ROLINA dhar Otte _ ■� Fayette Ale Greenville SOUTH CAROLINA 100km * rr olumbia 60mi f� I 11W Large scale map oaupi.s.fiy l 100km Omi ston-Slalem Greensboro e rh al l� North Carolina Irk . f{ \) 0 mbin iouth Large scale aerial Fayett 0 https://hdsc.nws.noaa.gov/hdsctpfds/pfds_printpage.htmI?Iat=35.0600&Ion=-80.6980&data=intensity&units=engIish&series=pds 3/4 4/15/22, 11:33 AM Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsctpfds/pfds_printpage.html?lat=35.0600&Ion=-80.698O&data=intensity&units=english&series=pds 4/4 Appendices Table 8.03e Runoff curve numbers of urban areas' Curve number for ---------------------------------------Cover Description----------------------------------hydrollogic soil group-------- Cover type and hydrologic condition Average percent A F B C D impervious area Fully developed urban areas (vegetation established) Open space (lawns, parks, golf courses, cemeteries, Poor condition (grass cover < 50%) ................. Fair condition (grass cover 50% to 75%) .......... Good condition (grass cover > 75%) ................ Impervious areas: Paved parking lots, roofs, driveways, etc. (excluding right-of-way) ................................... Streets and roads: Paved; curbs and storm sewers (excluding right -of -way) ...................................................... Paved; open ditches (including right-of-way) .... Gravel (including right-of-way) .......................... Dirt (including right-of-way) ............................... Urban districts: Commercial and business .................................... Industrial............................................................... Residential districts by average lot size: 1/8 acre or less (town houses) ............................. 1/4 acre................................................................. 1/3 acre................................................................. 1/2 acre................................................................. 1 acre.................................................................... 2 acres.................................................................. Developing urban areas Newly graded areas (pervious areas only, no vegetation) 4 ................... Idle lands (CN's are determined using cover types similar to those in table 2-2c). 3• 98 98 98 98 83 89 92 93 76 85 89 91 72 82 87 89 85 89 92 94 95 72 81 88 91 93 65 77 85 90 92 38 61 75 83 87 30 57 72 81 86 25 54 70 80 85 20 51 68 79 84 12 46 165 1 77 82 77 86 91 94 1. Average runoff condition, and la = 0.2S. 2. The average percent impervious area shown was used to develop the composite CN's. Other assumptions are as follows: impervious areas are directly connected to the drainage system, impervious areas have a CN of 98, and pervious areas are considered equivalent to open space in good hydrologic condition. CN's for other combinations of conditions may be computed using Figure 8.03c or 8.03d. 3. CN's shown are equivalent to those of pasture. Composite CN's may be computed for other combinations of open space cover type. 4. Composite CN's to use for the design of temporary measures during grading and construction should be computed using Figure 8.03c or 8.03d based on the degree of development (impervious area percentage) and the CN's for the newly graded pervious areas. Rev. 6ro6 8.03.17 Appendices Table 8.03g Runoff curve numbers for other agriculture lands' ---------------------------Cover description ------------------------------- HydrologicCover type conditions' Curve numbers for --------------hydrologic soil groups A B C ----------- D Pasture, grassland, or range— Poor 68 79 86 89 continuous forage for grazing. 2 Fair 49 69 79 84 Good 39 61 74 80 Meadow —continuous grass, protected — 30 58 71 78 from grazing and generally mowed for hay. Brush —brush -weed -grass mixture with Poor 48 67 77 83 brush the major element.' Fair 35 56 70 77 Good 304 48 65 73 Woods —grass combination (orchard or Poor 57 73 82 86 tree farm). 5 Fair 43 65 76 82 Good 32 58 72 79 Woods .6 Poor 45 66 77 83 Fair 36 60 73 79 Good 304 55 70 77 Farmsteads —buildings, lanes, — 59 74 82 86 driveways, and surrounding lots. 1 Average runoff condition, and la= 0.2S. 2 Poor. <50% ground cover or heavily grazed with no mulch. Fair: 50 to 75% ground cover and not heavily grazed. Good: > 75% ground cover and lightly or only occasionally grazed. 3 Poor. <50% ground cover. Fair: 50 to 75% ground cover. Good: >75% ground cover. 4 Actual curve number is less than 30; use CN = 30 for runoff computations. 5 CN's shown were computed for areas with 50% woods and 50% grass (pasture) cover. Other combinations of conditions may be computed from the CN's for woods and pasture. 6 Poor. Forest litter, small trees, and brush are destroyed by heavy grazing or regular burning. Fair: Woods are grazed but not burned, and some forest litter covers the soil. Good: Woods are protected from grazing, and litter and brush adequately cover the soil. Rev. 6ro6 8.03.19 Patrick Place Stormwater Management Report 6143-C-NC May 24, 2022 Appendix B Pre -Development Drainage Area Map Post -Development Drainage Area Map Water Quality Volume (WQv) and Peak Flow Calculations (I-inchrainfall) Stormwater Hydrographs (1-yr, 2-yr, 10-yr, 25-yr, 50-yr, and 100-yr 24-hr) ' °""fie,"'"'" bOlBZ ON 'M3H11HW zzaraa a(oo e emez om i. a yaw 021213110d S195 Lu OO -7388VH�0 a aceo-� s asny�n waia C) dHW V38V 30VNIH8O Ul 11b231 NHIONI 1N3WdO 73A30-3ai l D: 9 N1833 N19 N3 319tl3 3Ob'Id NDiH-Lvd 0- z°°j6�""'" bOlBZ ON 'M3H11HW aaraaa (tsU � smez om Lei eai Oa a3110d S195 _ lyj „.any a,,e,.en nE�oz 00 -7388HN O a asao-� sasny�n waia dHW V38V 30VAJIV80 llHal NHIONI 1N31IVd013A30-1s0d 30b'1d N01a1Vd 9 N1833 N19 N3 319tl3 0- _ l 1 � i � 2 V 4 Wet Detention Pond EN G I NEE RL N G PROJECT: Patrick Place CLIENT: Dean Harrell PROD. #: 6143 DATE: 4/15/2022 2013A Van Buren Avenue PHASE: POND A DESIGN BY: SAP Indian Trail, NC 28079 Wet Detention Pond - NCDEQ BMP Manual Calculate Water Quality Volume Water Quality Volume (WQV) based upon the first inch of rainfall. Drainage Area (A) = 686,122 Ft 15.75 ac New Impervious Area = 464,541 Ft 10.66 ac Impervious Fraction (IA) = 0.68 68 % Rv = 0.05+0.9(IA) = 0.66 Runoff Coefficient Water Quality Volume Required (WQV) = 37,699 ft 3 Where: WQV = 3630 * Rp * Rv * A Rainfall Depth (RD) = 1.0 in. Runoff Coefficient (Rv) = 0.66 unitless Watershed Area (A) = 15.75 ac. WQV Elev. = 694.25 WQV provided = �ft3 OK Permanent Pool Average Deptl da = [Vperm_pool] / [Aperi Area at bottom of shelf = Area at perm. Pool = Area at bottom of pond = Depth to bottom of shelf = Volume of perm. Pool= Percent Impervious Cover = SA/DA Ratio = Surface Area Req'd (SA) _ Surface Area Provided = Average Length = Average Width = Length to Width Ratio = WQV Volume Calculation 692 14,958 0 0 693 18,455 16,707 16,707 694 20,681 19,568 36,275 694.25 21,252 5,242 41,516 Length, Width (Area), Depth, Geometry i (dj F 5.1 I_pool] 12,196 Abot shelf (ftz) 12,196 Aperm_pool (ftz) 6,763 Abot_pond (ft2) ft 5.0 ft. (rounded down) Main Pool Volume Calculation Contour Area Volume Net Vol 685 5,994 0 0 686 6,763 6,379 6,379 687 7,576 7,170 13,548 688 8,431 1 8,004 21,552 689 9,327 8,879 30,431 690 10,255 9,791 40,222 691 11,212 10,734 50,955 692 12,196 11,704 1 62,659 6.00 Depth (ft) 62,659 ft 3 68 % 1.73 % 11,862 ftz ftz 135 ft 35 ft 3.9 :1 -based on assumed bottom, add 1'to design pond bottom to provide add'I sediment ctoraae SA/DA Ration for Perm. Pool Sizing % Imp. Cover Perm. Pool Avg Depth (ft) 4.5 5.0 5.5 60 70 80 Values trom Table: 1 (NCDEQ Stormwater Design Manual - Section C-3) Region: Piedmont Efficiency: 90 % EEI Project No. 6700 Wet Detention Pond Page 1 WQV Outlet Device Orifice diameter= 2.5 in. Orifice inv. Elev. = 692.00 Orifice Equation: Q = Cp A (2g(Ho/3))o.s 2-day Avg Discharge (Q2J = 0.2403 cfs (max.) Days to Discharge WQV 3.46 5-day Avg Discharge (Qv) = 0.0961 cfs (min.) OK Average Discharge (Q) = -cfs (provided) Discharge Coefficient (CD) = 0.60 Ho = Driving Head (ft), measured from the centroid X-sect area of orifice (A) = 0.0341 ft2 of the orifice area to the water surface Accel. due to gravity (g) = 32.2 ft/seC Avg. driving head (Ho) = 0.7153 ft Note: Use Ho/3 to compute drawdown to reflect the fact that head is decreasing as drawdown occurs Forebay Vol. Required(min.): 9,399 ft3 (15% main pool) Approx. Area Required: 2,350 ftZ Vol. Provided: 9,693 ft3 OK Area Provided: 2,762 ftz OK Design Percentage of Main Pond 15% OK (15-20% Req'd) The area and volume values shown above are the sum of all forebays for this pond. EEI Project No. 6700 Wet Detention Pond Forebay Volume Calculation Contour Area Volume Net Vol 686 606 0 0 687 906 756 756 688 1230 1,068 1,824 689 1578 1,404 3,228 690 1950 1,764 4,992 691 2345 2,148 7,140 692 2762 2,554 9,693 Page 2 EN61NEERING # 2413-A. Van Buren .Avenue Indian Trail. NG 28079 (704.) 882-4222 Riser Buoyancy Calculations - Wet Pond A Project Name: PATRICK PLACE Project No.: 6143 BMP Description: Wet Pond -A 1 ft. Spillway Height 698 ft. Spillway Elev. Riser Width: 60 in Riser Thickness: 6 in 697 ft. Riser Weir Barrel Size: 24 in Top of Basin: 699.00 ft. Bottom of Basin 692 ft. 5 ft. Riser Weir: 697.00 ft. Spillway Height from top of Basin: 1 ft. 692 ft. Bottom of Basin Unit wt. of H201 62.4 ft3 Volume of Riserl 175 1 ft3 Wt. of H2O displaced in riserl 10,920 Ibs Unit Wt. of concrete (pcf) 150 Ibs/ft3 Volume of concrete in riser 33.25 ft3 Wt. of concrete riser 4,988 Ibs Total Buoyancy Force to displace 15,908 Ibs Concrete Base Required to Stabilize Riser: Concrete Pad Thinckness 24 in. Concrete Pad Width/length 8 ft Volume of concrete pad 128.00 ft3 Wt. of H2O displaced = 7,987 Ibs Wt. of concrete pad 19,200 Ibs Factor of Safety: 1 1.207 1OK Factor of safety should be greater than 1.10 60 in. RISER Ballast Pad 699 ft. Top of Basin 24 in. RCP Wt. of H2O displaced in riser + Wt. of concrete riser 60 in. RISER Ballast Pad —� 24 in. — 8 ft. Ballast Pad Dimensions: 8 ft. X 8 ft. X 24 in. Hydraflow Table of Contents 6143_Wet Pond Hydrographs.gpw Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Watershed Model Schematic...................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 -Year SummaryReport......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, PRE-DEV A.......................................................................... 4 TR-55 Tc Worksheet........................................................................................................... 5 Hydrograph No. 2, SCS Runoff, POST-DEV A........................................................................ 6 Hydrograph No. 3, Reservoir, WET POND A.......................................................................... 7 Pond Report - WET POND A.............................................................................................. 8 Hydrograph No. 4, SCS Runoff, POST-DEV A BYPASS......................................................... 9 TR-55 Tc Worksheet......................................................................................................... 10 Hydrograph No. 5, Combine, POST-DEV A TOTAL.............................................................. 11 2 - Year SummaryReport....................................................................................................................... 12 HydrographReports................................................................................................................. 13 Hydrograph No. 1, SCS Runoff, PRE-DEV A........................................................................ 13 Hydrograph No. 2, SCS Runoff, POST-DEV A...................................................................... 14 Hydrograph No. 3, Reservoir, WET POND A........................................................................ 15 Hydrograph No. 4, SCS Runoff, POST-DEV A BYPASS ....................................................... 16 Hydrograph No. 5, Combine, POST-DEV A TOTAL.............................................................. 17 10 - Year SummaryReport....................................................................................................................... 18 HydrographReports................................................................................................................. 19 Hydrograph No. 1, SCS Runoff, PRE-DEV A........................................................................ 19 Hydrograph No. 2, SCS Runoff, POST-DEV A...................................................................... 20 Hydrograph No. 3, Reservoir, WET POND A........................................................................ 21 Hydrograph No. 4, SCS Runoff, POST-DEV A BYPASS ....................................................... 22 Hydrograph No. 5, Combine, POST-DEV A TOTAL.............................................................. 23 25 - Year SummaryReport....................................................................................................................... 24 HydrographReports................................................................................................................. 25 Hydrograph No. 1, SCS Runoff, PRE-DEV A........................................................................ 25 Hydrograph No. 2, SCS Runoff, POST-DEV A...................................................................... 26 Hydrograph No. 3, Reservoir, WET POND A........................................................................ 27 Hydrograph No. 4, SCS Runoff, POST-DEV A BYPASS ....................................................... 28 Hydrograph No. 5, Combine, POST-DEV A TOTAL.............................................................. 29 50 - Year SummaryReport....................................................................................................................... 30 HydrographReports................................................................................................................. 31 Hydrograph No. 1, SCS Runoff, PRE-DEV A........................................................................ 31 Hydrograph No. 2, SCS Runoff, POST-DEV A...................................................................... 32 Contents continued... 6143_Wet Pond Hydrographs.gpw Hydrograph No. 3, Reservoir, WET POND A........................................................................ 33 Hydrograph No. 4, SCS Runoff, POST-DEV A BYPASS ....................................................... 34 Hydrograph No. 5, Combine, POST-DEV A TOTAL.............................................................. 35 100 - Year SummaryReport....................................................................................................................... 36 HydrographReports................................................................................................................. 37 Hydrograph No. 1, SCS Runoff, PRE-DEV A........................................................................ 37 Hydrograph No. 2, SCS Runoff, POST-DEV A...................................................................... 38 Hydrograph No. 3, Reservoir, WET POND A........................................................................ 39 Hydrograph No. 4, SCS Runoff, POST-DEV A BYPASS ....................................................... 40 Hydrograph No. 5, Combine, POST-DEV A TOTAL.............................................................. 41 OFReport.................................................................................................................. 42 Watershed Model Schematic Hydraflow Hydrographs Extension forAutodesk® Civil 3D® by Autodesk, Inc. v2022 1 2 4 5 Project: 6143_Wet Pond Hydrographs.gpw Wednesday, 05 / 25 / 2022 Hydrograph Return Period Recap draflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 16.98 26.08 ------- ------- 54.20 72.76 88.15 104.40 PRE-DEV A 2 SCS Runoff ------ 42.17 55.56 ------- ------- 92.32 114.59 132.49 151.00 POST-DEV A 3 Reservoir 2 2.135 6.022 ------- ------- 27.15 44.26 67.68 79.36 WET POND A 4 SCS Runoff ------ 2.597 4.499 ------- ------- 10.61 14.74 18.30 22.11 POST-DEV A BYPASS 5 Combine 3,4 2.834 9.378 ------- ------- 37.07 59.00 85.90 101.29 POST-DEV A TOTAL Proj. file: 6143_Wet Pond Hydrographs.gpw Wednesday, 05 / 25 / 2022 Hydrograph Summary Report HydraflowHydrographsExtension for Autodesk®Civil 3DObyAutodesk,Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 16.98 2 726 57,764 ------ ------ ------ PRE-DEV A 2 SCS Runoff 42.17 2 716 85,445 ------ ------ ------ POST-DEV A 3 Reservoir 2.135 2 782 82,043 2 694.62 49,731 WET POND A 4 SCS Runoff 2.597 2 722 8,029 ------ ------ ------ POST-DEV A BYPASS 5 Combine 2.834 2 722 90,071 3,4 ------ ------ POST-DEV A TOTAL 6143_Wet Pond Hydrographs.gpw Return Period: 1 Year Wednesday, 05 / 25 / 2022 Hydrograph Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 PRE-DEV A Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 19.680 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 2.92 in Storm duration = 24 hrs Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Wednesday, 05 / = 16.98 cfs = 12.10 hrs = 57,764 cuft = 73* = 0 ft = 19.60 min = Type II = 484 25 / 2022 Composite (Area/CN) _ [(4.750 x 55) + (0.900 x 98) + (1.190 x 61) + (12.840 x 79)] / 19.680 PRE-DEV A Q (Cfs) Hyd. No. 1 -- 1 Year Q (Cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 0.00 0 2 4 6 8 10 12 14 Hyd No. 1 3.00 - 0.00 16 18 20 22 24 26 Time (hrs) 5 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 PRE-DEV A Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.52 0.00 0.00 Land slope (%) = 3.60 0.00 0.00 Travel Time (min) = 17.78 + 0.00 + 0.00 = 17.78 Shallow Concentrated Flow Flow length (ft) = 355.00 0.00 0.00 Watercourse slope (%) = 4.00 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =3.23 0.00 0.00 Travel Time (min) = 1.83 + 0.00 + 0.00 = 1.83 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.000 0.000 0.000 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 19.60 min 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 2 POST-DEV A Hydrograph type = SCS Runoff Peak discharge = 42.17 cfs Storm frequency = 1 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 85,445 cuft Drainage area = 15.750 ac Curve number = 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.92 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(10.660 x 98) + (5.090 x 61)] / 15.750 Q (cfs) 50.00 40.00 30.00 10.00 0.00 ' ' 0 2 4 Hyd No. 2 POST-DEV A Hyd. No. 2 -- 1 Year 6 8 10 12 14 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 16 18 20 22 24 Time (hrs) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 3 WET POND A Hydrograph type = Reservoir Peak discharge = 2.135 cfs Storm frequency = 1 yrs Time to peak = 13.03 hrs Time interval = 2 min Hyd. volume = 82,043 cuft Inflow hyd. No. = 2 - POST-DEV A Max. Elevation = 694.62 ft Reservoir name = WET POND A Max. Storage = 49,731 cuft Storage Indication method used. Q (cfs) 50.00 30.00 20.00 10.00 e WET POND A Hyd. No. 3 -- 1 Year 10 20 30 40 Hyd No. 3 Hyd No. 2 50 60 70 80 90 Total storage used = 49,731 cuft Q (cfs) 50.00 Ee le 30.00 20.00 10.00 1 0.00 100 Time (hrs) Pond Report 0 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Pond No. 1 - WET POND A Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 692.00 ft Stage / Storage Table Stage (ft) Elevation (ft) 0.00 692.00 1.00 693.00 2.00 694.00 2.25 694.25 3.00 695.00 4.00 696.00 5.00 697.00 6.00 698.00 7.00 699.00 Culvert / Orifice Structures [A] Rise (in) = 30.00 Span (in) = 30.00 No. Barrels = 1 Invert El. (ft) = 685.00 Length (ft) = 58.30 Slope (%) = 0.50 N-Value = .013 Orifice Coeff. = 0.60 Multi -Stage = n/a Wednesday, 05 / 25 / 2022 Contour area (sgft) Incr. Storage (cult) Total storage (cult) 14,958 0 0 18,455 16,674 16,674 20,681 19,555 36,230 21,252 5,241 41,471 23,443 16,752 58,223 24,366 23,901 82,124 25,298 24,828 106,952 26,239 25,764 132,716 27,189 26,710 159,426 Weir Structures [B] [C] [PrfRsr] [A] [B] [C] [D] 2.50 0.00 0.00 Crest Len (ft) = 10.00 2.50 20.00 0.00 2.50 0.00 0.00 Crest El. (ft) = 697.00 694.25 698.00 0.00 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 692.00 0.00 0.00 Weir Type = 1 Rect Ciplti --- 0.00 0.00 0.00 Multi -Stage = Yes Yes No No 0.00 0.00 n/a .013 .013 n/a 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 692.00 0.00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 1.00 16,674 693.00 56.67 is 0.16 is --- --- 0.00 0.00 0.00 --- --- --- 0.155 2.00 36,230 694.00 56.67 is 0.23 is --- --- 0.00 0.00 0.00 --- --- --- 0.226 2.25 41,471 694.25 56.67 is 0.24 is --- --- 0.00 0.00 0.00 --- --- --- 0.240 3.00 58,223 695.00 56.67 is 0.28 is --- --- 0.00 5.41 0.00 --- --- --- 5.687 4.00 82,124 696.00 56.67 is 0.32 is --- --- 0.00 19.27 0.00 --- --- --- 19.60 5.00 106,952 697.00 56.67 is 0.36 is --- --- 0.00 37.96 0.00 --- --- --- 38.33 6.00 132,716 698.00 76.93 is 0.18 is --- --- 33.30 43.45 s 0.00 --- --- --- 76.93 7.00 159,426 699.00 83.49 is 0.09 is --- --- 50.21 s 33.19 s 66.60 --- --- --- 150.09 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 4 POST-DEV A BYPASS Hydrograph type = SCS Runoff Peak discharge = 2.597 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 8,029 cuft Drainage area = 3.930 ac Curve number = 67* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.00 min Total precip. = 2.92 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(3.270 x 61) + (0.660 x 98)] / 3.930 Q (cfs) 3.00 2.00 1.00 0.00 0 2 4 Hyd No. 4 POST-DEV A BYPASS Hyd. No. 4 -- 1 Year 6 8 10 12 14 16 18 20 22 24 Q (cfs) 3.00 2.00 1.00 1 0.00 26 Time (hrs) 10 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 4 POST-DEV A BYPASS Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 35.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.52 0.00 0.00 Land slope (%) = 1.00 0.00 0.00 Travel Time (min) = 5.32 + 0.00 + 0.00 = 5.32 Shallow Concentrated Flow Flow length (ft) = 45.00 0.00 0.00 Watercourse slope (%) = 1.00 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.61 0.00 0.00 Travel Time (min) = 0.46 + 0.00 + 0.00 = 0.46 Channel Flow X sectional flow area (sqft) = 5.00 0.00 0.00 Wetted perimeter (ft) = 16.30 0.00 0.00 Channel slope (%) = 1.40 0.00 0.00 Manning's n-value = 0.026 0.015 0.015 Velocity (ft/s) =3.07 0.00 0.00 Flow length (ft) ({0})1150.0 0.0 0.0 Travel Time (min) = 6.24 + 0.00 + 0.00 = 6.24 Total Travel Time, Tc.............................................................................. 12.00 min 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 5 POST-DEV A TOTAL Hydrograph type = Combine Peak discharge = 2.834 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 90,071 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 3.930 ac Q (cfs) 3.00 2.00 1.00 0.00 0 10 Hyd No. 5 POST-DEV A TOTAL Hyd. No. 5 -- 1 Year 20 30 40 50 60 Hyd No. 3 Hyd No. 4 70 80 90 Q (cfs) 3.00 2.00 1.00 1 0.00 100 Time (hrs) Hydrograph Summary Report 12 Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 26.08 2 726 85,232 ------ ------ ------ PRE-DEV A 2 SCS Runoff 55.56 2 716 113,419 ------ ------ ------ POST-DEV A 3 Reservoir 6.022 2 740 109,954 2 695.03 58,938 WET POND A 4 SCS Runoff 4.499 2 722 12,672 ------ ------ ------ POST-DEV A BYPASS 5 Combine 9.378 2 724 122,626 3,4 ------ ------ POST-DEV A TOTAL 6143_Wet Pond Hydrographs.gpw Return Period: 2 Year Wednesday, 05 / 25 / 2022 Hydrograph Report 13 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 1 PRE-DEV A Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 19.680 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 3.52 in Storm duration = 24 hrs Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Wednesday, 05 / = 26.08 cfs = 12.10 hrs = 85,232 cuft = 73* = 0 ft = 19.60 min = Type II = 484 25 / 2022 Composite (Area/CN) _ [(4.750 x 55) + (0.900 x 98) + (1.190 x 61) + (12.840 x 79)] / 19.680 PRE-DEV A Q (Cfs) Hyd. No. 1 -- 2 Year Q (Cfs) 28.00 24.00 28.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0 2 4 6 8 10 12 14 — Hyd No. 1 - 0.00 16 18 20 22 24 26 Time (hrs) 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 2 POST-DEV A Hydrograph type = SCS Runoff Peak discharge = 55.56 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 113,419 cuft Drainage area = 15.750 ac Curve number = 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(10.660 x 98) + (5.090 x 61)] / 15.750 Q (Cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' 0 2 4 — Hyd No. 2 POST-DEV A Hyd. No. 2 -- 2 Year 6 8 10 12 14 Q (Cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 16 18 20 22 24 Time (hrs) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 3 WET POND A Hydrograph type = Reservoir Peak discharge = 6.022 cfs Storm frequency = 2 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 109,954 cuft Inflow hyd. No. = 2 - POST-DEV A Max. Elevation = 695.03 ft Reservoir name = WET POND A Max. Storage = 58,938 cuft Storage Indication method used. WET POND A Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 10 20 30 40 50 60 70 80 90 100 Time (hrs) Hyd No. 3 Hyd No. 2 Total storage used = 58,938 cuft 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 4 POST-DEV A BYPASS Hydrograph type = SCS Runoff Peak discharge = 4.499 cfs Storm frequency = 2 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 12,672 cuft Drainage area = 3.930 ac Curve number = 67* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.00 min Total precip. = 3.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(3.270 x 61) + (0.660 x 98)] / 3.930 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 0 2 4 Hyd No. 4 6 8 POST-DEV A BYPASS Hyd. No. 4 -- 2 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 5 POST-DEV A TOTAL Hydrograph type = Combine Peak discharge = 9.378 cfs Storm frequency = 2 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 122,626 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 3.930 ac POST-DEV A TOTAL Q (cfs) Hyd. No. 5 -- 2 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 8 16 24 32 40 48 56 64 72 80 88 Time (hrs) Hyd No. 5 Hyd No. 3 Hyd No. 4 Hydrograph Summary Report 18 Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 54.20 2 724 170,791 ------ ------ ------ PRE-DEV A 2 SCS Runoff 92.32 2 716 192,843 ------ ------ ------ POST-DEV A 3 Reservoir 27.15 2 724 189,269 2 696.43 92,815 WET POND A 4 SCS Runoff 10.61 2 722 27,970 ------ ------ ------ POST-DEV A BYPASS 5 Combine 37.07 2 722 217,239 3,4 ------ ------ POST-DEV A TOTAL 6143_Wet Pond Hydrographs.gpw Return Period: 10 Year Wednesday, 05 / 25 / 2022 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 1 PRE-DEV A Hydrograph type = SCS Runoff Peak discharge = 54.20 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 170,791 cuft Drainage area = 19.680 ac Curve number = 73* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 5.14 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(4.750 x 55) + (0.900 x 98) + (1.190 x 61) + (12.840 x 79)] / 19.680 Q (Cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 2 4 — Hyd No. 1 6 8 PRE-DEV A Hyd. No. 1 -- 10 Year Q (Cfs) 60.00 50.00 40.00 30.00 20.00 10.00 -W-- ' ' ' ' ' ' 1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 20 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Hyd. No. 2 POST-DEV A Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 15.750 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.14 in Storm duration = 24 hrs Peak discharge = Time to peak = Hyd. volume = Curve number = Hydraulic length = Time of conc. (Tc) = Distribution = Shape factor = Wednesday, 05 / 25 92.32 cfs 11.93 hrs 192,843 cuft 86* 0 ft 5.00 min Type II 484 / 2022 Composite (Area/CN) _ [(10.660 x 98) + (5.090 x 61)] / 15.750 POST-DEV A Q (cfs) Hyd. No. 2 -- 10 Year 100.00 Q (cfs) 100.00 90.00 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 100, 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 Hyd No. 2 14.0 16.0 18.0 20.0 22.0 Time 0.00 (hrs) 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 3 WET POND A Hydrograph type = Reservoir Peak discharge = 27.15 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 189,269 cuft Inflow hyd. No. = 2 - POST-DEV A Max. Elevation = 696.43 ft Reservoir name = WET POND A Max. Storage = 92,815 cuft Storage Indication method used. Q (cfs) 100.00 90.00 70.00 60.00 50.00 40.00 30.00 WET POND A Hyd. No. 3 -- 10 Year Q (cfs) 100.00 90.00 70.00 60.00 50.00 40.00 30.00 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 4 POST-DEV A BYPASS Hydrograph type = SCS Runoff Peak discharge = 10.61 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 27,970 cuft Drainage area = 3.930 ac Curve number = 67* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.00 min Total precip. = 5.14 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(3.270 x 61) + (0.660 x 98)] / 3.930 POST-DEV A BYPASS Q (Cfs) Hyd. No. 4 -- 10 Year Q (Cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 4 Time (hrs) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 5 POST-DEV A TOTAL Hydrograph type = Combine Peak discharge = 37.07 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 217,239 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 3.930 ac Q (cfs) 40.00 30.00 20.00 10.00 0.00 0 2 4 Hyd No. 5 POST-DEV A TOTAL Hyd. No. 5 -- 10 Year 6 8 10 Hyd No. 3 12 14 16 Hyd No. 4 18 20 22 24 Q (cfs) 40.00 30.00 20.00 10.00 ---* 0.00 26 Time (hrs) Hydrograph Summary Report 24 Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 72.76 2 724 227,775 ------ ------ ------ PRE-DEV A 2 SCS Runoff 114.59 2 716 242,459 ------ ------ ------ POST-DEV A 3 Reservoir 44.26 2 722 238,843 2 697.17 111,299 WET POND A 4 SCS Runoff 14.74 2 722 38,559 ------ ------ ------ POST-DEV A BYPASS 5 Combine 59.00 2 722 277,401 3,4 ------ ------ POST-DEV A TOTAL 6143_Wet Pond Hydrographs.gpw Return Period: 25 Year Wednesday, 05 / 25 / 2022 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 1 PRE-DEV A Hydrograph type = SCS Runoff Peak discharge = 72.76 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 227,775 cuft Drainage area = 19.680 ac Curve number = 73* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 6.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(4.750 x 55) + (0.900 x 98) + (1.190 x 61) + (12.840 x 79)] / 19.680 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 PRE-DEV A Hyd. No. 1 -- 25 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' ' ' ' ' 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) Hydrograph Report 26 Hydraflow Hydrographs Extension Hyd. No. 2 POST-DEV A Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration for Autodesk® Civil 3D® by Autodesk, Inc. v2022 = SCS Runoff = 25 yrs = 2 min = 15.750 ac = 0.0 % = User = 6.12 in = 24 hrs Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Wednesday, 05 / 25 = 114.59 cfs = 11.93 hrs = 242,459 cuft = 86* = 0 ft = 5.00 min = Type II = 484 / 2022 Composite (Area/CN) _ [(10.660 x 98) + (5.090 x 61)] / 15.750 POST-DEV A Q (Cfs) Hyd. No. 2 -- 25 Year Q (Cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.0 2.0 — Hyd No. 4.0 6.0 8.0 10.0 2 12.0 14.0 16.0 18.0 20.0 Time 0.00 (hrs) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 3 WET POND A Hydrograph type = Reservoir Peak discharge = 44.26 cfs Storm frequency = 25 yrs Time to peak = 12.03 hrs Time interval - 2 min Hyd. volume = 238,843 cuft Inflow hyd. No. - 2 - POST-DEV A Max. Elevation = 697.17 ft Reservoir name = WET POND A Max. Storage = 111,299 cuft Storage Indication method used. WET POND A Q (Cfs) Hyd. No. 3 -- 25 Year Q (Cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) — Hyd No. 3 — Hyd No. 2 Total storage used = 111,299 Cuft 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 4 POST-DEV A BYPASS Hydrograph type = SCS Runoff Peak discharge = 14.74 cfs Storm frequency = 25 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 38,559 cuft Drainage area = 3.930 ac Curve number = 67* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.00 min Total precip. = 6.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(3.270 x 61) + (0.660 x 98)] / 3.930 POST-DEV A BYPASS Q (Cfs) Hyd. No. 4 -- 25 Year Q (Cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 4 Time (hrs) 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 5 POST-DEV A TOTAL Hydrograph type = Combine Peak discharge = 59.00 cfs Storm frequency = 25 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 277,401 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 3.930 ac Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 0 2 4 Hyd No. 5 POST-DEV A TOTAL Hyd. No. 5 -- 25 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 4 Hydrograph Summary Report 30 Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 88.15 2 724 275,595 ------ ------ ------ PRE-DEV A 2 SCS Runoff 132.49 2 716 282,961 ------ ------ ------ POST-DEV A 3 Reservoir 67.68 2 722 279,317 2 697.62 123,038 WET POND A 4 SCS Runoff 18.30 2 720 47,598 ------ ------ ------ POST-DEV A BYPASS 5 Combine 85.90 2 722 326,915 3,4 ------ ------ POST-DEV A TOTAL 6143_Wet Pond Hydrographs.gpw Return Period: 50 Year Wednesday, 05 / 25 / 2022 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 1 PRE-DEV A Hydrograph type = SCS Runoff Peak discharge = 88.15 cfs Storm frequency = 50 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 275,595 cuft Drainage area = 19.680 ac Curve number = 73* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 6.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(4.750 x 55) + (0.900 x 98) + (1.190 x 61) + (12.840 x 79)] / 19.680 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 2 4 Hyd No. 1 PRE-DEV A Hyd. No. 1 -- 50 Year Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 2 POST-DEV A Hydrograph type = SCS Runoff Peak discharge = 132.49 cfs Storm frequency = 50 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 282,961 cuft Drainage area = 15.750 ac Curve number = 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(10.660 x 98) + (5.090 x 61)] / 15.750 Q (Cfs) 140.00 120.00 100.00 •• •• Q (Cfs) 140.00 120.00 100.00 •• •• 40.00 20.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 — Hyd No. 2 Time (hrs) 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 3 WET POND A Hydrograph type = Reservoir Peak discharge = 67.68 cfs Storm frequency = 50 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 279,317 cuft Inflow hyd. No. = 2 - POST-DEV A Max. Elevation = 697.62 ft Reservoir name = WET POND A Max. Storage = 123,038 cuft Storage Indication method used. WET POND A 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 4 POST-DEV A BYPASS Hydrograph type = SCS Runoff Peak discharge = 18.30 cfs Storm frequency = 50 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 47,598 cuft Drainage area = 3.930 ac Curve number = 67* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.00 min Total precip. = 6.91 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(3.270 x 61) + (0.660 x 98)] / 3.930 Q (Cfs) 21.00 18.00 15.00 12.00 • ee 3.00 0.00 ' ' 1 0 2 4 — Hyd No. 4 i POST-DEV A BYPASS Hyd. No. 4 -- 50 Year Q (Cfs) 21.00 18.00 15.00 12.00 3.00 J- ' ' ' I I I M I '- 0.00 8 10 12 14 16 18 20 22 24 26 Time (hrs) 35 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 5 POST-DEV A TOTAL Hydrograph type = Combine Peak discharge = 85.90 cfs Storm frequency = 50 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 326,915 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 3.930 ac Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 2 4 Hyd No. 5 POST-DEV A TOTAL Hyd. No. 5 -- 50 Year Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 Hydrograph Summary Report 36 Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 104.40 2 724 326,578 ------ ------ ------ PRE-DEV A 2 SCS Runoff 151.00 2 716 325,343 ------ ------ ------ POST-DEV A 3 Reservoir 79.36 2 722 321,676 2 698.07 134,627 WET POND A 4 SCS Runoff 22.11 2 720 57,350 ------ ------ ------ POST-DEV A BYPASS 5 Combine 101.29 2 722 379,025 3,4 ------ ------ POST-DEV A TOTAL 6143_Wet Pond Hydrographs.gpw Return Period: 100 Year Wednesday, 05 / 25 / 2022 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 1 PRE-DEV A Hydrograph type = SCS Runoff Peak discharge = 104.40 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 326,578 cuft Drainage area = 19.680 ac Curve number = 73* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 7.73 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(4.750 x 55) + (0.900 x 98) + (1.190 x 61) + (12.840 x 79)] / 19.680 Q (Cfs) 120.00 100.00 20.00 0.00 ' ' 0 2 4 — Hyd No. 1 6 8 PRE-DEV A Hyd. No. 1 -- 100 Year Q (Cfs) 120.00 100.00 20.00 "r ' ' ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 2 POST-DEV A Hydrograph type = SCS Runoff Peak discharge = 151.00 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 325,343 cuft Drainage area = 15.750 ac Curve number = 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.73 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(10.660 x 98) + (5.090 x 61)] / 15.750 POST-DEV A 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 3 WET POND A Hydrograph type = Reservoir Peak discharge = 79.36 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 321,676 cuft Inflow hyd. No. = 2 - POST-DEV A Max. Elevation = 698.07 ft Reservoir name = WET POND A Max. Storage = 134,627 cuft Storage Indication method used. WET POND A Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0 00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 2 0 Total storage used = 134,627 cult 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 4 POST-DEV A BYPASS Hydrograph type = SCS Runoff Peak discharge = 22.11 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 57,350 cuft Drainage area = 3.930 ac Curve number = 67* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.00 min Total precip. = 7.73 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(3.270 x 61) + (0.660 x 98)] / 3.930 Q (Cfs) 24.00 20.00 16.00 12.00 M M 0.00 ' ' 1 0 2 4 — Hyd No. 4 6 8 POST-DEV A BYPASS Hyd. No. 4 -- 100 Year Q (Cfs) 24.00 20.00 16.00 12.00 M 4.00 ' ' ' I I I M I '- 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Wednesday, 05 / 25 / 2022 Hyd. No. 5 POST-DEV A TOTAL Hydrograph type = Combine Peak discharge = 101.29 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 379,025 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 3.930 ac Q (Cfs) 120.00 100.00 20.00 0.00 ' 0 2 4 — Hyd No. 5 POST-DEV A TOTAL Hyd. No. 5 -- 100 Year Q (Cfs) 120.00 100.00 20.00 I 0.00 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) — Hyd No. 3 Hyd No. 4 Hydraflow Rainfall Report 42 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2022 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 59.2031 12.1000 0.8720 -------- 2 71.3135 12.6000 0.8706 -------- 3 0.0000 0.0000 0.0000 -------- 5 78.6002 13.1000 0.8440 -------- 10 77.3185 12.7000 0.8111 -------- 25 64.2527 11.0000 0.7384 -------- 50 57.3443 9.9000 0.6916 -------- 100 52.7444 9.1000 0.6543 -------- File name: 6143 - NOAA Intensity.IDF Intensity = B / (Tc + D)^E Wednesday, 05 / 25 / 2022 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 4.98 3.98 3.33 2.88 2.53 2.27 2.06 1.89 1.74 1.62 1.51 1.42 2 5.87 4.72 3.97 3.43 3.03 2.72 2.47 2.26 2.09 1.95 1.82 1.71 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.82 5.55 4.71 4.10 3.64 3.28 2.99 2.75 2.55 2.38 2.23 2.10 10 7.52 6.14 5.23 4.57 4.07 3.68 3.36 3.10 2.88 2.69 2.53 2.39 25 8.29 6.79 5.80 5.09 4.56 4.14 3.80 3.52 3.29 3.09 2.91 2.76 50 8.85 7.25 6.21 5.47 4.91 4.48 4.13 3.84 3.59 3.38 3.20 3.04 100 9.34 7.65 6.57 5.81 5.24 4.79 4.43 4.13 3.87 3.66 3.47 3.30 Tc = time in minutes. Values may exceed 60. \Land Proiects R2\6143-PINE LAKE TOWNHOMES RD HARRELL\Calculations\Stormwater\6143-NOAA - DeDth.DCD Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.92 3.52 0.00 4.45 5.14 6.12 6.91 7.73 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Patrick Place Stormwater Management Report Appendix C Storm Drain Calculations 6143-C-NC May 24, 2022 a � V ---- — — — — — — — — — — — — — — U g.E N v v r+ U MJ w —a c v — — — — — — m _ o - _ - N — — m — — — N m m m m a =aW; ---- 44 So v - - - - - SoSSSSo a m - - - oho N - - - 08 —a- : 0 - 8 - - M.S - - - S m - .Eggs o - 8 f - - m ^ N - - - - - E c � mo - - - - roi 8 8 Fi - g - - - - - a 'a F E -- - - - - - - - - - - - - - - - E c Si �i _ F E i -- an ri v i i v 6 v v v > -'-° -� � -o -- E o o v m a d a a m m R M o a m H o '� ---- Z- 0 --2 - - - - - - - - - - - - - - o •� =^ j .� v N in S N S v N S N N S S O - - - - - - - - - - - - - - � O _ 4 W OD 1° �° OD OD OD O �° W W W N N N N W W W W Ifl Ifl W Ifl Ifl Ifl Ifl Ifl Ifl Ifl W a a a O O Y o ,.� `° m ., .. .. ., ., ., ~ .. N N N - - - ---- - - - - - - - - - - - - - - - - - - - - - - - - - a - - - a s aa as 0 ro o o a ` E n r N v � N o v v v �n Lni a a m m m v Cl- ci ci o ci ci d 0 0 0 0 o N N o 0 0 o N o 0 0 0 -ci 0 - - - - - - - - - - - - - - - - - - c K E .. - Z M ypp U 2 C o m � U — — — — — — — — — — — — — — — — — — a E `w 'o o g ° N- �a - - - - o rai � o m o ^� - a �n - - - - - - E ° -- - - - - - - c - - - - - - - N - - N - - - - - - - - - - u u u u u o o o 0 0 0 0 0 o m m m u m m m m m m u ... u .. u m m m .. 'o - - - - - - - - - - - - - - - - - - o o 0 o m o 0 0 0 0 0 0 0 0 0 0 N 0 N m m N m m m N o m ry m j m m j ... j j m m m o L U ---- - - - - - - - - - - - - - - O Pi W L � U V V V V V V V V V V V V V V V V U U V V V V V U U g .EE_ rn m a a n N v roi vi v �n U o v v N a =a o ---- — m 8 o — S — —ZT — — S — S 8 0 — — — — — 44 _ N rn v v a a o S o v a m � — — — — v Sob S 4 m o 8 S v r a d F ---- — — — — — — — — — — — — — — E_= ti^' Si N$a _ F E iIs 6 — — ro — — — a > vm m m 6 6 6 i rmi v ni v 2MV E o a� r4i M, r�i m � � rn M � m m �, � m � M v o ,q Zl— $ v rn N n 6 O' —? — — a a s — v — — v m v — — m — v n is v m — v — v v — v v — c . `> v M ^ a v v v CO— W W ul ul ul ul ul ul ul ul ul W W W W ul ul ul ul ul ul M M M M M W W W W W W W W o mm E rn _mm a 1. V a 0 0 8 rn a E w.. a n v ^ r+ 0 ---- — — — — — — — — — — — — — — c K E .. W — V 2 8 O m rv� n m ---- — — — — — — — — — — — — — — a E `w 'o ^ w .2 � M o a v v v m y a` :::: 0 -- ---- — 0 0 — 0 0 o — m m m — o — m m — m m m — o 0 — 0 — m N N N — — M M — M M — M — M M ? Z 0 m m m m m m m m m m m m m m m w m N m m m m w d d o 0 o b o 0 'o ---- — — — — — — — — — — — — — — °= M M M M M M M M m u u u u V u u o u u u V V u u u u u u o m m u u m V m m V V o 0 0 0 0 0 0 0 !// .. . . . . . . . .... | !\ (( ( ( ( ( ( ( ( .... \5 \ \ } \\\ 5 § 5 5 ! §!!@ — }\!\\ ) 44 5\ \( ) ( \ \ . . \ \..T — — — — — ®){7 5§ § R § § § 5 5 5R§5 \/ \2 2 5 ( ! 6 § 9 !77! } /g ! g § § ! g 5 §§§§ 12 } I-- Z { _ 7/ „ !\ ro \\ \ \ \ \ Al) ) ))\) ER !§ § 5 ! 5 § g § gRR§ 44 :: o: o 0 0 0 0 �� cici .)� � \z -- — — — — — — {!? as a a a a a a a ae K$ ! § ! ! ! ! ! lK \\ _))� } .. . . . . . . . .... Mo �— — — — — — — i\ 8 8 8 8 8//\ Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, May 23 2022 HW-401 - FES-400 Invert Elev Dn (ft) = 686.00 Calculations Pipe Length (ft) = 85.90 Qmin (cfs) = 23.32 Slope (%) = 3.84 Qmax (cfs) = 23.32 Invert Elev Up (ft) = 689.30 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 23.32 No. Barrels = 1 Qpipe (cfs) = 23.32 n-Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 7.67 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 8.13 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 687.86 HGL Up (ft) = 691.01 Embankment Hw Elev (ft) = 692.79 Top Elevation (ft) = 700.00 Hw/D (ft) = 1.75 Top Width (ft) = 43.00 Flow Regime = Inlet Control Crest Width (ft) = 100.00 Ele (R) 701.00 698.00 BMW 692L0 6W M BMW 693. 00 0 MAIN - FESA00 10 20 30 40 50 60 70 00 90 100 110 120 Circular G.1-1t HGL Embank ft Depth (Rj 11.70 8.70 670 270 -0 30 330 -630 130 R—h (R) Patrick Place Stormwater Management Report Appendix D Erosion Control Calculations (Temporary sediment basins) 6143-C-NC May 24, 2022 ENGINEERING SEDIMENT BASIN A Project Patrick Place Client RD Harrell Project # 6143 Date 5/19/2022 2013A Van Buren Ave. Designation SB-A1 PH-1 Designer SAP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 8.95 Acres 390,055 Square Feet Total Disturbed Area 8.95 Acres 390,055 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume 110 7.52 Inches per Hour 639 26,890 0 0 Q10 33.67 CFS 640 29,543 28,217 28,217 641 32,252 30,898 59,114 Required Volume 16,118 Cubic Feet (1800 CF*DA) 642 35,018 33,635 92,749 Required Surface Area I 14,646 Square Feet (435 SF*Q10) 6431 37,840 36,429 129,178 644 40,719 39,280 168,458 Provided Volume 59,114 Cubic Feet OK 645 43,654 42,187 210,644 Provided Surface Area I 32,252 Square Feet OK 646 46,646 45,150 255,794 Length 192 Feet Minimum Spillway Design Width 45 Feet Q10 33.67 CFS H 1 Feet Spillway Elevation 645 C 3.367 Surface Area at Spillway 43,654 L 10.00 Feet Top of Berm Elevation 646 Spillway & Skimmer Design Spillway Length 20 Feet OK Days to Drain 5 Days Head over Spillway 1 Feet Skimmer Size 4 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 1.5 Inches Max Flow 67.3 CFS I OK Orifice Diameter 3.1 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SEDIMENT BASIN A Project Patrick Place Client RD Harrell Project # 6143 Date 5/19/2022 2013A Van Buren Ave. Designation SB-A1 PH-2 Designer SAP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 14.06 Acres 612,599 Square Feet Total Disturbed Area 14.06 Acres 612,599 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.52 Inches per Hour 639 26,890 0 0 Q10 52.88 CFS 640 29,543 28,217 28,217 641 32,252 30,898 59,114 Required Volume 25,314 Cubic Feet (1800 CF*DA) 642 35,018 33,635 92,749 Required Surface Area I 23,002 Square Feet (435 SF*Q10) 6431 37,840 36,429 129,178 644 40,719 39,280 168,458 Provided Volume 59,114 Cubic Feet OK 645 43,654 42,187 210,644 Provided Surface Area I 32,252 Square Feet OK 646 46,646 45,150 255,794 Length 192 Feet Minimum Spillway Design Width 45 Feet Q10 52.88 CFS H 1 Feet Spillway Elevation 645 C 3.367 Surface Area at Spillway 43,654 L 15.70 Feet Top of Berm Elevation 646 Spillway & Skimmer Design Spillway Length 20 Feet OK Days to Drain 5 Days Head over Spillway 1 Feet Skimmer Size 4 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 1.5 Inches Max Flow 67.3 CFS I OK Orifice Diameter 3.1 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SEDIMENT BASIN A Project Patrick Place Client RD Harrell Project # 6143 Date 5/19/2022 2013A Van Buren Ave. Designation SB-A1 PH-3 Designer SAP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 15.75 Acres 686,122 Square Feet Total Disturbed Area 15.75 Acres 686,122 Square Feet C 0.50 Tc 5 Minutes Contour Area Volume Net Volume I10 7.52 Inches per Hour 639 26,890 0 0 Q10 59.22 CFS 640 29,543 28,217 28,217 641 32,252 30,898 59,114 Required Volume 28,352 Cubic Feet (1800 CF*DA) 642 35,018 33,635 92,749 Required Surface Area I 25,763 Square Feet (435 SF*Q10) 6431 37,840 36,429 129,178 644 40,719 39,280 168,458 Provided Volume 59,114 Cubic Feet OK 645 43,654 42,187 210,644 Provided Surface Area I 32,252 Square Feet OK 646 46,646 45,150 255,794 Length 192 Feet Minimum Spillway Design Width 45 Feet Q10 59.22 CFS H 1 Feet Spillway Elevation 645 C 3.367 Surface Area at Spillway 43,654 L 17.59 Feet Top of Berm Elevation 646 Spillway & Skimmer Design Spillway Length 20 Feet OK Days to Drain 5 Days Head over Spillway 1 Feet Skimmer Size 4 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 1.5 Inches Max Flow 67.3 CFS I OK Orifice Diameter 3.1 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SEDIMENT BASIN B Project Patirck Place Client RD Harrell Project # 6143 Date 5/19/2022 2013A Van Buren Ave. Designation SB-B PH-1 Designer SAP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 1.50 Acres 65,543 Square Feet Total Disturbed Area 1.50 Acres 65,540 Square Feet C 0.50 Tc 5 Minutes 110 7.52 Inches per Hour Q10 5.66 CFS Contour Area Volume Net Volume Required Volume 2,708 Cubic Feet (1800 CF*DA) 696 3,000 0 0 Required Surface Area I 2,461 Square Feet (435 SF*Q10) 697 3,536 0 0 698 4,104 3,820 3,820 Provided Volume 8,224 Cubic Feet OK 699 4,704 4,404 8,224 Provided Surface Area I 4,704 Square Feet OK 700 5,336 .5,0201 13,244 Length 100 Feet Minimum Spillway Design Width 30 Feet Q10 5.66 CFS H 1 Feet Spillway Elevation C 3.367 Surface Area at SpillwayE279090 04 L 1.68 Feet Top of Berm Elevation Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 2 Inches Weir Coefficient ff3.367 *Cipoletti Weir Orifice Radius 0.9 Inches Max Flow 33.7 CFS I OK Orifice Diameter 1.8 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SEDIMENT BASIN B Project Patirck Place Client RD Harrell Project # 6143 Date 5/19/2022 2013A Van Buren Ave. Designation SB-B PH-2 Designer SAP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 0.89 Acres 38,638 Square Feet Total Disturbed Area 0.89 Acres 38,638 Square Feet C 0.50 Tc 5 Minutes 110 7.52 Inches per Hour Q10 3.34 CFS Contour Area Volume Net Volume Required Volume 1,597 Cubic Feet (1800 CF*DA) 696 3,000 0 0 Required Surface Area I 1,451 Square Feet (435 SF*Q10) 697 3,536 0 0 698 4,104 3,820 3,820 Provided Volume 8,224 Cubic Feet OK 699 4,704 4,404 8,224 Provided Surface Area I 4,704 Square Feet OK 700 5,336 .5,0201 13,244 Length 100 Feet Minimum Spillway Design Width 30 Feet Q10 3.34 CFS H 1 Feet Spillway Elevation C 3.367 Surface Area at SpillwayE279090 04 L 0.99 Feet Top of Berm Elevation Spillway & Skimmer Design Spillway Length 10 Feet OK _ Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 2 Inches Weir Coefficient ff3.367 *Cipoletti Weir Orifice Radius 0.9 Inches Max Flow 33.7 CFS I OK Orifice Diameter 1.8 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SEDIMENT BASIN C Project Patrick Place Client RD Harrell Project # 6143 Date 5/19/2022 2013A Van Buren Ave. Designation SB-C PH-1 Designer SAP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 3.38 Acres 147,094 Square Feet Total Disturbed Area 3.35 Acres 146,080 Square Feet C 0.50 Tc 5 Minutes I10 7.52 Inches per Hour Q10 12.70 CFS Contour Area Volume Net Volume 690 5,500 0 0 Required Volume 6,036 Cubic Feet (1800 CF*DA) 691 6,156 5,828 5,828 Required Surface Area I 5,523 Square Feet (435 SF*Q10) 692 6,844 6,500 12,328 693 7,564 13,720 19,548 Provided Volume 19,548 Cubic Feet OK 694 8,316 7,940 27,488 Provided Surface Area I 7,564 Square Feet OK Length 110 Feet Minimum Spillway Design Width 50 Feet Q10 12.70 CFS H 1 Feet Spillway Elevation _ 693 C 3.367 Surface Area at Spillway 7,5641 L 3.77 Feet Top of Berm Elevation 694 Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 3 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 1.2 Inches Max Flow 33.7 CFS I OK Orifice Diameter 2.5 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SEDIMENT BASIN C Project Patrick Place Client RD Harrell Project # 6143 Date 5/19/2022 2013A Van Buren Ave. Designation SB-C PH-2 Designer SAP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 0.61 Acres 26,371 Square Feet Total Disturbed Area 0.61 Acres 26,371 Square Feet C 0.50 Tc 5 Minutes I10 7.52 Inches per Hour Q10 2.28 CFS Contour Area Volume Net Volume 690 5,500 0 0 Required Volume 1,090 Cubic Feet (1800 CF*DA) 691 6,156 5,828 5,828 Required Surface Area I 990 Square Feet (435 SF*Q10) 692 6,844 6,500 12,328 693 7,564 13,720 19,548 Provided Volume 19,548 Cubic Feet OK 694 8,3161 7,9401 27,488 Provided Surface Area I 7,564 Square Feet OK Length 110 Feet Minimum Spillway Design Width 50 Feet Q10 2.28 CFS H 1 Feet Spillway Elevation _ 693 C 3.367 Surface Area at Spillway 7,564 L 0.68 Feet Top of Berm Elevation 694 Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain 3 Days Head over Spillway 1 Feet Skimmer Size 3 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 1.2 Inches Max Flow 33.7 CFS I OK Orifice Diameter 2.5 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SEDIMENT BASIN D Project Patrick Place Client RD Harrell Project # 6143 Date 5/19/2022 2013A Van Buren Ave. Designation SB-D PH-1 Designer SAP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 3.21 Acres 139,804 Square Feet Total Disturbed Area 3.12 Acres 135,727 Square Feet C 0.50 Tc 5 Minutes I10 7.52 Inches per Hour Q10 12.07 CFS Contour Area Volume Net Volume 698 10,500 0 0 Required Volume 5,609 Cubic Feet (1800 CF*DA) 699 12,036 11,268 11,268 Required Surface Area I 5,249 Square Feet (435 SF*Q10) 700 13,604 12,820 24,088 701 15,204 27,240 38,508 Provided Volume 38,508 Cubic Feet OK 702 16,836 16,020 54,528 Provided Surface Area I 15,204 Square Feet OK Length 350 Feet Minimum Spillway Design Width 30 Feet Q10 12.07 CFS H 1 Feet Spillway Elevation 701 C 3.367 Surface Area at Spillway 15,204 L 3.58 Feet Top of Berm Elevation 702 Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain 5 Days Head over Spillway 1 Feet Skimmer Size 3 Inches Weir Coefficient ff3.367 *Cipoletti Weir Orifice Radius 1.3 Inches Max Flow 33.7 CFS I OK Orifice Diameter 2.7 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 ENGINEERING SEDIMENT BASIN D Project Patrick Place Client RD Harrell Project # 6143 Date 5/19/2022 2013A Van Buren Ave. Designation SB-D PH-2 Designer SAP Indian Trail, NC 28079 NC Erosion and Sediment Control Planning and Design Manual Total Drainage Area 0.90 Acres 39,112 Square Feet Total Disturbed Area 0.90 Acres 39,112 Square Feet C 0.50 Tc 5 Minutes I10 7.52 Inches per Hour Q10 3.38 CFS Contour Area Volume Net Volume 698 10,500 0 0 Required Volume 1,616 Cubic Feet (1800 CF*DA) 699 12,036 11,268 11,268 Required Surface Area I 1,469 Square Feet (435 SF*Q10) 700 13,604 12,820 24,088 701 15,204 27,240 38,508 Provided Volume 38,508 Cubic Feet OK 702 16,836 16,020 54,528 Provided Surface Area I 15,204 Square Feet OK Length 350 Feet Minimum Spillway Design Width 30 Feet Q10 3.38 CFS H 1 Feet Spillway Elevation 701 C 3.367 Surface Area at Spillway 15,204 L 1.00 Feet Top of Berm Elevation 702 Spillway & Skimmer Design Spillway Length 10 Feet OK Days to Drain 5 Days Head over Spillway 1 Feet Skimmer Size 3 Inches Weir Coefficient 3.367 *Cipoletti Weir Orifice Radius 1.3 Inches Max Flow 33.7 CFS I OK Orifice Diameter 2.7 Inches EAGLE, ENGINEERING, INC. 2013 VAN BUREN AVENUE, STE A INDIAN TRAIL, NORTH CAROLINA 28079 Rip Rap Apron Design Project: Sun Valley Market Place Structure: FES-100 NCDENR Erosion and Sediment Control Planning and Design Manual Do = 36 in. d50 (6"min.)= 8 in. Q10 = 59.98 cfs dmax = 12 i n. 3Do = 9 ft. th= 18 in. La = 21 ft. W = 24.00 ft. 3 0 Outlet W = Do 4-La pipe t diameter (DO) La --d 7 i Water 0, 50o �l `malt ton �r O` I 6o e�I I l; i �\�` 99 50 Discharge J-J 0 1000 Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tvv a 0.5 diameter). Page 1 Rip Rap Apron Rip Rap Apron Design Project: Sun Valley Market Place Structure: FES-200 NCDENR Erosion and Sediment Control Planning and Design Manual Do = 15 in. d50 (6"min.)= 8 in. Q10 = 10.53 cfs dmax = 12 i n. 3Do = 3.75 ft. th= 18 in. La = 12 ft. W = 13.25 ft. 20 10 3 0 Outlet W = Do 4-La pipe t diameter (DO) La --d gii 7 ilwater 0,5Dp tiro5��' 6oI I I r�e�9 I IIIII��l��t l I:''l l E1 ffilu mmm ,01!I I�MENEM �In mw ON MEN 9 — 80( 4 IMII IIIII IIi1111111������N���■.1...l.IIIIIIIIIIIIPf I II 1 IIIII►O': AHI 1114111,1III MINEee� i 11 �I !l111: iii� 1llI I IIfP•'/l' 11! �,4•'�il II�Ii ■ 1 �'ll4ilil' �_ . 111iEu1 a Initll• . xiu Oil i i!:110R5 ErErIII 1���� ���/ �011 /' 11 � IIIL1111 1JC� 1 11:II�I�FIIII II d r�li,ul: •iv: Ill•liia!n nut �� � Illliltil!ill illllifl/illllllllll Iii I111IIIII IIIIIII �>ellr' Ilylll') I'd 11 I IBIIIIIIIIIIII I III"p'' p�'9'i �1}Ijjapl!;171HiW� HI�H��.. \.I I.IIHIIIIIIHI IH IX II II 11 II1.IpI HH11113111X1111X 1 1 11 11 11 i,1 Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tvv a 0.5 diameter). Page 1 Rip Rap Apron Rip Rap Apron Design Project: Sun Valley Market Place Structure: FES-300 NCDENR Erosion and Sediment Control Planning and Design Manual Do = 20 in. d50 (6"min.)= 8 in. Q10 = 14.91 cfs dmax = 12 I n. 3Do = 5 ft. th= 18 in. La = 12 ft. W = 13.67 ft. 3 0 Outlet W = Do + La 9 pipe diameter (DO) ; 0 La --•1 8, 7 ilwater 0,5Dp I f � 6o � 05 rtti itt i III IIII�111 1111EI11xpllr IIl� II II{Iyl '� i�e�• i■ �'. , I� 1 rl IIII III III FBI Illii I I , . "-•il�iliill����:��i�i�����11 i Ilt�ll� IIII Ililll�,�l!`��r�l, lllir� 1 I I V e•+�i" ill' I ■ IIII NNNIIIII I Ir Ur'"iA{!! JI �ffif�!!f ill � � 11 „ r� II EI •; 11 _ �� ii : �.,.N; `''''�'''I�I Iliil�ul- �•����i�����i��'�� fii�li f../1'h�If,,ii i, I;r� IIII . ;iN •ell ;I� �f� �H11fI� II ■ ■ 1 1/11 Sr:"reiill.11ll AI I IIIIIII fl 1 Fx xl . r::ilriddi:illN:Ili■1: IIIIIIIII� I�IIIB�.e . 1 11 r uiil IW.illlll`Il�lxillli 1 1ii HIxIIIJ FI 1 1I1 I1lIIIIllllnE I su01 !I IIIIIJill,, lIIlllt d/ �:r+'� i#1!'"Ilr•l-i �V" I III ■ 111 IIII I: IIfP+ii'/l1' ' Ilr 4•"'iP ;xl sae' °v_:'r�'p�,'���il�li �ll�Il�il ���l�llll�ll �111111N[i I 111f i � 1� 111:11N11I ►1 I 1 {,'�/' 4iill 1 nnrunummmnwc ; ne17u•::;i I� �A�/��a�wfF/m/RIIIIIIIIIIMNIiI■.111[IIIf1111i111IIlII��� 1��dliffdi111NAI Ir EM�UVI nmm�illuaw...'� ir"•• ` II I � r�iur;lue IIIIPr!'ii II! 1 1 Iillfl1111 I �g I II p $ W N1,1 ellfi y. 1' IIE I!il IIIIIIIIIf�III�Illllii'iiil:Illliili!!fl i�i��l9l��f�il�llilff9f�flfllfllfl� 9�S =���ii�','1: r•,...,>;;f�;;i�:'°. n u t! n uu l u ,lli.ul a naE.• x u 1 11l111 IIIIIII 1111111111 x I 11 � �!1%/ .�+ ell 1:d11►1lIJi '! . 1 IIII 111 I Illl I I I r�0I0gHilIIli HIM , �E1,0111 iln:,lli 1 I II(iII II I d r •il 111 fill Inu! 11 1 IIII 1+ 1 11+ � A� � ��LI/ � �ll!di :dllil/il1lllllllll IIIIIII 11111I�III�II�IiIH��I�II�I��IiI II l����� • .��� '.�•i�����llf�1'illli I d 11 IIIIIlllllllll111111 ,. III t 1 I I.o.�r511iii�lli���il.�d-�d`�d�ol��.l= I:,itl��lfllll�llh� I��!I'�.���Ilul�l��lllllllllll Curves may not be extrapolated. Figure 8.06a Design of outiet protection protection from a round pipe flowing full, minimum tailwater condition (Tvv a 0.5 diameter). Page 1 Rip Rap Apron Rip Rap Apron Design Project: Sun Valley Market Place Structure: FES40 NC0ENRErosion and Sediment Control Planning and Design Manual Do= 24 in. d50(6"min]= 8 in. [10= 23.32 ds d,a,= 12 in. 3Do= G ft. th= 18 in. L,= 12 ft. VV= 14'00 ft. BOW 115iii MEN SH, Curves may not ueextrapolated. mc. 80+H ' ' « v 111 gin'. '151.11 is Hill IN U101 Page 1 Rip Rap Apron Rip Rap Apron Design Project: Sun Valley Market Place Structure: FES-A NCDENR Erosion and Sediment Control Planning and Design Manual Do = 30 in. d50 (6"min.)= 8 in. Q10 = 27.15 cfs dmax = 12 i n. 3Do = 7.5 ft. th= 18 in. La = 16 ft. W = 18.50 ft. 3 0 Outlet W = Do 4-La pipe t diameter (DO) La --d gii 7 ilwater �- 0,5DO \YO 51 e� , ttl i .0 99 3 5 50 100 Discharge (ft3/sec) J-J 0 1000 Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tvv a 0.5 diameter). Page 1 Rip Rap Apron