HomeMy WebLinkAbout20221649 Ver 1_01. DWR Pre-Filing Meeting Request Form_20221118Contact Name*
Kevin Thomas
Contact Email Address*
kthomas@cecinc.com
Project Owner*
Vulcan Materials Company; POC Tony Johnson, Environmental Engineer
Project Name*
Spruce Mine Quarry
Project County*
Mitchell
Owner Address:*
Street Address
11020 David Taylor Drive, Suite 400
Address Line 2
aty
State / Province / Pegion
CHARLOTTE
NC
Postal / Zip axle
Country
28262
United States
Is this a transportation project?*
(- Yes c: No
Type(s) of approval sought from the DWR:
F 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
W Individual Permit F Modification
F Shoreline Stabilization
Does this project have an existing project ID#?*
(- Yes c: No
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below and include location information.*
An Approve Jurisdictional Determination was issued (SAW 2020-
02074) on 04/22/2021 in an effort to plan for future required mine
expansion to increase the Life of Mine (LOF) with an effort to
avoidance and minimize impacts to Jurisdictional Aquatic Resources.
However, there is unavoidable and need to impact— 871 sq.ft. or 267
I.f. with an — avg OHWM width of 3.3 ft, of an Intermittent stream.
VMC proposes to perform this permitting under NW # 44 (Mining) and
State Individual permit since the total length of impact exceeds the
150 linear feet under GC 4267.
We are happy to provide the AJD SAW # 2020-02074 as well as any
other documents.
Kevin Thomas, PWS & NC LSS
Cell 410.259.4745
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature *
Submittal Date 9/24/2021