Loading...
HomeMy WebLinkAboutNCC205020_NOT Closeout Documents_20221121North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Forsyth Project: WINSTON LAKE PARK River basin: Yadkin-PeeDee Person financially responsible: City of Winston-Salem - Robert Prestwood Project #: FORSY-2021-010 Address: PO Box 2511, Winston-Salem, NC 27102 1. Project Location: Winston Park Drive, Winston-Salem Pictures: Yes -Digital 2. Weather and soil conditions: 60's, sunny, workable soil Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: November 17, 2022 10. Comments: A site inspection was conducted on November 8, 2022 to facilitate a site closure. All construction has been completed and temporary erosion and sedimentation control devices have been removed. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. If you have any questions, please contact the Winston Salem Regional Office or nate.gainerAancdenr.gov or 336-776-9660. Reported by: Nate Gainer Others present: Robby Deans Date of inspection: November 08, 2022 Time arriving on site: 4:15 PM Time leaving site: 4:45 PM cc: