HomeMy WebLinkAbout20150003 Ver 1_401 Application_20141214G\SL7Uite ' O^ y �G �pp8 tt� N • "�1Vpgp \6'M1 Steve Troxier North Carolina Department of Agriculture Commissioner and Consumer Services Division of Soil and Water Conservation December 22, 2014 Tasha Alexander Regulatory Specialist Asheville Regulatory Field Office US Army Corps of Engineers - Wilmington District 151 Patton Avenue, Room 208 Asheville, NC 28801 -5006 RE: Benton EQIP Stream Project Wilkes County, NC Ms. Alexander, Patricia K. Hams Director Please find the enclosed PCN, location map, plan view and typical drawings for the Benton EQIP Stream Project. The project is a combination stream bank stabilization and stream restoration project on an unnamed tributary to Little Hunting Creek. We are using Natural Channel design methods to complete this project. We are requesting a Nationwide 27 Pernut. We are also submitting this to the Division of Water Resources to request a 401 Permit by copy of this letter. I have also submitted a copy to Andrea Leslie with NCWRC for her comments as per your request If you need further information or clarification, please feel free to contact me. Sincerely, Daphne M Cartner, EI Environmental Engineer Cc: Terry Benton, Owner NCD WR. 401 & Buffer Permtttmg Unit Andrea Leslie, NCWRC Divisvion of Sod & Water Conservation Western Piedmont Tech Services PO Box 845 Mocksvdle, NC 27028 An Equal Opportunity Employer Telephone 336 - 753 -0076 Daphne Gartner @ncagr gov O�of W AT�c9QG LMQ T 20150r�43 �� � � Office Use Only Corps action ID no DWO project no Form Version 1.3 Dec 10 2008 Page 1 of 11 PCN Form — Version 1 3 December 10, 2008 Version Pre - Construction Notification (PCN) Form A. Applicant Information 9 Processing 1a Type(s) of approval sought from the �Secbon Per mit Corps ❑ Section 10 Permit 1b Specify Nationwide Permit (NWP) number 27 or General Permit (GP) number 1c Has the NWP or GP number been venfied by the Corps? ® Yes ❑ No 1d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1e Is this notification solely for the record because written approval is not required? For the record only for DWO 401 Certification For the record only for Corps Permit - ❑ Yes ® No ❑ Yes No 1f Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu ❑Yes ® No fee program 1g Is the project located in any of NC's twenty coastal counties If yes, answer 1 h ❑ Yes ® No below 1h Is the project located within a NC DCNI Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a Name_of project Benton EQIP Stream Project 2b County Wilkes 2c Nearest municspality /town Ronda 2d Subdivision name NA 2e NCDOT only, T I P or state project no D (,� 3. Owner Information 3a ��I'Ij' 1` me(s) on Recorded Deed Terry L & Jan_ ice B Benton 4 3b Deed Book and Page No 3c Responsible Party (for LLC if r �o .. applicable) CES NA 401 &BUFFER PE M1 TING TIAJta 2961 Old 60 Hwy Ronda, NC 28670 336- 9848989 tbentonyvc@gmarl com 3d Street address 3e City, state, zip 3f Telephone no 3g Fax no 3h Email address Page 1 of 11 PCN Form — Version 1 3 December 10, 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ® Other, specify Designer 4b Name' Daphne M Gartner 4c Business name (if applicable) NC DACS Division of Sod & Water Conservation - 4d Street address PO Box 845 4e City, state, zip Mocksville, NC 27028 4f Telephone no 336- 753 -0076 4g Fax no 4h Emad address Qaphne cartnerancagr gov 6. AgentfConsultant Information-(If applicable) 5a Name Daphne Cartner 5b Business name (if applicable) NC DACS Division of Sod & Water Conservation 5c Street address PO Box 845/134 Water Street 5d City, state, zip Mocksvdle, NC 27028 5e Telephone no 336- 753 -0076 5f Fax no 5g Email address Daphne cartner @ncagr gov Page 2 of 11 B. Project Information and Prior Project History 1. Property Identification la Property identification no (tax PIiV or parcel ID) Latitude 36 1509 Longitude - 80 8938 1 b Site coordinates (in decimal degrees) (NAD 83) 1 c Property size 47 acres 2. Surface waters 2a game of nearest body of water (stream, river, etc } to Little Hunting Creek proposed project , 2b Water Quality Classification of nearest receiving water WS -III 2c River basin map is available at Yadkin -Pee Dee lhttp Yh2o enr state nc usladmmlmaps/ - - 3. Project Description 3a ;Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this _ pplication , - _ application,' An unnamed tributary to Little Hunting Creek through the property has eroding banks, portions of it are entrenched and portions have a torturous meander pattern including central and amid- channel bars The land on either side of the channel is pasture which has been fenced to limit livestock access E_x_i_stmg vegetation included invasive_ species as well as some that are detrimental to livestock '3b Last the total estimated acreage of all existing wetlands on the property 0 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property - -- 3,000 3d Explain the purpose o€ the proposed protect The project purposed is to stabilize eroding banks and provided a stable channel pattern, profile and dimension 3e Describe the overall protect in detail including the hype of equipment to be used The proposed project will construct bankfull benches in reaches where the channel is stable but bankfull flows are constrained in the channel resulting in some bank erosion J -hook rock vanes, cross vanes and log vanes will be used to redirect flow into the center of the channel during normal flow and reduce stress on the banks during storm events This activity will be from the beginning of the project to station 5 +50, station 18 +75 to the end and on the tributary from the 'crossing to the confluence From Station 5 +50 to station 18 +75, the channel will be graded to shape a stable pattern, profile and dimension as bedrock in the area permits Structures will be used for grade control and maintaining higher velocities in the center of the bankfull channel Ail areas vuill be seeded, mulched_ and livestaked Coir matting will be 'used as needed to provide protection until ground cover is establfshed 4. .jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property ❑Yes ❑ No Z Unknown projeci_fincluding all prior phases) in the past? Comments is blue line on quad sheet 4b if the Corps made the jurisdictional determination what type - - ❑ Prel -- - ry_ ❑ Final of determination was made? _ ,__ 4c if yes, who delineated the Iunsdictional areas? v Agen Consultant Company Name (i# known) Other _ 4d If yes, list-the dates of the Corps junsdictional determinations or State determinations and attach documentation Page 3 of 11 PCN Form — Version 1 3 December 10, 2008 Version 6 - Project History 5a Have permits or certifications been requested or obtained for -this project (including all prior phases) in the past? Q Yes ® No ❑ Unknown 5b If yes, explain in detail according to "help file" instructions ,6. Future Project Plans 6a Is this a phased pro }ect� ❑Yes ®No 66--If yes, explain Page 4 of 11 C. Proposed Impacts Inventory 1. Impacts Summary 1 a Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams - tnbutanes ❑ Buffers Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site, the_ n complete this question for each wetland area impacted 2a 2b 2c 2d 2e, 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P FIT ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h Comments 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete tnis question for all stream sites impacted 3a 3b 3c 3d 3e '3f 3g, Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) ) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? othery (feet) feet) S1 ®P ❑ T Stabilization of Unnamed tnbutary to Little Hunting ® PER ® Corps 5 897 banks Creek El INT DWQ S2 ®P ❑ T Stabilization of Unnamed tributary to Little Hunting ®PER Corps 2 332 banks Creek El INT DWQ S3 ®P ❑ T Restoration Unnamed tributary to Little Hunting ® PER ® Corps 10 1325 Creek El INT ®DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 2554 31 Comments Page 5 of 11 4 Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then indivi ually list all open water impacts below 4a 4b 4c 4d. 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f Total open water impacts 4g Comments S. Bond or lake Construction If pond or lake construction proposed, then complete the chart below 5a 5b 5c 5d 5e Pond ID Proposed use or purpose Wetland Impacts (acres) Stream Impacts (feet) Upland number of pond (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f Total 59 Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 51 Size of pond watershed (acres) 5k Method of construction 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below if any impacts require mitigation, then you MUST fill out Section D of this form 6a ❑ Neuse ❑ Tar - Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number— Permanent (P) or Reason for Stream name Buffer mitigation Zone 1 impact (square feet) Zone 2 impact (square feet) Temporary impact required? 131 ❑P ❑T El Yes ❑ No B2 ❑P ❑T ❑Yes ❑ No B3 ❑P ❑T ❑Yes ❑ No 6h Total buffer impacts 61 Comments Page 6 of 11 D. Impact Justification and Mitigabon 1. Avoidance and Minimization 1 a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project The existing condition of the bed and bank matenaf were taken into considerations as the type design was need If the 'channel was principally stable, the plans only include bank shaping with minimal structures In areas where the channel has central and mid- channel bars where it is over -wide and cannot access the flood plain and where the banks have eroded and cut back was restoration planned b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques All reaches where the existing stream dimensions are stable but the bankfuli flow does not have access to the floodplam only constructionlcutbrig of a bankfull bench will be done In areas where flow is directed into a bank causing excessive erosion but the dimensions are stable, a structure such as a rock or log vane with a }-hook will be installed to reduction shear stress on the banks Where possible, trees will be left in place to reduce the impact to the banks however trees that are dead or have been damaged will be removed to prevent future impacts Grade control structures will be used to insure that this project will not impact grade upstream or downstream of the project area 2. Compensatory Mitigation far Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for ❑ Yes ® No ,impacts to Waters of the U S or Waters of the State? 2b If yes, mitigation is required by (check all that apply) ❑ DWQ ❑ Corps [I Mittgation bank 2c If yes, which mitigation option will be used for this ❑ Payment to in -lieu fee program project? ❑ Permittee Responsible Mibgation 3. Complete if Using a Litigation Hank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4. Complete If Making a Payment to In -lieu Fee Program 4a Approval letter from on -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c if using stream mitigation, stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non- npanan wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments Page 7 of 11 PCN Form —Version 1 3 December 10, 2008 Version 5. Complete if using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWO 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you will have to fill out this entire form — please contact the State for more information El Yes ❑ No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required: 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g, payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments Page 8 of 11 E. Stormwater Management and Diffuse Flog Plan (required by DWO) 1. Diffuse Flog Plan la Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Huffer Protection Rules? 1 b If yes, then is a diffuse flown plan included? If no, explain why ❑Yes El No Comments Not within one of the protected areas 2. Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 0% 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan, explain why Is in a pasture 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? ❑ Phase li 3b Which of the following locally - implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties 4a Which of the following state - implemented stormwrater management programs apply ❑ HQW ❑ ORW (check all that apply) ❑ Session Lawn 2006 -246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review! 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1 3 December 10, 2008 Version .I F. Supplementary Information 1. Environmental Documentation (DWO Requirement) la Does the project involve an expenditure of public (federal /stateAocal) funds or the ® Yes ❑ No use of public (federal /state) land? lb If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter) Comments 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after -the -tact permit application? ❑ Yes ® No 2c If you answered "yes' to one or both of the above questions, provide an explanation of the violabon(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in El Yes ® No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description 4. Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility Page 10 of 11 PCN Form — Version 1 3 December 10, 2008 Version S. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat'7 5b Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? El Raleigh 5c If yes, indicate the USFWS Field Office you have contacted ® Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Spoke with Brian Tompkins on 12/19/14 There has been a bog turtle site - 1 mile downstream but not in the area of this project 6. Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? Spoke with Brian Tompkins on 12/19/14 and he confirmed there is no EFH in the area 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? http / /gis ncdcr gov/hpowveb/ ,8 Flood Zone Designation (Corps Requirement) '8a _Will this project occur in a FEMA- designated 1 GO-year floodplain? ❑ Yes No ,81:i If yes, explain how-project meets FEMA requirements 8c What source(s) did you use to make the fioodplain determination? w wwr ncfioodmaps corn Daphne M Cartner /2' . l� �: d% / i Appiscant/Agent's Printed Name Date ApplicanUAgenrs Signature .�— (Agent's signature is valid only if an authorization letter from the appi,cant is provided) Page 11 of 11 1� 12/192014 Letter of adhorizabon , Leteir of authorization terry benton [tibentonyvc@gmail.com] Sent:Frnday, December 19, 2014 12 11 PM To: Cartner, Daphne This letter gives Daphne Cartner the authority to apply for permits for a stream project on my property_ I can be reached at 336 -984 -8989 if there are any questions Thanks Terry benton h"Smad nc gov /owa/?ae= Item& --IPM Note& id= RgAAAAC9rnulwzcLEfYgpcwb°h 2V% fn3BwDuf8GougYhT4LVX18bNUWJ AAhNjIQ2MN %2fp6UOPwfQaf5 1/1 lop Oj Terry Benton NC 911 Fcard N 20 0 3S "09'05.32" N 80,5303 40 165 ft 21-961 Old •0 W%tjv. 9koiida.-1JC s t,7) Eye alt 44253 ft LIVESTOCK EXCLUSION /FENCING IS TO BE INTALLED 10 FEET FROM THE TOP OF BANK, A MINIMUM OF TWO ROWS OF TREES SHALL BE STAGGERED BETWEEN THE TOP OF BANK AND FENCING, A BANKFULL BENCH WILL BE INSTALLED FROM THE CULVERT ON THE NORTH END OF THE PROJECT TO THE INTERSECTION OF THE TWO STREAMS. LARGE /HEALTHY TREES WILL BE AVOIDED AS THEY ARE PROVIDING STABILIZATION. ALL DISTURBED AREA WILL BE MATTED, SEEDED AND LIVESTAKED BANK FULL BENCH WILL BE INSTALLED ON THE SMALL TRIBUTARY. MOST TREES WILL NEED TO BE REMOVED. TWO CROSS VANES WILL BE NEEDED TO MAINTAIN GRADE (LOCATION TO BE DETERMINED) ALL DISTURBED AREA WILL BE MATTED, SEEDED AND LIVESTAKED. STATE OF NORTH CAROLINA DEPARTMENT (IF AGRICULTURE MID CONSUMER SERVICES DIVISION OF SOIL AND WATER CONSERVATION a Western Pledmont Technical Services Port Dernce Dar 90, Nodur4e, NC 97M P}O8 336 -753 -" F L F1 W Legand q Proposed Centerline 'Thalweg' Propsed Left and Right Edge of Water 'normal flow' Existing 5ft contours Existing Ift contours OProposed Pools Proposed Boulder Cross -Vane END OF PATTERN WORK FROM THE INTERSECTION APPROXIMATELY 1325 LINEAR FEET OF STREAM WILL BE REALIGNED TO MEET DESIGNED PATTERN, PROFILE AND DIMENSIONS. DESIGN IS BASED ON ROSGEN NATURAL CHANNEL DESIGN, REFERENCE REACH STREAM IS A C4 /C1. THERE WILL ADDITIONAL STRUCTURES INSTALLED ALONG THE RE— ALIGNMENT. THOSE SHOWN ARE TYPICAL PLACEMENT. THIS DRAWING IS FOR PERMITTING PURPOSES, Benton EQUIP Stream Project Proposed Stream Work WILKES COUNTY IIM� 100 0 100 200 300 Scalel 1' = 100' PACT 6 1 WAM r - 1w MAWR sn ON CerCrrr 1 DAM W19/=4 OCET NM OF oAT0.E� Terry 11 11 11 1110 ' 110 11 Typical Riffle Cross-section- Cross-sectional area Mould ran a from o 20.1 sq ft. - - - - - or station 0 +00 to E +50 and s ation 18+75 to 22+01 A. f bankfull bench will be graded approxim tely 5 -ft Yfide on each side of the stream as needed r as directed by the engineer. There will be areas here trees are to be preserved and the - width oft a —be nche may vary rom — side to side. - here may be minor lignment adjustments through these reaches as directed by fi e rngineer during con ruction. or statio 5 +50 to 1 +75: The revise, channel lignment will be followed and the chann I shaped within the above cross - sectional area range. All cut slopes will be :1 or flatter unless �ank mate ial prohibits. a STATE ❑F NORTH CAROLINA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES DIVISION OF SOD, AND WATER CONSERVATION Western Pekinnnt Technk6l Services PO Box 843 MotksyMu, MC e7M PIOE, 736 -753 -0076 LO - + o + 0 Benton EQIP Stream Project Typical Cross - section Wilkes County, North Carolina 0 N n o i 1125 1 110 1105 1095 to o 0 0 PROJECT 0- Bsntan Suw DRAWN NY. 1080&, r/CM •WOM CWECKEB NY- SWEET M or — FILENAME, 0 EROMON CONTROL L o LANKET DETAILS Top Trench Backflll trench with compacted soil. Blanket Overlap Top over Bottom Blodegradeable fasteners such as Eco- Stakes or Blo-Stakes Toe Anchor F-wW s• Blanket Overlap Upstream over Downstream 1-- 4e —1 NOTES: 1. The top edge of the blanket shall be anchored in a 6 -inch deep by 6 -inch wide trench approx. 2 feet back from the top of the slope. The trench shall be backfilled and compacted after the blanket is fastened in the trench with fasteners (on 12 -inch spacing). 2. The blanket shall be placed with a minimum 4 -inch overlap from one section of blanket to the next section. 3. The blanket shall be overlapped with the upstream section overlapping the downstream section. All overlaps must be secured with fasteners on 12 -inch spacing. 4. The terminal end of the blanket must be anchored in a 6 -inch deep trench and secured and backfilled as noted above. 5. The fasteners shall be installed in a staggered pattern on 3 -ft. spacing along the row and 2 -ft. spacing between rows. �-` STATE OF NORTH CAROLINA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES DIVISION OF SOIL AND WATER CONSERVATION Western Piedmont Technical Services Post Ofnce Box 844, HocksvlUe, NC 27028 PHONE 336 - 733-0076 Uwe Rake and Haffings FaT &TOSS 8WHOhMan saadona W BOOT Am Lode Makes Blackwil Swltchgrass Vlrginla Wltdrye Silky Dogwood Silky Willow Splcewood Alder (Better as Seedling) NOTES: I. The Live Stakes shall be 1 to 3 inches in diameter and 18 to 36 inches in length. Live stakes must be harvested and installed while dormant. 2. Tops of the stakes shall be cut flat and the base shapened (at an angle). The stakes shall be driven into the ground to a minimum depth of 3 inches above the ground (or to refusal) with a wooden or rubber mallet. 3. Live stakes are to be installed on a 3 -ft x 3 -ft spacing in three rows with a staggered spacing. The site will require approximately 825 live stakes or bare root seedlings. NOTES: Apply seed under matting at a rate of 50 Ibs /acres for all disturbed area within the 40 ft buffer area. All other distubed area may be seeded with specs from permanent seeding. Benton EQUIP Stream Project Seeding Matting and Livestake Detai( WILKES COUNTY r PROJECT F I SCALE, NTS DRAWN lri ON Cartlwr I DATE, 11/19/2014 CHECKED an SHEET NC. OF DATE, FILENAIE+ Terry Channel Side Slope Toe Anchor F-wW s• Blanket Overlap Upstream over Downstream 1-- 4e —1 NOTES: 1. The top edge of the blanket shall be anchored in a 6 -inch deep by 6 -inch wide trench approx. 2 feet back from the top of the slope. The trench shall be backfilled and compacted after the blanket is fastened in the trench with fasteners (on 12 -inch spacing). 2. The blanket shall be placed with a minimum 4 -inch overlap from one section of blanket to the next section. 3. The blanket shall be overlapped with the upstream section overlapping the downstream section. All overlaps must be secured with fasteners on 12 -inch spacing. 4. The terminal end of the blanket must be anchored in a 6 -inch deep trench and secured and backfilled as noted above. 5. The fasteners shall be installed in a staggered pattern on 3 -ft. spacing along the row and 2 -ft. spacing between rows. �-` STATE OF NORTH CAROLINA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES DIVISION OF SOIL AND WATER CONSERVATION Western Piedmont Technical Services Post Ofnce Box 844, HocksvlUe, NC 27028 PHONE 336 - 733-0076 Uwe Rake and Haffings FaT &TOSS 8WHOhMan saadona W BOOT Am Lode Makes Blackwil Swltchgrass Vlrginla Wltdrye Silky Dogwood Silky Willow Splcewood Alder (Better as Seedling) NOTES: I. The Live Stakes shall be 1 to 3 inches in diameter and 18 to 36 inches in length. Live stakes must be harvested and installed while dormant. 2. Tops of the stakes shall be cut flat and the base shapened (at an angle). The stakes shall be driven into the ground to a minimum depth of 3 inches above the ground (or to refusal) with a wooden or rubber mallet. 3. Live stakes are to be installed on a 3 -ft x 3 -ft spacing in three rows with a staggered spacing. The site will require approximately 825 live stakes or bare root seedlings. NOTES: Apply seed under matting at a rate of 50 Ibs /acres for all disturbed area within the 40 ft buffer area. All other distubed area may be seeded with specs from permanent seeding. Benton EQUIP Stream Project Seeding Matting and Livestake Detai( WILKES COUNTY r PROJECT F I SCALE, NTS DRAWN lri ON Cartlwr I DATE, 11/19/2014 CHECKED an SHEET NC. OF DATE, FILENAIE+ Terry