Loading...
HomeMy WebLinkAboutNCC223846_ESC Approval Submitted_20221122ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality October 19, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Fairfield Mountains Property Owners Association, Inc. ATTN: Mr. Jeff Geisler 112 Mountains Blvd. Lake Lure, NC 28746 RE: Project Name: Rumbling Bald Guardhouse Acres Approved: 1.32 Project ID: RUTHE-2023-006 County: Rutherford City: Lake Lure Address: Mountains Blvd. River Basin: Broad Stream Classification: B, Trout Submitted By: Mr. David Odom, P.E. Date Received by LQS: October 5, 2022 Plan Type: Commercial Dear Mr. Geisler, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eN01) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form maybe accessed atdeq.nc.gov/NCGO1. Please direct questions about the eNOI form to the Stormwater North Carolina Department of Environmental Quality I Division of Energy, Mineral and land Resources Asheville Regional Office 12090 U.S. Highway 70 I Swannanoa, North Carolina 28778 NDaYH CAAGUNrt + 0'"n enwEA'i mne'uio�ar� �� 828.296.4500 Letter of Approval with Modifications Fairfield Mountains Property Owners Association, Inc. ATTN: Mr. Jeff Geisler October 19, 2022 Page 2 of 4 Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 48.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Mi ael Smith Assi nt Regiona Engineer Land Quality Section Letter of Approval with Modifications Fairfield Mountains Property Owners Association, Inc. ATTN: Mr. Jeff Geisler October 19, 2022 Page 3 of 4 Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet ec: Mr. David Odom, P.E. davidodom@odomengineering.com Ms. Jill Graudszus jill@)odomengineering.com Regional Office file MODIFICATIONS Project Name: Rumbling Bald Guardhouse Project ID: RUTHE-2023-006 County: Rutherford For final plan approval, on or before Thursday, November 3, 2022, please provide the requested information below. 1. Please consider increasing the font size of the contour intervals for the proposed graded area in the vicinity of the proposed coffee shop drive. The intervals are difficult to discern. {G.S. 113A-57 (3)}. 2. Please consider adding a callout or adding plan sheet legend for the proposed grading contours. {G.S. 113A-57 (3)}. 3. Please consider adding the timing of the erection of the proposed building/coffee shop to the applicable phase construction sequence. {G.S. 113A-57 (3)}. 4. Is the 18" stormwater plastic pipe shown on the Phase 2 Erosion Control Plan a new installation or replacement? If this is a new installation, please provide the design calculations showing that is adequately sized to accommodate the anticipated flows. {G.S. 113A-57 (3)}. S. Please add more detail to the callout for the 18" plastic stormwater pipe shown on the Phase 2 plan sheet C-401. For example, include the material and length, etc. {G.S. 113A-57 (3)}. Letter of Approval with Modifications Fairfield Mountains Property Owners Association, Inc. ATTN: Mr. Jeff Geisler October 19, 2022 Page 4 of 4 6. Please check the callout boxes for the Phase II and Phase III Construction Sequences on plan sheets C-401 and C -402, respectively. There is a typo identifying both these phases as Phase 1. {G.S. 113A-57 (3)}. 7. Please consider adding the demolition/rebuilding of the guard house to the Phase 11 and Phase III construction sequences. {G.S. 113A-57 (3)1. 8. Consideration should be given to avoiding Sericia Lespedeza as it is considered an invasive species, per NC State University/At&T University Cooperative Extension. The Extension recommends the following alternative native species: Switchgrass (Panicum virgatum), Splitbeard Bluestem (Andropogon ternarius), Beggarlice (Desmodium spp.), Partridge Pea (Chamaecrista fasciculata). This plant is shown on the temporary seeding schedule on plan sheet C-900. {Comment} 9. Please provide on the plans a brief narrative describing the nature and purpose of the demolition and construction activities on this site. {G.S. 113A-57 (3)}. 10. To assist the property owner with closing out the site please add to the final Phase 3 Construction Sequence, that after a close out inspection report has been received from the LQS Inspector, to file online an electronic notice of termination (e-NOT) to end coverage under the General Permit NCG01000. If the e-NOT is not completed the financially responsible party will continue to be billed $100.00 annually. {G.S. 113A -57 (3)1. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities J fio �A Wl N O r-r ''* 0-* � re � , m c� CD CD CD fD CD y CD CD 4 CA CD n 4�" C y c CD CL �• � CD CD CD M CL CL o CD � o CDCD 0 ITI It r z