Loading...
HomeMy WebLinkAbout20071660 Ver 1_401 Application_2007090707-1660 NC WILDLIFE RESOURCES COMMISSION DIVISION OF ENGINEE ~~ ~~ _ ~ _1 NG SERVICES ,~ ~, 5031 Cambridge Oaks Drive Matthews, NC 28104 September 26, 2007 SEP E 8 2007 Division of Water Quality 2321 Crabtree Blvd., Suite 250 Raleigh, NC 27604 DEN~t - UdATI;R 4tlALITY YVf'~'tl./Vrpe IUnD STOf3~lATbR i3FtANCi1 Gentlemen: Enclosed please find 7 sets of drawings and PCN's and a wire transfer in the amount of $200, payment ref. # 25803 for the Shoreline Protection of the Hickory Hill Boating Access Area on Falls Lake, Durham County, NC. A similar submittal has been made to the US Army Corps of Engineers for review under their Nationwide Permit #13. Please review this submittal and if you have questions or need additional information, let me know. Sincerely, ~~ Michael Benteen Facilities Engineer, NCWRC (704) 821-3157 Division of Engineering Services Mailing Address: 1720 Mail Service Center • Raleigh, NC 27699-1720 Office Location: 512 N. Salisbury Street • Raleigh, NC • Telephone: (919) 715-3155 • Fax: (919) 715-2380 Sep 11, 2007 4:29:57 PM OCP AP DOCUMENT GENERAL INFORMATION DGI NEXT FUNCTION: ACTION: HISTORY: 09/11/2007 16:29:50 PAY ENTITY 17PT VENDOR/EMP NUMBER: 566000372 40 VEND/EMP SHORT NAME: DENR DOCUMENT NUMBER 090507E DOCUMENT DATE 09/05/2007 CONTROL NUMBER 0428 DOCUMENT TYPE INVOICE DOCUMENT STATUS PD-FULL CURRENCY CODE GROSS DOC AMOUNT AMOUNT PAID COUNTY CDE/TRIP NBR: PO REFERENCE SIGN APPROVAL CODE DATES APPROVED CONTROL DATE 09/10/2007 APPLICATION AREA JC DATE ENTERED 09/10/2007 DATE LAST UPDATED: 09/10/2007 200.00 PROV ACCTG DATE 200.00 REMIT MESSAGE: 401 PERMIT FEE FOR NCWRC HICKORY HILL BOATING ACCESS AREA ~~~~d~ D D SEP 2 S 2007 DENbt -WATER CIUALITY WETIANDQ ACID STORIAl~AT6R BRANCH Sep 11, 2007 OCP AP NEXT FUNCTION: BROWSE: __ - ACTION: HISTORY: DPG 09/11/2007 16:29:59 PAY ENTITY 17PT VEND/EMP NBR: 566000372 90 VEND/EMP SHORT NAME: DENR DOCUMENT NBR: 090507B DOCUMENT DATE 09/OS/2007 PAYMENT NBR: 001 PRTL PYMT NBR: 000 IND AMOUNT SALES TAX/VAT SALES TAX 2 SALES TAX 3 FREIGHT . ADDITIONAL COST GROSS INVOICE 200.00 PAYMENT AMOUNT 200.00 AMOUNT PAID 200.00 PAYMENT TERMS NET PAY IMMEDIATELY PAYMENT DATE 09/10/2007 PAYMENT ROUTE CD FACTOR NUMBER REASON CODE/DESC 4:30:06 PM DOCUMENT PAYMENT GENERAL INFORMATION VAT INCLUSIVE N EXPENSE IND GL EFFECTIVE DATE: 09/10/2007 EXTRACT DATE ACCRUAL CANC DATE: CURRENCY CODE DISCOUNT TXPE NOT TAKEN DISCOUNT TAKEN PAYMENT STATUS PAID PAYMENT REF NBR 0000025803 PAYMENT TYPE : ELECTRONIC HANDLING CODE ONE INVC PER PYMT: YES BANK ACCT PYMT CD: IGO .00 f Office Use Only: Form Version March OS USACE Action ID No. DWQ No. ~ ~ 7 ' 1 6 6 ~ (If any particular item is not applicable to tuts project, please enrer _.NOt Hpp»cao,e ar ivir~ .~ I. Processing 1. Check all of the approval(s) requested for this project: ^ Section 404 Permit ^ Riparian or Watershed Buffer Rules ^ Section 10 Permit ^ Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ^ Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NW 13 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ^ 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ^ S. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ^ II. Applicant Information 1. Owner/Applicant Information Q~~~od~ err G ~ LUUI Mailing Address: 5031 Cambridge Oaks Drive Telephone Number: 704-821-3157 Fax Number: same E-mail Address: mbenteen(a~carolina rr com 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Updated 11/1/2005 Page 5 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USAGE requires information to be submitted on sheets no lazger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans aze reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Hickory Hill BAA Shoreline Protection 2. T.LP. Project Number or State Project Number (NCDOT Only): NA 3. Property Identification Number (Tax PIN): NA 4. Location County: Durham Nearest Town: Durham Subdivision name (include phase/lot number): NA Directions to site (include road numbers/names, landmarks, etc.): From I-85 South near Lhirham, exit on Redhill Road and turn Right. Go for approx 1.5 miles and turn left on Hickory Hill Boating Access Road The area is at the end of this road. 5. Site coordinates (For lineaz projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 36.0328 °N 78.4624 °W 6. Property size (acres): 10 acres 7. Name of nearest receiving body of water: Falls Lake 8. River Basin: Neese Basin (Note -this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The area is forested and is used as a wildlife habitat and boat ramp. Updated 11/1/2005 Page 6 of 12 10. Describe the overall project in detail, including the type of equipment to be used: This project consists of placing rip rap on the escarpment next to the existing boat ramy to yrotect from further erosion A trackhoe and hand labor will be used for this project. 11.Explain the purpose of the proposed work: The bank adiacent to the boat ramp is eroding at ~proximatel~l' per wear It is very close to the top of the maneuvering area. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. We have no record of permitting on this site. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. There will be a courtesy dock added in the future. As of now it is not funded and the shoreline protection is a matter of some urgent. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: The existing escarpment will be cleaned of loose materials, geofabric will be placed and riprap will be placed along Updated 11/1/2005 Page 7 of 12 approximately 127' of shoreline. Normal water level is 251.5' and the riprap will extend about 6' from the bank and go to a level of 250'. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/dralnage, etc. For dams, cer,arately list impacts due to both structure and flooding. Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-yeaz Floodplain es/no) Distance to Neazest Stream (lineaz feet) Area of Impact (acres) Total Wetland Impact (acres) 3. List the total acreage (estimated) of all existing wetlands on the property: -0- 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams r,,,,~t hP inclnded_ Tn calculate acrea~e_ multiply lens?tll X width, then divide by 43,560. Stream Impact Number (indicate on ma) Stream Name Type of Impact Perennial or Intermittent? Average Stream Width Before Im act Impact Length (lineaz feet) Area of Impact (acres) Total Stream Impact (by length and acreage) 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill_ excavation_ dred~in~_ floodine. drainaee, bulkheads, etc. Open Water Impact Site Number Name of Waterbody Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, Area of Impact indicate on ma) (if applicable) ocean, etc.) (acres) Updated 11/1/2005 Page 8 of 12 1 Falls Lake ~PmP Placed along the shoreline Lake .02 Total Open Water Impact (acres) .02 6. List the cumulative im act to all Waters of the U.S. resultin from the project: Stream Impact (acres): -0- Wetland Impact (acres): -D- en Water Im act (acres): .02 Total Impact to Waters of the U.S. (acres) .02 Total Stream Impact (linear feet): -0- 7. Isolated Waters Do any isolated waters exist on the property? ^ Yes ®No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The work on this project needs to be done at low water and will be performed by hand and trackhoe It will create no additional runoff. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Updated 11/1/2005 Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Cazolina (see DWQ website for most current version.). Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/lineaz feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. 2. Mitigation may also be made by payment into the North Cazolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they aze will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http•//www nceep net/pages/inlieureplace.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (squaze feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (required by DWQ) Updated 11/1/2005 Page 10 of 12 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federaUstate) land? Yes ® No ^ 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Cazolina Environmental Policy Act (NEPA/SEPA)? Note: If you aze not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ^ No 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ^ No ^ X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be cleazly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ^ No 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. _ Zone* ~ Impact `` Multiplier I Required 3 (2 for Catawba) 1.5 Total * Zone 1 extends out 30 feet perpendict additional 20 feet from the edge of Zone 1. from the top of the near bank of channel; Zone 2 extends an If buffer mitigation is required, please discuss what Donation of Property, Riparian Buffer Restoration Riparian Buffer Restoration Fund). Please attach all within 15A NCAC 2B .0242 or .0244, or .0260. XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from type of mitigation is proposed (i.e., Enhancement, or Payment into the appropriate information as identified uPaatea tvtnoos Page 11 of 12 ti , the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. The exiting site is heavily wooded and this project will not increase the amount of impervious area. XII. Sewage Disposal (required by DWQ) Cleazly detail the ultimate treatment methods and disposition (non-dischazge or dischazge) of wastewater generated from the proposed project, or available capacity of the subject facility. There is no waste water generated from this proiect XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ^ No Is this an after-the-fact permit application? Yes ^ No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact neazby downstream water quality? Yes ^ No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Cazolina Division of Water Quality policy posted on our website at http•//h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Updated tl/1/2005 Page 12 of 12 ~~ ~p I~YI ti N ~ F ~ ~ C~1 < ~ ~ ~ }' ~ ~ ~ ' ,q ~ ~ 2 C./) ~ a ~ ~ ~ •~I ~ ~ l j e ~ Q~ > ~ ~ ~ ~/~ ~/ ~/1 \ ~ ~ y of ~ + ~ ~ ~ ~ ~~O3r ` ~ ~. ~ ~ W / L/ 1 ~ Q~ a~ ~ m ~ N ~" ~ ~ 4-- ~ ~ ~ O o • N v ~ ~ ~ az T (n ti- ~ ~ m O 4J C O C ~ Ul O ' ~ +-+ ~ ~~ _ ~ ~ ~ cn N N p ~ +~ ~ ~ C ~ ~ ~ ~ ~ o N -•~ ~ O O ~ ~~ •~ U-O Q ~ ~ "-' p C ~ ~ O ~- O Q ~ U ~ ~ ~ ~ N ~ ~ ~ , ~ _ ~~ ~~-~~, -.- N U ~ ~ ~ O L ~ ~ ~ Q ~ ~ ~ N ~~ Q_ a~ N ~ ~ ~ ._ L ~ ~ ~ ~ O ~ ~ ~ ~ ~ ~ cn 3 ~ ~ (n ~ ~ ~ ~ ~ \ _ _ U ~ _ ~ ~ ~ ~ \ X O ~ ~ J ~ ~ ~ O O O ~ Q O ~ ,~ _.. i Q ~ - p __ ~ ~ F- Q > ~ `~-__ _ _ , _ _ ~ 0 .._. ~ , ~ \ a~ ~ ._ ~ ~,~ __ ~ ~ \ J ~~, rn _ ,~ R `-r ~ _, ~ \ ~ ~ R rnP ~ o ~ ~ ~ ,_ ~ ~ R ~p o ~ \ ~ c = U o .Y ~ ~ 11 Rq`~A w ~ ~, ` U .., ~ ~ ~ I ~ ~ ~ O v - ~ `° / (~ ~ N ! ~ (n Z ~ r W C7 Z x c? ~_ ~ J J w w Q ~ Q J Z ~ C7 Z w W U Q U Z ~ _ O ~ Q ~ U ° H O Z •~I ~ ~ ~ 0 0 +J ~? I ~ ~ ~ I ~ ~ .. . - ~ ~ N N I ~ N N I ~ O ~ ~ ~ - O ~ ~ v a~ ~ O ~ ~ ~ _ ~ ~ a~ ~ ~ It.l ; - -- -- - ° ~ ~ U ~ o ~--~ ~ ~; -_ _ o ~ , o ~ ~ `~ I m o ~ ~ ~ ~ ~ O N U ~ _ \ 4- Q L ~ ~ MM W O Q 0 L a 0 0 ~- - -_ ~ M N N ~ ~ ~ ~ ~ •~ O p O~ O u ~ Q, O i O ~ ~ ~ a I .. ~ QJ ~ p - ~ _- ------- ~ ~ ~ ~ ~ x O O ~ O ~ ~ ~ n } n ~ ~LJ ~LJ ~ U ~ ~ ~ ~ ~ °' ~ __ -- O ~ r n -- _ _ o _~ r n ~ O L ~~'~. v1 vl O O ~--~ U ~ Q~ U _ _ - - -- -_ N O 0;J CO ~ N O~ _ N O 00 _ (D d- N O D~ Q Q -+-' Z CO LO In to ~ In ~ d~ CO CD Ln Ln Ln Ln In ~ - ~ O N N N N N N N N N N N N N N N N ~ ~ ~ ~ ~ ~ U ~ O ~ ~ ~ O ~ ~ ~ ~ O ~ ~ ~ +~ O ~ ~ ~ ~ ~ ~ O ~ ~ ao ~ ~ °'~ v-p~- a~ ~ ° Q ~ ~ o~~o~' ~~~~ ._o 9~ ~~a~~o p ~ O - O C~ ~ N ~ _~, > N -o _,_, -,-, ~, l O L ~ CO ~ ~ C p ~ O p~ ~ ~ p ,J `~ ~ O p O ~ ~ . - ~ ~ -o ~, ~ ° ' ~ ~ ~~ ~ -a Q L ~ _oa a~ o ~ ~ ~ _ = cn o ~ o ~ O D +-~ ~ ~ i U ~ ~ ~ O ~ Ul N N ~ Q ~ ` ~ S' 00 ~ _ p (n CJ N _ Q ~ - -_ Q N 'L O (~ a p ~ ~ /~ O ~ O M W J~ ~ ~ ~ ~ Lp ~ Q ~ Q ~ ~ ~~ y-i ~~ ~ O N•L C ~-O U 0 0_ t2 ~ O ~ C ~ ~ ~ ~ O m ~ ~ 3 Q = ~ ~ Q ~ Ln _ ~ ~ U L ~ p L "~ U ~ ~ ~ N ~ Q~ ~ p U ~ O O ~ Li ~ _ ` __ '~ ~_ \~ ~ I ~ O- ~ .- O ~ U •- _O N i~ ,-~ O vl 4J N C O ~ O ~~`-~ OQ cn NC7~U 0-,-~`-+~ ~ Z O O~G o ~ _ ~ ~_ ~__ ~ - " - ' ~_ ~ p O O _, \_ m J U n O ~ ~ - ` Ul n ~ U p ~ ~ ~ ~ ~ Q Ra - ~ p `° ; `~ ~ ;- ' ~ > ~ ~ N - W W U o~` . - \ - - _ __ ~ cn z 6 a~ ~ -' V ~ W (.7 Z z w ~ ~~ LL _ ~ a ' " ' J D L1J Z ~ J ~ ~' drrP ~ ~ w v ~ ~ Q _U ~ ~ Z _ > ~ J cn O ~ ~ a Q ~ U N ~ f ~ _ O Z