Loading...
HomeMy WebLinkAbout20221431 Ver 1_Updated Impact Table_20221102D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project (check all that apply): ❑x Wetlands ❑ Buffers ❑ Pond Construction Streams - tributaries ❑ Open Waters 2. Wetland Impacts If there are wetland impacts proposed on the site, complete this table for each wetland area impacted. 2a. Site #` 2a1. Impact Reason/Type 2b. Impact Duration* 2c. Wetland Type* 2d. Wetland Name* 2e. Forested ?* 2f. Jurisdiction Type* 2g. Impact Area (ac) W1 Convert to Stream Permanent Non-NCWAM Types W1 No Corps 0.008 W1 Grading Temporary Non-NCWAM Types W1 No Corps 0.049 W2 Grading Temporary Non-NCWAM Types W2 No Corps 0.019 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter 2g1. Total temporary wetland impacts 0.068 ac 2g2. Total permanent wetland impacts 0.008 ac 2g3. Total wetland impacts 0.076 ac 2h. Type(s) of material being discharged and the amount of each type in cubic yards: Click to enter text. 2i. Comments: Wetland W2 and 0.049 acres of Wetland 2 will be impacted inorder to create floodplain benches. The final grades of the benches will allow Bat Fork to reconnect with its floodplain and will enhance wetland hydrology. 0.008 acres of wetland W1 will be converted to stream within the constructed new active channel for Bat Fork. This permanent impact is not a loss of waters. Page 9 of 20 PCN Form Version 4.3- April 20, 2022