HomeMy WebLinkAbout20221431 Ver 1_Updated Impact Table_20221102D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project
(check all that apply):
❑x Wetlands
❑ Buffers
❑ Pond Construction
Streams - tributaries
❑ Open Waters
2. Wetland Impacts
If there are wetland impacts proposed on the site, complete this table for each wetland area impacted.
2a.
Site #`
2a1.
Impact
Reason/Type
2b.
Impact
Duration*
2c.
Wetland Type*
2d.
Wetland Name*
2e.
Forested
?*
2f.
Jurisdiction
Type*
2g.
Impact Area
(ac)
W1
Convert to
Stream
Permanent
Non-NCWAM
Types
W1
No
Corps
0.008
W1
Grading
Temporary
Non-NCWAM
Types
W1
No
Corps
0.049
W2
Grading
Temporary
Non-NCWAM
Types
W2
No
Corps
0.019
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
Choose one
Temp/ Perm
Choose one
Click to enter
Y/N
Choose one
Click to enter
2g1. Total temporary wetland impacts
0.068 ac
2g2. Total permanent wetland impacts
0.008 ac
2g3. Total wetland impacts
0.076 ac
2h. Type(s) of material being discharged and the amount of each type in cubic yards:
Click to enter text.
2i. Comments:
Wetland W2 and 0.049 acres of Wetland 2 will be impacted inorder to create floodplain benches. The final grades
of the benches will allow Bat Fork to reconnect with its floodplain and will enhance wetland hydrology. 0.008 acres
of wetland W1 will be converted to stream within the constructed new active channel for Bat Fork. This permanent
impact is not a loss of waters.
Page 9 of 20 PCN Form Version 4.3- April 20, 2022