Loading...
HomeMy WebLinkAboutNC0056863_Authorization to Construct_20060622Town of Rose Hill A to C No. 056863A02 Issued September 30, 2004 ENGINEER'S CERTIFICATION gAirrit I,115Aliko. - (, 4^t ` - ; p t: , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the Conjunctive Use Reclaimed Wastewater System serving the Town of Rose Hill, located in Duplin County, hereby state that to the best of my abilities, due care and diligence was used in the observation of the following construction: Replacement of grit removal system, and the distribution box, pursuant to the letter of request received November 27, 2001, and in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature // r; : , Registration No. Date Mail this Certification to: DENR/DWQ Design Management Unit Construction Grants & Loans Section 1633 Mail Service Center Raleigh, NC 27699-1633 EcEE • mn v. swJJ JL., secretary ry North Carolina Department of Environment and Natural Resources ba Alan W. Klimek. P.E. Director O Division of Water Quality August 12, 2002 Mr. Thomas G. Drum, Town Administrator Town of Rose Hill Post Office Box 8 Rose Hill, North Carolina 28458-0008 Dear Mr. Drum: 5 AUG 2 6 2002 DENR - WATER QUALITY POINT SOURCE BRANCH SUBJECT: A to C No. 056863A01 Authorization to Construct Town of Rose Hill Town of Rose Hill WWTP Duplin County Project No. E-SRG-T-00-0085 A letter of request for Authorization to Construct was received on July 23, 2002 by the Division, and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 0.45 MGD Town of Rose Hill Wastewater Treatment Plant, with discharge of treated wastewater into Reedy Branch in the Cape Fear River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Replacement of two screw pumps and associated electrical work. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0056863 issued March 28, 2002, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0056863. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may Construction Grants and Loans Section 1633 Mail Service Center E-Mail Address www.nccgl.net 421. NCDENR Raleigh, NC 27699-1633 (919) 733-6900 Customer Service FAX (919) 715-6229 1 800 623-7748 be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Wilmington Regional Office, telephone number (910) 395-3900, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to Cecil G. Madden, Jr., P.E., Construction Grants & Loans, DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. 2 Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Cecil G. Madden, Jr., P.E. at telephone number (919) 715-6203. Sincerely, Alan W. Klimek, . . ID:dr cc: The Wooten Company (Dr. Shankar R. Mistry, P.E.) Duplin County Health Department Wilmington Regional Office, Water Quality Section Technical Assistance and Certification Unit Daniel Blaisdell, P.E. Dave Goodrich, NPDES Permitting Unit Cecil G. Madden, Jr., P.E. SRG 3 TOWN OF ROSE 111 P.O. BOX 8 ROSE HILL, NORTH CAROLINA 28458 FY 2004-2005 (BEGINNING JULY 1, 2004) PERFORMANCE ANNUAL REPORT GENERAL INFORMATION FACILITYISYSTEM NAME: RESPONSIBLE ENTITY: ROSE HILL WASTEWATER TREAMENT PLANT TOWN OF ROSE HILL PERSON 1N CHARGE\CONTACT:GERALD F. JAMES (910) 289-3159 OR (910) 289-2000 APPLICATION PERMIT: NC 0056863 DESCRIPTION OF COLLECTION OR TREATMENT PROCESS: 0.45 MGD WASTEWATER TREATMENT FACILITY CONSISTING OF AN INFLUENT PUMP STATION, BAR SCREEN, OXIDATION DITCH, THREE (3) CLARIFIERS, AERATED SLUDGE HOLDING TANK, FIVE (5) DRYING BEDS, CLORINE DISINFECTION BASIN AND POST AERATION BASIN LOCATED AT ROSE HILL WASTEWATER TREATMENT PLANT, NCSR 1931 IN DUPLIN COUNTY (SEE FLOW SCHEMATIC). THE DISCHARGE FROM SAID TREATMENT WORKS AT THE LOCATION SPECIFIED ON THE ATTATCHED MAP IS INTO REEDY BRANCH WHICH IS CLASSIFIED CLASS C-SWAMP WATERS IN THE CAPE FEAR RIVER BASIN. 2. PERFORMANCE TEXT SUMMARY OF SYSTEM PERFORMANCE FOR FISCAL YEAR 2004-2005 SAID WASTEWATER TREATMENT FACILITY PASSED ALL 4 QUARTERLY CHRONIC TOXICITY THAT IS REQUIRED IN OUR NPDES PERMIT. THE FACILITY RECEIVED A NOV (NOTICE OF VIOLATION) FOR A FLOW VIOLATION IN MARCH OF 2005. LIST (BY MONTH) ANY VIOLATIONS OF PERMIT CONDITIONS OR OTHER ENVIRONMENTAL REGULATIONS; MONTHLY LIST SHOULD INCLUDE DISCUSSION OF ANY ENVIRONMENTAL IMPACTS AND CORRECTIVE MEASURES TAKEN TO ADDRESS VIOLATIONS. JULY 2004 NO VIOLATIONS PASSED TOXICITY AUGUST 2004 NO VIOLATIONS SEPT. 2004 NO VIOLATIONS OCT. 2004 NO VIOLATIONS PASSED TOXICITY NOV. 2004 NO VIOLATIONS DEC. 2004 NO VIOLATIONS JAN. 2005 NO VIOLATIONS PASSED TOXICITY FEB. 2005 NO VIOLATIONS MAR. 2005 NOTICE OF VIOLATION PERMIT EFFLUENT FLOW APR. 2005 NO VIOLATIONS PASSED TOXICITY MAY 2005 NO VIOLATIONS JUNE 2005 NO VIOLATIONS 3. NOTIFICATION STATE HOW THIS REPORT HAS BEEN MADE AVAILABLE TO USERS OR CUSTOMERS OF THE SYSTEM AND HOW THOSE USERS HAVE BEEN NOTIFIED OF THE AVAILABILITY. NOTIFICATION WAS MAILED TO THE ADDRESS OF EACH SEWERICUSTOMER SO AS TO INFORM SAME THAT A COPY OF THIS REPORT COULD BE OBTAINED AT THE TOWN OF ROSE HILL TOWN HALL (COPY OF NOTIFICATION ATTATCHED). 4. CERTIFICATION I CERTIFY UNDER PENALTY OF LAW THAT THIS REPORT IS COMPLETE AND ACCURATE TO THE BEST OF MY KNOWLEDGE. I FURTHER CERTIFY THAT THIS REPORT HAS BEEN MADE AVAILABLE TO THE USERS OR CUSTOMERS OF THE NAMED SYSTEM AND THAT OSE USERS HAVE BEEN NOTIFIED OF ITS AVAILABILITY. z2-aS_ D F. J DATE IC UTILITIES ' 1' i TOR OF ROSE HIL . BOX 8 OSE HILL, N.C. 28458 �Sl �. -r.I l�'• Ati r = y.+L �:./. f t .•.:t �'; w .... ;:, u } t ry.0 r L 4.. .'%li: 1 r �.�-'r`Ywi�11� ..,, • '.ram •.y.tf . 6 t. i t � _{ � t..t, ..i, • x= .•�..: ��• C..,. i r is tit rf r� , r�` ?�.,�,� , -9` •�: *•SI r aci� K:::tt, rk.tti cd' f'•nl .;(.. 'Y.;.• :�1. � C M. 'r a er k�!�� t �� .� :.. .{. l.. ♦ JI..M1r. s 'i"�•L1.Y.�'.�_r-i• �.17LL. •►3�6 �. �,'�Ar.�'R _ .� ili-i%`._��• . • V Y. _ r—� ~ ( rG 3 - PCsar No. r w w a.4SMGZRosa ilU14 FIcw SCt.2:.t21zic t { t S_Ld a I—i f QC- s ri ' wr 6 Bads Li t ( r Y 7 • • • tom GS: e Sludge I FG . T r �. R. re-, a a ricuir Limas Sludge t _as Ra..._.•.: C 'as: z i a:e+ SludTe 77. —e t 1 z C.C.daticm / / M 1 11 a rs r. r � 1 1 7 1 + .. 3�� . • • aa — A