Loading...
HomeMy WebLinkAboutWQ0043787_Application (FTSE)_20220914OWORmw� Dlvislon of Water Resources State of North Carolina Department of Environmental Quality NC Dept of Environmental Qualit Division of Water Resources SP 14 2 AST TRACK SEWER SYSTEM EXTENSION APPLICATION VIA 06-21 & SUPPORTING DOCUMENTATION (to be completed by DWR) we co Yj 7 Q Q 7 All items must be completed or the application will be returned 7 alei h CFional Office Application um e I. APPLICANT INFORMATION: 1. Applicant's name: Franklin County (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Federal ® State/County ❑ Municipal 3. Signature authority's name: Chris Doherty per 15A NCAC 02T .0106{b} Title: Public Utilities Director 4. Applicant's mailing address: 1630 US Hwy I City: Youngsville State: NC Zip: 27596- 5. Applicant's contact information: Phone number: (919) 556-6177 Email Address: cdohertv(@franklincounttync.us IL PROJECT INFORMATION: ❑ Privately -Owned Public Utility ❑ Other 1. Project name: Farmington Oaks Pump Station Abandonment 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: , For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Franklin 4. Approximate Coordinates (Decimal Degrees): Latitude: 36.038064 Longitude:-7$.436878 5. Parcel ID (if applicable): 037961 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Benjamin B. Wibbens. P.E. License Number: 54448 Firm: LKC EnaineerinR, PLLC Mailing address: 140 Aqua Shed Court City: Aberdeen State: NC Zip: 28315- Phone number: (910) 420-1437 Email Address: ben(@LKCent=-ineering.com 1V. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Franklin County WWTP Permit Number: NC006931 Owner Name: Franklin County V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQ 2. Downstream (Receiving) Sewer Information: 18 inch Z Gravity L Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS00179 Owner Name(s): Franklin County FORM: FTA 06-2 1 Pagel of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑ No ® N: A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Oppational Agreement (FORM: DEV} been attached? ❑ Yes ❑ No ® N.-'A 3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement (FORM: HOA) and supplementary documentation as required by 15A NCAC 02T.0115(c) been attached? ❑ Yes ❑ No ® NIA 4. Origin of wastewater: (check all that apply): ® Residential (Individually Owned) ❑ Retail (stores, centers, malls) ❑ Car Wash ® Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool f day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool/Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses ;' offices 1 factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater. 100 % Domestic % Commercial % Industrial (See 15A NCAC 02T .0103(20) If Industrial, is there a Pretreatment Program in effect? ❑ Yes❑ No 6. Hasa flow reduction been approved under ISA ttiCAC 02T .0114(f)? ®Yes ❑ No ➢ If yes, provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type (see 02T.0I14(f)) Daily Design Flow',b No. of Units Flow gal{ GPD gall GAD gall GPD gal/ GPD gall GPD gaV GPD Total GPD a See 15A. NCAC 02T .0114(bl_ f dl_ (e)f 11 and (e2] for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G_S. 42A-4). b Per 15A NCAC 02T .01 14(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01 t4) shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 0 GPD (per 15A NCAC 02T .01141 ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number:. Issuance Date: _ ❑ Rehabilitation or replacement of existing sewers with no new flow expected ® Other (Explain): Farmington Oaks pump station to be abandoned and flow redirected to adjacent gravity sewer outfall. FORM: I TA 06-21 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (if Applicable) - 02T .0305 & MDC JQravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 176 PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: 3. Total number of pumps at the pump station:.. ___ 3. Design flow of the pump station: millions gallons per day (firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s) per pump(s): gallons per minute (GPM) at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per MDCPSFM Section 2.01C.1.b. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify) 6. Power reliability in accordance with 15A NCAC 02T _0305(h)(1): ❑ Standby power source or ❑ Standby pump ➢ Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: ➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of ail the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 06-21 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separationslaltematives found in I5A NCAC 1 .0305 i & fig 'x ® Yes ❑ No 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches 'Water mains (vertical - water over sewer preferred, including in benched trenches) 18 inches 'Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet "Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet "Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet "Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ If noncompliance with 02T_0305(t) or (gj, see Section XI of this application * 15A NCAC 02T.0305( contains alternatives where separations in 02T.0305(f) cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. "Stream classifications can be identified using the Division's NC Surface Water Classifications webnaee 2. Does this project comply with the minimum separation requirements for water mains? ® Yes L No ❑ N A ➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ® Yes ❑ No ❑ N A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft separation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ®Yes Basin name: Neuse ❑ No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B _0200? ® Yes ❑ No ➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202 5. Does the project require coverage.'authorization under a 404 Nationwide individual permits ❑ Yes ® No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage.."authorization is required. 6. Does project comply with 15A NCA(7_.02T 0.1_05(cl( ) (additional permitsicertifications)? ®Yes J No Per 15A NCAC 02T.0I05(c)(6), directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high.. priority?" ❑ Yes ® No Per 1SiN Ng&C ,Tt , "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interferencelconflict boxes require a variance approval. ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 06-21 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for The peimigi a of Puny Slations And Fq a Mains ilatest version) and the Gravity Sewer min imumlk5 ign Criteria (latest version as applicable? ® Yes ❑ No If no, for projects requiring a single variance, complete and submit the Variance/Altemative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be Issued 2. Professional Engineer's Certification: I, Beniamin B. Wibbens., P.E. , attest that this application for Farmington Oaks_PuMp Station Abandonment (Professional Engineer's name from Application Ilcm III l ) (Project Name from Application Item II 1) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria For G,raviry Sewers [latest version, and the Minimum tisigfst GriLed4 for the ¢ast-Track P rmittintt p Force Mains latest version . Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S 10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701) �. ---................ ....... .......... .. North Carolina Professional Engineer's seal, signature, and. date: 3, Applicant's Certification per 15A NCAC 02T .0106(b): ����1f11111/ •`''t k CM ••',�D,, ii 'Ad i i N Fst•• �fi •` k Z Ili. 1, Chris Doherty , attest that this application for Farmington Oaks Pump Station Abandonment (Signature Authority Name from Application Item 13) (Project Name from Application Item It 1) attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE In accordance with General Statutes 143-215.6A and 143-215.68, any person who knowingly snakes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. t3 2022..� September 13th, 2022 Mr. Scott Vinson NCDEQ — Raleigh Regional Office 3800 Barrett Drive, Raleigh, NC 27609 Re: Franklin County Farmington Oaks Pump Station Abandonment Fast -Track Sewer Application Mr. Vinson, Regarding the above referenced project, please find the following items: NC DePt of Environmental Qualit-, SEP 14 M2 Raleigh Regional Office 1. Two Copies of the Fast Track Application Package and supporting documents 2. One application fee check for $480.00 The proposed project includes the abandonment of Farmington Oaks Pump Station and redirection of flow to adjacent 18-inch gravity sewer outfall via 176 L.F. of 8-inch PVC gravity sewer. If you have any questions, please do not hesitate to contact me at (910) 420-1437 or by email at ben @Ikcengineering.com. Sincerely, LKC Engineering, PLLC x V4//, Benjamin B. Wibbens, P.E. LKC Engineering, PLLC,140 Aqua Shed Court, Aberdeen, North Carolina 28315 PH: 910/420-1437 * FAX: 9101420 1438 * License No. P 1095 �- �, ,. NORTH PASTURES TRi f j NNYS WAY ,z CoLU c� �- ■ 7 CIO -Holding Farm2iP5.,,�# Z s ";:2I Holdkng.Farms 1 P5 j r ♦ C 17 PL n CREEK RD } F rt HERRINGB_OIVE DR � �ON01� ClrDAR� .� . • ri CANTI=RBUR-DR <� Farmgt6OakPS ♦ 1- My Legend Pump Stations {+� J r, . ti ��<i ♦♦��• Existing Gravity Sewer % z+� Existing Force Main FARMINGTON OAKS PUMP STATION ABANDONMENT Feet YOUNGSVILLE, NC 0 500 1,000 2,000 it W ,�.. i STUR1=S TR! kor 16 NOR JENNYS WAYy ,z }IiLu {f r �� ■ EpgRHUR }p O l4 ■ ''` STN i z x Qy cOR #mot �, ��: ' ■.. �< Holding Farms 2 P$ ` z Fioldfng Farms 9 PSG.IL ♦ 5 c; �ar1VP' CREEK+RA ^j;.,�; ( HERR1NG80NEDFt a •A CEDAR_ { ..+ . k D15- �Nl 'y CANTFRSURYDR R r. O � 1 O C! + FF tiRppN a �2 GTONpR" _ 'h G'y` �. • rrning4drQaka PS� { ' " Legend ® Pump Stations - `; �" ����• Existing Gravity Sewer kLb FARMINGTON OAKS PUMP EP 14 m2 L C STATION ABANDONMENT;oo Feet YOUNGSVILLE, NC November 81h, 2022 Cassidy Kurtz NCDEQ— Raleigh Regional Office 3800 Barrett Drive, Raleigh, NC 27609 Re: Franklin County Farmington Oaks Pump Station Abandonment Fast -Track Sewer Application Response to Comments Dear Cassidy: Regarding the above referenced project, this letter addresses comments provided on November 3rd, 2022 from your initial review. Please find enclosed electronic files of the Fast Track Application Package and supporting documents which remain unchanged aside from the revised USGS and aerial maps. For clarity, all comments are shown below with our responses bold and italicized under each: 1. Please provide a more detailed project narrative. The proposed project includes the abandonment of Farmington Oaks Pump Station and redirection of flow to the 18-inch gravity sewer outfall which runs adjacent to the Farmington Oaks development. Existing gravity sewer to be intercepted via doghouse manhole and approximately 176 L.F. of 8-inch PVC gravity sewer to be installed to redirect flow to the 18-inch outfall. Pump station structures to be demolished and forcemain to be abandoned in ploce.p 2. Will the scope of this project include the abandonment of the existing forcemain associated with the pump station (as shown on the included maps)? (This can be included in the revised project narrative) Yes, the project scope includes the abandonment of the forcemain. Line to remain in place and be plugged at either end. Project narrative updated above. IXC I;nlinccring, PI.1.C, 140 Aqua Stied Court, ,lbcrdccn, North Carolina 28315 PI1:910/420-1437" FAN: 910/420-1438' IaccnseNo. 11•105 3. Please provide a map depicting the new gravity line (or provide clarity if the new gravity line was depicted on the originally submitted maps). See attached. If you have any questions, please do not hesitate to contact me at (910) 420-1437 or by email at ben@lkcengineering.com. Sincerely, LKC Engineering, PLLC Benjamin B. Wibbens, P.E. Robinson, Jason From: Ben Wibbens <ben@lkcengineering.com> Sent: Tuesday, November 8, 2022 4:50 PM To: Kurtz, Cassidy; Doherty, Chris Cc: Robinson, Jason; Thomas, Zachary T; Logan Parsons; Adam Kiker Subject: [External] RE: Farmington Oaks Pump Station Abandonment fast track sewer extension Attachments: Farmington Oaks Pump Station Abandonment - FTA Package - 11.08.2022.pdf; Farmington Oaks Pump Station Abandonment - Response to Comments - 11.08.2022.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good Afternoon Cassidy, See the attached response to comments and fast track application package, please let me know if you have any questions or if any additional information is needed. Thank You, �[] Ben Wibbens, P.E. v LKC Engineering, PLLC 140 Aqua Shed Court Aberdeen, NC 28315 Sj Office: (910) 420-1437 Mobile: (910) 986-0353 From: Kurtz, Cassidy <Cassidy.Kurtz@ncdenr.gov> Sent: Thursday, November 3, 2022 3:19 PM To: Doherty, Chris <cdoherty@franklincountync.us>; Ben Wibbens <ben@lkcengineering.com> Cc: Robinson, Jason <jason.t.robinson@ncdenr.gov>; Thomas, Zachary T <zachary.thomas@ncdenr.gov> Subject: Farmington Oaks Pump Station Abandonment fast track sewer extension Hi Chris and Benjamin, We're reviewing the subject fast track application and have the following questions/comments: Please provide a more detailed project narrative. Will the scope of this project include the abandonment of the existing forcemain associated with the pump station (as shown on the included maps)? (This can be included in the revised project narrative) Please provide a map depicting the new gravity line (or provide clarity if the new gravity line was depicted on the originally submitted maps). Thanks! Cassidy Cassidy Kurtz Engineer Raleigh Regional Office Water Quality Regional Operations NC DEQ 1 Division of Water Resources Office: (919) 791-4237 cassid .kurtz ncdenr. ov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties.