Loading...
HomeMy WebLinkAbout20150057 Ver 1_Application_20150116NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III Governor Secretary Attachment L: Low Impact Bridge Replacement Process Low Impact Bridge Project No.: BD -5109V County Forsyth Bridge No. 11 over South Potts Creek WBS Element Number 45355.1.22 This project is subject to the Low Impact Bridge Process as agreed to on October 6, 2009. This project meets the documentation requirements and approval procedures under NEPA, as defined by FHWA, for Low Impact Bridge Replacements. This project meets the standards of NCDOT's Minimum Criteria Rules. Date: January 16, 2015 Applicant Name: NCDOT Division 9 Applicant Address: 375 Silas Creek Parkway Winston Salem, NC 27127 Primary Contact for Project: Amy Euliss Phone No.: 336 - 671 -2886 Is this an after -the -fact application: Yes x No River Basin: Yadkin Stream Classification: C Regulatory Authorization Options for this Activity Federal: USACE Nationwide General Permit 3 — Maintenance State: General Water Quality Certification #3883 and /or Buffer Authorization Local: None Project Description — This project is a low impact bridge replacement project and is located to the south and west of Lexington. The area is rural in nature and the surrounding terrain is rolling hills. The existing bridge on Swicegood Road over First Potts Creek was built in 1972 and is 90' long and 30.3' wide. The bridge is both structurally deficient and functionally obsolete and has a sufficiency rating of 31.85 out of 100. It is constructed of timber components and precast, prestressed concrete channels. The proposed bridge will be 100' long and 36' wide. It will be a precast prestressed concrete box beam bridge on a concrete substructure. It will fully span the creek and will not create any impacts to the natural flow of First Potts Creek. The approach roadway on each end of the bridge will be updated to current design standards and guardrail will be placed on each corner of the new bridge where currently there isn't any guardrail. The existing roadway will be widened only slightly to tie into the new bridge Transportation Permitting Unit 1617 Mail Service Center, Raleigh, North Carolina 27699 -1650 Location: 512 N Salisbury St., Raleigh, North Carolina Phone: 919 - 707 -87841 FAX: 919 - 733 -1290 Internet http:lfportal.ncdenr.org /web /wq An Equal Opportunity 1 Affirmalive Mion Employer NorthCarolina )VRtlll'l lly width. The paved roadway width will match the existing width of 24'. There will beno deck drains placed over the stream mn this bridge; they will be over the floodp|ainarea. The remaining surface water will drain off the bridge to the north end where the water will be captured intwo concrete drainage structure, The water will then flow out through a 15° drainage pipe. There will boa rip rap energy dimsipotoratthe outlet of the pipe. The outlet of the pipe will be approximately G5'hnm the edge ofthe stream. The outlet area io flat and well vegetated. All water from the roadway will flow through vegetation prior tmentering the stream; there will be no direct discharge into the stream where currently water from the bridge flows directly into the stream through the open bridge rail. There will be approximately S5 linear feet Vfimpacts 10 First Potts Greek ho the southeast side of the bridge, This accounts for 1O linear feet ofpermanent impacts due to bank stabilization and 85 linear feet of temporary impacts due to the placement of an impervious dike for dewatering. There will be approximately 205 linear feet of impacts to the UT to First Putts Creek that flows in the roadside ditch om the southeast side of the bridge. This accounts for 145 linear feet cf permanent impacts due to realignment of the channel and 60 linear feet of temporary impacts due boa temporary stream crossing and dmvvateMng. All nf the impacts on this project are caused by the widening of the shoulder inthis area to accommodate the placement of the guardrail at the bridge approach. Impacts were minimized by limiting widening of the roadway to only the areas necessary to accommodate guardrail and only installing the minimum amount of guardrail, 75 linear feet, required by the sub-regional tier design guidelines. Also, the fill slope was designed at 2:1 in this area. The existing fill slope is 1:1 or steeper in this area and therefore didn't allow for any widening and was creating safety concerns with the shoulder washing. The UT|s being shifted bm the east toallow for the widening mfthe shoulder. Due hm the slope of the channel (between 2 and 5.58%),class B rip rap is being used asmliner ho prevent scour. No mitigation is required for project impacts. Please reference email dated November 18.2018stating that the US Army Corps of Engineers would not require mitigation. Impacts are below mitigation thresholds for Division of Water Resources, Please contact mmast338-747-78O2or aeuIiss(@_ncdot.goy,if'Vou have any questions or concerns. Print Name: Y I Title: Division Environmental Officer. Priority TIP NO BD-5109V WBS 45355.1.22 County Davidson Bridge Number 280011 Description Replace Bridge over South Potts Creek on SIR 1155 (Swicegood Rd) Basin Yadkin ,Classification C Stream SIN 12-111 .Type Inland Size (width & depth) 22'x 2' pe 3 Sp,an: PPC Channels /Timber �Substructure Existing Structure Size (lengthxMdth out-out) 90'x 303 Suff. Rating 31.9 Proposed Structure T 1 Seaw Concrete Box Beam / Concrete Substructure out-Out 100' x 36' Stream USACE Impacts (LF) -iGDWQ 155'( Perm ); 145'(Temp) Impacts (LF) 155'(Perm); 145'(Temp) USAGE Impacts (AC) None Wetlands Non 404 Impacts LAC) None LAMA Impacts (AC) N/A NC DWO Buffers Impacts (SF) None Buffer Application Required (YJN) N NC DWQ StormWater Permit Required (Y/N) No Habitat in Yes (TBD)-NLEB, yes Schweinitz's sunflower T&E Species Present trees not surveyed for NLEB, No evidence of bats on bridge (7-29.14), no Schweinitz's sunflower (523.14,7.29.14) Bio Conclusion TBD-NLEB, No effect Schweinitz's sunflower Moratorium T (per WRC) TBD Dates TBD Nativell-latchery No Trout Waters Trout Species Present No Trout Conditions (YIN) No WRC Reviewer Maria Chambers LAMA AECs N/A Essential Fish Habitat (y1n) No Nay. Opening No USCG Permit No Historic Properties No Archaeological Resources No Tribal Lands No 4(f) Resources No 6(DLWCEJ Resources No Wild and Scenic River No Forest Service Lands No TVA Area No FEMA Buyout, No FEMA Flood Study USTs Haz Mats MOA - Redelineated No Relocatees No Location ILAT N 35.7625 ILONG W 803821 Project Comments the roadway There will be approximately 95 linear feet of impacts to First Potts Greek to the southeast side of the bridge. This accounts for 10 linear feet of permanent impacts due, to bank stabilization and 85 linear feet of temporary impacts due to the placement of an impervious dike for dewatering. There will be approximately 205 linear feet of impacts to the UT to First Potts Creek that flows in the roadside ditch on the southeast side of the bridge. This accounts for 145 linear feet of permanent impacts due to realignment of the channel and 60 linear feet of temporary impacts due to a temporary stream crossing and d'ewatering. All of impacts an this project are caused by the widening of the shoulder in this area to accommodate the placement of the guardrail at the bridge approach. Impacts were minimized by limiting widening of the to only the areas necessary to accommodate guardrail and only installing the minimum amount of guardrail, 75 linear feet, required by the sub-regional tier design guidelines. Completed by: 41Z01 Engineer, Date i mental Officer, From: Thomas, John T JR SAW To: Euliss, Amy Subject: RE: Low Impact Bridge (UNCLASSIFIED) Date: Monday, December 02, 2013 8:24:31 AM Classification: UNCLASSIFIED Caveats: NONE Amy I concur with your review in that the minor road widening is associated with the bridge replacement and not a widening for a road upgrade. Therefore, the project is verified under the low impact authorization. John Thomas - - - -- Original Message---- - From: Euliss, Amy [mailto:aeuliss&ncdot.gov] Sent: Monday, November 25, 2013 4:40 PM To: Thomas, John T JR SAW Subject: [EXTERNAL] RE: Low Impact Bridge (UNCLASSIFIED) Sorry to bother you about this project again. In Stephanie's original email she stated that there was roadwork which led to the need for the guardrail being moved, and hence the stream needing to be relocated. Technically the bridge is being widened and in order to match the existing road with the wider bridge, the road will be tapered by less than 100'. This will result in the guardrail being shifted out. Is it possible to do this under a NW3 instead of a NW14? This would allow us to do the work under the Low Impact Program and utilize the PCE from Federal Highways in order to get Right of Way. If not, we'll have to delay the project. Thanks! Amy - - - -- Original Message---- - From: Thomas, John T JR SAW [mailto: John .T.Thomas.JR&usace. army. miI] Sent: Wednesday, November 13, 2013 11:44 AM To: Euliss, Amy Subject: RE: Low Impact Bridge (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Amy With reference to provided stream quality forms and our telephone conversation earlier today, the proposed stream channel relocation would not result in significant aquatic function impacts that would require compensatory mitigation. You can use copy of this e -mail as record of this review and decision. John Thomas Raleigh Regulatory Field Office 3331 Heritage Trade Drive Wake Forest, NC 27587 919 554 -4884 ext. 25 - - - -- Original Message---- - From: Euliss, Amy [mailto:aeuliss&ncdot.gov] Sent: Wednesday, November 06, 2013 2:44 PM To: Thomas, John T JR SAW Cc: Braquet, Stephanie Subject: [EXTERNAL] RE: Low Impact Bridge (UNCLASSIFIED) John, This is in reference to a bridge replacement project in Davidson County on Swicegood Road. You were in previous communications with Stephanie regarding impacts to a perennial UT to South Potts Creek that will need to be relocated for the addition of guardrail and fill slope. The impacts to the UT have been adjusted and should be less than 100'. The stream will be relocated and lined (both bed and bank) with rip rap. Stream slopes are 3 -5 %. I would like to know if you will require mitigation on the channel, and if so at what ratio. The existing perennial stream is ditched at the road fill in the project area. I've attached a copy of the Stream Quality form. Let me know if you need anything else. Amy - - - -- Original Message---- - From: Braquet, Stephanie Sent: Wednesday, November 06, 2013 2:36 PM To: Euliss, Amy Subject: FW: Low Impact Bridge (UNCLASSIFIED) Please note that my new phone number is (336) 747 -7800 - - - -- Original Message---- - From: Thomas, John T JR SAW [mailto: John .T.Thomas.JRCglusace. army. miI] Sent: Friday, May 17, 2013 10:37 AM To: Braquet, Stephanie; Euliss, Amy Cc: Jones, Matthew W Subject: RE: Low Impact Bridge (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Stephanie The low impact bridge process is just for bridge replacements. Sounds like this one includes road work as well as bridge replacement; so, submit a pcn for a nwp 14 for this one. The other - -> yes include the impact on the spread sheet and show it on your plans. As before, submit the spread sheet and plans by e -mail for confirmation. John Thomas 919 554 -4884 ext. 25 - - - -- Original Message---- - From: Braquet, Stephanie [mai Ito: scbraauet&ncdot.gov] Sent: Friday, May 17, 2013 9:46 AM To: Thomas, John T JR SAW; Euliss, Amy Cc: Jones, Matthew W Subject: Low Impact Bridge We have a low impact bridge that will have greater than 150 feet of linear stream impacts due to guardrail. I went to the project this past Tuesday with Matt Jones and it is a stream. The road will be widened to meet new standards and DOT has to place fill in the stream to allow for the guardrail. Shifting the right of way to the other side of the road will create a curve that will lengthen the project limits and also create a reverse curve on each end of the project. Changing the slope would not solve the problem because the guardrail would still impact the stream. I have a few questions based on what I just mentioned. Would this bridge still be allowed on the low impact program with 150 of linear stream impacts? What kind of mitigation would be required and also other than reporting the 150 feet of impacts on the attachment G is there anything else needed on that form? The bridge is located in Davidson County on Swicegood Road. It crosses First Potts Creek which has a classification of C and is not 303(d). John: I also have another one on Jackson Hill Road in Davidson County over Cabin Creek class WS IV, not listed as 303(d). We have a temporary easement to put in a driveway to give a farmer access to his field. The driveway will impact approximately 0.02 acres of wetlands. What is required other than noting the impact on the Attachment G and do we need to submit anything else? Thanks so much for your help on this. Please note that my new phone number is (336) 747 -7804 Stephanie Braquet Division 9 Environmental Specialist (336) 747 -7804 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Classification: UNCLASSIFIED Caveats: NONE Classification: UNCLASSIFIED Caveats: NONE Classification: UNCLASSIFIED Caveats: NONE ae unr /r rr ire; f See Sheet I-A I-or index oll S/x-,-cls See Sheet I-B For Symbology Siyeef a --- 6-4– DWOUtROUTE 6,Off" NORL" 11 (CIAR011-ANA DIVISION (OF FIGHWAYS ---- ----------- r--4Z -T volu LOCATION. REPLACE, EXISTING BRIDGE NO.H OVER FIRST PO It CREEK ON SR 1155 TYPE OF WORK: GRADING, DRAINAGE, WIDENING, PAVEMENT MARKINGS AND STRUCTURE BEGIN APPROACH SLAB END APPROACH SLAB I L STAt/+83.88 --I -- STA I -i +nR L3 w 8;1— (,LL/ii TAPFR\,\ RDWY --- ! \k 8;1 TAPER TAPER PROP. TAPER BRIDGE BEGIN BRIDGE SHOULDER 7 BERM -L- 11194.88 -L- STA 12,1-97J GUTTER SKETCH SHOWING DIMENSION OF PAVEMENT AND SHOULDERS IN RELATION TO PROPOSED BRIDGE WIDTH PAVED SHLD, fill GEM" Max. d- 2 R, 6= 2 Fl, Type of ti— CL 8 Rip-Rap b= 5 H. FROM - ----------- DAA7fl1)80N ('0U1\7TY CURVE DATA PROJECT REFERENCE NO. SHEET NC). '-- __- I 3D 5A �9V 4 I 0W 01PAC-F BRIDGE E SIRUCTURE 280011 PI Sto 10 +65.67 PI Sto 13 46925 r 4-Y 29.6'(RT) A = O'54'49Z(TT) AT I _,RW-, SHEET NO. ROADWAY N ---A�6k�A--uucs- Ls 99-11- 10 wpws 45355A,22 D 0'45'50.2' D = 945'50.2 I GRAD ,350 ENGINEER ENGINEER - TIP BD-S109V L 119.69 N 04'05' 195 E %A R C) T 112,90' T 59.50' �31 . ...... t '41 ?5"484 GI TYPE III R 7,500.00' R 7,500.00' SEAL N 24'5 3'59-7 E --.,5'x6"DECK DRAINS � 6' SPACING LEFT AND RIGHT 58 s FAVEREN C�RAU SEE STRUCTURE PLANS NO DECK DRAINS SHAI-L B/ GARLAND JAMES FOONTS 2 GRAD 350 X %k o 350 P[AC[O OVER THE STRI,4I and VADA S.KOONTS vv SCOT 1,, --,�,�,' CHRISTOPHER L. HARRISON 15 DO 988 PG 118 --L- PC Sto. a 9452.77 670 and CASSICI M, HARRISON 02 13) BOBBY JOE FlIZCERALD PLANS PREPARED BY' DB 1966 PC 1422 BEGIN TIP PROJECT BD-5109V C11 ASS /I HIP RAP Ql DO 2012 PC 2427 PARSOM PB 18 PC 24 VR S 7-1 IV WIGEO)FXfhF FABRIC i END TIP PROJECT BD-5109V BRINCKERHOIFF *78.56, ;t . - I PENNY & TONY JONES FS-1 60 1 ONS EST SY GF BOBBY gHIL')a Z� R-P51 450 -;z1v SEE D1-7,VI A OB 2042 PC 2427 HUNSE MI. FA165 fill GEM" Max. d- 2 R, 6= 2 Fl, Type of ti— CL 8 Rip-Rap b= 5 H. FROM - ----------- AT I w -L-- PC Sto. 1.3+09.45 � , , I GRAD ,350 --------- - .... ...... N 04'05' 195 E �31 TYPE 1 t '41 ?5"484 GI TYPE III ...... . . . . 15" RCP-iV N 24'5 3'59-7 E FAVEREN C�RAU 2 GRAD 350 X 350 EXIST. 15 --L- PC Sto. a 9452.77 670 R 05 -L- POO SIG. 10+90.00 - , i APA, ... � /ol,' ; - CLASS B RIP HAP I- Fl- Sto. 14 +29.05 BEGIN TIP PROJECT BD-5109V u! cu w1FIL7 ER FABRIC -1-00 . I TOM, 5 sy Gi, -L- POT Stc. 13-�95.00 VR S 7-1 IV N- 607 ! /0, i ; I I END TIP PROJECT BD-5109V ZATERAi, 2'811-5k� [)if W1 Cl. 13 RIP RAP *78.56, ;t . - I PENNY & TONY JONES FS-1 60 1 ONS EST SY GF BOBBY 80, JOE FITZGERALD Z� OB 2042 PC 2421 LIMIT OF UETAIL A SEE D1-7,VI A OB 2042 PC 2427 CL FXCAVAT)ON LATERAL—RASE—DITCH 03 1 -FILL EXISTING DITCH fill GEM" Max. d- 2 R, 6= 2 Fl, Type of ti— CL 8 Rip-Rap b= 5 H. FROM - ----------- 650 . . . EX,�AVA -- ---- BE R jd?]� Mllf cy 7- O!T H R�,F� El f657.80 �T.'504 F)o JL - - 9 '10 11 '12 .... fNDD� �j EUT [D- 0 1 67. T' r V v RA. --------- 0 670 ..... ........ . 55ZI 660 LX.AVA F-F o V/ " Fs !801 cY Kt ) /J) V 3- (TYP) T.4 - - ---- 2 10 00 W&E, f/ 6D O,(Y-1bw2qo -4- 13 14 15 16 --------- - .... ...... FAVEREN EXIST. "RADI 670 ------- ... 41 660 00 650 . . . EX,�AVA -- ---- BE R jd?]� Mllf cy 7- O!T H R�,F� El f657.80 �T.'504 F)o JL - - 9 '10 11 '12 .... fNDD� �j EUT [D- 0 1 67. T' r V v RA. --------- 0 670 ..... ........ . 55ZI 660 LX.AVA F-F o V/ " Fs !801 cY Kt ) /J) V 3- (TYP) T.4 - - ---- 2 10 00 W&E, f/ 6D O,(Y-1bw2qo -4- 13 14 15 16 DAV�'.DSON COUNTY CURVE DATA PROJECT REFERENCE NO. SHEET NO. 8D -5109V 4 LOW IMPACT Elpo STRUCTURE 280DII BRIDGE PI Sto t0 +65.67 PI Sto 13+69.25 A = /* 4T 29L'(RT) ��s = Ol 54'49Z (LT) RW SHEE7 Na. ROADWAY DESIGN "Y'o"A""C' BEGIN APPROACH SLAB STA/1+83.88 END APPROACH SLAB I's 09-11-110 WRS 453551,22 D = 9 45'50Z D = 0145'500 IN ENGINEER -L-- STA13+08J3 TIP BD 5709V L = 225.79' L 119LO' v\ Ro", 000,1�v, 8-1 ER T= IJ2_W T T 59.80' I R = 7,500.OL R 7,50000 ' ,\k 8`1 CLEAR CL� --jkQ� SEA Lo TAPER " RDWY 5'x6' DECK DRAINS 1? 9 SPACING LEF7 AND RIGHT SEE STRUCTURE PLANS NO DECK DRAINS SHALL BE GARLAND JAMES KOONTS PLACED -AVER THE STREAU and VADA S.KOONTS D8 �JOO PG 718 ,z sc 8.1 CHRISTOPHER L. HARRISON and CASSIDI M. HARRISON BOBBY JOE FITZGERALD PLANS PREPARED BY: 8 8. W TAPER OB 1966 PC 14 2 CLASS 6 RIP HAP, DS 2042 PG 2427 PARSOM TAPER T PROP. PB 18 PC 22 4 ��IGEOiEXTILE FARRIC ORMOWAHOFF BRIDGE 881XE BEGIN END BRIDGE L- STA11*94.88 -L- SHOULDER BERM (D 49 (-Fypj +50 D4 FAYE37MIT use ML "I� STRM STA12+97J3 GUTTER R 25' + L,O SKETCH SHOWING DIMENSION OF PAVEMENT A5 AND SHOULDERS IN RELATION TO PROPOSED JO-L_ BRIDGE WIDTH Ics AT-1 F -1-87 PC StC,. 13-K)9.45 Gam. 350 PAVED SHLD. Ep l N 2,,rO5'I9.T,E_. TYPE I II , III 4H Gi TYPE II 45 E i 12451-15' RCI-416 N 24535949, kc 2 GRAU 350 CPAU 0 350 :T is, '30.00, -L- PC Sto. 9+52.7i 255 `f05- r smemm -Tmpw--r -L- Poc Sto. 10+90.00 50' BEGIN TIP PROJECT BD-5109V PAVEMENT CLASS 8 RIP RAP -L- PT Sto. 14 k29D5 + WIFILTER FABRIC _l.__ POT Sto. 13 +95.00 I TON, 5 SY GF TRANSITION ; 80, 10, END TIP PROJECT BD-51OW LATERAL 2'BASE aTCH W/ CL B RIP RAP +78.56 PENNY & TONY JONES ZMPACr EST 60 TONS 80' EST 05 SY CF BOBBY JOE FITZGERALD SEE DETAIL A DS 2042 PG 2127 t - Lo OB 2042 PC 2421 LIMIT OF DETAIL A EXCAVATION LATERAL BASE DITCH {wig Bawl FILL EXISTING DITCH i_llj Ft" = 10 Mme.d- 2 Ft B 6 - &W 8= 2 ft Tyjw aFliners CL B RpT*,p b- 5 Fl. FROM STA. 11 +00 TO STX 12+10 jj -7 - - -------- BRIDGE HYDRAUL)C DATA A 680 DESIGN DISCHARGE 1560 CFS ------,BASE DESIGN HW ELEVATION DISCHARGE = 66139 FT _29 2p CES 670 _L_ Sto) 11+444,9 BASE FREQUENCY too YRS 7 BASE HIN ELEVATION 664-30 FT CL S� -A' '12 +4610 OVERTOPPING DISCHARGE 3700 CFS _U_ 7.!0. 491.49 OVERTOPPING FREQUENCY= 500 YRS 5 Sl 'AN) C k).39'bbX 13E� 660 j BEGIN NG OVERTOPPING ELEVATION 667J FT )?ESU, EL 667.7 _'K I 9O',SATW,-1 LCE, 7-BE 56,3.- T-T, kPS-, P/ 11-f-4.49 Mir -656-T-15- - J e " P= 1.* +65 — Sta.4 - I �3E_IW_7 /P P ROJFIT R)::5_�19V TIP PROJE`CT PD-110.9V I El. 167-08, 1 7 E, V�)_ST. RAD K =30 t ADAVEW71V­T_ -4­ J Rm4fl= 670 PROP.GRI -L- 670 '00 Y? W5 EF 5(14.30 660 660 650 RMIN A [CH- RTT- qfl Ex CA L - _60_= VIE- - EX.AVA- ES /80 E CY 650 ST /I WO FS .l5 CY = C HA _ D tp/-4/450 :- ,H CH *1 46 46 -6 qr� KE W5 ED i : 7q Al �5 �.O/ 621071201q) '50 =657-ffo S�T 1 A +121CO.OI E4,656 4656 .00 9 10 11 12 13 14 15 16 Kum *Rounded totals are sum of actual impacts NOTES: Revised 201310 2 Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) -L- 11+94,88 to 12+97.13 Single 100' span; 39" box beam with 4' end bent caps UT to First Potts Greek - stream realignment 145.000 UT to First Potts Creek - temporary stream crossing and dewatering 60.000 First Potts Creek - bank stabilization 10.000 1 1 1 First Potts Creek - temporary dewatering I 1 1 85.000 1 Kum *Rounded totals are sum of actual impacts NOTES: Revised 201310 2 ROADSIDE ENVIRONMENTAL UNIT DEPARTMENT OIL TRANSPORTATION DIVISION OF HIGHWAYS R67AumxC 2012 STANDARD SPECIFICATIONS THESE EROSION AND SEDIAIMT' CONTROL PLANS COMPLY WITH TIIE REGULATIONS SET FORTH EY TITE NCG- 410000 GENERAL CONSTRUCTION PERMIT EFFECTIVE AUGUST 3, 2011 ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY 14--- -- TO .NC 150 IMI CHRISTiPHER L. HARRISON and CASSIDI M. HARRISON B q/1 Z tf' � ti J 0111 A GARLAND JAMES KOONTS and VADA S. KOONTS -CLASS ll RIP RAP w/GEOTCX71LC FABRIC DAVID LEROY FITZGERALD and ROSEMAE FITZGERALD, TRUSTEES OF THE FITZGERALD FAMILY TRUST 4_05 1� PROJECT REFERENCE NO, SHEET NO. 8D--5/09V EC-L__ !t SHEET NO. PARWALS BR#MCKERHOFF 434 FAYL aL E STREET TEMPORARY PIPE FOR STREAM CROSSING f87 IMPERVIOUS LATERAL. 2' BASE DITCH-- D1KI -- W/ CL B R/P RAP EST 60 TONS EST 135 SY GF SET Dt- FAIL A &A,- 4 aac.iRf,`Rm„ .Symbol 1606.01 `I eanpox"y Sik 1 encc . -HLl -- --III lit - 1606.01 Spooi.l Se h-at l.ancral Fe..< 1622.01 T.- p.rxiry Be,-. nmJ Slep D,.;.. "- 1.630,02 silt 1$asin Type Ill 1634.02 Temporary Rock Sediment ].)am Type B 1630.03 Temparary Silt Ditel. - 1630.05 Terr.,pnrnry M-ain,n 1640.01 C6ir hiber Baffle 1630,06 Special S611ins IBesin 1631.01 Matting installation 1632.03 R-1 lnrlet S.Ji -..t R p Type C .............. 1633.01 Tempeay lael< Sih Cheek T P,-, a ncwpor.ry R -k Silt Chock Typ.- A W31.1n M.iting ana 1FOly x, elamirlc iPAM) 1633.02 R-k Sik t h-11, Type °I3 2y "y yerapgocnrcy CY ALLJe .......... . ..... -... ,...... ......... W .tel. . ;A PAy.4­ylm iJ9 (PAM) _ 1634.02 Tomporary R-1 Sedi -eat D.a.nr Type" B .. 1(Z5.01 IteoC �'p.: 9mle Ssdirne i °fray. o'y1.e� CHARLES HEAFNER LEVEL III NAME 3440 LEVEL III CERTIFICATION NO. `c Y ' KR r 3 -) I0, _- CLASS B R11" RAP w/FIl L C_ R FAL31?1C I TON, 5 SY GF �._._.._. LIMI OF EXCAVATION �--HLL EXISTING D17 CH DAVID L.EROY FITZGERALD and ROSEMAE FITZGERALD, TRUSTEES OF THE FITZGERALD FAMILY TRUST SR 11-55 SVVICI -0000 ROAD TO ;VC 150 - -- �- CLEARING AND GRUBBING EROSION CONTROL FOR CONSTRUCTION SHEET 4 IMPLEMENT FINAL GRADE EROSION CONTROL PLAN UPON COMPLETION OF STREAM REALIGNMENT DETAIL A LATERAL BASE DITCH I Not to scale) _ Natural ....---. -! - -- Fill il Ground d �,;.w 1'%Et. Slope - - GEOTEXTILE -- B Agin. 0 = 2 Ft. Max. d= 2 Ft, 'When B is < 6.0' B_ 2 Ft, Type of Liner CL B Rip -Rap b= 5 Ft. 201.2 STC'AN>CDARD DRAWINGS 1604.01 Railroad Erosion Comrnl.Detail 1632.01. Rock Inlet Sediment Trap Type 1605.01 Temporary Silt Pence 1632.02 Rock Inlet Sediment Trap 'Type B 1606.01 Special Sediment Control Yen- 1632.03 Rock inlet Sediment Trap Type C 1607.01 G.-I Cra vtroction EmmaCC 1622"01 Temporary Berms and Slope Drams 1633.02 'Tempamy Rock Silt Check Type B 1630.01 Riser Bas1n 1634.01 Temporary Rock Sediment Data Type A 1630.02 Silt Basin Type B 1634.02 Temporary Rock Sediment ].)am Type B 1630.03 Temporary Silt Ditch 1635.01 Rock Pipe Inlet Sediment Trap Type A 1630.04 Stilling Basin 1635.02 Rock Pipe Inlet Sadimcnt Trap Type B 1630.05 Temporary ffi -ioa 1640.01 C6ir hiber Baffle 1630.06 Special Stilling Basin 1645.01 Temporary Stream Grossing 1631.01 Matting installation FROM STA. 11 + 00 TO STA. 12 A -10 NOTES: ANY DEVIATION FROM OPTIONS GIVEN WILL REQUIRE PRIOR APPROVAL BY ENGINEER. ADDITIONAL EROSION CONTROL DEVICES MAY NEED TO BE INSTALLED AS DIRECTED BY THE ENGINEER. Stair 1" = 3,T �a a �4• t,n ® IN am _K ROADSIDE ENVIRONMENTAL UNIT DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS wst.monttc. 2012 STANDARD SPECIFICATIONS THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY NE '�O Y IffTIf THE REGULATIONS SET FORTH BY TILE NGG4101h? GENERAL CONSTRUCTION PERMIT EFFEC7PEAUGUST 3, 2011 L' [ISSUED BY THE NOR CA OUNA DEPARTMENT OF ENVIRONMENT AND TH R NATURAL RESOURCES DMSION OF WA QUALITY. `ROSION T R014 PLAN GARLAND JAMES KOONTS and VADA S.KOONIS PROJECT REFERENCE NO. I SHEET NO, -c KW SHEET NO- PARSOM BRINCKERHOiFF 434 FAYETTENTEIE qTf*XT CLASS 111?1P RAP w1(310_1'LX/1LL FABRIC DAVID LEROY FITZGERALD CHRIS-I PI IER L. HARRISON /0/ and ROSEMAE FITZGERALD, and CASSIDI M. HARRISON ("Y IRUSII-LS OF THE FITZGERALD FAMILY TRUST 7 - �37 11 - --- / EMPORARY PIPE, FOR S7_R1.___AV CRPSSiNG IM!"'TRVIOU5 ATERAL 2' BASE D/7 L >1K1. W1 CL B R/F RAF ES-1 60 TONS L-51 135 SY CF SEE /)/-_1"A11'_ A a 5fiL___ D=ri11fi2n 1605.01 'feo' romty Silt Ferree 1605,01 T.enpo­yy Sik 11",-, 1632.03 Roeh Wet S.dimeatr.p 'Type C 1606.01 gyp eia.l S i C..c..i F­- 1622.01 T—P.—Y B­­­d Sll.pe D­i- 1630.01 ILL— H.io 1630.02 Silt B-ie Type B 1634 02 Ternp­,v R-k Sediew Dan, Type 13 1630.03 Tomp .... y SJ, DitA 163004 S tAGi4 B,,,i 1630.05 Te-,--y M­,i- 1640.01 Ori, Fiber Brffi. 1630.06 Spe",iA Srillb.g A.Ni. 1631.01 Mottir4 Instshotim ............... ...... . ........ 1632.03 R.A ln6, Ty,,, C °_ 13 1633.01 T.o,p ... y 1 &h (%_ T,pe­A T mpo­y RoA Silt CI—k T yj"',A .;A M.tfing ­1 1,01Y.-YI-1 WAND CEO 1633.02 Tee.P.­y R-k Silc CL­), Ty­­B W.i4l,e y,ith P.Jlf.—T6m�,L (PAND 1634.02 T—P--y Rock e7rz rnut D.., Typ"'-:R 1635.01 Reek P ,­ I.W 84i—ni T-1, "_ "ye,"A . . ......... CHARLES HEAFNER LEVEL III NAME 3440 LEVEL Ill CERTIFICATION NO, 105 15" 3 /0 , I I I. - -_ -- ­ ­ CLASS B RIP HAP -4— wIFILIE-H f-At.3HI� I ON, 5 S)l CF LIMY OF F- XCAVATION FILL EXISTING /)/ / Cl i DAVID LEROY FITZGERALD and ROSEMAE FITZGERALD, TRUSTEES OF THE FITZGERALD FAMILY TRUST 2012 STANDARD DRAWINGS CLEARING AND GRUBBING EROSION CONTROL FOR CONSTRUCTION SHEET 4 IMPLEMENT FINAL GRADE EROSION CONTROL PLAN UPON COMPLETION OF STREAM REALIGNMENT DETAIL A LATEkX[_­BASE DITCH (Not to Sole) b Groun Nol.ral, F619 d 1v D Slope GEOTEXTILE Min, D= 2 FL Max, d — 2 Ft 'When B is < 6.0' 0--= 2 FiL, Type of Liner= CIL 8 Rip --Rap b== 5 Ff. 1604.01 Ril-d Erosion Ctirnml]Detail 1632.01 Ronk Inlet Sediment Trap Type A 1605.01 'feo' romty Silt Ferree 1632.02 Rork 1.1,-t Sedirnm'fvap Type B 1006,01 Sp .... I Sedi—t C­t.] F—e 1632.03 Roeh Wet S.dimeatr.p 'Type C 1607.01 G­".1 Corearru non- Entrance 1622,01 'rernp ... ry Berms and Stop,, Drains 163102 Tempohrry Roch Silt Q k Type B 1630.01 ILL— H.io 1634M Fernp.,m Rock Sediment Dm 'fyp, A 1630.02 Silt Bus Type B 1634 02 Ternp­,v R-k Sediew Dan, Type 13 1¢30.03 T—P.— Sift Ditch 1635,01 Reek Pipe Wet Sedirnent 'Trap Type A 163004 S tAGi4 B,,,i 1635.02 Rod, Pipe brier Stdirnoor'4up I'lpe B 1630,05 T—k—ry Di—i.. 1640.01 Ori, Fiber Brffi. 1630.06 Npec,.l Stifling WA. 1645.01 'L.mpv.,y Sit.- C-m.,iog 1631.01 Mottir4 Instshotim ............... ...... . ........ — ---------------- NOTES: ANY DEVIATION FROM OPTIONS GIVEN WILL REQUIRE PRIOR APPROVAL BY ENGINEER. ADDITIONAL EROSION CONTROL DEVICES MAY NEED TO BE INSTALLED AS DIRECTED BY THE ENGINEER, ROADSIDE ENVIRONMENTAL UNIT DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RAJMOH.X.G. 2012 STANDARD SPECIFICATIONS THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY ATTH TIM REGULATIONS SET FORTH BY THE Nt"(3410000 GENERAL CONSTRUCTION PERMITEFFEGIM AUGUST 3,2011 ISSUED BY THE NORTH CAROLINA DEPARTMENT OF EMPTRONMENT AND NATURAL RESOURCES DIPTSION OF WATER QUALITY. vn o 000 Os - - 1-0 'vc /50 CHRISTIPHER L. HARRISON and CASSIDI M. HARRISON I A[ F-RAL 2' BASE D/7 CH N/ CL B RIP HAP ESY 60 7 ONS EST 135 SY GF SEE DETAIL A Sa'-! D'0RrARGPM s3EM61 160SAI T.n,p.,.,, Silt 1a HL --fl+___ 1606.01 SP .6e1 SeJia­.t 1 m Qrml F,.— 7 1622.01 1)­�ns 16.34M Temporary Rock Sdineent W. Type A 1630.02 Silt B..i. T 'P.� B 1630.03 T­E,,,ary Silt Dith 1630.03 T..P ... J­Y'901 Da'J' 1635.02 lt—k Pipe Inlet sediment I".P Type 8 I630.05 Te-p.—Y Di­,, ;.. Tb 1630.06 special s6ifli.g B.6" 1632.03 Rork X.W SJime.f T­p Typ,, C 1633.01 T.-p.r." R­k Silt Check Type-A T..jP .... y , 1 k Silt 4 ' '6d' ­,t], M.U;.g .-I CPAM) - 1033.02 Te—P ... ��' Ik­k Silo- Ck-h Type-11 Xwe, wajd' w,iffle arid' P.�"­Y4 i& (I'Alkl) 1634.02 1--p.—y R­" D,e� Typ,,--B 1635,01 flij- 1.Tei Sedi "T" ,P, 'FyF,"A J 41 CHARLES HEAFNER LEVEL Ill NAME 3440 LEVEL Ill CEKTIFICATION NO, sr ''y GARI.AND JAMES K00IN_1S and VADA S. KOONTS r CLASS 11[i1F HAP wlG�- 07,-7XT/1_T" 1'_A8R/C /0' T YPJ 0 ) _. ac _l f. on 2GI R 15 RCPAV "'Si 2 05 15" CLASS 8 RIP RAP / -­R ABRIC w/1 I L 71 _ I ' I I O/V, 5 SY GF 1_11WIT OF FXCAVA,"IOAI F—Ul. rrXISTIAIG DITCH DAVID LEROY FITZGERALD and ROSEMAE FITZGERALD, TRUSTEES OF THE FITZGERALD FAMILY TRUST 20.12 STANDARD DRAWINGS 1604.01 Emifirwd Fosioa Control Detait 1632,01 flock Inlet Sediment I'mp Type A 1609.01 T.mpu­y Sill 1 1632,02 Ro.k 1.10 Sediment T.p Type B 1606.01 Special Sediment Control Fertos 1632.03 Rook Inlet Sediment Tnp Type C 1607,01 Gravel C.-truction, Ent- 1622 ' 01 Te.P.—Y Be— and M.P. Drains 1633.02 'I-mmury Rack Silt Chenk Type 0 1630,01 Rise, B.i. 16.34M Temporary Rock Sdineent W. Type A 1630.02 Sik 11-siu TYPI� B 1634.02 T..p..J-y R..k ,Sediment Dam Type B 1630.03 T­E,,,ary Silt Dith 1639A1 Roek Pipe Inlet Sediment Trap Type A 1630.04 Stilling It.,. 1635.02 lt—k Pipe Inlet sediment I".P Type 8 1630.05 Ternp­,y Diversion 1640,01 Coi, Iliber B.111,; 1630.06 Spninl Stifling B.4. 1645.01 Stream Crossing 16.11A] Matting f-edlaimt PROJECT REFERENCE NO. I SHEET NO, R" SHEET NO. PARSOM BRNWNWRHOFF au VIINT11"Fewl1v $Tws. ' DAVID LEROY FITZGERALD and ROSEMAE FITZGERALD TRUSTEES OF THE FITZGERALD FAMILY TRUST SR /165 -SW!CL,,0GL)' POAf) (Not to Scale) Natural Fill Ground If tD 4 Y, Slope GEOTEXTILE Min. D = 2 Ft. Max. d = 2 K -When B is < 6,0' 8 = 2 Ft. Type of Liner == CL B Rip-Rap b= 5 Ft. FROM STA. 11 + 00 TO STA. 12 + 10 T 0 NC rSCi NOTES: ANY DEVIATION FROM OPTIONS GIVEN WILL REQUIRE PRIOR APPROVAL BY ENGINEER. ADDITIONAL EROSION CONTROL DEVICES MAY NEED TO BE INSTALLED AS DIRECTED BY THE ENGINEER. art a as sp TEMPORARY ROCK SILT CHECK TYPE I A I WITH L EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM) PROJECT REFERENCE NO. SHEET' NO. . .......... 434 FAMIT"LLE STRLET sliffEl 1500 RALEIGH ' NC 27601 LICENSE NO. F4165 EXCELSIOR MATTING FLOW NOTES USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR SEDIMENT CONTROL STONE MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE. PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE A j" A MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT o 5,q? 47Y 1 c TO BE APPLIED TO EACH ROCK SILT CHECK. -2 e-'c 'o ',­v 6 INITIALLY APPLY 3.5 OUNCES OF POLYACRYLAMIDE (PAM) TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES. STRUCTURAL STONE--------/ . ...... .. .... (3n5 Oz L=3xH c B-- INSET A PLAN qmmumpr-4w '13 CHANNEL' EXCELSIOR 2 2' MIN WIDTH — — — --------- MATTING _� _� N/`7�,7 1 21f 2' MIN *T H 12" MIN 0 1 EXCELSIOR,--Z B STONE MATTING SECTION B—B SECTION A—A .1-1 ---------------- — -- --- — *T = 12" MIN,, 18" MAX. 0 s DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA /)I-- T H //-'7 /0A1 S-7-ALI-3 fl- i-VATION 1 IlVlf-, - - --------- - - - - ---------- .......... - ----- - - ---- - -- PERIMETER DIKES, SWALES, DITCHES AND SLOPES ---- ----- 7 DAYS NONE ---------- ---- HIGH QUALITY WATER (HOW) ZONES 7 DAYS NONE - --- - ---------- ------ -- . .. ......... - SLO[')ES STEEPER THAN 3-.1 7 DAYS IF SLOPES ARE 10' OR LESS IN - ----- LENGTH AND ARE NOT STEEPER THAN 2 .-1914 DAYS ARE ALLOWED. SLOPES 3 ®1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER TI--IAN 50' IN - --- - --- ----- LENGTH. ALL OTHER AREAS WITH SLOPES FLATTER THAN 4.1 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HOW ZONES. 0 2.5 S PROD. REFERENCE NO. SHEET NO. BD -5109V X -3 5 5' S 0 0 I 1 1 � 1 1 5 0 5 1 - 5' -- - - -- - _ - -- - - - - -i - - -- - - - - - - - -- - -- - - -- - ---------------- __ -- ._.... a i _ a I ijijij i i , 9 _ —----- —_— _ ._._. __ ____. _....._.._ _.__._ -s_ __.__ .......... _ _— ___ __ ____ I — I q 1 END TIP OROJE T '109V i fa. 1-+ 95.1oo , _ _ - - -- _- __ -_ _ ___ ___ _______ ------ ------ - 5 0 5 0 5 30 2 1 l 1 1 2 25 0 5 5 5 70 75 f srx.^u+41.49-� em o-~ oozrs | GRADE DATA -L- _TO NC 150. CURVE DATA PIstam+6sc /- A ~ r 43' 29.6'(R-1) D = o^ 45' 50.2' L ~uzsz* T ~u2.9u' FILL FACE Q END BENT I --T- 12+00 END BENT 1 SPAN A WATER SURFACE- BASE DISCHARGE- UNCLASSIFIED STRUCTURE E L. 6 61 t EL.663± EL 662t SUBS RUC TURE EL. 664 ADL To ZRADF To DRAIN EXCAVATE TO- _fDRAIN 658 656± EL. 661.0 XCAVATE El­ 656 _ TO Et- 656T CLASS II RIP RAP SECTION ALONG -L- SECTIONS AT END BENTS ARE AT RIGHT ANGLES EARTH BERM EL 659.11 SUBSTRUCTURF 51`ly2. 13+00 13+50 PI ~ 13~65.00 /- 1-61 u'.~sa7�ou vc ~ ou GRADE DATA -L- TA. 12+97.13 12+97.13 -L- El­. ------- sazm BEGIN FRONT SLOPE III .aar� STA. 13 1 05 77 L FIX. Z =""..^�____________-_- -~~_� LOW CHORD EL. 663.40 HP 12x53nea PILE(T,P.) END BENT 2 EARTH BEF EL. 659.06 102'-3' TOTAL Lcwmx 0 anzD GE PLAN pzLcs NOT sxoww mn c�AnzrY FILL FACE 6� END BE� sm12+97.13+- SLAB ��imiff-4110 HYDRAULIC DATA msl(;w nzsoxAnns -________-1560 crx STA. 11-91.88 -L- -680 mszcw HIGH WATER s/cVATruw EL. 667.59 oxxrwxcs AREA. 5.8 no.Mz. BF..G,lN FRONT SLOPE ops EL 668^ s/o 1 --- - - - - - - - EL. 667.62 - - - - - - - - - - LOW CHORD EL. 663.69 san sso f 11/2t1 s/ups-' /woawxL ro xswn ! (r,p.) _TO NC 150. CURVE DATA PIstam+6sc /- A ~ r 43' 29.6'(R-1) D = o^ 45' 50.2' L ~uzsz* T ~u2.9u' FILL FACE Q END BENT I --T- 12+00 END BENT 1 SPAN A WATER SURFACE- BASE DISCHARGE- UNCLASSIFIED STRUCTURE E L. 6 61 t EL.663± EL 662t SUBS RUC TURE EL. 664 ADL To ZRADF To DRAIN EXCAVATE TO- _fDRAIN 658 656± EL. 661.0 XCAVATE El­ 656 _ TO Et- 656T CLASS II RIP RAP SECTION ALONG -L- SECTIONS AT END BENTS ARE AT RIGHT ANGLES EARTH BERM EL 659.11 SUBSTRUCTURF 51`ly2. 13+00 13+50 PI ~ 13~65.00 /- 1-61 u'.~sa7�ou vc ~ ou GRADE DATA -L- TA. 12+97.13 12+97.13 -L- El­. ------- sazm BEGIN FRONT SLOPE III .aar� STA. 13 1 05 77 L FIX. Z =""..^�____________-_- -~~_� LOW CHORD EL. 663.40 HP 12x53nea PILE(T,P.) END BENT 2 EARTH BEF EL. 659.06 102'-3' TOTAL Lcwmx 0 anzD GE PLAN pzLcs NOT sxoww mn c�AnzrY FILL FACE 6� END BE� sm12+97.13+- SLAB ��imiff-4110 HYDRAULIC DATA msl(;w nzsoxAnns -________-1560 crx rncuuEwo, OF nozuw FLOOD­ 25 rnx mszcw HIGH WATER s/cVATruw ------- 663.9 oxxrwxcs AREA. 5.8 no.Mz. oASEorsmwnu mmu -_____-'2229 ops BASE ozuxwmcnELEVATION ____66w.m OVERTOPPING FLOOD DATA uvmropp-wo pumn ozsnx^nxc ____3700 cpx mumswc, OF ovaroppzwo FLOOD ------ son+ ,ns. oVEoruprcwn pmoo ELcvxrruw ____667.1 1-NORMAL TO CAP 1` 6" AT END BENT I SLOPE 111/2.1 F`--O-MIN.EARlH BERM GROUND Lzws NORMAL To CAP + GEoTEXrrLc� pz sto 13+69�25 -L' A ~ o~ 5 4'*9.2' (1.n D ~u~ 45' 50.2' L ~usau' / ~sy.8o n~/,sou.00' RIP RAP DETAIL I IIERFBY CERTIFY 'THESE PLANS ARE THE AS-BUILT PLANS PROJECT NO. - DAVIDSON COUNTY STATION: