HomeMy WebLinkAbout670011_Compliance Evaluation Inspection_20221110JJ
,Facility Nunilier
Division of Water Resources
0 Division of Soil and Water Conservation
0 Other Agency
Type of Visit: V Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: ® Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit:
Farm Name:
Owner Name:
Mailing Address:
Physical Address:
Arrival Time:1-ci Departure Time:
rr�
foD)
Owner Email:
Phone:
County:
Region:
Facility Contact:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Title: Phone: ('to33o a
Latitude:
Integrator:
Certification Number:
Certification Number:
Longitude:
Swine
Design Current
Capacity Pop.
Wean to Finish
Wean to Feeder
34
3g2:1
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Design °Current.
Wet Poultry ~ Capacity Pop,
Layer'
Non -Layer
Design Current
Dr Poultr Ca .acity Po
Cattle
Design Current
Capacity
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
❑ Yes [ No ❑ NA ❑ NE
❑ Yes
❑ Yes
❑ No L"t' ❑ NE
❑ No Lit' ❑ NE
O No OAK❑ NE
❑ No ❑ NA' ' ❑ NE
❑ NA ❑ NE
Page 1 of 3
5/12/2020 Continued
Facility Number: 6 1 -
Date of Inspection: j (' 10
22
Waste Collection &Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes to ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No [] N ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes EKO ❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? n Yes No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes 117 o ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes D4o ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
❑ NA ❑ NE
❑ Yes o ❑ NA ❑ NE
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes �No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes [/o ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ Pxo ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes EIXo ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes Flo ❑ NA ❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes �No ❑ NA ❑ NE
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [r No ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes Q No ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes "No ❑ NA ❑ NE
Page 2 of 3
5/12/2020 Continued
OZOZ/ZD/S
Z21 aI I11
:MUG
:auold
£./•o £ and
:aznlgu�is zoloadsul/zamaina21
:OMEN zo;oadsul/zamainaZl
am ❑
aN ❑
gN ❑
,A0
VN❑
FAN ❑
VN ❑
VN ❑
am ❑
/ 1 " • t--4C9 a-3 AY. t76 C Vj
J-D Thr4—) ,..,r'c®J`O A modk S J
Sto 7 c Ike
k Pr
1,.1,
E LQ
sax ❑
sax ❑
sax ❑
•(CAUssaau Su sa ed_jeuorltppU asn) sug1;enlis•uErUidxa arallaq o : titan a s iirnneap ash
iuoaa rtieuotltp'pu Au* ojpui sxan9,sae sax,£uu u.tuidx i;:( not sanb:44`,4atai) sluaulw.OD
Lifoua3e aims all Sq lisin du -mop,' g azmbaz klilioej all saoa •l,£
Lanileluasazdaz alis-uo uu llim uopoadsuymainaz ssnosip o; liu3 zoloadsul/zamaina21 aill P?a •££
!,dJAIA VD zo liuuad all Jo aougilduioo-uou asngo goilm pa;ou suzalgozd lguoilippg /cue azam •Z£
oN ❑ saX ❑
saA ❑
IN ❑ VN ❑ old sax ❑
aN❑ VN❑ ot\11 sox
am ❑ VN,❑ ON ❑
aN ❑ ❑ "El
soA ❑
saA ❑
:zol;O ❑
puod agezo;s/u000vi ❑ plaid uogeoilddd ❑
•moiaq xoq a;eizdozdde al; Noalo `sari 3I Liculioe3 all Ie lsixa stump alit aogjznsgns oQ • I £
(uopuoilddg-zano `suzalgozd pzeogaazg `aazelosip `•a•i) puuad
all iiq pazmbaz se suoi;enlis Xoua$zauia jo aogjo leuoiila)l al; icjilou of lig3'ililioed al; Pia •0£
•1ilaleipauiiui anileluasazdaz Xlilena z!V leuoi20z g Ioelnoo `SOX JI
zuzaouoo klgenb zie zo zopo ue asod Ciliou3 al; pip uoi;oadsui al;jo auiil al; w •6Z
j,leuuou uuq; zalpl a.Iam;ell solez 41g;zouI jioda.i pun
luaiunoop zo/pue sznoq bZ tplm sleuuue peap jo asodsip iilzadozd of lie3'ililiou3 all pia •gZ
am ❑ VN❑ vCI
am ❑ VN ❑
slanal aiipnls zoo VOd u dolanap o; azniied❑
sanssl 101110
zuoileogilzao (Zv'Jd) sluauzssasse ssoi siuogdsogd a aznoas o; lie3 kliliaej all pin •LZ
LaRzelo ui zolgzado pagilzao iilaniloe ugJo uoi;eluauznoop apinozd o; I1e3 iiliae3 aqi PIa •9Z
:aoueilduioo-uou tut;eoipui Jianzns lszg Jo am pug (s)aznlonzls lsi I
LIOORUI Sing ui SIOAOI a pnIs lugilduioo-LION ❑
Xo uns a2pnls lgnuue alalduioo of aznp•ed ❑
•molaq (sa)xoq algizdozddu al;
Noalo `sa'i jI j,a2pnls o; palglaz suoilipuoo liuuad l;im aouuilduioo Jo Ino 4lioed al; sI •SZ
�liuuad all iiq pazmbaz se luauidinba uoiluogddg alsem algzggi o o; HE.; icliliovj aql P?a •-frZ
�2 J 01 I 1 1 :uoipadsul;o alua
11
- L. :JoquinK kampu3