Loading...
HomeMy WebLinkAboutSW5221101_Design Calculations_20221117K4CLA Mack Gay Associates, P.A. Engineering 1 Surveying - Planning 1667 Thomas A. Betts Pkwy., Rocky Mount, NC 27804 Phone: 252-446-3017 - Fax: 252-446-7715 Firm License: C-0569 - www.mackgaypo.com STORMWATER CALCULATIONS MANUAL Cedar Creek Apartments 2468 Cedar Creek Road, Youngsville, Franklin County, North Carolina September 22, 2022 Prepared by: Phillip Joyner, Jr., PE `,,�741111rt/rf� 1111i ` iESS;6 SEAL �= 036MB - TABLE OF CONTENTS SECTION 1................................... Stormwater Narrative SECTION 2................................... USGS Map, Soils Map, Surface Water Classification SECTION 3................................... Deed SECTION 4................................... Supplement EZ Cover Page, Drainage Areas Form, Wet Pond Form SECTION 5................................... Wet Pond Calculations SECTION 6................................... Runoff Calculations SECTION 7................................... Pipe Network Calculations SECTION 8................................... Drainage Areas Summary SECTION 9................................... Nutrient Calculations WET POND CALCULATIONS WATER QUALITY POND DESIGN CALCULATIONS AREA SUMMARY PERMANENT POOLSIZING, acres sf Permanent Pool 42059 cf Drainage Area 7.69 334976 Permanent Pool 9441 sf Pervious Area 6.13 267023 Average Depth = 4.5 ft Impervious Area 1.56 67954 ENTER SA/DA TABLE WITH 4.0' Impervious Cover 20% SA/DA (from table) 0.6 Piedmont Minimum Area 2144 sf RUNOFF VOLUME Permanent Pool Area 9441 sf Simple Method Permanent Pool Area Acceptable RUNOFF COEFFICIENT CALCULATION R, . 0.05+0.9*IA . Ry=Runoff coeefficient (runoff (in)/rainfall (in), unitless IA=Impervious fraction Rv= 0.232575 VOLUME CALCULATION V=3630*RD*Rv*A V=Volume to be controlled for the design storm (ft3)', RD=Design Rainfall Depth (in) 1.0" or 1.5" A=Watershed Area (acres) Rainfall Capture Depth l inch Runoff Volume 6492.255 cf I PERMANENT POOL STAGE -STORAGE TABLES MAIN POND Area Incremental Cumulative Volume Elevation (sf) Volume (cf) (cf) 424 0 Bottom of Sediment Storage 423 4750 Bottom of Pond 424 5458 5104 5104 425 6196 5827 10931 426 6963 6580 17511 427 7760 7362 24872 428 8586 8173 33045 Permanent Pool 429 9441 9014 42059 Elevation Area Ineremental Cumulative Volume (sf) Volume (cf) (cf) Bottom of Sediement Storage 425 760 Bottom of Forebay 426 1208 984 984 427 1709 1459 2443 428 2262 1986 4428 Permanent Pool 429 2861 2562 6990 Permanent Pool Total 42059 cf Forebay to Main Pond 16.6% OK TEMPORARY POOL STAGE -STORAGE TABLES MAIN POND + FOREBAY Incremental Elevation Area Cumulative Volume Volume Permanent Pool 429 12302 0 430 15826 14064 14064 431 17591 16709 30773 432 19424 18508 49280 433 21306 20365 69645 434 23247 22277 91922 435 25237 24242 116164 7 DRAW DOWN CALCULATIONS ORIFICE CALCULATIONS Q=CD*A*V(2*g*Ho) Q=Discharge Rate (cfs) A= Area of orifice (sf) g=Acceleration of gravity Ho=Driving Head from orifice centroid to water surface (typically use Ho/3 for decreasing head) Coefficient of Discharge Orifice Size Orifice Size Orifice Area Temporary Pool Head Driving Head Discharge Rate DRAWDOWN PERIOD Discharge Time 0.6 1.75 in 0.15 ft 0.017 sf 0.46 ft 0.129 ft 0.029 cfs 2.6 Days 3 OUTLET STRUCTURE BOUYANCY CALCULATIONS STRUCTURE UCTURE WEIGHT Box Dimensions Front/Rear (ft) Sides (ft) Base (ft) Width 4.0 5.3 5.3 Height 10.5 10.5 5.3 Thickness 0.67 0.67 4.0 4 of Walls 2.0 2.0 1.0 Concrete Weight (lblft) 150.0 150.0 150.0 Weight (lbs) 8442.0 11270.1 16854.0 Total Weight (lbs) 36566.1 Water Force Box Front Width (ft) 5.3 Box Side Width (ft) 5.3 Submerged Height (ft) 10.5 Water Weight (lb/ft) 62.4 Displaced Water Weight 18404.6 Factor of Safety Minimum 1.5 SF= 2.0 RUNOFF CALCULATIONS Table of Contents Project Name: P200160 - Cedar Creek Hydrology Studio v 3.0.0.261 09-15-2022 BasinModel Schematic...................................................................................................................................... 1 Hydrographby Return Period............................................................................................................................ 2 1 -Year HydrographSummary .................................................................................................................................. Hydrograph Reports Hydrograph No. 1, NRCS Runoff, Pre-Development................................................................................. 4 Hydrograph No. 2, NRCS Runoff, Post To Pond ......................... 5 Hydrograph No. 3, NRCS Runoff, Post Remaining Site ....................... ...................................................... Hydrograph No. 4, Pond Route, Wet Pond................................. ............................................................ Detention Pond Reports - Wet Pond.......................................................................................... 8 Hydrograph No. 5, Junction, Post Total Site ...................................... 2 - Year HydrographSummary ............................................... .......................... Hydrograph Reports Hydrograph No. 1, NRCS Runoff, Pre -Development ........................ Hydrograph No. 2, NRCS Runoff, Post To Pond ................. ............. Hydrograph No. 3, NRCS Runoff, Post Remaining Site .................... Hydrograph No. 4, Pond Route, Wet Pond ........................... Hydrograph No. 5, Junction, Post Total Site ................................... 10 -Year HydrographSummary ................................................... Hydrograph Reports Hydrograph No. 1, NRCS Runoff, Pre -Development Hydrograph No. 2, NRCS Runoff, Post To Pond ........ Hydrograph No. 3, NRCS Runoff, Post Remaining Site Hydrograph No. 4, Pond Route, Wet Pond ............... Hydrograph No. 5, Junction, Post Total Site ............. 13 14 ................................................ 15 16 17 18 19 20 ............................................................ 21 22 23 ............................................................ 24 25 - Year HydrographSummary .................................................................................................... Hydrograph Reports Hydrograph No. 1, NRCS Runoff, Pre -Development ......... Hydrograph No. 2, NRCS Runoff, Post To Pond .............. ........................................... Hydrograph No. 3, NRCS Runoff, Post Remaining Site .................. Hydrograph No. 4, Pond Route, Wet Pond ........................................ Hydrograph No. 5, Junction, Post Total Site ...................................................... ... 25 26 ..... 27 ,;,,, 28 29 30 100 - Year Contents continued... HydrographSummary................................................................................................................................ 31 Hydrograph Reports Hydrograph No. 1, NRCS Runoff, Pre -Development ............................. . 32 Hydrograph No. 2, NRCS Runoff, Post To Pond ................. .................................................................... 33 Hydrograph No. 3, NRCS Runoff, Post Remaining Site .......................................... . ................................ 34 Hydrograph No. 4, Pond Route, Wet Pond....................................................................................... Hydrograph No. 5, Junction, Post Total Site............................................................................. 36 Basin Model Project Name: P200160 - Cedar Creek Hydrology Studio v 3.0.0.26 09-15-2022 Pre -Development Post To Pond Post Remaining Site 1/1/I J/I/1 l�l/I Wet Pond r Post Total Site 'o. Hydrograph by Return Period Hvdroloov Studio v 10.0.26 Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. Hydrograph Type Hydrograph Name Peak Outflow (cfs) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 NRCS Runoff Pre -Development 4.175 9.254 14.71 37.17 57.08 2 NRCS Runoff Post To Pond 7.159 11.70 16.36 34.32 49.73 3 NRCS Runoff Post Remaining Site 3.001 4.962 6.978 14.79 21.49 4 Pond Route Wet Pond 0.071 0.090 0.106 0.151 0.812 5 Junction Post Total Site 3.028 5.006 7.036 14.88 21.60 Hydrograph 1 -yr Summary Hvdrolnov Studio v 10026 Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. Hydrograph Type Hydrograph Name Peak Flow (cis) Time to Peak (hrs) Hydrograph Volume (Cult) Inflow Hyd(s) Maximum Elevation (ft) Maximum Storage (Cuft) 1 NRCS Runoff Pre -Development 4.175 11.97 11,926 ---- 2 NRCS Runoff Post To Pond 7.159 11.97 15,210 3 NRCS Runoff Post Remaining Site 3.001 11.97 6,430 — 4 Pond Route Wet Pond 0.071 24.03 13,764 2 429.88 12,399 5 Junction Post Total Site 3.028 11.97 20,194 3,4 Hydrograph Report Hydrology Studio v 3.0.0.26 Pre -Development Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. 1 Hydrograph Type = NRCS Runoff Peak Flow = 4.175 cfs Storm Frequency = 1-yr Time to Peak = 11.97 hrs Time Interval = 2 min Runoff Volume = 11,926 cuff Drainage Area = 11.06 ac Curve Number = 61 Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 2.87 in Design Storm = Type 11 Storm Duration = 24 hrs Shape Factor = 484 Qp = 4.17 cfs 5 _ 4 I i 3 �Vy V 2 '� ................. .................. ............... ............. .... .. .... ..._ _. ........ ................. ...... ... 0- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Time (hrs) 4 Hydrograph Report Hydrology Studio v 3.0.0.26 Post To Pond Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. 2 Hydrograph Type = NRCS Runoff Peak Flow = 7.159 cfs Storm Frequency = 1-yr Time to Peak = 11.97 hrs Time Interval = 2 min Runoff Volume = 15,210 cuft Drainage Area = 7.69 ac Cure Number = 68.51 Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 2.87 in Design Storm = Type it Storm Duration = 24 hrs Shape Factor = 484 . Composite CN worksheet. AREA(ar) CN OESCRiPTiON 1A4 98 Impervious 6.25 61 Pervious 7.69 69 Weighted CN Method Employed K 7 5 V 4 C7 3 2 0 Qp =J.16 cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Time (hrs) 5 H y d ro g ra p h Report Project Name: P200160 - Cedar Creek Hydrology Studio v 3.0.0.26 Post Remaining Site 09-15-2022 Hyd. No. 3 Hydrograph Type = NRCS Runoff Peak Flow = 3.001 cfs Storm Frequency = 1-yr Time to Peak = 11.97 hrs Time Interval = 2 min Runoff Volume = 6,430 cult Drainage Area = 3.37 ac Curve Number = 68 Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 2.87 in Design Storm = Type II Storm Duration = 24 hrs Shape Factor = 484 Qp = 3.00 cfs 4 I i j j .^ i i I i i 0 ii 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Time (hrs) 6 Hydrograph Report Hydrology Studio v 3.0.0.26 Wet Pond Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. 4 Hydrograph Type = Pond Route Peak Flow = 0.071 cfs Storm Frequency = 1-yr Time to Peak = 24.03 hrs Time Interval = 2 min Hydrograph Volume = 13,764 cuff Inflow Hydrograph = 2 - To Pond Max. Elevation = 429.88 ft Pond Name = Wet Pond Max. Storage = 12,399 cuft Pond Routing by Storage indication Method Center of mass detention time = 30.13 hrs N. 7 M. 5 4 C7 3 2 I 0 Qp = 0.07 cfs 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hrs) — To Pond — Wet Pond 7 Pond Report Project Name! P2001660 - Cedar Creek Hydrology Studio v 3.0.0.26 09-15-2022 Wet Pond Stage -Storage 435 434 433 a' 432 w 431 430 M User Defined Contours Description Input Bottom Elevation, ft 429.00 Voids (%) 100.00 Volume Calc None Stage ! Storage Table Stage Elevation Contour Area Incr. Storage Total Storage (ft) (ft) (Sgft) (cuft) (cuft) 0.00 429.00 12,302 OA00 0.000 1,00 430.00 15,826 14,064 14,064 2.00 431.00 17,591 16,709 30,773 3,00 432.00 19,424 18,508 49,280 4.00 433.00 21,306 20,365 69,645 5.00 434.00 23,247 22,277 91,922 6.00 435.00 25,237 24,242 116,164 Stage -Storage 0 20000 40000 60000 80000 100000 Total Storage (cuft) — Contours 6 I 4 v 3 (D 2 1 0 120000 8 Pond Report Project Name: P200160-Cedar Creek Hydrology Studio v 3.0.0.26 09-15-2022 Wet Pond Stage -Discharge Orifices Culvert I Orifices Culvert Orifice Plate 1" 2 3 Rise, in 36 1.75 Orifice Dia, in Span, in 36 1.75 No. Orifices No. Barrels 1 1 Invert Elevation, ft Invert Elevation, ft 429.00 429.00 Height, ft Orifice Coefficient, Co 0.60 0.60 Orifice Coefficient, Co Length, ft 100 Barrel Slope, % 1 N-Value, n 0.013 Weirs Weirs Riser" Ancillary 1" 2 3 Shape 1 Type Box V-notch Cipoletti Exfiltration, inlhr Crest Elevation, ft 433.5 430.65 434 Crest Length, ft 16 20 Angle, deg 90 Weir Coefficient, Cw 3.3 3.3 "Routes through Culvert Stage -Discharge 435 434 433 m 432 w 431 430 429 0 5 10 i5 20 25 30 35 40 45 50 55 60 65 70 Discharge (cfs) — Top of Pond --- Culvert — Riser —Orifice Total Q 6 5 4 14 zi 3 m 2 1 9 Hydrology Studio v 3.0.0.26 Wet Pond Project Name: P200160 - Cedar Creek 09-15-2022 Stage -Storage -Discharge Summary Stage (ft) Elev. (ft) Storage (tuft) Culvert (cfs) Ortlices, cis Riser ON weirs, cis Pf Riser (Cfs) Exfil (cfs) User (cis) Total ON 1 2 3 1 2 3 0.00 429.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.00 430.00 14,064 0.076 is 0.076 0.000 0,000 0.000 0.076 2.00 431.00 30,773 0.110 is 0.110 0.000 0,000 0.000 0.110 3.00 432.00 49,280 0.136 is 0.136 0.000 0.000 0.000 0.136 4.00 433.00 69,645 0,158 is 0.158 0.000 0.000 0.000 0.158 5.00 434.00 91,922 18.81 Ic 0.146 18.67 0.000 s 0.000 18.81 6.00 435.00 116,164 72.19 is 0.000 0.000 0.000 0.000 72.19 Suffix key: is = inlet control, oc = outlet control, s = submerged weir 10 Pond Report Project Name: P200160 - Cedar Creek Hydrology Studio v 3.0.0.26 Wet Pond 09-15-2022 Extended Detention Stage (ft) w Ln m o 0 rn • � o N O N .............-______. ............. ........................ ..._ O N _ ......................... ...,..,..,..,., .,..,..,..,., .. ...................... ___ ___,................ O Qi O I O f• O . .. ........... ............. ....... o T r- �.... ... .... .. ... .... .,... ........ _. _,... .............. -__ __. _ O M t0 T � = 0 7 i O Ln C 0 O O O }' o LD of r� CD O V O 0 ..................,....,...., _ __ _ ... .......... ........ p lD 11 0 x M ... ............ __ __ .. ... .........._ vi L o [bj rn r\1 r+n __ N rn .... ................... .... _......... o Y LO I I ro � v m M v M � v"" o cn v v I ( ) A@ 11 Hydrograph Report Hydrology Studio v 3.0.0.26 Post Total Site Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. 5 Hydrograph Type = Junction Peak Flow = 3.028 cfs Storm Frequency = 1-yr Time to Peak = 11.97 hrs . Time Interval = 2 min Hydrograph Volume = 20,194 cuft Inflow Hydrographs = 3, 4 Total Contrib. Area = 3.37 ac 3 0 Qp = 3.03 cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hrs) Remaining Site Wet Pond — Total Site 12 Hydrograph 2-yr Summary u 1-1 It fin a An 2a Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. Hydrograph Type Hydrograph Name Peak Flow (cis) Time to Peak (hrs) Hydrograph Volume (cuft) Inflow Hyd(s) Maximum Elevation (ft) Maximum Storage (cuft) 1 NRCS Runoff Pre -Development 9.254 11.97 21,050 2 NRCS Runoff Post To Pond 11.70 11.97 23,823 3 NRCS Runoff Post Remaining Site 4.962 11.97 10,137 — 4 Pond Route Wet Pond 0.090 - 24.07 20,107 2 430.37 20,184 5 .function Post Total Site 5.006 11.97 30,244 3,4 13 Hydrograph Report Hydrology Studio v 10.0.26 Pre -Development Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. 9 14 Hydrograph Report Hydrology Studio v 3.0.0.26 Post To Pond Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. 2 Hydrograph Type = NRCS Runoff Peak Flow = 11.70 cfs Storm Frequency = 2-yr Time to Peak = 11.97 hrs Time Interval = 2 min Runoff Volume = 23,823 cuff Drainage Area = 7.69 ac Curve Number = 68.51* Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 3.47 in Design Storm = Type II Storm Duration = 24 hrs Shape Factor = 484 ' Composite CN Worksheet AREA(ac) CN DESCRIPTION 1." 98 Impervious 6.25 61 Pervious 7.69 69 Weighted CN Method Employed 10 9 '....... ... 0 0 -}—r i 0 1 2 3 4 5 6 7 S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Time (hrs) 15 Hydrograph Report Hydrology Studio v 3.0.0.26 Post Remaining Site Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. 3 Hydrograph Type = NRCS Runoff Peak Flow = 4.962 cfs Storm Frequency = 2-yr Time to Peak = 11.97 hrs Time Interval = 2 min Runoff Volume = 10,137 cuft Drainage Area = 3.37 ac Curve Number = 68 Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 3.47 in Design Storm = Type II Storm Duration = 24 hrs Shape Factor = 484 Qp = 4.96 cfs 5 a q i - I i i --.- I Cr i e _ o i I t I I I I I I I I I I I I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Time (hrs) 16 Hydrograph Report Hydrology Studio v 3.0.0.26 Wet Pond Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. 4 Hydrograph Type = Pond Route Peak Flow = 0.090 cfs Storm Frequency = 2-yr Time to Peak = 24.07 hrs Time Interval = 2 min Hydrograph Volume = 20,107 cuft Inflow Hydrograph = 2 - To Pond Max. Elevation = 430.37 ft Pond Name = Wet Pond Max. Storage = 20,184 cuft Pond Routing by Storage Indication Method Center of mass detention time = 33.89 hrs 13 12 11 1C 9 8 7 u CT 6 5 4 3 2 1 0 0 Qp=0.09cfs 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hrs) — To Pond — Wet Pond 17 Hydrograph Report Hydrology Studio v 3.0.0.26 Post Total Site Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. 5 Hydrograph Type = Junction Peak Flow = 5.006 cfs Storm Frequency = 2-yr Time to Peak = 11.97 hrs Time Interval = 2 min Hydrograph Volume = 30,244 cuft Inflow Hydrographs = 3, 4 Total Contrib. Area = 3.37 ac 6 51 3 Cr 2 0 Qp = 5.01 cfs 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hrs) — Remaining Site --- Wet Pond -- Total Site ,o 18 Hvdroloav Studio v 3.0.0.26 Project Name: P200160 - Cedar Creek 09-15-202-2 Hyd. No. Hydrograph Type Hydrograph Name Peak Flow (cfs) Time to Peak (hrs) Hydrograph Volume (cult) Inflow Hyd(s) Maximum Elevation (ft) Maximum Storage (cuft) 1 NRCS Runoff Pre -Development 14.71 11.97 31,155 — 2 NRCS Runoff Post To Pond 16.36 11.97 32,857 — 3 NRCS Runoff Post Remaining Site 6.978 11.97 14,038 — 4 Pond Route Wet Pond 0.106 24.07 25,349 2 430.87 28,539 5 Junction Post Total Site 7.036 11.97 39,387 3,4 19 H yd rog ra p h Report Project Name: P200160 - Cedar Creek Hydrology Studio v 3.0.0.26 Pre -Development 09-15-2022 Hyd. No. 1 Hydrograph Type = NRCS Runoff Peak Flow = 14.71 cfs Storm Frequency = 10-yr Time to Peak = 11.97 hrs Time Interval = 2 min Runoff Volume = 31,155 cuff Drainage Area = 11.06 ac Curve Number = 61 Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 4.03 in Design Storm = Type 11 Storm Duration = 24 hrs Shape Factor = 484 Qp = 14.71 cfs 16 15 14 __ .. 13 0 12 ................ 11 10 9 -- u 8 - Cr 7 I 6 5 ......... 1 4 j 3 , - ----i — 2 .. - _ .... t _,. ............. ......,_ 0 � 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Time (hrs) 20 Hydrograph Report Hydrology Studio v 3.0.0.26 Post To Pond Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. 2 Hydrograph Type = NRCS Runoff Peak Flow = 16.36 cfs Storm Frequency = 10-yr Time to Peak = 11.97 hrs Time Interval = 2 min Runoff Volume = 32,857 cuft Drainage Area = 7.69 ac Curve Number = 68.51 Tic Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 4.03 in Design Storm = Type II Storm Duration = 24 hrs Shape Factor = 484 " Composite ON Worksheet AREA(ac) CN DESCRIPTION 144 98 Impervious 625 61 Pervious 7.69 69 Weighted CN Method Employed 18 17 16 15 14 13 12 11 10 Vi 9 C 8 7 6 5 4 3 2 1 0 0 1 Qp = 16.36 cfs 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Time {hrs} 21 H yd rog ra p h R e p o rt Project Name: P200160 - Cedar Creek Hydrofogy Studio v 3.0.0.26 Post Remaining Site 09-15-2022 Hyd. No. 3 Hydrograph Type = NRCS Runoff Peak Flow = 6.978 cfs Storm Frequency = 10-yr Time to Peak = 11.97 hrs Time Interval = 2 min Runoff Volume = 14,038 cuff Drainage Area = 3.37 ac Curve Number = 68 Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 4.03 in Design Storm = Type 11 Storm Duration = 24 hrs Shape Factor = 484 Qp = 6.98 cfs a 7 ...... i _... ....... 6 i I 5 .. ......... . 4 I C7 2 k �: k i 0 I i i i i f i f i i f i i 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Time (hrs) 22 Hydrograph Report Hydrology Studio v 3.0.0.26 Wet Pond Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. 4 Hydrograph Type = Pond Route Peak Flow = 0.106 cfs Storm Frequency = 10-yr Time to Peak = 24.07 hrs Time Interval = 2 min Hydrograph Volume = 25,349 cult Inflow Hydrograph = 2 - To Pond Max. Elevation = 430.87 ft Pond Name = Wet Pond Max. Storage = 28,539 cult Pond Routing by Storage Indication Method Center of mass detention time = 35.44 hrs 1 1 1 1 1 1 1 1 u C7 QP = 0.11 cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hrs) — To Pond — Wet Pond 23 Hydrograph Report Hydrology Studio v 3.0.0.26 Post Total Site Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. 5 Hydrograph Type = Junction Peak Flow = 7.036 cfs Storm Frequency = 10-yr Time to Peak = 11.97 hrs Time Interval = 2 min Hydrograph Volume = 39,387 cuft Inflow Hydrographs = 3, 4 Total Contrib. Area = 3.37 ac M 7 M. 5 4 C7 3 2 1 r Qp = 7.04 cfs 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hrs) — Remaining Site - Wet Pond --- Total Site 24 Hydrograph 25-yr Summary Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. Hydrograph Type Hydrograph Name Peak Flow (cis) Time to Peak (hrs) Hydrograph Volume (tuft) Inflow Hyd(s) Maximum Elevation (ft) Maximum Storage (cuft) 1 NRCS Runoff Pre -Development 37.17 11.97 74,479 -- 2 NRCS Runoff Post To Pond 34.32 11.97 68,999 — 3 NRCS Runoff Post Remaining Site 14.79 11.97 29,705 — 4 Pond Route Wet Pond 0.151 24.07 39,891 2 432.66 62,697 5 Junction Post Total Site 14.88 11.97 69,596 3,4 25 Hydrograph Report Hydrology Studio v 3.0.0.26 Pre -Development Project Name: P20016C - Cedar Creek 09-15-2022 Hyd. No. I Hydrograph Type = NRCS Runoff Peak Flow = 37.17 cfs Storm Frequency = 25-yr Time to Peak = 11.97 hrs Time interval = 2 min Runoff Volume = 74,479 cuft Drainage Area = 11.06 ac Curve Number = 61 Tc Method = User • Time of Conc. (Tc) = 5.0 min Total Rainfall = 5.96 in + Design Storm = Type II Storm Duration = 24 hrs Shape Factor = 484 'p Qp = -37.17 cfs 26 Hydrograph Report Hydrology Studio v 3.0.0.26 Post To Pond Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. 2 Hydrograph Type = NRCS Runoff Peak Flow = 34.32 cfs Storm Frequency = 25-yr Time to Peak = 11.97 hrs Time Interval = 2 min Runoff Volume = 68,999 cult Drainage Area = 7.69 ac Curve Number = 68.51" Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 5.96 in Design Storm = Type II Storm Duration = 24 hrs Shape Factor = 484 Composite CN Worksheet AREA (ac) CN DESCRIPTION 1.44 98 Impervious 6.25 61 Pervious 7.69 69 Weighted CN Method Employed 38 36 34 32 30 28 26 24 22 u 20 18 16 14 12 10 8 6 4 2 0 0 Qp = 34.32 cfs 1 2 3 4 5 6 7 8 9 10 11. 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Time (hrs) 27 H y d ro g ra p h Report Project Name: P200160 - Cedar Creek Hydrology Studio v 3.0.0.26 Post Remaining Site 09-15-2022 Hyd. No. 3 Hydrograph Type = NRCS Runoff Peak Flow = 14.79 cfs Storm Frequency = 25-yr Time to Peak = 11.97 hrs Time Interval = 2 min Runoff Volume = 29,705 cuft Drainage Area = 3.37 ac Curve Number = 68 Tc Method = User Time of Conc. (TO = 5.0 min Total Rainfall = 5.96 in Design Storm = Type 11 Storm Duration = 24 hrs Shape Factor = 484 Qp = 14.79 cfs 28 Hydrograph Report Hydrology Studio v 3.0.0.26 Wet Pond Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. 4 Hydrograph Type = Pond Route Peak Flow = 0.151 cfs Storm Frequency = 25-yr Time to Peak = 24.07 hrs Time Interval = 2 min Hydrograph Volume = 39,891 tuft Inflow Hydrograph = 2 - To Pond Max. Elevation = 432.66 ft Pond Name = Wet Pond Max. Storage = 62,697 cult Pond Routing by Storage Indication Method Center of mass detention time = 37.80 hrs Qp=0.15efs 38 -- 36 24 22 20 V CY 18 16 14 12 10 a 6 4 ------ , __ ........ 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hrs) — To Pond ---- Wet Pond Hydrograph Report Hydrology Studio v 3.0.0.26 Post Total Site Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. 5 Hydrograph Type = Junction Peak Flow = 14.88 cfs Storm Frequency = 25-yr Time to Peak = 11.97 hrs Time Interval = 2 min Hydrograph Volume = 69,596 cuft Inflow Hydrographs = 3, 4 Total Contrib. Area = 3.37 ac Qp = 14.88 cfs 30 Hydrograph 100-yr Summary Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. Hydrograph Type Hydrograph Name Peak Flow (cfs) Time to Peak (hrs) Hydrograph Volume (cuft) Inflow Hyd(s) Maximum Elevation (ft) Maximum Storage (cuff) 1 NRCS Runoff Pre -Development 57.08 11.97 114,365 — 2 NRCS Runoff Post To Pond 49.73 11.93 100,527 — 3 NRCS Runoff Post Remaining Site 21.49 11.93 43,418 -- 4 Pond Route Wet Pond 0.812 17.87 57,929 2 433.54 81,645 5 Junction Post Total Site 21.60 11.93 101,347 3,4 31 a Project Name: P200160 Cedar Creek H y d ro g ra p h Report Hydrology Studio v 3.0.0.26 Pre -Development 09-15-2022 Hyd. No. 1 Hydrograph Type = NRCS Runoff Peak Flow = 57.08 cfs Storm Frequency = 100-yr Time to Peak = 11.97 hrs Time Interval = 2 min Runoff Volume = 114,365 cuft Drainage Area = 11.06 ac Curve Number = 61 Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 7.46 in Design Storm = Type 11 Storm Duration = 24 hrs Shape Factor = 484 Qp = 57.08. cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Time (hrs) 32 H y d ro g ra p h Report Project Name: P200160 - Cedar Creek Hydrology Studio v 3.0.0.26 Post To Pond 09-15-2022 Hyd. No. 2 Hydrograph Type = NRCS Runoff Peak Flow = 49.73 cfs Storm Frequency = 100-yr Time to Peak = 11.93 hrs Time Interval = 2 min Runoff Volume = 100,527 cuft Drainage Area = 7.69 ac Curve Number = 68.51* Tic Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 7.46 in Design Storm = Type II Storm Duration = 24 hrs Shape Factor = 484 Composite ON Worksheet AREA(ac) CN GESCRIPTON 1.44 98 Impervious 625 69 Pervious 7.69 69 Weighted GN Method Employed 33 Hydrograph Report Project Name: P200160 - Cedar Creek Hydrology Studio v 3.0.0.26 Post Remaining Site 09-15-2022 Hyd. No. 3 Hydrograph Type = NRCS Runoff Peak Flow = 21.49 cfs Storm Frequency = 100-yr* Time to Peak = 11.93 hrs Time Interval = 2 min Runoff Volume = 43,418 cuft Drainage Area = 3.37 ac Curve Number = 68 Tc Method = User Time of Conc. (Tc) = 5.0 min Total Rainfall = 7.46 in Design Storm = Type II Storm Duration = 24 hrs Shape Factor = 484 34 Hydrograph Report Hydrology Studio v 3.0.0.26 Wet Pond Project Name: P200160 - Cedar Creek 09-15-2022 Hyd. No. 4 Hydrograph Type = Pond Route Peak Flow = 0.812 cfs Storm Frequency = 100-yr Time to Peak = 17.87 hrs Time Interval = 2 min o Hydrograph Volume = 57,929 cuft Inflow Hydrograph = 2 -To Pond Max. Elevation = 433.54 ft Pond Name = Wet Pond Max. Storage = 81,645 cuft Pond Routing by Storage Indication Method Q Center of mass detention time = 3f.49 hrs 56 54 52 50 48 46 44 42 40 38 36 34 32 30 V 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 0 Qp =.0.81 cfs 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hrs) — To Pond ---- Wet Pond 35 H y d ro g ra p h Report Project Name: P200160 - Cedar Creek Hydrology Studio v 3.0.0.26 Post Total Site 04-15-2022 Hyd. No. 5 36 PIPE NETWORK CALCULATIONS Plan View Stotmwater Studio 2022 v 3-0.0.29 M Project Name: Enter Project Name... 09-10.2022 K CL 0 ljz o - ■ CL le o d 0 d 0 d 2 i � ( 2 0 1 I e ' 0 E § § k � o § � 2 k v - _ n � ■ & � � a d d . ® 0 a R . ■ 2 2 2 Clk Lon to Cl 0 0 0 ■ E f § § e k k I ■ £ o C . . F C4 � E q $ q ■ � F 2 co 0 2 m 0 0 § ' § § § k � i q q I ) 0 ° ° £ § § d to 2 & a G CL 2 CL e e E e e C - k . 2 } ) . 2 _ n . z Energy Grade Line Calculations Stormwater Studio 2022 v 3.0.0.29 Project Name. Enter Project Name... 09-10-2022 Downstream I Upstream Pipe Junction Line Line Q Invert depth Area HGL Vet Val EGL tmrert Depth Area HGL Vet Vel EGL n Enrgy HGLa EGLa Enrgy No Sire .mi Etev Elev Head Etev Etev EleY Head Etev Value Loss Etev Etev Loss (in) (cse) (11) (tt) (Sqft) (it) (Ws) (1t) (tt) (tt) (R) 00 (S`NV (ft) (nis) (III) (tt) (tt) (n) (tt) (tt) 1 24 18.28 429.00 0.93$ 1A3 429.93 12.79 2.54 431.53 44.00 432.00 1.612 2.65 433.51 7.16 0.80 434.31 0.013 2.786 433.61 434.31 0.00 2 24 15.62 434.00 1.37$ 229 435.37 6.78 0.71 438.08 62.00 434.47 1.402 2.34 436.87 6.63 0.68 436.55 0.013 0.470 435.87 438.55 0.00 3 24 i0.33 434.57 1.87 3.05 436.44 3.39 0.18 436.61 209.50 436AS 1.142 1.85 437.69 5.60 0.49 438.08 0.013 1.467 437.59 438.08 0.00 Notes: Return Period = 25-yrs. ' Critical depth. $ Supercritleal. Pro act FNe: P200160 - SW AbWark Phase r Swan Rautlng swa Line I - P-S Stormwater Studio 2022 v 3.0,0.29 Project Names Enter Project Name.., 09-10-2022 Elev (ft) 453.00 453.00 449.00 449.00 J $ p � 0 C ! + f!1 .4 u1 'Y? M O v Ln ` m m 445.00 q — 445.00 G J J .. ,.. U) cc C S z �...� 441.00 441.00 O CD a O v CQ — m 437.00 437.00 + a v w v m U) M 7 t7 � LtJ ! -- ---- ------ - —------- ----- ........ — 433.00 l 433.00 ---- -------- - q-...•,.,, w„ 24 @ 44 - 429.00 429.00 425.00 425.00 0 5 10 15 20 25 30 35 40 45 50 Reach (ft) Grnd Surface HGL--------• EGL Projecr Fdo: P200160 - SW Mhrnrk Phaso I Swala Rowjnq.sw: Line 2 Stormwater Studio 2022 v 3.0.0.29 Project Name: Enter Project Name... 09-10-2022 Efev (ft) 450.00 450.00 448.00 448.00 446.00 446.00 o = 0 0 E �_ C ' `� "' '� 444.00 CC � o o fl t Q O O " m n-m Q M LtDq 444.00 Q m °p o urwcu`r vv o rlrn m m m V m m � . m m J E 'c J J + — r 442Ap 442A0 y y CO. Cr K - 440.00 440.00 438.00 438.00 . ....... ......... 436.00 ------ 436.00 , 434.00 - 62U - 2 " @ 0.76% 434.00 432.00 432.00 430.00 430.00 0 10 20 30 40 50 60 70 80 Reach (ft) Grnd Surface HGL--------- EGL Fn�ncr Filo: F200iG0 - SW Nohaark Ahnse ! Swnla Rouring.sws Line 3 Stormwater Studio 2022 v 3.0.0.29 Project Name: Enter Project Name... 09-10-2022 Elev (ft) 450.00 450.00 448.00 448.00 C, 446.00 446.00 o O moo' 04 bi o°r-a `o � c - M 444.00 • p p rn M q V a Co M J J - J > Q i7 444.00 p rro -'-w w 'n V UJ S S w L9 wu442.00 442.00 440.00 440.00 438.00.. - N -__ - - - 438.00 _ - k1 w 436.00 _ 436.00 21 OU - 24" @ 0.,90 0 434.00 - -- 434.00 432.00 432.00 0 20 40 60 80 100 120 140 160 180 200 220 Reach (fi) Grnd Surface HGL--------- EGL ProjaG Pilo: P200160 - SWNetwork Phaso 0 Swale Routing.svrs Plan View Stormwater Studio 2022 v 3.0.0.29 A . G&3 � 0 INp3 New LA SDI A' ROB ,pp �O Project Name: P200160 - Cedar Creek - Prase 1 09-10.2022 Projecl File. P2OOTGO- WorNaMnrk Phase Lsws a u m P O V O 4i V $ ONt W O O O N i Length o 0 o ni u`i `� oo m p� a Op N O '. a Oyy O O O O O �Opp O pNb'' O OpN O O O O O O i i ./ > p O O O O d CD O O O O O O O O O O .0 O o O O O ipit O t. M C. o O c�Oit O g O w�i O O $ O $ O � O a O o O $ O ii [� Rational Cn o 0o N O op pap o 0 0 0 �.; 0 pp:: O:' aoo N 0 N 0 �i 0 N 0 m oy a C o, O o r fait O N ;. n x pO O : a O V O N C N p.. O m O V O O �a pC N O W Q 73 a i V —► W j— �t r A 0 > N CON : Cn GD tact Oft Oat -A► cn w o o w o w Ott o cn o w to cn vt vt 9 O o O rn O w o 3 w z A w w: O w aW w � rnp Sn w w O�pI epn w; w to C. w w rnp A' ' w V o V V v _ 3 O ' O m O O O m w m w ' CO O om m w CO w w t0 w 0 m PP w p w o w w Goo p — O i w p p W m m m � intensity Oat {► 001 L. A .? O a O :V+ O iV O O^ i Od O1 O bW O O N w 0aO— Total Q V W OE O V N : N O N m O O i. .: �. i i O 0) .0:. -► O �0�p W V Ql :tpW A 04 Capacity i NV iVD fallCapacity Oi i i A fp4� N w CO �P pN W W W fm �NCpp Velocity to Co : Co Co W O Co O 0 d a O GW C—n w m A ? V N to t Al m fJt N :fT !Oa A V i m i i O i O pJ i pi Op , W O *% V i N i., Ni t!1 pi O pi A a m V w `^ 9~ yw w w ,Op A� + + N N ,Op a O f7l y M W o ,01 fit N cc w G. p O CNi O w NV W N W N O A A :tA � t I t $ a fn O fa71 o O N tV71 w w fi7 O o O O N N O o w A w w A N A O A ?a w W i � y �n m V a}ww� W CO {0 T�w i► }w� �i1 i M V V (n T j., fa :� m y�w�^ WC�Ppp jAT[� J ? m < .P i1 IV w Oit din Cn f,�,� Cn m 40 CD + Co Q 0m m v w w ? w T. w Fm w w a c m N A CO W �wp A A O W t0 W i+ O o pwp�� Vt A Ww O N O C" O Q H Z pp A A ? aa O A A CO yy� A AA CO) ,,pp A fp4.pt1 yy�� A m t w d w w pp A AA t w W o r C► � m .r CO v ww AG�pO V O mm W t�Dn W �Wg N TJ O O N O Ul O ' < Oft W O A S71 .iP. Oi m i m i v i W i w uA• i i i m V 0 w A w N i a tA (n 3 O d 3 a o o CD N �,! 0 ca �-A Cr Irt O Composite C Worksheet Stormwater Studio 2022 v 3.0.0.29 Project Name: P200160 - Cedar Creek - Phase I 09.10-2022 Line No Description Drainage Area (ac) Runoff Coeff (C) C x A Composite (C) Structure ID 4 IMPERVIOUS 0.400 0.95 0.380 CB-3 PERVIOUS 0.180 0.40 0.072 Totals 0.580 0.452 Or78 5 IMPERVIOUS 0.360 0.95 0.342 CB-4 PERVIOUS 0.110 0.40 0.044 Totals 0.470 0.386 6,.82 6 PERVIOUS 0.040 0.40 0.016 DI-1 Totals 0.040 0.016 0.40 7 PERVIOUS 0.020 0.40 0.008 DI-2 Totals 0.020 0.008 0.40 8 IMPERVIOUS 0.020 0.95 0.019 Totals 0.020 0.019 Q.9S P4W rjjtL PM60- SWAWww* PhM Laws 0 75 U cc W W 4 O, cc M L > 0 � v 2 L d W€ U1 wa O O O O O O O O C O O O O O O tl O O O m -' 0 0 0 0 0 0 0 d O o d 0 0 d 0 d 0 0 o Q V. O lV N to h m m N M M ids V N f• W r r to M tti m t0 A CW W ��' N r. as r g N N N r N tv ri ttf tG ct�cQ � op W ppyy M�j �mp ttotf MM CAD, C M1 M �1 � �p Of t�D+, m, t� ro � Pn'i _ sm� �• sm� V' VM, �M V' V' to 0) cm M (A o O p W ;W OOf O NN W U) O O O N M M O O O N! o O r m 3 M r M r M M w M r M w co rO M rO M rO M r M r M co M M r M r4 _M M: —d- M r M r iy C> O O O O Q O Q O O O O d C d d O 0 O 0 Q O O O Cc!r 0 O O O O O O C O O O O J eN� M n wi o t, a� 0prV s0 04 +� N v N r o f3 e+ N Bp�i^ nr ui v ttso� �uf `u tte°, tt`or Ln 4 ttlll1-5 4 Q VV' V' R � co o e +J= S C O O O O O O O O 0 O O 0 _0 O O 0 OI O O _ h N r M M R 0 v m g N 0 II iCf tCJ to V' M r N t" M si' N c pM�� = us w a to t3 tri �. a Q_Co r N O r O r r w l co N co IS to Q to M. O M W O N N r r O O CC; C C C d O O C O O C C O m O r AO tl; � vi '�0,' VN' bt n N N 1�' ti r N O C r r 0 O. o O C C 0 C C o aNi+ toy � yNeMi q � — —. Ip .CpG ewe N tC •Nitu� �t'fftW`'� v t VO' 0 h $ tp CR CD O � � �Y O m * !N► 4 � O O' h. 4'1 O tQ V' M OD f r W . Q N N tQj to r i NN a co t�py t+� t0d+, t t��j {� eV�; A N cj stt Q to v A to eY�; Q tlr'; trN� tttf R tr{9. 7 0 -- o 0 ;; 0 CO 0 t°io 0 o 0 f 0 0 ry o r�i Q � o e°i 0 t� 0 �`! Q ey 0 � 0 � o c o 0j 0 0 0 0 tiio o r r- t0 to 0 tD N V' CV '. .00 aNq V' .M- M H N Q m co M. o M o M a+, to r: r O tti > u4; o`g a ti q to a cMy t`mi m set uNi a a} t°!� t i v Lq tgi O 0 lY t0 m 00 T W 1t7 r to st rr$F ttf !� r O m O m O .O d O O V' O to r 0 to O N C r N to O 0 O CDC Q r to q iH tq O l� Qpp p M O at O C r 0 iO} 0 O O O Q d t3 �Of' C .}O� O O Q ha.: C; O O �y cO�pp .�yOry V t�py cz O VOA �Ory O .pp ��{ �a .t�� n VN,' yO O i {� OVD O ,1 to O O O O N V, VM,' 11f Pd�, hd. r tC1 Q; V)�~" JH„g I Q 0 N N V � � tD ;p tb tp d OD m d <a OD OD W m cq OJ O r N M V to to ti M to J o r N M V' to 0 t` co of r r w r w r r r r r Line 1 - Pl Stormwater Studio 2022 v 3.0.0.29 Project Name: P200160 - Cedar Creek - Phase 1 09-10.2022 Elev (ft) 455.00 455.00 to C ? U N c c 00 0 0 h m .� m ry r~ m v V — +' _. M rV lf1 M M CD LU 450.00 450.00 > 445.00 445.00 o O U! CD r-- 440.00 m 440.00 0 0 Q r r M LU 435.00 r,=�_---- ---- 435.00 430.00 -------------------------------------- 430.00 r t , 42Lf - 2' @ 7.190/0 — 425.00 425.00 420.00 420.00 0 5 10 15 20 25 30 35 40 45 50 Reach (ft) Grnd Surface HGL--------- EGL Projncr Filo.' P2Bf1Y50 - SW Nofria+k r'hasc 1, sws Line 2 - P2 Stormwaler Stud€o 2022 v 3.0.0.29 Project Name: P200160 - Cedar Creek - Phase 1 09-10-2022 Elev (ft) 458.00 458.00 454.00 454.00 _ a, O 0° U O CD = G O CO U e roC? m m rn M cv N a r v rnm m 450.00 p ,Zr M M Ln Lo 450.00 {. p _ I.IJ w W J J Q EiJ LLI �_ 7 l7 l7 L7ur l7 Atl E > > l7 l7 V3 [[ T T u� (n � = c T S w 446.00 Oft 446.00 442.00 - 442.00 438.00 438.00 434.00 ,, ., , ;gin " 8.,�:: 434.0032U - 30" @ 0.99% 430.00 430.00 426.00 426.00 0 5 10 15 20 25 30 35 40 Reach (ft) Grnd Surface HGI_ EGL Projocl File: P200160 - SW Network Pnaso Isws Line 3 -- P3 Slarmwdter Studio 2022 v 3.0.0.29 Project Name: P200160 - Cedar Creek - Phase 09-10-2022 Elev (ft) 458.00 458.00 _.- __ __-..._..__ _.-- 454.00 454.00 c+7 C Q Q m 'C C Q U r'l3 O Q p m m I-k� tt O `^ -R m ' vi of u�i 0 `r a � m m m 45Q.Q0 450.00 Q �' w w d eh _ A O _ w w w 'r m m V V m rrt m V' Cr) Lj l7 T w w N a a y J J J ll li C7 C7 LD U C? w w tl w 446.00 446.00 442.00 442.00 o 438.00 �i 438.00 - 434.00 434.00 430.00 430.00 0 10 20 30 40 50 60 70 80 90 100 110 120 130 Reach (ft) Grnd Surface HGL--------- EGL Project Filn: P200160 - S W Natwerk PAa sA 1, sws DRAINAGE AREAS SUMMARY DRAINAGE AREAS SUMMARY Input Data Cover Type Curve,# Impervious 98 Lawn 61 Woods 55 .Post -Development Impervious Lawn Woods Curve # DA-1 * 0.28 3.04 64.12 DA-2 0.24 98.00 DA-3 0.64 61.00 DA-4 0.43 0.14- 88.91 DA-5 0.18 0.39' 72.68 DA-6 0.04 0.09 72.38 DA-7 0.03 0.29 64.47 DA-8 0.02 98.00 DA-9 0.05 98.00 DA-10 0.02 98.04 DA-1'1 0.09 `' 98.00 DA-12 0.02 98.00 DA-13 0.05 98.00'' DA-14 0.02 98.00 DA-15 0.09 98.00 DA-1`6 1.54 61.00'' TOTAL 1.56 6.13 4 68.51 Total Acreage 17.69 *Impervious is pond permanent pool area NUTRIENT CALCULATIONS Tar -Pamlico Stormwater Rule 15A NCAC 2B . 0258 Last Modified 9/10/2022 Piedmont of the Tar -Pamlico River Basin: Includes Oxford, Henderson, Rocky Mount and Tarboro as well as Franklin, Nash and Edgecome Counties Total Nitrogen and Total Phosphorus Loading Calculation Worksheet (Automated) Project ]dame: Cedar Creek .4partnsents Date: 911012022 By: Phillip Ji�rner. Jr Checked By: Directions (same far pre -development and post -development tables): > Enter the acres of each type of land cover in the green boxes. The spreadsheet will calculate all of the values in light blue. > Compare total areas of development in pre- and post- tables for consistency (bottom of column (2)), and also for consistency with the site plans. If all of these values are not the same, there is an error that must be corrected. > unless drainage onto the development from offsite is diverted around or through the site, offsite catchment area draining in must be included in the acreage values and treated. Pre -development. (1) (2) (3) (4) (5) (6) (7) Type of Land Cover Area S.M. Formula Average EMC Column Average EMC Column acres 0.46 + 8.3I of TN to 2 * 3 4 of TP m L) (2)* 3 * 6 Transportation impervious 0.46 2.60 0.00 0.19 0.00 Roof impervious 0.46 1.95 0.00 0.11 0.00 Managed pervious 11.4b 1.42 7.22 0.28 1.42 (lawn/landscaped) Managed pervious 0.46 4.23 0.00 1.23 0.00(cropland) Managed pervious 0.40 2.04 0.00 0.62 0.00 (pasture) Wooded pervious 0.46 0.94 0.00 0.14 0.00 TN Loading TP Loading Fraction Impervious (1)=r(l. (Ib/yr) = 7.22 (I b/yr) = 1.42 TN Exp. Coeff. TP Exp. Coeff. Total Area of Development = 11.06 (Ibladyr) _ 0.65 (lb/ae/yr) = 0.13 Post -development: (1) (2) (3) (4) (5) (6) (7) Type of Land Cover Area S.M. Formula Average EMC Column Average EMC Column acres 0.46 + 8.3 of TN m 2 * 3 * 4 of TP m 2 * 3 6 Transportation impervious 1.54 2.60 4.25 0.19 0.31 Roof impervious 1.54 1.95 1.14 0.11 0.06 Managed pervious 1.54 1.42 21.06 0.28 4.15 Wooded pervious 1.54 0.95 0.00 0.14 0.00 Fraction Impervious P (1) = 0.13 TN Loading 26.46 TP Loading 9 4.53 f� (lh/yr) (lblyr) Total Area of Development = 11.06 TN Exp. Coeff. TP Exp. Coeff.2.39 0.41 (lb/ae/yr) _ (Ib/ac/yr) _ Note: The nutrient loading goals are 4.0 Ib/ac/yr for TN and 0.4 lb/aclyr for TP. If the post -development nutrient loading is below these levels, then no BMP is necessary. Otherwise, the next workshmt calculates post -development TN and TP loadings after BMPs are installed. Tar -Pamlico 3tormwater Rule 15A NCAC 28 .0258 Last Modified 5/23/03 Piedmont of the Tar -Pamlico River Basin: Includes Oxford- Henderson. Rockv Mount and Tarboro as well as Franklin. Nash and Edeecome Counties BMP Removal Calculation Worksheet (Automated) Project Name: Cedar Creek : partmentc Date: 9/101202 2 By: Phillip Jnlater. Jr: Checked By: Directions: > It may be advantageous to split the development into separate catchments to be handled by separate BMPs. The tables below allow the development to be split into as many as three catchments, and can be copied for greater than three. NOTE: Unless runoff flowing onto the development from offsite is routed separately around or through the site, the offsite catchment area draining in must be included in the acreage values of the appropriate land use(s) and treated. > Above each table: Enter the catchment acreage in the top green blank. Based on a comparison of the post -development TN and TP export coefficients you calculated above to the rule requirements of 4.0 Iblaclyr TN and 0.4 lblaclyr TP, select BMP(s) from the list for treating the catchment runoff. Enter the chosen BMP(s) nutrient removal rates in the green blanks. If more than one BMP is to be used in series, the combined removal rates will be calculated automatically in the blue blanks. > Catchment Tables: Enter the acres of each type of land cover in the green boxes. The spreadsheet will calculate all of the light blue boxes. NOTE: Compare the Total Catchment Acreage for the Development (final table) to the value you established in the pre-BMP workshect tables, and also to the site plans, for consistency, All of these values need to be the same TN TP Design Standard BMP Wet Detention Pond 25 40 NC BMP Manual Nutrient Stormwater Wetland 40 35 NC BMP Manual Removal Sand Filter 35 45 NC BMP Manual Rates Bioretention 35 45 NC BMP Manual Grass Swale 20 20 NC BMP Manual Vegetated Filter Strip w! -)o 35 NC BMP Manual Level Spreader Dry Detention 10 10 NC BMP Manual Catchment 1: Total acreage of catchment 1 = ac First BMP's TN removal rate =% First BMPs TPremlrate Second BMP's TN removal rate =% Second BMP's TP removal rateThird W - BMP's TN removal rate =% Third BMP's TP removal rate = % TOTAL TN REMOVAL RATE = 25 % TOTAL TP REMOVAL RATE= 40 % (1) (2) (3) (4) {5) (6) (7) Type of Land Cover Catchment S.M. Formula Average EMC Column Average EMC Column Acrca c 0.46 + 8.31 of TN m !L 2 3 • 4 of TP m /L 2 3 ^ 6 Transportation impervious 2.15 2.60 6.58 0.19 0.48 Roof impervious 2.1 S 1.95 1.59 0.11 0.09 Managed pervious 2,15 1.42 17.82 0.28 3.51 Wooded pervious 2.15 0.94 0.00 0,14 0.00 Area taken up by BMP 2.15 1.95 1.17 0.11 0.07 Fraction Impervious (1) = 0.20 Pre-BMP TN 27.17 Pre-BMP TP 4.15 Load (lblyr) = Load (Iblyr) _ Total Area of Development = 7.69 PraBMP TN 3.53 Pr BMP TP 0.54 Export (lbladyr) = Export (Iblaclyr) _ Post-BMP TN 2Q.38 Post-BMP TP 2A9 Load (lblyr) = Load (Iblyr) = Post-BMP TN 2.65 Past-BMP TP 0.32 Export (Iblaclyr) - Export (Ibladyr) = Tar -Pamlico Stormwater Rule 15A NCAC 2B .0258 Last Modified 5123103 Catchment 2: Total acreage of catchment 2 = ac First BMPs TN removal rate = % First BMTs TP removal rate = % Second BMP's TN removal rate = % Second BMP s TP removal rate = % Third BMP's TN removal rate = % Third BMP's TP removal rate = % TOTAL TN REMOVAL RATE = 0 % TOTAL TP REMOVAL RATE = 0 % (1) (2) (3) (4) (5) (6) (7) Type of Land Cover Catchment S.M. Formula Average EMC Column Average EMC Column Acrcapc 0.46 + 8.3I of TN m 2 3 4 of TP m L 2 3 6 Transportation impervious 0.46 2.60 0.00 0.19 0.00 Roof impervious 0.46 1.95 0.00 0.I 1 0.00 Managed pervious 0.46 1.42 2.20 0.28 0.43 Wooded pervious ' 0.46 0.94 0.00 0.14 11.00 Area taken up by BMP `! ht 0.46 1.95 0.00 0.11 11.00 Fraction Impervious (I) = 0.00 Pre-BMP TN 2.20 Pre-BMP TP 0.43 Load (lblyr) = Load (lb/yr) = Total:lresofl)evelopntcnt- 3.37 PrrBMP TN Export 0.65 Pre-BMPTP Export 0.13 (Ibladyr) - Ublaelyr) = Post-BMP TN Post-BMP TP 2.20 41.43 Load (Iblyr) = Load (Ib/yr) _ Post-BMP TN 065 Post-BMP TP 0.13 Export (Iblatlyr) = . Export (Iblaclyr) _ Catchment 3: Total acreage of catchment 3 = ac First BMP's TN removal rate = % First BMP's TP removal rate = % Second BMP's TN removal rate = % Second BMP's TP removal rate = % Third BMP's TN removal rate = % Third BMP's TP removal rate = % TOTAL TN REMOVAL RATE = 0 % TOTAL TP REMOVAL RATE = 0 % (1) (2) (3) (4) (5) (6) (7) Type of Land Cover Catchment S.M. Formula Average EMC Column Average EMC Column Acrea a 0.46 + 8.3I of TN m 2 3 4 of TP m L 2 3 6 Transportation impervious 7 M1 0.19 Roof impervious 1.95 0.11 Managed pervious 1.42 0.28 Wooded pervious 0.94 0.14 Area taken up by BMP 1.95 0.11 Fraction Impervious (n = Pre-BMP TN Pre-BMP TP Load (lb/yr) = Load (lb/yr) = Total Area of Development = P�BMP TN Export Pre-BMP TP Export (Ibladyr)) - (Ibladyr) _ Post-BMP TN Post-BMP TP Load (lb/yr) = I Load (lb/yr) = Past-BMP TN Post-BMP TP Export (Iblaclyr) = Export (Ibladyr) - Tar -Pamlico Stormwater Rule 15A NCAC 2B .0258 Last Modified 5123/03 Weighted Average of Nutrient Loadings from the Catchments: Catchment Post-BMP Post-BMP Acreage TN Loading TP Loading (lb/ac! r) Iblac! ) Catchment 1 7.69 2.65 0.32 Catchment 2 3.37 0.65 0.13 Catchment 3 0.00 0.00 0.00 TOTAL FOR DEVELOPMENT 11,06 2.04 0.26 Note: The nutrient loading goals are 4.0 IWaclyr for TN and 0.4 lblac/yr for TP. If the post -development nutrient loading is below these levels, then the BMPs planned are adequate. Otherwise, additional BMPs and/or modifications in development plans are required.