I.#tOJECT INFORMATION
1 Project Name
Cedar Creek Apartments
2 Project Area ac
11,06
3 Coastal Wetland Area ac
4 Surface Water Area ac
.28 wet pond permanentpool)
5 Is this project High or Low Density?
High
6 Does this project use an off -site SCM?
No
.O_ PLIA,�-W...ITH
02H .'100.3(4)
7
Width of vegetated setbacks provided feel
NIA
8
Will the ve eta_ted setback remain vegetated?
NIA
9
_ _ _
if BUA is proposed in the setback, does it meet NCAC 021-1.1003 4 c-d ?
NIA
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration System
12
Bioretention Cell
13
Wet Pond
1
14
1 Stormwater Wetland
15
!Permeable Pavement
16
1 Sand Filter
17
!Rainwater Harvesting RWH
i8
_
Green Roof
19
!LevelSpreader-Filter StriLS-F5
20
Disconnected Impervious Surface (DIS)
21
;Treatment Swale
22
Dry Pond
23
Storm Filter
24
!Silva Cell
25
1 Ba filter
26 ---.
Filterra -- ----
LOAD SUPPLEMENT FORMS
DESIGNER CERTIFICATION
27
Name and Title:
Phillip R Joyner, Jr. - Project Engineer
28.
Organization:
Mack Ga Associates, PA
29
Street address: Y
1667 Thomas A Betts Pk
30
_
City, State, Zip:
Rocky Mount, NC 27804
31
Phone numbers :
_
252-446-3017
32
. Email:
phillip@mackgaypa.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
�'Z 99 •cr�SS16 4, 1��
_ SEAL r;
03G348 `
a �
R. J0-4a���,`
Signature of Designer
17- ??- -Zo?Z
DRAINAGE AREAS
1
Is this a hi h density project?
Yes
2
1 If so, number of drains a areas/SCMs
1
3
Does this project have low density areas?
No
4
If so, number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
4 T pe of SCM
Entire Site
1
Wet Pond
5
JTotal drainage area (sq ft)
334976.4
6
lOnsite drainage area (sq ft
334976.4
7
Offsite drainage area (sq ft
8
Total BUA in project sq ft
62547 sf
9
New BUA on subdivided lots (subject to permitting)
(sq ft)
10
New BUA not on subdivided lots (subject to
permitting) s
62547 sf
11
Offsite BUA (sq ft
12
Breakdown of new BUA not on subdivided lots:
- Parkin (sq ft)
40740 sf
- Sidewalk (sq ft)
5431 sf
- Roof (sq ft
16376 sf
- Roadway (sq ft)
- Future (sq ft)
- Other, please specify in the comment box
below (sq ft)
13
New infiltrating permeable pavement on subdivided
lots (sq ft)
14
New infiltrating permeable pavement not on
subdivided lots sq ft)
15
Existing BUA that will remain (not subject to
permitting) (sq ft
xistin BUA that is ahead permitted sq ft}
xistin BUA that will be removed s ft
ercent BUA
19%
Design storm inches)
1.0 in
KADDITIONAL
esign volume of SCM cu ft)
6492 cf
alculation method for design volume
Simple Method
INFORMATION
lease use this space to provide any additional information about the
rainage area(s):
WET POND
Drainage area number
1
2
P1
Minimum required treatment volume cu ft
6078 cf
ENERAE
MDC FROM 02H .1050
3
is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls.wr other engineered
side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
1 (0- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Other
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM desi ned bj an NC licensedprofessional?
Yes
WET POND
MDC FROM 02H .1053
18
Sizing method used
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl)
423.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
424.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
429.00
231
Elevation of the permanent pool (fmsl)
429.00
241
Elevation of the top of the vegetated shelf (fmsl)
430.00
25
Elevation of the temporary pool (fmsl)
429.46
26
Surface area of the main permanent pool (square.feet)
9441
27
Volume of the main permanent pool (cubic feet)
42059 cf
28
Average depth of the main pool (feet)
4.50 ft
29
Average depth equation used
Equation 2
301
If using equation 3, main pool perimeter (feet)
311
If using equation 3, width of submerged veg. shelf (feet)
32
Volume of the forebay (cubic feet)
6990 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
12 in
35
Design volume of SCM (cu ft)
116164 cf
36
is the outlet an orifice or a weir?
Orifice
Wet Pond 1 8.37 AM 9/15/2022
WET POND
37
If orifice, orifice diameter (inches)
1.8 in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
2.6
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
42
Are berms or baffles provided to improve the flow path?
No
43
Depth of forebay at entrance (inches)
48 in
44
Depth of forebay at exit (inches)
24 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
permanent pool?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
lyr, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC(9) is met.)
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
54
Hasa Clanting Elan been Erovided for the vegetated shelf?
Yes
ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about the
wet pond(s):
Drain Ei ing with valve is installed for dewaterin