Loading...
HomeMy WebLinkAboutSW5221101_Stormwater Narrative_20221117STOWWWATER.'NARRATI VE STORMWATER MANUAL NARRATIVE The 11.06 acres property is mostly cutover with some open areas. The purpose of this project is to construct two new multifamily apartment buildings. This project requires stormwater runoff peak flow management and first flush treatment. The project will result in 1.44 acres of built upon area and 0.28 acres of impervious area for the water quality pond permanent pool. The project will disturb 6.7 acres. This project is located in the Tar -Pamlico River Basin and the receiving stream is Brandy Creek Index number 28-29-3-(3), Classification B;NSW This project will utilize a water quality pond that discharges to an existing rip -rap armored channel. The water quality pond was designed according to the current NC BMP Manual. The water quality pond will treat the first 1.0" flush per NCDEQ requirements and will manage the peak flow. The pond will detain and route the post -development peak flows from the 1 year, 10 year, and 100 year storms to less than the pre -development flows. See stormwater summary below: 1- r Storm 2- r Storm 10- r Storm 25- r Storm 1 00-r Storm PRE TOTAL SITE 4.18 9.25 14.71 37.17 57.08 POST TOTAL SITE 3.03 5.01 7.04 14.88 21.60 aH flow is in ds