Loading...
HomeMy WebLinkAboutGW1-2022-10126_Well Construction - GW1_20221110 WELL CONSTRUCTION RECORD For Internal Use ONLY: This firm can be used for single or multiple wells 1.Well Contractor information: 14.WATER ZONES I Kolby Mitchell Sawyers FROM TO DESCRIPTION Well Contractor Name 4471-A NC Well Contractor Certification Number I5.OUTER CASING for multi-cased"wells)OR LINER(if a able) FROM TO DIAMETER I THICKNESS MATERIAL CLYDE SAWYERS & SON WELL & PUMP INC +1 ft 54 ft' 6.25 ; in. #21 PVC Company Name 16.INNER CASING OR TUBING eothermalclosed400 2021-00014 FROM TO DIAMETER THICKNESS MATERIAL 2.Well Construction Permit#: tt. ft. in. List all applicable Hell permits(i.e.Counh;State. Variance,byection.etc.) ft. fL in. 3.Well Use(check well use): 17.SCREEN Water Supply Well: FROM TO DIAMETER ' SLOTSIZ,E THICKNESS MATERIAL ft. rt. in. ❑Agricultural ❑Municipal/Public ❑Geothermal(Heating/Cooling Supply) OResidential Water SuPPIY(single) ft. it. in.' ❑Industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT FROM I TO MATERIAL EMPLACEMENT METHOD&AMOUNT ❑Irrigation 0 ft, 20 f/ Bentonite Pumped Note-Water Supply Well: ft. ft. ❑Monitoring ❑Recovery Injection Well: ft. rt. ❑Aquifer Recharge ❑Groundwater Remediation 19.SANDIGRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Storage and Recovery ❑Salinity Barrier ft. ft. ❑Aquifer Test ❑Stonmwater Drainage ft. ft. I ❑Experimental Technology ❑Subsidence Control 2D.DRILLING LOG(attach additional sheets"ifnecessa ❑Geothermal(Closed Loop) ❑Tracer FROM TO DESCRIPTION color,hardness,soil/rock type,grain size,etc.) ❑Geothermal(Heating/Cooling Return) ❑Other(explain under 421 Remarks) 0 ft- 54 ft. OVER BURDEN 10-4-2022 54 ft- 225 it• GRANITE 4.Date Well(s)Completed: Well iD# ft. ft. ,a.Well Location: David Livengood ft. ft. Facility/Owner Name Facility ID#(ifapplicable) ft. ft. Suddreth Lane Candler, NC 28715 Physical Address,City,and Zip 21.REMARKS. Buncombe 8695467852 County Parcel Identification No.(PIN) DWQRM 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22.Certification nf'well field.one lat/long is sufficient) • N W 10-24-2022 Signature of Cenifi Well Contractor Date 6.Is(are)the well(s): 2 Permanent or ❑Temporary By signing this form,I hereby certq} that the well(s)was(were)constructed in accordance with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a 7.Is this a repair to an existing well: ❑Yes or ©No copy q/his record has been provided to the well owner. l/thi.,is a repair.fill out known well construction itilormation and evplain the nature a/the repair under 42l remarks section or on the back o/this form. 23.Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8.Number of wells constructed: 1 construction details. You may also attach additional pages if necessary. Fur multiple injection ur non-wider supph•wells ONLY with the saute construction,you can emit one town. SUBMITTAL INSTUCTIONS 9.Total well depth below land surface: 225 (ft.) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple iveiih list all depths it di(jerent(example-3@200'and 2G100') construction to the following: 10.Static water level below top of casing: 30 (ft) Division of Water Resources,Information Processing Unit, (l barer level is above casing,use + 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 6.25 (in.) 24b. For Injection Wells ONLY: �ln addition to sending the form to the address in ROTARY 24a above, also submit a copy of this form within 30 days of completion of well 12.Well construction method: construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 i 13a.Yield m 8 Method of test: RIG 24c.For Water Supply&Injection Wells: lgP ) Also submit one copy of this form within 30 days of completion of 13h.Disinfection type: PILLS Amount• 20 well construction to the county health department of the county where constructed. Forr}r GW-I North Carolina Department of Environment and Natural Resources-Division of Water Resources Revised August 2013