Loading...
HomeMy WebLinkAboutNCC210636_NOT Closeout Documents_20221117North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Rockingham Project: Dollar General - Reidsville River basin: Cape Fear Person financially responsible: Teramore Construction - Joe Strickland Project #: ROCKI-2021-024 Address: 214 Klumac Road, Suite 101, Salisbury, NC 27016 1. Project Location: US 29 Business, Reidsville Pictures: Yes - Digital 2. Weather and soil conditions: sunny, 60s workable soil Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Title: Inspection report: Sent Report Date given/sent: November 17, 2022 9. Corrective action needed: 10. Comments: A routine site inspection was conducted on November 1, 2022. All construction of the site has been completed and the store is open. Temporary erosion and sedimentation measures have been removed. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. If you have any questions, please contact the Winston Salem Regional Office or nate.gainerAancdenr.gov or 336-776-9660. Reported by: Nate Gainer Others present: Date of inspection: November O1, 2022 Time arriving on site: 1:15 PM Time leaving site: 1:30 PM cc: Yes