Loading...
HomeMy WebLinkAboutNCC204093_NOT Closeout Documents (9)_20221117North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 Lot Clearing Plan for Lot 88 at Avery County: Harnett Project: Pond Sd., Ph III D Person financially responsible: LGI Homes - NC, LLC — Keith Sears, Regional Construction Manager Address: 1450 Lake Robbins Drive, Suite 430, Spring, TX 1. Project Location: Old Head Way, Hectors Creek Pictures: No 2. Weather and soil conditions: sunny, workable soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: River basin: Cape Fear Project #: HARNE-2020-066 COC: NCC204093 Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: 10. Comments: Title: Date given/sent: November 04, 2021 Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Yes Reported by: Lori Britt Others present: Date of inspection: October 26, 2021 Time arriving on site: 10:35 AM Time leaving site: 10:37 AM cc: