From: Bailey, David E SAW <David.E.Bailey2 @usace.army.mil>
Sent: Thursday, January 15, 2015 12:12 PM
To: EMcClanahan; Buddy Seymour
Cc: Homewood, Sue
Subject: McConnell Center - Lot 1 PCN, Guilford County; SAW -2013- 002235 (UNCLASSIFIED)
Classification: UNCLASSIFIED
Caveats: NONE
Messrs. McClanahan and Seymour,
Thanks for your PCN and attached plans dated 12/12/2014, received 12/15/2014, for the above referenced project. I
have reviewed the information and offer the following comments to be addressed before your application can be
considered complete:
1) Please submit a plan view showing what is proposed to be built on the entire lot, including the proposed crossing.
The Corps can only permit single and complete projects based on the project's purpose and need, and based on your
submitted information the road and crossing do not have a terminus or serve any particular project. Keep in mind that
you can submit a conceptual plan if design is not completed yet. However, the plan should clearly show the boundaries
of waters of the US and demonstrate that the single and complete project does not directly or indirectly impact
additional areas of water of the US.
2) The plan view of the proposed crossing is difficult to read. Please resubmit this drawing to show the culvert
structure, roadway, jurisdictional features (stream and wetland), and proposed areas of impacts more clearly (perhaps
by removing layers that are not necessary to show the proposed project impacts ?).
3) Will any additional utility impacts be required for this lot, or are they included in the roadway fill or impacts avoided
via aerial crossings or directional drill techniques?
4) The development of Lot 1 appears to part of a larger McConnell Center Drive industrial /commercial park. Are any
other impacts to waters of the US proposed or required for the development /build -out of the industrial /commercial
park as a whole? If so, please include them all in the same PCN to avoid "piece - mealing" the project. Note that the
Corps will consider any additional impact to waters of the US within this industrial /commercial park to be part of the
same single and complete project with respect to Nationwide Permit and compensatory mitigation thresholds.
Please submit the above information within 30 days of receipt of this Notification or we may consider your application
withdrawn and close the file. If you have any questions please let me know.
Sincerely,
-Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE- SAW -RG -R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554 -4884, Ext. 30.
Fax: (919) 562 -0421
Email: David. E. Bailey2 @usace.army.mil
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at http : / /regulatory.usacesurvey.com /.
Classification: UNCLASSIFIED
Caveats: NONE