Loading...
HomeMy WebLinkAbout20221629 Ver 1_Shoreline Stabilization_20221118D--ixa-D-1 c.90-9 ROY COOPER Governor MICHAEL S. REGA Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality State of North Carolina Department of Environment Quality Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 09-2020 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service If sending via delivery service (UPS, FedEx, etc.) Paul Wojoski Paul Wojoski DWR — 401 & Buffer Permitting Branch DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 NOTE: Before submitting this form, please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all certification requests must include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre -Filing Meeting Request to this application. Date of Pre -filing Meeting Request: / / (required) DWR ID # A. Applicant Information 1. Owner Information Name: Pe-� r Mailing Address: Telephone Number: E-mail Address: Version (if applicable) [15A NCAC 02H .0502(a)] 16 tanner Ln. n'aresvlll-e N - 2 511-1 70y- G 5 i 93:ax Number: -PeSM me CUrm �EQ>� Department m Environmental Quality. North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center l Raleigh, North Carolina 27699-1617 919.707.9000 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: S hPY ( LA Company Affiliation: Mailing Address: Telephone Number: E-mail Address: L�S�. Labe nor ran a ,r‘ n 7recl i ZOO Ue\�`n ChL)-clack Lncc lokon plc 2�( 12 1 OA- -SOS " Ot iP Fax Number: Ch c ppellSlateN MAW%Corn B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Tre(-0\ Nearest Town: 'mob'eSU l l le Lake/ river/ ocean adjacent to property: La'_e Norma {1 Property size (acres): 0 `I Subdivision name or site address (include phase/lot number): 115 Y)v n ri e r Ln mONe S \i ‘ 1\e NC_ 2 1 \-1 Directions to site - please include road names and numbers, landmarks, etc.: SCV\c)c «d 1 ` c box.- t 0 t6-k-PD Y1 Latitude (in decimal degrees) 3S:SL1135� Longitude (decimal de rees) DO. 13 I (4 V g 9 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): reSde\A'hCA. 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): jca,* Acc.eSS Zh FORM: SSGP 09-2020 Page 2 of 5 7. Will work be conducted from land? ❑ From water? 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: Temporary impacts in square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: Temporary impacts (temporary clearing, construction corridor) in square feet: 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): l( h\ 11. Signature By signing below, I, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time Ocwner A ent's Si nature'[15A NCAC 02H /g g .0502(f)] Date 'Agent's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation FORM: SSGP 09-2020 Page 3 of 5 CATAWBA RIPARIAN BUFFER NOTIFICATION FORM S113- Project Name/address: 5'170ra- k 1-'.cri r� OlfCSoiCounty: r 1 ) Owner: J1 Q r. Print Signat Contractor/agent: :Th \eY Y 1, 1 USL- Print Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Ack edgement of Notification I, Q�i ( , hereby state that I have been informed of the Catawba Ri arian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification an c uffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner Date: / / / -02 RECEIVED NOV 1 8 DEo-WATER RESOURCES 401 & BUFFER PERMITTING Duke Enerav Excavation Permit Application Form FOR DUKE ENERGY USE ONLY Duke File No. Application Fee $ Security Deposit $ Check # Date Recv'd Initials Date of Duke Energy Lake Services, applicant and/or contractor on -site inspections Date 1 112itials Jer-/1 Date Final Protection/Avoidance Area Markings Field - Verified Initials Approved to Start Work By * : Date (Print) (Sign) Date Completion Required Date of Any Approved Extension Initials Date Passed Closeout Inspection* Initials Any Stop Work Orders or SMG Violations*? (check one) DYes DNo (if Yes, explain in PART V) Date Deposit Refunded Initials Date Permit Database Updated Initials * Forward copy of approved application (all pages, plus any attachments that Duke Energy changed) back to applicant with Approval Letter and highlight any changes. File copies of Approval and Close-out Checklists and any Stop Work Orders with application. Part I. Applicant Information (Please Print) Name-TCC S1Skx re Email address: 1)f', S\S¥ , Corn Telephone 7 - c\a5- c c1 LI 3 Lake Address 1_ Mailing Address (if different) 11S 'Bonner moixesvt11.e NC 2gII-1 Contractor Company LA ke Nor Anna n 1b red (( Contractor Contact Person SI \ei CV L \)SV._ Telephone IN- 3 0 - C4 (j ChcAepe\\sh ®yahcoi Cm LAKE LOT INFORMATION Lake t\Or YY1Ar'County I redell City mooteSY ‘ 11e State NCTax Map No. Contractor Email Address: Subdivision A-) Of ) '(" Lot / Section No. 1-1 I Lot Size ' �RAcres Duke Energy Page 4 of 13 Excavation Program rev 11/22/21 Duke Energy Excavation Permit Aoolication Form Security Deposit Refund Information The security deposit will be refunded after the excavation permit has expired if no violations of the approval occurred. The applicant will receive the security depost refund at the mailing address in Part I unless an alternative recipient is identified. Send the security deposit to an alternative recipient? (check one) ❑Yes I fNo (If Yes, include name and mailing address below. Name: PQ- y S* ve Tax ID: Mailing Address: t \5 -geY1Y1er Lr ii'1 N YfS\ 11tP N c 2461 n Are there any Co -Applicants*? (check one) DYes o (If Yes, include names, street addresses or lot numbers, pier numbers, phone numbers, and email addresses in Part V — Additional Information) * Co -Applicants exist when the proposed work is being done under a single application, will be performed by a single contractor as one continuous project, and is done to benefit multiple owners / lease holders of Project -front properties within a single development. There can be no more than 4 co -applicants in addition to the lead applicant on any application. Do not continue the application until an on -site inspection has been conducted between a Duke Energy Lake Representative and the applicant and/or the excavation contractor. NOTE: Initialling this portion of the application by a Lake Representative in no way constitutes approval or eminent approval of the excavation or any other lake use permitting activity. Date of on -site inspection i 1 1, 2. Initials (Duke Energy) 012 t,11l (applicant/contractor) Duke Energy Page 5 of 13 Excavation Program rev 11/22/21 Duke Enerev Excavation Permit Application Form Part H. Description of Project A. Basic Information 1. Type of excavation: (check one) 0 New excavation Maintenance excavation 2. Purpose of excavation: (check one) Boat Access Channel ❑ Water Intake Channel 0 Wastewater Discharge Channel ❑ Other (specify): 3. Lake user category: (check one) 'rivate ❑Residential Marina ❑Commercial Marina ❑Public ❑Other (specify): 4. Max. Excavation Area Dimensions (ft): Length \ 21 Width Z'] Depth ^�.. (Note: include additional area dimensions if necessary so response to #5 below equals max. area dimensions in #4) 5. Volume of Excavated Material (TOTAL for the project): 2. 2. Cubic yards 6. Type of material removed (applicant determines by field sample if practical): C o.1 , Or3Oj- 7. Excavation Site area: 0 015 Acre (s) (s) Disposal Site area: d 01 5 Acre 8. Total Disturbed Area (including equipment staging area): 15 Acre (s) 9. Doe tie project meet the requirements of the applicable General Permit? (check one) es ❑No 10. Do you claim title to the disposal area? (check one) ❑Yes No 11. Do you claim title to the equipment staging area? (check one) Ores ❑No 12. Are there any water -treatment facilities within 50 feet of the proposed excavation area? (check one) ❑Yeso (If Yes, specify): 9( 13. How will the excavated material be entrapped and the erosion controlled? (e.g. see attached erosion control plan and disposal area design): Lo nc3 c-ect c h eY CaN r O'n be r C c Duke Energy Excavation Program Page 6 of 13 rev 11/22/21 Duke Enerav Excavation Permit AnD ication Form 14. Type(s) of excavation equipment to be used: +-C n ck - iooa.1- , 1 o nGJ reach CYCa va-l-or i bo rd . 15. Will waters or wetlands b ossed in transporting equipment to or from the site? (check one) ❑Yes io (If yes, explain) 16. Will return water re-enter the reservoir? (Check one) ❑Yes ❑No (If Yes, specify point(s) of re-entry and show on Excavation Area Drawing) y/A 17. Is there an e ' ting facility (e.g. pier) that access is being maintained to by conducting the excavation? ,Yes ❑No (If Yes, provide the existing permit number. If No, include a scaled drawing of the proposed facility). Permit # q 2. 1 18. Total planned duration of the work (Include first equipment mobilization, excavation through final mitigation measures complete): START / FINISH / (Month) (Year) (Month) (Year) Duke Energy Excavation Program Page 7 of 13 rev 11/22/21 Duke Energy Excavation Permit Application Form Part II. (Continued) B. Protection / Avoidance Area Description Complete the following table including all land areas within and immediately adjoining the disturbed area: Protection/Avoidance Areas Annrox Identification Method (*) Avoid (A) or Mitigate (M) (check all that apply) Ar EMIR ID Work A(ea Dwg. ID in a. Marshland, swamp, ponds, beneficial (/ � aquatic vegetation or other potential wetlands (circle all that apply) b. Buffer Zones (specify width & source NIA of requirement) c. Environmental Areas as identified by I ' ADuke Energy d. Natural Areas as identified by Duke N JA Energy e. Historic properties (specify) NIA f. Rare or threatened species (specify) hiIA g. Buried gas, water, sewer, ^ ' 1 V conununications or electric lines (circle) Duke Energy Excavation Program Page 8 of 13 rev 11/22/2021 Duke Energy Excavation Permit Application Form Protection/Avoidance Areas ADDrox IdentUcation Method (*) Avoid (A) or Mitigate (M) (check all that apply)e Field ID Work Area Dwg. ID i� h. Impact Minimization Zones as A / v identified by Duke Energy i. Other areas requiring specific NV\ avoidance, protection or mitigation (specify) * For "Field ID" column, specify entity or person that performed the identification and how it was physically marked (e.g. Duke Energy (John Doe)/Pink and purple -dotted tape, Corps of Eng. (John Smith)/ yellow flagging). For "Work Area Dwg ID" column, show the symbol that is used on the drawings to identify the protection/avoidance area. ** List and attach mitigation plans Duke Energy Page 9 of 13 rev 11/22/2021 Excavation Program Duke Energy Excavation Permit Application Form C. Applicant's Signatures Comments: Applicant Name (print) Applicant Signature Co -Applicant Name (print) Co -Applicant Signature* Co -Applicant Name (print) Date / Date Co -Applicant Signature* Date Co -Applicant Name (print) Co -Applicant Signature* Date Co -Applicant Name (print) Co -Applicant Signature* Date *Per my signature, the information provided in this application is correct to the best of my knowledge. Duke Energy Excavation Program Page 10 of 13 rev 11222021 Excavation Project User's Agreement Letter (Please fill in the blanks. Please Print) Date I I— IQ- ZZ TO: Duke Energy c/o Lake Services - EC 12Q 526 S. Church Street Charlotte, NC 28202 RE: Excavation For (Subdivision and Lot #'s or Other Project Name 16 & 1+ryer Ln, MOOreS' IBC NC Z3I0 (Lake/County/City) f t (rylar> / T,-P de 1 / WI bfeSv t I IP (Applicant's full name) -Pe Cr S S-}G r.Q hereby agrees to comply with all recommendations, requirements and/or conditions of Duke Energy, General Permit(s) (if applicable) and other federal, state and local agency requirements pertaining to the application to excavate for the purpose of a Pjc(1-r- a cress In addition, I/we have read and agree to comply with Duke Energy's current Shoreline Management Plan (SMP) or other applicable guidelines, much of which is repeated herein, and understand that written authorization must be obtained from Duke Energy prior to beginning any activity within the Federal Energy Regulatory Commission (FERC) project boundary or on Duke Energy property associated with a reservoir, collectively referred to as Project Boundary. The excavation will be completed as described in the approved application and within eighteen (18) months from the date of written approval by Duke Energy, unless specifically noted otherwise in the application or unless I/we obtain approval for a single, time extension (maximum of one year) in writing from Duke Energy. I/we understand that if the SMP or other applicable guidelines or rules change during any extension period, I/we will be expected to comply with the new requirements to the maximum extent practicable. I/we also recognize that failure to complete the excavation within this build -out period will require the filing of a new application within the then - current SMP or other applicable guidelines and the new application must include any applicable fees and security deposits. I/we attest to be the owner(s) or lease holder(s) of the land immediately adjoining the Project Boundary where the excavation activity is to take place, or if not the owner or lease holder, I/we have included proof of title to the property and written authorization from the owner(s) or lease holder(s) to carry out the proposal within the Project Boundary adjacent to their land. 1/we attest to be the owner(s) or lease holder(s) of the land that will be used for equipment staging and disposal of excavated material or if not the owner or lease holder, I/we have included proof of title to the property and written authorization from the owner(s) or lease holder(s) to carry out the work on their land. Duke Energy. Page 1 Rev. 4/6/2020 I/we understand that all excavation work must be done directly in front of my/our property and as specified in Duke Energy's approval. Uwe also understand that access channels must run perpendicular to the shoreline while within the third of the cove area that is nearest my/our property. I/we understand that for proposed excavations, 1/we must notify the appropriate local, state and federal agencies in advance of the activity by sending them a completed copy of Duke Energy's Excavation Permit Application Form and other required information. I/we understand that written authorization and/or other permits may be required by some of these agencies and such required authorizations must be obtained before 1/we submit the final application to Duke Energy. At FERC-licensed reservoirs, I/we understand that except for maintenance excavations, any excavation exceeding 2000 cubic yards of material removed or any excavation or shoreline stabilization work needed to support an application that requires FERC review does itself require specific review and approval by the FERC before Duke Energy can issue any approvals. I/we agree that unless specifically approved otherwise in the application, explosives will not be used as part of this excavation activity. I/we understand that every reasonable effort must be made to minimize any adverse impact on fish, wildlife and other natural resources. I/we understand that applicants in South Carolina proposing excavations that are not covered under the General Permit, or are greater than 150 cubic yards, must receive prior written authorization from the South Carolina Department of Health and Environmental Control (SCDHEC) or the US Army Corps of Engineers (as applicable) before submitting the completed application to Duke Energy. I/we agree that excavation activities will not occur during the months of March, April, May and June because of the potential impacts to fish spawning areas. I/we understand that trees and vegetation growing within or adjoining the lake play an important role in its overall environmental condition, and the ecological benefit the vegetation has on fish and wildlife habitat directly supports a sound and healthy lake environment. 1/we also understand that unauthorized removal of shoreline vegetation (e.g. button bushes, willows, cattails, etc.) and/or disturbance of the shoreline buffer may result in suspension or denial of lake use permitting requests, forfeiture of security deposits and require re-establishment of vegetation at my/our expense, particularly if the disturbance is found to be in violation of state or local ordinances or impacts FERC project buffers. Uwe agree all excavated material will be placed in upland areas, landward of the Project Boundary, and confined to prevent erosion and sedimentation back into the lake or nearby streams. Duke Energy Page 2 Rev. 4/6/2020 .Uwe agree to adequately stabilize all excavated material and all disturbed shoreline to prevent erosion and runoff into the lake. 1/we understand that the double handling of excavated material will not be allowed; therefore, all excavated material must be placed above the Project Bounty in one handling. Uwe have designed the hydraulic excavation process (if any will be used) so that return water re- enters the lake in the same general vicinity and cove as the excavation, to the maximum extent practicable. I/we agree that the proposed excavation will not be for the purpose of creating additional shoreline, will not alter the Project Boundary or the full pond contour, and will not impact threatened or endangered species, historic properties, or environmentally -important areas, unless special public entity provisions were made in the application. I/we recognize that it is my/our responsibility to clearly locate in the field and label on my/our work area drawings any areas that require specific protection or avoidance during this excavation work. Examples of these protection/avoidance areas include but are not limited to, any Environmental Areas, Natural Areas or Impact Minimisation Zones as identified by Duke Energy; jurisdictional wetlands; historic properties; rare or threatened species; and buried gas, water, sewer, electric or communications lines. I/we agree to provide my/our contractor with a copy of these work area drawings showing these areas to stress the necessary protection measures. I/we agree that if any archaeological resources (e.g. pottery shards, Indian artifacts, etc.) are discovered during the excavation, work shall be halted immediately. I/we will then notify Duke Energy and the State Historic Preservation Office to determine what measures, if any, Uwe must pursue to protect or salvage the archaeological resources. 1/we agree that any excavation from within the Project Boundary will not exceed the volume as outlined in the application and will remove and disturb only what is absolutely necessary to achieve the project's stated purpose. Uwe agree to be fully responsible for the permitted lake use and Uwe understand that this responsibility is considered to transfer automatically along with ownership and leases of the adjoining tract. Uwe understand Duke Energy representatives may issue Stop Work Directives for violations of the SMP or other applicable guidelines and other consequences may result from such violations, including but not limited to suspension or cancellation of approved permits, increases in fees, modification or removal of non -complying structures and restoration of disturbed areas at my/our own expense or loss of any consideration for future lake use permits. I/we agree to immediately comply with any Stop Work Directives, to fully cooperate with Duke Energy and other agencies as necessary, and to perform the necessary remedial actions within the specified time frame. Duke Energy Page 3 Rey: 4/6/2020 1/we agree to develop any required mitigation plans and to complete any required mitigation activities at my. -'our own expense within the specified time frames. live recognize that the excavation work is not considered complete and deposits will not be refunded until the mitigation requirements (if any) have been satisfactorily fulfilled. bire agree to notify Duke Energy by phone when the excavation is initiated and to ensure that during the excavation period. 1/we will post Duke Energy's approval letter in a clear waterproof bag at the job site and visible from the water's edge. liite agree to notify Duke Energy in writing when the excavation is completed (including any required mitigation measures) and that the excavation was completed per the approved application, so a close-out inspection can be performed. 1/ e recognize security deposits will not be refunded if any violations of the SMP, other applicable guidelines, or this user's agreement occur. 1/we understand there will be no change in hydro project operations as a result of the excavation and/or utilization of the excavated area. //we agree to maintain the work area in a safe condition and to fully indemnify and save Duke Energy harmless from any and all claims, liability, loss or damage that may arise from this excavation project. I.hte understand that this user's agreement does not, in any way, constitute the transfer of any rights in real property and that my/our use and enjoyment of FERC project and Duke Energy lands and waters shall not hinder the general public's lawful use and enjoyment of the same. Sincerely, Applicant's Name (Print) 1 Applicant's Signature Co -Applicant's Name (Print) Co -Applicant's Signature Co -Applicant's Name (Print) Co -Applicant's Signature Co -Applicant's Name (Print) Co -Applicant's Signature Co -Applicant's Name (Print) Co -Applicant's Signature Uate lzerey Page 4 kr, .14 Zu2U 44 \ 47 48 H 1� y "14 MN o �/-A�s D THE HARel• 1 MAP C TAX MS ¢7AZC A S 0 � 1 \ ?2 PH. 1 MAP 88 \ �."11MAP R0. 2C-A-3C \ 65 \ 1.06 24 S.F.E. 69A es;" DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS S RYNEA 1��1tyM7' CRESCENT RESOURCES, INC. TAX MAP NO. 2F-C-5 SEE MAP 2 of J GRAPHIC SCALE IRO (1R P1 LT) t Mob . 100 R. SEE MAP 3 OF 3 FOR NOTES, SETBACKS, LINE TABLE, CURVE TABLE, & STREET DETAILS. a• NORM CAROLIM, IRFDEL COUNTY FOREGOIN G CCEERT IFICAtE Of A NOT A PUBLIC (iF P � RE Of CORRECT PRE$LNIEO.- 0OR DU R I NIS OFfM: If, N pLAT OuI1R G T TNIE octacR . TRR EIEIIY CRESCENT RESOURCES, INC. TAX MAP NO. 2F-C-5 CERTIFIED AND of. reAr,oe, puRsiragrOrefr RR tux woo. OtoJIM rmlT'N. ram« =rot Mt AR WIDOW MOW OM, N00 44 us C00d, FILED IRMA. CONIY NC 09i06'96 2134 PR OREM D. BELL Resistor 0( Deeds 13K.17 iI 76 C1ER/LEVE S. CRESCENT0 RESOURCES, INC . DEED' 924-666 SHEET TITLE RECORD PLAT — 10.298 ACRES PROJECT THE HARBOUR PHASE 3M la P P DAVIDSON TIISP., MOM CO., NC OS ONNF.R CRESCENT RESOURCES TNC. YARBROUGH - wILIL1al & ABBOCLITEB. nem PLANNING SURVEYING • ENGINEERING 0A.PN . » 20273 WM, no IeM��Moor 0f1.1.30 BK 1092PG 1203 /o'% I96p8LL COUNTY NC 08/14/98 to 8598.00 :081 Real Estate ! Excise Tax FILED IR'EDELL COUNTY NC 08/14/98 11:58 AM BREtU A D. BELL Register Of Deeds Excise Tax 598 Recording Time. Book and Page Tax Lot No. 4625-49-6609 Parcel Identifier No. Verified by County on the ..... .... day of , 19 by Mail after recording to Grantee This instrument was prepared by PERRY,PATRICK, FARMER & MICHAUX, , P.A.(rh/sp) Brief description for the Index 'L 49 BL 3 THE HARBOUR 27/75-77 NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED made this ....I.2TRI.. day of AUGUST , 19. 98 ., by and between GRANTOR SAUSSY BURBANK, INC., a North Carolina corporation GRANTEE PETER J. SISTARE and wife, TAMARA R. SISTARE 115 BONNER LANE MOORESVILLE NC 28117 Enter in appropriate Mock for exoh party: name, address, and, it appropriate, character of entity, e.q. corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of DAVIDSON _ ., . Township, IREDELL County, North Carolina and more particularly described as follows: BEING all of Lot 49 in Block 3 of THE HARBOUR subdivision, Ph. 3, Map 1, as same is shown on map thereof recorded in Map Book 27 at Pages 75 through 77 in the Iredell County Public Registry. N. C. bar AAwr. F No. 3 ci 1976. Revised 9, 1977 .,... wae..., s u,. it... u.,n rn. r,ar.,w.•1. N C MY, law Ag tn., f. 11., nxr'..- IJMI BK 1092PG 1204 The property hereinabove described was acquired by Grantor by instrument recorded in DEED BOOK 1050 PAGE 59 MECKLENBURG COUNTY PUBLIC REGISTRY A inap showing the above described property is recorded in Plat Book 27 pages,._75-77 TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. Title to the property hereinabove described is subject to the following exceptions: 1. VALID AND ENFORCEABLE EASEMENTS AND RESTRICTIONS OF RECORD. axxxAditxtadalklitindektillixPliftxkftbriatidifiactritibtifillbardbrittaxiblibakibkikkbor IN WITNESS winniEOF, the Grantor has hereunto set his bend And seal, er If corporate, has caused this Instrument to be elgned in its corporate name by its duly authorized officers and Its seal to be hereunto affixed by authority of its Board of Directors, the day and year filet written. SAUSSY BURBANK, INC. By: _-tx t r_ :'_'1'President ATTEST) ......� t✓ aE)1t:.{C 10.1P 't ' ,•'.Zw,+`� NORTH CAROLINA, County. certify that Grantor, ilteaYr(IrY (Corporate Sean USE BLACK 1NK ONLY _(SEAL) (SEAL) (SEAL) I, a Notary Public of the County and State aforesaid, qpersonally appeared before me this day and aelutowl D hand and official stamp or seal, this (SRAL) the execution of the foregoing Instrument Witness my day of , 1e My commission expires: Notary Public ��LS�RQ NORTH CAROLINA, �(`• ?Fit ,..• •. ris I, a Notary Public of the County and State aforesaid, I 01AR y••• %.ersonally came before me this day and aeknowl i .. SAUSSY BURBANK, INC. r ••\J 7 jp yen and as the act of the corporation, the foreptng .' :`V.president, sealed with its corporate seal and attested by '¢, �� �"•"•�•" � .+ witness my hand and official stamp or seai, t11a12T2 �4rF4/ 8UBu �a,$N,.rwwonn •a Mecklenburg. My commission expires: 6 2l /40Y0 The foregoing Certificate(s) of County. certify that Oust —A he Is _i1 Saiti_t&Ui;. Secretary of a North Carolina corporation, and that by authority duly Instrument was signed In its name by its Vice her as Rs Assistant of ____.- AUGUST 19 98 1.&C-1 Notary Public Diane Bost Secretary. Is/are cert'rlyd to be oorreet. Thls instrument an4 this certificate are duty registered at the date and time and In Inc Book and Page shown on the first pap reef. Hy REGISTER OF DEEDS FOR DeputyiAeet.Mn►-Register of Deeds COUNTY N.C. Dar Anna I Ni. 3 a 1976. Rrriwd F. 1977 s r, 1.•<. n0. 17, r... ,,..ii..N a �xrs . irtoM n, Ap,.,nvM w.:n IM N G Pro Abw - 1!nl r 11C 1(1:1- ri) 0 - 14' crs - rrtk - — — ((q -I , ,„ TO WHOM IT MAY CONCERN: SAMUEL GOODSON GIVES AUTHORIZATION TO SHANNON MILLER WITH LAKE NORMAN DREDGING & MARINE CONSTRCTION TO USE PROPERTY LOCATED AT 6790 KIDVILLE RD, DENVER NC 28037 FOR DREDGE MATERIAL DISPOSAL SITE. PARCEL NUMBER- # 3694021277 SAMUEL GOODSON 2 1.. f.Yr Y•1 Yf I..av r W Taff ar r if rwl ar r W WWI W r W a.<1 YAW W Y' awn —4 r W 01111 Y 1.111 r a all Y. YI ar wa We M+ar1 r w In aw. r V MAN m ar r rwan Y. YIP r K Trfr u1 KY wl W Tlll r r1 we W WWI m aA r W re, Y r1P r W aJ1'! Y1 a1s0 11 If a1A IIf1 r W Y 11111 rWWWI a /11 r.f WW1 PT.! W -O 1036. / N47 Ser A� I1P0 R aZ-1T fM 1M 2 f`'� nib N 1 MDOa 'was tow 0000000rens LINED 00.7:f91-730 75 ALMS UY Dttll I:101.3/41AIM: . r\54 1t,11 �f W •ID. Il I114� aM_lOrt)u..a.1N .1 W PP.? MY. 1.1 iRM`m .11 ow 1� 11111.di .1.11 0a Mot .p .• low) •w area rn' a' u.scr• two. / 6J / cam Emote w.e ry.30•1s Oft W tJ t< :4111, 1AKII 10.01 a 7 1Su-1111a 4A -.a Ye, MI PIO MA IV' 1Y .1i71 :r T1 • 1 -113 wr • IOW M W-01 SAMUEI. T. 400DSON CA1.,...wwa.0,.... nR n.aw 7MI0 0111111 imam IIO.1. aw NUN ! O IN= 1O WEIR ! 011 MP MP narrw imp RA. wr+•rwtor Rey WAWA AMMON. tieroiowe .AND •LIRVIIC111/40 �7-4341iO4 WWII 01/R r TM.MI_ 1 111t I — W Y r w1 MI01R I0 O! RNI R W RWI R TI IP CY w 1 IP a ( . Ma. soy a CUM .t:. / 1-Ye .0 .......-4.,....a......,� DWI :J+.A.L.T .11W, A• ..... ,....1. MOW i WO IWWM 11.1 a. •.•9 . ofawa..N.1.1, .sA La W ..�IY..1M I m6 NI as ninny 1r.s4 . 1w.1 .....d w.., or sew ...WE. or--- - .w.11Y. I. W A.M. 4 mot/Ana --, } 1.M idly 1/17/a1e ,, .R .- M 11IW / A 1 BOOK 2337PAGE 730 009253 Filed Date: August 28. 2012 Pgs: 4 Time: 2:06 PM Recording Fees Book: 2337 $26.00 Page: 730 Danny R. Hester Register of Deeds Lincoln County, NC 2337 0730 201209253 DEED Prepared by: Richard E. Jonas, Attorney at Law, Lincolnton, NC After recording mail to: Grantee 2G(4) STATE OF NORTH CAROLINA WARRANTY DEED COUNTY OF LINCOLN Deed of Gift This deed made this air day of GZc A. 7 , 2012 by and between KATHLEEN GOODSON FISHER, FKA KATHLEEN GOODSON hereinafter referred to as "Grantor" and SAMUEL THOMAS GOODSON Address: 6790 1(co& /2./ a. A C P- rot) ; 7 hereinafter referred to as "Grantee." The designation "Grantor and Grantee" as used herein shall include said parties, their heirs, personal representatives, successors and assigns and shall include the singular, plural, masculine, feminine or neuter as required by the context. BOOK 2337PAGE 731 WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in Catawba Springs Township, Lincoln County, N. C. and more particularly described as follows: All of Tax Parcel 34700 being all of the Keith Goodson heirs property on the southwestern side of Kidville Road, the same being property described in deed recorded Book 379, Page 381, Book 512, Page 573 and Book 603, Page 70, to which deed reference is made for further description which is incorporated herein by this reference. See also Exhibit A for further deed description. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereunto belonging to the said Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. Title to the property hereinabove described is subject to the following exceptions: Valid and enforceable reservations, restrictions, conditions, easements and rights -of -ways in the record chain of title. The draftsman of this deed did not examine or certify title and did not participate in the closing of this transaction. IN WITNESS WHEREOF, the Grantor has hereunto set his hand and seal, the day and year first above written. 16-(-47..4.2.►--- `^- 7- �•-148EAL) Kathleen Goodson Fisher BOOK 2'3 3 7 PAGE 732 NORTH CAROLINA, COUNTY OF LINCOLN I, a Notary Public for said County and State do hereby certify that Kathleen Goodson Fisher personally appeared before me this day and acknowledged the due execution of the foregoing instrument. 2012. Witness my hand and Notarial Seal, this the oZ Cr day of BOOK 2337PACE 733 EXHIBIT A Parcel 34700 6792 Kidville Road TRACT 1: BEGINNING at a stake on West side of a branch in Susan Keever's line, and runs North 65' deg. East 93 poles to a white oak; thence North 3 deg. East 47' poles to a stone; thence North 25 deg. East 45-7/8 poles to a stone on West side of Lincolnton Road; thence North 9 deg. West 22 poles to a stone; thence North 62 % deg. West 6-3/5 poles to a stone; thence South 16 deg. West 8' poles to a stone; thence North 78' deg. West 11-1/5 poles to a stone; thence South 86' deg. West 29 % poles to a stake in the Road; thence South 81-3/4 deg. West 29 poles to a stake in the Road; thence South 44 deg. West 37 poles to a dogwood near a branch; thence South 72 deg. West 22 poles to a cedar; thence South 66 deg. West 46 poles to a stake in the branch; thence, down the branch as it meanders, to the beginning, being about 991/2 poles, containing 85 acres, more or Tess. Deed Reference: Book 379, Page 381. TRACT 2: BEGINNING at an iron stake, a new comer on the old line of C.A. Keever and also corner of the property of Keith Goodson, and runs thence with Keith Goodson's old line, South 89 deg. 10 min. 24 sec. East 482.63 feet to an iron stake, Keith Goodson's old comer, thence North 1 deg. 34 min. 21 sec. East 69.25 feet to an iron stake a new comer in the old line at the edge of the right of way of State Road No. 1381, thence three (3) new lines with the lands of C.A. Keever, South 41 deg. 58 min. 17 sec. West 32.85 feet to an iron stake, thence, South 64 deg. 24 min. 18 sec. West 29.52 feet to an iron stake, thence South 86 deg. 42 min. 23 sec. West 436.61 feet to the point of BEGINNING, containing 0.20 acres more or Tess. Deed Reference: Book 603, Page 70. TRACT 3: BEGINNING at a point in the center of N.C. Highway #1381, new corner in the old A.B. Keever line, and runs thence with the center of the highway South 32 deg. 10 min. East 183.5 feet to a point in the center of the highway (which said comer is located North 78 deg. 30 min. West 27.4 feet from an old control comer), and runs thence with other lands of Goodson North 78 deg. 30 min. West 122.5 feet to an old corner; thence with property of A.B. Keever North 2 deg. 45 min. West 109.8 feet to the BEGINNING. Deed Reference: Book 512, Page 573. Una Tate We 1 fmb Murat Is. U 6 124.626 114 T Sr 07211 U 67.042 NIT 46' 80.067 18 70.M6 SIC 07' =UM U 06.87 SW 6Y f0.88'1 U 63.308 BIT 41' 80.771 10 MU BIT 9P 17.731 I8 51269 8U' 49' tun LIN 48963 87T 00' A.B9.1 111 61.I0I 890' 5' 5SJ9"1 U2 U.707 69' IS' 01871 U8 81A66 UT 00' 00801 US 406.Ifl NIT 44' 17.781 U7 M.617 NIP U' V.111 III 1072/6 NIP Sr 4E961 UB 197.00 NIT 40' 60.061 Id 114.139 BIT 411' 20391 U4 SO.O9D BST 1r 41.17Y 120 KM N71. 44' 41.801 U BI860 SIT 80' 46001 U I0200 SIP Or 4B.1187 IZMIR DO: 2690-178 cw in o .>C+.4 rslu — - 43-- .•1,..... 1. 15%.s7" 586 Wi BLYTHE DB: 2491-289 .5y3w .M�512 GOODSON DEED BK:2337-730 75 ACRES BY DEED REMAINING 13190t DB: 922-575 L3 L 436.6.12. jI 471150 —r— eaz22. �7.00'w i 581. 4.20.06W N77' 38' 43.38'E 78.739\ fig{TI/NUE_QEVESP IE _DEDICATION 1 tie) hereby certify that 1 am (.e are) the oner(%) of the properly rhos and described hereon and that 1 (Bel hereby adopt this plan of subdivision with tor four) free consent. Gate Property Owner 506.189 3iQ2.91'w 2 ACRES TO BE DEDICATED AS A 'SEW DUMP' I' ' N71' 06' 33.30'WI 89.596 Nj 50'60 p91 CPU DB: 924-67 9St6S101GIS MOMW ISM MD W aBeW I' PRO m d7 0*1 ONNEIS S07' 12' 41.17'W 179.674—\\ j h N WWI 81 OM /RIM 108 U' 10 01E DI NB POIQ IBi 14 P91 OD WU.69 10 12 13 IQ Bart F6 ISM NOUN DB: 503-360 A NEW BOUNDARY SURVEY for 1 SAMUEL T. GOODSON CATAWBA SPRINGS TOWNBNC LNCOLN= NN. NC APRIL 17. 2015 SCALE. 1'.20a PROPERTY INFORMATION: PHYSICAL ADDRESS: 6792 EIDVIUE ROAD DGNYER. NC 28037 �UT NOTES: PIN 83694023379 FBA: ZONE A NAP 9 37103494001 ZONING: FIT OBNER INFORMATION: SAMI+LT. T. GOODSON NAIUNG ADDRESS: 6790 GOODSON ROAD DENVER. NC 28037 IJ1AT 11MM 11 OMB tN ODD 2377-732 20:OK)C r atith S NOTE r0A0 MIN 2 W 3,10 COINOOD u9NG 0:01201AIS IOW 4 At DSIMMIS AR R050 NOQOI)II IRLSS ONQaff .012 UM WOW 00.1.411005 4M e16900 19N 1)0 DORMS WE 4901EC11NOPDInY DOdM 101 LE MR A MOO 02A10 MEA 0 MOEC100 MOM 71010110110015OR 610016 EM MOW Ir®S DO MN CLOSE IA6fRn n 9MEC1 10 M0 M0 ALL 900056 DOOM 1 NELTON. LAND SURVEYING 7 04-634-93 S4 JWMoLTONL..00.0 .COM ACM t. HELTON. PIS I7O4) 634-0354 7315 P0188EY BURR )RNYER. NC 28037 DEED AND PUT REFERENCES: 1 DB: 2337 PC: 730 DB: 922 PC: 575 DB: 17E PG: 472 PB: 13 PG: 439 a _ar :ar +ar 44RAPHIC SCALE 1' 200 1S0 SL70TY: DRAIN: 1t1bl DRAt1A 36 4/16 199 4/17/18 #18100 L Jacob W. Hasa rarity ar FM pm.ss dr....der en apnwwad lion vwde.dv p ysr sr csi (Ina deed of rxM walk Sr the 0e®drisots4.vt3mre elm* ltllessed. den. lion deed demon nosed):dun the trio of meeker adesUad M I:140004: eondie phi .e reeprd in .m.d.M.4 G.S.47.30..seYed. Wirn.my WOW siphon, ramoon maim salmi this 17 dsy *EAPO. 201SA0. That the survey is of another category. such as the recorabhution of existing parcels, n court -ordered surrey. or other exemption or ezeapUon to the definition of subdivision. Jacob Helton 4/17/2018 ^�Nc... 1 VICINITY SMITH: N0 SASE 1