HomeMy WebLinkAbout20220949 Ver 1_More Info Received_20221116 (3)Strickland, Bev
From: Cohn, Colleen M <colleen.cohn@ncdenr.gov>
Sent: Monday, September 12, 2022 5:20 PM
To: Ward Marotti; Alex Hornaday
Cc: Norton, April R CIV USARMY CESAW (USA)
Subject: Oakwood DWR#20220949
Follow Up Flag: Follow up
Flag Status: Flagged
Good afternoon,
I am reviewing the above referenced project, and in order to complete the review, some additional information is
required:
1. Please provide the Division with a copy of your complete response to the August 15, 2022, Request for
Additional Information from the US Army Corps of Engineers. This includes updated impact PCN, maps, and
tables following the completion of the updated survey mentioned in your September 7, 2022, response to the
USACE. [15A NCAC 02H .0502(c)]
2. It is difficult to understand the location and extent of jurisdictional features on the project maps in relation to
the proposed impacts. Please provide a site map that locates all wetlands, streams, and other waters of the
State as overlays on the site plan(s). The use of colors, highlights, hatching, and/or shading may prove useful.
[15A NCAC 02H .0502(9)]
3. Please provide more details regarding avoidance and minimization of stream and wetland impacts for this
project. [15A NCAC 02H .0506(b)(1)]
4. Please provide a copy of the USGS topographic map for the site. It appears that aerial photos were submitted on
the map pages that state they are from the USGS topographic map. [15A NCAC 02H .0502(c)]
5. Please provide additional information regarding the proposed After the Fact impacts. For instance, are the
culverts buried to allow for the passage of aquatic life? [15A NCAC 02H .0502(c)]
6. I'm not understanding the necessity of the "Road Crossing" in impact C of 32LF other than as an after -the -fact
impact. What is the purpose of this crossing moving forward? Could this culvert be removed? [15A NCAC 02H
.0506(b)]
7. I'm also not understanding the necessity of the "Road Crossing" in Impact Area F of 50LF other than as an after -
the -fact impact. There is a newly proposed crossing is in the same area, and the existing crossing doesn't appear
to lead to anywhere. What is the purpose of this crossing moving forward? Could this culvert be removed? [15A
NCAC 02H .0506(b)]
8. Stream SA is listed as "Intermittent" on the impact table for Stream Impacts B, C, and F. Please provide
supporting documentation for this call, such as DWR stream forms and photos. [15A NCAC 02H .0502(c)]
9. Please note that responses to the above questions may result in an additional request for information to ensure
that the project is fully evaluated.
Thanks,
Colleen Cohn
Environmental Specialist II
North Carolina Department of Environmental Quality
Division of Water Resources
Raleigh Regional Office
380o Barrett Drive
1
Raleigh, NC 27609
Office: 919-791-4258
E-mail correspondence to and from this address may be subject to the
North Carolina Public Records Law and may be disclosed to third parties.
2