Loading...
HomeMy WebLinkAboutB-4626 revised impact summary sheet.pdfWETLAND AND SURFACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 EBL Sta. 33+18 to Sta. 36+00 RT Temp. loading pad 0.54 189 1 EBL Sta. 43+95 to Sta. 44+35 RT Temp. loading pad / Class'I' Rip -Rap 0.02 35 1 EBL Sta. 44+37 to Sta. 44+51 Med Bank Stabilization <0.01 18 TOTALS*: 0.57 18 224 *Rounded totals are sum of actual impacts NOTES: Revised 2016 09 09