Loading...
HomeMy WebLinkAbout20220949 Ver 1_More Info Received_20221116SPANGLER ENVIRONMENTAL, INC. Environmental Consulting I Litigation Support I Environmental Services April R. Norton Regulatory Division US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Zachary Thomas Environmental Program Consultant North Carolina Department of Environmental Quality Division of Water Resources Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699 Re: Request for Additional Information: SAS-2020-01710, and DWR# 20220949: Oakwood PCN April and Zach: Below please find our responses to USACE and DWR comments re: the above referenced project. USACE Comments and Responses: 1) The PCN indicates that the proposed project would result in the permanent discharge of fill material into 3,717 (assuming square feet) of stream bed. The total acreage for the proposed stream impacts would result in the loss of —0.08 acre of stream bed. Nationwide permits may not be used for activities that may result in the loss of more than 0.05 acre of stream bed. Please revise your plan sheets to meet the required NWP thresholds or withdraw your application and request a Standard Permit. Response: Upon further review of the impact plans, it appears that the jurisdictional stream width/area within the impact areas was not accurately represented/calculated (i.e. the streams' jurisdictional limits originally presented were much wider than they actually are, as observed/documented in the field). SEI environmental scientists (led/overseen by Ward Marotti) have completed detailed evaluation/documentation of each proposed stream impact's location and extent. In order to document the field conditions at each impact location, a representative cross section was recorded. The results of this detailed site evaluation are attached. www.spanglerenvironmental.com Raleigh I Charlotte I Charleston I Tampa 866-772-6453 The impact exhibits have been updated based on the results of this detailed study and now accurately depict impact length and area. Total permanent stream impacts (existing and proposed combined) are now 0.028 acre (0.024 when existing impact F is removed), which is well below the 0.05 Nationwide Permit maximum cited above. 2) Cumulative permanent stream impacts for this project exceed the 0.02-acre and therefore compensatory mitigation is required. Please submit a compensatory mitigation plan. The mitigation rule generally prescribes purchasing stream credits first through a mitigation bank with stream credits available in the appropriate 12-digit HUC, or second through the NC Division of Mitigation Services; please provide a mitigation acceptance letter from your proposed compensatory mitigation provider. Typically, compensatory mitigation is required at a 2:1 credit to impact ratio unless otherwise justified based on evaluation of aquatic function. Response: The mitigation bank SOA is attached. 3) The PCN included an outdated Approved Jurisdictional Determination. On August 30, 2021, the U.S. District Court for the District of Arizona remanded and vacated the 2020 Navigable Waters Protection Rule (NWPR) defining "waters of the United States" under the Clean Water Act via an order on motion for summary judgement in the Pasqua Yaqui Tribe et al v. United States Environmental Protection Agency et al. case. The Corps has halted implementation of the NWPR and are interpreting "waters of the United States" consistent with the pre-2015 regulatory regime. Please submit an updated jurisdictional determination request using the attached Rapanos Form. Response: We are no longer claiming that any wetland features are non jurisdictional (i.e. all are WOTUS) and all of these features are either included in the wetland impact totals or impacts to them have been avoided. 4) Please note that the PCN submitted was dated January 2009. The current PCN used dated April 13, 2022, is located at the following link: https://edocs.deq.nc.gov/Forms/Pre- Construction Notification Form. Please use the most up to date form when submitting PCNs. Response: There is no PDF version of the above -referenced form available. The attached v 1.4 is the most recent one available. Also, as stated on the USACE Wilmington District's website, "The use of this ePCN is not a USACE requirement." 5) Please note that responses to the above questions will likely result in an additional request for information to ensure that the project is fully evaluated. Also, it would be helpful to include information regarding the after the fact impacts. Response: The existing (after the fact) impacts were in place at the time of the current owner's purchase of the property. Existing impact A will be necessary for the site's main access road and existing impact C is necessary for ongoing utility easement access and maintenance. The culvert at Impact F will be removed and the stream restored. 9 ENVIRONMENTAL INC. SPANGLER NCDWR Comments (provided by Colleen Cohn via email on 12 September 2022) and Responses: 1) Please provide the Division with a copy of your complete response to the August 15, 2022, Request for Additional Information from the US Army Corps of Engineers. This includes updated impact PCN, maps, and tables following the completion of the updated survey mentioned in your September 7, 2022, response to the USACE. [15A NCAC 02H .0502(c)1 Response: Please see above/attached. 2) It is difficult to understand the location and extent of jurisdictional features on the project maps in relation to the proposed impacts. Please provide a site map that locates all wetlands, streams, and other waters of the State as overlays on the site plan(s). The use of colors, highlights, hatching, and/or shading may prove useful. [15A NCAC 02H .0502(9)1 Response: Please see the attached "Overall Map" sheets, which depict the location and extent of all features within the project area, as well as the detailed/zoomed in impact maps. 3) Please provide more details regarding avoidance and minimization of stream and wetland impacts for this project. [15A NCAC 02H .0506(b)(1)1 Response: The proposed impacts are the minimum necessary to provide the required access and infrastructure for the proposed residential development. While a more dense site plan would have resulted in a greater return on investment, it would have also resulted in additional impacts. The proposed plan has the minimum impacts necessary to provide the transportation and other necessary infrastructure to server the development. 4) Please provide a copy of the USGS topographic map for the site. It appears that aerial photos were submitted on the map pages that state they are from the USGS topographic map. [15A NCAC 02H .0502(c)] Response: Please see attached. 5) Please provide additional information regarding the proposed After the Fact impacts. For instance, are the culverts buried to allow for the passage of aquatic life? [15A NCAC 02H .0502(c)1 Response: The existing impacts that are proposed to remain were installed at elevations and with slopes adequate to allow for aquatic life passage during the features' intermittent, seasonal flows. In the locations where obstructions have accumulated, they will be restored. 6) I'm not understanding the necessity of the "Road Crossing" in impact C of 32LF other than as an after -the -fact impact. What is the purpose of this crossing moving forward? Could this culvert be removed? [15A NCAC 02H .0506(b)1 Response: Existing Impact C is located within an existing power line right of way and is used for the ongoing maintenance and repair of the public infrastructure. 9 ENVIRONMENTAL INC. SPANGLER 7) I'm also not understanding the necessity of the "Road Crossing" in Impact Area F of 5OLF other than as an after -the -fact impact. There is a newly proposed crossing is in the same area, and the existing crossing doesn't appear to lead to anywhere. What is the purpose of this crossing moving forward? Could this culvert be removed? [15A NCAC 02H .0506(b)1 Response: As shown in the updated plans, this culvert will be removed and the stream channel restored. 8) Stream SA is listed as "Intermittent" on the impact table for Stream Impacts B, C, and F. Please provide supporting documentation for this call, such as DWR stream forms and photos. [15A NCAC 02H .0502(c)l Response: See attached NC DWQ Stream ID form for Stream A (SA), as well as stream cross sections and photos for each impact location. Please advise if you have any questions or need additional clarification on any of the above responses. Thanks for your timely review of this information. Sincerely, Spangler Environmental, Inc. 4a4.4ci AJ Varick Ward Marotti Environmental Technician - Land & Water Resources Director - Land & Water Resources 69 SPANGLER ENVIRONMENTAL. INC. Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑ Section 10 Permit X Section 404 Permit 1 b. Specify Nationwide Permit (NWP) number: 29 & 58 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes X No 1 d. Type(s) of approval sought from the DWQ (check all that apply): — Regular ❑ Non-404 Jurisdictional General Permit — Express ❑ Riparian Buffer Authorization X 401 Water Quality Certification ❑ 401 Water Quality Certification 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: For the record only for Corps Permit: ❑ Yes X No ❑ Yes X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. X Yes ❑ No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes X No 2. Project Information 2a. Name of project: Oakwood 2b. County: Orange 2c. Nearest municipality / town: Mebane 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: *see attached table 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: X Agent ❑ Other, specify: 4b. Name: Melanie Graf 4c. Business name (if applicable): Meritage Homes of NC, Inc. 4d. Street address: 3300 Paramount Pkwy, Suite 120 4e. City, state, zip: Morrisville, NC 27560 4f. Telephone no.: 4g. Fax no.: 4h. Email address: melanie.graf@meritagehomes.com 5. Agent/Consultant Information (if applicable) 5a. Name: Ward Marotti 5b. Business name (if applicable): Spangler Environmental 5c. Street address: 4338 Bland Rd. 5d. City, state, zip: Raleigh, NC 27607 5e. Telephone no.: 919-8754288 5f. Fax no.: 5g. Email address: ward@spanglerenvironmental.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): *see attached table 1 b. Site coordinates (in decimal degrees): Latitude: 36.08268 Longitude: -79.251325 lc. Property size: 134.15 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Haw Creek 2b. Water Quality Classification of nearest receiving water: WS-V;NSW 2c. River basin: Cape Fear (03030002) 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project area is occupied by forested areas, maintained fields, and some stormwater devices constructed by prior property owners. 3b. List the total estimated acreage of all existing wetlands on the property: 0.43 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 5,089 3d. Explain the purpose of the proposed project: Proposed residential development 3e. Describe the overall project in detail, including the type of equipment to be used: Bulldozers, excavators, motor graders, off -road trucks, rollers, etc. will be used to clear and grade the property prior to the construction of residences. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / (includingall priorphases)in the past? project � X Yes ❑ No ❑ Unknown Comments: Corps AJD 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary X Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Maria Polizzi Agency/Consultant Company: Spangler Environmental Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Corps AJD dated 3/19/2021 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes X No Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Open Waters ❑ Pond Construction X Wetlands X Streams — tributaries X Buffers 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 0.074 2h. Comments: *See attached impact table Total permanent impacts: 0.009 ac Total temporary impacts: 0.065 ac 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 - Choose one - - S2 - Choose one - - S3 - Choose one - - S4 - Choose one - - S5 - Choose one - - S6 - Choose one - - 3h. Total stream and tributary impacts 1,438 3i. Comments: *See attached impact table Total permanent impact: 1,053 sq. ft. (0.02 acre) Total temporary impact: 385 sq. ft. (<0.01 acre) Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary (T) 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose O2 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman X Other:Jordan Lake 6b. Buffer Impact number — Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) B1 - Yes/No B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 6i. Comments: Property is within Jordan Lake buffer area. Impacts will be permitted through the City of Mebane. Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The proposed project was designed to avoid and minimize impacts to aquatic features to the maximum extent practicable. The planned wetland impacts are required to allow road accessibility throughout the site. Additional potential impacts to wetlands due to site grading were avoided by the proposed construction of retaining walls. Hydrologic connectivity between unimpacted areas will be maintained via culverts at all road crossings. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Sediment and erosion control measures will be implemented in order to control runoff and other discharges from activities from activities to be conducted in fill areas. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? No X Yes ❑ 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ X Corps 2c. If yes, which mitigation option will be used for this project? fee program Mitigation X Mitigation bank ❑ Payment to in -lieu ❑ Permittee Responsible 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: RES: Dairyland Site 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: See attached SOA. 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? X Yes ❑ No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). Project is located within Jordan Lake buffer area. Impacts will be permitted through the City of Mebane. 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? X Yes ❑ No 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes X No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2b. Does this project require a Stormwater Management Plan? X Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? City of Mebane 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? City of Mebane 3b. Which of the following locally -implemented stormwater management programs apply (check all that apply): ❑ Phase II NSW ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 4. DWQ Stormwater Program Review 4a. Which of the following state -implemented stormwater management programs apply (check all that apply): Coastal counties ❑ HQW ❑ORW ❑Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? ❑ Yes X No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? ❑ Yes ❑ No 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: ❑ Yes ❑ No 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 2B .0200)? ❑ Yes X No 2b. Is this an after -the -fact permit application? X Yes ❑ No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Prior property owners constructed multiple stormwater ponds in the project area. These impacts have been incorporated into this permit application. 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? ❑ Yes X No 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Project will be served by municipal sewer. Page 9 of 10 PCN Form — Version 1.4 January 2009 Stream Impact B - Existing T or P Permanent Type of Impac Stream Name SA Perennial or Intermittent INT Type of Jurisdiction 404 Averag Stream Width 4.0 pact ength 139 Impact Area 603 Yes Road crossing C Existing Permanent Yes Road crossing SA INT 404 3.3 32 97 F Existing Temporary Yes Road crossing SA INT 404 2.5 72 185 F Proposed Permanent No Road crossing SA INT 404 2.1 181 353 H Proposed Temporary No Sewer line crossing Haw Creek PER 404 10 20 200 H E or P IF, Proposed Permanent Proposed Proposed Temporary Temporary ATF Type of Impact No Grading/fill No Sewer line Sewer line Type of Wetland Bottomland hardwood Bottomland hardwood Bottomland hardwood Forested Yes Yes Yes Type of Jurisdiction 404 404 404 Area of impa 0.009 0.032 0.033 Ores Environmental Banc & Exchange, LLC Stream and Wetland Banks Statement of Availability November 16, 2022 U.S. Army Corps of Engineers April Norton Raleigh Regulatory Field Office 3331 Heritage Trade Center, Suite 105 Wake Forest, NC 27587 Re Project: Oakwood This document confirms that the Meritage Homes of NC, Inc. (Applicant) for the Oakwood (Project) has expressed an interest to utilize 879.00 Stream Mitigation Credits from the EBX sponsored RES Cape Fear 02 Umbrella Mitigation Bank, specifically 879.00 Stream credits from the Dairyland Site, in the Cape Fear HUC 03030002. As the official Bank Sponsor, Environmental Banc & Exchange, LLC, attests to the fact that mitigation is available for reservation at this time. These mitigation credits are not considered secured, and consequently are eligible to be used for alternate purposes by the Bank Sponsor, until payment in full is received from the Applicant resulting in the issuance of a Mitigation Credit Transfer Certificate by the bank acknowledging that the Applicant has fully secured credits from the bank and the Banker has accepted full responsibility for the mitigation obligation requiring the credits/units. The Banker will issue the Mitigation Credit Transfer Certificate within three (3) days of receipt of the purchase price. Banker shall provide to Applicant a copy of the Mitigation Credit Transfer Certificate and a documented copy of the debit of credits from the Bank Official Credit Ledger(s), indicating the permit number and the resource type secured by the applicant. A copy of the Mitigation Credit Transfer Certificate, with an updated Official Credit Ledger will also be sent to regulatory agencies showing the proper documentation. Please contact me at 919-209-1055 or astaley@res.us if you have any questions. Best Regards, Amy Staley Resource Environmental Solutions, LLC 3600 Glenwood Avenue, Suite 100 Raleigh, NC 27612 1 PID Owner Name Owner Mailing Address Deed Book/Page 9825601982 DAVIS LINDA ETAL 504 N FIRST ST, MEBANE, NC 27302 6760/1539 9825502531 TICON PROPERTIES LLC 5836 FAYETTEVILLE RD, STE 203, DURHAM, NC 27713 4542/22 9825404628 TICON PROPERTIES LLC 5836 FAYETTEVILLE RD #201, DURHAM, NC 27713 4530/170 9825604799 DAVIS LINDA S ETAL 504 N FIRST ST, MEBANE, NC 27302 6760/1539 9825529420 BAILEY KATHERINE S HRS 1156 BELFAIR WAY DOWNING CREEK, CHAPEL HILL, NC 27517 212/215 9825614053 DAVIS LINDA S ETAL 504 N FIRST ST, MEBANE, NC 27302 6760/1539 Parcel Table s Niqk P'"'" - 210 420 630 840 -= SCALE IN FEET -- IIItY II 11 lit limmal I f - I r Ii r I --_ I ? r. 1 i yy■ I ( Ir j . f - - - J 1 1 I9- .9.f., .„ 11Se u 1 1 , L N - , I I 1 4 } ( ...„7"/ dk e } j J1 SI # SI .may 7 {r _--- .L * _ (.)1) . , r CATIONS ARE A IMATE _ 1I I LEGEND Property Boundary ADDRESS: 0 OAKWOOD ST. ACREAGE: 133 ACRES PROJECT NAME: OAKWOOD CITY, STATE: MEBANE, NC PROJECT#. 20220220 SOURCES: USGS MEBANE & EFLAND 7.5 MINUTE QUADRANGLE (2022) DATE: NOVEMBER 2022 SPANGLER 4338 H AR BOND OM 69 RAEREN NORTH CNTAL. INA EN%PRONMENTAL.INC. SPANGLERENVIRONMENTAL.COM (919) 875-4288 MAP NAME: TOPOGRAPHIC MA NC DWQ Stream Identification Form Version 4.11 Date: 11 / 14/2022 Project/Site: Oakwood Latitude: 36.087164° Evaluator: AJ Varick County: Orange Longitude: -79.251129° Total Points: Stream is at least intermittent 22 if >_ 19 or perennial if >_ 30* Stream Determination (circle one) Ephemeral Intermittent Perennial Other e.g. Quad Name: A. Geomorphology (Subtotal = ) Absent Weak Moderate Strong 1 a. Continuity of channel bed and bank 0 1 2 3 2. Sinuosity of channel along thalweg 0 1 2 3 3. In -channel structure: ex. riffle -pool, step -pool, ripple -pool sequence 0 1 2 3 4. Particle size of stream substrate 0 1 2 3 5. Active/relict floodplain 0 1 2 3 6. Depositional bars or benches 0 1 2 3 7. Recent alluvial deposits 0 1 2 3 8. Headcuts 0 1 2 3 9. Grade control 0 0.5 1 1.5 10. Natural valley 0 0.5 1 1.5 11. Second or greater order channel No = 0 Yes = 3 a artificial ditches are not rated; see discussions in manual B. Hydrology (Subtotal = 12. Presence of Baseflow 0 1 2 3 13. Iron oxidizing bacteria 0 1 2 3 14. Leaf litter 1.5 1 0.5 0 15. Sediment on plants or debris 0 0.5 1 1.5 16. Organic debris lines or piles 0 0.5 1 1.5 17. Soil -based evidence of high water table? No = 0 Yes = 3 C. Biology (Subtotal = 18. Fibrous roots in streambed 3 2 1 0 19. Rooted upland plants in streambed 3 2 1 0 20. Macrobenthos (note diversity and abundance) 0 1 2 3 21. Aquatic Mollusks 0 1 2 3 22. Fish 0 0.5 1 1.5 23. Crayfish 0 0.5 1 1.5 24. Amphibians 0 0.5 1 1.5 25. Algae 0 0.5 1 1.5 26. Wetland plants in streambed FACW = 0.75; OBL = 1.5 Other = 0 *perennial streams may also be identified using other methods. See p. 35 of manual. Notes: Sketch: 0/2022 2:37:47 PM, leti ent Drawings \19-0139 STREAM BUFFER IMPACT MAPS.dwg, STREAM BUFFER IMPACT MAPS - OVERALL FULL, 1 N:\2019\19-0139.007 Meritage - Oakwo t VICINITY MAP NOT TO SCALE 1-85 BUCKHORN RD 0 IMPACT AREA "J" /*SCALE 1 "=750' FIRST ISSUE DATE 01-11-2022 PROJECT NO. 19-0139 SHEET NO. E-1 J STREAM IMPACT AREA "A" IMPACT AREA "B" \\ WETLANDS IMPACT AREA "C" IMPACT AREA "D" STREAM I" IMPACT AREA H COPYRIGHT © 2022 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. / II l IIREAM I 1 IMPACT AREA "F" WETLAND REAM MPACT AREA"E" 1 WETLANDS IMPACT AREA "G" STREAM EXISTING IMPACT DATA TOTALS FOR AREAS A-J SITE GRADING IMPACTS: ZONE 1 STREAM BUFFER (PERMANENT) ZONE 2 STREAM BUFFER (PERMANENT) ROAD CROSSING IMPACTS: ZONE 1 STREAM BUFFER (PERMANENT) ZONE 2 STREAM BUFFER (PERMANENT) STREAM IMPACT AREA (PERMANENT) STREAM IMPACT LENGTH (PERMANENT) UTILITY ACCESS ROAD IMPACTS: ZONE 1 STREAM BUFFER (PERMANENT) ZONE 2 STREAM BUFFER (PERMANENT) STREAM IMPACT AREA (PERMANENT) STREAM IMPACT LENGTH (PERMANENT) 48,345 SF 51,879 SF 12,967 SF 7,779 SF 603 SF 211 LF 11. SUNMI1� DESIGN AND ENGINEERING SERVICE WETLAND AND STREAM IMPACTS PERMANENT IMPACTS TEMPORARY IMPACTS STREAM RESTORATION SHEET N IMPACT AREA IMPACT TYPE ZONE 1 BUFFER ZONE 2 BUFFER STREAM IMPACT AREA STREAM IMPACT LENGTH WETLAND ZONE 1 BUFFER ZONE 2 BUFFER STREAM IMPACT AREA STREAM IMPACT LENGTH WETLAND ZONE 1 BUFFER ZONE 2 BUFFER STREAM RESTORATION AREA STREAM RESTORATION LENGTH E-4 A SITE GRADING -EXISTING 20,301 20,249 E-5 B SITE GRADING -EXISTING 18,301 16,318 E-5 B ROAD CROSSING -EXISTING 8,036 5,542 603 139 E-6 B SITE GRADING -PROPOSED 802 2,218 E-6 B WALKING PATH -PROPOSED 257 E-7 C SITE GRADING -EXISTING 707 3,025 E-7 C UTILITY ACCESS ROAD -EXISTING 2,223 1,316 97 32 E-8 D SITE GRADING -EXISTING 9,036 12,287 E-9 E SITE GRADING -PROPOSED 1,421 E-9 E WALKING PATH -PROPOSED 1,101 3,546 E-10 F ROAD CROSSING -EXISTING 4,931 2,237 185 72 4,931 2,237 185 72 E-11 F SITE GRADING -PROPOSED 3,756 5,055 E-11 F ROAD CROSSING -PROPOSED 9,884 5,733 353 181 E-12 G SITE GRADING -PROPOSED 292 5,215 402 E-13 H SEWER OUTFALL-PROPOSED 1,424 846 200 20 1382 E-14 1 SEWER OUTFALL-PROPOSED 1426 TOTALS IN SQUARE FEET (SF) 79,370 84,419 1,238 424 402 1424 846 200 20 2808 4,931 2,237 185 72 TOTALS IN ACRES (AC) 1.822 1.938 0.028 0.009 0.033 0.019 0.005 _ 0.064 0.113 0.051 0.004 PROPOSED IMPACT DATA TOTALS FOR AREAS A-J SITE GRADING IMPACTS: ZONE 1 STREAM BUFFER (PERMANENT) ZONE 2 STREAM BUFFER (PERMANENT) WETLAND (PERMANENT) ROAD CROSSING IMPACTS: ZONE 1 STREAM BUFFER (PERMANENT) 2,223 SF ZONE 2 STREAM BUFFER (PERMANENT) 1,316 SF STREAM IMPACT AREA (PERMANENT) 97 SF STREAM IMPACT LENGTH (PERMANENT) 32 LF WETLAND (PERMANENT) TOTAL EXISTING IMPACTS FOR AREA "F" TO BE RESTORED* ROAD CROSSING IMPACTS: ZONE 1 BUFFER IMPACT (PERMANENT): ZONE 2 BUFFER IMPACT (PERMANENT): STREAM IMPACT AREA (PERMANENT): STREAM IMPACT LENGTH (PERMANENT): 4,931 SF 2,237 SF 732 LF 72 LF *NOTE: EXISTING 50 LF CULVERT TO BE REMOVED. ALL EXISTING IMPACTS TO THE STREAM, EMBANKMENT AND STREAM BUFFER AREAS FOR AREA "F" TO BE RESTORED TO THE BEST APPROXIMATION OF THEIR ORIGINAL CONDITION. WALKING PATH IMPACTS: ZONE 1 STREAM BUFFER (PERMANENT) ZONE 2 STREAM BUFFER (PERMANENT) SEWER OUTFALL IMPACTS: ZONE 1 STREAM BUFFER (TEMPORARY): ZONE 2 STREAM BUFFER (TEMPORARY): STREAM IMPACT AREA (TEMPORARY): STREAM IMPACT LINEAR (TEMPORARY): WETLAND AREA (TEMPORARY): IMPACT STUDIES OAKWOOD OAKWOOD STREET EXTENSION MEBANE, NC (STREAM BUFFER IMPACT MAP OVERALL MAP t NOT „,111110, CARQ 4 �1GINE�� ,\ L/AMR.\\`' J CONSTRUCTION} 1/0111111„ R. 4,850 SF 13,909 SF 0.009 AC 9,884 SF 5,733 SF 353 SF 181 LF 0.009 AC 1,101 SF 3,803 SF 1,424 SF 846 SF 200 SF 20 LF 0.065 AC GRAPHIC SCALE 0 750 1500 h 11 (IN FEET) 1 inch = 750 ft. l 1� SUMMIT' DESIGN AND ENGINEERING SERVICES State License #: P 0339 320 Executive Court Hillsborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732-6676 www.summitde.net N:\2019\19-0139.007 Meritage - Oakwood \Civil\Current Drawings\19-0139_STREAM BUFFER IMPACT MAPS.dwg, 2 STREAM BUFFER IMPACT MAPS - OVERALL, 11/10/2022 2:39:05 PM, leticia.raimon - ---- ± If - EXISTING POND LOCATION h(PROPOSED SCM #1) EXISTING WETLAND EXISTING POND LOCATION (PROPOSED SCM #2) /*SCALE 1 "=250' i)) lr r J l ►� EXISTING POND LOCATION /" FIRST ISSUE DATE 01-11-2022 PROJECT NO. 19-0139 SHEET NO. E-2 J 1\\ IMPACT AREA "A" COPYRIGHT © 2022 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. J IMPACT AREA "F" IMPACT AREA "E" EXISTING POND LOCATION PROPOSED SCM #3 LOCATION EXISTING POND LOCATION (PROPOSED SCM #4) f MATCH LINE (SEE E-2) t r. --4 IMPACT AREA "G" LEGEND: i / 1 EXISTING WETLANDS EXISTING IMPACT DATA TOTALS FOR AREAS A-G SITE GRADING IMPACTS: ZONE 1 STREAM BUFFER (PERMANENT) ZONE 2 STREAM BUFFER (PERMANENT) ROAD CROSSING IMPACTS: ZONE 1 STREAM BUFFER (PERMANENT) ZONE 2 STREAM BUFFER (PERMANENT) STREAM IMPACT AREA (PERMANENT) STREAM IMPACT LENGTH (PERMANENT) UTILITY ACCESS ROAD IMPACTS: ZONE 1 STREAM BUFFER (PERMANENT) ZONE 2 STREAM BUFFER (PERMANENT) STREAM IMPACT AREA (PERMANENT) STREAM IMPACT LENGTH (PERMANENT) 48,345 SF 51,879 SF 12,967 SF 7,779 SF 603 SF 211 LF 2,223 SF 1,316 SF 97 SF 32 LF TOTAL EXISTING IMPACTS FOR AREA "F" TO BE RESTORED* ROAD CROSSING IMPACTS: ZONE 1 BUFFER IMPACT (PERMANENT): ZONE 2 BUFFER IMPACT (PERMANENT): STREAM IMPACT AREA (PERMANENT): STREAM IMPACT LENGTH (PERMANENT): 4,931 SF 2,237 SF 732 LF 72 LF 1 *NOTE: EXISTING 50 LF CULVERT TO BE REMOVED. ALL EXISTING IMPACTS TO THE STREAM, EMBANKMENT AND STREAM BUFFER AREAS FOR AREA "F" TO BE RESTORED TO THE BEST APPROXIMATION OF THEIR ORIGINAL CONDITION. ZONE 1 BUFFER IMPACT ZONE 2 BUFFER IMPACT WETLAND IMPACT STREAM IMPACT STREAM IMPACT IMPACT STUDIES OAKWOOD OAKWOOD STREET EXTENSION MEBANE,NC STREAM BUFFER IMPACT MAP `OVERALL MAP PROPOSED IMPACT DATA TOTALS FOR AREAS A-G SITE GRADING IMPACTS: ZONE 1 STREAM BUFFER (PERMANENT) ZONE 2 STREAM BUFFER (PERMANENT) WETLAND (PERMANENT) ROAD CROSSING IMPACTS: ZONE 1 STREAM BUFFER (PERMANENT) ZONE 2 STREAM BUFFER (PERMANENT) STREAM IMPACT AREA (PERMANENT) STREAM IMPACT LENGTH (PERMANENT) WETLAND (PERMANENT) WALKING PATH IMPACTS: ZONE 1 STREAM BUFFER (PERMANENT) ZONE 2 STREAM BUFFER (PERMANENT) ,GIN•. ' ��� �• <R\`�\\\ IMI J \CONSTRUCTION) GRAPHIC SCALE 125 0 125 250 4,850 SF 13,909 SF 0.009 AC 9,884 SF 5,733 SF 353 SF 181 LF 0.009 AC 1,101 SF 3,803 SF 500 ( IN FEET ) I inch = 250 ft. • 1� SU MM IT, DESIGN AND ENGINEERING SERVICES State License #: P 0339 320 Executive Court Hillsborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732-6676 www.summitde.net 10/2022 1:57:33 PM, leticia.raimond, ent Drawings \19-0139 STREAM BUFFER IMPACT MAPS -SS OUTFALL.dwg, 3 STREAM BUFFER IMPACT MAPS -SS OUTFALL - OVERALL (2), N:\2019\19-0139.007 Meritage - Oakwo i'"5 P. SCALE 1 "=250' FIRST ISSUE DATE 01-11-2022 PROJECT NO. 19-0139 SHEET NO. E-3 4)16 0 ics)// /15?)-/ 'QL,4yw s. COPYRIGHT © 2022 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. J \\ firms% MATCH LINE (SEE E-1) / / .frw \\k j II 4(//4:qQ ilk \4,4q EXISTING - WETLANDS ----- (:„AcC>77--)--- slk EXISTING"C }))"L��� WETLANDS 1 �� a? ff r �fr�'1,re4Vss ��n f` 1 1-r-ratt r IMPACT STUDIES OAKWOOD OAKWOOD STREET EXTENSION MEBANE, NC STREAM BUFFER IMPACT MAP `OVERALL MAP r NOT FOR ,\\�.\\A CAR°, /o.?.! J \CONSTRUCTION) LEGEND: ZONE 1 BUFFER IMPACT ZONE 2 BUFFER IMPACT WETLAND IMPACT STREAM IMPACT STREAM IMPACT PROPOSED IMPACT DATA TOTALS FOR AREAS H AND J SEWER OUTFALL IMPACTS: ZONE 1 STREAM BUFFER (TEMPORARY): 1,424 SF ZONE 2 STREAM BUFFER (TEMPORARY): 846 SF STREAM IMPACT AREA (TEMPORARY): 200 SF STREAM IMPACT LINEAR (TEMPORARY): 20 LF WETLAND AREA (TEMPORARY): GRAPHIC SCALE 125 0 125 250 1 500 (IN FEET) 1 inch = 250 ft. 0.065 AC • 1� SU MM IT, DESIGN AND ENGINEERING SERVICES State License #: P-0339 320 Executive Court Hillsborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732-6676 www.summitde.net ent Drawings \19-0139 STREAM BUFFER IMPACT MAPS.dwg, 4 STREAM BUFFER IMPACT MAPS - EX -IMPACT MAP AREA A, 11/10/2022 2:40:22 PM, letic N:\2019\19-0139.007 Meritage - Oakwo /*SCALE 1 "=60' "[/1, I �1 \ �i\ \\ I II �I\ I I I I I :/ ��i / 20' / ZONE 2 30' //// 1 ZONE1� 30' 1 ZONE1 20' ZONE 2 ZONE 1 STREAM BUFFER IMPACT AREA (13,693 SF) 1 ` ZONE 2 STREAM BUFFER IMPACT AREA (11,730 SF) EXISTING POND FIRST ISSUE DATE 01-11-2022 PROJECT NO. 19-0139 SHEET NO. E-4 J //jcillir/ I, • L CD COPYRIGHT © 2022 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. / 50' RIPARIAN BUFFER EACH SIDE OF CREEK co ZONE 1 STREAM BUFFER ( IMPACT AREA (768 SF) 651 649 ZONE 1 STREAM BUFFER IMPACT AREA (4,390 SF) ZONE 2 STREAM BUFFER IMPACT AREA (3,629 SF) ZONE 2 STREAM BUFFER IMPACT AREA (4,890 SF) ZONE 1 STREAM BUFFER IMPACT AREA (1,450 SF) AREA "A" AREA "B" 666 659 EXISTING POND IMPACT STUDIES OAKWOOD OAKWOOD STREET EXTENSION MEBANE, NC (EXISTING STREAM BUFFER IMPACT MAP IMPACT AREA "A" LEGEND: EXIST / PROPOSED 111111 SD CURB INLET DROP INLET 0 JUNCTION BOX FLARED END SECTION (FES) SDI EXISTING STORM PIPE PROPOSED STORM PIPE LD/SF LD/SF — LIMITS OF DISTURBANCE & SILT FENCE LIMITS OF DISTURBANCE & TREE PROTECTION FENCE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR WOODS LINE ZONE 1 BUFFER IMPACT ZONE 2 BUFFER IMPACT WETLAND IMPACT STREAM IMPACT STREAM IMPACT NOTE: "WOODS LINE" IS FOR ILLUSTRATIVE PURPOSES ONLY AND CLARITY OF THE PLANS. REFER TO THE "LIMITS OF DISTURBANCE" LINE FOR ACTUAL CLEARING LIMITS. LD/TP LD/TP 100 98 100 98 TOTAL EXISTING IMPACTS FOR AREA "A" SITE GRADING IMPACTS: ZONE 1 BUFFER IMPACT (PERMANENT): ZONE 2 BUFFER IMPACT (PERMANENT): 4 ',,</.4 Ml R.',\\\\ J 00 CONSTRUCTION} 20,301 SF 20,249 SF GRAPHIC SCALE 30 0 15 30 60 120 (IN FEET ) 1 inch = 60 ft. • IF SU MM IT, DESIGN AND ENGINEERING SERVICES State License #: P 0339 320 Executive Court Hillsborough, NC 27278 Voice: (919) 732=3883 Fax: (919) 732=6676 www.summitde.net N:\2019\19-0139.007 Meritage - Oakwood \Civil\Current Drawings\19-0139_STREAM BUFFER IMPACT MAPS.dwg, 5 STREAM BUFFER IMPACT MAPS - EX -IMPACT MAP AREA B, 11/10/2022 2:41:15 PM, letic r ,64 \ \rn P i641 20� n\ y�\'6 ZONE2\! sy 2s -�" \t►�; 50' RIPARIAN BUFFER EACH SIDE OF CREEK C-(A\ .1•4`4,\‘* EXISTING WETLAND 1 20' 30' ZONE 21 ZONE 1 STREAM BUFFER IMPACT AREA (8,587 SF) ZONE 2 STREAM BUFFER IMPACT AREA (6,550 SF) -RCP sslaso _� /� J 649 20+n, = EXISTING 60" RCP (127 LF) ZONE 1 STREAM BUFFER IMPACT AREA (3,506 SF) ZONE 2 STREAM BUFFER IMPACT AREA (2,465 SF) _ II ZONE 2 STREAM BUFFER IMPACT AREA (1,034 SF) m ZONE 1 STREAM BUFFER IMPACT AREA (1,139 SF) EXISTING POND �� 1'SCALE 1 "=60' FIRST ISSUE DATE 01-11-2022 PROJECT NO. 19-0139 SHEET NO. E-5 J AREA "A" AREA "B" IN--, °/ 1 1// EXISTING �� ��// POND ,/ // /7/ ZONE 1 STREAM BUFFER IMPACT AREA (1,220 SF) /I/ /a / / /// \\)1((11/ COPYRIGHT © 2022 1 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. ZONE 1 STREAM BUFFER IMPACT AREA (7,355 SF) ZONE 2 STREAM BUFFER z IMPACT AREA (8,235 SF) / �� ./,/."/// I I /(�1r r�I� 7// 1Ir71 r� � l � 1 / r /`p�/�7 J �I G I�l I STREAM IMPACT LENGTH (139 LF) 1 I I I RAM ACT ( l AREASTE(603 IMPSF) �648 EXISTING PAVED ROAD - Y - ZONE 2 STREAM BUFFER gA2' r/,"// IMPACT AREA (3,077 SF) ZONE 1 STREAM BUFFER _ IMPACT AREA (4,530 SF) AREA "B" AREA "C" 64? LEGEND: EXIST / PROPOSED 111111 0 SD CURB INLET DROP INLET 0 JUNCTION BOX 3111 FLARED END SECTION (FES) SDI EXISTING STORM PIPE PROPOSED STORM PIPE LD/SF LD/SF — LIMITS OF DISTURBANCE & SILT FENCE LD/TP LD/TP 100 98 C-] LIMITS OF DISTURBANCE & TREE PROTECTION FENCE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR WOODS LINE ZONE 1 BUFFER IMPACT ZONE 2 BUFFER IMPACT WETLAND IMPACT STREAM IMPACT STREAM IMPACT NOTE: "WOODS LINE" IS FOR ILLUSTRATIVE PURPOSES ONLY AND CLARITY OF THE PLANS. REFER TO THE "LIMITS OF DISTURBANCE" LINE FOR ACTUAL CLEARING LIMITS. TOTAL EXISTING IMPACTS FOR AREA "B" SITE GRADING IMPACTS: ZONE 1 BUFFER IMPACT (PERMANENT): ZONE 2 BUFFER IMPACT (PERMANENT): ROAD CROSSING IMPACTS: ZONE 1 BUFFER IMPACT (PERMANENT): ZONE 2 BUFFER IMPACT (PERMANENT): STREAM IMPACT AREA (PERMANENT); STREAM IMPACT LENGTH (PERMANENT): 18,301 SF 16,318 SF 8,036 SF 5,542 SF 603 SF 139 LF EXISTING 60" RCP EXISTING STR EXIST , SUB GRADE` .\ • STREAM CULVERT CROSS SECTION NTS EXISTING GRADE TOP OF HEADWALL= 639.75' INV. ELEV.= 632.15' UNKNOWN DEPTH IMPACT STUDIES OAKWOOD OAKWOOD STREET EXTENSION MEBANE, NC EXISTING STREAM BUFFER IMPACT MAP IMPACT AREA "B" r NOT FOR ,\\\.,N CARo, � 44MR• ) `CONSTRUCTION) GRAPHIC SCALE 30 0 15 30 60 �r 120 (IN FEET) 1 inch = 60 ft. SUMMIT, DESIGN AND ENGINEERING SERVICES State License #: P-0339 320 Executive Court Hillsborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732 6676 wwwsummitde.net o_ a N:\2019\19-0139.007 Meritage - Oakwood \Civil\Current Drawings\19-0139_STREAM BUFFER IMPACT MAPS.dwg, 6 STREAM BUFFER IMPACT MAPS - P-IMPACT MAP AREA B, 11/10/2022 2:4 (SCALE 1 "=60' SCM #2 FIRST ISSUE DATE 01-11-2022 PROJECT NO. 19-0139 SHEET NO. E-6 J u EXISTING WETLAND /b I I ZONE 1 STREAM BUFFER IMPACT AREA (763 SF) � 5 ZONE 2 STREAM BUFFER IMPACT AREA (891 SF) COPYRIGHT © 2022 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. 7/ AREA "A" AREA "B" \, 50' RIPARIAN BUFFER EACH SIDE OF CREEK f-rir� EXISTING POND / ///1/ (//01//// / 1///// 20' // ZONE 2 ZONE 2 STREAM BUFFER IMPACT AREA (257 SF) ZONE 2 STREAM BUFFER IMPACT AREA (1,327 SF) \ \ ZONE 1 STREAM BUFFER IMPACT I AREA (39 SF) ) I AREA "B" AREA "C / / / ( 65 LF 18" RCP CLASS B RIP RAP OUTLET PROTECTION LIMITS OF DISTURBANCE SCM #3 IMPACT STUDIES OAKWOOD OAKWOOD STREET EXTENSION MEBANE, NC PROPOSED STREAM BUFFER IMPACT MAP IMPACT AREA "B" LEGEND: EXIST / PROPOSED 111111 0 • ■ 0 SDSD LD/SF LD/SF LD/TP LD/TP 100 98 100 98 _� CURB INLET DROP INLET JUNCTION BOX FLARED END SECTION (FES) EXISTING STORM PIPE PROPOSED STORM PIPE LIMITS OF DISTURBANCE & SILT FENCE LIMITS OF DISTURBANCE & TREE PROTECTION FENCE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR WOODS LINE ZONE 1 BUFFER IMPACT ZONE 2 BUFFER IMPACT WETLAND IMPACT STREAM IMPACT STREAM IMPACT NOTE: "WOODS LINE" IS FOR ILLUSTRATIVE PURPOSES ONLY AND CLARITY OF THE PLANS. REFER TO THE "LIMITS OF DISTURBANCE" LINE FOR ACTUAL CLEARING LIMITS. TOTAL PROPOSED IMPACTS FOR AREA "B" SITE GRADING IMPACTS: ZONE 1 BUFFER IMPACT (PERMANENT): ZONE 2 BUFFER IMPACT (PERMANENT): 802 SF 2,218 SF WALKING PATH IMPACTS: ZONE 2 BUFFER IMPACT (PERMANENT): 257 SF r NOT FOR \\\�,,,,IIIIII/,/// \\\.<N CARO /'' ' 4 AMR • �\\\ ,11/III,,, ) `CONSTRUCTION) GRAPHIC SCALE 30 0 15 30 60 �r 120 ( IN FEET ) 1 inch = 60 ft. SUMMIT, DESIGN AND ENGINEERING SERVICES State License #: P-0339 320 Executive Court Hillsborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732 6676 wwwsummitde.net LEGEND: N:\2019\19-0139.007 Meritage - Oakwood \Civil\Current Drawings\19-0139_STREAM BUFFER IMPACT MAPS.dwg, 7 STREAM BUFFER IMPACT MAPS - EX -IMPACT MAP AREA C, 11/10/2022 2:43:56 PM, letic SCALE 1 "=60' FIRST ISSUE DATE 01-11-2022 PROJECT NO. 19-0139 SHEET NO. E-7 ZONE 1 STREAM BUFFER IMPACT AREA (631 SF) ZONE 2 STREAM BUFFER - IMPACT AREA (1,597 SF) ZONE 2 STREAM BUFFER IMPACT AREA (680 SF) / ZONE 1 STREAM BUFFER IMPACT AREA (2,223 SF) ZONE 2 STREAM BUFFER IMPACT AREA (1,428 SF) ZONE 1 STREAM BUFFER IMPACT AREA (76 20' 0 ZONE 1 30' ZONE 1 AREA "B" AREA "C" STREAM IMPACT LENGTH (32 LF) STREAM IMPACT JAREA (97SF) EXISTING 20 LF CULVERT, FOR UTILITY ACCESS >HE- ft*`I (DIAMETER UNKNOWN) R i��R j„ \� v ZONE 2 STREAM BUFFER ( 20' IMPACT AREA (636 SF) ZONE 2 I 50' RIPARIAN BUFFER EACH SIDE OF CREEK EXISTING STREAMBED, ELEVATION UNKNOWN EXISTING ;\ SUBGRADE !\�� 5.3% EXISTING CULVERT (DIAMETER UNKNOWN) STREAM CULVERT CROSS SECTION NTS EXISTING GRADE INV. ELEV. UNKNOWN t COPYRIGHT © 2022 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. UTILITY EASEMENT IMPACT STUDIES OAKWOOD OAKWOOD STREET EXTENSION MEBANE, NC (EXISTING STREAM BUFFER IMPACT MAP IMPACT AREA "C" EXIST / PROPOSED 111111 El 0 CURB INLET • DROP INLET Q JUNCTION BOX ▪ FLARED END SECTION (FES) SDSD EXISTING STORM PIPE PROPOSED STORM PIPE LD/SF LD/SF - LIMITS OF DISTURBANCE & SILT FENCE LIMITS OF DISTURBANCE & TREE PROTECTION FENCE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR WOODS LINE ZONE 1 BUFFER IMPACT ZONE 2 BUFFER IMPACT WETLAND IMPACT STREAM IMPACT - - - - STREAM IMPACT NOTE: "WOODS LINE" IS FOR ILLUSTRATIVE PURPOSES ONLY AND CLARITY OF THE PLANS. REFER TO THE "LIMITS OF DISTURBANCE" LINE FOR ACTUAL CLEARING LIMITS. LD/TP 100 LD/TP 98 100 98 C_1 TOTAL EXISTING IMPACTS FOR AREA "C" SITE GRADING IMPACTS: ZONE 1 BUFFER IMPACT (PERMANENT): ZONE 2 BUFFER IMPACT (PERMANENT): UTILITY ACCESS IMPACTS: ZONE 1 BUFFER IMPACT (PERMANENT): ZONE 2 BUFFER IMPACT (PERMANENT): STREAM IMPACT AREA (PERMANENT); STREAM IMPACT LENGTH (PERMANENT): NOT FOR •qq ,,,111111/,,,,, �I -\,\\��N CAR /,, ►\ 4 ////,IIIIII\\� J \CONSTRUCTION] 707 SF 3,025 SF 2,223 SF 1,316 SF 80 SF 32 LF GRAPHIC SCALE 30 0 15 30 60 120 (IN FEET ) 1 inch = 60 ft. r 1� SUMMIT' DESIGN AND ENGINEERING SERVICES State License #: P-0339 320 Executive Court Hillsborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732 6676 wwwsummitde.net 0/2022 2:44:51 PM, letic N:\2019\19-0139.007 Meritage - Oakwood \Civil\Current Drawings\19-0139_STREAM BUFFER IMPACT MAPS.dwg, 8 STREAM BUFFER IMPACT MAPS - EX -IMPACT MAP AREA D. SCALE 1 "=60' FIRST ISSUE DATE 01-11-2022 PROJECT NO. 19-0139 SHEET NO. E-8 ko\ )\% ZONE 1 STREAM BUFFER IMPACT AREA (1,607 SF) ZONE 2 STREAM BUFFER IMPACT AREA (2,427 SF) ZONE 1 STREAM BUFFER IMPACT AREA (7,429SF) ZONE 2 STREAM BUFFER IMPACT AREA (7,937 SF) / I7 1� I IIII / NO II III I I I 1 II I; i ZONE 2 STREAM BUFFER IMPACT AREA (1,923 SF) 50' RIPARIAN BUFFER EACH SIDE OF CREEK COPYRIGHT © 2022 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. 20' (ZONE 2 30' ZONE 1 /i i '637- EXISTING POND IMPACT STUDIES OAKWOOD OAKWOOD STREET EXTENSION MEBANE, NC (EXISTING STREAM BUFFER IMPACT MAP IMPACT AREA "D" LEGEND: EXIST / PROPOSED 111111 CURB INLET ® DROP INLET ® 0 JUNCTION BOX FLARED END SECTION (FES) �SD SDEXISTING STORM PIPE PROPOSED STORM PIPE LD/SF LD/SF - LIMITS OF DISTURBANCE & SILT FENCE LD/TP LD/TP 100 98 L-� LIMITS OF DISTURBANCE & TREE PROTECTION FENCE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR WOODS LINE ZONE 1 BUFFER IMPACT ZONE 2 BUFFER IMPACT WETLAND IMPACT STREAM IMPACT - - - - STREAM IMPACT NOTE: "WOODS LINE" IS FOR ILLUSTRATIVE PURPOSES ONLY AND CLARITY OF THE PLANS. REFER TO THE "LIMITS OF DISTURBANCE" LINE FOR ACTUAL CLEARING LIMITS. TOTAL EXISTING IMPACTS FOR AREA "D" SITE GRADING IMPACTS: ZONE 1 BUFFER IMPACT (PERMANENT): ZONE 2 BUFFER IMPACT (PERMANENT): NOToliiiiiiiii FOR • ,,s\`9\N O7i'' 4 44. i•. M R '-4v ///111111111, \\\ �CONSTRUCTIONJ 9,036 SF 12,287 SF GRAPHIC SCALE 30 0 15 30 60 120 ( IN FEET ) 1 inch = 60 ft. r 1� SUMMIT' DESIGN AND ENGINEERING SERVICES State License #: P-0339 320 Executive Court Hillsborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732 6676 wwwsummitde.net N:\2019\19-0139.007 Meritage - Oakwood \Civil\Current Drawings\19-0139_STREAM BUFFER IMPACT MAPS.dwg, 9 STREAM BUFFER IMPACT MAPS - P-IMPACT MAP AREA E, 11/10/2022 2:47:39 PM, le SCALE 1 "=60' FIRST ISSUE DATE 01-11-2022 PROJECT NO. 19-0139 SHEET NO. E-9 50' RIPARIAN BUFFER - " EACH SIDE OF CREEK / - ,4<" 39 / JI l rr / f -7L/ COPYRIGHT © 2022 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. N. t646 PROPOSED WALKING PATH ZONE 2 STREAM BUFFER IMPACT AREA (1,918 SF) ///////v ZONE 1 STREAM BUFFER IMPACT AREA (439 SF) ZONE 2 STREAM BUFFER IMPACT AREA (1,421 SF) 7/ , 20' ZONE 2 30' ZONE 1 5�6• 3� 7/ / `'0. ZONE 1 STREAM BUFFER IMPACT AREA (452 SF) EXISTING WETLAND 30' i - ZONE1- 20' ZONE 2' ZONE 2 STREAM BUFFER IMPACT AREA (1,628 SF) ZONE 1 STREAM BUFFER / IMPACT AREA (210 SF) 665 — IMPACT STUDIES OAKWOOD OAKWOOD STREET EXTENSION MEBANE, NC 'PROPOSED STREAM BUFFER IMPACT MAP IMPACT AREA "E" LEGEND: EXIST / PROPOSED CURB INLET ® DROP INLET O 0 JUNCTION BOX FLARED END SECTION (FES) ■SD SDEXISTING STORM PIPE PROPOSED STORM PIPE LD/SF LD/SF — LIMITS OF DISTURBANCE & SILT FENCE 111111 LD/TP LD/TP 100 98 ,00 98 E-] LIMITS OF DISTURBANCE & TREE PROTECTION FENCE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR WOODS LINE ZONE 1 BUFFER IMPACT ZONE 2 BUFFER IMPACT WETLAND IMPACT STREAM IMPACT STREAM IMPACT NOTE: "WOODS LINE" IS FOR ILLUSTRATIVE PURPOSES ONLY AND CLARITY OF THE PLANS. REFER TO THE "LIMITS OF DISTURBANCE" LINE FOR ACTUAL CLEARING LIMITS. TOTAL PROPOSED IMPACTS FOR AREA "E" SITE GRADING IMPACTS: ZONE 2 BUFFER IMPACT (PERMANENT): WALKING PATH IMPACTS: ZONE 1 BUFFER IMPACT (PERMANENT): ZONE 2 BUFFER IMPACT (PERMANENT): NOT FOR /4(5.0t:S§14.4.1/ 4 44.44% tirz-4i17 ///1111111\0 j `CONSTRUCTION} 7 GRAPHIC SCALE 30 0 15 30 60 1,421 SF 1,101 SF 3,546 SF 120 ( IN FEET ) 1 inch = 60 ft. r 1� SUMMIT' DESIGN AND ENGINEERING SERVICES State License #: P 0339 320 Executive Court Hillsborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732 6676 wwwsummitde.net LEGEND: EX -IMPACT MAP AREA F, 11/10/2022 2:49:22 PM, leticia.r N:\2019\19-0139.007 Meritage - Oakwood \Civil\Current Drawings \19-0139_STREAM BUFFER IMPACT MAPS.dwg, 10 STREAM BUFFER IMPACT MAP / w / �� / / to / ll/8 Z / / 1� / / / �0� // i / / 50' RIPARIAN BUFFER EACH SIDE OF CREEK \ \ /iI)` I►(II \I 1 `�!,►I \I� ZONE 2 STREAM BUFFER IMPACT AREA (1,307 SF)* j ZONE 1 STREAM BUFFER IMPACT AREA (4,383 SF) * ZONE 2 STREAM BUFFER IMPACT AREA (930 SF)*/ j�)(///) I_ STREAM IMPACT LENGTH (72 LF), I SCALE 1 "=75' FIRST ISSUE DATE 01-11-2022 PROJECT NO. 19-0139 SHEET NO. E-10 J j . / \\\\\\- 'I - FFQ 20' /� ZONE 2I) 65���� 6 ZONE ' So / ZONE30/ I / /.()�i /1 20' N 1 j/ 56/-0 //// /7 /// r// I `\ \ \ � I 1 \ \ \\t\1 I 1 ZONE 2�p TO BE RESTORED* I //2 J 2 /� EXISTING / ///l// A',�16�/ WETLAND 6 GP I I STREAM IMPACT AREA (185 SF), TO BE RESTORED* —-_JJ) l / EXISTING 50 LF CULVERT 46" DIA. CMP, TO BE REMOVED AND STREAM RESTORED* COPYRIGHT © 2022 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. J TOTAL EXISTING IMPACTS FOR AREA "F" ROAD CROSSING IMPACTS: ZONE 1 BUFFER IMPACT (PERMANENT): ZONE 2 BUFFER IMPACT (PERMANENT): STREAM IMPACT AREA (PERMANENT): STREAM IMPACT LENGTH (PERMANENT): 4,931 SF 2,237 SF 732 LF 72 LF EXIST / PROPOSED 111111 0 DD .DJ • O SD LD/SF LD/SF LD/TP LD/TP 100 98 CURB INLET DROP INLET JUNCTION BOX FLARED END SECTION (FES) EXISTING STORM PIPE PROPOSED STORM PIPE LIMITS OF DISTURBANCE & SILT FENCE LIMITS OF DISTURBANCE & TREE PROTECTION FENCE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR WOODS LINE ZONE 1 BUFFER IMPACT ZONE 2 BUFFER IMPACT WETLAND IMPACT STREAM IMPACT STREAM IMPACT NOTE: "WOODS LINE" IS FOR ILLUSTRATIVE PURPOSES ONLY AND CLARITY OF THE PLANS. REFER TO THE "LIMITS OF DISTURBANCE" LINE FOR ACTUAL CLEARING LIMITS. *NOTE: EXISTING 50 LF CULVERT TO BE REMOVED. ALL EXISTING IMPACTS TO THE STREAM, EMBANKMENT AND STREAM BUFFER AREAS FOR AREA "F" TO BE RESTORED TO THE BEST APPROXIMATION OF THEIR ORIGINAL CONDITION. EXISTING STREAMBED EXISTING SUBGRADE 3.5% EXISTING 46" DIA. STREAM CULVERT CROSS SECTION NTS EXISTING GRADE CULVERT INV. ELEV. UNKNOWN IMPACT STUDIES OAKWOOD OAKWOOD STREET EXTENSION MEBANE, NC (EXISTING STREAM BUFFER IMPACT MAP IMPACT AREA 'F" NOT FOR • 4/A M R '///1111111\0 0\ J \CONSTRUCTIONJ C_11 GRAPHIC SCALE 0 75 150 (IN FEET ) 1 inch = 75 ft. l 1� SUMMIT' DESIGN AND ENGINEERING SERVICES State License #: P0339 320 Executive Court Hillsborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732 6676 wwwsummitde.net 1 E N:\2019\19-0139.007 Meritage - Oakwood \Civil\Current Drawings \19-0139_STREAM BUFFER IMPACT MAPS.dwg, 11 STREAM BUFFER IMPACT MAPS - P-IMPACT MAP AREA F, 11/10/2022 2:50:28 PM, letic 665 Imo/ 1 50' RIPARIAN BUFFER EACH SIDE OF CREEK ZONE 2 STREAM BUFFER IMPACT AREA (3,003 SF) co PROPOSED 140 LF CULVERT (DIA TBD) ;6ti //IIIII / PROPOSED STREAM IMPACT AREA 353 SF IIIIII I PROPOSED STREAM IMPACT LENGTH 181 LF ei I( i Y /),L. II 0/11 /(1,/;))A 'ci , 4/// /// I I i655 /////y/ / / I _c 14 / / I \I EXISTING(1 I i, l,, WETLAND \ _ ' �7f --.1/40‘.71 V SCALE 1 "=60' FIRST ISSUE DATE 01-11-2022 PROJECT NO. 19-0139 SHEET NO. E-11 EXISTING 50 LF 46" CMP COPYRIGHT © 2022 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. 20' ZONE 30' ZONE 659- 65? sss _ --- 30' ZONE 1 20' ZONE 2 I ZONE 2 STREAM BUFFER IMPACT AREA (1,086 SF) • ZONE 2 STREAM BUFFER " IMPACT AREA (217 SF) ZONE 1 STREAM BUFFER ° / J / IMPACT AREA (9,884 SF) ZONE 2 STREAM BUFFER IMPACT AREA (2,730 SF) ZONE 1 STREAM BUFFER IMPACT AREA (3,756 SF) ) ZONE 2 STREAM BUFFER ) IMPACT AREA (3,752 SF) ry � I co I /666 co TOTAL PROPOSED IMPACTS FOR AREA "F" SITE GRADING IMPACTS: ZONE 1 BUFFER IMPACT (PERMANENT): ZONE 2 BUFFER IMPACT (PERMANENT): ROAD CROSSING IMPACTS: ZONE 1 BUFFER IMPACT (PERMANENT): ZONE 2 BUFFER IMPACT (PERMANENT): STREAM IMPACT AREA (PERMANENT): STREAM IMPACT LENGTH (PERMANENT): IMPACT STUDIES OAKWOOD OAKWOOD STREET EXTENSION MEBANE, NC 'PROPOSED STREAM BUFFER IMPACT MAP IMPACT AREA "F" 3,756 SF 5,055 SF 9,884 SF 5,733 SF 353 SF 181 LF LEGEND: EXIST / 111111 0 rn PROPOSED • SDSD LD/SF LD/SF LD/TP LD/TP 100 98 C_� CURB INLET DROP INLET JUNCTION BOX FLARED END SECTION (FES) EXISTING STORM PIPE PROPOSED STORM PIPE LIMITS OF DISTURBANCE & SILT FENCE LIMITS OF DISTURBANCE & TREE PROTECTION FENCE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR WOODS LINE ZONE 1 BUFFER IMPACT ZONE 2 BUFFER IMPACT WETLAND IMPACT STREAM IMPACT - — — - STREAM IMPACT NOTE: "WOODS LINE" IS FOR ILLUSTRATIVE PURPOSES ONLY AND CLARITY OF THE PLANS. REFER TO THE "LIMITS OF DISTURBANCE" LINE FOR ACTUAL CLEARING LIMITS. NOT FOR \\\ 44. j `CONSTRUCTION} GRAPHIC SCALE 0 75 150 ( IN FEET ) 1 inch = 75 ft. r 1� SUMMIT' DESIGN AND ENGINEERING SERVICES State License #: P 0339 320 Executive Court Hillsborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732-6676 wwwsummitde.net N:\2019\19-0139.007 Meritage - Oakwood \Civil\Current Drawings\19-0139_STREAM BUFFER IMPACT MAPS.dwg, 12 STREAM BUFFER IMPACT MAPS - P-IMPACT MAP AREA G, 11/10/2022 2:52:05 PM, letic 666. 168�j r 7v ZONE 2 STREAM BUFFER IMPACT AREA (5,215 SF) -14/ N,- /, / / 7 F ZONE 1 STREAM BUFFER IMPACT AREA (292 SF) WETLAND IMPACT AREA (0.009 AC) 62 _ 66" 660 LIMITS OF DISTURBANCE SCALE 1 "=60' FIRST ISSUE DATE 01-11-2022 PROJECT NO. 19-0139 SHEET NO. E-12 34 r 30' ZONE 1 - - - COPYRIGHT © 2022 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. 107- T 50' RIPARIAN BUFFER EACH SIDE OF CREEK ` 20' ZONE 2 30' \ ZONE 1 \ 169 / / 6(-‘ CHE JokT EXISTING — / WETLAND \ S89° 26' 02 249.99' OHE�-I_ UTILITY EASEMENT SHE IMPACT STUDIES OAKWOOD OAKWOOD STREET EXTENSION MEBANE, NC (PROPOSED STREAM BUFFER IMPACT MAP IMPACT AREA "G" LEGEND: EXIST / PROPOSED 111111 0 ID SD • • 0 Lio SD LD/SF LD/SF LD/TP LD/TP 100 98 100 98 -� CURB INLET DROP INLET JUNCTION BOX FLARED END SECTION (FES) EXISTING STORM PIPE PROPOSED STORM PIPE LIMITS OF DISTURBANCE & SILT FENCE LIMITS OF DISTURBANCE & TREE PROTECTION FENCE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR WOODS LINE ZONE 1 BUFFER IMPACT ZONE 2 BUFFER IMPACT WETLAND IMPACT STREAM IMPACT STREAM IMPACT NOTE: "WOODS LINE" IS FOR ILLUSTRATIVE PURPOSES ONLY AND CLARITY OF THE PLANS. REFER TO THE "LIMITS OF DISTURBANCE" LINE FOR ACTUAL CLEARING LIMITS. TOTAL PROPOSED IMPACTS FOR AREA "G" SITE GRADING IMPACTS: ZONE 1 BUFFER IMPACT (PERMANENT): ZONE 2 BUFFER IMPACT (PERMANENT): 292 SF 5,215 SF WETLAND IMPACT (PERMANENT): 0.009 AC NOT FOR • \,,,,13/,,,,414. KNL ►� 4 //7</AMR /////1111110 J \CONSTRUCTIONJ GRAPHIC SCALE 30 0 15 30 60 120 ( IN FEET ) 1 inch = 60 ft. l 1� SUMMIT' DESIGN AND ENGINEERING SERVICES State License #: P 0339 320 Executive Court Hillsborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732-6676 wwwsummitde.net ent Drawings \19-0139 STREAM BUFFER IMPACT MAPS -SS OUTFALL.dwg, 13 STREAM BUFFER IMPACT MAPS -SS OUTFALL - P-IMPACT MAP AREA H, 11/10/2022 1:56:44 PM, letic N:\2019\19-0139.007 Meritage - Oakwo I JO � TEMPORARY PROPOSED STREAM IMPACT (200 SF) ZONE 1 STREAM BUFFER IMPACT AREA (1,424 SF) ZONE 2 STREAM BUFFER IMPACT AREA (444 SF) LIMITS OF DISTURBANCE 1 //' / / )1'// / LIMITS OF / DISTURBANCE / / / SCALE 1 "=40' FIRST ISSUE DATE 01-11-2022 PROJECT NO. 19-0139 SHEET NO. E-13 COPYRIGHT © 2022 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. TEMPORARY PROPOSED STREAM IMPACT (20 LF) 30' ZONE 1= ZONE 2- i 20' I 1 r 6• M/21 M J M/a ZONE 2 STREAM BUFFER ` "\\ . / 01 ) . (— IMPACT AREA (402SF) �.,A 0 A TEMPORARY WETLAND IMPACT AREA (0.032) IMPACT STUDIES OAKWOOD OAKWOOD STREET EXTENSION MEBANE, NC 'PROPOSED STREAM BUFFER IMPACT MAP IMPACT AREA "H" LEGEND: EXIST / PROPOSED 111111 CURB INLET ® DROP INLET O 0 JUNCTION BOX [/:3 3111 FLARED END SECTION (FES) ■SD SDEXISTING STORM PIPE PROPOSED STORM PIPE LD/SF LD/SF — LIMITS OF DISTURBANCE & SILT FENCE LIMITS OF DISTURBANCE & TREE PROTECTION FENCE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR WOODS LINE ZONE 1 BUFFER IMPACT ZONE 2 BUFFER IMPACT WETLAND IMPACT STREAM IMPACT STREAM IMPACT NOTE: "WOODS LINE" IS FOR ILLUSTRATIVE PURPOSES ONLY AND CLARITY OF THE PLANS. REFER TO THE "LIMITS OF DISTURBANCE" LINE FOR ACTUAL CLEARING LIMITS. LD/TP LD/TP 100 98 [-1 TOTAL PROPOSED IMPACTS FOR AREA "H" SEWER OUTFALL IMPACTS: ZONE 1 BUFFER IMPACT (TEMPORARY): ZONE 2 BUFFER IMPACT (TEMPORARY): 1,424 SF 846 SF STREAM IMPACT AREA (TEMPORARY): 200 SF STREAM IMPACT LINEAR (TEMPORARY): 20 LF WETLAND IMPACT (TEMPORARY): 0.032 AC NOT FOR /4)9.:•0:s§O'ce 44.*:4!Cmitrz ///1111111" j `CONSTRUCTION} GRAPHIC SCALE 20 0 10 20 40 80 ( IN FEET ) 1 inch = 40 ft. r 1� SUMMIT' DESIGN AND ENGINEERING SERVICES State License #: P-0339 320 Executive Court Hillsborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732-6676 wwwsummitde.net 0/2022 12:32:35 PM, le ent Drawings \19-0139 STREAM BUFFER IMPACT MAPS -SS OUTFALL.dwg, 14 STREAM BUFFER IMPACT MAPS -SS OUTFALL - P-IMPACT MAP AREA J, 1 N:\2019\19-0139.007 Meritage - Oakwo / / 7' S > " ; r EXISTING WETLANDS \\ EXISTING POND a \ 1 \ Ir _( SCALE 1 "=60' FIRST ISSUE DATE 01-11-2022 PROJECT NO. 19-0139 SHEET NO. E-14 COPYRIGHT © 2022 1 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. TEMPORARY WETLAND IMPACT AREA (0.024 AC) 25' SS EASEMENT (LIMITS r OF DISTURBANCE TO \ J EXTEND TO EASEMENT) TEMPORARY WETLAND IMPACT AREA (0.0001 AC) TEMPORARY WETLAND IMPACT AREA (0.005 AC) TEMPORARY WETLAND IMPACT AREA (0.003 AC) — t Vc C LEGEND: EXIST / PROPOSED 111111 CURB INLET ® DROP INLET ® Q JUNCTION BOX FLARED END SECTION (FES) ■SDSDEXISTING STORM PIPE PROPOSED STORM PIPE LD/SF LD/SF - LIMITS OF DISTURBANCE & SILT FENCE LIMITS OF DISTURBANCE & TREE PROTECTION FENCE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR WOODS LINE ZONE 1 BUFFER IMPACT ZONE 2 BUFFER IMPACT WETLAND IMPACT STREAM IMPACT STREAM IMPACT NOTE: "WOODS LINE" IS FOR ILLUSTRATIVE PURPOSES ONLY AND CLARITY OF THE PLANS. REFER TO THE "LIMITS OF DISTURBANCE" LINE FOR ACTUAL CLEARING LIMITS. LD/TP LD/TP 100 98 C_1 TOTAL PROPOSED IMPACTS FOR AREA "J" ssF SEWER OUTFALL IMPACTS: WETLAND IMPACT AREA (TEMPORARY): 0.033 AC rrr EXISTING WETLAND 1 , NOT FOR 001111111///1/41 o. 44. 1 IMPACT STUDIES OAKWOOD OAKWOOD STREET EXTENSION MEBANE, NC 'PROPOSED STREAM BUFFER IMPACT MAP IMPACT AREA "J" ►\ 4 4414.1citi.r4 ///1111111jo j `CONSTRUCTION} GRAPHIC SCALE 30 0 15 30 60 120 (IN FEET) 1 inch = 60 ft. i 1� SUMMIT' DESIGN AND ENGINEERING SERVICES State License #: P-0339 320 Executive Court Hillsborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732-6676 wwwsummitde.net SUMMIT ENGINEERING OAKWOOD IMPACT MAP 6 SPANGLER ENVIRONMENTAL., INC. PROJECT #: DATE ACRES 20220220 NOVEMBER 2022 4338 BLAND ROAD RALEIGH, NORTH CAROLINA SPANGLERENVIRONMENTAL.COM (919) 875-4288 PROJECT NAME: OAKWOOD MAP NAME: STREAM CROSS SECTION LOCATIONS 637 636.5 634.5 634 B-E5 Cross Section OHWM OHWM (left) (right) 4 2 4 6 Width (ft) 8 10 12 BE-5 (Looking Upstream) BE-5 (Looking Downstream) 633 632.5 632 = 631.5 c ° • 631 c▪ o °' w 630,5 630 629,5 629 0 C-E7 Cross Section OHWM (left) 1 2 3 4 5 Width (ft) 6 7 8 CE-7 (Looking Upstream) CE-7 (Looking Downstream 646 6455 z 645 r c •° 644,5 co 11 6644 643,5 643 0 F-E10 Cross Section OHWM (left) 2 3 Width (ft) 5 6 7 8 FE-10 (Looking Upstream) FE-10 (Looking Downstream) 651 650,5 650 649,5 649 ro co 648.5 w 648 647,5 647 F-E11 Cross .Section (left) OHWM (right) 2 L 6 8 10 12 14 16 Width (ft) FE-11 (Looking Upstream) FE-11 (Looking Downstream) 621 620,5 620 619,5 c o 4— 619 ro co 618.5 W 618 617,5 617 H-E13 Cross Section 0 2 L 6 8 10 12 14 16 WFdth (ft) HE-13 (Looking Upstream) HE-13 (Looking Downstream)