Loading...
HomeMy WebLinkAboutNCG140512_Inspection Report_20221117Compliance Inspection Report Permit: NCG140512 Effective: Expiration: Owner : Lane Construction Company SOC: Effective: Expiration: Facility: LaneBlythe Batch Plant County: Wake 9317 Old Stage Rd Region: Raleigh Garner NC 27529 Contact Person: Marcus Curran Title: Phone: 413-772-9678 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 11/17/2022 Entry Time 09:30AM Exit Time: 10:OOAM Primary Inspector: Brittany D Carson Phone: Secondary Inspector(s): Lauren Garcia Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG140512 Owner - Facility: Lane Construction Company Inspection Date: 11/17/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Inspection was in response to an application for NCG14 coverage. The plant will be a temporary batch plant providing concrete for the 540 project. The site has not yet been constructed and is expected to be in operation by March or April of 2023. The site is expected to be in operation for only 5-6 months. Site contacts have been in communication with Brittany Carson, General Industrial Permit Coordinator, about the permit application and have provided construction plan sheets for the batch plant. There will be a closed loop collection system for the concrete truck wash. Any additional wastewater associated with truck washing or machinery washing will be pumped and trucked offsite for disposal. Wastewater generated from spraying down fine materials is expected to flow over the ground to a basin, where the water will be monitored and tested if necessary. The water flowing to this basin will only be a result of water coming into contact with stockpiled materials, and sediment will be the greatest concern. It was discussed during the site visit that the permit coverage will be approved for the facility and a follow up visit will occur once the facility has been constructed. Page 2 of 3 Permit: NCG140512 Owner - Facility: Lane Construction Company Inspection Date: 11/17/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Page 3 of 3