Loading...
HomeMy WebLinkAboutNCG160066_Inspection Letter_20221117ROY COOPE[t Goverrum. ELIZABETH S. BISER 5errelot ), BMAN WRENN Dir elor Barnhill Contracting Company Attn: Tracy Wilson 4425 Pleasant Valley Road Raleigh, NC 27622 N.:7H r ;-AROLINA Environmental Quality December 17, 2022 Subject: COMPLIANCE EVALUATION INSPECTION Barnhill Contracting Company Pleasant Valley Road Facility, Certificate of Coverage-NCG160066 NPDES Stormwater General Perm it-N CGO60000 Wake County ►TlIrditl�Ti�l On December 08, 2022 a site inspection was conducted for the Barnhill Contracting Company, facility located at 4425 Pleasant Valley Road, Wake County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit-NCG160000, Certificate of Coverage- NCG160066. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as Turkey Creek, a Class B;NSW waterbody in the Neuse River Basin. As a result of the inspection, the facility was found to be in compliance with the conditions of the NCG160000 permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil penalty assessment of up to $25,000 per day for each violation. If you or your staff has any questions, comments, or needs assistance with understanding any aspect of your permit please contact me at (919) 791-4200 or by e-mail at Thad.valentine(a)ncdenr.c�ov. Sincerely, Thad Valentine Environmental Senior Specialist North Carolina Department of Environmental Quality ! Division of Energy. Mineral and Land Resources van,.:•.. ter. ,.<.. � Ralerejh Regional Office 1 Ib28 Mail Service Center 13800 Barrett Drive ! Raleigh. North Carolina 27bOU �rf� O. 919791.4200 Compliance Inspection Report Permit: NCG160066 Effective: 08/01/19 Expiration: 05/31/24 Owner: Barnhill Contracting Company SOC: Effective: Expiration: Facility: Barnhill Contracting Co County: Wake 4425 Pleasant Vly Rd Region: Raleigh Raleigh NC 27622 Contact Person: David Glover Title: Phone: 252-824-8273 Ext.231 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 11/08/2022 Entry Time 10:OOAM Primary Inspector: Thaddeus W Valentine Secondary Inspector(s): Certification: Phone: Exit Time: 11:25AM Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Asphalt Paving Mixture Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG160066 Owner • Facility: Barnhill Contracting Company Inspection Date: 11/08/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: We looked at the area around the maintenance shop and all of the drums and containers that were previousely located outside have been moved so as not to be exposed to stormwater. We walked the site and identified the 1) additional outfall. We talked about the requirement for have a preventive maintenance and good housekeeping plan for all the areas and task that have a potential for exposer to stormwater and I stressed that those plans should be outlined in the SP3. Also stressed the compliance with the inspection requirements for the facility for any tasks or areas with the potential for exposer to stormwater or spills and the need for a checklist and to document findings in the SP3. We talked about the possible need for a sprayer at the conveyor for dust control and asked Tracy to be aware of the amount of dust from the front end loader moving sand and rock as that creates alot of dust. That area could potentially require the use of a sprayer for dust control. Im satisfied that Barnhill and Tracy Wilson are working to improve any areas or issues on site and so consider the site in compliance. Page 2of3 Permit: NCG160066 Owner - Facility: Barnhill Contracting Company Inspection Date: 11/08/2022 Inspection Type: Compliance Evaluation Reason for Visit. Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ E # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ 0 # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ ■ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ 0 # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ 0 Comment: We looked at the SP3 at the maintenance facility only and talked about updates to that plan that should be implemented Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0000 Comment: We looked at the outfall locations and found that the sample point at the maintenance shop (drop inlet on West Side of Maintenance shop) was not shown as a sample point and should have been. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ N ❑ ❑ Comment: We identified an additional sample point at the maintenance shop which is the only sample point for that area. I asked Tracy Wilson to add that as a sample point and make that update in the (SP3) stormwater Pollution Prevention Plan. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? ■❑❑❑ ❑❑■❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: We identified an additional outfall at the maintenance shop for the maintenance shop area. Page 3of3