HomeMy WebLinkAboutNCG110061_Renewal COC_20180601Certificate of Coverage
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
GENERAL PERMIT NO. NCG110000
Certificate of Coverage No. NCG110061
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and
the Federal Water Pollution Control Act, as amended,
Town of Beaufort
is hereby authorized to discharge stormwater from a site located at:
Beaufort WWTP
301 Freedom Park Rd
Beaufort
Carteret County
to receiving waters designated as Turner Creek, class SA;HQW waters in the White Oak River Basin, in
accordance with the effluent limitations, monitoring requirements, and other conditions set forth in N.C.
General Permit No. NCG110000, issued on 5/31/2018.
This Certificate of Coverage shall become effective on 6/112018.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
for William E. (Toby) Vinson, Jr., P.E., CPM
Interim Director, Division of Energy, Mineral, and Land Resources
By the Authority of the Environmental Management Commission
Georgoulias, Bethany
From: laserfiche@ncdenr.gov
Sent: Thursday, November 17, 2022 3:17 PM
To: Meshaw, Greg
Subject: Renewal COC for NPDES Stormwater Permit No. NCG110061
Attachments: Certificate of Coverage.pdf
Dear Permittee:
Please see the attached new Certificate of Coverage No. NCG110061 for renewed coverage under Stormwater General
Permit NCG110000 for this facility. This permit is reissued pursuant to the requirements of North Carolina General
Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental
Protection Agency, dated October 15, 2007 (or as subsequently amended.)
You must print a copy of the new NCG110000 General Permit from our Stormwater General Permits web page. In
addition to the full permit, the most recent print package on the website includes revised Discharge Monitoring Report
(DMR) forms and Qualitative Monitoring Report Forms.
The General Permit authorizes discharges of stormwater, and it specifies your obligations with respect to discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all
changes in the reissued permit. Your facility has six (6) months from receipt of the permit to update your Stormwater
Pollution Prevention Plan (SPPP) to reflect any new permit requirements.
When does electronic DMR (eDMR) reporting start, and does it affect this permit?
If activities at this facility ever require analytical monitoring, eDMR will affect you. We are setting up our database with
the outfalls that permittees submitted on-line and permit parameters. Permittees will receive notification when our
eDMR system is ready for permit -holders to register and begin reporting monitoring data electronically. If you have any
questions about the status, please contact Bethany Georgoulias at (919) 707-3641.
Your coverage under the General Permit is transferable only through the specific action of DEMLR. This permit does not
affect the legal requirements to obtain other permits which may be required by the N.C. Department of Environmental
Quality (DEQ), nor does it relieve the permittee from responsibility for compliance with any other applicable federal,
state, or local law, rule, standard, ordinance, order, judgment, or decree.
If you have any questions regarding this permit please contact The Stormwater Program at (919) 707-9220.
Sincerely,
The NC DEQ Stormwater Program
This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not
monitored.