Loading...
HomeMy WebLinkAboutNCS000208_Renewal Application_20190529DEPARTMENT OF THE ARMY MILITARY SURFACE DEPLOYMENT AND DISTRIBUTION COMMAND 596'h TRANSPORTATION BRIGADE MILITARY OCEAN TERMINAL, SUNNY POINT 6280 SUNNY POINT ROAD SE SOUTHPORT, NORTH CAROLINA 28461-7800 REPLY TO ATTENTION OF: Public Works Division SW Individual Permit Coverage Renewal Stormwater Permitting Program Attn: Suzanne McCoy 1612 Mail Service Center Raleigh, NC 27699-161.2 ,Subject: Renewal Application Form Dear Ms. McCoy, 22 May 2019 +r MAY 2 9 2019 DEAR -LAND QUALITY STORMWATcR FERMI F(iNG Enclosed is the Renewal Application Form for the Military Ocean Terminal Sunny Point for permit #NCS000208. If you have any questions or require any additional information, please contact me at 910-437-8425. Sincerely, Paul Peterson Environmental Manager Ai MA Permit Coverage �.1 Renewal ARplication Form NCDENR National Pollutant Discharge Elimination System NP NCS DOD2o� Permit Number Stormwater Individual Permit Please provide your permit number in box in the upper right hand corner, complete the information in the space provided below and return the completed renewal form along with the required supplemental information to the address indicated. Owner Information * Address to whichP ermit correspondence will be mailed Owner / Organization Name: 1J15 iACZrr`l / MOT Svc Owner Contact: 6V (+ i - P W , M M A o ii_� Mailing Address: b 2 r3a 5 LA rjN Y PZ31 NT 29-7) ,!5D1XTH1 PDfVX r~C- a8N 6 I Phone Number: 41 v- 1-151- 8 Z ti 1 Fax Number: E-mail address: A'05C P 1A • C- F 4 �-1(S y- cl) rue, 1 Facility Information Facility Name: �y r 11 1- I Tifz` OGGq,.► I �12M+NqL S�-tNr i�i] r Facility Physical Address: :ZBy 5 to r' N V Pa 1 ti , R+D c7WTA Po rr N c. 2 8,4 61 Facility Contact: L- 19 E i F_RSpV-) Mailing Address: 51)AT- IPwE 92S0 SlTNl"'Y 120IN 110 50 L'C_1 J11 F10 fL% NC - Phone Number: Fax Number: E-mail address:�-- Permit Information Permit Contact: Mailing Address: 51JIj7-- PW IC 6't $ o Sk +7 r,c 2s-iGl Phone Number: cl 1 O - 4 5-4 - 'S `1 -L 5 Fax Number: E-mail address: A In L. 1-2 F-Tr-. iLSo -)l ro . Ct \J LJ m 6 1 L. rn l L Discharae Information Receiving Stream: Stream Class: Basin: Sub -Basin: Number of Outfalls: CALF rF,AI'L R1jff,'L FaciliWActivity Changes Please describe below any changes to your facility or activities since issuance of your permit. Attached a separate sheet if necessary. SFrr !�-1T►�cri�f� Sr�s; tx5 CERTIFICATION I certify that I am familiar with the information contained in the application and that to the best of my knowledge and belief such information is true, complete and acc rate. , q Signature LI$Qffe /t4Yr COL, LG OxwLm'"Joy Print or type name of person signing above Commas ing Title SW Individual Permit Coverage Renewal Please return this completed application form Stormwater Permitting Program and requested supplemental information to: 1612 Mail Service Center Raleigh, North Carolina 27699-1612 . STORMWATER POLLUTIONS PREVENTION PLAN DEVELOPMENT AND ;IMPLEMENTATION CERTIFICATION North Carolina Division of Energy, Mineral, and Land Resources - Storm water Permitting Facility Name: M11-tTgrLy NN-) 701ti� Permit Number: NCS 000 702? Location Address: S'D 07-7D?N- E 6,9 30 SIAN N / p 1 r, R-�7 SO t,.Ts -1 PO jZ-, r) c. A g -i 6 1 County: ?j2uLN.5�-D IG1L "I certify, under penalty of law, that the Stormwater Pollution Prevention Plan (SPPP) document and all attachments were developed and implemented under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information required by the SPPP. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information gathered is, to the best of my knowledge and belief, true, accurate and complete." And "I certify that the SPPP has been developed, signed and retained at the named facility location, and the SPPP has been fully implemented at this facility location in accordance with the terms and conditions of the stormwater discharge permit." And "I am aware that there are significant penalties for falsifying information, including the possibility of fines and imprisonment for knowing violations." Sign (according to permit signatory requirements) and return this Certification. DO NOT SEND STORMWATER POLLUTION PREVENTION PLAN WITH THIS CERTIFICATION. Signature 3 ' Print or type name of person signing above HEATHER J. CARLISLE COL, LG Commanding Date (n ar ( `yp 11 l �'W 44& Title SPPP Certification 10/13 SUPPLEMENTAL INFORMATION REQUIRED FOR RENEWAL OF INDIVIDUAL NPDES STORMWATER PERMIT Two copies of each of the following shall accompany this submittal in order for the application to be considered complete: (Do not submit the site Stormwater Pollution Prevention Plan) Initials OK 1. A current Site Map from the Stormwater Pollution Prevention Plan. The location of industrial activities (including storage of materials, disposal areas, process areas and loading and unloading areas), drainage structures, drainage areas for each outfall, building locations and impervious surfaces should be clearly noted. PotL. 2. A summary of Analytical Monitoring results during the term of the existing permit (if your permit required analytical sampling). Do not submit individual lab reports. The summary can consist of a table including such items as outfall number, parameters sampled, lab results, date sampled, and storm event data. 3. A summary of the Visual Monitoring results. Do not submit individual monitoring reports. The summary can consist of a table including such items as outfall number, parameters surveyed, observations, and date monitoring conducted. l�� « 4. A summary of the Best Management Practices utilized at the permitted facility. Summary should consist of a short narrative description of each BMP's in place at the facility. If the implementation of any BMP's is planned, please include information on these BMP's. Do K 5. A short narrative describing any significant changes in industrial activities at the permitted facility. Significant changes could include the addition or deletion of work processes, changes in material handling practices, changes in material storage practices, and/or changes in the raw materials used by the facility. cDLy c 6. Certification of the development and implementation of a Stormwater Pollution Prevention Plan for the permitted facility (Sign and return attached form). If the final year analytical monitoring of the existing permit term has not been completed prior to filing the renewal submittal, then the last years monitoring results should be submitted within 30 days of receipt of the laboratory reports. (i.e. do not withhold renewal submittal waiting on lab results) ti ,. Military Ocean Terminal, d % �� 4 ! Legend Creeks Point I RSunny f ❑ LakelAondQ mMOTSU SUI&ngs - eu:uuy 2,728 r� 57 12 % f I ! sre J 1 M Opan Storage fveas Parking PAVED J ti / I f I t C:I uNPAveo Rands j 64 � r r 0 PAVED ij UNPAVED A Sidewalk � � 1 Inslell.d.n Baund.,y culvem 503 - Stc— Lines 43 J Ditches - } _ �//]] 7. � I 36 8�t` 7 1087 �J 6 \ _ ! • ho �` - - 6 .' 3 r FIGURE 2-9 DRAINAGE ARF,ASWITH 6 1 IMPERV1015 TOTAL AREAS FOR DRAINAGE '� _ PERCENTAGES' FOR OUTFALL 001 AND 002 IS`"�•.,�� 32 465,600 FT (10.6 ACRES) C!l�0 , OUTFALL 001 IS 53,100 FTC (IMPERVIOUS) �,� , OUTFALL 002 IS 54,000FT2` :'20 (IMPERVIOUS) ` ,1 BOTH OUTFALLS ARE 100% f -- IMPERVIOUS AREAS�� EXTRA AREA DRAINS INTO r as G SYSTEM POST SAMPLIN47 LOCATIONS SITES ` ' 46 9.1 WGS_1984_Web_Mercator_Auxiliary_Sphere 817.5 0 408.77 817.5 U.S. Survey FOUO 596th Transportation Brigade - Directorate of Public Works Feet j 4 23 27 28 12 57 63 M 64 w MN 0 S.,.Mfl SD02 78-0'48".73"W, 33-59'30.358"N ssr.-e. cloak 17 62": pp. 53 10010,97 -.36 15 P—I - DIN—y 55 C3 P—m --D—y NP—m - R.4 5 6 5 PAVED 59 P—L-QW 9. .-. .,: ..." 3 FIA.9 24 .31 ek*m E—� b VhK E..M 30 4 Is", 26 Nigis Creek CM SDOI 40 78'0'45.168"W, 33'59'27.045"N 32 10 54 2 596th Transportation Brigade 25 22 Directorate of Public Works 20 Military Ocean Terminal 9 Sunny Point 140 70 0 140 F,!,T Date Created' 25-Outober-2011 -# Of NCS000208 MILITARY OCEAN TERMINAL SUNNY POINT OUTFALL PARAMETER 1/12/2015 8/31/2015 4/7/2016 12/5/2016 6/20/2017 12/20/2017 5/17/2018 11/19/2018 2019 2019 RAIN FALL AMOUNT 1.14" 0.42" 0.20" 1.41" 0.75" 1.42" 0.54" 0.38" SD01 NOT COLLECTED AT THIS TIME OIL & GREASE < 5 mg/L <5 mg/L <5 mg/L <5 mg/L <5 mg/L <5 mg/L <5 mg/L <5 mg/L CADMIUM <0.10 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L LEAD 0.094 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L TSS 79.0 mg/L 29.7 mg/L 20.4 mg/L <2.9 mg/L 32.7 mg/L 70.5 mg/L 10.9 mg/L <2.7 mg/L pH 7.68 8.54 6.73 7.38 7.83 7.33 7.52 7.52 BOD 3.0 mg/L <2 mg/L 7 mg/L <2 mg/L 2 mg/L 15 mg/L 2 mg/L <2 mg/L COD 162 mg/L 51 mg/L 41 mg/L <20 mg/L 36 mg/I 81 mg/L 22 mg/L <20 mg/L MBAS 0.170 mg/L 0.096 mg/L 0.076 mg/L <0.040 mg/L 0.122 mg/L 0.123 mg/L 0.087 mg/L <0.038 mg/L SD02 OIL & GREASE < 5 mg/L <5 mg/L 5 mg/L <5 mg/L 6 mg/L 6 mg/L <5 mg/L <5 mg/L CADMIUM < 0.10 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L LEAD 0.176 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L <0.01 mg/L TSS 31.8 mg/L 22.2 mg/L 10.3 mg/L 35.3 mg/L 37.8 mg/L 85.5 mg/L 14.9 mg/L <2.6 mg/I PH 7.66 8.11 6.83 8.02 7.6 7.9 8.33 7.28 BOD 3.0 mg/L <2 mg/L 8 mg/L 2 mg/L 5 mg/L 7 mg/L 2 mg/L 4mg/L COD 81 mg/L 42 mg/L 41 mg/L 27 mg/L 73 mg/L 64 mg/L <20 mg/L <20 mg/L WAS 0.161 mg/L 0.092 mg/L 0.066 mg/L <0.038 mg/L 0.270 mg/L 0.145 mg/L 0.077 mg/L 0.042 mg/L It3 NCS000208 MILITARY OCEAN TERMINAL SUNNY POINT OUTFALL PARAMETER 1/12/2015 8/31/2015 4/7/2016 6/20/2017 12/20/2017 S/17/2018 11/19/2018 2019 2019 RAIN FALL AMOUNT 1.14" 0.42" 0.20" 0.75" 1.42" 0.54" 0.38" SD01 NOT COLLECTED AT THIS TIME COLOR CLEAR CLEAR CLEAR CLEAR CLEAR CLEAR CLEAR ODOR NONE NONE NONE NONE NONE NONE NONE CLARITY 1 1 1 1 1 1 1 FLOATING SOLIDS 1 1 1 1 1 1 1 SUSPENDED SOLIDS 1 1 1 1 1 1 1 FOAM NO NO NO NO NO NO NO OIL SHEEN NO NO NO NO NO NO NO EROSION /DEPOSITION NO NO NO NO NO YES NO EROSION FROM SIDE OTHER NONE NONE NONE NONE NONE OFSANK NONE SD02 COLOR CLEAR CLEAR CLEAR CLEAR CLEAR CLEAR CLEAR ODOR NONE NONE NONE NONE NONE NONE NONE CLARITY 1 1 2 1 1 1 1 FLOATING SOLIDS 1 1 2 1 1 1 1 SUSPENDED SOLIDS 1 1 1 1 1 1 1 FOAM NO NO NO NO NO NO NO OIL SHEEN NO NO NO NO NO NO NO EROSION /DEPOSITION NO NO NO NO NO NO NO OTHER NONE NONE YELLOW POLLEN NONE NONE NONE NONE 4. SUMMARY BEST MANAGEMENT PRACTICES 3.3 BEST MANAGEMENT PLAN IMPLEMENTATION 3.3.1 Baseline Best Management Practices The USEPA has identified eight baselines (BMPs) for implementation at all NPDES-permitted installations. These baseline BMPs have been adopted and expanded by MOTSU for implementation at all departments and operations within MOTSU that may directly or indirectly impact human health or the environment. The baseline BMPs are described in the following sections. Baseline BMP 1- Employee Training Personnel training is essential to effective implementation of the SWPPP. Personnel at all levels of responsibility will be trained in the components and goals of the NPDES program and the SWPPP. Training will address each component of the SWPPP; including how and why tasks are to be implemented. At a minimum, the following will be part of the training program: • Personnel will be trained to identify and manage potential spills that can occur from equipment and containers of petroleum products (i.e. gasoline, diesel fuel, oil, lubricating grease, hydraulic fluids, etc.). • Employees will be trained in proper good housekeeping practices which include: - Regular vacuuming and/or sweeping; - Cleaning up spilled materials; - Identifying where brooms, vacuums, absorbents, foams, neutralizing agents, and other good housekeeping and spill response equipment are located; - Instruction on securing drums and containers; and, - Frequently checking for leaks and spills of various materials. • Personnel will be trained to recognize toxic and hazardous substances located at the installation. Personnel will be trained in: - Proper organization and storage of materials; and, - Identification of toxic and hazardous substances stored, handled, and produced on -site. Personnel refresher training will be held on an annual basis. New personnel will receive training within thirty (30) days of assignment. Personnel training will be documented on a Training Sign - In Sheet produced by PWE. The Environmental Manager will coordinate training for all SWPPT 4. SUMMARY BEST MANAGEMENT PRACTICES members in the elements of the SWPPP. SWPPT members will coordinate training on the proper implementation of BMPs for all personnel within their jurisdiction. Baseline BMP 2 - Good Housekeeping Housekeeping is part of daily operations. Good housekeeping includes continuously improving operations and maintenance of processes and equipment, proper storage of materials and wastes, maintaining routine cleanup schedules, maintaining well organized work areas, and promoting safe work habits of personnel. Specific good housekeeping procedures implemented at the MOTSU include: • Maintaining clean, dry floors and work areas, with regular sweeping at least once per week; • Regular removal of garbage and waste material; • Prompt cleanup of spilled materials to prevent migration; • Proper material and waste storage practices, including adequate aisle space to provide for material transfer and easy access in the event of an emergency; and • Neat and convenient storage of housekeeping and spill response kits (brooms, vacuums, absorbents, foams, neutralizing agents, containment booms, etc). Baseline BMP 3 - Visual Inspections Routine visual inspections are conducted to identify conditions that may become a pollution source or a risk to installation personnel. The visual inspection program concentrates on all areas that could potentially be the source of a material release, fire, explosion, or stormwater pollutant (e.g., loading docks, storage tanks, pumps and piping, and drum storage areas). A variety of visual inspections are performed at MOTSU to satisfy environmental health and safety, and security requirements. These inspections serve as a periodic check for indications of stormwater pollution. The following inspection programs are recognized by the SWPPP: • Fire prevention inspections are conducted monthly by the Installation Fire Department. The inspections use a standard checklist form for documentation and the Fire Department maintains records of the inspections. • Health and Safety inspections are conducted annually by the Safety Office. The inspections are documented and filed within the Safety Office. Certain areas of the installation that have been identified as high risk to employees or property, due to the types of work performed or equipment used, are inspected quarterly. 4. SUMMARY BEST MANAGEMENT PRACTICES • Storage tank visual inspections are conducted on a monthly basis. One UST is equipped with automatic tightness testing sensors. The visual inspections are documented and filed with the Environmental Manager Office. Baseline BMP 4 - Preventive Maintenance Preventive maintenance involves the regular inspection and testing of equipment and stormwater systems. The purpose of these inspections is to uncover conditions such as cracks or slow leaks that could result in discharges of oil, chemicals, or other materials. The preventive maintenance schedule prevents breakdown and failures by adjustment, repair, or replacement of equipment. MOTSU's preventive maintenance program includes: • Identification of equipment, systems, and facility areas to be inspected. This includes piping, pumps, storage tanks, valves, material handling equipment, and catch basins; • Periodic inspections or tests of the equipment and systems; • Appropriate and timely adjustments and repair or replacement of equipment and systems; and • Maintenance of all documents showing equipment/system inspections, repairs, and replacements. Baseline BMP 5 - Spill Prevention and Response Spill prevention and response is covered in the Integrated Spill Contingency Plan. Baseline BMP 6 — Erosion and Sediment Control Soil erosion and sediment control (E&SC) measures minimize the erosion and transport of sediment into natural water bodies. During the semi-annual SWPPP inspections, the Environmental Manager inspects the entire installation to identify bare areas or areas susceptible to erosion. The US Army Corps of Engineers Engineer Office onsite has responsibility for inspection of construction projects in accordance with the respective E&SC Plan. In general, three guidelines for reducing the potential for erosion are followed at MOTSU: • Bare areas that do not show signs of channeling, are sodded or seeded. This establishes a low -maintenance, permanent ground cover more resistant to erosion. • Areas that are too steep to seed or exhibit signs of channeling are covered with rip -rap. Similar to the seeding, rip -rap minimizes erosion by reducing runoff velocity and filtering sediment laden runoff as it passes through the rip -rap. • Areas susceptible to erosion are regularly inspected for signs of erosion or sedimentation. 4. SUMMARY BEST MANAGEMENT PRACTICES • All areas that are erosion prone or where construction is occurring on the installation should be inspected regularly. Baseline BMP 7 - Management of Runoff This practice seeks to offset the increase of impermeable area in a watershed by implementing mitigation measures that divert, inhibit, or reduce overland flow and reduce the effect of degradation of stormwater quality by filtering runoff from industrial areas. Measures employed at MOTSU include maintenance of large permeable areas (grassy and forested), use of secondary containment around tanks and covered containment pallets for 55- gallon drums, the use of naturally vegetated swales to convey runoff from portions of the site, and the maintenance of an effective stormwater system. New construction projects are designed using the State of North Carolina stormwater guidelines. Baseline BMP 8 — Record keeping and Reporting PWE personnel maintain records of events that occur on site as a means of tracking the progress of pollution prevention efforts and to develop improved BMPs. Records include documentation of all spills, leaks, and related incidents. Record keeping also includes maintaining employee training records, inspection documentation, and internal and external correspondence. 3.3.2 STANDARD OPERATING PROCEDURE BMPS The following is a list of BMPs that were found to be a part of standard operating procedures generally implemented throughout the installation: • All spills are reported to a single contact, Installation Fire Department. • Industrial activities are conducted inside and storm water contact is minimized. • Good housekeeping procedures are applied throughout MOTSU. • Drip pans are available for equipment stored and/or maintained outside. • Hazardous liquids contained in 55-gallon drums are stored on secondary containment pallets indoors; smaller containers are placed in appropriate storage lockers. • Consideration is given to segregation of stored materials in contained areas. 0 Maintenance activities for vehicles are performed under a roof, if possible. 4. SUMMARY BEST MANAGEMENT PRACTICES • Most installation vehicles are washed at the vehicle wash rack. The Fire Department washes response vehicles daily with .mild soap and water rinses with no degreasing. No POVs are washed at MOTSU. • Exposure minimization is practiced throughout MOTSU. • HAZMAT areas including Satellite Accumulation Areas (SAAs) are located inside buildings. • All ASTs have secondary containment and any accumulated structure stormwater is inspected prior to release. • Spill kits are readily available at all HAZMAT and hazardous waste storage areas. The kits are properly labeled and easily accessible. • All major vehicle and equipment painting is performed off site of MOTSU. • Proper security measures are in place throughout MOTSU. • Dumpsters and recycle bins are covered and plugged at all times to prevent rain from coming in contact with the contents in the containers. • Annual storm water pollution prevention and BMP training is provided to maintenance personnel. • Contractors are required to remove junk/scrap vehicles and equipment from MOTSU. • Public Works has a procedure to inspect secondary containment contents prior to release. • Maintenance equipment and vehicles are parked in covered storage bays where practicable. • Replaced electrical transformers are removed as soon as contract allows. • Used batteries are stored on a containment pallet and in covered area or in weatherproof cabinet. • Inspections of buildings and areas identified as potential pollutant sources are inspected and records are on file in the PWE office. • Construction contractors are made aware of environmental permits and compliance issues for their respective project area. The following BMPs were implemented during the 2014-2019 permit at MOTSU: • Construction of a canopy wash area (B43) that is enclosed and self-contained with an oil filtration system; removes exposure to stormwater runoff. • Construction of a heavy equipment wash rack area at Building 143 which facilitates proper preventative maintenance and eliminates stormwater runoff. 5. Significant Changes during 2014 - 2019 Permit 1. Construction of a canopy wash area (B43) that is enclosed and self-contained with an oil filtration system; removes exposure to stormwater runoff. 2. Construction of a covered heavy equipment wash rack area at Building 143 which facilitates proper preventative maintenance and eliminates stormwater runoff. The drainage system passes through an oil water separator before discharging into a sanitary sewer system.