Loading...
HomeMy WebLinkAbout20150034 Ver 1_Site Plan_20150112PLAN VIEW PROPOSED GEOTEXTILE FABRIC CLASS II RIP RAP ALONG PROPOSED SLOPE (1.5:1 OR FLATTER) -- PROPOSED RECYCLED CONCRETE SLABS (APPROX. 8" THICK) OHW KEY IN 2' MIN. EXISTING GROUND TOP OF BERM icy' MAX. ENCROACHMENT FROM ORDINARY HIGII WATER ELEVATION OF 15' PROPOSED WASHED STONE OR CRUSHED RECYCLED CONCRETE cIF?loss sEcTloN N1'S GENERAL NOTES: t. PROJECT NOT SURVEYED. PLAN VIEW AND CROSS SECTION TO BE CONSIDERED SCHEMATIC EXHIBIT ONLY. 2 WORK TO BE CONDUCTED AS EMERGENCY REPAIR PER 1/7/15 NCDWR, TRIPP BROTHERS (CONTRACTOR), TOWN OF HOOKERTON (OWNER) & SEPT (ENGINEER) SITE VISIT DISCUSSION & PROJECT NARRATIVE ATTACHED TO USACE GENERAL PERMIT NO, 197800080. 3. SHOWN DATA FROM GIS SPATL4LL DATA, SITE VISIT, AND AERIAL PHOTOGRAPHY. CONSTRUCTION NOTES: t. GEOTEXTILE FABRIC SHALL BE INSTALLED ON CLEARED AND GRUBBED SLOPE PRIOR TO INSTALLATION OF WASHED STONE OR RECYCLED CONCRETE. 2. RECYCLED CONCRETE SLABS MAY BE USED TO FORM REVETMENT, HOWEVER NO REBAR OR REINFORCING WIRE SIIALL PROTRUDE FROM SLABS. 3. RAP STONE SIZE 24" TO 36" SHALL BE USED TO FORM THE TOE OF SLOPE AND KEYED IN A MINIMUM OF 2' BELOW THE STREAM BED. CLASS II RIP RAP AND RECYCLED CONCRETE SHALL BE PLACED A MINIMUM OF ?.'THICK UPSLOPE TO FORM THE REVETMENT. REVETMENT STRUCTURE WILL BE LOCATED NO FURTHER THAN t0 FEET WATERWARD OF THE ORDINARY HIGH WATER MARK. q. REVETMENT SLOPE SHALL BE t.$' (H): t' (V) OR FLATTER 5. NO GRUBBING OF STREAM BANKS IS ALLOWED BEYOND THE 5o' EMERGENCY REPAIR PROJECT AREA. LAND CLEARING FOR ACCESS TO SITE SHALL BE LIMITED TO HAND CLEARING. 6. HEAVY EQUIPMENT ACCESS TO THE PROJECT AREA SHALL NOT TRAVERSE ANY PART OF THE WASTEWATER LAGOON BERMS. 0 z z_ Z J J h i � p O E rn O to 02 o in v cv �r�¢m Vr o,Lj u~i F -ma�0 0 c E,2 °- pmp ^z�Z� Z Lj z a r 3 H Z i w rn Cl Z rn w Lo Q J V � 2 LLj i H < o0 0 i } u � m t a Ld uj� NY° w w z ~ v Z U) z o 0 w U 8 m au U Z z 0 � Q z U z W N C � w Q z w�o� w�� =o U Q � w w m z w C 3: zw00 ry Z O U 0 z z_ Z J J h i � p O E rn O to 02 o in v cv �r�¢m Vr o,Lj u~i F -ma�0 0 c E,2 °- pmp ^z�Z� Z Lj z a r 3 H Z i w rn Cl Z rn w Lo Q J V � 2 LLj i H < o0 0 i } u � m t a Ld uj� NY° w w z ~ v Z U) z o 0 w U 8 m au