Loading...
HomeMy WebLinkAbout20140650 Ver 1_Approval Letter_20150109A y'-VA NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary January 9, 2015 PSNC Energy Attn: Whitney Waldrop, PE 800 Gaston Rd Gastonia, NC 28056 DWQ # 14 -0650 reissuance Alamance /Orange County Subject: Approval of 401 Water Quality Certification with Additional Conditions Approval of Jordan Riparian Buffer Impacts with Additional Conditions Line T -021B Pipeline Project Dear Mr. Waldrop: You have our approval for the updated impacts listed below for the purpose described in your original authorization issued by the Division on August 22, 2014 and the updated impact information received on October 6, 2014. This authorization shall supersede the authorization issued by the Division on August 22, 2014 in its entirety. These impacts are covered by the attached Water Quality General Certification Number 3884, Jordan Buffer Rules, and the conditions listed below. The General Certification allows you to use Nationwide Permit Number 12 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non - Discharge, and Water Supply Watershed regulations. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification and Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certifications) /Permit /Authorization and is responsible for complying with all conditions. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification, General Permit and /or Buffer Rules are met. No other impacts are approved, including incidental impacts. Winston -Salem Regional Office Location: 585 Waughtown St. Winston - Salem, North Carolina 27107 Phone: 336- 771 -50001 FAX: 336 -771 -46301 Customer Service: 1-877-623-6748 Internet: www.ncwaterauality.org An Equal Opportunity 1 Affirmative Action Employer PNG DWR# 14 -0650 reissuance 401 /Buffer APPROVAL Page 2 of 5 Type of Impact Amount Approved Amount Approved (Units) (units) Temporary Permanent Wetlands 0.201 acres 2.802 acres Streams 2,427 linear feet Buffers Zone 1- perpendicular crossings > 40 linear feet construction corridor with 30 foot maintenance corridor (Allowable Activity with Mitigation) Streams S5, S12, S14, 3675 square feet 9838 square feet S16, S18, S18A, S25, S26, S29, S32, S33, S37, S40, S42 Buffers - Zone 2 - perpendicular crossings > 40 linear feet construction corridor with 30 foot maintenance corridor (Allowable Activity with Mitigation) Streams S5, S12, S14, 1502 square feet 6379 square feet S16, S18, S18A, S25, S26, S29, S32, S33, S37, S40, S42 Buffers Zone 1- Other than perpendicular crossings (Allowable Activity with Mitigation) Streams S1, S4, S6, S7, 11952 square feet 9677 square feet S8, S17, S22, S23, S24, S28, S30, S31, S34, S36, S38, S41, S46, S47 Buffers - Zone 2 - - Other than perpendicular crossings (Allowable Activity) Streams S1, S4, S6, S17, 9951 square feet 7467 square feet S22, S23, S24, S28, S30, S31, S34, S36, S38, S41, S47 PNG DWR# 14 -0650 reissuance 401 /Buffer APPROVAL Page 3 of 5 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification and Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification (s) /Permit /Authorization and is responsible for complying with all conditions. 3. Mitigation must be provided for the proposed impacts as specified in the table below. The Division has received an acceptance letter from the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. Until the EEP receives and clears your payment, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to the EEP to meet the following compensatory mitigation requirement: 4. For Stream Impact sites S1, S14, S17, S18, S18A, S23, S29, S30, S38 and S47 open cut /trench installation shall be conducted provided the applicant adheres to the environmental commitments outlined in the S &ME cover letter dated June 2014 and submitted to the Division on June 25, 2014. 5. Construction Corridors shall be limited to 50 feet in all buffer areas and permanent maintenance corridors shall be limited to 30 feet in all buffer areas. 6. At Stream Site 33, bridging shall be used for equipment access in areas where the stream parallels the pipeline and all stream banks shall be protected to the maximum extent practical. Stream dewatering techniques shall be utilized to avoid downstream sediment movement. Stream banks shall be reconstructed to match the original pattern and profile, and stabilized with erosion control matting for permanent stabilization. Any areas that are reconstructed will be visually monitored by a qualified person for a minimum of quarterly for one year after reconstruction. Impacts Requiring Compensatory Mitigation. Buffer Basin / Sub -basin Buffer. Jordan / Haw Zone 1 crossings 13,513 (square feet) Zone 2 crossings 7,881 (square feet) Zone 1 other 21, 629 (square feet) than crossings 4. For Stream Impact sites S1, S14, S17, S18, S18A, S23, S29, S30, S38 and S47 open cut /trench installation shall be conducted provided the applicant adheres to the environmental commitments outlined in the S &ME cover letter dated June 2014 and submitted to the Division on June 25, 2014. 5. Construction Corridors shall be limited to 50 feet in all buffer areas and permanent maintenance corridors shall be limited to 30 feet in all buffer areas. 6. At Stream Site 33, bridging shall be used for equipment access in areas where the stream parallels the pipeline and all stream banks shall be protected to the maximum extent practical. Stream dewatering techniques shall be utilized to avoid downstream sediment movement. Stream banks shall be reconstructed to match the original pattern and profile, and stabilized with erosion control matting for permanent stabilization. Any areas that are reconstructed will be visually monitored by a qualified person for a minimum of quarterly for one year after reconstruction. PNG DWR# 14 -0650 reissuance 401 /Buffer APPROVAL Page of 5 7. This authorization exempts the Permittee from meeting Condition #16 and Condition #17 in the attached general certification for the width of construction and maintenance corridors. The construction and permanent maintenance corridor shall be limited to the width shown in the permit application documents. 8. This authorization exempts the Permittee from meeting Condition #10 in the attached general certification for alignment of utilities lines which cross streams. This approval and its conditions are final and binding unless contested. This Certification and Buffer Authorization can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings. You may obtain a petition form from the Office of Administrative Hearings at http: / /www.ncoah.com/ or call the OAH clerk's office at (919) 431 -3000 for information. Within sixty (60) calendar days of receipt of this Certification and Buffer Authorization, you must file the petition with the Office of Administrative Hearings. A petition is considered filed when the original and one (1) copy along with any applicable filing fee is received in the Office of Administrative Hearings during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the Office of Administrative Hearings at (919) 431 -3100, provided the original and one copy of the petition along with any applicable filing fee is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. Mailing address for the Office of Administrative Hearings: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699 -6714 One (1) copy of the petition must also be served to DENR: Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699 -1601 PNG DWR# 14 -0650 reissuance 401 /Buffer APPROVAL Page 5 of 5 This letter completes the review of the Division of Water Quality under section 401 of the Clean Water Act and the Jordan Riparian Buffer Rules as described in 15A NCAC 02B .0267. Please contact Sue Homewood at 336- 771 -4964 or Sue.Homewoodpncdenr.gov if you have any questions or concerns. Sincerely, W. Corey Basinger Regional Supervisor Water Quality Regional Operations Division of Water Resources Enclosures: GC 3884 cc: Crystal Fox, S &ME (via email) Craig Brown, USACE Raleigh Regulatory Field Office (via email) Kelly Williams, NCEEP (via email) DWR -WQP WSRO 401 files DWR -WQP Webscape Unit A=4*A NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary North Carolina Division of Water Quality Jordan Buffer Authorization Summary of Permitted Impacts and Mitigation Requirements In accordance with 15A NCAC 213 .0268, Whitney Waldrop of the PSNC Energy has permission as outlined below to fill or otherwise impact 35,142 square feet of Zone 1 and 7,881 square feet of Zone 2 of Jordan Lake Riparian Buffer to construct the proposed Line T021B Pipeline Project which is located in Alamance County and Orange County, North Carolina. All activities associated with these authorized impacts must be conducted with the conditions listed in the attached Permit transmittal letter. THIS AUTHORIZATION IS NOT VALID WITHOUT THE ATTACHMENTS. COMPENSATORY MITIGATION REQUIREMENTS, ECOSYSTEM ENHANCEMENT PROGRAM DWQ PROJECT #: 2014 -0650 reissuance SITE NAME: Line T021B Pipeline Project LOCATION: Swepsonville through Carrboro, NC vicinity COUNTY Alamance and Orange BASIN/ SUB BASIN Cape Fear (HUC: 03030002) — Haw River Subwatershed As required by 15A NCAC 213 .0268, and the conditions of this Authorization, you are required to compensate for the above mitigable impacts through the restoration, creation, enhancement or preservation of wetlands, surface waters and riparian buffers as outlined below prior to conducting any activities that impact or degrade the waters of the state. Note: Acreage requirements proposed to be mitigated through the Ecosystem Enhancement Program must be rounded to one - quarter acre increments and linear foot requirements must be rounded up to the nearest foot according to 15 2R.0503(b). Impacts Mitigation 35,142 square feet Zone 1 buffer 105,426 square feet buffer 7,881 square feet Zone 2 buffer 11,822 square feet buffer One of the options you have available to satisfy the compensatory mitigation requirement is through the payment of a fee to the Wetlands, Stream and Buffer Restoration Fund per NCAC 2R.0503. If you choose this option, please sign this form and mail the form along with a copy of the 401 Certification and Variance Approval to the Ecosystem Enhancement Program at the address below. An invoice for the appropriate amount of payment will be sent to you upon receipt of this form. PLEASE NOTE, THE ABOVE IMPACTS ARE NOT AUTHORIZED UNTIL YOU RECEIVE NOTIFICATION THAT YOUR PAYMENT HAS BEEN PROCESSED BY THE ECOSYTEM ENHANCMENT PROGRAM. Signature Date ECOSYSTEM ENHANCEMENT PROGRAM 1652 Mail Service Center RALEIGH, N.C. 27699 -1652 (919) 707 -8976 1617 Mail Service Center, Raleigh, North Carolina 27699 -1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919 - 807 -63001 Fax: 919 - 807 -6492 Internet:: www.ncwaterouality.oW An Equal OpportunilylAffirmative Action Employer Pre - Construction Notification: NWP No. 12 /WCQ No. 3884 Line T -021 B Pipeline Project 16" T -0218 PIPELINE RIPARIAN BUFFER IMPACT TABLE SE Project No. 7235 -14 -013, Phase 22 October 3, 2014 Page 1 of 5 Zone 1 Impacts (sf) Zone 2 Impacts (sf) Forested Wetland within Buffer Zone Total Area of Area Within Existing sting Area of Temporary Area of Permanent Total Area of Area Within Existing Area of Temporary Area of Permanent Adjusted Total Area For Mitigation (Zone 1 + Zone 2) Stream ID Drawing No Perpendicular Crossing? Disturbance at z Crossing Type Crossing Notes/Justification Crossing Greater 3 Maintained s Clearing Impact ** Maintenance Disturbance s Maintained Clearing Maintenance (sf)- Forested Wetland than 401f Easement' Impact Easement' Impact ** Impact Zone 1 (sf) Zone 2 (sf) Within Buffer ROW aligned to parallel existing maintained ROW. Portions of new ROW within Existing maintained Cardinal easement. Permanent impacts depicted are included in mitigation S1 (SL1) 301 No No HDD totals. 3,209 783 2,426 1,724 552 1,172 1 3,598 S2 (SL2) NA NA NA Avoided N /A. Area will not be impacted. 0 0 0 0 1 0 0 0 Exempt from Jordan Lake Riparian S3 (SF1) 302 Yes Yes Open cut Buffers- Existing Maintained Easement 3,062 3,062 0 2,069 2,069 0 0 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S4 (SF2) 303 No Yes Open cut allowed to re-vegetate naturally. 3,547 1,562 521 1,464 2,161 1,011 268 882 1 3,135 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S5 (SF3) 304 Yes Yes Open cut allowed to re-vegetate naturally. 3,205 2,065 736 404 2,146 1,697 251 198 161 1,428 Primarily Existing Maintained Easement. Temporary impacts due to clearing are included in mitigation totals. Pipeline has been realigned at property owner's S6 (SF19) 305 No Yes Open cut request. 4,296 4,210 86 0 2,711 2,623 88 1 0 174 Current route avoids direct impacts to S7. Parallel Zone 2 Impacts of 429 sf not included in permaintenance totals or mitigation totals. New temporary impacts depicted on 307 are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area allowed to re- vegetate S7 (SF20) 305 -307 NA NA Avoided naturally. 1,456 0 21 1,435 2,632 3,061 1,301 1,760 1 77 4,440 Small area of Zone 2 conversion. NOTE: 20140822 Impact Map Depicts neck down to 30 -foot permanent S8 (SS4) 306 NA NA Avoided maintained corridor. 0 0 0 1,148 0 1,148 1,071 S9 (SC22) 307 NA NA Avoided N /A. Area will not be impacted. 0 0 0 0 0 0 0 S10 (SC24) NA NA NA Avoided N /A. Area will not be impacted. 0 0 0 0 0 0 0 Exempt from Jordan Lake Riparian S11 (SF6) 308 Yes Yes Open cut Buffers - Existing Maintained Easement 2,321 2,321 0 3,301 3,301 0 0 Temporary and permanent impacts depicted on 309 are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area allowed to re- vegetate S12 (SF7) 309 Yes Yes Open cut naturally. 3,088 2,482 528 78 2,095 1,606 414 75 1,095 S13 (SF8) 309 NA NA Avoided N /A. Area will not be impacted. 0 0 0 0 0 1 0 1 0 Primarily Existing Maintained Easement. Temporary impacts due to clearing are S14 (SC6) 311 Yes Yes Open cut included in mitigation totals. 2,950 2,588 362 0 2,166 1,936 230 0 592 Current route avoids direct impacts to S15 (SC8) 311 NA NA Avoided S15. 9 9 0 1,967 1,967 0 0 Temporary impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area allowed to re- vegetate S16 (SC5) 312 Yes Yes Open cut I naturally. 1 3,719 1 3,512 1 207 1 0 1 2,613 1 2,523 1 90 1 0 1 1 1 297 Page 1 of 5 Pre - Construction Notification: NWP No. 12 /WCQ No. 3884 Line T -021 B Pipeline Project 16" T -021B PIPELINE RIPARIAN BUFFER IMPACT TABLE SE Project No. 7235 -14 -013, Phase 22 October 3, 2014 Page 2of5 Zone 1 Impacts (sf) Zone 2 Impacts (sf) Forested Wetland within Buffer Zone Stream ID Drawing No. ' Perpendicular Crossing? Disturbance at z Crossing Type Crossing Notes /Justification Total Area of Area Within Existing Area of Temporary P rY Area of Permanent Total Area of Area Within Existing 9 Area of Temporary P rY Area of Permanent Adjusted Total Area For Mitigation Zone 1 + Zone 2 9 ( ) Crossing Greater Disturbance 3 Maintained 3 Clearing Impact ** Maintenance 3 Disturbance Maintained Clearing Maintenance (sf)- Forested Wetland than 401f Easement Impact 3 Easement Impact ** Impact Zone 1 (sf) Zone 2 (sf) Within Buffer Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S17 (SC4) 313 No Yes Open cut allowed to re-vegetate naturally. 5,434 2,371 2,052 1,011 4,878 2,671 875 1,332 5,270 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S18 (SC1) 315 Yes Yes Open cut allowed to re-vegetate naturally. 3,083 2,106 610 367 2,053 1,375 407 271 1 1,655 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S18A (SC1) 315 Yes Yes Open cut allowed to re-vegetate naturally. 3,162 2,183 466 513 2,011 1,527 387 97 1,463 Exempt from Jordan Lake Riparian Buffers - Existing Maintained Easement. Culvert is within Existing Maintained S20 (SC20) 316 Yes Yes Open cut Easement. 5,755 5,755 0 5,429 5,429 0 0 30 -foot permanent maintained corridor S21 (SC21) 317 Yes Yes Open cut neckdown depicted. 3,434 3,434 0 2,281 2,281 0 0 0 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S22 (SF9) 321 No Yes Open cut allowed to re-vegetate naturally. 6,082 4,456 971 655 3,091 1,886 790 415 1 64 2,767 Existing gas line to the north limits crossing angle. Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area allowed to re- vegetate S23 (SF10) 322 No Yes Open cut naturally. 5,120 3,469 935 716 3,135 2,366 421 1 348 434 1 1,986 Located primarily within Existing Maintained Easement. ROW aligned to parallell and south of existing maintained ROW to avoid further impact with Stream S24. Existing gas line to the north limits crossing angle. Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area allowed to S24 (SC12) 323 No Yes Open cut re-vegetate naturally. 3,531 2,422 694 415 2,144 2,144 0 1 1,109 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S25 (SC11) 324 Yes Yes Open cut allowed to re-vegetate naturally. 3,339 3,243 96 0 2,236 2,036 200 0 296 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S26 (SC10) 326 Yes Yes Open cut allowed to re-vegetate naturally. 3,140 2,333 807 0 2,091 1,631 460 0 1,267 Exempt from Jordan Lake Riparian S27 (SC14) 328 Yes Yes Open cut Buffers - Existing Maintained Easement 3,669 3,669 0 2,515 2,515 0 0 Page 2of5 Pre - Construction Notification: NWP No. 12 /WCQ No. 3884 Line T -021 B Pipeline Project 16" T -021B PIPELINE RIPARIAN BUFFER IMPACT TABLE SE Project No. 7235 -14 -013, Phase 22 October 3, 2014 Page 3 of 5 Zone 1 Impacts (sf) Zone 2 Impacts (sf) Forested Wetland within Buffer Zone Stream ID Drawing No. ' Perpendicular Crossing? Disturbance at z Crossing Type Crossing Notes /Justification Total Area of Area Within Existing Area of Temporary P rY Area of Permanent Total Area of Area Within Existing 9 Area of Temporary P Y Area of Permanent Adjusted Total Area For Mitigation Zone 1 + Zone 2 9 ( ) Crossing Greater Disturbance 3 Maintained 3 Clearing Impact ** Maintenance 3 Disturbance Maintained Clearing Maintenance (sf)- Forested Wetland than 401f Easement Impact 3 Easement Impact ** Impact Zone 1 (sf) Zone 2 (sf) Within Buffer Exempt from Jordan Lake Riparian Buffers - Existing Maintained Easement. Existing gas line north and south of proposed line limit crossing angle. Temporary workspace will impact forested areas outside of the existing maintained easement. The total are impacted by temporary workspace is reflected in mitigation totals. This area S28 (SC15) ** 329 No Yes Open cut will not be permanently maintained. 5,026 4,564 462 4,139 3,601 538 1,000 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S29 (SC13) 330 Yes Yes Open cut allowed to re-vegetate naturally. 2,759 2,584 175 0 2,078 1,788 290 0 465 Located primarily within Existing Maintained Easement. Portions of buffer will be cleared and permanently maintained and are reflected in mitigation totals. Gas line to the north limits crossing angle. 30 -foot neckdown for permanent maintained easement depicted, Permanent and temporary impacts resulting from clearing are S30 (SF11) 331 No Yes Open cut included in mitigation totals. 3,395 2,118 521 1,277 2,936 2,532 404 1,419 3,621 Current alignment avoids direct impacts to S31. The alignment is located primarily within existing maintained easement. Permanent and temporary impacts resulting from clearing are S31 (SC17) 337 NA Yes Avoided included in mitigation totals. 1,667 706 797 164 2,612 1,887 668 57 23 1,663 Located primarily within Existing Maintained Easement. Temporary and permanent clearing impacts depicted S32 (SC18) 337 Yes Yes Open cut are included in mitigation totals. 3,038 2,082 956 0 2,024 1,390 634 48 1,638 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S33 (SC19) 338 Yes Yes Open cut allowed to re-vegetate naturally. 11,028 6,745 2,547 1,736 5,814 4,118 1,169 527 5,979 Gas line to the north limits crossing angle. 30 -foot permanent maintained corridor depicted. Temporary impacts to clearing of TWS are included in S34 (SF13) 339 No Yes Open cut mitigation totals. 2,654 2,052 602 0 2,723 2,098 625 0 0 0 1,227 S35 (SP1) 339 No Yes Open cut Not Subject to Jordan Lake Buffers 0 0 0 0 0 0 0 Primarily within Existing Maintained Easement. Gas line to the north limits crossing angle. Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area allowed to re- vegetate S36 (SF14) 340 No Yes Open cut naturally. 3,409 2,445 644 320 2,343 1,427 740 176 161 1,719 Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S37 (SF15) 341 Yes Yes Open cut allowed to re-vegetate naturally. 1 3,436 1 2,634 1 662 1 140 1 2,320 1 1,679 1 505 136 1 1 1,443 Page 3 of 5 Pre - Construction Notification: NWP No. 12 /WCQ No. 3884 Line T -021 B Pipeline Project 16" T -0218 PIPELINE RIPARIAN BUFFER IMPACT TABLE SE Project No. 7235 -14 -013, Phase 22 October 3, 2014 Page 4 of 5 Zone 1 Impacts (sf) Zone 2 Impacts (sf) Forested Wetland within Buffer Zone Stream ID Drawing No. Perpendicular Crossing? Disturbance at z Crossing Type Crossing Notes /Justification Total Area of Area Within Existing Area of Temporary Area of Permanent Total Area of Area Within Existing 9 Area of Temporary P Y Area of Permanent Adjusted Total Area For Mitigation Zone 1 + Zone 2 9 ( ) Crossing Greater Disturbance 3 Maintained 3 Clearing Impact ** Maintenance 3 Disturbance Maintained Clearing Maintenance (sf)- Forested Wetland than 401f Easement Impact 3 Easement Impact ** Impact Zone 1 (sf) Zone 2 (sf) Within Buffer Located mostly within Existing Maintained Easement. ROW aligned to parallell and south of existing maintained ROW to avoid further impact with Stream S38 and Wetland W49. 30 -foot permanent maintained corridor depicted. Temporary impacts to clearing of TWS S38 (SF16) 342 No Yes Open cut are included in mitigation totals. 1,674 1,318 356 343 1,388 1,011 377 40 1,116 Not Subject to Jordan Lake Buffers. Small area will be included in new S39 (SF17) 342 NA NA Avoided maintained 15 -foot right of way. 0 0 0 0 0 0 0 Located within Existing Maintained Easement. Crossing angle limited by gas line to the north. 30 -foot permanent maintained corridor depiicted. Temporary impacts to clearing of TWS S40 (SF18) 343 Yes Yes Open cut are included in mitigation totals. 3,342 2,278 1,064 0 3,208 2,338 870 0 1,934 Primarily Existing Maintained Easement. Crossing angle at stream limited by gas line to the north. Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area allowed to re- vegetate S41 (SM1) 344 No Yes Open cut naturally. 3,415 2,027 668 720 2,327 1,844 210 273 1 1,871 Primarily Existing Maintained Easement. Crossing angle at stream limited by gas line to the north. Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary impacts will be reseeded in accordance with the previously submitted Restoration plan and the area allowed to re- vegetate S42 (SM2) 345 Yes Yes Open cut naturally. 3,044 1,985 622 437 2,109 1,487 472 150 1 1,681 Exempt from Jordan Lake Riparian Buffers - Existing Maintained Easement. Crossing angle limited by gas line to the S43 (SM3) 345 No Yes Open cut north. 0 0 0 0 0 0 0 Not subject to Jordan Lake Riparian Buffers. Crossing located completely S44 (SF22) 346 No Yes Open cut within existing maintained easement. 0 0 0 0 0 0 0 Not subject to Jordan Lake Riparian Buffers. Crossing located completely S45 (SF23) 346 Yes Yes Open cut within existing maintained easement. 0 0 0 0 0 0 0 No mitigation required for Zone 2 S46 (SF21) 346 NA NA Avoided parallel impacts. 0 0 0 851 68 0 Primarily Existing Maintained Easement. Crossing angle limited by gas line to the north. Current alignement avoids impacts to wetlands to the north and additional buffer impacts to the south. Temporary and permanent impacts depicted are included in mitigation totals. Areas disturbed by temporary clearing impacts will be reseeded in accordance with the previously submitted Restoration plan and the area S47 (SF24) 347 No Yes Open cut allowed to re- vegetate naturally. 3,416 2,063 809 544 2,567 1,544 700 323 35 145 2,196 S48 (SF25) 347 NA NA Avoided N /A. Area will not be impacted. 0 0 0 0 0 0 0 Exempt from Jordan Lake Riparian S49 (SF26) 350 Yes Yes Open cut Buffers - Existing Maintained Easement. 2,170 2,170 0 2,725 2,725 0 0 Not subject to Jordan Lake Riparian Buffers. Crossing located completely within existing maintained easement. Crossing angle limited by gas line to the S50 (SF27) 351 No Yes Open cut north. 0 0 0 0 0 0 0 Page 4 of 5 Pre - Construction Notification: NWP No. 12 /WCQ No. 3884 Line T -021B Pipeline Project 16" T -0218 PIPELINE RIPARIAN BUFFER IMPACT TABLE SE Project No. 7235 -14 -013, Phase 22 October 3, 2014 Page 5 of 5 Forested Wetland within Zone 1 Impacts (sf) Zone 2 Impacts (sf) Buffer Zone Stream ID Drawing Perpendicular Crossing? Disturbance at 2 Crossing Type Crossing Notes /Justification Area Within Existing area of Permanent Area Within Area of Area of Adjusted Total Area For Nor Total Area of Area of Temporary Total Area of Existing Temporary Permanent Mitigation (Zone 1 + Zone 2) Crossing Greater Disturbance 3 Maintained 3 Clearing Impact ** Maintenance 3 Disturbance Maintained Clearing Maintenance (sf)- Forested Wetland than 401f Easement Impact 3 Easement Impact ** Impact Zone 1 (sf) Zone 2 (sf) Within Buffer Totals: 113,023 19,515 13,583 85,586 13,846 10,599 50,398 r Please note, the drawing numbers depicted cores and to the last three digits of the drawing number as shown on APPROXIMATE JURISDITIONAL BOUNDARIES IMPACT DRAWINGS. 2HDD (horizontal directional drill)- will not impact the jurisdictional feature. 3 Areas denoted for informational purposes only. Areas within Existing Maintained Easements, are not subject to Jordan Lake Buffer Requirements or Mitigation. ** Temporary Workspace cleared will not be permanently maintained however temporary impacts are reflected in mitigation totals. Area will be restored in accordance with the Restoration plan and allowed to re-vegetate naturally. Change previously submitted to DWR via email on July 28, 2014 ,August 7, 2014- Change submitted August 11, 2014, reroute Change associated with neckdown from 50 -feet permanent maintained ROW to 30 -foot permanent maintained ROW, August 22,2014. Change associated with neckdown from 50 -feet permanent maintained ROW to 30 -foot permanent maintained ROW (includes areas of reclamation), September 8,2014 Change October 3,2014. Recalculation of pertinent impact areas. Page 5 of 5 Pre - Construction Notification: NWP No. 12 /WCQ No. 3884 Line T -021 B Pipeline Project WETLAND IMPACT TABLE SE Project No. 7235 -14 -013, Phase 22 October 3, 2014 Page 1 of 2 Classification Impacts Wetland ID Sheet No.' Vegetative Type Relation to Waterbody Temporary Impacts Conversion Crossing Type* sf ac sf ac W1 (WL1) NA NA Scrub Shrub- ent Riparian 0 0 0 0.000 Avoided W2 (WF1) 302 Forested /Emergent Riparian 1,516 0.035 0 0.000 Open cut W3 (WF2) 304 Emergent Riparian 12,386 0.284 161 0.004 Open cut W4 (WF14) 305 Forested /Emergent Riparian 780 0.018 0 0.000 Open cut W5 (WF15) NA Forested Riparian 0 0.000 0 0.000 Avoided W6 (WF16) NA Forested Riparian 0 0.000 0 0.000 Avoided W7 (WS1) 306 Forested Riparian 0 0.000 9 0.000 Conversion W8 (WS2) 307 Forested Riparian 0 0.000 0 0.000 Avoided W9 (WC27) 307 Forested Riparian 0 0.000 0 0.000 Avoided W10 (WC28) 307 Forested Riparian 0 0.000 77 0.002 Conversion W11 (WC29) NA Forested Riparian 0 0.000 0 0.000 Avoided W12 (WF3) 308 Forested /Emergent Riparian 23,950 0.550 0 0.000 Open cut W13 (WF4) 309 Forested Riparian 0 0.000 0 0.000 Avoided W14 (WF5) 310 Forested /Emergent Non - riparian 3,751 0.086 0 0.000 Open cut W15 (WC5) 311 Forested /Emergent Riparian 3,156 0.072 600 0.014 Open cut W16 (WC4) 311 Forested /Emergent Riparian 9,804 0.225 775 0.018 Open cut W17 (WC2) NA Forested Non - riparian 0 0.000 0 0.000 Avoided W18 (WC1) 314 Forested /Emergent Non - riparian 14,481 0.332 1,127 0.026 Open cut W19 (WC25) 316 Open Water Non - riparian 0 0.000 0 0.000 Avoided W20 (WC26) 317 Forested /Emergent Riparian 2,917 0.067 0 0.000 Open cut W21 (WFA) 318 Shrub -Scrub Non - riparian 0 0.000 0 0.000 Avoided W22 (WC6A) 318 Open Water Non - riparian 0 0.000 0 0.000 Avoided W23 (WC6) 319 Forested /Shrub- Scrub /Emergent Non - riparian 1,612 0.037 0 0.000 Open cut W24 (WC27) 320 Shrub -scrub Non - riparian 0 0.000 0 0.000 Avoided W25 (WF6) 321 Forested /Emergent Riparian 301 0.007 278 0.006 Conversion W26 (WP1) 322 Forested /Emergent Riparian 1,002 0.023 0 0.000 Open cut W27 (WF34) NA Forested Riparian 0 0.000 0 0.000 Avoided W28 (WF33) 324 Forested Riparian 0 0.000 0 0.000 Avoided W29 (WC11) 325 Forested Riparian 0 0.000 333 0.008 Open cut W30 (WC11A) 325 Open Water Non - riparian 0 0.000 0 0.000 Avoided W31 (WC9) 326 Forested /Emergent Riparian 2,928 0.067 0 0.000 Open cut W32 (WC10) 326 Forested Riparian 0 0.000 0 0.000 Avoided Page 1 of 2 Pre - Construction Notification: NWP No. 12 /WCQ No. 3884 Line T -021 B Pipeline Project WETLAND IMPACT TABLE SE Project No. 7235 -14 -013, Phase 22 October 3, 2014 Page 2 of 2 Classification Impacts Wetland ID Sheet No.' Vegetative Type Relation to Waterbody Temporary Impacts Conversion Crossing Type* sf ac sf ac W33 (WC 13) 327 Forested /Emergent Non - riparian 4,476 0.103 0 0.000 Open cut W34 (WC 12) 330 Forested /Emergent Riparian 8,059 0.185 861 0.020 Open cut W35 (WF7) 332 Emergent Non - riparian 435 0.010 0 0.000 Open cut W36 (WF8) NA Open Water Non - riparian 0 0.000 0 0.000 Avoided W37 (WC14A) NA Open Water Non - riparian 0 0.000 0 0.000 Avoided W38 (WC14) 334 Emergent Riparian 6,349 0.146 0 0.000 Open cut W39 (WC15) 335 Forested /Emergent Riparian 3,331 0.076 264 0.006 Open cut W40 (WC16) 336 Emergent Non - riparian 852 0.020 0 0.000 Open cut W41 (WC 17) 337 Forested /Emergent Riparian 434 0.010 23 0.001 Open cut W42 (WC 18) 337 Forested /Emergent Riparian 12 0.000 0 0.000 Open cut W43 (WC20) 337 Forested Riparian 0 0.000 0 0.000 Avoided W44 (WC22) 337 Forested /Emergent Riparian 643 0.015 0 0.000 Open cut W45 (WC21) 337 Forested /Emergent Riparian 0 0.000 18 0.000 Open cut W46 (WF9) 339 Forested /Emergent Riparian 4,041 0.093 0 0.000 Open cut W47 (WF10) 340 Forested /Emergent Riparian 1,869 0.043 161 0.004 Open cut W48(WF11) 341 Forested Riparian 0 0.000 0 0.000 Avoided W49 (WF12) 342 Emergent Riparian 685 0.016 0 0.000 Open cut W50 (WF17) 346 Forested Riparian 0 0.000 0 0.000 Avoided W51 (WF20) 347 Forested /Emergent Riparian 4,484 0.103 2,065 0.047 Open cut W52 (WF19) 347 Forested Riparian 0 0.000 0 0.000 Avoided W53 (WF21) 348 Forested /Emergent Non - riparian 2,608 0.060 1,836 0.042 Open cut W54 (WF22) 349 Forested /Emergent Non - riparian 236 0.005 170 0.004 Open cut W55 (WF24) 350 Forested /Emergent Riparian 4,977 0.114 0 0.000 Open cut W56 (WF23) 350 Open Water Non - riparian 0 0.000 0 0.00-0--T- .000 Avoided Totals: 122,075 2.802 8,758 0.201 Horizontal directional drill (HDD) that will not impact the wetland. 1 Please note, the drawing numbers depicted corespond to the last three digits of the drawing number as shown on Approximate Jurisdictional Boundaries Drawings Indicates change attibutable to re- routing. Change associated with DWR requested neckdown from 50 -feet permanent maintained ROW to 30 -foot permanent maintained ROW (includes areas of reclamation), September 8,201, Change October 3, 2014. Recalculation of pertinent impacts. Page 2 of 2 vo STREAM S1 'v O L. F. \� EXISTING MAINTENANCE EASEMENT— — — — — — — .�G--�G G G G G EXISTING 10" PSNC T -021 PIPELINE G _ N N _ _EXISTING CARDINAL EASEMENT - - — — — -' — — — GIG G c c EXISTINGG 24" CARDINAL PIPELINE GAG � N I � ----------------- EXISTING CARDINAL EASEMENT LEGEND: i EXISTING TREE LINE 110 / ry TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY HDD METHOD 1- 21 Z2 Z2 Z2 n G G Z2 - o v - - -I -- -- --- - - - - -- G G ---j— / No I �1 �G�G G G NEW PERMANENT EASEMENT PROPOSED 16" T -021 B PIPELINE NEW PERMANENT EASEMENT 7 STREAM S1 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 2,426 SQ. FT. 1,172 SQ. FT. TEMP. IMPACT 783 SQ. FT. 552 SQ. FT. 50 25 0 50 SCALE IN FEET X13 PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMNGTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX 1007 STREAM CROSSING S1 ALIGNMENT SHT: 58701101 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 9 +37, M.P 0.18 58703301 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK ALAMANCE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 WETLAND W2 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 1 ,51 6 SQ. FT. 0.035 AC. STREAM S3 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 190 SO. FT. 0.004 AC. EXISTING MAINTENANCE EASEMENT — — — — WETLAND W2 0� c�0 STREAM S3 TOTAL JORDAN LAKE BUFFER IMPAC_` ZONE 1 ZONE 2 PERM. IMPACT 0 S0. FT. 0 SQ. FT. TEMP. IMPACT 3,062 SQ. FT. 2,069 SQ. FT. I STREAM S3 50 L.F. EXISTING (MAINTAINED) 50' ROW v! 2 0 9 EXISTING 10" PSNC T -021 PIPELINE N G c cam`' G G G G G G G G G G G PROPOSED 16" T -021 B PIPELINE o N Ln EXISTING 24" CARDINAL PIPELINE r G G G G G G G G "=G G GAG— —� EXISTING MAINTENANCE EASEMENT T- -- -- - - - - - TEMPORARY WORKSPACE TEMPORARY WORKSPACE N LEGEND: EXISTING TREE LINE N n _ TEMPORARY IMPACT AREA N V PERMANENT IMPACT AREA NOTE: 50 25 0 50 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD SCALE IN FEET X13 PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMNGTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX 1007 4 0383 WETLAND CROSSING W2 & STREAM CROSSING S3 ALIGNMENT sHr: 58701102 VERSAILLES, KY 4 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 30 +67, M.P 0.58 58703302 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ALAMANCE COUNTY, NORTH CAROLINA SCALE: 1" = 50 REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 06/17/2014 STREAM S4 TOTAL JORDAN LAKE BUFFER IMPACTS PERM. IMPACT ZONE 1 ZONE 2 PERM. IMPACT 1,464 SO. FT. 882 SQ. FT. TEMP. IMPACT -.083 SQ. FT. 1,279 SQ. FT. 10' TEMPORARY WORKSPACE EASEMENT NO MITIGATION REQUIRED. 30' LIMIT OF PERMANENT MAINTENANCE TEMPORARY WORKSPACE G G G G O M LEGEND: DISTANCE VARIES EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD I N N N N r I N N N Ii 50' BUFFER i 3o, i I ry N N I plc STREAM S4 TOTAL IMPACTS PERM. IMPACT 0 S0. FT, 0.000 AC. TEMP. IMPACT 776 SQ. FT.. 0.019 AC. TEMPORARY WORKSPACE 7 /7 / /TAT /7TH EXISTING 24" CARDINAL PIPELINE ^Ln Gam- (X�G -7� G N — 'EXISTING MAINTENANCE EASEMENT �L EXISTING 10" PSNC T -021 PIPELINE -G G G G G PR(1P(1CPTl 1 F" T -(171 R PIPPI INIF- a 7 TA A ol O 2 v EXISTING MAINTENANCE EASEMENT ---------- - - - - -- \ TEMPORARY WORKSPACE EASEMENT — DISTANCE VARIES. PERMANENT CLEARING OF FORESTED AREA, ZONE 1 — 521 SQ. FT. ZONE 2 — 268 SQ. FT. N I STREAM S4 77 L. F. NOTE: MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE— SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE— VEGETATE NATURALLY. 50 25 0 50 SCALE IN FEET om PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMNGTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX 1007 STREAM CROSSING S4 ALIGNMENT SHT: 5801102 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 47 +67, M.P 0.90 58703303 HOUSTON, TX DETROIT, MI CHARLESTON • TULSA, OK ALAMANCE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 IDATE OF PLOT: 09/05/2014 JO 30' LIMIT OF PERMANENT MAINTENANCE/ TEMPORARY WORKSPACE TEMPORARY WORKSPACE EASEMENT, DISTANCE N VARIES. NO MITIGATION REQUIRED. N G G G GEXISTING 24" " CARDG G CARDINAL PIPELINE c c G — N — EXISTING MAINTENANCE EASEMENT — / °/ / T �� - - - - -- — 174- 17 G — G G G G G G G -- — - - -- — — - - - -- EXISTING MAINTENANCE EASEMENT STREAM S5 3 L. F. I N LEGEND: N EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD ENERG MANAGEMENT & SERVICES CO. CORPORATE OFFICE: 109 FIELDVIEW DRIVE P.O. BOX 1007 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 BRANCH OFFICES: HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK BAY CITY, MI www.emseng.com TEMPORARY WORKSPACE EASEMENT, DISTANCE VARIES. AREA OF TEMPORARY IMPACT FOR ZONE 1 — 736 SQ. FT. ZONE 2 — 251 SQ. FT. \ FORESTED WETLAND WITHIN ZONE 1 — 161 SQ. FT. I- 7 N� vA I'-Z� 0 v WETLAND W3 G G G G G — — — — — — — — — — — — — — — — — EXISTING 10" PSNC T -021 PIPELINE G G G G G G- PROPOSED 16" T -021 B PIPELINE STREAM S5 TOTAL JORDAN LAKE BUFFER IMPACTS WETLAND W3 TOTAL IMPACTS ZONE 2 PERM. IMPACT 161 SQ. FT. 0.004 AC. TEMP. IMPACT 12,386 SO. FT. 0.284 AC. STREAM S5 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 181 SQ. FT. 0.007 AC. I- 7 N� vA I'-Z� 0 v WETLAND W3 G G G G G — — — — — — — — — — — — — — — — — EXISTING 10" PSNC T -021 PIPELINE G G G G G G- PROPOSED 16" T -021 B PIPELINE STREAM S5 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 404 SO. FT. 198 SQ. FT. TEMP. IMPACT 2,801 SO. FT. 1,948 SO. FT. 50 25 0 50 SCALE IN FEET PSNC ENERGY DRAWN BY: CAC 05/28/14 DRAFTING CK: SFS 05/29/14 APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIRONMENTAL CK: ENGINEERING CK: WETLAND CROSSING, STREAM CROSSING S5 ALIGNMENT SHT: 58701103 DRAWING NO.: @ STATION 64 +42, M.P 1.22 58703304 ALAMANCE COUNTY, NORTH CAROLINA SCALE: 1" = 50' 1 REV. A SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 7 O- titi 1 1 / STREAM S7 2/ ul TA ti � ti m Z NOTE: Z � 2 �\ Z1 WETLAND W4 � \\ Z2 MITIGATION FOR TEMPORARY WORKSPACE �ID G 30' LIMIT OF PERMANENT cG�INTENANCE \ \ \ c \\ LEGEND: EXISTING EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE— SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE— VEGETATE NATURALLY. STREAM S6 73 L.F. 10' TEMPORARY WORKSPACE EASEMENT. AREA OF TEMPORARY IMPACT FOR ZONE 1 — 86 SQ. FT. ZONE 2 — 88 SQ. FT. —G G STREAM S6 TOTAL JORDAN LAKE BUFFER IMPACTS WETLAND W4 TOTAL IMPACTS ZONE 1 PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 780 SQ. FT. 0.018 AC. STREAM S6 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 402 SQ. FT. 0.009 AC. 7 O- titi 1 1 / STREAM S7 2/ ul TA ti � ti m Z NOTE: Z � 2 �\ Z1 WETLAND W4 � \\ Z2 MITIGATION FOR TEMPORARY WORKSPACE �ID G 30' LIMIT OF PERMANENT cG�INTENANCE \ \ \ c \\ LEGEND: EXISTING EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE— SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE— VEGETATE NATURALLY. STREAM S6 73 L.F. 10' TEMPORARY WORKSPACE EASEMENT. AREA OF TEMPORARY IMPACT FOR ZONE 1 — 86 SQ. FT. ZONE 2 — 88 SQ. FT. —G G STREAM S6 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 0 SQ. FT. TEMP. IMPACT 4,296 SQ. FT. 2,711 SQ. FT. 1A\ 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. EXISTING 10" PSNC T -021 PIPELINE G _ G G--*-GAG PROPOSED ROPOSED 16" T -021 B PIPELINE EXISTING 24" CARDINAL PIPELINE _ GAG -G- 50 25 0 50 SCALE IN FEET 4E& P S N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEN DRIVE P.O. BOX 1007 ALIGNMENT sHT: 58701103 4 VERSAILLES, KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 70 +14, M.P 1.33 58703305 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, DI( ALAMANCE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 50' � BUF STREAM S7 WETLAND W7 TOTAL IMPACTS STREAM S8 N LP PERM. IMPACT 9 S0. FT. 0.0002 AC. TEMP. IMPACT 0 SO. FT. 0.000 AC. �P WETLAND W7 N 0NF 7 ti NEW 50' ROW z z \ NEW PERMANENT EASEMENT _ \ PROPOSED 16" T -021 B PIPELINE o \ \ o \ \ — NEW PERMANENT EASEMENT — _TEMPORARY WORKSPACE EASEMENT_ NEW 30' ROW LEGEND: EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD ENERGY & SERVICES CO. CORPORATE OFFICE: 109 FIELDVIEW DRIVE P.O. BOX 1007 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 BRANCH OFFICES: HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK BAY CITY, MI www.emseng.com STREAM S8 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 1,148 SO. FT. TEMP. IMPACT 0 S0. FT. 0 SQ. FT. 50 25 0 50 SCALE IN FEET DRAWN BY: CAC 06/02/14 P S N C ENERGY DRAFTING CK: SFS 06/03/14 APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIRONMENTAL CK: ENGINEERING CK: WETLAND CROSSING W7 ALIGNMENT SHT: 58701103 DRAWING NO.: @ STATION 80 +53, M.P 1.53 58703306 ALAMANCE COUNTY, NORTH CAROLINA SCALE: - 50 REV. A SHEET 1 OF 1 DATE OF PLOT: 06/20/2014 N O N Z p rn N Z1 N O Z p I / I Z2�22 /STREAM S9 Z 7 U3 (51�� STREAM S7 LEG / Z2 / '--PARALLEL ZONE 2 END: _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA _ J / WETLAND W8— — 71 ?7 O� IMPACTS 429 SQ. FT. �NO MITIGATION REQUIRED. EXISTING TREE LINE NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD N STREAM S7 TOTAL JORDAN LAKE BUFFER IMPACTS PERM. IMPACT ZONE 1 ZONE 2 PERM. IMPACT 1,435 SO. FT. 1,760 SO. F I TEMP. IMPACT 21 SQ. FT. 1,301 SQ. FT. WETLAND 9 LZ Z —I [Z_ STREAM S7 Q z 0 a v z Q �2 WETLAND W10 z Z1 � 2 WETLAND W8 � \� �27 —Z7 —z1 NEW 30' ROW \ \22 2 NEW PERMANENT EASEMENT N PROPOSED 16" T -021 B PIPELINE NEW PERMANENT EASEMENT T iTEMPORARY WORKSPACE EASEMENT WETLAND W10 TOTAL IMPACTS PERM. IMPACT 77 SQ. FT. 0.002 AC. TEMP. IMPACT 1,322 SQ. FT. 0.030 AC. FORESTED WETLAND WITHIN ZONE 1 77 SQ. FT. NOTE: MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PPROVIDED. AREA WILL BE RE— SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE— VEGETATE NATURALLY. 50 25 0 50 SCALE IN FEET P S N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEME T DRAFTING CK: SFS O6/o3/1� & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX 4 WETLAND CROSSING W8, W10 & STREAM S7 ALIGNMENT sHT: 58701104 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 87 +17, M.P 1.65 58703307 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ALAMANCE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 06/20/2014 LG G— TEMPORARY WORKSPACE LEGEND: WETLAND W12 TOTAL IMPACTS PERM. IMPACT 0 0 SO, FT. 0 0.000 AC. TEMP. IMPACT 2 23,950 SO. FT. 0 0.550 AC. r/ N PROPOSED 16" N T -021 B PIPELINE N I GG �G EXISTING TREE LINE G= _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD ENERGY & SERVICES CO. CORPORATE OFFICE: 109 FIELDVIEW DRIVE P.O. BOX 1007 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 BRANCH OFFICES: HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK BAY CITY, MI www.emseng.com 1 , 7 WETLAND W12 STREAM S11 52 L.F. I/ I /,-- EXISTING (MAINTAINED) 50' ROW EXISTING 10" PSNC T -021 PIPELINE u G G G G — — G ® G G — — — — — G I _ EXISTING 24" CARDINAL PIPELINE N N N STREAM S16 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SO. FT. 0 S0. FT. TEMP. IMPACT 2,321 S0, FT. 3,301 SO. FT. �o s� 7A .Z EXISTING MAINTENANCE EASEMENT G G G — G _ G TEMPORARYI WORKSPACE STREAM S11 TOTAL IMPACTS PERM. IMPACT 0 S0. FT. 0.000 AC. TEMP. IMPACT 240 SO. FT. 0.006 AC. 100 50 0 100 SCALE IN FEET PSNC ENERGY DRAWN BY: CAC 06/02/14 DRAFTING CK: SFS 06/03/14 APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIRONMENTAL CK: ENGINEERING CK: WETLAND CROSSING W12 & STREAM CROSSING S11 ALIGNMENT SHT: 58701105,06 DRAWING NO.: @ STATION 127 +54, M.P 2.42 58703308 ALAMANCE COUNTY, NORTH CAROLINA SCALE: - 100' 1 REV. A SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 �o s� 7A .Z EXISTING MAINTENANCE EASEMENT G G G — G _ G TEMPORARYI WORKSPACE STREAM S11 TOTAL IMPACTS PERM. IMPACT 0 S0. FT. 0.000 AC. TEMP. IMPACT 240 SO. FT. 0.006 AC. 100 50 0 100 SCALE IN FEET PSNC ENERGY DRAWN BY: CAC 06/02/14 DRAFTING CK: SFS 06/03/14 APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIRONMENTAL CK: ENGINEERING CK: WETLAND CROSSING W12 & STREAM CROSSING S11 ALIGNMENT SHT: 58701105,06 DRAWING NO.: @ STATION 127 +54, M.P 2.42 58703308 ALAMANCE COUNTY, NORTH CAROLINA SCALE: - 100' 1 REV. A SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 100 50 0 100 SCALE IN FEET PSNC ENERGY DRAWN BY: CAC 06/02/14 DRAFTING CK: SFS 06/03/14 APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIRONMENTAL CK: ENGINEERING CK: WETLAND CROSSING W12 & STREAM CROSSING S11 ALIGNMENT SHT: 58701105,06 DRAWING NO.: @ STATION 127 +54, M.P 2.42 58703308 ALAMANCE COUNTY, NORTH CAROLINA SCALE: - 100' 1 REV. A SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 I� STREAM S12 TOTAL IMPACTS PERM. IMPACT 0 S0. FT. 0.000 AC. TEMP. IMPACT 247 SQ. FT. 0.006 AC. STREAM S12 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 78 SQ. FT. 75 SQ. FT. TEMP. IMPACT 3,010 SQ. FT. 2,020 SQ. FT. STREAM S13 WETLAND W13- / 10' TEMPORARY WORKSPACE EASEMENT. AREA OF TEMPORARY IMPACT FOR ZONE 1 - 528 SQ. FT. 30' LIMIT OF PERMANENT � / N � � / ZONE 2 - 414 SQ. FT. MAINTENANCE - - -- I / EXISTING MAINTENANCE EASEMENT — — JAL — — — — z �o W U'l� v� m '2 0 2 v EXISTING 10" PSNC T -021 PIPE G G G G G G G G A G G G G G G G G G PROPOSED 16" T -021 B PIPELINE AL EXISTING 24" CARDINAL PIPELINE G G G G G G — — — G — — G G G G G- - - - - - - - - - - - - - - - - EXISTING MAINTENANCE l STREAM S12 ` w z c 4 50 L. F. \ � �1 \ \ TEMPORARY WORKSPACE TEMPORARY WORKSPACE EASEMENT, DISTANCE LEGEND: ONE _ Tom\ VARIES. NO MITIGATION REQUIRED. EXISTING TREE LINE 20 2 �FFE� \ NOTE: �E 0 MITIGATION FOR TEMPORARY WORKSPACE TEMPORARY IMPACT AREA ti0 C� �� \ IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL PERMANENT IMPACT AREA BE RE- SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. NOTE: 50 25 0 50 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD SCALE IN FEET Il PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. Box 1007 ALIGNMENT SHT: 58701106 4 VERSAILLES, KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 146 +89, M.P 2.78 58703309 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, DI( ALAMANCE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 IDATE OF PLOT: 09/05/2014 WETLAND W14 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 3,751 SO. FT. 0.086 AC. EXISTING (MAINTAINED) 50' ROW — — — — EXISTING MAINTENANCE EASEMENT c c c c c G EXISTING 10" PSNC T -021 PIPELINE O G G G G G G PROPOSED 16" T -021 B PIPELINE EXISTING 24" CARDINAL PIPELINE G G G —G - - -G G G G G G G G C EXISTIN ��///// ANCE EASEMENTT WORKSPACE — � ACE TEMPORARY WORKSPACE G Lo L N TEMPORARY LEGEND: 0 W v� Is m _Z 0 y C EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO HE INSTALLED BY OPEN CUT METHOD WETLAND W14 50 25 0 50 SCALE IN FEET is PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX 4 WETLAND CROSSING W14 ALIGNMENT sHr: 58701106 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 153 +01, M. P 2.90 58703310 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK SCALE: 1 = 50' REV. A 6AY CITY. MI ALAMANCE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 06/17/2014 STREAM S14 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 990 SQ. FT. 0.022 AC. 10' TEMPORARY WORKSPACE EASEMENT. AREA OF IMPACT FOR ZONE 1 — 362 SQ. FT. ZONE 2 — 230 SQ. FT. PROPOSED 16° WETLAND 15 T -021 B PIPELINE ---- EXISTING MAINTENANCE EASEMENT G G G G r /T /T /T /T /T /T /T/ 7 TEMPORARY WORKSPACE 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. LEGEND: STREAM S15 EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD WETLAND W15 TOTAL IMPACTS PERM. IMPACT 600 SQ. FT. 0.014 AC. TEMP. IMPACT 2,556 SQ. FT. 0.059 AC. ZON� STREAM 14 50 L.F. 50, BN F R f L A 2% ZONE WETLAND W16 TOTAL IMPACTS PERM. IMPACT 775 SO. FT. 0.018 AC. TEMP. IMPACT 9,029 S0: FT. 0.207 AC. 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. 30' LIMIT OF PERMANENT N MAINTENANCE c Q � N > \ N 1 \Z2 `21 Z1 _z2 � \ -zz STREAM S14 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 S0. FT. 0 SQ. FT. TEMP. IMPACT 2,950 SO. FT. 2,166 SQ. FT. �o s� vA .Z C) 7 v EXISTING 24" CARDINAL PIPELINE EXISTING 10" PSNC T -021 PIPELINE / GA G_ G G G G Tii c — /T�MPORARY WORKSP7 AE EXISTING MAINTENANCE EASEMENT 7 - WETLAND W16 STREAM S15 TOTAL JORDAN LAKE PUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 0 SQ. FT. TEMP. IMPACT 9 S0. FT. 1,967 SQ. FT. 100 50 0 100 SCALE IN FEET PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 LES, KY DRIVE WETLAND CROSSING W15 & W16 & STREAM CROSSING S14 & S15 P.O. BOX 1007 ALIGNMENT SHT: 58701107 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 173 +20, M.P 3.28 58703311 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ALAMANCE COUNTY, NORTH CAROLINA SCALE: , = 100' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S16 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 831 SQ. FT. 0.019 AC. N EXISTING MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE G G G G— EXISTING 24" CARDINAL PIPELINE G EXISTING MAINTENANCE EASEMENT TEMPORARY WORKSPACE LEGEND: EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD 0'\ gUF 20, Z0AE 2 30 1 pNE \ N \ \ N /\ STREAM, S16 \ \ 63 L.F. 1 \ \ N G STREAM S16 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 0 SQ. FT. TEMP. IMPACT 3,719 SQ. FT. 2,613 SO. FT. 10' TEMPORARY WORKSPACE EASEMENT. AREA OF TEMPORARY IMPACT FOR ZONE 1 — 207 SQ. FT. ZONE 2 — 90 SO. FT. �a 0 s� 2� �3 —L-30' LIMIT OF PERMANENT MAINTENANCE - — — — — — — — — — — — — — — — — — G G O M G G G G G� G cl TEMPORARY WORKSPACE \ 9' TEMPORARY WORKSPACE EASEMENT. \ \ NO MITIGATION REQUIRED. NOTE: \ \ \ MITIGATION FOR TEMPORARY WORKSPACE \ IMPACTS WILL BE PROVIDED FOR\ RIPARIAN BUFFER ZONES. AREAS WILL \ BE RE— SEEDED IN ACCORDANCE WITH, THE RESTORATION PLAN AND ALLOWED\ TO RE— VEGETATE NATURALLY. \ \ 50 25 0 50 SCALE IN FEET 40� PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/o3/1 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX STREAM CROSSING S16 AALIGNMENT sHT: 58701108 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 187 +76, M.P 3.56 58703312 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ALAMANCE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 I� STREAM S17 TOTAL IMPACTS 10' 1 PERM. IMPACT 0 SQ. FT. 0.00 AC. EASE ZONE TEMP. IMPACT 1,195 SQ. FT. 0.027 AC. ZONE STREAM S17 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 1 ,01 1 SQ. FT. 1,332 SQ. FT. TEMP. IMPACT 4,423 SQ. FT. 3,546 SQ. FT. ENT Ep,SEM TENANCE EXIST NG MP1N� C x_021 �p1P G 10" PSN� N/ �1NE �pROpOSED 16 �_p21B p�pE ME EMPORARY WORKSPACE SENT. AREA OF IMPACT FOR 1 — 309 SQ. FT. (TEMPORARY) 2 — 262 SQ. FT. (TEMPORARY) a G �1 i sue' ZY O '�A 7 S 2 v� 0 � � v / Z2 tit ti c c w , , I I CE EWA EXoST_\NG 10' TEMPORARY WORKSPACE EASEMENT. AREA OF IMPACT FOR ZONE 1 — 1.743 SO. FT. (TEMPORARY) — j i ZONE 2 — 613 SQ. FT. (TEMPORARY) TEMPORARY WORKSPACE / STREAM S17 90 L. F. LEGEND: EXISTING TREE LINE PTE: MITIGATION FOR TEMPORARY WORKSPACE TEMPORARY IMPACT AREA / LNG 2�G IMPACTS WILL BE PROVIDED FOR I E� \`'� RIPARIAN BUFFER ZONES. AREAS WILL BE RE— SEEDED IN ACCORDANCE WITH PERMANENT IMPACT AREA c�c THE RESTORATION PLAN AND ALLOWED 30, TO RE— VEGETATE NATURALLY. NOTE: ONE 1 20' ZONE 2 50 25 0 50 � 1. PIPELINE TO BE INSTALLED 1 NN BY OPEN CUT METHOD �L ^_ SCALE IN FEET 4E& PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06 /o3 /� & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. Box 1007 ALIGNMENT SHT: 58701108 4 VERSAILLES, KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 197 +87, M.P 3.75 58703313 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, DI( ALAMANCE COUNTY NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com ' SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 WETLAND W18 TOTAL IMPACTS PERM. IMPACT 1,127 SQ. FT, 0.026 AC. TEMP. IMPACT 13,354 SO. FT, 0.307 AC. G G G G G G — — — — — — — — — — LEGEND: EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD EXISTING MAINTENANCE EASEMENT NOW—G G G G G— G G- EXISTING 10" PSNC T -021 PIPELINE PROPOSED 16" T -021 B PIPELINE EXISTING 24" CARDINAL PIPELINE G G G G G G G EXISTING MAINTENANCE EASEMENT va W s� Z 0 Z G G I G G G— TEMPORARY WORKSPACE WETLAND W18 50 25 0 50 SCALE IN FEET q PSNC ENERGY DRAWN BY: CAC 09/22/14 ENERGY MANAGEMENT DRAFTING CK: SFS 09/22/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENGINEERING AL CK: 109 FIELDVIEN DRIVE P.O. Box 1007 ALIGNMENT SHT: 58701108 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 206 +07, M. P 3.90 58703314 HOUSTON, TX MI DETROIT, CHARLESTON, WV TULSA, DI( ALAMANCE COUNTY, NORTH CAROLINA SCALE: ' = 50 REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S18 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 1,072 SQ. FT. 0.025 AC. 10' TEMPORARY WORKSPACE EASEMENT. AREA OF TEMPORARY IMPACT FOR \ ZONE 1 - 610 SQ. FT. ZONE 2 - 407 SQ. FT. \ \�z IG G N G STREAM S18A TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 1,252 SQ. FT. 0.032 AC. \ 10' TEMPORARY WORKSPACE EASEMENT. N N AREA OF TEMPORARY IMPACT FOR L 1 - 466 SQ. FT. 2 - 387 SQ. FT. LIMIT OF PERMANENT NTENANCE XISTING MAINTENANCE ASEMENT — — — — — — — — XISTING 10" SNC T -021 PIPELINE G G j NOTE: / MITIGATION FOR TEMPORARY WORKSPACE L� IMPACTS WILL BE PROVIDED FOR / 367 SQ. FT. RIPARIAN BUFFER ZONES. AREAS WILL > TEMPORARY BE RE- SEEDED IN ACCORDANCE WITH��� WORKSPACE RESTORATION PLAN AND ALLOWED RE- VEGETATE NATURALLY. s� NO v� I / __' 1 1- STREAM S18 LEGEND: 50 L.F. EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD In F G G G XISTING MAINTENANCE EASEMENT TEMPORARY — WORKSPACE N 1 / ZONE 1 ZONE 2 PERM. IMPACT 367 SQ. FT. r a 2,716 SQ. FT. 1,782 SQ. FT. s� v� I N N 2 v� O� 1 I N N G EXISTING 24" G G CARDINAL PIPELINE LZ —G — G— N I I / N 1 N N �,>_,TEMPORARY WORKSPACE, DISTANCE VARIES EASEMENT. NO MITIGATION REQUIRED. TEMPORARY NOTE: /I WORKSPACE�� N / STREAM S18 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 367 SQ. FT. 271 SQ. FT. TEMP. IMPACT 2,716 SQ. FT. 1,782 SQ. FT. STREAM S18A TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 513 SQ. FF. 97 SQ. FT. TEMP. IMPACT 2,649 SQ. FT. 1,914 SQ. FT. 30, / ONE 20' / 50, ZONE 2 / BUFFER N STREAM S18A 50 L.F/ / / AN n, / 50 25 0 50 SCALE IN FEET 4E& PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/1 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX STREAM CROSSING S18 & S18A AALIGNMENT sHT: 58701109 4 VERSAILLES, KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 214 +60, M.P 4.06 58703315 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, DI( ALAMANCE COUNTY NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com ' SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 / so F� N (,0,— STREAM S20 � 99 L.F. EXISTING (MAINTAINED) 50' ROW I I EXISTING CULVERT---____ G G G— \ G� G G Ii G LEGEND: GIG in N TEMPORARY WORKSPACE EXISTING TREE LINE _ TEMPORARY IMPACT PERMANENT IMPACT NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD STREAM S20 TOTAL IMPACTS PERM. IMPACT 0 SO. FT. 0.000 AC. TEMP. IMPACT 1,452 SQ. FT. 0.033 AC. STREAM S20 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 0 SQ. FT, TEMP. IMPACT 5,755 SQ, FT. 5,429 SQ. FT, EXISTING MAINTENANCE EASEMENT — — — — — — — — — — — — — — — — — — EXISTING 10" PSNC T -021 PIPELINE G G G G jk�i— G —�G G� G G��w �� \ EXISTING MAINTENANCE EASEMENT \ \ �T �2 2 j \ OPEN WATER \ WETLAND W19 AREA 2 Z 2\ 2j AREA 2 7a s� 7A Z 7�3 0 Z 7 G G G G )POSED 16" T -021 B PIPELINE EXISTING 24" G CARDINAL PIPELINE G TEMPORARY WORKSPACE 50 25 0 50 SCALE IN FEET PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/o3/� & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. Box 1007 ALIGNMENT SHT: 58701110,11 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 265 +24, M.P 5.02 58703316 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ALAMANCE COUNTY, NORTH CAROLINA SCALE: , = so' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 06/17/2014 ISTIN EXISTING 10" PSNC T -021 PIPELINE G G G G G G PR(1P(1Cp-F1 1 r," T —(171 R PIPp7I INIp- EXISTING 24" CARDINAL PIPELINE G _ EXISTING MAINTENANCE EASEMENT TEMPORARY WORKSPACE,---�-� LEGEND: —30' LIMIT OF PERMANENT/ MAINTENANCE WETLAND W20 STREAM S21 57 L.F. V ti^ 0 rl � �V ti� o 50 7' AV i va T, s� 2� v� 0 2 v 10' TEMPORARY WORKSPACE EASEMENT -G -G G G G G G G G G N WETLAND W20 _� _ / TEMPORARY WORKSPACE ��— EXISTING CULVERT EXISTING (MAINTAINED) 50' ROW �vvvv� EXISTING TREE LINE TEMPORARY IMPACT AREA 3 , O PERMANENT IMPACT AREA AV 7 ti� NOTE: 50 25 0 50 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD 2 SCALE IN FEET 4 PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 1611 T -021B PIPELINE ENVIINONMENTACLKCK: 109 E WETLAND CROSSING W20 & STREAM CROSSING S21 P.O. BOX ,007 ALIGNMENT SHT: 58701111 VERSAILLLES, S, DRIVE KY KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 278 +00, M. P 5.27 58703317 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ALAMANCE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 WETLAND W20 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 2,917 SQ. FT. 0.067 AC. STREAM S21 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 205 SQ. FT. 0.004 AC. STREAM S21 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 0 SQ. FT. TEMP. IMPACT 3,434 SQ. FT. 2,281 SO. FT. ISTIN EXISTING 10" PSNC T -021 PIPELINE G G G G G G PR(1P(1Cp-F1 1 r," T —(171 R PIPp7I INIp- EXISTING 24" CARDINAL PIPELINE G _ EXISTING MAINTENANCE EASEMENT TEMPORARY WORKSPACE,---�-� LEGEND: —30' LIMIT OF PERMANENT/ MAINTENANCE WETLAND W20 STREAM S21 57 L.F. V ti^ 0 rl � �V ti� o 50 7' AV i va T, s� 2� v� 0 2 v 10' TEMPORARY WORKSPACE EASEMENT -G -G G G G G G G G G N WETLAND W20 _� _ / TEMPORARY WORKSPACE ��— EXISTING CULVERT EXISTING (MAINTAINED) 50' ROW �vvvv� EXISTING TREE LINE TEMPORARY IMPACT AREA 3 , O PERMANENT IMPACT AREA AV 7 ti� NOTE: 50 25 0 50 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD 2 SCALE IN FEET 4 PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 1611 T -021B PIPELINE ENVIINONMENTACLKCK: 109 E WETLAND CROSSING W20 & STREAM CROSSING S21 P.O. BOX ,007 ALIGNMENT SHT: 58701111 VERSAILLLES, S, DRIVE KY KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 278 +00, M. P 5.27 58703317 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ALAMANCE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 OPEN WATER 7 WETLAND W22 F a — — — — — — — — — — — — — — _ _. _ —. — — — — — — z n 9� 0 — — — — — — — - - EXISTING (MAINTAINED) ------ - - - - -- -- —50' ROW----- - - - - -- — — — — — — — EXISTING MAINTENANCE EASEMENT- - — — — — — — — — — — — — — — — — — ------------------ EXISTING 10" PSNC T -021 PIPELINE G G G G G G G G G G G G G G G G G G PROPOSED 16" T -021 B PIPELINE cn 0 c cEXISTING c24" CARDINAL PIPELINE G G G G G G G G G G G G — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — EXISTING MAINTENANCE EASEMENT LEGEND: EXISTING TREE LINE WETLAND W22A _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 50 25 0 50 1. PIPELINE TO HE INSTALLED BY OPEN CUT METHOD SCALE IN FEET Qs PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.D. BOX 100 WETLAND 22 & 22A ALIGNMENT SHT: 58701112 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 313 +64, M.P 5.94 58703318 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK SCALE: 1 = 50' REV. A 6AY CITY. MI ALAMANCE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 06/17/2014 WETLAND W23 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 1,162 SQ. FT. 0.027 AC. LEGEND: G G G G G G G G G G G G EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD G C WETLAND W 23 m 7a s� 7A _Z v� 2 7 F EXISTING 10" PSNC T -021 PIPELINE c c c c c c G PROPOSED 16" T -021 B PIPELINE / — — EXISTING G G 4" CARDNAL PIPELINE G — G — — G — — G� EXISTING MAINTENANCE EASEMENT f,*— EXISTING CULVERT WETLAND W23 50 25 0 50 SCALE IN FEET aKs PSNC ENERGY DRAWN BY: 06/02/14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE °. BOX 1007 WETLAND CROSSING W23 ALIGNMENT sHT: 58701113 4 VERSAILLES, KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 322 +44, M. P 6.11 58703319 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK SCALE: 1 = 50' REV. A BAY CITY, MI ALAMANCE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 IDATE OF PLOT: 06/17/2014 EXISTING MAINTENANCE EASEMENT G G G G G G G G G EXISTING 10" PSNC T -021 PIPELINE PROPOSED 16 T -021 B PIPELINE c c EXISTING 2G" CARDING L PIPELINE G c L — _ _ — _ _ — EXISTING MAINTENANCE EASEMENT LEGEND: EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA —G G G G G G s� G 7A G .z G G —G G 7�0 G r Z G 7 —G G G G G G G G G G G G —G G G G G G WETLAND W24 NOTE: 50 25 0 50 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD SCALE IN FEET aKs PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENGINEERING AL CK: 109 FIELDVIEW DRIVE P.O. BOX 1007 WETLAND W24 ALIGNMENT SHT: 58701113 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 326 +63, M.P 6.19 58703320 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, GK ALAMANCE COUNTY, NORTH CAROLINA SCALE: ' = 50 REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 06/17/2014 STREAM S22 TOTAL IMPACTS PERM, IMPACT 0 S0. FT. 0.000 AC. TEMP. IMPACT 674 SQ. FT. 0.015 AC. WETLAND W25 TOTAL IMPACTS PERM. IMPACT 278 SO, FT. 0.006 AC. TEMP. IMPACT 230 SQ. FT. 0.005 AC. 10' TEMPORARY WORKSPACE EASEMENT. TEMPORARY NO MITIGATION REQUIRED. _ WORKSPACE 30' LIMIT OF PERMANENT EXISTING 24" CARDINAL PIPELINE MAINTENANCE in G G G G ��` N / EXISTING MAINTENANCE EASEMENT — — — — — — — — — — — — — — — — — — — — — — EXISTING 10" PSNC T -021 PIPELINE -G G G G G G G 0 PROPOSED 16" T -021 B PIPELINE LEGEND: EXISTING MAINTENANCE EASEM WETLAND W25 EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD U) w NOTE: MITIGATION FOR TEMPORARY WORKSPACE ° IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL s BE RE— SEEDED IN ACCORDANCE WITH 7� THE RESTORATION PLAN AND ALLOWED TO RE— VEGETATE NATURALLY. 4Z ° "z 7 Z'2 STREAM S22 TEMPORARY WORKSPACE G G N 50' BUFFER f 20' I � I I ZONE � 30' ONE � I � STREA PER 10' TEMPORARY WORKSPACE EASEMENT. AREA OF TEMPORARY IMPACT FOR ZONE 1 — 971 SQ. FT. ZONE 2 — 790 SQ. Fr. M S22 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 M. IMPACT 655 SQ. FT. 415 SQ. FT. TEMP. IMPACT G G G G G G G N 50' BUFFER f 20' I � I I ZONE � 30' ONE � I � STREA PER 10' TEMPORARY WORKSPACE EASEMENT. AREA OF TEMPORARY IMPACT FOR ZONE 1 — 971 SQ. FT. ZONE 2 — 790 SQ. Fr. M S22 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 M. IMPACT 655 SQ. FT. 415 SQ. FT. TEMP. IMPACT 5,427 SO. FT. 2,676 SO. FT. FORESTED WETLAND WITHIN ZONE 1 — 64 SQ. FT. 50 25 0 50 SCALE IN FEET � � PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIRONMNGTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX 1007 4 0383 WETLAND CROSSING W25 & STREAM CROSSING S22 ALIGNMENT sHr: 5801114 VERSAILLES, KY 4 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 359 +63, M.P 6.81 58703321 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK SCALE: 1 = 50' REV. A BAY CITY, MI ORANGE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 TEMPORARY WORKSPACE \ \ / \\ \ N G G - GAG --- G LEGEND: �2 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD STREAM S23 TOTAL JORDAN LAKE BUFFER IMPACTS STREAM S23 TOTAL IMPACTS PERM. IMPACT PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 993 SQ. FT. 0.022 AC. WETLAND W26 TOTAL IMPACTS PERM. IMPACT 790 SO. FT. 0.018 AC. TEMP. IMPACT 213 SO. FT. 0.005 AC. TEMPORARY WORKSPACE \ \ / \\ \ N G G - GAG --- G LEGEND: �2 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD STREAM S23 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 716 SO. FT. 348 SO. FT. TEMP. IMPACT 4,404 SQ. FT. 2,787 SQ. FT. STREAM S23 48 L.F. EXISTING (MAINTAINED) ' 30' ROW \ c G EXIST PIPELINE PIPELINE 24" CARDINAL PI \ Z2 c O \ 20' ZONE 2 NOTE: � MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE— SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE— VEGETATE NATURALLY. 30' LIMIT OF PERMANENT MAINTENANCE Z vQ w v� _Z 2 v TEMPORARY WORKSPACE G G G 14 EXISTING MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE G G G G--�G- 0 PROPOSED 16" T -021 B PIPELINE c M EXISTING MAINTENANCE EASEMENT — — NEW PERMANENT EASEMENT \ 10' TEMPORARY WORKSPACE EASEMENT. TEMPORARY CLEARING OF FORESTED AREA, ° ZONE 1 — 935 SQ. FT., ZONE 2 — 421 SQ. FT. FORESTED WETLAND AREA WITHIN ZONE 1 — 434 SQ. FT. WETLAND W26 50 25 0 50 SCALE IN FEET os P S N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMNGTACLKCK: 109 FIELDVIEW DRIVE P.O' BOX 1007 4 0383 WETLAND CROSSING W26 & STREAM CROSSING S23 ALIGNMENT sHr: 58701115 VERSAILLES, KY 4 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 374 +57, M.P 7.12 58703322 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S24 TOTAL JORDAN LAKE BUFFER IMPACTS STREAM S24 TOTAL IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SO. FT. 0.00 AC. PERM. IMPACT 694 SO. FT. 0 SO. FT. TEMP. IMPACT 905 SQ. FT. 0.021 AC. TEMP. IMPACT 2,837 SQ. FT. 2,144 SO. FT, 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. T /7l /T/ EXISTING 24 CARDINAL INE EXISTING MAINTENANCE EASEMENT LLL LL EXISTING 10" PSN G T -021 PIPELINE G_ —G G G PROPOSED 16" T -021 B PIPELINE 7 � EXISTING MAINTENANCE EASEMENTS j / /�� TEMPORARY WORKSPACE -1-mivi 45 L.F.JET � I III I �� °I --G G��G�JC 30' LIMIT OF PERMANENT MAINTENANCE vo s� F C) v7 / /-7–/-7- / ^/ T TEMPORARY WORKSPACE G1YZ7 LEGEND: EXISTING (MAINTAINED) 30' ROW EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD N � N N N N I 30' 2p' ZONE 2 ZONE 1 / N N 10' TEMPORARY WORKSPACE EASEMENT. AREA OF IMPACT FOR ZONE 1 – 415 SQ. FT. (TEMPORARY) N N NOTE: MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE— SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE— VEGETATE NATURALLY. 50 25 0 50 SCALE IN FEET X13 PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMNGTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX STREAM CROSSING S24 ALIGNMENT sHr: 5801115 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 398 +18, M.P 7.55 58703323 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA ALE: 1° = 50� REV. A BAY CITY, MI DA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S25 TOTAL JORDAN LAKE BUFFER IMPACTS PERM. IMPACT ZONE 1 ZONE 2 PERM. IMPACT 0 SO. FT. 0 SO. FT. TEMP. IMPACT 3,339 SO, FT. 2,236 SQ. FT. STREAM S25 TOTAL IMPACTS PERM. IMPACT 0 S0. FT. 0.000 AC. TEMP. IMPACT 325 SO. FT. 0.007 AC. EXISTING 24" CARDINAL PIPELINE c EXISTING 10" PSNC T -021 PIPELINE —G G G G G PROPOSED 16" T -021 B PIPELINE LEGEND: TEMPORARY WORKSPACE- EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD ti 10' TEMPORARY WORKSPACE EASEMENT. AREA OF IMPACT FOR ZONE 1 - 96 SQ. FT. (TEMPORARY) ZONE 2 - 200 SQ. FT. (TEMPORARY) STREAM S25 — 56 L.F. i N EXISTING MAINTENANCE N -EASEMENT -------- — — — c G— I I 30 so, �ry I 30' LIMIT OF PERMANENT / MAINTENANCE ti ti 1XISTING (MAINTAINED) �c, — — � 0' ROW G I 1 - I po c 0 i N 1 TEMPORARY WORKSPACE 0 I n� EXISTING WETLAND W28 / CULVERT NOTE:,,, MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL tit BE RE— SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE— VEGETATE NATURALLY. R 10' TEMPORARY WORKSPACE v �� EASEMENT. NO MITIGATION REQUIRED. I I 50 215 0 50 I MI SCALE IN FEET os PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMNGTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX STREAM CROSSING S25 ALIGNMENT sHr: 5801116 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 407 +05, M.P 7.72 58703324 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50 REV. A BAY CIN, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 / N eU OPEN WATER �G- s G G/G / v� c\ �� G WETLAND W30 \ c � G / 7To c / / 7 \ �G G EXISTIN 2G CARDIN LA GPIPELINE / / / / NEW PERMANENT EASEMENT / PROPOSED RE— LOCATED 10" T -021 PSNC / PROPOSED 16" T -021 B PIPELINE / — NEW PERMANENT EASEMENT / NEW 50' ROW LEGEND: EXISTING TREE LINE WETLAND W29 TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD WETLAND W29 TOTAL IMPACTS PERM. IMPACT 333 SO. FT. 0.008 AC. TEMP. IMPACT 0 SO. FT. 0.000 AC. 50 25 0 50 SCALE IN FEET is PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMING ENTAL CK: 109 FIELDVIEW DRIVE P.O. sox tool WETLAND CROSSING W29 ALIGNMENT SHT: 587011 16 VERSAILLES, KY 40363 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 417 +85, M.P 7.91 58703325 HOUSTON, TX DETROIT, MI CHARLESTON, WN TULSA, OK SCALE: 1 " = 50' REV. A 6AY CITY. MI ORANGE COUNTY, NORTH CAROLINA www.emseng.com SHEET t OF t DATE OF PLOT: 06/20/2014 STREAM S26 TOTAL JORDAN LAKE BUFFER IMPACTS STREAM S26 TOTAL IMPACTS WETLAND W31 TOTAL IMPACTS o ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 0.000 AC. PERM. IMPACT 0 S0. FT. 0.000 AC. � PERM. IMPACT 0 SC. FT. 0 SQ. FT. TEMP. IMPACT 326 SO, FT. 0.007 AC. TEMP. IMPACT 2,928 SQ. FT. 0.067 AC. v� TEMP. IMPACT 3,140 SO. FT. 2,091 SO. FT. v TEMPORARY WORKSPACE EASEMENT, DISTANCE ?7^ VARIES. AREA OF TEMPORARY IMPACT FOR 1- FFER ZONE 1 - 807 SQ. FT. �3 5� 6v ZONE 2 - 460 SQ. FT. 2 jp TEMPORARY WORKSPACE EASEMENT, DISTANCE VARIES. NO MITIGATION REQUIRED. ONE \ \ a \\ \\ NE 2 30' LIMIT OF PERMANENT MAINTENANCE — — — — — — EXISTING MAINTENANCE EASEMENT — EXISTING 10" PSNC T -021 PIPELINE c c c c c -�c c c \ 0 PROPOSED 16" T -021 B PIPELINE EXISTING 24" CARDINAL PIPELINE —�— i - -- -- - -S' - -�' -- G G G G G EXISTING MAINTENANCE EASEMENT / — I N I w N N II WETLAND W31 TEMPORARY WORKSPACE TEMPORARY WORKSPACE N N WETLAND W32 1 j LEGEND: / i EXISTING TREE LINE i NOTE: MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR TEMPORARY IMPACT AREA STREAM S26 RIPARIAN BUFFER ZONES. AREAS WILL 52 L.F. BE RE- SEEDED IN ACCORDANCE WITH / PERMANENT IMPACT AREA �� THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. / NOTE: 50 25 0 50 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD SCALE IN FEET 40� PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/o3/1� & SERVICES CO. APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: CORPORATE OFFICE: 109 FIELDVIEW DRIVE P.O. BOX 1007 WETLAND CROSSING W31 & STREAM CROSSING S26 ALIGNMENT sHT: 580,1, 7 4 0383 VERSAILLES, KY 4 TEL:(859) 873 -0076 • FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 430 +22, M.P 8.15 58703326 HOUSTON, TX • DETROIT, MI CHARLESTON, WV • TULSA, OK BAY CITY, MI ORANGE COUNTY, NORTH CAROLINA [SCALE: , = 50' REV. A www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 G WETLAND W33 TOTAL IMPACTS PERM. IMPACT 0 SO. FT. 0.000 AC. TEMP. IMPACT 4476 SQ. FT. 0.103 AC. WETLAND W33 EXISTING MAINTENANCE EASEMENT — — — — — — — — — — — — — — — — — — EXISTING 10" PSNC T -021 PIPELINE r, PROPOSED 16" T -021 B PIPELINE EXISTING 24" CARDINAL PIPELINE —G G G G G G G EXISTING MAINTENANCE EASEMENT LEGEND: TEMPORARY WORKSPACE EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA G G - EXISTING (MAINTAINED) 50' ROW G G n0 �a sPA q -Z �3 D G G G G G G G TEMPORARY WORKSPACE NOTE: 50 25 0 50 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD SCALE IN FEET aKs PSNC ENERGY DRAWN BY: CAC 06/02'14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINOEERINC NMENTAL CK: 109 FIELDVIEW DRIVE °. S, 4 WETLAND CROSSING W33 ALIGNMENT sHT: 58701118 LES, VERSAIL KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 488 +23, M.P 9.25 58703327 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK SCALE: 1" = 50' REV. A SAY CITY. MI ORANGE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 06/17/2014 Sp 6�FFFR STREAM S27 �F 61/ L. F. EXISTING (MAINTAINED) 50' ROW EXISTING MAINTENANCE EASEMENT - -- - - - - -- -- EXISTING 10" PSNC T -021 PIPELINE —G —G —G G G G G G ` G G G G G G G- PROPOSED 16 11 T -021 B PIPELINE I / CD EXISTING 24" CARDINAL PIPELINE G G G G G G G G - - EXISTING MAINTENANCE EASEMENT — z2� _ ti1 TEMPORARY WORKSPACE /ti �z1 z1 LEGEND: — \ \I , � EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: �Z 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD 2 �a cp", 'p A 2� �o v G LC) G G / G G G G G G G / N TEMPORARY WORKSPACE A� i �1 / titi tit STREAM S27 TOTAL JORDAN LAKE BUFFER IMPACTS STREAM S27 TOTAL IMPACTS 3pl / 0 PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 182 SQ. FT. 0.004 AC. STREAM S27 �F 61/ L. F. EXISTING (MAINTAINED) 50' ROW EXISTING MAINTENANCE EASEMENT - -- - - - - -- -- EXISTING 10" PSNC T -021 PIPELINE —G —G —G G G G G G ` G G G G G G G- PROPOSED 16 11 T -021 B PIPELINE I / CD EXISTING 24" CARDINAL PIPELINE G G G G G G G G - - EXISTING MAINTENANCE EASEMENT — z2� _ ti1 TEMPORARY WORKSPACE /ti �z1 z1 LEGEND: — \ \I , � EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: �Z 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD 2 �a cp", 'p A 2� �o v G LC) G G / G G G G G G G / N TEMPORARY WORKSPACE A� i �1 / titi tit STREAM S27 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 0 SQ. FT. TEMP. IMPACT 3,669 SQ. FT. 2,515 SQ. FT. 50 25 0 50 SCALE IN FEET 4E& PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/ & SERVICES CO. APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE CORPORATE OFFICE: ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. Box 1007 ALIGNMENT SHT: 58701119 VERSAILLES, KY 40383 4 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 496 +41, M.P 9.40 58703328 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, DI( BAY CITY, MI ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A www.emseng.com SHEET 1 OF 1 IDATE OF PLOT: 06/17/2014 A I I I I N EXISTING (MAINTAINED) STREAM S28 i 50' ROW 58 L.F. EXISTING MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE —G G G G G G G I G G o PROPOSED 16" T -021 B PIPELINE / Ln G EXISTING 24" CARDINAL PIPELINE G G G c G c EXISTING MAINTENANCE EASEMENT TEMPORARY WORKSPACE ti / TEMPORARY WORKSPACE LEGEND: / ti EXISTING TREE LINE _ TEMPORARY IMPACT AREA 2� titi PERMANENT IMPACT AREA NOTE: �Oi O- 1. PIPELINE TO HE INSTALLED BY OPEN CUT METHOD I ' N� v — ZONE 1 0- 462 SO. FT. 0.011 AC. TEMPORARY WORKSPACE MITIGATION REQUIRED I ZONE 2 v 538 SO. FT. 0.012 AC. �o TEMPORARY WORKSPACE 2 MITIGATION REQUIRED T 7 TEMPORARY WORKSPACE r, IG G G G I J Q ADDITIONAL TEMPORARY WORKSPACE 3 I 2 � I 0 m 50 25 0 50 II SCALE IN FEET 40� PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMNGTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX 1007 ALIGNMENT sFlr: 58701119 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 507 +73, M.P 9.62 58703329 HOUSTON, TX MI DETROIT, CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50 REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 06/17/2014 STREAM S28 TOTAL IMPACTS STREAM S28 TOTAL IMPACTS BUFFER PERM. IMPACT 0 SQ. FT. 0.000 AC. ZONE 1 ZONE 2 TEMP. IMPACT 478 SO. FT. 0.011 AC. PERM. IMPACT 0 S0. FT. 0 SQ. FT, TEMP, IMPACT 4,564 SO. FT. 3,601 SO. FT. A I I I I N EXISTING (MAINTAINED) STREAM S28 i 50' ROW 58 L.F. EXISTING MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE —G G G G G G G I G G o PROPOSED 16" T -021 B PIPELINE / Ln G EXISTING 24" CARDINAL PIPELINE G G G c G c EXISTING MAINTENANCE EASEMENT TEMPORARY WORKSPACE ti / TEMPORARY WORKSPACE LEGEND: / ti EXISTING TREE LINE _ TEMPORARY IMPACT AREA 2� titi PERMANENT IMPACT AREA NOTE: �Oi O- 1. PIPELINE TO HE INSTALLED BY OPEN CUT METHOD I ' N� v — ZONE 1 0- 462 SO. FT. 0.011 AC. TEMPORARY WORKSPACE MITIGATION REQUIRED I ZONE 2 v 538 SO. FT. 0.012 AC. �o TEMPORARY WORKSPACE 2 MITIGATION REQUIRED T 7 TEMPORARY WORKSPACE r, IG G G G I J Q ADDITIONAL TEMPORARY WORKSPACE 3 I 2 � I 0 m 50 25 0 50 II SCALE IN FEET 40� PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMNGTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX 1007 ALIGNMENT sFlr: 58701119 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 507 +73, M.P 9.62 58703329 HOUSTON, TX MI DETROIT, CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50 REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 06/17/2014 WETLAND W34 TOTAL IMPACTS PERM. IMPACT 861 SQ. FT. 0.020 AC. TEMP. IMPACT 7,198 SQ. FT. 0.165 AC. STREAM S29 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 813 SQ. FT. 0.019 AC. STREAM S29 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 0 SQ. FT. TEMP. IMPACT 2,759 SQ. FT. 2,078 SO. FT. 10" TEMPORARY WORKSPACE EASEMENT. - AREA OF TEMPORARY IMPACT FOR ZONE 1 — 175 SQ. FT. ZONE 2 — 290 SQ. FT. EXISTING MAINTENANCE EASEMENT — — — — 'EXISTING 10" PSNC T -021 PIPELINE — G G 7-021B G G PROPOSED 16" PIPELINE WETLAND W34 I v 0 WETLAND W34 2� v� 0 G a v 20 30 20 I / 30' LIMIT OF PERMANENT MAINTENANCE T ------ - - - - -- r°7 ti G G c G EXISTING 24" CARDINAL PIPELINE G G G G G G G G G G EXISTING MAINTENANCE EASEMENT — — NJ N vTEMPORARY WORKSPACE 1 N > TEMPORARY WORKSPACE LEGEND: 2 I TEMPORARY WORKSPACE, DISTANCE VARIES EASEMENT. NO MITIGATION REQUIRED. EXISTING TREE LINE / NOTE: / N N MITIGATION FOR TEMPORARY WORKSPACE TEMPORARY IMPACT AREA IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL PERMANENT IMPACT AREA 50' BE R SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED BUFFER TO RE- VEGETATE NATURALLY. NOTE: STREAM S29 50 25 0 50 1. PIPELINE TO BE INSTALLED 50 L.F. BY OPEN CUT METHOD SCALE IN FEET aKs PSNC ENERGY DRAWN BY: 06/02/14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMENTACLKCK: ,O9 LES, KY DRIVE WETLAND CROSSING W34 & STREAM CROSSING S29 P.O. BOX 1007 ALIGNMENT SHT: 58701120 VERSAILLES, KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 517 +70, M.P 9.80 58703330 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK SCALE: 1 = 50' REV. A BAY CITY, MI ORANGE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 NOTE: MITIGATION FOR TEMPORARY WORKSPACE AN, / IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE— SEEDED IN ACCORDANCE WITH e(�FF ti THE RESTORATION PLAN AND ALLOWED / FAQ / / 0 3o. titi TO RE– VEGETATE NATURALLY. / NF 7 30' LIMIT OF PERMANENT ADDITIONAL TEMPORARY N STREAM S30 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 1,165 SQ. FT.. 0.027 AC. STREAM S30 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 1,277 SQ. FT. 1,419 SO. FT. TEMP. IMPACT 3,395 SQ. FT. 2,936 SO. FT. Z va cl vA v z� Z 7 0 7 Y WORKSPACE EXISTING 24" CARDINAL PIPELINE TEMPORARY WORKSPACE G \G G' —c Gam- -c EXISTING MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE G G�G G G G G o PROPOSED 16" T -021 B PIPELINE C)l O r) 0 IL /_z/ G TEMPORARY WORKSPACE EXISTING MAINTAINED LEGEND: 50' ROW EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD EXISTING MAINTENANCE EASEMENT \ ----TEMPORARY WORKSPACE EASEMENT – �a \ DISTANCE VARIES. TEMPORARY CLEARING \ <",,STREAM S30 \ OF FORESTED AREAS, ZONE 1 – 67 L.F. 521 SQ.FT., ZONE 2 – 404 SQ. FT. 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. �z1 - Z1� �2� 50 25 0 50 SCALE IN FEET 4E& PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/1 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX STREAM CROSSING S30 AALIGNMENT sHT: 58701120 4 VERSAILLES, KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 528 +91, M.P 10.02 58703331 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, DI( ORANGE COUNTY, NORTH CAROLINA SCALE: , = so' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 WETLAND W35 TOTAL IMPACTS. PERM. IMPACT 0 SQ. FT, 0.000 AC. TEMP, IMPACT 435 SQ. FT. 0.010 AC, TEMPORARY WORKSPACE in 1 —G G G- 0 LEGEND: WETLAND W35 EXISTING (MAINTAINED) 50' ROW EXISTING 24" CARDINAL PIPELIN —G— EXISTING MAINTENANCE EASEMENT G — EXISTING 10" PSNC T -021 PIPELINE PROPOSED 16" T -021 B PIPELINE 7a cl w TA 7A .Z n 7� 0 7 TEMPORARY WORKSPACE —G -- G —fYG-- G - - -G — G G G G G G G G G EXISTING MAINTENANCE EASEMENT — — — — — — — — — — — — — — — — — — — — — — — EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 50 25 0 50 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD SCALE IN FEET aKs PSNC ENERGY DRAWN BY: CAC 06/02'14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINOEERINC NMENTAL CK: 109 FIELDVIEW DRIVE P.O. BOX WETLAND CROSSING W35 AALIGNMENT sHT: 58701121 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 554 +37, M. P 10.50 58703332 HOUSTON, TX MI DETROIT, CHARLESTON, WV • TULSA, DI( ORANGE COUNTY, NORTH CAROLINA SCALE: n "' _cm" REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 06/17/2014 WETLAND W38 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 6,349 SQ. FT, 0.146 AC. _EXISTING MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE G G G G G G G PROPOSED 16" T -021 B PIPELINE o _ _ EXISTING MAINTENANCE EASEMENT NEW PERMANENT EASEMENT LEGEND: EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA WETLAND W38 Z 0 c,+ v� v y r� c y EXISTING (MAINTAINED) 30' ROW G G G G NEW 20' ROW NOTE: 50 25 0 50 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD SCALE IN FEET aKs PSNC ENERGY DRAWN BY: CAC 06/02'14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENTAL CK: CORPORATE OFFICE: ENVIINONMING 109 FIELDVIEW DRIVE P.O. Box 1007 ALIGNMENT SHT: 58701123 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 596 +80, M. P 11.30 58703334 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, DI( BAY CITY, MI ORANGE COUNTY, NORTH CAROLINA SCALE: n "' _cm" REV. A www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 06/17/2014 G GIG G G - - - - - -o LEGEND: WETLAND W39 TOTAL IMPACTS PERM. IMPACT 264 SO. FT. 0.006 AC. TEMP. IMPACT 3,331 SO. FT. 0.076 AC. G G/G G G — — — — — — — — — — — — — —v— NEW 20' ROW WETLAND W39 70 q 7 L 7 O Z EXISTING (MAINTAINED) 30' ROW EXISTING MAINTENANCE EASEMENT -- - - - - - - - - - - - - - - - - EXISTING 10" PSNC T -021 PIPELINE G G G G G PROPOSED 16" T -021 B PIPELINE EXISTING MAINTENANCE EASEMENT NEW PERMANENT EASEMENT EXISTING TREE LINE _ TEMPORARY / IMPACT AREA / PERMANENT EXISTING CULVERT IMPACT AREA NOTE: STREAM 31 50 25 0 50 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD SCALE IN FEET is PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE °. S, 4 WETLAND CROSSING W39 ALIGNMENT sHT: 5801123 LES, VERSAIL KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 603 +66, M.P 11.43 58703335 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK SCALE: 1 ° = 50' REV. A 6AY CITY. MI ORANGE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 06/20/2014 WETLAND W40 EXISTING MAINTENANCE EASEMENT -- — — — — — — — — — — — — — — — — — — — — — — — — — — — — — EXISTING 10" PSNC T -021 PIPELINE G G G G G G G G G G o PROPOSED 16" T -021 B PIPELINE — — — — — - - - - - - - - - - -- EXISTING MAINTENANCE EASEMENT NEW PERMANENT EASEMENT LEGEND: EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD 70 C", 7A .z 0 2 EXISTING (MAINTAINED) 30' ROW ®ice WETLAND W40 TOTAL IMPACTS PERM. IMPACT 0 S0. FT. 0.000 AC. TEMP. IMPACT 852 SQ. FT. 0.020 AC. NEW 20' ROW 50 25 0 50 SCALE IN FEET aKs PSNC ENERGY DRAWN BY: CAC 06/02'14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMING ENTAL CK: 109 FIELDVIEN DRIVE P.O. Box 1007 ALIGNMENT SHT: 58701123 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 608 +48, M. P 11.52 58703336 HOUSTON, TX MI DETROIT, CHARLESTON, WV • TULSA, DI( ORANGE COUNTY, NORTH CAROLINA SCALE: 1 REV. a BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 06/17/2014 STREAM WETLAND W44 TOTAL IMPACTS 0.000 AC. PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 643 SQ. FT. 0.015 AC. 1,503 SQ. FT. STREAM S32 TOTAL IMPACTS WETLAND W41 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 339 SQ. FT. 0.008 AC. STREAM WETLAND W42 TOTAL IMPACTS - 482 PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 12 SO. FT. 0.0002 AC. STREAM S31 TOTAL JORDAN LAKE BUFFER IMPACTS 0.000 AC. TEMP. IMPACT 18 SQ. FT. ZONE 1 BE RE- SEEDED IN ZONE 2 PERM. IMPACT 164 SQ. FT. NATURALLY. 57 SQ. FT. TEMP. IMPACT 1,503 SQ. FT. 2,555 SQ. FT. 31, WETLAND W41 TOTAL IMPACTS - 797 PERM. IMPACT 23 S0. FT. 0.000 AC. - 486 TEMP. IMPACT 434 SQ. FT. 0.010 AC. 30' 30' LIMIT OF PERMANENT MAINTENANCE EXISTING MAINTENANCE EASEMENT_ EXISTING PSNC 10" T -021 PIPELINE —G G G G G G- O M PROPOSED 16" T -021 B PIPELINE — EXISTING MAINTENANCE EASEMENT FORESTED WETLAND o WITHIN ZONE 1 - 23 SQ. FT. WETLAND W43 LEGEND: WETLAND W43 EXISTING TREE LINE WETLAND W42- TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD STREAM S31 0 L. F. WETLAND W44 WETLAND W41--� N 50' G N \N WETLAND W45 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 18 SQ. FT. 0.0004 AC. NOTE: MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE- SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. 20' STREAM ZONE 2 51 L.F. ZONE 1 N II G v 0 Imo, s� 2� Z 8' TEMPORARY WORKSPACE EASEMENT. 7 TEMPORARY CLEARING OF FORESTED N AREAS: N STREAM 31, ZONE 2 - 182 SQ. FT. I STREAM 32, ZONE 1 - 232 SQ. FT. STREAM 32, ZONE 2 - 152 SQ. FT. G G G G -7� - ---------------- ZONE 1 ZONE 2 PERM. IMPACT 10' TEMPORARY WORKSPACE 48 SQ. FT. EASEMENT. WETLAND W45 / OF FORESTED ti AREAS: STREAM S32 51 L.F. STREAM v 0 Imo, s� 2� Z 8' TEMPORARY WORKSPACE EASEMENT. 7 TEMPORARY CLEARING OF FORESTED N AREAS: N STREAM 31, ZONE 2 - 182 SQ. FT. I STREAM 32, ZONE 1 - 232 SQ. FT. STREAM 32, ZONE 2 - 152 SQ. FT. G G G G -7� - ---------------- ZONE 1 ZONE 2 PERM. IMPACT 10' TEMPORARY WORKSPACE 48 SQ. FT. EASEMENT. TEMPORARY CLEARING OF FORESTED AREAS: STREAM 31, ZONE 1 - 797 SQ. FT. ti STREAM 31, ZONE 2 - 486 SO. FT. /STREAM 32, ZONE 1 - 724 SQ. FT. STREAM 32, ZONE 2 - 482 SQ. FT. STREAM S32 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 48 SQ. FT. TEMP. IMPACT 3,038 SQ. FT. 1,976 SQ. FT. 50 25 0 50 SCALE IN FEET aKs PSNC ENERGY DRAWN BY: 06/02/14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMENTACLKCK: 109 LES, KY DRIVE WETLAND CROSSING W41, W42, W44 & W45 & STREAM CROSSINGS S31 & S32 P.O. BOX 1007 ALIGNMENT SHT: 58701124 VERSAILLES, KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 631 +95, M.P 12.06 58703337 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CI TY MI www.emseng.com SHEET 1 OF 1 IDATE OF PLOT: 09/05/2014 STREAM S33 TOTAL JORDAN LAKE BUFFER IMPACTS PERM. IMPACT ZONE 1 ZONE 2 PERM. IMPACT 1,736 SQ. FT. 527 SQ. FT. TEMP, IMF AC;T 9,292 SQ. FT. 5,287 SQ. FT. TEMPORARY WORKSPACE EASEMENT, DISTANCE------. VARIES. AREA OF TEMPORARY IMPACT FOR ZONE 1 - 563 SQ. FT. ZONE 2 - 279 SQ. FT. /tie 1� T N i G 7 �0 �0- x o 0, -A _z2 �p q z7 0, / _z1 p 30' LIMIT OF PERMANENT MAINTENANCE / v Z2 / - / o _ 1 i 21 G G G G G G G. G G STREAM S33 DISTANCE VARIES � � N 1 135 L. F. \ I — - TEMPORARY WORKSPACE EASEMENT, DISTANCE EXISTING 10" PSNC T -021 PIPELINES \2 VARIES. AREA OF TEMPORARY IMPACT FOR ZONE 1 - 1984 SQ. FT. ZONE 2 - 890 SQ. FT. PROPOSED 16" T -021 B PIPELINE z2 \N EXISTING TREE LINE N EXISTING MAINTENANCE EASEMENT TEMPORARY IMPACT AREA NOTE: N PERMANENT IMPACT AREA MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD STREAM S33 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 694 SQ. FT. 0.002 AC. BE RE- SEEDED IN ACCORDANCE WITH 50 25 0 50 THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. SCALE IN FEET 4smal PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENGINEERING KCK: 109 FIELDVIEW DRIVE P.O. BOX STREAM CROSSING S33 AALIGNMENT sHT: 5801124 4 VERSAILLES, KY 40383 TEL:(859) 873 -0078 • FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 646 +15, M.P 12.24 58703338 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK SCALE: 1 = 50' REV. A BAY CITY, MI ORANGE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S34 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 755 SQ. FT. 0.017 AC. STREAM S34 TOTAL JORDAN LAKE BUFFER IMPACTS PERM. IMPACT ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 0 SQ. FT. TEMP. IMPACT 2,654 SQ. FT. 2,723 SQ. FT. 9' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. EXISTING MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE G G G G G G PROPOSED 16" T -021 B PIPELINE EXISTING MAINTENANCE EASEMENT STREAM S34 58 L.F. LEGEND: WETLAND W46 EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD ENERGY & SERVICES CO. CORPORATE OFFICE: 109 FIELDVIEW DRIVE P.O. BOX 1007 VERSAILLES, KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 BRANCH OFFICES: HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK BAY CITY , MI www.emseng.com �0, ti N / G G G���� o� O r7 �a cp sA vA v� 0 2 v EXISTING (MAINTAINED) 50' ROW 30' LIMIT OF PERMANENT MAINTENANCE G G G 0 Ln If ITARING -------- - - - - -- ' TEMPORARY WORKSPACE EASEMENT. TEMPORARY E OF FORESTED AREAS, ZONE 1 — 602 SQ. FT. NE 2 — 625 SQ. FT. 1 -� 2 STREAM S35 /Z2-50 L.F. WETLAND W46 NOTE: X 1 ^ / MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL STREAM S35 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 345 SO. FT. 0.008 AC. WETLAND W46 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 4,041 SQ. FT. 0.093 AC. BE RE- SEEDED IN ACCORDANCE WITH 50 25 0 50 THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. SCALE IN FEET PSNC ENERGY DRAWN BY: CAC 06/02/14 DRAFTING CK: SFS 06/03/14 APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIRONMENTAL CK: ENGINEERING CK: WETLAND CROSSING W46 & STREAM CROSSINGS S34 & S35 ALIGNMENT SHT: 58701126 DRAWING NO.: @ STATION 673 +46, M.P 12.83 58703339 ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' 1 REV. A SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 G LEGEND: STREAM S36 TOTAL JORDAN LAKE DUFFER IMPACTS PERM. IMPACT ZONE 1 ZONE 2 PERM. IMPACT 320 SO. FT. 176 SQ. FT. TEMP. IMPACT 3,089 SQ. FT. 2,167 SQ. FT. WETLAND W47 TOTAL IMPACTS PERM. IMPACT 161 SO. FT. 0.004 AC. TEMP. IMPACT 1,708 SQ. FT. 0.039 AC. 30' LIMIT OF PERMANENT MAINTENANCE o EXISTING MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE -G G G G G EXISTING MAINTENANCE EASEMENT --------------- DISTANCE VARIES ti WETLAND W47 / FORESTED WETLAND WITHIN ZONE 1 — 161 SQ. FT. EXISTING TREE LINE TEMPORARY IMPACT AREA STREAM S36— 56 L.F. PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD NOTE: � r S0. 60F'�F / R / > 0 30. tiF 7 / ?0N 0 ti c c TEMPORARY WORKSPACE EASEMENT, DISTANCE VARIES. AREA OF TEMPORARY IMPACT FOR ZONE 2 — 299 SQ. FT. --� --- TEMPORARY WORKSPACE EASEMENT, DISTANCE n VARIES. AREA OF TEMPORARY IMPACT FOR ZONE 1 — 644 SQ. FT. ZONE 2 — 441 SO. FT. JJINo 9 WIN \IslaIy /r1 MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE— SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE— VEGETATE NATURALLY. -I- 7u s� 7 2� 2 0 v STREAM S36 TOTAL IMPACTS PERM. IMPACT 0 SO. FT. 0.000 AC. TEMP. IMPACT 364 SQ. FT. 0.008 AC. 50 25 0 50 SCALE IN FEET oa PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMENTACLKCK: 109 LES, KY DRIVE WETLAND CROSSING W47 & STREAM CROSSING S36 P.O. BOX 1007 ALIGNMENT SHT: 58701126 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 697 +94, M. P 13.22 58703340 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK SCALE: 1 ° = 50' REV. A 6AY CITY. MI ORANGE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S37 TOTAL JORDAN LAKE BUFFER IMPACTS PERM. IMPACT ZONE 1 ZONE 2 PERM. IMPACT 140 SQ. FT. 136 SQ. FT. TEMP. IMPACT 3,296 SQ. FT, 2,184 SQ. FT. STREAM S37 TOTAL IMPACTS PERM. IMPACT 0 SO. FT. 0.000 AC. TEMP. IMPACT 267 SO. FT. 0.006 AC. G MAINTENANCE El'sEMENT TEMPORARY WORKSPACE EASEMENT, DISTANCE ,/ VARIES. AREA OF TEMPORARY IMPACT FOR ZONE 1 - 81 SO. FT. ZONE 2 — 127 SQ. FT. 30' LIMIT OF PERMANENT MAINTENANCE 0 ro EXISTIN — — — pSNC T 02111 G G c — 10' � TING_ T_021B PIPELINE c 16 EASEMENT------- - - -- PROPOSED NANCE — — / G ti> �a C", s� 7A ;TREAM S37 55 L.F. G G G — — / EXISTING M_AINT — /X _ - I DISTANCE VARIES— 0 30 / TEMPORARY WORKSPACE EASEMENT, DISTANCE �0 0 ' VARIES. AREA OF TEMPORARY IMPACT FOR LEGEND: 2 ZONE 1 - 581 SQ. FT. ZONE 2 - 378 SQ. FT. EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD NOTE: WETLAND W48 MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE- SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. 50 25 0 50 SCALE IN FEET 40� PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMNGTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX 1007 ALIGNMENT sFIT: 58701127 4 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 718 +61, M.P 13.61 58703341 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 WETLAND W49 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 685 SO. FT. 0.016 AC. EXISTING (MAINTAINED) 35' ROW G G G G G- -- - -ter -- NEW 15' ROW LEGEND: EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD /ZZ� c WETLAND W49 G G- cn 0 STREAM S39 0 L. F. Zz, G 1 STREAM S38 52 L.F. STREAM S38 TOTAL IMPACTS PERM. IMPACT 0 SO. FT. 0.000 AC. TEMP. IMPACT 540 SQ. FT. 0.012 AC. 3p, 1- 7 s� 10' TEMPORARY WORKSPACE EASEMENT. ? ,NO MITIGATION REQUIRED. o� PERMANENT CLEARING OF r ze FORESTED AREA — 383 SQ, FT. I 50' N 30' LIMIT OF PERMANENT BuFF�R \ MAINTENANCE EXISTING_ MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE VG G G G G G o PROPOSED 16" T -021 B PIPELINE EXISTING MAINTENANCE_ EASEMENT NEW PERMANENT EASEMENT- STREAM S38 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 343 SO. FT. 40 SQ. FT. TEMP. IMPACT 1,674 SO. FL 1,388 SO. FT. TEMPORARY WORKSPACE EASEMENT DISTANCE VARIES TEMPORARY CLEARING OF FORESTED AREAS, ZONE 1 - 356 SQ. FT., ZONE 2 - 377 SQ. FT. 220 NOTE: �F2 MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE- SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. 50 25 0 50 SCALE IN FEET aKs PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMING ENTAL CK: 109 LES, KY DRIVE WETLAND CROSSING W49 & STREAMS CROSSING S38 & S39 R.O. BOX ,007 ALIGNMENT SHT: 58701128 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 733 +56, M.P 13.96 58703342 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK SCALE: 1 ° = 50' REV. A 6AY CITY, MI ORANGE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 IIIDATE OF PLOT: 09/05/2014 STREAM S40 TOTAL IMPACTS PERM. IMPACT 0 SO. FT. 0.000 AC. TEMP. IMPACT 486 SQ. FT. 0.011 AC. EXISTING (MAINTAINED) 35' ROW 50' BUFFER N STREAM S40 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 S0. FT. 0 SQ. FT. TEMP. IMPACT 3,342 SO. FT. 3,208 SQ. FT. 1 v� s� .Z 0 Z v I 1�11 " TEMPORARY WORKSPACE EASEMENT. MITIGATION REQUIRED. 20' ZONE 2 30' LIMIT OF PERMANENT 30MAINTENANCE ZONEXISTING MAINTENANCE EASEMENT 77T aKs PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMING ENTAL CK: 109 FIELDVIEW DRIVE P.O. STREAM CROSSING S40 ALIGNMENT SHT: 58701128 VERSAILLES, S, 4 KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 732 +81, M.P 14.13 58703343 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK SCALE: 1 ° = 50' REV. A SAY CITY. MI ORANGE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 EXISTING 10" PSNC T -021 PIPELINE G G G G G G G G G G G G PROPOSED 16" T -021 B PIPELINE G 0 L0 o Z2 r7 — — — — — — — — — — — — — — — — — — — EXISTING MAINTENANCE EASEMENT — — — — — — — — — — — - - NEW PERMANENT EASEMENT - 10' TEMPORARY WORKSPACE EASEMENT. \ \ _ — — — — STREAM S40 TEMPORARY CLEARING OF FORESTED AREAS, \ _ — — 56 L.F. LEGEND: ZONE 1 - 1,064 SQ. FT., ZONE 2 - 870 SQ. FT.\ �� — �� � A NOTE: EXISTING TREE LINE MITIGATION FOR TEMPORARY WORKSPACE _ TEMPORARY IMPACT AREA �Z' IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL � � BE RE- SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED PERMANENT IMPACT AREA \� z2— — TO RE- VEGETATE NATURALLY. NOTE: 50 25 0 50 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD SCALE IN FEET aKs PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMING ENTAL CK: 109 FIELDVIEW DRIVE P.O. STREAM CROSSING S40 ALIGNMENT SHT: 58701128 VERSAILLES, S, 4 KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 732 +81, M.P 14.13 58703343 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK SCALE: 1 ° = 50' REV. A SAY CITY. MI ORANGE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S41 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 344 SQ. FT. 0.008 AC. LEGEND: 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. 30' LIMIT OF PERMANENT MAINTENANCE 0 EXISTING MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE G G G G G G G PROPOSED 16" T -021 B PIPELINE EXISTING MAINTENANCE EASEMENT --------------- -- DISTANCE VARIES - EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD I'D' N 20, ` 30' ZONE 2 ONE r 1- 70 / 011 f s ti� 2� STREAM S41 58 L. F. ti G � I N I I I I N I I I I I I i I 50' BUFFER G G G G G TEMPORARY WORKSPACE EASEMENT, DISTANCE VARIES. AREA OF TEMPORARY IMPACT FOR ZONE 1 - 668 SO. FT. ZONE 2 - 210 SQ. FT. STREAM S41 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 720 SQ. FT, 273 SQ. FT. TEMP. IMPACT 2,695 SO. FT. 2,054 SQ. FT. NOTE: MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE- SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. 50 25 0 50 SCALE IN FEET 4E& PS N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/o3/1 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX STREAM CROSSING S41 AALIGNMENT sHT: 58701129 4 VERSAILLES, KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 765 +25, M.P 14.49 58703344 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, DI( ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A BAY CITY, MI www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 30' 50' 20 BUFFER ZONE 2 ONE 1 \ N STREAM S42 N \ \ 50 L.F. 1 N S ING MAIN EN N E AS M IN N 1 0 EXISTING 10" PSNC G T -021 ffELINE G G G nDnCCn 1 P" T –no 1 R oloCl II\IC ,N -. N _EXISTING MAINTENANCE EASEMENTr71� LEGEND: EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD ENERGY & SERVICES CO. CORPORATE OFFICE: 109 FIELDVIEW DRIVE P.O. BOX 1007 VERSAILLES, KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 BRANCH OFFICES: HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK BAY CITY, MI www.emseng.com STREAM S42 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 322 SQ. FT. 0.007 AC. STREAM S43 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 959 SQ. FT. 0.022 AC. 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. —G G G G G G G O ti� T ti^ 10' TEMPORARY WORKSPACE EASEMENT. AREA OF TEMPORARY IMPACT FOR ZONE 1 - 622 SQ. FT. ZONE 2 - 472 SQ. FT. STREAM S43 142 L.F. STREAM S42 TOTAL JORDAN LAKE BUFFER IMPACTS 50 25 0 50 ZONE 1 ZONE 2 PERM. IMPACT 437 SQ. FT. PS N C ENERGY 150 SQ. FT. TEMP. IMPACT 2,607 SQ. FT. APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE 1,959 SQ. FT. 90 1p s� 9� q v� o� G G NOTE: MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE- SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE- VEGETATE NATURALLY. 50 25 0 50 SCALE IN FEET PS N C ENERGY DRAWN BY: CAC 06/02/14 DRAFTING CK: SFS 06/03/14 APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIRONMENTAL CK: ENGINEERING CK: STREAM CROSSINGS S42 & S43 ALIGNMENT SHT: 58701129 DRAWING NO.: @ STATION 776 +00, M.P 14.70 58703345 ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A SHEET 1 OF 1 JDATE OF PLOT: 09/05/2014 STREAM S44 TOTAL IMPACT PERM. IMPACT 0 SO. FT. 0.000 AC. TEMP. IMPACT 183 SQ. FT. 0.004 AC. STREAM S44 54 L. F. EXISTING MAINTENANCE EASEMENT `EXISTING 10" PSNC T -021 PIPELINE —G G G G PROPOSED 16" T -021 B PIPELINE EXISTING MAINTENANCE EASEMENT N 1 LEGEND: Z2 �1 EXISTING TREE LI TEMPORARY IMPA, PERMANENT IMPA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD STREAM S45 TOTAL IMPACT PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 146 SQ. FT. 0.003 AC. w w v z Q 0 STREAM S46 TOTAL JORDAN LAKE BUFFER IMPACTS ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 68 SQ. FT. TEMP. IMPACT 0 SQ. FT. 783 SQ. FT. TEMPORARY WORKSPACE, DISTANCE VARIES EASEMENT. NO MITIGATION REQUIRED. G G G G G \ 1 to \N I ' � z7� -Z1 STREAM S45 50 L. F. a �o w a m 1Z m ti 0 a G G G WETLAND W50/ ZONE 2 PARALLEL, NO MITIGATION REQUIRED N \ tit z WETLAND W50A Z� 0 L. F. S46 50 25 0 50 SCALE IN FEET aKs PSNC ENERGY DRAWN BY: CAC 06/02'14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX 1007 ALIGNMENT sHT: 58701130 4 VERSAILLES, KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 799 +35, M.P 15.14 58703346 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK SCALE: 1 ° = 50' REV. A BAY GITY. MI ORANGE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S47 TOTAL JORDAN LAKE BUFFER IMPACTS PERM. IMPACT ZONE 1 ZONE 2 PERM. IMPACT 544 SQ. FT. 323 SQ. FT. TEMP. IMPACT 2,872 SQ. FT. 2, 244 SQ. FT. WETLAND W52 10' TEMPORARY WORKSPACE EASEMENT. NO MITIGATION REQUIRED. EXISTING MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE G G G G G PROPOSED 16" T -021 B PIPELINE U, 0 OvFF�R 20E 2 tioN 30' LIMIT OF PERMANENT MAINTENANCE -- EXISTING MAINTENANCE EASEMENT cn ti D T,1 \ LEGEND: STREAM S47— 54 L. F. EXISTING TREE LINE © TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD G----G STREAM S48 NOTE: MITIGATION FOR TEMPORARY WORKSPACE IMPACTS WILL BE PROVIDED FOR RIPARIAN BUFFER ZONES. AREAS WILL BE RE— SEEDED IN ACCORDANCE WITH THE RESTORATION PLAN AND ALLOWED TO RE— VEGETATE NATURALLY. STREAM S47 TOTAL IMPACTS PERM. IMPACT 0 S0. FT. 0.000 AC. TEMP. IMPACT 384 SQ. FT. 0.008 AC. WETLAND W51 TOTAL IMPACTS PERM. IMPACT 2,065 S0. FT. 0.047 AC. TEMP. IMPACT 4,484 SQ. FT. 0.103 AC. z 0 w ul l v� 0 G G G G G FORESTED WETLAND WITHIN ZONE 1 — 35 SO, FT. WITHIN ZONE 2 — 145 SQ. FT. WETLAND W51 TEMPORARY WORKSPACE EASEMENT, DISTANCE VARIES. AREA OF TEMPORARY IMPACT FOR ZONE 1 — 809 SQ. FT. ZONE 2 — 700 SQ. FT. 50 25 0 50 SCALE IN FEET Y a P S N C ENERGY DRAWN BY: CAC 06/02/14 ENERGY MANAGEMENT DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMENTACLKCK: 109 FIELDVIEW DRIVE P.O. BOX 1007 4 0383 WETLAND CROSSING W51 STREAM CROSSING S47 ALIGNMENT sHT: 5801130,31 VERSAILLES, KY 4 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 809 +73, M.P 15.34 58703347 HOUSTON, TX DETROIT, MI CHARLESTON, WV • TULSA, OK SCALE: 1 = 50' REV. A BAY CITY, MI ORANGE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 0®/05/2014 WETLAND W53 TOTAL IMPACTS PERM. IMPACT 1,836 SQ. FT. 0.042 AC. TEMP. IMPACT 2,608 SQ. FT. 0.060 AC. EXISTING MAINTENANCE EASEMENT EXISTING 10 PSNC T -021 PIPELINE —G G G G G G G- PROPOSED 16" T -021 B PIPELINE EXISTING MAINTENANCE EASEMENT — — — — — — — — — — — — — — — — — — — — — — LEGEND: EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD �o s� 2 WETLAND W53 0 Z v —G G G G G G G- 50 25 0 50 SCALE IN FEET aKs PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY DRAFTING CK: SF`S 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINOERINC AL CK: 109 FIELDVIEW DRIVE °. S, 4 WETLAND CROSSING W53 ALIGNMENT sHT: 58701131 LES, VERSAIL KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 814 +29, M.P 15.42 58703348 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK SCALE: 1 ° = 50' REV. A SAY CITY. MI ORANGE COUNTY, NORTH CAROLINA www.emseng.COM SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 WETLAND W54 TOTAL IMPACTS PERM. IMPACT 170 SQ. FT. 0.004 AC. TEMP. IMPACT 236 SQ- FT. 0.005 AC. Z O cp W ul� v �Z 0 Z v EXISTING MAINTENANCE EASEMENT — — — — — — — — — — — — — — EXISTING 10" PSNC T -021 PIPELINE G G G G c c c c c G- G G G G G G G PROPOSED 16" T -021 B PIPELINE EXISTING MAINTENANCE EASEMENT — — — — — — — — LEGEND: EXISTING TREE LINE — — _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA WETLAND W54 NOTE: 50 25 0 50 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD SCALE IN FEET aKs PSNC ENERGY DRAWN BY: CAC 06/02'14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMING ENTAL CK: 109 FIELDVIEW DRIVE P.O. WETLAND CROSSING W54 ALIGNMENT sHT: 58701131 VERSAILLES, S, 4 KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 818 +37, M. P 15.50 58703349 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK SCALE: 1 ° = 50' REV. A SAY CITY. MI ORANGE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 09/05/2014 STREAM S49 TOTAL IMPACTS STREAM ZONE 1 ZONE 2 PERM. IMPACT 0 SQ. FT. 0 SQ. FT. TEMP. IMPACT 2,170 SQ. FT. 2,725 SQ. FT. EXISTING (MAINTAINED) 50' ROW EXISTING CULVERT G G G S0, UFF� LEGEND: STREAM S49 - L.F EXISTING TREE LINE TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD ENERGY MANAGEMENT & SERVICES CO. CORPORATE OFFICE: 109 FIELDVIEW DRIVE P.O. BOX 1007 VERSAILLES, KY 40383 TEL(859) 873 -0076 FAX:(859) 873 -5872 BRANCH OFFICES: HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK BAY CITY, MI www.emseng.com OPEN WATER Z2--\ EXISTING MAINTENANCE EASEMENT G ti / 3p' o/V 20 Ne 2p , 2 Z O WETLAND W56 U, a m v �Z m �Z 0 0 / \ . --WETLAND W55 — G G G G G G G G PROPOSED 16" T -021 B PIPELINE I — — — — — — — — — — — — — — — I EXISTING 10" PSNC T -021 PIPELINE I EXISTING MAINTENANCE EASEMENT WETLAND W55 TOTAL IMPACTS STREAM S49 TOTAL IMPACTS TEMP. IMPACT PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 57 SQ. FT. 0.001 AC. WETLAND W55 TOTAL IMPACTS PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 4,977 SQ. FT. 0.114 AC. 50 25 0 50 SCALE IN FEET PS N C ENERGY DRAWN BY: CAC 06/02/14 DRAFTING CK: SFS 06/03/14 APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIRONMENTAL CK: ENGINEERING CK: WETLAND CROSSING W55 & STREAM CROSSING S49 ALIGNMENT SHT: 5870113, DRAWING NO.: @ STATION 821 +42, M.P 15.56 58703350 ORANGE COUNTY, NORTH CAROLINA SCALE: 1" = 50' REV. A SHEET 1 OF 1 DATE OF PLOT: 06/20/2014 Et LEGEND: STREAM S50 X// 59 L.F. EXISTING (MAINTAINED) 50' ROW EXISTING CULVERT EXISTING MAINTENANCE EASEMENT EXISTING 10" PSNC T -021 PIPELINE PROPOSED 16" T-0218 PIPELINE —c G - -T� G EXISTING MAINTENANCE EASEMENT / EXISTING TREE LINE _ TEMPORARY IMPACT AREA PERMANENT IMPACT AREA NOTE: 1. PIPELINE TO BE INSTALLED BY OPEN CUT METHOD EXISTING CULVERTS /#�/ STREAM S50 TOTAL IMPACT PERM. IMPACT 0 SQ. FT. 0.000 AC. TEMP. IMPACT 531 SO. FT. 0.012 AC. a vo w �Z Z ➢o 50 25 0 50 SCALE IN FEET aKs PSNC ENERGY DRAWN BY: CAC 06/02/14 ENERGY DRAFTING CK: SFS 06/03/14 & SERVICES CO. CORPORATE OFFICE: APPROXIMATE JURISDICTIONAL BOUNDARIES OF 16" T -021 B PIPELINE ENVIINONMING ENTAL CK: 109 FIELDVIEW DRIVE P.O. STREAM CROSSING S50 ALIGNMENT SHT: 58701132 VERSAILLES, S, 4 KY 40383 TEL:(859) 873 -0076 FAX:(859) 873 -5872 DRAWING NO.: BRANCH OFFICES: @ STATION 838 +76, M. P 15.89 58703351 HOUSTON, TX DETROIT, MI CHARLESTON, WV TULSA, OK SCALE: 1 50" REV. A 6AY GITY. MI ORANGE COUNTY, NORTH CAROLINA www.emseng.com SHEET 1 OF 1 DATE OF PLOT: 06/17/2014