Loading...
HomeMy WebLinkAbout20141149 Ver 1_Prospectus comments submittal_20150112Homewood, Sue From: Sent: To: Cc: Subject: Attachments: David, Homewood, Sue Monday, January 12, 2015 12:55 PM 'Bailey, David E SAW' Baker, Virginia; 'Worth Creech' RE: Public Notice period, Cape Fear 02 Mitigation Bank; SAW- 2014 -00657 (UNCLASSIFIED) Cape Fear 02 umbrella bank notes.docx Please accept the attached comments as the Division's formal comments. Thank you for the opportunity to comment on this prospectus. We look forward to working with the project in the future. Sue Please note my new contact information Sue Homewood NC DENR Winston -Salem Regional Office Division of Water Resources — Water Quality Programs 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 Voice: (336) 776 -9693 Cell: (336) 813 -1863 E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. - - - -- Original Message---- - From: Bailey, David E SAW [mailto:David.E.Bailey2 @usace.army.mil] Sent: Friday, January 09, 2015 9:26 AM To: Tugwell, Todd SAW; Homewood, Sue; Karoly, Cyndi; Wilson, Travis W.; bowers.todd @epa.gov; Bryant, Shari L.; emily iernigan @fws.gov; fritz.rohde @noaa.gov; Merritt, Katie; Baker, Virginia; Matthews, Kathryn; Hall, Dolores; Gledhill - earley, Renee Cc: Adam Riggsbee; Worth Creech; Grant Lewis Subject: Public Notice period, Cape Fear 02 Mitigation Bank; SAW- 2014 -00657 (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE All, Thank you for your participation thus far on the IRT for the above referenced project. We finished up the initial site visits for the project on Tuesday and had many productive conversation. This email is remind everyone that the Public Notice period ends on Tuesday, January 13, 2015. If you would prefer, feel free to submit your comments via email. IF you have any questions please let me know. 1 -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE- SAW -RG -R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554 -4884, Ext. 30. Fax: (919) 562 -0421 Email: David.E.Bailey2 @usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http : / /regulatory.usacesurvey.com /. Classification: UNCLASSIFIED Caveats: NONE Cape Fear 02 Umbrella Mitigation Bank Final Prospectus — Restoration Systems General comments: • The Division has concerns that the restoration of low scoring intermittent streams will disconnect these streams from groundwater. A disconnection with groundwater could result in a channel becoming non - jurisdictional and no longer viable for mitigation credit. Specific site comments: Motes Creek: • The Division prefers to see less cattle crossings throughout a mitigation site. Orphan Creek: • The Division prefers to see the cattle crossing relocated to the head of reach UT2. • The Division recommends that UT3 be proposed for El instead of Ell. Maple Hill Farm: • The Division recommends that UT2a and UT2B be removed from the mitigation plan as they appear to be non - jurisdictional features. • The Division proposes that UT2 does not warrant Ell credit. Rocky Top: • The Division has concerns that UT2 has limited potential for functional uplift. We recommend considering adding some protections such as fencing and invasive removal to secure a reduced Enhancement Credit ratio such as 5:1 or similar. • The Division has concerns that restoration of UT1 and removal of the upstream pond will result in channel forming flows. • There is potential for a stormwater BMP within a swale west through the pasture to the west UT1. Benton Branch: • The Division has concerns that restoration of UT1 and UT2 and removal of the upstream ponds will result in channel forming flows. Chico Branch: • The Division recommends that UT1 (above a very large headcut) be removed from the mitigation plan as it appears to be a non - jurisdictional feature. Slingshot Creek Site: • The Division recommends that the upper portion of the Main Channel be considered for Ell credit. • The Division recommends that the restoration plan for the Main Channel immediately below the upper portion be developed in a manner that will avoid disturbance to as many mature trees as possible. • The lower portion of the Main Channel, between UT2 and the crossing is mostly stable. The Division recommends that the designer consider leaving as much of this channel in place.