Loading...
HomeMy WebLinkAbout20040639 Ver 1_Triage Check List_20150112To: Cherri Smith - Raleigh Regional Office From: 401 & Buffer Permitting Unit, Central Office Date: 1/12/2015 Project Name: Halifax-Northampton Regional Airport County: Halifax 60-day Processing Time: 12/30/14 — 2/28/15 Z Please review attached final monitoring report, complete close-out inspection and send close out letter if mitigation is acceptable. ❑ This is an Individual Permit and will be issued out of the Central office. F-1 This is a "Courtesy Copy" and is located in Laserfiche. r—] A copy of the application/stormwater has been given to Cory. Restoration Project NOT for mitigation (issued by RO). A copy has been given to the Mitigation Coordinator. F—] Non-EEP (bank) mitigation project (issued by RO). Mitigation Coordinator has DWR CO file copy. F-1 EEP full delivery project (issued by RO). Mitigation Coordinator has DWR CO file copy. ❑ EEP design-bid build project (issued by RO). Mitigation Coordinator has DWR CO file copy.