Loading...
HomeMy WebLinkAbout20141323 Ver 1_I-0914--Wetland/Stream Impact tables_20141223 PermanentTemp. ExcavationMechanized ClearingPermanent Temp. ChannelChannelNatural WetlandsWetlands Wetlandsin Wetlands WetlandsimpactsimpactsPermanentTemp.Design Fill InFill Inin Clearingin SW SWImpactsImpactsStream NC DEPARTMENT OF TRANSPORTATION (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) OF68 880 DIVISION OF HIGHWAYS Existing Existing VANCE/WARREN SURFACE WATER IMPACTS 170.01< 0.011210< 0.01< 0.014521< 0.01< 0.011010 10/13/2014 555555 WBS-38688 I-0914BA < 0.01< 0.011012< 0.01< 0.0113< 0.01< 0.01123977< 0.01< 0.0113< 0.01< 0.0115 64 27 < 0.01< 0.017< 0.01< 0.018 SHEET 0.040.02 < 0.01< 0.01< 0.01 WETLAND PERMIT IMPACT SUMMARY Hand WETLAND IMPACTS 118+00- NBL- RTEx. 36" RCP/ Scour Hole8143+33 -NBL- LT & RTEx. 60" RCP/ Scour Hole Replace Wingwall 7142+24 to 143+32 -NBL- RTStream Relocation9143+35 to 144+60 -NBL- RTStream Relocation Bank StabilizationBank StabilizationBank StabilizationBank StabilizationBank Stabilization Existing 30" RCPExisting 24" RCPExisting 18" RCP Size / Type Structure *Rounded totals are sum of actual impacts 111+45 -NBL- RT10153+35 -NBL- RT11183+20 -NBL- RT 100+65 -SBL- LT142+45 -SBL- LT12202+25 -SBL- LT 63+15 -NBL- RT66+30 -NBL- RT (From/To) Station TOTALS*: Revised 2013 10 24 NOTES: No. Site 123456 PermanentTemp. ExcavationMechanized ClearingPermanent Temp. ChannelChannelNatural WetlandsWetlands Wetlandsin Wetlands WetlandsimpactsimpactsPermanentTemp.Design Fill InFill Inin Clearingin SW SWImpactsImpactsStream NC DEPARTMENT OF TRANSPORTATION (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) OF68 0 DIVISION OF HIGHWAYS Existing Existing VANCE/WARREN SURFACE WATER IMPACTS < 0.01< 0.011010< 0.01201041010< 0.01< 0.012811< 0.01< 0.011010 10/13/2014 5853 WBS-38688 I-0914BA 61< 0.01< 0.0136< 0.01< 0.0122 65 < 0.01< 0.019< 0.01< 0.015< 0.01< 0.015 4 2 SHEET < 0.01< 0.010.02< 0.01 < 0.01 WETLAND PERMIT IMPACT SUMMARY Hand < 0.01 0.01< 0.010.01 WETLAND IMPACTS < 0.01 Bank Stabilization< 0.01< 0.01< 0.01 19276+01 to 276+71 -NBL- RT & LT30" RCP/ Scour Hole Bank StabilizationBank StabilizationBank Stabilization Bank Stabilization15241+10 to 241+93 -NBL- RT & LTBank StabilizationBank Stabilization Roadway Fill Ditch Tie-In Size / Type 2' Lat Ditch Structure 24" RCP 15" CSP 18275+42 to 276+03 -SBL- LT & RT 22307+96 to 308+99 -SBL- LT *Rounded totals are sum of actual impacts 215+10 -NBL- RT & LT229+85 -NBL- RT & LT249+10 -NBL- RT & LT 28+60 -Y5SBL- RT 215+90 -NBL- RT241+17 -NBL- RT275+46 -NBL- RT307+07 -NBL- RT (From/To) Station TOTALS*: Revised 2013 10 24 NOTES: No. Site 15A 131416172021 PermanentTemp. ExcavationMechanized ClearingPermanent Temp. ChannelChannelNatural WetlandsWetlands Wetlandsin Wetlands WetlandsimpactsimpactsPermanentTemp.Design Fill InFill Inin Clearingin SW SWImpactsImpactsStream NC DEPARTMENT OF TRANSPORTATION (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) OF68 0 DIVISION OF HIGHWAYS Existing Existing VANCE/WARREN SURFACE WATER IMPACTS < 0.01< 0.013920< 0.01< 0.011110< 0.01< 0.015732 < 0.01< 0.012610< 0.01< 0.011210 10/13/2014 5555 4 WBS-38688 1 I-0914BA < 0.01< 0.011110< 0.01< 0.011012 66 SHEET < 0.01 < 0.010.020.010.03 < 0.01< 0.01 WETLAND PERMIT IMPACT SUMMARY Hand < 0.01< 0.01 WETLAND IMPACTS < 0.01 0.06< 0.010.07 33523+73 to 525+10 -NBL- RT & LTBank Stabilization< 0.01 Construction AccessConstruction Access 23327+85 to 328+05 -SBL- LT18" RCP/Scour Hole Bank StabilizationBank StabilizationBank StabilizationBank Stabilization31518+47 to 520+97 -NBL- RT & LTBank Stabilization 29503+68 to 506+22 -NBL- RT & LTPipe Clean Out Exist. 36" RCPExist. 36" RCPExist. 30" RCP Size / Type Structure *Rounded totals are sum of actual impacts 32521+42 to 523+58 -NBL- 30520+18 to 520+55 -NBL 28463+98 -NBL- RT & LT 27450+55 -SBL- LT & RT 436+19 -NBL- RT 355+27 -SBL- LT435+22 -SBL- LT (From/To) Station TOTALS*: Revised 2013 10 24 NOTES: No. Site 242526 PermanentTemp. ExcavationMechanized ClearingPermanent Temp. ChannelChannelNatural No.(From/To)Size / TypeWetlandsWetlands Wetlandsin Wetlands WetlandsimpactsimpactsPermanentTemp.Design SiteStationStructureFill InFill Inin Clearingin SW SWImpactsImpactsStream NC DEPARTMENT OF TRANSPORTATION (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) OF68 < 0.01< 0.0148470 DIVISION OF HIGHWAYS Existing Existing VANCE/WARREN SURFACE WATER IMPACTS < 0.01< 0.012137 10/13/2014 55 WBS-38688 I-0914BA < 0.01< 0.0121 67 < 0.01< 0.016 SHEET WETLAND PERMIT IMPACT SUMMARY Hand < 0.01< 0.01 WETLAND IMPACTS 35544+93 to 546.05 -NBL-S.L. 60" CSP/ Scour Hole 18" RCP24" RCP 15" CSP *Rounded totals are sum of actual impacts 34525+59 -NBL- RT 36595+78 -SBL- LT37599+51 -SBL- LT TOTALS*: Revised 2013 10 24 NOTES: PermanentTemp. ExcavationMechanized ClearingPermanent Temp. ChannelChannelNatural WetlandsWetlands Wetlandsin Wetlands WetlandsimpactsimpactsPermanentTemp.Design Fill InFill Inin Clearingin SW SWImpactsImpactsStream NC DEPARTMENT OF TRANSPORTATION (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) OF68 0 DIVISION OF HIGHWAYS Existing Existing VANCE/WARREN SURFACE WATER IMPACTS 88< 0.01< 0.014847 10/13/2014 3 WBS-38688 13 I-0914BA 68 27 27 SHEET 0.040.020.020.010.010.030.080.06 WETLAND PERMIT IMPACT SUMMARY Hand < 0.01< 0.01 < 0.010.01< 0.010.07< 0.010.02 WETLAND IMPACTS < 0.010.07 < 0.01 Size / Type Structure *Rounded totals are sum of actual impacts TOTAL SHEET 64TOTAL SHEET 65TOTAL SHEET 66TOTAL SHEET 67 (From/To) Station TOTALS*: Revised 2013 10 24 NOTES: No. Site