HomeMy WebLinkAboutNCG520110_Compliance Evaluation Inspection_20221013ROY COOPER
Governor
ELIZABETH 5. BISER
5ecrefvey
RICHARD E. ROGERS, JR.
Director
Ricky C Duncan
City of Kings Mountain
PO Box 429
Kings Mountain, NC 28086
Dear Mr. Duncan:
NORTH CAROL! NA
Entilironmrrtlral Qualify
October 13, 2022
Subject: Compliance Evaluation Inspection
Moss Lake Dredging Operations
NPDES Permit No. NCG520110
Cleveland County
Enclosed is a copy of the Compliance Evaluation Inspection for the inspection conducted at the
subject facility on October 11, 2022, by Ori Tuvia. Your cooperation during the site visit was much
appreciated. Please advise the staff involved with this NPDES Permit by forwarding a copy of the
enclosed repot.
The report should be self-explanatory; however, should you have any questions concerning this
report, please do not hesitate to contact Ori Tuvia at (704) 235-2190, or at ori.tuvia@ncdenr.gov.
Sincerely,
�DocuSigned by:
44 44tw H Nut',
F161FB69A2D84A3...
Andrew H. Pitner P.G., Assistant Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
Cc: MRO Files (Laserfiche)
State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations
Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115
704 663 1699
United States Environmental Protection Agency
EPA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code
1 IN I 2 IL
21IIIIII
NPDES yr/mo/day Inspection
I 3 I NCG520110 111 121 22/10/11 117
Type
1810I
IIIIIIIII1I
Inspector Fac Type
191 S I 2011
IIIIIIIIIIIIIIIIII I IIIIII
P6
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
67I1.0 I 70I I 711 172 I N I 73I 1 74 751
I I 1
1 1 1 1 1 1 180
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Moss Lake Dredging Operations
Airport Rd Sr 1926
Shelby NC 28150
Entry Time/Date
12:30PM 22/10/11
Permit Effective Date
21/03/01
Exit Time/Date
01:OOPM 22/10/11
Permit Expiration Date
25/07/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Steve Killian,PO Box 429 Kings Mtn NC 280860429//704-734-4596/7047344480
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Operations & Maintenar Facility Site Review
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and
Ori A Tuvia
Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
,—DocuSigned by:
DWR/Division of Water Quality/704-663-1699/ 10/12/2022
`— BB057A2DE017498...
Signature of ManegerRWii'tsi.W'Pt'F
Andrew PitnerA"'
viewer Agency/Office/Phone and Fax Numbers Date
' H P' /R/MRO WQ/704-663-1699 Ext.2180/ 10.13.22
F161FB69A2D84A3...
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
NPDES yr/mo/day
31 NCG520110 111 121 22/10/11
I17
Inspection Type
18 [j
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page# 2
Permit: NCG520110
Inspection Date: 10/11/2022
Owner - Facility: Moss Lake Dredging Operations
Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ ❑
application?
Is the facility as described in the permit? • ❑ El El
# Are there any special conditions for the permit? El • El El
Is access to the plant site restricted to the general public? • ❑ ❑ ❑
Is the inspector granted access to all areas for inspection? • ❑ ❑ ❑
Comment: The subject permit expires on 7/31/2025. 4000 tons of sand have been dredged on
average on 2020, 2021 and 2022
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? • ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable DOME
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: Prior to dredging facility staff should re-establish the berm. at the time of the inspection
the berm was eroded, but no dredging was taking place.
Page# 3