Loading...
HomeMy WebLinkAboutBuffalo Branch Mitigation Bank A p A S EM� R North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III Governor Secretary January 8,2015 EBX Neuse I,LLC David Godley,EBX 909 Capability Dr Suite 3100 Raleigh,NC 27606 Subject: Buffer Determination NBRRO#14-475 Johnston County Determination Type: Buffer Call Isolated or EIP Call ®Neuse(15A NCAC 2B .0233) ❑Tar-Pamlico(15A NCAC 2B.0259) ❑Ephemeral/Intermittent/Perennial Determination ❑ El Jordan(15A NCAC 26 .0267) Isolated Wetland Determination Project Name: Buffalo Branch Mitigation Bank Location/Directions: Property is located at the NE quadrant of HWY 96 and Little Divine Rd. Intersection in Johnston County,NC Subject Stream: Buffalo Creek Determination Date: December 19,2014 Staff: James Graham Feature/Flag Not Subject E/I/P* Start@ Stop@ Soil USGS Subject To Survey Topo To Buffers Buffers A X P X X B X I X C X I X (Modified Natural Stream *E/I/P-Ephemeral/Intermittent/Perennial Explanation: The feature(s)listed above has or have been located on the Soil Survey of Wake County,North Carolina or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each feature that is checked "Not Subject"has been determined not to be a stream or is not present on the property. Features that are checked "Subject"have been located on the property and possess characteristics that qualify it to be a stream. i on a may be I ) � iy North Carolina Division of Water Resources 1628 Mail Service Center Raleigh,NC 27699-1628 Phone(919)791-4200 Internet: www.narateraualitv.org Location:3800 Barrett Drive Raleigh,NC 27609 Fax (919)788-7159 An Equal Opportunity/Affirmative Action Employer-50%RecycW10%Post Consumer Paper Buffalo Branch January 8,2015 Page 2 of 2 considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Resources (DWR). This on-site determination shall expire five(5)years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR or Delegated Local Authority may request a determination by the Director.An appeal request must be made within sixty(60)days of date of this letter or from the date the affected party(including downstream and/or adjacent owners)is notified of this letter. A request for a determination by the Director shall be referred to the Director in writing c/o Karen Higgins,DWR WeBSCaPe Unit,1650 Mail Service Center,Raleigh,NC 27699. This determination is final and binding unless,as detailed above,you ask for a hearing or appeal within sixty(60) days. The owner/future owners should notify the Division of Water Resources(including any other Local,State,and Federal Agencies)of this decision concerning any future correspondences regarding the subject property(stated above). This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the Division of Water Resources(Central Office)at(919)-807-6300,and the US Army Corp of Engineers (Raleigh Regulatory Field Office)at(919)-554-4884. If you have questions regarding this determination,please feel free to contact James Graham at(919)791 4256. espec fully, Danny Smith Supervisor Water Quali Section Raleigh Regional Office cc: RRO/SWP File Copy Daniel Ingram WK Dickson 720 Corporate Center Dr. Raleigh,NC 27607 V •ate _ ♦ � � \ � e �t ` i ��1fff a , !3w Oak Csm :146 i Drainage Area- 539 acres r • • j _..vim' ' ti , C...... a;yam • o •. f Cem, b Ch Source: Selma Quadrangle'`} Copyrigh 2013 National Geographic Society, i-cubed ~ Figure 2. J, Z*t' USGS Topographic Map uffalo Branch Buffer/Nutrient Offset Site Proposed Easement 0 1,000 2,000 4,000 1— — — Drainage area Feet 1 inch = 2,000 feet