HomeMy WebLinkAboutBuffalo Branch Mitigation Bank A p A S EM�
R
North Carolina Department of Environment and Natural Resources
Pat McCrory John E. Skvarla, III
Governor Secretary
January 8,2015
EBX Neuse I,LLC
David Godley,EBX
909 Capability Dr Suite 3100
Raleigh,NC 27606
Subject: Buffer Determination
NBRRO#14-475
Johnston County
Determination Type:
Buffer Call Isolated or EIP Call
®Neuse(15A NCAC 2B .0233)
❑Tar-Pamlico(15A NCAC 2B.0259) ❑Ephemeral/Intermittent/Perennial Determination
❑
El Jordan(15A NCAC 26 .0267) Isolated Wetland Determination
Project Name: Buffalo Branch Mitigation Bank
Location/Directions: Property is located at the NE quadrant of HWY 96 and Little Divine Rd.
Intersection in Johnston County,NC
Subject Stream: Buffalo Creek
Determination Date: December 19,2014 Staff: James Graham
Feature/Flag Not Subject E/I/P* Start@ Stop@ Soil USGS
Subject To Survey Topo
To Buffers
Buffers
A X P X X
B X I X
C X I X
(Modified Natural
Stream
*E/I/P-Ephemeral/Intermittent/Perennial
Explanation: The feature(s)listed above has or have been located on the Soil Survey of Wake County,North
Carolina or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each feature that is checked
"Not Subject"has been determined not to be a stream or is not present on the property. Features that are checked
"Subject"have been located on the property and possess characteristics that qualify it to be a stream. i on a may be
I ) � iy
North Carolina Division of Water Resources 1628 Mail Service Center Raleigh,NC 27699-1628 Phone(919)791-4200
Internet: www.narateraualitv.org Location:3800 Barrett Drive Raleigh,NC 27609 Fax (919)788-7159
An Equal Opportunity/Affirmative Action Employer-50%RecycW10%Post Consumer Paper
Buffalo Branch
January 8,2015
Page 2 of 2
considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Resources
(DWR).
This on-site determination shall expire five(5)years from the date of this letter. Landowners or affected parties that
dispute a determination made by the DWR or Delegated Local Authority may request a determination by the
Director.An appeal request must be made within sixty(60)days of date of this letter or from the date the affected
party(including downstream and/or adjacent owners)is notified of this letter. A request for a determination by the
Director shall be referred to the Director in writing c/o Karen Higgins,DWR WeBSCaPe Unit,1650 Mail Service
Center,Raleigh,NC 27699.
This determination is final and binding unless,as detailed above,you ask for a hearing or appeal within sixty(60)
days.
The owner/future owners should notify the Division of Water Resources(including any other Local,State,and
Federal Agencies)of this decision concerning any future correspondences regarding the subject property(stated
above). This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be
directed to the Division of Water Resources(Central Office)at(919)-807-6300,and the US Army Corp of Engineers
(Raleigh Regulatory Field Office)at(919)-554-4884.
If you have questions regarding this determination,please feel free to contact James Graham at(919)791 4256.
espec fully,
Danny Smith Supervisor
Water Quali Section
Raleigh Regional Office
cc: RRO/SWP File Copy
Daniel Ingram
WK Dickson
720 Corporate Center Dr.
Raleigh,NC 27607
V •ate _ ♦ � � \ �
e
�t `
i ��1fff
a , !3w Oak
Csm :146
i Drainage Area- 539 acres r
• • j _..vim' ' ti ,
C...... a;yam
• o •. f
Cem, b
Ch
Source: Selma Quadrangle'`} Copyrigh 2013 National Geographic Society, i-cubed
~ Figure 2. J, Z*t'
USGS Topographic Map
uffalo Branch Buffer/Nutrient Offset Site Proposed Easement
0 1,000 2,000 4,000 1— — — Drainage area
Feet
1 inch = 2,000 feet