Loading...
HomeMy WebLinkAbout20221369 Ver 1_More Info Requested_20221116All, I have conducted a review of the materials provided in the 401 application for the above noted project and require additional information/clarification in order to proceed further. Please submit a response to the items below within 30 days of receipt of this email. Please note that the application will be considered to be placed “on hold’ until a complete response is received. 1. Please provide a justification for why non-impact constructions methods (directional drilling, etc) are not proposed for each location individually. Given the size of the streams and the complications in open trench of large channels, non-impact techniques should be extensively evaluated. 2. The Division has significant concerns about the proposed dewatering technique referenced in the PCN (pump around). The Division’s experience is that complete dewatering of channels of that size is extremely difficult. Please review the proposed plan carefully and either provide an alternative dewatering method and a detailed construction sequence, or provide additional information with regards to the proposed pump around method in order to ensure that water quality standards will not be violated during construction activities. Please let me know if you have any questions regarding these topics. Thank you, Sue Homewood (she/her/hers) Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue.Homewood@ncdenr.gov <mailto:Sue.Homewood@ncdenr.gov> 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 ed by Laserfiche workflow. Please do not respond to this email address, as responses aren’t monitored.