HomeMy WebLinkAbout20190661 Ver 1_Task 7 Credit Release Request Sassarixa Swamp II_20221116ID#* 20190661
Select Reviewer:
Katie Merritt
Initial Review Completed Date 11/16/2022
Mitigation Project Submittal - 11/16/2022
Version* 1
Is this a Prospectus, Technical Proposal or a New Site?*
Type of Mitigation Project:*
Stream Wetlands Buffer Nutrient Offset
(Select all that apply)
Project Contact Information
Contact Name:*
Andrea Eckardt
Project Information
ID#:* 20190661
Existing ID#
Project Type: DMS • Mitigation Bank
Project Name: Sassarixa Swamp II
County: Johnston
Document Information
O Yes O No
Email Address:*
aeckardt@wildlandseng.com
Version:* 1
Existing Version
Mitigation Document Type:*
Mitigation Bank Information
File Upload: Task 7 Credit Release Request Sassarixa Swamp
1.52MB
I1.pdf
Please upload only one PDF of the complete file that needs to be submitted...
Signature
Print Name: * Andrea Eckardt
Signature: *
November 16, 2022
CREDIT RELEASE REQUEST FORM
To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator
From: Andrea Eckardt,aeckardt@wildlandseng.com, 704-560-2997
Through: Wildlands Holdings III, LLC
We formally request a credit release for the Sassarixa Swamp II Nutrient Offset and Buffer
Mitigation Bank Parcel for completion of Task 7 per the approved credit release schedule, which is
included in the Attachments with this request. The following documents have been submitted to
DWR for Task 7 and are pending review: Recorded Assignment of Conservation Easement Long-
term Stewardship (UP2Save)
Credits requested for release are detailed below:
Credit Type % Release Credit Amount Notes/Comments
(include Units)
Buffer Restoration 5% 14,187.60 Square Feet
Buffer Preservation NA NA
1
Buffer Enhancement 5% 1,714.38 square feetEnhancement and
2
3,116.49 Square feetenhancement via
1
cattle exclusion
2
Coastal headwater
Generated Nitrogen Nutrient pou
5%1,675.60 nds
t
Offse
Delivered Nitrogen Nutrient NANA
Offset (Jordan sites only)
Generated Phosphorus Nutrient NANA
Offset
Delivered Phosphorus Nutrient NANA
Offset (Jordan sites only)
Signature:
Attachments:
Approved Project Credit Table
Approved Credit Release Schedule
Recorded Assignment of Conservation Easement to Long-term
Steward
SassarixaSwampCreditReleaseSchedule
%Credit%RiparianBufferCredit
TaskProjectMilestoneAvailableReleasewithinCoastal
forSaleHeadwatersAreas
InstrumentandBPDPApprovedbyDWR,ConservationEasementRecorded,
120None
FinancialAssurancePosted,andDraftStreamMitigationPlanApprovedbyIRT
MitigationSiteEarthwork,PlantingandInstallationofMonitoringDevices
220None
Completed,andallApplicablePermitsObtained
3MonitoringFinancialAssurancePostedandApprovalofAsBuiltReport1025
4MonitoringReport#1:ApprovedbytheDWR*&financialassurancerenewed1010
5MonitoringReport#2:ApprovedbytheDWR*&financialassurancerenewed1010
6MonitoringReport#3:ApprovedbytheDWR*&financialassurancerenewed105
ItemB(1)ofSectionXinthisInstrumenthasbeencompletedandapprovedby
755
DWR
bƚƩĻƒğźƓźƓŭĭƩĻķźƷƭǞźƌƌĬĻƩĻƌĻğƭĻķǒƓƷźƌƷŷĻĭƚƓƭĻƩǝğƷźƚƓĻğƭĻƒĻƓƷŷğƭ
ĬĻĻƓğƭƭźŭƓĻķƷƚğƓğƦƦƩƚǝĻķƌğƓķƷƩǒƭƷƚƩƭƷĻǞğƩķƭŷźƦ
8MonitoringReport#4:ApprovedbytheDWR*&financialassurancerenewed55
MonitoringReport#5:ApprovedbytheDWR*&financialassurancerenewed
9forcoastalheadwaterbufferareas,andfinalsitevisitbyDWRhasbeen1020
conductedfornutrientoffsetareas
MonitoringReport#6:ApprovedbytheDWR*&financialassurancerenewed
10N/A10
forcoastalheadwaterbufferareas
MonitoringReport#7:ApprovedbytheDWR*&finalsitevisitbyDWRhas
11N/A10
beenconductedforcoastalheadwaterbufferareas
100%
Total100%