Loading...
HomeMy WebLinkAbout20190661 Ver 1_Task 7 Credit Release Request Sassarixa Swamp II_20221116ID#* 20190661 Select Reviewer: Katie Merritt Initial Review Completed Date 11/16/2022 Mitigation Project Submittal - 11/16/2022 Version* 1 Is this a Prospectus, Technical Proposal or a New Site?* Type of Mitigation Project:* Stream Wetlands Buffer Nutrient Offset (Select all that apply) Project Contact Information Contact Name:* Andrea Eckardt Project Information ID#:* 20190661 Existing ID# Project Type: DMS • Mitigation Bank Project Name: Sassarixa Swamp II County: Johnston Document Information O Yes O No Email Address:* aeckardt@wildlandseng.com Version:* 1 Existing Version Mitigation Document Type:* Mitigation Bank Information File Upload: Task 7 Credit Release Request Sassarixa Swamp 1.52MB I1.pdf Please upload only one PDF of the complete file that needs to be submitted... Signature Print Name: * Andrea Eckardt Signature: * November 16, 2022 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Andrea Eckardt,aeckardt@wildlandseng.com, 704-560-2997 Through: Wildlands Holdings III, LLC We formally request a credit release for the Sassarixa Swamp II Nutrient Offset and Buffer Mitigation Bank Parcel for completion of Task 7 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Task 7 and are pending review: Recorded Assignment of Conservation Easement Long- term Stewardship (UP2Save) Credits requested for release are detailed below: Credit Type % Release Credit Amount Notes/Comments (include Units) Buffer Restoration 5% 14,187.60 Square Feet Buffer Preservation NA NA 1 Buffer Enhancement 5% 1,714.38 square feetEnhancement and 2 3,116.49 Square feetenhancement via 1 cattle exclusion 2 Coastal headwater Generated Nitrogen Nutrient pou 5%1,675.60 nds t Offse Delivered Nitrogen Nutrient NANA Offset (Jordan sites only) Generated Phosphorus Nutrient NANA Offset Delivered Phosphorus Nutrient NANA Offset (Jordan sites only) Signature: Attachments: Approved Project Credit Table Approved Credit Release Schedule Recorded Assignment of Conservation Easement to Long-term Steward SassarixaSwampCreditReleaseSchedule %Credit%RiparianBufferCredit TaskProjectMilestoneAvailableReleasewithinCoastal forSaleHeadwatersAreas InstrumentandBPDPApprovedbyDWR,ConservationEasementRecorded, 120None FinancialAssurancePosted,andDraftStreamMitigationPlanApprovedbyIRT MitigationSiteEarthwork,PlantingandInstallationofMonitoringDevices 220None Completed,andallApplicablePermitsObtained 3MonitoringFinancialAssurancePostedandApprovalofAsBuiltReport1025 4MonitoringReport#1:ApprovedbytheDWR*&financialassurancerenewed1010 5MonitoringReport#2:ApprovedbytheDWR*&financialassurancerenewed1010 6MonitoringReport#3:ApprovedbytheDWR*&financialassurancerenewed105 ItemB(1)ofSectionXinthisInstrumenthasbeencompletedandapprovedby 755 DWR bƚƩĻƒğźƓźƓŭĭƩĻķźƷƭǞźƌƌĬĻƩĻƌĻğƭĻķǒƓƷźƌƷŷĻĭƚƓƭĻƩǝğƷźƚƓĻğƭĻƒĻƓƷŷğƭ ĬĻĻƓğƭƭźŭƓĻķƷƚğƓğƦƦƩƚǝĻķƌğƓķƷƩǒƭƷƚƩƭƷĻǞğƩķƭŷźƦ 8MonitoringReport#4:ApprovedbytheDWR*&financialassurancerenewed55 MonitoringReport#5:ApprovedbytheDWR*&financialassurancerenewed 9forcoastalheadwaterbufferareas,andfinalsitevisitbyDWRhasbeen1020 conductedfornutrientoffsetareas MonitoringReport#6:ApprovedbytheDWR*&financialassurancerenewed 10N/A10 forcoastalheadwaterbufferareas MonitoringReport#7:ApprovedbytheDWR*&finalsitevisitbyDWRhas 11N/A10 beenconductedforcoastalheadwaterbufferareas 100% Total100%