HomeMy WebLinkAbout20180196 Ver 2_Catfish Pond II_Credit Release Request Task 7_20221116ID#* 20180196
Select Reviewer:
Katie Merritt
Initial Review Completed Date 11/16/2022
Mitigation Project Submittal - 11/16/2022
Version* 2
Is this a Prospectus, Technical Proposal or a New Site?*
Type of Mitigation Project:*
Stream Wetlands Buffer Nutrient Offset
(Select all that apply)
Project Contact Information
Contact Name:*
Andrea Eckardt
Project Information
ID#:* 20180196
Existing ID#
Project Type:
Project Name:
O Yes O No
Email Address:*
aeckardt@wildlandseng.com
Version:* 2
Existing Version
DMS • Mitigation Bank
Catfish Pond II Mitigation Bank Parcel
County: Durham
Document Information
Mitigation Document Type:*
Mitigation Bank Information
File Upload: Catfish Pond II_Credit Release Request Task 7.pdf 729.01 KB
Please upload only one PDF of the complete file that needs to be submitted...
Signature
Print Name:* Andrea Eckardt
Signature: *
November 16, 2022
CREDIT RELEASE REQUEST FORM
To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator
From: Andrea Eckardt, aeckardt@wildlands eng.com, 704-560-2997
Through: Wildlands Holdings V, LLC
We formally request a credit release for the Catfish Pond II Nutrient Offset and Buffer Mitigation
Bank for completion of Task #7 per the approved credit release schedule, which is included in the
Attachments with this request. The following documents have been submitted to DWR for Task #7
and are pending review: Assignment of the Conservation Easement to the Long-term Steward
(UP2Save).
Credits requested for release are detailed below:
Credit Type % Release Credit Amount Notes/Comments
(include Units)
2
Buffer Restoration 5 17,141.700 ft
Buffer Preservation
2
Buffer Enhancement5 2,602.07ft
Generated Nitrogen Nutrient
52,164.385 lb-N
Offset
Delivered Nitrogen Nutrient
Offset (Jordan sites only)
Generated Phosphorus Nutrient 5139.403 lb-P
Offset
Delivered Phosphorus Nutrient
Offset (Jordan sites only)
Signature:
Attachments:
1) Approved Project Credit Table
Approved Credit Release Schedule
Recorded Assignment of Conservation Easement to Long-term
Steward
źƌķƌğƓķƭ9ƓŭźƓĻĻƩźƓŭͲLƓĭ͵ΛtΜВЊВ͵БЎЊ͵ВВБЏΘЌЊЋĻƭƷaźƌƌĬƩƚƚƉwƚğķͲ{ǒźƷĻЋЋЎΘwğƌĻźŭŷͲb/ЋАЏЉВ
——
2.786
893.299256.139743.777
Nutrient
2,044.286
Delivered
Offset: P (lbs)
——
43.258
N (lbs)
3,976.844
Delivered
13,869.43431,739.76811,547.938
Nutrient Offset:
NoNo
YesYesYesYesYes
Offset?
Nutrient
Convertible to
22
——
0.000
Credits
829.000
CreditsCredits
5,882.4112,788.063
76,212.00046,159.00052,041.41143,287.706
265,793.000342,834.000394,875.411
Riparian Buffer
0
—
NoNo
YesYesYesYesYes
Buffer?
342,834127,969470,803829,563
Riparian
to Riparian
Convertible
Square FeetSquare Feet
Buffer Credits
Nitrogen:
1.000001.000001.000002.000006.06061
Ratio (x:1) Ratio (x:1)
Final Credit Final Credit
Phosphorus:
TOTAL NUTRIENT OFFSET MITIGATION
Restoration:
Preservation:
TOTAL AREA OF BUFFER MITIGATION (TABM)
Enhancement:
Mitigation TotalsMitigation Totals
33%33%33%
100%100%100%100%
Offset:
Total Riparian Buffer:
Nutrient
% Full Credit% Full Credit
1112211
Ratio (x:1)Ratio (x:1)
Initial Credit Initial Credit
))
22
00
829
0.0%0.0%
Total Total
76,21292,31835,651
265,793470,803156,934
(Creditable) (Creditable)
Area of Buffer
Mitigation (ftArea for Buffer Mitigation (ft
):):
22
)
2
0
829
76,21292,31835,651
265,793608,259221,304
1,300,366
Total Area (sf)
Total Area (ft
Totals:
Eligible for Preservation (ft
ch D
Preservation Area Subtotal (ft
Ditch DDit
Feature NameFeature Name
Mountain Creek
Catfish Creek, UT1, Catfish Creek, UT1, Catfish Creek, UT1, Catfish Creek, UT1, Catfish Creek, UT1,
Mountain TributaryMountain TributaryMountain TributaryMountain Tributary
/pound)
Preservation as % Total Area of Buffer Mitigation:
/pound)
2
2
-100
0-500-501-200
0-100
101-200101-200
Width (ft)Width (ft)
Ephemeral Reaches as % Total Area of Buffer Mitigation:
Min-Max Buffer Min-Max Buffer
RestorationRestorationRestorationRestorationRestoration
Preservation
Cattle ExclusionCattle Exclusion
Enhancement via Enhancement via
Mitigation ActivityMitigation Activity
Project AreaN Credit Conversion Ratio (ftP Credit Conversion Ratio (ft
I / PI / PI / PI / PI / P
DitchDitch
Feature TypeFeature Type
)
1
NoNo
YesYesYesYesYes
arcel
NO if
ditch
P
Subject?
(1.69 acres) which includes the Ditch D channel, the forested area along Ditch D, credits removed for non-diffuse flow, areas more than 200' from top of bank, and internal crossings.
2
ephemeral or
Subject? (enter
19.16394
297.54099
2021
RuralRuralRuralRuralRuralRuralRural
470803
0 -
itigation Bank LocationLocation
M
ear
Neuse 03020201 - Upper Falls Lake
Y
0
BufferBufferBufferBufferBufferBuffer
470803
onitoring
Credit TypeCredit Type
Nutrient OffsetNutrient Offset
Catfish Pond II MEnter Preservation Credits Below
1.The Randleman Lake buffer rules allow some ditches to be classified as subject according to 15A NCAC 02B .0250 (5)(a).2.No credit is claimed for 73,616 ft
Approved Credit Release Schedule (BPDP)
Catfish Pond II Mitigation Bank Parcel
Bank Parcel Development Package
% Credit Available
Task Project Milestone
for Sale
Instrument and BPDP Approved by NCDWR, NCDMS Full Delivery
1Mitigation Plans approved by the IRT and DWR, Conservation Easement 20
Recorded and Financial Assurance Posted
NCDMS Full Delivery As-Built Report Submitted to NCDWR, all
Mitigation Site Earthwork, Planting and Installation of Monitoring
2 20
Devices Completed for both the Catfish Pond Full-Delivery Site (DMS ID
#100039) and the Bank Parcel.
3 Monitoring Financial Assurance Posted and Approval of As-Built Report 10
Monitoring Report #1: Approved by the NCDWR & financial assurance
4 10
renewed
Monitoring Report #2: Approved by the NCDWR & financial assurance
5 10
renewed
Monitoring Report #3: Approved by the NCDWR & financial assurance
6 10
renewed
Item B(1) of Section X in this Instrument has been completed and
7 5
approved by NCDWR
No remaining credits will be released until the conservation easement has been assigned to an
approved land trust or stewardship
Monitoring Report #4: Approved by the NCDWR & financial assurance
8 5
renewed
Monitoring Report #5: Approved by the NCDWR and final site visit by
9 10
NCDWR has been conducted
Total 100%