Loading...
HomeMy WebLinkAbout20180196 Ver 2_Catfish Pond II_Credit Release Request Task 7_20221116ID#* 20180196 Select Reviewer: Katie Merritt Initial Review Completed Date 11/16/2022 Mitigation Project Submittal - 11/16/2022 Version* 2 Is this a Prospectus, Technical Proposal or a New Site?* Type of Mitigation Project:* Stream Wetlands Buffer Nutrient Offset (Select all that apply) Project Contact Information Contact Name:* Andrea Eckardt Project Information ID#:* 20180196 Existing ID# Project Type: Project Name: O Yes O No Email Address:* aeckardt@wildlandseng.com Version:* 2 Existing Version DMS • Mitigation Bank Catfish Pond II Mitigation Bank Parcel County: Durham Document Information Mitigation Document Type:* Mitigation Bank Information File Upload: Catfish Pond II_Credit Release Request Task 7.pdf 729.01 KB Please upload only one PDF of the complete file that needs to be submitted... Signature Print Name:* Andrea Eckardt Signature: * November 16, 2022 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Andrea Eckardt, aeckardt@wildlands eng.com, 704-560-2997 Through: Wildlands Holdings V, LLC We formally request a credit release for the Catfish Pond II Nutrient Offset and Buffer Mitigation Bank for completion of Task #7 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Task #7 and are pending review: Assignment of the Conservation Easement to the Long-term Steward (UP2Save). Credits requested for release are detailed below: Credit Type % Release Credit Amount Notes/Comments (include Units) 2 Buffer Restoration 5 17,141.700 ft Buffer Preservation 2 Buffer Enhancement5 2,602.07ft Generated Nitrogen Nutrient 52,164.385 lb-N Offset Delivered Nitrogen Nutrient Offset (Jordan sites only) Generated Phosphorus Nutrient 5139.403 lb-P Offset Delivered Phosphorus Nutrient Offset (Jordan sites only) Signature: Attachments: 1) Approved Project Credit Table Approved Credit Release Schedule Recorded Assignment of Conservation Easement to Long-term Steward ‘źƌķƌğƓķƭ9ƓŭźƓĻĻƩźƓŭͲLƓĭ͵ΛtΜВЊВ͵БЎЊ͵ВВБЏΘЌЊЋ‘ĻƭƷaźƌƌĬƩƚƚƉwƚğķͲ{ǒźƷĻЋЋЎΘwğƌĻźŭŷͲb/ЋАЏЉВ —— 2.786 893.299256.139743.777 Nutrient 2,044.286 Delivered Offset: P (lbs) —— 43.258 N (lbs) 3,976.844 Delivered 13,869.43431,739.76811,547.938 Nutrient Offset: NoNo YesYesYesYesYes Offset? Nutrient Convertible to 22 —— 0.000 Credits 829.000 CreditsCredits 5,882.4112,788.063 76,212.00046,159.00052,041.41143,287.706 265,793.000342,834.000394,875.411 Riparian Buffer 0 — NoNo YesYesYesYesYes Buffer? 342,834127,969470,803829,563 Riparian to Riparian Convertible Square FeetSquare Feet Buffer Credits Nitrogen: 1.000001.000001.000002.000006.06061 Ratio (x:1) Ratio (x:1) Final Credit Final Credit Phosphorus: TOTAL NUTRIENT OFFSET MITIGATION Restoration: Preservation: TOTAL AREA OF BUFFER MITIGATION (TABM) Enhancement: Mitigation TotalsMitigation Totals 33%33%33% 100%100%100%100% Offset: Total Riparian Buffer: Nutrient % Full Credit% Full Credit 1112211 Ratio (x:1)Ratio (x:1) Initial Credit Initial Credit )) 22 00 829 0.0%0.0% Total Total 76,21292,31835,651 265,793470,803156,934 (Creditable) (Creditable) Area of Buffer Mitigation (ftArea for Buffer Mitigation (ft ):): 22 ) 2 0 829 76,21292,31835,651 265,793608,259221,304 1,300,366 Total Area (sf) Total Area (ft Totals: Eligible for Preservation (ft ch D Preservation Area Subtotal (ft Ditch DDit Feature NameFeature Name Mountain Creek Catfish Creek, UT1, Catfish Creek, UT1, Catfish Creek, UT1, Catfish Creek, UT1, Catfish Creek, UT1, Mountain TributaryMountain TributaryMountain TributaryMountain Tributary /pound) Preservation as % Total Area of Buffer Mitigation: /pound) 2 2 -100 0-500-501-200 0-100 101-200101-200 Width (ft)Width (ft) Ephemeral Reaches as % Total Area of Buffer Mitigation: Min-Max Buffer Min-Max Buffer RestorationRestorationRestorationRestorationRestoration Preservation Cattle ExclusionCattle Exclusion Enhancement via Enhancement via Mitigation ActivityMitigation Activity Project AreaN Credit Conversion Ratio (ftP Credit Conversion Ratio (ft I / PI / PI / PI / PI / P DitchDitch Feature TypeFeature Type ) 1 NoNo YesYesYesYesYes arcel NO if ditch P Subject? (1.69 acres) which includes the Ditch D channel, the forested area along Ditch D, credits removed for non-diffuse flow, areas more than 200' from top of bank, and internal crossings. 2 ephemeral or Subject? (enter 19.16394 297.54099 2021 RuralRuralRuralRuralRuralRuralRural 470803 0 - itigation Bank LocationLocation M ear Neuse 03020201 - Upper Falls Lake Y 0 BufferBufferBufferBufferBufferBuffer 470803 onitoring Credit TypeCredit Type Nutrient OffsetNutrient Offset Catfish Pond II MEnter Preservation Credits Below 1.The Randleman Lake buffer rules allow some ditches to be classified as subject according to 15A NCAC 02B .0250 (5)(a).2.No credit is claimed for 73,616 ft Approved Credit Release Schedule (BPDP) Catfish Pond II Mitigation Bank Parcel Bank Parcel Development Package % Credit Available Task Project Milestone for Sale Instrument and BPDP Approved by NCDWR, NCDMS Full Delivery 1Mitigation Plans approved by the IRT and DWR, Conservation Easement 20 Recorded and Financial Assurance Posted NCDMS Full Delivery As-Built Report Submitted to NCDWR, all Mitigation Site Earthwork, Planting and Installation of Monitoring 2 20 Devices Completed for both the Catfish Pond Full-Delivery Site (DMS ID #100039) and the Bank Parcel. 3 Monitoring Financial Assurance Posted and Approval of As-Built Report 10 Monitoring Report #1: Approved by the NCDWR & financial assurance 4 10 renewed Monitoring Report #2: Approved by the NCDWR & financial assurance 5 10 renewed Monitoring Report #3: Approved by the NCDWR & financial assurance 6 10 renewed Item B(1) of Section X in this Instrument has been completed and 7 5 approved by NCDWR No remaining credits will be released until the conservation easement has been assigned to an approved land trust or stewardship Monitoring Report #4: Approved by the NCDWR & financial assurance 8 5 renewed Monitoring Report #5: Approved by the NCDWR and final site visit by 9 10 NCDWR has been conducted Total 100%