HomeMy WebLinkAbout20070682 Ver 1_Meeting Minutes_20070904~Ye° ~t °~
•Y
.~.~
STATE OF NORTH CAROLINA
DEPARTIV~NT OF TRANSPORTATION
MICHAEL F. EASLEY DMSION OF HIGHWAYS
GOVERNOR
September 4, 2007
WBS Element: 33309.3.1 (B-3863)
Contract 1~To. C241643
F. A. Number: BRZ-1722 (2)
County: Johnston
Description: Bridge over Little River and Approaches on SR 1722
MEMORANDUM TO: Ellis C. Powell, Jr., PE
State Construction Engin
FROM: Wendi O. Johnson, PE
Division Construction Enginee
LYNDO TIPPETT
SECRETARY
SUBJECT; Approved Preconstruction Conference & Permit Meeting Minutes
We are transmitting an approved copy of the minutes covering the Preconstruction Conference for
the above project, which was held on August 20, 2007. The minutes were approved by the
Contractor, S. W. Wooten Corporation, as recorded.
Attachment
c: Ron Lucas (FHWA)
Gary Jordan (US Fish & Wildlife)
Rob Ridings (NCDENR, Division of Water Quality)
Brian Wrenn (NCDENR, Division of Water Quality)
John Holley (NCDENR, Land Quality Section)
Travis Wilson (NCWRC)
David Cox (NCWRC)
Ron Sechler (National Marine Fisheries)
William Wescott (US Army Corps of Engineers)
Richard White (Bell South)
Post Office Box 3165, Wilson, North Carolina 27895-3165
Telephone (252) 237-6164 Fax (252) 234-6174
Ellis C. Powell, Jr., PE
September 4, 2007
Page 2
ec: Cecil Jones, PE
Donald Pearson, EI, CPESC
Robert Simpson
Andy Brown, PE
Bobby Lewis, PE
Mike Robinson, PE
Warren Walker, PE
Andy Pridgen
Ron Hancock, PE
Lloyd Johnston, Jr.
Mike McKeel, PE
Keith Honeycutt, PE, PLS
Charles W. Brown, PE, PLS
Kevin Lacy, PE
Victor Barbour, PE
Don G. Lee
Jimmy Marler
Jamie Guerrero
Haywood Daughtry, PE
Doug Allison
Monroe Brown
Chris Kreider, PE
David R. Henderson, PE
Queen Crittendon
Greg Dixon
Tim Little, PE
Jeff Allen, PE
Kenny Baines
PRECONSTRUCTION CONFERENCE AND PERMIT MEETING
WBS Element: 33309.3.1 (B-3863)
Federal Aid No.: BRZ-1722 (2)
Contract No.: C201643
County: Johnston
Description: Bridge over Little River and Approaches on SR 1722
The Preconstruction Conference for the above project was h nlddan tRhe Wilson Division Office Conference
Room on August 20, 2007 with the following persons m atte
REPRESENTING
N_
Andy Pridgen NCDOT - QA Lab
NCDOT -Right of Way
Steve Grimes
NCDOT -Office of Civil Rights
Greg Dixon NCDOT -Resident Engineer
Mike McKeel NCDOT -Assistant Resident Engineer
Brandon Herring NCDOT -Location and Surveys
Keith Honeycutt NCDOT -Roadside Environmental Unit
Tim Robbins NCDOT -Hydraulics
Brook Anderson Wooten
T
S
Brian Weathersby .
.
Erick Frazier S. T. Wooten
Michael Vaught Narron Contracting
Wendi Johnson, Division Construction Engineer, presided over the conference. She asked everyone present to
introduce themselves and their company affiliation.
The Contractor submitted his letter naming persons authorized to sign Supplemental Agreements.
David High will act as Project Superintendent for the Contractor.
Scott Price will act as Project Inspector and Traffic Control Coordinator for the Division of Highways.
The Contractor advised they plan to begin work August 27, 2007.
The Contractor submitted his progress schedule. He was advisde`ds natthe Contractor that his progr Sould
be advised if satisfactory. By copy of these rrunutes, we area g
schedule has been checked and is approved as submitted.
RIGHT OF WAY
Steve Grimes covered this portion of the contract.
All of the right of way necessary for this projectnts cover all of the right ofhw y and easements necessary
given to the Resident Engineer. These agreeme
for this project that were acquired by negotiation.
Preconstruction Conference Minutes
B-3863
Page 2
There are no 200 Series Items on this project.
There is no known asbestos contamination, underground storage tanks, nor any known soil contamination
within the right of way of the project.
The Contractor is advised not to exceed the right of way or easement areas during construction without
written permission from the property owner.
Mr. Grimes advised that one property owner (Mr. Brown) had some questions and concerns, but he has
talked with Mike McKeel and resolved those issues.
LOCATION AND SURVEYS
Keith Honeycutt covered this portion of the contract. Hew hed~vis ~ of way was staked inuOctober 2006
surveying. The survey work was done in October 2002 and gh
Right of way was verified in July 2007. Control Data Sheets are in the plans. There is no calibration on
this project.
There is a parcel of land on this project that is part of a FEMA buyout and needs orange fencing around it.
UTILITY CONFLICTS
Mike McKeel advised that all utility conflicts on this project have been cleared.
ASPHALT PAVEMENTS
Mr. Andy Pridgen, Division QA Supervisor, asked the Contractor if he had any questions of the Special
Provisions outlined on pages 28 thru 31.
Mr. Pridgen advised that the Special Provisions in this contract are dated 07/18/06 (Rev. 9/19/06).
Density testing may be required for wedging (depending on the depth).
The Contractor can now design Rap mix with 20% rap rather than 15%.
The Contractor's attention was called to page 30 of the contract which shows New Source Rap Gradation
and Binder Tolerances-
The Contractor advised that cores will be utilized for testing on this project.
Item 21, Asphalt Plant Mix, Pavement Repair, shall be done in accordance with Section 654 of the
Standard Specifications.
Preconstruction Conference Minutes
' B-3863
Page 3
DISADVANTAGED BUSINESS ENTERPRISE
Greg Dixon covered this portion of the contract.
It is the policy of the North Carolina Department of Transportation that Disadvantaged Business
Enterprises (DBEs) as defined in 49 CFR Part 26 shall have the opportunity to participate in the
performance of contracts financed in whole or in part by federal funds in order to create a level playing field
on which DBEs can compete fairly.
The Contractor, subcontractor and sub-recipient shall not discriminate on the basis of race, color, national
origin or sex in the performance of this contract. The Contractor shall carry out applicable requirements of
49 CFR Part 26 in the award and administration of federally assisted contracts. Failure by the Contractor
to carry out these requirements is a material breach of this contract, which may result in the termination of
this contract or such other remedy, as the Department deems necessary.
The Contractor is also encouraged to give every opportunity to allow DBE participation in Supplemental
Agreements.
The Contractor's EEO Officer and Minority Liaison Officer is Richard Vick.
The Contractor shall exercise all necessary and reasonable steps to insure that Disadvantaged Business
Enterprises participate in at least 5% of the contract. The contract was awarded with 14.1% participation.
The Resident Engineer furnished the Contractor with required posters for his bulletin board. The Contractor's
EEO Policy Statement is to be posted on the project's bulletin board, which should be weatherproof, along
with the following posters:
1. Davis-Bacon Minimum Prevailing Wage Rate Schedule
2. Wage-Rate Information - F/A Project, Form PR-1495
3. Notice Relating to False Statements, Form PR-1022
4. EEO Poster -Discrimination is Prohibited
The Contractor is urged to document, in writing, all actions taken in complying with Equal Opportunity of
Employment Provisions, Training Provision, and Minority Business Enterprise Provision. This includes
applicant referrals, meetings with employees, on-site inspections, wage evaluations, etc.
All subcontractors and suppliers are responsible for meeting the same requirements as the pn-ime contractor,
and it is the prime contractor's responsibility to oversee that both are in compliance.
All alleged discriminatory violations should be brought to the attention of the Resident Engineer,
The State and/or FHWA will conduct a Contract Compliance Review sometime during the life of this contract.
Therefore, fair employment practice should be maintained at all times.
Preconstruction Conference Minutes
B-3 863
Page 4
Reporting Disadvantaged Business Enterprise Participation -When payments are made to Disadvantaged
Business Enterprise firms, including material suppliers, contractors at all levels shall provide the Engineer with
an accounting of said payments. This accounting shall be furnished to the Engineer for any given month by the
end of the following month.
The Contractor shall report the accounting of payments through the Department's DBE Payment Tracking
System, which is a web-based application. The System can be accessed through the following web link:
hops'//apps.dot.sta[e.nc.usiV'endor/Pa~ mcntTrackin ~!.
The Contractor shall also provide the Engineer an affidavit attesting the accuracy of the information submitted
in the Payment Tracking System. This, too, shall be submitted for any given month by the end of the following
month.
Submission of Records -Federal Aid Projects - This project is not located on the National Highway
System; therefore, federal form FHWA-47 is not required. Also, certified payrolls are not required on this
project.
Form PR-1391 is required for any subcontract over $10,000.00.
PROJECT SPECIAL PROVISIONS
GENERAL
Contract Time and Liquidated Damages -The date of availability for this contract is August 27, 2007.
The completion date for this contract is May 15, 2008.
The liquidated damages for this contract are $500.00 per calendar day.
Fuel Price Adjustment -Bidders will have the option to opt out of receiving a fuel price adjustment on this
contract. If no designation is shown in the bid, the bidder will be subject to the fuel price adjustment. The base
index price for Number Two Diesel Fuel is $2.0502 per gallon. The Contractor chose not to opt out.
Erosion & Sediment Control/Storm Water Certification -Contractor shall provide a Certified Supervisor,
Certified Foreman and Certified Installer on this project. Contractor will notify the Engineer of changes in
certified personnel over the life of the contract within two days of change. David High will serve as the
Certified Supervisor on this project. The roles and responsibilities of the Certified Supervisor, Certified
Foreman and Certified Installer are shown on pages 16-20 of the contract. The Inspector will make certain
that the Certified Supervisor, Certified Foreman and Certified Installer are performing their duties as stated
in the contract.
Procedure for Monitoring Borrow Pit Discharge -Water discharge from borrow pit sites shall not cause
surface waters to exceed 50 NTUs in streams not designated as trout waters and 10 NTUs in streams, lakes
or reservoirs designated as trout waters. For lakes and reservoirs not designated as trout waters, the
turbidity shall not exceed 25 NTUs. If the turbidity exceeds these levels due to natural background
conditions, the existing turbidity level shall not be increased.
Preconstruction Conference Minutes
B-3863
Page 5
If during any operating day, the downstream water quality exceeds the standard, the Contractor shall do all
of the following:
(A) Either cease discharge or modify the discharge volume or turbidity levels to bring the downstream
turbidity levels into compliance, or
(B) Evaluate the upstream conditions to determine if the exceedance of the standard is due to natural
background conditions. If the background turbidity measurements exceed the standard, operation
of the pit and discharge can continue as long as the stream turbidity levels are not increased due to
the discharge.
(C) Measure and record the turbidity test results (time, date and sampler) at all defined sampling
locations 30 minutes after startup and at a minimum, one additional sampling of all sampling
locations during that 24-hour period in which the borrow pit is discharging.
(D) Notify DWQ within 24 hours of any stream turbidity standard exceedances that are not brought into
compliance.
During the Environmental Assessment required by Article 230-4 of the Standard Specifications, the
Contractor shall define the point at which the discharge enters the State's surface waters and the
appropriate sampling locations. The discharge shall be closely monitored when water from the dewatering
activities is introduced into jurisdictional wetlands. No activities shall occur in wetlands that adversely
affect the functioning of a wetland. Visible sedimentation will be considered an indication of possible
adverse impacts on wetland use.
The Contractor stated that no outside borrow will be needed.
PROJECT SPECIAL PROVISIONS
ROADWAY
Shoulder and Fill Slope Material -Required shoulder and slope construction for this project shall be
performed in accordance with the requirements of Section 226 of the 2006 Standard Specifications except
as follows:
Construct the top 6" (150mm) of shoulder and fill slopes with soils capable of supporting vegetation.
Provide soil with P.I. greater than 6 and less than 25 and with a pH ranging from 5.5 to 6.8. Remove
stones and other foreign material 2" (SOmm) or larger in diameter. All soil is subject to testing and
acceptance or rejection by the Engineer.
EROSION CONTROL
Crimping Straw Mulch -Crimping shall be required on this project adjacent to any section of roadway
where traffic is to be maintained or allowed during construction. In areas within six feet of the edge of
pavement, straw is to be applied and then crimped. After the crimping operation is complete, an additional
application of straw shall be applied and immediately tacked with a sufficient amount of undiluted,
emulsified asphalt.
Preconstruction Conference Minutes
B-3863
Page 6
Reforestation -Reforestation will be planted in areas where the detour is removed and regraded to natural
elevations and in other areas as directed. Reforestation is not shown on the plan sheets (see the
Reforestation Detail Sheet). Reforestation shall be planted from November 15 through March 15. The
Contractor should allow ample time for ordering and receiving the materials needed for reforestation.
All non-maintained riparian buffers impacted by the placement of temporary fill or clearing activities shall
be restored to the preconstruction contours and revegetated with native woody species.
Environmentally Sensitive Areas -This project is located in an Environmentally Sensitive Area. This
designation requires special procedures to be used for clearing and grubbing, temporary stream crossings
and grading operations within the Environmentally Sensitive Areas identified on the plans and as designated
by the Engineer. This also requires special procedures to be used for seeding and mulching and stage
seeding within the project.
The Environmentally Sensitive Area shall be defined as a 50-foot buffer zone on both sides of the stream or
depression, measured from top of stream bank or center of depression.
Clearing and Grubbing - In areas identified as Environmentally Sensitive Areas, the Contractor may
perform clearing operations but not grubbing operations until immediately prior to beginning grading
operations as described in Article 200-1 of the Standard Specifications. Only clearing operations (not
grubbing) shall be allowed in this buffer zone until immediately prior to beginning grading operations.
Erosion control devices shall be installed immediately following the clearing operation. Contractor was
advised to only clear and grub where absolutely necessary.
Grading -Once grading operations begin in identified Environmentally Sensitive Areas, work shall
progress in a continuous manner until complete. All construction within these areas shall progress in a
continuous manner such that each phase is complete and areas are permanently stabilized prior to beginning
of next phase. Failure on the part of the Contractor to complete any phase of construction in a continuous
manner in Environmentally Sensitive Areas will be just cause for the Engineer to direct the suspension of
work in accordance with Article 108-7 of the Standard Specifications.
Minimize Removal of Vegetation: -The Contractor shall minimize removal of vegetation at stream banks
and disturbed areas within the project limits as directed. Only remove what is absolutely necessary.
Waste and Borrow Sources -Payment for temporary erosion control measures, except that made necessary
by the Contractor's own negligence or for his own convenience, will be paid for at the appropriate contract
unit price for the devices or measures utilized in borrow sources and waste areas. Excess waste will be
taken to a commercial site.
No additional payment will be made for erosion control devices or permanent seeding and mulching in any
commercial borrow or waste pit. All erosion and sediment control practices that may be required on a
commercial borrow or waste site will be done at the Contractor's expense.
Safety Fence -The Safety Fence shall be installed prior to any land disturbing activities. The Resident
.Engineer and the Contractor will meet on site Friday, August 24, 2007.
Preconstruction Conference Minutes
B-3 863
Page 7
Coir Fiber Baffle -Contractor shall install Coir Fiber Baffles in silt basins and sediment dams at drainage
outlets.
STRUCTURES
No comments.
PERMITS
Mrs. Johnson advised that the US Army Corps of Engineers and NCDENR have issued a permit for this
project.
Permit drawings were enlarged to show detail.
Everyone working on the project should be familiar with the conditions of the permit.
The Contractor shall comply with all applicable permit conditions during construction of this project.
Agents of the permitting authority will periodically inspect the project for adherence to the permits.
Should the Contractor propose to utilize construction methods (such as temporary structures or fill in waters
and/or wetlands for haul roads, work platforms, cofferdams, etc.) not specifically identified in the permit
(individual, general or nationwide) authorizing the project, it shall be the Contractor's responsibility to
coordinate with the Engineer to determine what, if any, additional permit action is required.
The Contractor shall also be responsible for initiating the request for the authorization of such construction
method by the permitting agency. The request shall be submitted through the Engineer. The Contractor shall
not utilize the construction method until it is approved by the permitting agency. The request normally takes
approximately 60 days to process; however, no extensions of time or additional compensation will be granted
for delays resulting from the Contractor's request for approval of construction methods not specifically
identified in the permit.
Where construction moratoriums are contained in a permit condition. which restricts the Contractor's activities
to certain times of the year, those moratoriums will apply only to the portions of the work taking place in the
waters or wetlands, provided that activities outside those areas are done in such a manner as to not affect the
waters or wetlands.
If concrete is used during construction, a dry work area should be maintained to prevent direct contact
between curing concrete and stream water.
During construction of the project, no staging of equipment of any kind is permitted in waters of the US or
riparian buffers.
Any Rip Rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not
impede aquatic life passage.
Heavy equipment must be operated from the banks rather than in the stream channel in order to minimize
sedimentation and reduce the likelihood of introducing other pollutants into the stream.
Preconstruction Conference Minutes
B-3863
Page 8
Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface
waters is prohibited.
All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise
authorized by this certification.
A copy of the Water Quality Certification shall be posted on the construction site at all times.
Page 119 of the contract shows the wetlands/surface water drawings. Page 125 shows where the buffers can
be impacted. Inside easement looks to be completely permitted.
OTHER COMMENTS
The Contractor was reminded that he needed to get his bridge demolition plan submitted as soon as possible.
The Contractor advised that Stay Alert wants help with the location of the detour signs.
The Contractor also advised that he was in the process of refining the drilled shaft procedure with Gemini.
This will be forwarded to the Geotechnical Unit as soon as possible.
The monthly estimate will be processed at the end of the month.
The Resident Engineer and the Contractor will hold monthly construction meetings.
There were no further questions and/or comments and the meeting was adjourned.
S. T. WOOTEN CORPORATION
S L 4 0 7 .mow Gc.` ri~ra~
DA AP OVED NAME AND TITLE
ae ,,.r,~ w ~~ -~,.b,tsc~r