Loading...
HomeMy WebLinkAboutWQ0043901_Engineering Specs & Details Manual_20221021w, oo43o( CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL SlEc o 3 — UTILITY TREINIcHES Excavation and Preparation RECENEDMCDENR/DW OCT 2'1 2022 Water Quality Regional Operations Section Washington Regional Office Preparation. Trenching for pipelines shall be excavated to the required depth to permit the installation of the pipe (inclusive of pipes, wires, cables, ducts, and conduit) along the lines and grades shown on the construction drawings. Prior to trenching for the construction of any utility mains or connections, the Contractor shall locate all existing utilities within the construction zone. This may include at a minimum contacting the North Carolina One Call Center at 811 or 1-800-632-4949. Where critical City of Goldsboro water and sewer utilities cannot be located by traditional means, specialized utility locating, such as vacuum excavation or ground penetrating radar (GPR) may be required to locate existing utilities before excavating. In all cases where trenchless methods are planned to cross an existing utility corridor with water, sewer, force main, reclaimed water and/or other City maintained pipelines, a Subsurface Utility Exploration services firm shall be contracted to verify the depths of existing utilities prior to boring. The Contractor shall be responsible for implementing all required safety provisions for trenching in compliance with OSHA regulations and all other applicable safety requirements and procedures. Trenching. The minimum trench width at the top of the pipe shall be at least 18 inches greater than the outside diameter of the pipe. Rock shall be removed to a depth of at least 6 inches below the bottom of the pipe and the trench backfilled with suitable material. Open trenches shall not exceed 100 feet. All trenches shall be confined to the limits of the right-of-way or utility easement. Trenches in paved areas shall not be sloped. All trenches in or along roadways shall be properly backfilled at the end of each working day. Wet trenches shall be stabilized with a base layer of #78 M or #57 stone. The bottom of the trench shall be shaped to provide uniform support along the entire length of the pipeline. Severely unstable trench bottoms requiring undercut excavation shall receive a foundation support system for the pipeline designed by a registered Geotechnical Engineer licensed in the State of North Carolina. A space shall be excavated at each bell to provide ample space to join the pipes with no misalignment. The Contractor shall take all necessary measures to prevent water from entering the trench. Pipe Laying and Backfilling All pipe shall be laid in accordance with the manufacturer's recommendations. Pipe laying and backfilling shall be accomplished in a manner to prevent damage and misalignment of the pipe. The subgrade at the bottom of the trench shall be shaped to secure uniform support throughout the length of the pipe. A space shall be excavated under the bell of each pipe to provide space to relieve bearing pressure on the bell and to provide room to adequately make the joint. Open 16 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL ends of the pipe shall be plugged with a standard plug or cap at all times when pipe laying is not in progress. Trench water shall not enter the pipe. Backfill material shall be free from construction materials, debris, and frozen, organic, or unstable material. The top two feet of backfill material shall be free from stones greater than 2 inches in diameter. Under roadways and extending at a slope of 1 to 1 beyond the back of the curb, measured perpendicular from the centerline, backfill shall be compacted to a density of no less than 100% Standard Proctor maximum dry density as measured by AASHTO method T99. Backfill shall be placed in lifts of 12 inches or less of uncompacted soil. Other fill material shall be compacted to a density of no less than 95% of the maximum dry density as measured by AASHTO method T99. Backfill material shall be placed in lifts of 12 inches or less of uncompacted soil. Suitable backfill material shall be utilized and compacted in accordance with the City compaction requirements and the pavement repair shall be in accordance with the applicable section of this Manual. All trenches shall be properly backfilled at the end of each working day. All curb cuts shall be repaired within a maximum of 3 days from the date the cut is made. If conditions do not permit a permanent repair within the given time limit, permission to make a temporary repair must be obtained from the City Engineer. In locations where backfill material is temporarily stockpiled on the roadway surface, a layer of 1.5 inches of screenings shall be used between the pavement surface and the backfill material. Trenchless Pipe Installation General. All utility crossings within City streets shall be made by trenchless methods. State maintained streets within the City's ETJ should also be crossed using trenchless methods. In cases where utility conflicts, rock, or other obstructions prevent trenchless crossings, the City may consider approving other methods. The preferred trenchless method shall be auger boring. Altemate trenchless methods including micro -tunneling, guided boring, conventional tunneling, horizontal directional drilling or hand tunneling may be approved after thorough evaluation by the Engineering Department. In addition to meeting or exceeding all City requirements, all trenchless crossings shall be approved by and meet the requirements of all controlling legal authorities, such as NCDOT, Norfolk Southern Railway and CSX Corporation. Direct bores may be made without a casing pipe on pipelines 6 inches in diameter and smaller. Encasement pipe shall be installed with all trenchless construction methods (excluding horizontal directional drilling when it is approved and as noted above). There shall be a minimum cover of 4 feet between the pavement subgrade and the top of the casing pipe. Under no circumstances shall the pavement subgrade be disturbed. Permanent easements shall be provided at all trenchless pits to allow for future access to casing pipes. Encasement Pipe. Encasement pipe shall be new and manufactured of grade 'B' steel with minimum yield strength of 35,000 psi in accordance with ASTM A139 and A283. All casing 17 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL pipe shall have machine cut, bevel ends that are perpendicular to the longitudinal axis of the casing. Size and minimum wall thickness of smooth wall or spiral welded steel encasement pipe shall be as shown in the below table. Actual wall thicknesses shall be determined by the casing installer based on their evaluation of the required forces to be exerted on the casing when it is installed. Minimum Wall Thickness of Steel Encasement Pipe Encasement Pipe OD (inches) Minimum Wall Thickness (inches) 12.75 0.188 14 0.250 16 0.250 18 0.250 20 0.250 24 0.250 26 0.312 28 0.312 30 0.312 36 0.375 42 0.500 48 0.500 54 0.500 60 0.500 66 0.625 Encasement pipe installed for railroad bores shall meet the requirements of the American Railway Engineering Association (AREA) for boring under railroads. 18 A CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Minimum Allowable Steel Encasement Diameter Per Carrier Size (inches) Carrier Pipe Size Inside Diameter Carrier Pipe Outside Bell Diameter Steel Encasement Nominal Diameter 6 9.19 12.75 8 11.33 16 10 13.56 18 12 15.74 20 14 19.31 24 16 21.43 26 18 23.7 28 20 25.82 30 24 29.88 36 30 36.34 42 36 42.86 48 42 49.92 60 48 56.36 66 Casing Pipe Spacers and End Closures. The carrier pipe shall rest on steel pipe alignment spacers. The spacers shall have either a bituminous or epoxy coating. A minimum of 2 steel spacers per joint shall be required on carrier pipe less than 36 inches. Carrier pipe greater than or equal to 36 inches shall have a third spacer. The steel spacers shall be located evenly along the carrier pipe alignment in such a manner that each spacer supports the same unit weight of carrier main. The spacing interval of the steel spacers shall assure the necessary grade, clearance, and support of the carrier main. The spacers shall be manufactured for the specific carrier pipe and casing pipe diameters being used such that the risers do not allow the pipe to float within the casing. In cases where the encasement pipe is installed in closed proximity to facilities with stray current, such as gas lines, high voltage power transmission lines, petroleum lines, railroad tracks, etc. the steel spacers shall be provided with composite contacts on the runners such as an EPDM rubber liner or an ultra -high molecular weight polyethylene plastic skid to prevent transmitting the stray current to the carrier pipe. The carrier pipe bells shall not be allowed to contact the interior of the encasement pipe under any circumstances. No blocks or temporary spacers shall be wedged between the carrier pipe 19 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL and the top of the encasement pipe. The ends of the encasement pipe shall be sealed using 8 inch bricks and a non -shrink grout. A 2 inch galvanized vent pipe shall be provided on the upper end of the casing on all stream and railroad crossings. Carrier Pipe. All carrier pipe shall be locking joint ductile iron pipe resting on steel skids as shown in the Standard Detail Drawings to prevent damage to the pipe bell. A minimum of 2 skids per joint of carrier pipe spaced evenly in the encasement pipe shall be required. Pipe bells shall not contact the interior of the casing pipe. No blocks or spacers shall be wedged between the pipe and the top of the casing. External Corrosion Protection External corrosion can occur at an accelerated rate in metallic pipelines such as steel and ductile iron when they are installed in aggressive soils or when they are installed near other structures or utilities that carry impressed currents. Such facilities that typically utilize impressed current cathodic protection are gas pipelines. Other potential sources that may create stray currents that contribute to accelerated pipeline corrosion are high voltage power transmission lines and railroad crossings. In cases where metallic steel and ductile iron pipelines or encasement pipes are planned for installation in close proximity to any potential sources of stray current or aggressive soils, zinc coated pipe shall be specified and a field analysis consisting of stray current evaluation and soil testing shall be conducted by an experienced technician, as certified by the National Association of Corrosion Engineers, (NAGE), to determine the potential for extemal corrosion and the need for additional protection measures. In cases where stray current conditions and/or aggressive soils are prevalent, a corrosion specialist certified by the NACE or other applicable certification board shall be consulted regarding the design of pipeline protection measures. At a minimum, all stray current protection systems should include bonded joints and sacrificial anodes with a 50 year or longer design life and test facilities in lieu of polyethylene encasement, unless otherwise approved by the City of Goldsboro. The cathodic protection element of the pipeline design package shall be sealed by Professional Engineer licensed in the State of NC. Full impressed current cathodic protection shall only be utilized when extreme corrosion potential has been proven and/or as otherwise directed by the City Engineer and the certified corrosion engineer of record. Trench and Cut Repairs To protect cuts the street infrastructure and safety, all utility trench and cut repairs must be perpendicular or parallel to the existing edge of pavement and square or rectangular in shape 20 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL with a minimum cut size to be 2 feet from any fixed object on all sides (manholes, utility valves, concrete infrastructure). Repairs shall be completed in accordance with the following: Asphalt Utility Cuts. If an asphalt trench and cut repair inside a City of Goldsboro maintained right-of-way is left open for 10 calendar days, it shall consist of ABC compacted to 100% Standard Proctor. From 11 to 30 calendar days, it shall consist of bituminous binder course of Type 119.0B. From 31 calendar days, cut repair shall be completed with a wearing surface course of Type SF9.5A. If an asphalt strip between a cut and the edge of the pavement is 3 feet or less, the strip will be removed and replaced as part of the cut. New asphalt utility cuts within and over half of an existing asphalt utility repair area will require the replacement of the entire existing repair area or at the discretion of the City Engineer or designee. Trench cuts in asphalt roadways that exceed half of the roadway width in a shoulder section shall require a full width overlay with SF9.5A extending 17.5 feet to each side of the trench. For those trenches that exceed half of the roadway width in a gutter or curb and gutter section, the full width mill and overlay with SF9.5A shall extend 5 feet to each side of the trench. Trench cuts in asphalt roadways that exceed more than 20 feet parallel to the road will require a minimum half roadway mill and overlay. Utility cuts in asphalt roadways with an asphalt age of 3 years or less will require a minimum half roadway mill and overlay. All street markings and traffic control devices shall be replaced to City Standards. Concrete Utility Cuts. Concrete trench and cut repairs inside a City of Goldsboro maintained right of way shall be completed within 10 calendars days. For utility cuts in concrete curb, curb and gutter, or sidewalk, the concrete must be removed and replaced from nearest expansion on both sides of the utility cut or have an expansion joint installed at the cut. Any replacement of sidewalk with a decorative stamp pattern must be stamped with the same pattern as the existing sidewalk. Any existing sidewalk ramps removed must be replaced to the current ADA Standards. When concrete sidewalk utility cuts are required in locations where the sidewalk contains reinforcing steel adjacent to a tree pit, a straight vertical cut shall be made to remove the reinforced concrete. Repair the sidewalk cut by drilling 6 inches into the existing concrete along the vertical face of the cut then dowel in and secure #4 steel rebar with approved epoxy. Replace the sub -grade, then splice steel in the new cut at a minimum of 4 inches and replace remaining steel before replacing the concrete. 21 r 3 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Soil Utility Cuts. Soil cut inspection limits within a City of Goldsboro maintained right-of-way is a minimum of 5 feet out from the edge of the pavement, 5 feet out from the back of curb, or the back edge of the sidewalk furthest from the pavement. Soil trench and cut repairs inside a City maintained right-of-way shall be completed within 10 calendar days. Other Utility Cuts. Brick trench and cut repair inside a City of Goldsboro maintained right-of- way shall be completed within 10 calendar days by replacing existing brick above 6 inch lifts of compacted soil and 8 inches of ABC stone compacted to 100% Standard Proctor. Excess Spoil Piles. Any excess spoil piles shall be removed and soil disturbances and utility cuts shall be restored to original or better condition. Crack and Joint Sealing. The repair areas consisting of sealing existing longitudinal and transverse pavement cracks, joints, and traffic signal detector loops with hot -poured rubber asphalt, modified asphalt compound (peel and stick roll) and NCDOT approved Qualified Products List Materials shall be applied as per the following requirements: • Hot -Poured Rubber Asphalt. Hot -poured rubber asphalt must have a 2 inch sealed overband and be applied as per the manufacturer's recommendations. • Modified Asphalt Compound Tape. Modified asphalt compound tape must be 4 inches wide, centered over the crack or joint, and applied as per the manufacturer's recommendations. • Traffic Signal Detector Loop. See NCDOT QPL list and apply as per the manufacturer's recommendations. City of Goldsboro Right -of -Way Cut Permit In the event that a resident, contractor, or utility company will be cutting asphalt, concrete, brick, or dirt surfaces within the right-of-way maintained by the City of Goldsboro, then excavating the subsurface for the purpose of installing or repairing public or private utilities as well as above ground infrastructure, all parties are required to obtain a Right -of -Way Cut Permit. Permit Application. Apply for the Right -of -Way Cut Permit at 200 North Center Street and be able to provide the following information: • Address nearest to the location of the cut. • Name of the nearest intersecting street. • Length and width dimensions • Type of surface to be cut. 22 1 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL WASTEWATER Wastewater Collection Systems Design All public sanitary sewer mains shall be installed in dedicated street right of way or in dedicated utility easements. Mains installed in City right of way shall be located in the center of pavement or as otherwise approved. Mains within easements shall be centered within the easement. Mains located within NCDOT right of way shall be placed in accordance with NCDOT standards. In preparing engineering design plans for sanitary sewer mains, all elevations shall be tied to NC grid system and the benchmark shall be described on the plans. All private sewer collection mains inside the City of Goldsboro service area that will connect or are planning to discharge into the City sewer system shall comply with all City of Goldsboro design, siting and installation criteria outlined herein. The Owner of the private sewer collection system shall meet all State design requirements and obtain a State permit to operate the private system. Gravity mains shall be installed in dedicated public right of way or in dedicated utility easements as follows: Standard Easement Width for Sanitary Sewer Mains Pipe Size (diameter) Pipe Depth (feet) Easement Width (feet) 8-inch to 5 12-inch 10-ft or less 20-ft 8-inch to 5 12-inch 10-ft - 12.5-ft 25-ft 8-inch to 5 12-inch 12.5 - 15-ft 30-ft 8-inch to 5 12-inch 15-ft - 17.5-ft 35-ft 8-inch to 5 12-inch 17.5-ft - 20-ft 40-ft > 12-inch to 5 24-inch 15-ft or less 30-ft > 12-inch to 5 24-inch 15-ft - 17.5-ft 35-ft > 12-inch to 5 24-inch 17.5-ft - 20-ft 40-ft Greater than 24-inch Any Depth As Determined by the City Any Size Deeper than 20-ft Dedicated easements for sewer mains and appurtenances shall be recorded as "City of Goldsboro Permanent Utility Easement". City of Goldsboro sewer easements shall contain 77 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL only City of Goldsboro utilities unless otherwise approved by the site plan or an encroachment agreement. No permanent structures, equipment, retaining walls, embankments, impoundments, or other elements that would inhibit maintenance operations shall be constructed within a sewer main easement. Fences may be allowed across easements provided that appropriate access gates have been installed to allow utility maintenance. In all cases, the City of Goldsboro shall have access to secured access gates. Fill or cut slopes are not allowed to extend into easements without full development plan approval or an approved encroachment agreement from the City. All such pre-existing or planned conditions as noted herein that would impact operations and maintenance within the noted sewer main easement shall be noted and disclosed during the site plan approval process. Pre-existing conditions that are not disclosed during the site plan review may nullify the approval and require relocating the sewer easement where there are no existing conflicts. Sewer line easements shall be graded smooth, free from rocks, boulders, roots, stumps, and other debris, and seeded and mulched upon the completion of construction. Easements across sloped areas shall be graded uniformly across the slope to no steeper than a 5 to 1 ratio. Mains paralleling a creek shall be of sufficient depth to allow lateral connections below the stream bed elevation. The top of the sewer main and laterals shall be at least one foot below the stream bed. Concrete encasement and ductile iron pipe shall be required when the cover between the top of the pipe and the stream bed is less than 3 feet. Mains shall not be installed under any part of water impoundments. The following minimum horizontal separations shall be maintained: • 100 feet from any private or public water supply source, including wells, WS-1 waters or Class I or Class II impounded reservoirs used as a source of drinking water (except as noted below) • 50 feet from wetlands and any waters (from normal high water) classified WS-II, WS-III, B, SA, ORW, HOW or SB (except as noted below) • 10 feet from any other stream, lake, or impoundment (except as noted below) • With approval directly from PERCS, the following separations may be acceptable when water main standards are implemented: o All appurtenances shall be outside the 100 foot radius of wells. • 25 feet from private wells (with no exceptions) • 50 feet from public water wells (with no exceptions) Where the required minimum separations cannot be obtained sewer pipe, ductile iron pipe shall be used with joints equivalent to water main standards. 78 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Sewer mains shall always be extended along natural drainage courses to all adjacent upstream property lines. Gravity sewer mains shall be deep enough to serve the adjoining property and allow for sufficient slope in lateral lines. Gravity sewer pipe shall have the following minimum covers: • 4 feet from the top of pipe to finished subgrade in roadways. • 3 feet from the top of pipe to finished grade outside roadways. Sewer mains over 20 feet deep require ductile iron for the entire run between manholes. Sewer mains 14 feet to 18 feet along or in roadways shall also require ductile iron pipe for the entire run between manholes. The maximum depth of sewer along or in roadways shall be 18 feet. In all cases where fill material is added above existing sewer mains, the Engineer of Record shall prepare a structural analysis of the existing pipeline and determine if it is capable of supporting additional loading. If the additional fill material exceeds AWWA, DIPRA, UNIBELL and/or manufacturer standards for loading, the pipeline shall either be reinforced to adequately support the additional loading or replaced with a ductile iron pipe rated to support the added loading. Separation Between Sanitary Sewer and Storm Water Pipes. Sewer mains shall have a minimum vertical separation of 24 inches between storm pipes when the horizontal separation is 3 feet or less. Where sanitary and storm sewers cross with a vertical separation of less than 24 inches, the entire leg of sanitary sewer shall be made of standard ductile iron pipe with joints rated for water main service and the void space between the pipe crossing shall be backfilled with 3000-psi concrete or quick setting, minimum 500-psi, non-excavatable flowable fill that meets or exceeds NCDOT Specifications. Separation Between Sanitary Sewer and Sewer Force Main. There shall be a minimum 7 foot horizontal separation between parallel gravity and/or force mains when the depth of installation is 8-ft or Tess. Otherwise, the minimum horizontal separation between pipelines shall be 10-ft up to 10-ft depth of installation. Otherwise, a project specific design shall be implemented. Separation Between Sanitary Sewer and Water Main. • Parallel Installations: 10-ft lateral separation (pipe edge to pipe edge) or minimum 3-ft lateral separation, and water line at least 18-inches above sanitary sewer line measured vertically from top of sewer pipeline to bottom edge of water main. In. unique cases where the sanitary sewer and the water main are installed with at least 3-ft of lateral separation but less than 10-ft of horizontal separation, and less than 18-inches of vertical 79 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL separation, both the water main and sanitary sewer shall be constructed of ductile iron pipe with joints in full compliance with water main standards. • Crossings (Water Main Over Sewer): All water main crossings of sewer lines shall be constructed over the sewer line in conformance with City of Goldsboro Specifications. At a minimum, 18-inches of clearance shall be maintained between the bottom edge of the water main and the top edge of the sewer main. If 18-inches of clearance is not maintained, the water main and sanitary sewer main shall: o Both lines shall be constructed of ductile iron pipe with joints in conformance with water main construction standards. o The sanitary sewer pipe shall be ductile iron the entire run from manhole to manhole. o The void space between the pipes shall be filled with minimum 500-psi, quick setting non-excavatable flowable fill extending 3-ft on both sides of the crossing. Regardless of pipe material, at least 12-inches of vertical separation is required for sanitary sewer crossings of potable water mains. • Crossings (Water Main Under Sewer Line): Allowed only as approved by City of Goldsboro, when it is not possible to cross the water main above the sewer line. At a minimum, 18-inches of separation shall be maintained, (measured from pipe edge to pipe edge) and the sanitary sewer shall be constructed of ductile iron in conformance with water main construction standards the entire run from manhole to manhole. If local conditions prevent providing 18-inches of clearance, then at least 12-inches of clearance shall be provided and the void space between the pipes shall be filled with minimum 500-psi, quick setting, non-excavatable flowable fill extending at least 3-ft on both sides of the crossing. Main Size, Slope and Design Criteria Public gravity mains shall be a minimum of 8 inches in diameter. Major interceptors shall be sized appropriately using the following flow factors. At a minimum, all gravity sewer mains shall be designed and sized to serve the ultimate tributary buildout of the drainage basin. Residential flow rates Land Use Flow Factor Single Family Residential 280 gpd per dwelling unit Multi -Family Residential 100 gpd per bedroom 80 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL For non-residential flow rates, use the current flow factors as required by the North Carolina Department of Environmental Quality. The ratio of peak to average daily flow shall be 3.3. Sanitary sewers shall be designed to carry the projected peak flow at no more than 2/3 full. The minimum velocity for sanitary sewer lines shall be 3-fps. Sanitary sewers shall be sized based on Manning's Equation with Manning's roughness coefficient "n" = 0.013 or greater. Pipe diameter sizes used in the calculation of Manning's Equation shall be nominal pipe sizes. The minimum grades for public sanitary sewers shall be as follows: Minimum Slopes for Gravity Sewer Mains Main Size (diameter in inches) Minimum Slope (feet per 100 feet) V=3fps; 2/3 Depth 8 0.61 10 0.46 12 0.36 14 0.29 15 0.27 16 0.25 18 0.21 21 0.17 24 0.14 27 0.13 30 0.11 36 0.09 The minimum grade for the uppermost reach of a sanitary sewer line shall be 1 % regardless of sewer line size. The maximum grade for sanitary sewers is 10%. The maximum velocity in sanitary sewers is 15 ft/sec. These limits may only be exceeded with the approval of the City and the incorporation of the following provisions, which apply to all sewers either designed or installed at grades equal to or exceeding 10%: • All sewers with a grade of 10% or higher must have the downstream run of pipe installed with ductile iron pipe. 81 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL • High velocity manholes shall be used on all sewers with a grade of 10% or higher. High velocity lines cannot tie directly to an existing line and must proceed 180° through the invert into the downstream line. • Concrete thrust collars shall be installed on all sewers designed at grades of 10% or higher. The anchors shall be installed at the following spacing: o Not over 36' center to center on grades from 10% to 25% o Not over 24' center to center on grades from 25% to 40% o Not over 16' center to center on grades exceeding 40% • The Town reserves the right to require all high velocity requirements outlined herein for sewer lines either designed or installed at grades of 10% or greater, regardless of the flow velocity. In cases where the design grade established on the sewer design plan is exceeded during construction and the10% threshold is exceeded, all high velocity requirements shall apply without waiver. Sewer extensions shall be designed for projected flows, even when the diameter of the receiving sewer is less than the diameter of the proposed extension. All pipe diameter changes shall occur only in manholes, with the invert of the larger pipe lowered sufficiently to maintain the same energy gradient. An approximate method of obtaining this result is to place the 0.8 depth point of both sewers at the same elevation. As an alternative, the crown of the incoming pipes may be designed for an elevation at or above the crown of the outgoing pipe. All transitions of pipe material, pipe separations, grade changes and all angular deflection changes shall occur only at manholes. Pipe trench excavation and backfilling shall be performed in accordance with these Specifications. Materials Ductile Iron Pipe. Ductile Iron Pipe shall be designed and manufactured in accordance with AWWA C150 and C151 and provided in nominal 20-ft lengths. The minimum requirements for ductile iron pipe and required laying conditions are tabulated below. For all other installations other than specified, the laying condition, bedding requirements or the minimum pressure class rating and/or thickness class shall be increased in accordance with AWWAC151. A pipe thickness design shall be submitted for extemal loading in all cases where the pipe depth exceeds the specified range of depths outlined in the following table. 82 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Pressure Class. Max. Depth and Laving Condition for DI Sewer Mains Pipe Diameter AWWA C-150, Laying Condition Pressure Class (psi) Max Depth of Cover 8 inch type 1 350 3-16 feet 8 inch type 4 350 16-34 feet 10-12 inch type 1 350 3-10 feet 10-12 inch type 4 350 10-28 feet 10-12 inch type 5 350 28-44 feet 14-20 inch type 4 250 3-22 feet 14-20 inch type 5 250 22-30 feet 14-20 inch type 5 350 30-38 feet 24-30 inch type 4 250 3-19 feet 24-30 inch type 5 300 19-29 feet 24-30 inch type 5 350 29-33 feet 36-42 inch type 4 300 3-20 feet 36-42 inch type 5 350 20-32 feet For cases not specified, a ductile iron pipe and bedding design certified by a Professional Engineer licensed in the State of North Carolina shall be required in compliance with AWWA C150 and the Ductile Iron Pipe Research Association. In cases where thickness class designation of ductile iron pipe is specified, the corresponding thickness class designations are as outlined in the table below. 83 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Ductile Iron Pipe Thickness Class Pipe Diameter Pressure Class (psi) Nominal Thickness (inches) Minimum Corresponding Thickness Class 4 350 0.25 51 6 350 0.25 50 8 350 0.25 50 10 350 0.26 50 12 350 0.28 50 14 250 0.28 50 16 250 0.30 50 18 250 0.31 50 20 250 0.33 50 24 250 0.37 50 24 300 0.40 51 30 250 0.42 51 30 300 0.45 52 36 300 0.51 52 36 350 0.56 53 42 300 0.57 52 42 350 0.63 53 Pipe joints shall be of the push -on type as per AWWA C111. For 10-inch diameter and smaller gravity sewer mains, pipe lining shall be cement mortar with a seal coat of bituminous material, all in accordance with AWWA C104. For 12-inch diameter and larger gravity sewer mains, all ductile Iron pipe and fittings for sewer construction shall receive an interior ceramic epoxy coating, consisting of an amine cured novalac epoxy containing at least 20% by volume of ceramic quartz pigment, as manufactured by Protecto 401. The interior coating shall be applied at a nominal dry film interior thickness of 40-mils. All DIP bells and spigots shall be lined with 8-mils of joint compound by Protecto 401 or approved equal applied by brush to ensure full coverage. All pipe supplied with Protecto 401 interior lining shall be provided free of holidays. Pipe installed with defects in the lining will be rejected and required to be replaced. Patching of Protecto 401 coating defects after installation shall not be approved. Protecto 401 lined pipe must be installed within one year of the application date on the pipe. All buried DIP and fittings shall have bituminous coating on the exterior surface in accordance with AWWA C151. Pipe shall be supplied in minimum 20-ft lengths. 84 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL All ductile iron pipes shall be marked in conformance with ASTM A-746. Solid Wall PVC Pipe. PVC Pipe shall be solid wall and made of PVC plastic having a cell classification of 12454 or 12364 (with minimum tensile modulus of 400,000 psi) as defined in Specification D1784. PVC pipe shall have integral wall bell and spigot joints for the conveyance of domestic sewage and shall be supplied in minimuml4 or 20 foot lengths. Fittings shall be made of PVC plastic having a cell classification of 12454-B, as defined in ASTM D1784. All PVC gravity sewer pipe and PVC fittings up to 15-inches in diameter shall be manufactured in accordance with the latest version of ASTM D3034. All solid wall PVC pipe installed at diameters from 18-inches to 27-inches in diameter shall be manufactured in conformance with ASTM F679 and provided at minimum pipe stiffness of 115-psi. Fittings must be manufactured by pipe supplier or approved equal, and have bell and/or spigot configurations compatible with that of the pipe. PVC pipe shall be installed in accordance with the requirements of this Specifications manual and ASTM D2321. All PVC pipe up to and including 15 inches in diameter shall have a maximum Standard Dimension Ratio (SDR) of 35 for depth of installation no shallower than 4-ft of cover from the pipe crown and no deeper than 14-ft measured from the bottom of the pipe. All solid wall PVC pipe for depth of installation greater than 14-ft shall have a maximum Standard Dimension Ratio (SDR) of 26. Solid wall PVC pipe shall not be approved for depths of installation greater than 20-ft. All solid wall PVC pipe shall be marked and certified in conformance with ASTM D3034 or ASTM F679. PVC Pipe Sizing and Minimum Wall Thickness Nominal Pipe Diameter (inches) Outside Diameter (inches) Minimum Wall Thickness SDR 35 (inches) Minimum Wall Thickness SDR 26 (inches) 8 8.400 0.240 0.323 10 10.500 0.300 0.404 12 12.500 0.360 0.481 15 15.300 0.437 0.588 18 18.701 0.720 21 22.047 0.849 24 24.803 0.956 27 27.953 1.077 Note: SDR 35 not approved for pipe diameters greater than 15-inches and for depths greater than 14-ft. 85 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Sewer Main Installation. Pipe trench excavation and backfilling shall be performed in accordance with these Specifications. Transitions of pipe material, pipe separations, grade changes and all angular deflection changes shall occur only at manholes. All sewer mains installed with less than 4-ft of cover or deeper than 20-ft shall be ductile iron pipe. Pipe and fitting interiors shall be protected from foreign matter and shall be inspected for damage and defects prior to installation. In the event foreign matter is present in pipe and fittings, it shall be removed before installation. Open ends of pipe shall be covered and protected when pipe laying is not in progress to prevent debris from entering the pipe. All pipes shall be constructed with at least 48 inches of cover below the finished grade. Pipe shall be laid on true lines as directed by the Engineer. Trenches shall be sufficiently wide to adjust the alignment. Bell holes shall be dug at each joint to permit proper joint assembly. The pipe shall be laid and adjusted so that the alignment with the next succeeding joint will be centered in the joint and the entire pipeline will be in continuous alignment both horizontally and vertically. Pipe joints shall be fitted so that a thoroughly watertight joint will result. All joints will be made in conformance with the manufacturer's recommendations for the type of joint selected. Prior to beginning construction, the Contractor shall contact local utility companies and verify the location of existing utilities. The Contractor shall be completely and solely responsible for locating all existing buried utilities inside the construction zone before beginning excavation. The Contractor shall be solely responsible for scheduling and coordinating the utility location work. When an existing utility is in conflict with construction, it shall be exposed prior to beginning construction to prevent damage to the existing utility. Embedment Material. Bedding and embedment material classifications shall be defined as follows: • CLASS I - Angular, (1/4 to 1-1/2 inch) graded stone, including a number of fill materials that have regional significance such as coral, slag, cinders, crushed stone, crushed gravel, and crushed shells. • CLASS II - Coarse sands and gravels with maximum particle size of 1-1/2 inch, including variously graded sands and gravels containing small percentages of fines, generally granular and non -cohesive, either wet or dry. Soil types GW, GP, SW and SP are included in this class. • CLASS III - Fine sand and clayey gravels, including fine sands, sand -clay mixtures, and gravel -clay mixtures, Soil Types GM, GC, SM, and SC are included in this class. 86 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL • CLASS IV - Silt, silty clays, and clays, including inorganic clays and silts of medium to high plasticity and liquid limits. Soil Types MH, ML, CH and CL are included in this class. These materials shall not be used for embedment. Class I foundation material consisting of to 1'/2 -inch graded stone shall be required in addition to standard bedding and embedment for all sewer installations, regardless of pipe material, when the trench bottom is unstable due to water, rock, infiltration or soil type. All bedding, embedment and backfill materials shall be compacted to a minimum of 95% Standard Proctor density regardless of material. In instances where compliance with compaction requirements is questionable as determined by the City, testing shall be provided by the Contractor and a reputable licensed Geotechnical Engineer to verify compliance. In any area where the pipe will be installed below existing or future ground water levels or where the trench could be subject to inundation, additional Class I material shall be used for bedding. If hydraulic jack shoring is utilized for trench walls, it shall be restricted to the area just above the top of the pipe. This will ensure the embedment materials and pipe will not be disturbed when the shoring is removed. DIP Specific Installation Requirements. Ductile iron pipe shall be installed in accordance with the requirements of AWWA C600 and the Ductile Iron Pipe Handbook published by the Ductile Iron Pipe Research Association. Materials at all times shall be handled with mechanical equipment or in such a manner to protect them from damage. At no time shall pipe and fittings be dropped or pushed into ditches. Pipe shall be installed at laying conditions as specified herein and identified by the plan drawings. Laying conditions for ductile iron pipe shall be as described in AWWA C151 and the Ductile Iron Pipe Research Association. Laying conditions shall be defined as follows: 87 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Type 1: Flat Bottom Trench with Pipe Resting on Stable Undisturbed Earth. Unstable conditions such as wet trench bottoms, intermediate rock layering, partially weathered rock, and other unsuitable soil conditions shall require utilizing more stringent laying conditions. At a minimum, Type 4 laying condition shall be utilized with a minimum of 4- inches of bedding to overcome unstable conditions. For severe unstable soil conditions, undercut excavation and an engineer designed foundation plan shall be provided prior to pipeline installation. Type 1 • Type 4: Pipe bedded in Class 1 material, No. 67 or No. 78 crushed stone to a depth of 1/8 pipe diameter or a minimum of 4-inches. Embedment material consisting of Class 1, Class 2 or Class 3 materials shall be compacted to the top of the pipe greater than 95% Proctor. Careful attention must be allocated to compacting embedment material under the bottom edges of the pipe. Type 4 Type 5: Pipe bedded in Class 1 material, No. 67 or No. 78 crushed stone to the center of the pipe and extending a minimum of 4-inches under the pipe. Granular or select embedment, consisting of Class 1 or Class 2 materials, compacted to greater than 95% Proctor installed to the top of the pipe. Type 5 88 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL PVC Specific Installation Requirements. The installation of PVC Pipe shall satisfy the requirements of the manufacturer, and/or the following, whichever is more stringent. For PVC pipe, the pipe shall be produced with bell and spigot end construction. Joining shall be accomplished by rubber gasket in accordance with manufacturer's recommendation. Flexible watertight elastomeric seals in accordance with ASTM D3212-1 may also be used. Each pipe length shall be clearly marked with information including pipe size, profile number and class number. Installation of PVC pipe shall follow the recommendations of ASTM D-2321 "Underground Installation of Thermoplastic Pipe for Sewers and other Gravity -Flow Applications". For PVC pipe installation, bedding and embedment material shall be Class I, typically No. 67 or No. 78 washed stone. Bedding and embedment materials for PVC gravity sewers other than No. 67 or No. 78 washed stone shall be approved by the City of Goldsboro prior to use. Typical bedding and embedment for SDR35 PVC Gravity Sewers, 4-ft to 14-ft in depth shall consist of minimum 4-inches of No. 67 or No. 78 stone installed under the pipe. Embedment shall extend to the top of the pipe. Bedding and embedment shall be compacted to 95% standard proctor density. Careful attention shall be placed on compacting embedment under the haunches of the pipe to prevent any potential voids. Typical bedding and embedment for SDR26 PVC Gravity Sewers, 14-ft to 20-ft in depth shall consist of minimum 6-inches of No. 67 or No. 78 stone installed under the pipe. The embedment, consisting of the same material, shall extend 6-inches above the crown of the pipe. Bedding and embedment shall be compacted to 95% standard proctor density. Careful attention shall be placed on compacting embedment under the haunches to prevent any potential voids. The bedding and embedment materials shall be in accordance with ASTM D-2321. The embedment materials shall be installed from trench wall to trench wall. The maximum allowable deflection after installation shall BE LESS THAN 5% for PVC pipe. All PVC pipe shall be stored properly to prevent UV damage prior to installation. Any PVC pipe with visible fading caused by UV radiation from sunlight shall be rejected. All PVC pipe shall be free from nicks, scratches and gouges at the time of installation. Such defects can impact the strength of PVC pipe and all pipes with visible gouges shall be rejected. Pipe Identification and Marking. Marking tape shall be installed continuously and longitudinally along all sanitary sewer mains for new construction and for any repair or retrofit construction using open trench methods. For service connections, the marking tape shall extend from the main line to the cleanout at the right-of-way/easement. Marking tape shall be installed directly above the center of the pipe and at least 16-inches deep from final grade to a maximum depth of 24-inches below final grade. 89 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL The marking tape shall be made of polyethylene (or approved equivalent) material, 6-inches wide and a minimum of 6 millimeters thick. The marking tape shall have detectable markers embedded in the tape and spaced adequately to provide continuous detection along the tape from above the buried pipe at final grade. The tape shall be green in color and shall be marked with words "CAUTION SEWER LINE BURIED BELOW" (or an approved equivalent wording). The wording shall be repetitive along the full length of the tape. Manholes Location Sizing and Design. Manholes shall be spaced at a maximum distance of 400 feet for lines 12 inches in diameter or less, and 500 feet for lines greater than 12 inches in diameter. Manholes shall be installed at each deflection of line and/or grade. The flow channel through manholes shall have a uniform and smooth finish free of irregularities or obstructions. The invert channel shall conform to the shape and slope of the entering/exiting sewer line. Either pre -cast or brick and mortar inverts may be used. When sewers of uniform slope pass through a manhole, the slope shall be maintained and the invert at the center of the manhole shall be provided. When sewers change slope at a manhole, the incoming and outgoing invert elevations will be given on the plan drawings. The maximum flow deflection angle in a manhole shall be dependent upon pipe size as shown in the following table. Sufficient drop shall be provided in the manhole to compensate for energy loss caused by the change of alignment. A minimum drop of 0.1-ft is required for a change of alignment greater than 30-degrees. Maximum Allowable Flow Deflection Pipe Size (largest pipe controls) Maximum Deflection Angle per Manhole 8-10 inch diameter 90 degrees 12-20 inch diameter 75 degrees >20-inch diameter 60 degrees Free falls of wastewater flow into the manhole invert from incoming sewer mains shall not be allowed, except under limited circumstances. In certain isolated circumstances standard free drops may be allowed, not exceeding 20- inches, when pipe diameter changes occur at a manhole. In these cases, the smaller diameter pipe crown shall be positioned no higher than the larger diameter pipe crown to limit the drop. When free drops are necessary due to pipe size changes, the Contractor shall take preventive measures to prevent free drops into the manhole invert, such as building a flume or trough up to the incoming invert, or piping the flow to the primary invert flow channel. 90 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Drop manholes are not allowed without the written approval of the City of Goldsboro. While certain physical constraints may dictate the need for drop manholes, they may not be used merely to decrease trenching depth. Upstream slope changes shall be used to avoid the need for drop manholes. In the event that drop manholes are required, they shall be constructed with an outside drop connection. The entire incoming sewer main leading to the drop shall be made of ductile iron pipe. Drops shall be concrete encased and constructed in accordance with the Standard Details. Inside drop manholes shall only be allowed in unique circumstances on a limited basis and can only be approved by the City of Goldsboro. Manholes shall not be obstructed from view or access. It is illegal to bury or obstruct access to manholes. Manhole covers shall be elevated as follows: • Roadways: Manholes installed in roadways and road shoulders shall be installed with the cover flush with the top of pavement. • Outside of Roadways: Manholes installed outside of roadways shall be elevated at least 1-ft above the surface grade unless otherwise noted. • Wooded Outfalls: All manholes installed in wooded, forested or brushy areas shall be elevated at least 2-ft above the surface elevation. • 100-Year Flood Zone: All manholes located within the 100-year flood elevation shall be elevated at least 24 inches above the 100-year flood elevation or specify watertight covers and vents that extend at least 24 inches above the 100-year flood elevation. • Well Maintained Areas: All manholes installed in well maintained areas, such as yards, sidewalks or otherwise inside an improved right-of-way shall be installed flush with the finished surface. Manholes higher than 30 inches above finished grade shall be constructed with a flat top and outside steps. Manholes shall be provided without interior steps. When connecting a new sewer main to an existing main, the connection shall be established with a "Doghouse" type of manhole inserted over the existing main. Manhole Sizing. Manholes shall be sized as shown in the following table. The next larger size shall be required if the pipe size, depth, drop connection or number of main line connections warrants a larger size. In consideration of main line connections, all will be considered regardless of type, whether inside drop, outside drop, force main or standard connection. Manhole Sizing Guide 91 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Manhole Size (diameter) Maximum Allowable Pipe Size (diameter) Maximum Depth of Cover (invert to surface) Maximum Depth with Extended Base (invert to surface) Frame and Cover Size (outside of paved areas) (diameter) Maximum Sewer Main Connections (quantity) 4-ft 8-12 inches 12-ft 25-fte 24-inches 3b 5-ftd 14-24 inches 12-ft 35-ft 24-inches 2° 6-ftd 27-42 inches 12-ft 35-ft 36-inches 2° 8-ftd 48 inches 12-ft 35-ft 36-inches 2° 10-ftd 54 inches 12-ft 35-ft 35-inches 2° aDepths beyond 14-ft in roadways shall require a 5-ft diameter manhole with extended base. bFour connections may be permitted in a 4-ft diameter manhole when the separation between each incoming connection is at least 85° °Additional smaller diameter connections that meet the spacing requirements listed in the Installation section may be approved by the City. dDue to the limited manhole wall area that could exist between the invert in and out, some manholes may require upsizing as directed by the City. All manholes 5-ft in diameter shall be extended to surface elevation with no further reduction in diameter until the eccentric cone section. Manhole transitions for 6-ft and larger diameter manholes are only allowed in the top 5-ft of the manhole. In no case shall the smallest barrel size be Tess than 5-ft diameter. At least 5-ft of vertical clearance shall be maintained above the pipe crown before transitioning to a smaller diameter riser, or transition shall not be utilized. An eccentric flat slab reducer from 6-ft diameter or larger manhole base sections to 5-ft diameter risers (non -paved areas) or eccentric cones (paved areas) shall be used to make any transition. Manholes outside of paved areas that are 6-ft in diameter and greater and are too shallow to maintain 5-ft of vertical clearance above the crown of the pipe shall maintain the full manhole diameter up to the design surface elevation and be provided with a flat top slab cover with eccentric hole. Manholes inside of paved areas that are 6-ft in diameter and greater shall be constructed with an eccentric, flat top reducer to 5-ft diameter and provided with a 5-ft diameter eccentric, 92 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL tapered cone at the finished grade. When the depth of the manhole is too shallow to maintain 5-ft of vertical clearance above the crown of the pipe a 3-ft tall eccentric, tapered cone shall be used without any additional 5-ft diameter risers. Materials Concrete Manholes. Manholes shall be precast concrete with a minimum compressive strength of 4000-psi and utilize minimum grade 60 rebar in compliance with ASTM C478. All 4-ft and 5-ft diameter manholes and all 6-ft diameter manholes in paved areas shall be provided with eccentric cone sections. Flat top manholes are required in outfall areas for 6-ft and larger diameter manholes. Precast concrete manholes shall meet all design and manufacturing requirements of ASTM C478 and all H-20 loading requirements. Minimum wall thickness shall be 5-inches and shall increase with depth and diameter in accordance with ASTM standards. The standard joint shall be sealed with a plastic cement putty meeting Federal Specification SS-S-00210, such as Ram- Nek or a butyl rubber sealant. All lift holes must be plugged with non -shrinking grout after installation. All manholes greater than 5-ft diameter shall have minimum 8-inch (6-inch for 4-ft diameter manholes), 4,000-psi concrete bottoms resting on a minimum of 12 inches of #57 stone. Sewer mains shall enter and exit radially through the manhole. Inverts shall be constructed with a width equal to the effluent pipe and a height equal to 1/2 that of the effluent pipe. Inverts shall be so finished with sufficient drop across the manhole to compensate for all resulting energy loss across the invert. Flat invert channels shall not be allowed. At each inlet and outlet of 8 inches or greater, resilient connectors or manhole boots shall be provided in conformance with ASTM C923. Rings and clamps are to meet standards of ASTM A167 and/or ASTM C923. Precast manhole components shall not be installed, transported, or removed from the casting yard prior to reaching the minimum compressive strength of 4,000-psi and at least 7 days have elapsed since casting. Manhole flat slab, eccentric reducers provided for 6-ft diameter and larger manholes shall be provided with minimum slab thickness of 12-inches. Flat slab, eccentric reducers shall not be allowed for manhole diameters less than 6-ft. Manhole flat top slab covers for outfall manholes 6-ft diameter and greater shall be designed and, manufactured for H-20 loading and provided in minimum slab thickness of 8-inches. Manhole flat top covers shall be provided with a minimum clear opening of 36-inches when utilized with a 36-inch clear span manhole frame and cover. 93 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Manhole benches shall slope upwards from the spring line of the pipe to the projected level of the pipe crown at the manhole wall, or 8-inches above the spring line, whichever is less. Bowl type inverts recessed inside of precast benches shall not be accepted. Manhole Frame and Cover Materials. Manhole Frames and Covers shall be Class 35 gray iron with "Sanitary Sewer" forged into the cover. Ring and cover shall be stamped with make and model. All manhole frames and covers shall be domestically made and manufactured in the USA from domestic iron. Types: • Manhole Frames and Covers in Paved Areas and some Unpaved Areas: For all installations in roadways or within the right of way, use Type 1 ring and cover, and place sufficient depth of concrete below the pavement around the ring to ensure contact with manhole. Type 1 covers shall be provided with 1 vent hole. Type 1 covers shall be designed for a proof load of 40,000 lbs. and be provided in Class 35B gray iron in conformance with ASTM A48. At a minimum, Type 1 manhole rings shall weigh 190 lbs. and the cover shall weigh 120 lbs. • Manhole Frames and Covers for Outfalls: For installation in outfall areas, with 4-ft and 5-ft diameter manholes use Type 2 ring and covers. Type 2 covers shall not be installed in areas subject to traffic loading. Type 2 covers shall be provided with an integrated frame and cover assembly in which the cover rotates away from the frame for access. The rotating assembly shall be provided with a cast in stainless steel rod assembly. Type 2 covers shall be provided with a minimum 24-inch clear span opening along the axis with the stainless steel rod assembly. Security shall be provided by 3 exterior cast lugs at 3/4-inch thickness that allow padlock installation or bolting with 3 stainless steel bolts with stainless steel zinc plated nuts. Type 2 covers shall be made of Class 35B iron in conformance with ASTM A48 and designed for a proof load of 12,000 lbs. The frame and cover weight shall not be less than 60-Ibs for the cover and 80-lbs for the ring. The Type 2A frame and cover assembly shall be provided with a gasket that makes the cover assembly watertight when bolted at all three lugs. Type 2A covers shall be provided inside the 100-year flood elevation or other areas subject to flooding. Type 2B covers are not watertight and are not required to have a gasket. • Manhole Frames and Covers for Large Diameter Outfall Manholes: Type 3 ring and cover assemblies shall be provided with a minimum 36-inch clear span opening and utilized for 6-ft diameter or larger manhole installations with eccentric flat top manholes outside of paved areas. (Within paved areas, use standard Type 1 cover on a 5-ft diameter eccentric cone.) The type 3 frame and cover shall be provided with a 36-inch cover with an inset cover of 26-inches in diameter. The frame and cover assembly shall 94 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL be provided in the watertight configuration in areas within the 100-year flood elevation or other areas subject to flooding. All castings shall be machined to give even and continuous bearing on the full length of the frame. Castings shall be free of porosity and blow holes. All manhole frames shall be bolted to the manhole, except in paved streets. Installation General. The upstream side of the last manhole(s) of a sanitary sewer line extension under construction shall be plugged by constructing a brick/block wall to prevent the passage of groundwater, runoff and sediment into the sanitary sewer system. All water upstream of the wall shall be pumped out of the sanitary sewer line and all sediment and solids shall be removed and properly disposed of by the Contractor. The wall shall not be removed until the line has been inspected by the City to ensure that all possible points of inflow or infiltration have been eliminated. Manholes shall not be buried or hidden. All manhole penetrations, whether sewer main or service lateral, shall be cored with a concrete coring machine. All pipe connections must be made with flexible watertight couplings or boots. For new manholes, there shall be a minimum of 9-inches or IA the pipe outside diameter (OD), whichever is greater, between the pipe hole openings. (Pipe hole opening is typically 4" greater than the pipe OD.) When the adjacent pipes are different sizes, the OD of the smaller pipe shall be used to determine the spacing requirement, but shall never be less than 9-inches. For connections to existing manholes, there shall be a minimum of 9-inches or 3.5-inches plus 'A the OD of the existing pipe, whichever is greater, between the pipe hole openings. All external manhole joints shall be wrapped with an approved joint seal material. Manholes Subject to Inundation. Manholes subject to flooding shall be watertight and vented 24 inches above the 100-YR flood elevation. In flood prone areas, the manholes shall be vented at least every 1000-ft or every other manhole, whichever is greater. The exterior of all manholes within the 100-year flood elevation and in wetland areas shall receive an exterior coating of an approved bitumastic coal tar epoxy or an approved epoxy coating at 40-mils to prevent weepage or attack by acidic soils. Anti -flotation design measures shall be implemented as required in flood prone areas. 95 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Manholes Located on Large Collection Mains. The City reserves the right to require all manholes located on interceptor or outfall mains 24-inches in diameter and larger to have the manhole interior and bench coated with an approved epoxy coating at 80-mils thickness. The epoxy coating shall be field applied and tested as described herein. Force Main Discharge Manholes. All manholes located on gravity mains that serve or will serve as discharge points for sanitary sewer force mains shall receive an interior epoxy coating at 80-mils thickness. In addition to the receiver manhole, the City reserves the right to require epoxy coating of the next two consecutive manholes downstream of the receiver manhole or all downstream manholes within 1500-If of the receiver manhole. Epoxy Coating. Concrete manholes must be well cured prior to application of the protective epoxy coating. Generally, 28 days is adequate cure time for standard Portland cement. If earlier application is desired, compressive or tensile strength of the concrete can be tested to determine if acceptable cure has occurred. (Note: Bond strength of the coating to the concrete surface is generally limited to the tensile strength of the concrete itself. An Elcometer pull test to determine suitability of concrete for coating may be required). Surface preparation shall be based on the requirements of the manufacturer of the epoxy coating and applicable NACE International standards. A minimum 80-mils thickness shall be field applied to new manholes (120-mils for existing manholes). During application a wet film thickness gage, meeting ASTM D4414 -Standard Practice for Measurement of Wet Film Thickness of Organic Coatings by Notched Gages, shall be used to ensure a monolithic coating and uniform thickness during application. Temperature of the surface to be coated should be maintained between 40°F and 120°F during application. Prior to and during application, care should be taken to avoid exposure of direct sunlight or other intense heat source to the structure being coated. Where varying surface temperatures do exist, care should be taken to apply the coating when the temperature is falling versus rising or in the early morning. The humidity should also be observed to ensure compliance with the epoxy manufacturers' recommendations. Manufacturer approved heated plural component spray equipment shall be used in the application of the specified protective epoxy coating. The spray equipment shall be specifically designed to accurately ratio and apply the specified protective coating materials and shall be regularly maintained and in proper working order. If necessary, subsequent top coating or additional coats of the protective coating should occur as soon as the basecoat becomes tack free, ideally within 12 hours but no later than the recoat window for the specified products. Additional surface preparation procedures will be required if this recoat window is exceeded. 96 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Service Connections Design. Direct sewer service taps shall not be allowed on sewer interceptor or outfall mains 15-inches in diameter or larger, except by manhole connection. All residential subdivision lots shall be served by gravity unless otherwise approved. If a pump is approved, it shall be privately maintained and must pump into either a service connection placed on the lot or through a private force main to a manhole. The pump and force main (if needed) must have a note on the recorded plat indicating the following: "Privately maintained sewer pump and force main is required to serve this lot". Service connections to the main lines shall be perpendicular to the main line and shall extend to the edge of the right of way or easement line. Cleanouts are required on all services with a maximum spacing of 75 feet on 4 inch services and 100 feet on 6 inch services, and at the right of way line or edge of easement. All cleanouts shall extend a minimum of 6 inches above finished grade with brass caps or meet the optional cleanout method requirements in accordance with the Standard Details. Sewer cleanouts located in paved areas, which bear vehicle loading, must have ductile iron risers, ductile iron fittings and a traffic rated cast iron cover assembly. All 6 inch service connections shall be into a manhole. Service lines connected to manholes shall not be through the cone section or manhole joints. Service lines shall be installed 6" above, but no more than 30 inches above the invert or shall be installed with a standard drop. Multiple service connections shall not be maintained by the City. For 6-ft diameter and larger manholes no service is allowed in the reduced diameter riser sections of the manhole. The use of in -line wyes for service connections shall be required for all new construction. When connecting to existing sewer mains, service saddle taps will be allowable. Taps shall be at the 10 or 2 o'clock position, and shall not be top taps. Service connections to mains at depths of 14-ft and greater shall utilize ductile iron pipe between the main and the cleanout, including a ductile iron wye for the cleanout stack. Location and angle of fittings shall be as shown in the standard detail drawings. Where the flood level rims of plumbing fixtures are below the elevation of the manhole cover of the next upstream manhole in the public sewer, such fixtures shall be protected by a backwater valve installed in the building drain, branch of the building drain or horizontal branch serving such fixtures. Plumbing fixtures having flood level rims above the elevation of the manhole cover of the next upstream manhole in the public sewer shall not discharge through a backwater valve. 97 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Pipe Materials PVC pipe shall be schedule 40 or greater supplied in minimum 18-ft lengths. Schedule 40 PVC pipe shall be manufactured with a cell classification of 12454 in conformance with ASTM D1784. Schedule 40 pipes shall be manufactured to dimensional tolerances as specified in ASTM D1785 and rated for service conditions up to temperatures of 140-degrees Fahrenheit. The pipe may be joined by solvent weld in conformance with ASTM D2564. Schedule 40 PVC Service Pipe Sizing Nominal Pipe Diameter (inches) Outside Diameter (inches) Inside Diameter (inches) Thickness (inches) 4 4.50 4.02 0.24 6 6.62 6.03 0.28 PVC pipe for sewer services shall require bedding based upon depth as follows: • 3 to 14-ft Depth — 4-inches of stone bedding extended to springline • 8 to 20-ft Depth — 6-inches of stone bedding extended 6-inches above pipe crown Ductile Iron Pipe shall be sued for sanitary sewer services with Tess than 4 fee of cover or in excess of 20 feet of cover. Ductile iron services shall also be used in all cases where a well is located within 100-ft of the sewer service line. Ductile iron service piping shall be provided in conformance with the ductile iron piping standards outlined herein including cement mortar lining. DIP Service Pipe Sizing Nominal Pipe Diameter (inches) Outside Diameter (inches) Inside Diameter (inches) Thickness (inches) 4 4.80 4.30 0.25 6 6.90 6.40 0.25 Sewer Service Fittings, New Construction All sewer service connections for new construction shall be provided with in -line wye fittings. DIP Main with DIP Service. In -line wye fittings for ductile iron main lines joined with ductile iron service lines shall be typical ductile iron mechanical joint fittings as specified herein. In this 98 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL case all fitting sizes shall conform to AWWA C153. Wye fittings through 10-inches in diameter shall be provided with cement mortar lining in accordance with AWWA C104 and provided with exterior asphaltic coating per AWWA C151. Wye fittings for lines larger than 10-inches in diameter shall be provided with Protecto 401 lining as specified herein for ductile iron pipe of the same sizing. DIP Main with PVC Service. For ductile iron sewer mains to be joined with PVC service lines, the in -line wye fittings shall be slip joint ductile iron with an IPS sized branch for PVC schedule 40 service lines. Ductile iron fittings for connecting PVC service lines shall be deep bell, gasketed joint and air test rated. Gasket grooves shall be machined. Bell depths shall meet the minimum socket depth requirements of ASTM D3034 and ASTM F1336. Wall thickness shall meet the requirements of AWWA C153. Ductile iron wye fittings through 10-inches in diameter with IPS connections shall be provided with cement mortar lining in accordance with AWWA C104 and provided with exterior asphaltic coating per AWWA CI51. Ductile iron wye fittings for PVC lines larger than 10-inches in diameter shall be provided with Protecto 401 lining as specified herein. PVC Main with PVC Service. For PVC sewer mains to be joined with PVC service lines, PVC in -line wye fittings shall be provided. Typical Schedule 40 PVC fittings shall be provided at the cleanout wye and stack. PVC Main with DIP Service. A ductile iron tee/wye shall be provided when the service line is required to be ductile iron due to a crossing or other obstruction. The fitting shall be specifically manufactured for ASTM 3034 PVC pipe such that a smooth flow way exists on the main line through the fitting. The branch shall be gasketed to receive the 4-inch DIP service line without additional fittings. The ductile iron tee/wye fitting shall be Protecto 401 lined. Service Saddle Connections, Existing Sewer Mains PVC service saddles shall be of the same material as the main, and shall be solvent welded and fastened with double stainless steel bands. For existing DIP main lines, ductile iron service saddles shall be used. The saddle assembly shall consist of a virgin SBR or NBR gasket compounded for sewer service, a ductile iron saddle casting, a 304 stainless steel adjustable strap for fastening the gasket and the saddle casting to the sewer main and a 304 stainless steel adjustable circle clamp for securing the service line into the rubber gasket. 99 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Installation Sewer laterals shall not be located in easements when gravity service can be provided to the property frontage at the street. Each separately owned structure requires a separate tap to a public sewer. All service lines with less than 3-ft of cover or deeper than 20-ft shall be made of ductile iron pipe. Four inch lines shall have a minimum slope of 1.0-ft/100 feet and 6 inch lines shall have a minimum slope of 0.60-ft/100 feet. All service connections to existing sanitary sewer mains shall be made by the City. Service connections to new mains may be made by the Contractor, but shall include the use of wye (not tee) connections. Saddle taps on to new lines shall not be allowed. Saddle taps into existing PVC mains shall be made at the 10 o'clock or 2 o'clock position of the main with the wye saddle angled 45-degrees towards the direction of flow in the main. Taps shall only be made by a mechanical circular cutting saw providing a smooth and uniform cut for the saddle installation. Service connections shall be made using an approved sewer saddle when the existing sewer line is 8", 10", or 12" in diameter. This service connection shall not be used when the sewer main material is truss sewer pipe. The opening in the sewer main for the sewer saddle shall be cut with a hydraulically or pneumatically driven circular tapping saw of the same nominal diameter as the sewer service line. Testing and Inspections The Contractor shall furnish all materials, labor, and equipment to perform all testing. The Contractor may arrange to obtain water for testing purposes from the City. The Contractor shall reimburse the City for all water used for construction at current inside utility rates. Visual Testing and Observation. All materials used must be approved by the City of Goldsboro prior to installation. Rejected materials shall be immediately removed from the job. Gravity sanitary sewer lines shall be clean and free from obstructions, and shall be visually inspected from every manhole. Lines which do not exhibit a true line and grade or which have structural defects shall be corrected. Sanitary sewer service connections shall be visually inspected prior to backfilling. Air Testing. Low-pressure air testing in accordance with ASTM F1417 shall be performed on all sewer mains before the laterals or stubs are installed on the line, and after the trench has been backfilled to finished grade. Plugs shall be installed at each manhole to seal off the test section. The line will be pressurized with a single hose and monitored by a separate hose connection from the plug. Air then shall be slowly introduced into the sealed line until the 100 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL internal air pressure reaches 4.0 psig. The air pressure shall then be allowed to stabilize for a minimum of 2 minutes at no Tess than 3.5 psig (plus groundwater pressure, if any). When the pressure reaches 3.5, the time required for the pressure to drop 1.0 psi will be observed and recorded. The line shall be "acceptable" if the pressure does not drop more than 1.0 psi in the time prescribed for the test in the Sanitary Sewer Air Test table found in the Standard Detail Drawings. An abbreviated version of the air test table is shown below. Specification Time (min:sec) Required for Pressure Drop From 3-1/2 to 2-1/2 PSIG Nominal Pipe Diameter (inches) 8 12 15 16 18 21 24 27 30 36 42 Length of Test Section 50 7:33 11:20 14:10 15:11 17:00 19:48 22:40 25:30 28:19 34:00 39:40 100 7:33 11:20 14:10 15:11 17:00 19:48 22:47 28:51 35:37 51:17 69:48 150 7:33 11:20 14:10 15:12 19:14 26:10 34:11 43:16 53:25 76:55 104:42 200 7:33 11:24 17:48 20:16 25:39 34:54 45:35 57:42 71:13 102:36 139:36 250 i 7:33 14:15 22:16 25:20 32:03 43:37 56:58 72:07 89:02 128:12 174:30 300 7:35 17:06 26:43 30:23 38:28 52:21 68:22 86:32 106:48 153:54 209:25 350 8:52 19:57 31:10 35:27 44:52 61:05 79:46 101:00 124:42 179:30 244:19 400 10:07 22:48 35:37 40:31 51:17 69:48 91:10 115:24 142:30 205:06 279:13 450 11:23 25:39 40:04 45:35 57:42 78:31 102:36 129:48 160:18 230:48 314:07 500 1 2:39 28:30 44:31 50:39 64:06 87:15 114:00 144:12 178:06 256:24 349:02 If the section fails to meet these requirements, the source of leakage shall be repaired and the pipe section re -inspected. The City may require that an infiltration test be performed that shall not exceed 100 GPD/inch/mile. Deflection Testing for Flexible Pipe. The mandrel (go/no-go) deflection test shall be performed on each line prior to acceptance and no sooner than 30 days after installation. The pipeline shall be thoroughly clean and free of debris and/or sediment prior to testing. The Contractor shall supply the mandrel used for this performance test. The mandrel device shall be cylindrical in shape having 9 possible contact points with the pipe. The mandrel's length and diameter (ID of proving ring) shall be in accordance with the following tables, and shall be subject to the City's approval. For flexible pipes such as PVC, the following shall apply: 101 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Nominal Diameter (Inches) Pipe Class Average Inside Pipe Diameter (inches) 5% Deflection Mandrel Diameter (inches) Length of Mandrel (inches) Minimum Fins Included with Mandrel 8 SDR 26 7.715 7.329 10 9 8 SDR 35 7.891 7.496 10 9 10 SDR 26 9.644 9.162 10 9 10 SDR 35 9.864 9.371 10 9 12 SDR 26 11.480 10.906 10 9 12 SDR 35 11.737 11.150 10 9 15 SDR 26 14.053 13.350 10 9 15 SDR 35 14.374 13.655 10 9 18 SDR 26 17.261 16.398 24 9 21 SDR 26 20.349 19.332 24 9 24 SDR 26 22.891 21.746 24 9 27 SDR 26 25.799 24.509 24 9 Note: Calculated 5% deflection allowance does not include additional manufacturing tolerances provided by pipe manufacturers. For purposes of testing, 5% deflection shall be calculated from standard pipe Inside diameter as published in ASTM D3034 and ASTM F679. The mandrel shall be advanced through the pipeline to determine if bedding and embedment has been provided in compliance with ASTM D2321 to assure joint deflection of less than 5%. If the mandrel becomes obstructed for any reason while being pulled through the line with less than 100-Ibs of force, the location of the defect shall be noted and the mandrel shall be removed from the pipeline. Under no circumstances shall heavy equipment be utilized to force the mandrel through the pipeline. Deflection testing may be done concurrently with sewer televising inspections, provided the mandrel is kept within visible range of the camera. Video Assessment and Cleaning. As a final measure required for acceptance, the Contractor shall clean and televise all newly installed sewer mains prior to acceptance by the City. The Contractor shall televise the sewer main and all lateral connections installed from the upstream to downstream manhole with no reverse setups or cutaways. Throughout shooting, the camera shall be panned and tilted for a complete view of the main. Lighting shall be adequate to view the entire sewer main and service connections from beginning to end. The video inspection shall be submitted to the Inspector on a CD and formatted with software compatible and readable by the City. The City shall not be responsible for purchasing additional software necessary to view the CD's. 102 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL The camera shall be advanced at a uniform rate not to exceed 20 feet per minute that allows a full and thorough inspection of the new sewer main. The camera shall be a color, pan and tilt camera capable of producing a five hundred line resolution picture. Lighting for the camera shall be sufficient to yield a clear picture of the entire periphery of the pipe. The picture quality shall be acceptable and sufficient to allow a complete inspection with no lapses in coverage. The length of the sewer main shall be measured and recorded on the video screen. The distance counter shall be calibrated before shooting the inspection video. The Contractor shall clean the sewer mains ahead of video inspection with a high -velocity water jet. The video inspection shall take place within 2-hours of cleaning operations as witnessed by the Inspector. All construction debris shall be collected in the downstream manhole and shall not be released into the sewer system. The Inspector shall be present throughout the cleaning and televising of the sewer mains to verify that the video work complies with the Specifications. Prior to submitting the CD's to the Inspector, the Contractor shall label the CD's with the following information: • Name of the Project/Development. • Name and contact information of responsible party. • Date of televising. • Manhole identification as shown on the design plans. Testing of the marker tape shall be performed by the Contractor at the completion of the project to assure it is working properly and completely detectable. It is the Contractor's responsibility to provide the necessary equipment to test the markers. Any defective, missing, or otherwise non -locatable segments shall be replaced. Manhole Testing Vacuum Testing. All newly installed manholes shall pass a vacuum test in accordance with ASTM C 1244. The Contractor shall supply all equipment and materials necessary to vacuum test the manholes. Vacuum Testing shall be completed prior to any specified coating and lining materials being installed. The Inspector shall be present and witness all vacuum testing. The following vacuum testing criteria shall apply for compliance with the testing procedure: • A vacuum of 10-inches of mercury shall be drawn with an approved vacuum testing unit. • The testing time shall not be measured until after the vacuum pump has been shut off. • The time required for the vacuum to drop from 10-inches to 9-inches of mercury shall meet or exceed the values listed in the following table. 103 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Manhole Vacuum Testing Time (seconds) Depth (feet) Manhole Diameter (inches) 48 60 72 8 20 26 33 10 25 33 41 12 30 39 49 14 35 48 57 16 40 52 67 18 45 59 73 20 50 65 81 22 55 72 89 24 59 78 97 26 64 85 105 28 69 91 113 30 74 98 121 Repairs and Modifications Vitrified Clay Pipe. Replace damaged section with SDR-35 PVC and Shearguard coupling at each end. PVC Pipe. Replace damaged section with PVC Pipe and install a Shearguard coupling at each end. ABS/PVC Truss Pipe. Replace damaged section with SDR-35 PVC and install a Shearguard coupling at each end. Asbestos Cement Pipe. Replace damaged section with SDR-35 PVC and couplings. All repairs to damaged sanitary sewer lines in paved areas shall be backfilled with ABC stone (crusher run) to a density of 95 percent Standard Proctor. All repairs to damaged sanitary sewer lines shall be bedded with 6-inches of washed stone and compacted to a minimum of 95% Standard Proctor density before installing the new joint of ductile iron or PVC pipe. A detailed pumping and emergency plan shall be required for any sewer line draining event. All sanitary sewer mains and sewer force mains 20-inches and larger, active, inactive, or abandoned shall begin to be drained by tapping the bottom half of the pipe. A corporation stop 104 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL or other valve shall be provided to control flow. All effluent shall be pumped to a downstream manhole (when available) or other containment tank utilizing continuous piping. The use of a sump pit on lines 20-inches and larger is not allowed. In sensitive environmental areas and in other various scenarios the City may require lines Tess than 20-inches also be tapped in order to be drained. 105 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL SECTION 9 - WATERFO General CE MAINS These Specifications apply to all force mains that are to be owned, operated, and maintained by the City of Goldsboro. Design of private pump stations and force mains and associated facilities is not covered by these Specifications or otherwise herein, and the applicant should look for guidance from other appropriate agencies (NCDENR, NC Plumbing Code, etc.). All aspects of the design of wastewater force mains, and associated facilities shall, at a minimum, meet the requirements of the latest version of the NCDENR "Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains". Requirements presented in the City of Goldsboro Standard Specifications hereunder that are more restrictive or go above and beyond the requirements of the Minimum Design Criteria are required by the City of Goldsboro. All aspects of the design of pump stations, force mains, and associated facilities shall be submitted for review and approval by the City of Goldsboro. Wastewater force main interconnections shall be prohibited. All wastewater force mains shall extend to the nearest gravity sewer or pump station wet well that has sufficient long term capacity. Design Force mains shall be installed with a minimum cover of 4 feet measured from the top of the pipe to the finished grade. Force mains shall be installed in dedicated public right of way or in dedicated utility easements as follows. When wastewater force mains are constructed adjacent to gravity sewer mains or for construction of parallel wastewater force mains, the minimum horizontal clearance shall be at minimum 7-ft from pipe edge to pipe edge when the depth of installation is 8-ft or less. Otherwise, the minimum horizontal separation between pipelines shall be 10-ft up to installation depth of 10-ft. Clearances for pipelines greater than 10-ft depth shall be designed by Engineer of Record and approved by the City of Goldsboro. Easement widths outlined below shall be widened by at least the clearance between the pipelines when constructing a shared gravity sewer and wastewater force main corridor. Standard Easement Width for Sewer Force Mains 106 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Pipe Size (diameter) Pipe Depth (feet) Easement Width (feet) 8-inch to 12-inch 10-ft or Tess 20-ft 8-inch to 12-inch 10-ft to 12.5-ft 25-ft 8-inch to 12-inch 12.5-ft to 15-ft 30-ft 8-inch to 12-inch 15-ft to 17.5-ft 35-ft 8-inch to 12-inch 17.5-ft to 20-ft 40-ft 12-inch to 24-inch 15-ft or less 30-ft 12-inch to 24-inch 15-ft to 17.5-ft 35-ft 12-inch to 24-inch 17.5-ft to 20-ft 40-ft Greater than 24-inch Any Depth Specified by the City Any Size Deeper than 20-ft Dedicated easements for force mains and appurtenances shall be recorded as "City of Goldsboro Utility Easement". City of Goldsboro force main easements shall contain only City of Goldsboro utilities unless otherwise approved by an encroachment agreement. Wastewater force main discharge manholes and intermediate air release locations that require odor control shall be provided with sufficient easement area to accommodate the odor control systems as designed by the Engineer of Record, whether utilizing passive, forced -air or chemical treatment for odor control. The maintenance easement for odor control systems shall be sized based on site specific conditions and shall provide sufficient area for routine maintenance operations, such as refilling media, chemicals, replacing equipment, etc. Force mains shall discharge at the invert of the receiving manhole and shall be as close as possible to 180 degrees from the outlet pipe. Force main design shall facilitate cleaning and inspection. The use of 90 degree bends is prohibited. Force mains shall be constructed with a pigging/bypass connection located within 50-ft of the pump station valve vault. Force main minimum design velocity shall not be Tess than 2-ft per second throughout the length of the force main. As a design preference, force main systems when operating at higher flows shall reach velocities of 3 to 5 ft/s to re -suspend any settled solids. Force main systems shall be of adequate sizing and design to effectively convey the ultimate peak flows as applied by the connected pump station to the discharge point. 107 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL The force main route shall be such that the number of high points requiring combination air valves is minimized to the extent possible. Combination Air Valves rated for use with raw wastewater shall be installed at all the high points or runs exceeding 3000-ft on all force mains in accordance with the Standard Details. A high point shall be determined as any location where the vertical separation between the adjacent low point and high point in the force main is greater than or equal to 10 vertical feet. All valves and fittings shall be restrained. Pipe joints shall also be restrained an adequate length away from valves and fittings in accordance with AWWA manual M41 (or the latest edition of Thrust Restraint Design for Ductile Iron Pipe as published by the Ductile Iron Pipe Research Association). In all cases, there must be a pipe restraint plan with the method of restraint to be used and the length of pipe to be restrained clearly identified on the plans at all necessary locations. The pipe restraint plan shall be included under the design responsibility of the NC Professional Engineer sealing the plan drawings. • Pipe Joints: The standard joint restraint method shall be to use manufacturer provided restrained joint pipe. Pipe up to and including 12-inches in diameter may also utilize either mechanical joint pipe with approved wedge action retainer glands (for the specified distance) or reaction blocking at fittings as an altemative. All joint restraint products that include the means of restraint within the joint gasket shall be prohibited. • Valves: Valves shall be restrained in a manner consistent with operation as a dead end. This includes restraining the valve to the pipe and restraining a sufficient number of pipe joints on both sides of the valve to accommodate dead end restraint. A plug valve shall be installed at least every 3000 feet of force main length. All air release valves, plug valves greater than 12-inches, or other appurtenances that have moving or operating parts and require maintenance and routine access shall have a manhole placed over them or over the operating portion of the device. Separation between Sewer Force Main and Storm Water Pipes: Sewer force mains shall have a minimum vertical separation of 24 inches between storm pipes when the horizontal separation is 3 feet or less. Where sanitary and storm sewers cross with a vertical separation of less than 24 inches, the entire leg of sanitary sewer shall be made of standard ductile iron pipe with joints rated for water main service and the void space between the pipe crossing shall be backfilled with 3000-psi concrete or minimum 500-psi, quick setting, non-excavatable flowable fill that meets or exceeds NCDOT Specifications. Separation between Sanitary Sewer and Sewer Force Main: There shall be a minimum 7 foot horizontal separation between parallel gravity and/or force mains in outfall locations when the 108 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL depth of installation is 8-ft or less. Otherwise, the minimum horizontal separation between pipelines shall be 10-ft in outfalls. Separation between Sewer Force Main and Water Main: Parallel Installations: 10-ft lateral separation (pipe edge to pipe edge) or minimum 3-ft lateral separation, and water line at least 18-inches above sewer force main measured vertically from top of sewer pipeline to bottom edge of water main. In unique cases where the sewer force main and the water main are installed with at least 3-ft of lateral separation but less than 10-ft of horizontal separation, and less than 18-inches of vertical separation, both the water main and sewer force main shall be constructed of ductile iron pipe with joints in full compliance with water main standards. Crossings (Water Main over Sewer Force Main): All water main crossings of sewer force mains shall be constructed in conformance with City of Goldsboro Specifications. At a minimum, 18- inches of clearance shall be maintained between the bottom edge of the water main and the top edge of the sewer force main. If 18-inches of clearance is not maintained, the water main and sewer force main shall both be constructed of ductile iron pipe with joints in conformance with water main construction standards. The ductile iron sewer force main shall extend 10-ft on both sides of the crossing. When the separation between pipelines is 18-inches or less, the void space between the pipes shall be filled with minimum 500-psi, quick setting, and non- excavatable flowable fill extending 3-ft on both sides of the crossing. Regardless of pipe material, at least 12-inches of vertical separation is required for sewer force main crossings of potable water mains. Crossings (Water Main under Sewer Force Main): Allowed only as approved by City of Goldsboro, when it is not possible to cross the water main above the sewer force main. At a minimum, 18-inches of separation shall be maintained, (measured from pipe edge to pipe edge) and both the water main and sewer force main shall be constructed of ductile iron in conformance with water main construction standards to a minimum of 10-ft on both sides of the crossing. If local conditions prevent providing 18-inches of clearance, then at least 12- inches of clearance shall be provided and the void space between the pipes shall be filled with minimum 500-psi, quick setting, and non-excavatable flowable fill extending at least 3-ft on both sides of the crossing. In all cases the water main pipe shall be centered at the point of crossing with joints equally spaced from the point of crossing. Sanitary Sewer Force Main and Stream Crossings: The top of the sewer force main shall be at least one foot below the stream bed. Concrete encasement and ductile iron pipe shall be required when the cover between the top of the pipe and the stream bed is Tess than 3 feet. Sewer force mains shall not be installed under any part of water impoundments. The following minimum horizontal separations shall be maintained: 109 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL • 100 feet from any private or public water supply source, including wells, WS-1 waters or Class I or Class II impounded reservoirs used as a source of drinking water (except as noted below) • 50 feet from any waters (from normal high water) classified WS-II, WS-III, B, SA, ORW, HQW or SB (except as noted below) • 10 feet from any other stream, lake, or impoundment (except as noted below) • 25 feet from private wells (with no exceptions) • 50 feet from sources of public water supply (with no exceptions) Where the required minimum separations cannot be obtained, ductile iron sewer force main pipe with joints equivalent to water main standards shall be used. Materials Pipe Materials: The minimum wastewater force main size shall be 4-inches in diameter. SDR- 35 PVC or ductile iron pipe shall be required for all wastewater force mains. SDR-35 PVC or ductile iron pipe shall be designed and manufactured in accordance with AWWA C150 and C151 and provided in nominal 20-ft lengths. The minimum requirements for ductile iron pipe and required laying conditions are tabulated below. For all other installations other than specified, the laying condition, bedding requirements or the minimum pressure class rating and/or thickness class shall be increased in accordance with AWWA C151. A pipe thickness design shall be submitted for extemal loading in all cases where the pipe depth exceeds the specified range of depths outlined in the following table. Pressure Class, Max. Depth and Laying Condition for DI Wastewater Force Mains Pipe Diameter AWWA C-150, Laying Condition Pressure Class Maximum Depth of Cover 4 to 8 inch type 1 350 psi 3-16 feet 4 to 8 inch type 4 350 psi 16-20 feet 10 to 12 inch type 1 350 psi 3-10 feet. 10 to 12 inch type 4 350 psi 10-20 feet 14 to 20 inch type 4 350 psi 3-28 feet 24 inch type 4 350 psi 3-25 feet Note: For cases not specified, a ductile iron pipe and bedding design certified by a Professional Engineer licensed in the State of North Carolina shall be required in compliance with AWWA C150 and the Ductile Iron Pipe Research Association. All pipe shall be marked in conformance with ASTM A-746. 110 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL All ductile iron wastewater force mains and fittings for sewer construction shall receive an interior ceramic epoxy coating, consisting of an amine cured novalac epoxy containing at least 20% by volume of ceramic quartz pigment, as manufactured by Protecto 401. The interior coating shall be applied at a nominal dry film interior thickness of 40-mils. All DIP bells and spigots shall be lined with 8-mils of Protecto 401 joint compound applied by brush to ensure full coverage. All pipe supplied with Protecto 401 interior lining shall be provided free of holidays. Pipe installed with defects in the lining will be rejected. Patching of Protecto 401 coating defects after installation shall not be approved. Protecto 401 Tined pipe must be installed within one year of the application date on the pipe. Pipe fittings shall be made of ductile iron designed and manufactured per AWWA C110 or C153. All fittings up to and including 24 inches in diameter shall be designed for a minimum internal pressure of 350 psi, unless otherwise approved by the City of Goldsboro. Fittings shall be mechanical joint or proprietary manufacturer provided restrained joint. Gaskets shall be in accordance with AWWA C111. All fittings shall be interior coated with Protecto 401 as specified herein for ductile iron pipe. Restrained Joint Ductile Iron Pipe shall be the boltless type unless otherwise approved. For installations requiring welded locking rings, the rings shall be factory welded. The restrained joints shall provide a minimum of 4-degrees of deflection for pipe sizes, 4-inches through 12- inches in diameter. All proprietary pipe restraint systems shall be approved by the City of Goldsboro and provided in compliance with all standards for coatings, linings, pressure classes, etc. as required for ductile iron pipe. All restrained joint pipe shall be installed based on laying conditions, pressure class, etc. as required for typical ductile iron pipe. Manhole Materials: All sewer force main manholes shall be installed according to the City of Goldsboro Standard Specifications when design and installation criteria are not otherwise covered herein. All force main discharge locations and other manholes for wastewater force mains (excluding those housing large diameter plug valves) shall be epoxy coated at minimum 80-mils thickness. Sewer force main receiver manholes, sewer force main combination air valve manholes and other concrete structures subject to high levels of hydrogen sulfide gas shall be provided with an approved monolithic epoxy coating system consisting of a 100% solids, solvent -free, two - component epoxy resin that meets the following Specifications for up to 100 mils of coating with a manufacturer approved set time of 6-hours or Tess. Force Main Receiver Manholes: Sewer force mains shall not discharge directly into existing gravity sewer lines. Sewer force mains shall typically discharge into a receiver manhole that 111 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL has been epoxy coated as specified herein. The receiver manhole shall be provided in the typical eccentric tapered design at minimum 5-ft diameter. The bench shall be sloped up to 8- inches from the invert channel to the manhole wall. The invert shall be provided with a gradual up sloping alignment from the force main entry to the gravity transition point. Sufficient grade shall be placed on the invert such that wastewater falls back into the force main when the pumps are not in operation creating a vapor lock between the force main and the manhole. Drop connections into force main receiver manholes shall be prohibited. Combination Air Valve Manholes: Manholes for combination air valve installation shall be provided in flat top configuration to accommodate the excess length of wastewater combination air valves. In cases where the combination air valve assembly shall be located in a paved area, provide typical eccentric, tapered manhole design with typical manhole frame and cover for paved areas. The minimum manhole diameter for combination air valve assemblies shall be 5-ft. Minimum 6-ft diameter manholes shall be used with force mains 20-inches and larger and when an odor control system is required. Any manholes located in NCDOT or street right- of-way shall be provided flush with finished grade. Installation General. Ductile iron pipe shall be installed in accordance with the requirements of AWWA C600 and the Ductile Iron Pipe Handbook published by the Ductile Iron Pipe Research Association. Materials at all times shall be handled with mechanical equipment or in such a manner to protect them from damage. At no time shall pipe and fittings be dropped or pushed into ditches. Pipe trench excavation and backfilling shall be performed in accordance with these Specifications. Pipe and fitting interiors shall be protected from foreign matter and shall be inspected for damage and defects prior to installation. In the event foreign matter is present in pipe and fittings, it shall be removed before installation. Open ends of pipe shall be plugged or capped when pipe laying is not in progress. All pipe shall be constructed with at least 48 inches of cover below the finished surface grade. Pipe shall be laid on true lines as directed by the Engineer. The wastewater force main shall be installed at a grade which will allow air to migrate to a high point where the air can be released through an air valve. A minimum pipe slope of 1 foot in 500 feet should be maintained and there shall be no intermediate high points in the line. Trenches shall be sufficiently wide to adjust the alignment. Bell holes shall be dug at each joint to permit proper joint assembly. The pipe shall be laid and adjusted so that the alignment with 112 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL the next succeeding joint will be centered in the joint and the entire pipeline will be in continuous alignment both horizontally and vertically. Pipe joints shall be fitted so that a thoroughly watertight joint will result. All joints will be made in conformance with the manufacturer's recommendations for the type of joint selected. All transition joints between different types of pipe shall be made with transition couplings approved on shop drawings showing the complete assembly to scale. Embedment Material. Bedding and embedment material classifications shall be defined as follows: • CLASS I - Angular, (1/4 to 1-1/2 inch) graded stone, including a number of fill materials that have regional significance such as coral, slag, cinders, crushed stone, crushed gravel, and crushed shells. • CLASS II - Coarse sands and gravels with maximum particle size of 1-1/2 inch, including variously graded sands and gravels containing small percentages of fines, generally granular and non -cohesive, either wet or dry. Soil types GW, GP, SW and SP are included in this class. • CLASS III - Fine sand and clayey gravels, including fine sands, sand -clay mixtures, and gravel -clay mixtures, Soil Types GM, GC, SM, and SC are included in this class. • CLASS IV - Silt, silty clays, and clays, including inorganic clays and silts of medium to high plasticity and liquid limits. Soil Types MH, ML, CH and CL are included in this class. These materials shall not be used for embedment. Class I foundation material consisting of'/ -inch to 11/2-inch graded stone shall be required in addition to standard bedding and embedment for all sewer installations, regardless of pipe material, when the trench bottom is unstable due to water, rock, infiltration or soil type. All bedding, embedment and backfill materials shall be compacted to a minimum of 95% Standard Proctor density regardless of material. In instances where compliance with compaction requirements is questionable as determined by the Inspector, testing shall be provided by the Contractor and a reputable licensed Geotechnical Engineer to verify compliance. The minimum trench width shall be one pipe diameter plus 9 inches on each side of the pipe as described in these Specifications. In any area where the pipe will be installed below existing or future ground water levels or where the trench could be subject to inundation, additional Class I material shall be used for bedding. 113 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL If hydraulic jack shoring is utilized for trench walls, it shall be restricted to the area just above the top of the pipe. This will ensure the embedment materials and pipe will not be disturbed when the shoring is removed. Laying Conditions. Pipe shall be installed at laying conditions as specified by the plans. Laying conditions for ductile iron pipe shall be as described in AWWA C151 and the Ductile Iron Pipe Research Association. Laying conditions shall be defined as follows: Type 1: Flat Bottom Trench with Pipe Resting on Stable Undisturbed Earth. Unstable conditions such as wet trench bottoms, intermediate rock layering, partially weathered rock, and other unsuitable soil conditions shall require utilizing more stringent laying conditions. At a minimum, Type 4 laying condition shall be utilized with a minimum of 4-inches of bedding to overcome unstable conditions. For severe unstable soil conditions, undercut excavation and an engineer designed foundation plan shall be provided prior to pipeline installation i Type 1 w Type 4: Pipe bedded in Class 1 material, No. 67 or No. 78 crushed stone to a depth of 1/8 pipe diameter or a minimum of 4-inches. Embedment material, consisting of Class 1, Class 2 or Class 3 materials, shall be compacted greater than 95% Proctor to the top of the pipe. Careful attention must be allocated to compacting embedment material under the bottom edges of the pipe. Type 4 114 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Type 5: Pipe bedded in Class 1 material, No. 67 or No. 78 crushed stone to the center of the pipe and extending a minimum of 4-inches under the pipe. Granular or select embedment, consisting of Class 1 or Class 2 materials, compacted to greater than 95% Proctor installed to the top of the pipe. Type 5 Installation Below the Water Table. For installations below the water table, a single layer of engineering fabric shall be installed between the pipe and trench floor/trench wall. The fabric shall fully encapsulate the force main, bedding, and embedment material with a minimum of 12-inch overlap at the top of the embedment material. Utility Coordination. Prior to beginning construction, the Contractor shall contact local utility companies and verify the location of existing utilities. The Contractor shall be completely and solely responsible for locating all existing buried utilities inside the construction zone before beginning excavation. The Contractor shall be solely responsible for scheduling and coordinating the utility location work. When an existing utility is in conflict with construction, it shall be exposed prior to beginning construction to prevent damage to the existing utility. Marking Tape. Marking tape shall be installed continuously and longitudinally along all_sewer force mains for new construction and for any repair or retrofit_construction using open trench methods. Marking tape shall be installed directly above the center of the pipe and at least 16- inches_deep from final grade to a maximum depth of 24-inches below final grade. The marking tape shall be made of polyethylene (or approved equivalent) material, 6-inches wide and a minimum of 6 millimeters thick. The marking tape shall have detectable markers embedded in the tape and spaced adequately to provide continuous detection along the tape from above the buried pipe at final grade. The tape shall be green in color and shall be marked with words that read "CAUTION SEWER LINE BURIED BELOW" (or an approved equivalent wording). The wording shall be repetitive along the full length of the tape. 115 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Valves and Appurtenances The rated working pressure of all valves and appurtenances shall meet the maximum design pressure of the pump station and pipeline. Check Valve: Check valves shall be iron bodied, fully bronze mounted with bronze clapper disc and bronze seat ring, and shall have a spring loaded lever arm capable of being mounted on either side of the valve. Plug Valve: Plug valves shall be non -lubricating, eccentric action and resilient plug facing with heavy duty Type 316 stainless steel bearings. Plug valves shall be designed for a minimum working pressure of 175 psi for valves 12 inches and smaller, 150 psi for valves 14 inches and larger. Valves shall be bi-directional and meet the pressure rating in both directions of flow. The plug valve body shall be cast iron ASTM A126 Class B with welded -in overlay of 90% nickel alloy content on all surfaces contacting the face of the plug. Sprayed, plated, nickel welded rings or seats screwed into the body are not acceptable. All plug valves 12 inches and smaller shall have round port design that provides a minimum 80% port area. The valve plug shall be ductile iron ASTM A536 Grade 65-45-12 up to 20- inches in diameter, with EPDM, Buna N, or Neoprene resilient seating surface to mate with the body seat. Valves 24-inches and larger may have plugs made of cast iron in accordance with ASTM A126 class B. Large plug valves with rectangular plugs shall provide clean passage for a solid sphere of at least 67% of the adjoining pipe diameter to facilitate pigging of the force main. Force main plug valves with rectangular port shall be "full -port" cross -sectional area perpendicular to the flow of at least 100% of the adjoining pipe. All buried plug valves shall be provided with worm gear actuators. All plug valves shall be buried and provided with a 2-inch operator nut and valve box as shown in the details. Plug valves greater than 12-inches shall be installed such that the actuator and gearing is accessible in a manhole as shown in the details. All plug valves shall be provided with typical mechanical joint end connections and restrained with wedge action retainer glands on both ends of the valve assembly as described herein. Valves shall be installed according to the manufacturer's recommendations. Typically for wastewater this means installing the seat side toward the pump station so that the flow is against the face of the plug in the closed position. In the open position, the plug should rotate up to the top of the pipeline which may require installing the valve on its side. Rubber Seated Ball Valve: For larger diameter force mains where plug valves are not available, rubber seated ball valves shall be of the tight -closing, shaft -mounted type that fully comply with AWWA Standard C507 to provide a full port unobstructed waterway with no additional pressure 116 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL drop. Design pressure ratings shall be 150 psi or greater and provide tight shutoff against flow. With the valve in the closed position, the rubber seated valve shall be bubble tight at rated pressure. All ball valves shall be provided in an epoxy coated manhole with worm gear actuators and a handwheel. Valve Box Covers: Force main plug valves or ball valves shall have valve box covers and/or manhole lids with the word "Sewer" cast into them. Combination Air Valves: Combination Air Valves shall be provided to purge air from the system at startup, vent small pockets of air while the system is being pressurized and running, and prevent critical vacuum conditions during draining. Combination air valves approved for use in wastewater force main installations shall be installed at all high points of wastewater force mains 6 inches in diameter or larger and at other locations, such as major changes in slope, as directed by the City. A high point shall be determined as any high location where the difference between the high elevation and adjacent low elevation exceeds 10-ft unless otherwise determined by the City based on special circumstances. The combination air valve shall automatically exhaust large volumes of air from the system when it is being filled and allow air to re-enter the pipe when the system is being drained. The wastewater force main shall be installed at a continuous grade between low and high points without intermediate high points unless an air release valve is being installed. A minimum pipe slope of 1 foot in 500 feet should be maintained. Combination air valves shall be sized by the Engineer and approved by the City. • Combination air valves shall be of the single housing style with Type 304 or 316 stainless steel body that combines the operation of both an air/vacuum and air release valve. The valve must meet the requirements of AWWA C512 and be installed in accordance with the Details. The valve shall have a minimum 145-psi working pressure unless the pipeline design requires a higher pressure rating. • The valve shall have a minimum 2-inch male NPT inlet for a 2-inch valve assembly. Combination air valves sized from 3-inches to 8-inches shall be provided with studded inlet connectors or flanged connections. The combination air valve shall be provided with cylindrical shaped floats and anti -shock orifice made of high density polyethylene. Combination air valves with spherical floats shall not be accepted. All combination air valves shall be installed in accordance with the Details. • Installation of Combination Air Valve Assembly: o The Engineer of Record shall provide ample depth of installation to accommodate the extended height of combination air valves for wastewater force mains. All combination air valves shall be connected to the main by an MJ x FLG tee with the branch diameter equal to at least half of the main diameter. 117 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL o The 2-inch combination air valve shall be provided with male NPT threads and isolated with a 2-inch gate valve. The isolation valve shall be provided with NPT threads and connected with brass or bronze piping. o Combination air valves 3-inches and greater shall be connected by flange or studs. If needed due to a larger diameter tee, a flanged reducer shall be provided between the tee and the isolation valve. Gate valves shall be used for 3-inch assemblies. Combination air valves 4-inches and larger shall be isolated with a plug valve. In all cases the isolation valve shall be sized equal to the combination air valve. Pigging Station: Force mains shall be constructed with a pigging/bypass connection located within 50-ft of the pump station valve vault. This pigging leg shall consist entirely of Protecto 401 coated ductile iron pipe of the same diameter as the main. A restrained MJ wye shall be provided in the main line and valved on each branch. The pigging leg shall extend out of the ground and be closed with a blind flange. The protruding pipe shall be protected by concrete bollards spaced 6-ft apart. Bypass Connection Assembly: On some wastewater force mains, an additional bypass connection assembly may be required. The size, criticality and proximity to a downstream manhole will be important factors in the need for this connection. The bypass assembly shall include either a ball valve or plug valve assembly for isolation from the primary wastewater force main. Additionally, the primary force main shall be provided with a main line plug valve or ball valve on the upstream side of the bypass assembly to prevent bypass flow from draining back to the pump station. The bypass assembly shall be brought to the final graded surface with a visible blind flange assembly for connection by an outside pumping contractor. Force Main Odor Control Systems: Force main odor control shall be included in the design plans for any proposed force main at discharge locations, intermediate air release locations and otherwise as directed by the City. In limited cases, air release valves located in isolated areas may be approved without odor control systems. The suggested odor control technology shall be designed by the Engineer of Record to achieve 95% or greater hydrogen sulfide removal. All systems, including those utilizing activated carbon, shall be manufactured specifically for addressing hydrogen sulfide gas. Forced air systems should be avoided due to the need to include provisions for electrical power to the odor control system. For all odor control systems, the Engineer of Record shall provide sufficient easement area for long term maintenance of the system. Inspections All materials and equipment used in the construction of the wastewater pumping system must be verified for compliance with the Specifications (or other approval granted by the City) by the 118 4 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Inspector prior to installation. Non -conforming materials or equipment shall be immediately removed from the job site. Compliance with plans and Specifications shall be verified on a regular basis by the Inspector. Testing The Contractor shall fumish all materials, labor, and equipment to perform all testing. Water for testing purposes may be obtained from the City. The Contractor shall reimburse the City for all water used at Inside Utility Rates. All water or wastewater used during testing of the pump station, force main, or any of the systems described in this section, must be returned to the City of Goldsboro sanitary sewer system after proper coordination with the City. All on -site testing and/or installation verification shall be performed in the presence of the Inspector or other representative authorized by the City. The force main shall be completely filled with water, all air shall be expelled from the pipe, and the discharge end of the pipeline shall be plugged and adequately blocked before the hydrostatic test begins. The force main shall be tested to a pressure of 100 psi or three times the rated Total Dynamic Head of the pumps in psi, whichever is larger, as measured at the lowest elevation of the pipeline, for a duration of 2 hours. The pressure gauge used in the hydrostatic test shall be calibrated in increments of 5 psi or less. At the end of the test period, the leakage shall be measured with an accurate water meter. All leaks shall be located and repaired regardless of the amount of leakage. If the force main does not pass the leakage test requirements, the cause of the failure shall be identified and repaired. Testing shall be repeated until the force main passes. Allowable Leakage, L= S x D x V(P) 133,200 Where: L = leakage (gph) S = length of pipe (feet) D = nominal diameter of pipe segment tested (inches) P = test pressure (pounds per square inch) 119 G u7 CITY OF GOLSDBORO ENGINEERING DEPARTMENT SPECIFICATIONS AND DETAILS MANUAL Testing of the tracer wire and marker tape shall be performed by the Contractor at the completion of the project to assure they are all working properly. It is the Contractor's responsibility to provide the necessary equipment to test. Any defective, missing, or otherwise non -locatable units shall be replaced. 120