Loading...
HomeMy WebLinkAboutNCG160242_Inspection Report_2022115Compliance Inspection Report Permit: NCG160242 Effective: Expiration: Owner: Carolina Sunrock LLC SOC: Effective: Expiration: Facility: Wake Forest Distribution Center County: Wake 5043 Unicorn Dr Region: Raleigh Wake Forest NC 27587 Contact Person: Tracy E Davis Title: Phone: 919-554-0500 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 11/15/2022 Entry Time 10:30AM Primary Inspector: Lauren Garcia Secondary Inspector(s): Certification: Phone: Exit Time: 11:OOAM Phone: 919-707-3648 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Asphalt Paving Mixture Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG160242 Owner - Facility: Carolina Sunrock LLC Inspection Date: 11/15/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Inspection was in response to an application for coverage under an NCG16. The information on the application is accurate. A concrete plant is also in operation onsite and is covered under permit number NCG140382. Water used to spray down the concrete plant equipment and used to wash out trucks is meant to flow towards a treatment basin area in the northeastern corner of the site. The water recieves a pH treatment in this holding area. A truck was observed being washed outside of the designated washout areas and water was observed flowing across the parking lot and into a rip rap ditch near the facility access road. The water that is colleted in the conrete washwater treatment basin is also piped to this same rap rap lined ditch. The ditch directs water towards a basin in the southeast corner of the site. This basin does not recieve any treatment. Water used to spray down materials stockpiles to control fines also flows across the parking lot and makes its way to a rip rap lined channel that conveys the water to the basin in the southeast corner of the site. The water in the concrete pretreatment area appeared to be a bright green color. The pH of the water was 5.85. The pH of the water is continuously monitored and reports are sent electronically to Tracy Davis one a week. Tracy Davis performs weekly site visits and documents maintenance activities. Water flows from the ashpalt plant into the pond in the southeast corner of the site and does not recieve treatment other than some measures to remove sediment. There appeared to be evidence of some old tar spills around the asphalt plant silos. The tar did not travel far and is hardened in place. There is not much water used to spray down equipment at the asphalt plant because materials must be very dry. Stormwater samples are taken from the outfall of the pond in the southeastern corner of the site. Coverage under the NCG16 is recomended. Site contacts should ensure washwater is not bypassing pH treatments. Page 2 of 3 Permit: NCG160242 Owner - Facility: Carolina Sunrock LLC Inspection Date: 11/15/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Page 3 of 3