Loading...
HomeMy WebLinkAboutNCC205116_NOT Closeout Documents_20221115North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Northampton Project: Lake Gaston Hydropower Station -Eel River basin: Roanoke Person financially responsible: Dominion Energy attn: Katheryu Curtis Project #: NORTH-2021-001 Address: 120 Tredegar Street Richmond Va. 23219 1. Project Location: Johnny Faulcon Rd., Littleton Pictures: No 2. Weather and soil conditions: cold dry workable Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Oula Shehab-Dandan Title: Env. Consultant Inspection report: Sent Report Date given/sent: December 07, 2021 9. Corrective action needed: 10. Comments: This project is stabilized and all measures can be removed and NPDES records no longer need to be tracked and erosion measures no longer need to be inspected. This project will be closed in the Land Quality office. Reported by: Thaddeus Valentine Others present: No one Date of inspection: December 07, 2021 Time arriving on site: 09:45 AM Time leaving site: 10:15 AM cc: