Loading...
HomeMy WebLinkAbout20140351 Ver 2_Site Plan_20141230NoW 1. A0ALST CN0TON3 MAY 0FR ROM CND|TON3SH0N C HE ° CONTRACT DRAWINGS. CONTACT THE DESIGN ENGINEER IF A D|3CR�PANCY |3 - FOUND. 2. EXISTING SITE CONDITIONS SHOWN ON THE CONTRACT ORA0UN83 ARE F�0� �~~ 11 � " DIGITAL FILES PREPARED BY THE SURVEY0R, WITHERS AND RAYEMEL. PER THE ""�_ 3URVEY0R, PLANS WERE PREPARED FROM I � , 11 I , )',�� ,,,,, " � . , If , " \ , , \ I . ..... " 1, 1, X ','-\:'I'\'-- ­,", 11 C0NDUCTED BETVYEEN MAY 21. 301� AND SEPTEMBER 21. 2D12. 3. THE HORIZONTAL DATUM AND BEARINGS SHOWN HEREON REFER T0 NORTH '/ � CAROLINA STATE PLANE COORDINATE SYSTEM NAD83 AND ARE Bk3ED ON /~`�/ C|TY0F 1� GREENSBORO /CDC\ MONUMENT "215" AND ORIENTED TO�HE AZIMUTH ~ __1 OET�EEN CO� �0NU�ENT "215" AND COG MONUMENT "218" MADEBYYV|THER3 � / �/ AND RA\ENEL ON MAY 24, 2012. � ' 4. THE VERTICAL DATUM SHOWN HEREON REFERS TO NCVD 28 AND IS BASED ON THE NCG3 MONUMENT "INFIRM", LOCATED ON 5-24-2012 BY YMTH�RS AND �� / n RAVENE[, --- it DATE DRWN CHKD 5. UTILITY INVERT ELEVATIONS WERE CALCULATED FROM A FIELD SUFVEY NO UND�RG�OUND UllL|T|E3 WERE DESIGNATED AS A PART OF THIS S0RVEY. -- ONLYTHE �B0VE GROUND APPURTENANCE3 WERE LOCATED AS AP ART OF THIS SURVEY. VISUAL EVIDENCE FOR STORM AND SANITARY SEWER WAS � UTILIZED TO COMPLETE CONNECTIVITY WHERE STRUCTURES WERE �(,,'CESS|BLE. x �� � /� � 0. WETLANDS SHOWN ON THE DRAWINGS WERE DELINEATED BYHAZE� AND / `� SAWYER. P.C. ON SEPTEMBER 7, 2011 USING THE 1987 CORPS OF ENGINEERS ' WETLAND DELINEATION MANUAL (ENVIRONMENTAL LABORATORY, 1907\. THE �ETLAND FLAG� YYERE SURVEYED USING A HANDHELD GPS UNIT. T�E GP3 UNIT PROVIDED SUB-METER ACCURACY AND THE SETTINGS OF THE GP3 VYERE / AS PRESCRIBED BY THE U.S . ARMY CORPS OF ENGINEERS FOR DELINEATION OF JURISDICTIONAL WATERS OF THE U.S. � 7. PRIOR TO BEGINNING ANY EXCAVATION W0RK, THE CONTRACTOR S�ALL. n �� /^m THROUGH FIELD INVESTIGATIONS, DETERMINE ANY CONFLICTS OR uu//u` ~' � ~` � � INTERFERENCES BETWEEN EXISTING UTILITIES AND PROPOSED UT|L|�E3 TO BE � C0N3TRUCTED UNDER THIS PROJECT. THIS DETERMINATION SHALL 3E BASED X ~~ X � /X �� ~X X. ` ON THE ACTUAL LDCAT|ONS, ELEVA7lON5, 3LOPES, ETC., OF EX|3T|NG UTILITIES _ � � \ X! AS DETERMINED IN THE FIELD INVESTIGATIONS AND LOCATION3, ELEVAT|ON, X �� ~~ X X X � X \ ` X X �� SLOPE, ETC. OF PROPOSED UTILITIES AS SHOWN ON THE DRAWINGS. IF A CONFLICT EX|ST3, THE CONTRACTOR SHALL BRING IT T0 THE ATTENTION OF ' THE DESIGN ENGINEER AS SOON AS POSSIBLE. IF THE DESIGN ENG:\NEER � � AGREES THAT A CONFLICT EX|3T3, HE SHALL MODIFY THE DESIGN AS | X X X X X X X REQUIRED. / � 8. CONTRACTOR SHALL PROTECT TREES AS NECESSARY AND MINIMIZE REMOVAL � OF ANY TREES GREATER THAN 8" DIAMETER AT BREAST HEIGHT [0BH). \ / \ } / 11 0. ANY WETLANDS FLAGS THAT ARE LOST DURING CONSTRUCTION SHALL BE REPLACED WITH BLUE FLAGGING AS SOON AS POSSIBLE AND VERIFIED BY THE / If ENGINEER OR SURVEYOR OF RECORD. 10. CITY OF GREENSBORO STANDARD DRAWINGS ARE TO BE USED THR0UGH0UT //// |Ht pKUVLU| \H|W//WWW.yxtuvbuunu mU.Uuv/|wuLxaurxrt-e�7L Zono/ / ­�-��= , / I I ;, / ") I I � t , ';�/,,, , , �/,"; lt� __ 11.1 " I I ' - - Wmrm I�f i, ,elll'll�I� "l", ; "", "';,,// , , (REFER TO THE CITY OF GREENSBORO LAND DEVELOPMENT /-- - " , -A//1/N// ,�/Ie X/ ��19I'i " /' "' ' ' "' � t ­­ - , " �'- /;:�//,, " ,�,4 /" 1 . CONTACT THE PLANNING DIRECTOR TO SCHEDULE A :�, , Mr DISTURBANCE, EXCEPT AS NOTED IN SEC. I'll, r, /,/ ? �� Z. ALL |K�t. UUNbLNV8||UN ULY1ULZ�) Mub| uL |mu|*LLLu 4. NO PARKING, STORAGE, DIRT STOCKPILING, CONCRETE _ .._- PROTECTION ._.-_ AND _-. REQUIREMENTS FOR THE TCA HAVE BEEN WAIVED BY THE URBAN FORESTER. \ � \ ", " , , X` \ \ _-��u� �Wu*u/*||um ��|�� % ` VAULT /BY OTHERS) \ \ \ `���`~~ ` � ' � � ° / I ""�_ 11 � , 11 I , )',�� ,,,,, " � . , If , " \ , , \ I . ..... " 1, 1, X ','-\:'I'\'-- ­,", 11 \ '*1 , " �__, e; ", "', I ,�", \ , , \_ ,�, \ \ , 1,N, " - I ( ...... "", 1\ \ " NI, \ \ \_-, " 1, I'll ­­­- X X --, 1� / ,,,� / I X ,/ , I \ .... .... I \ ,I \ "IN " "'�, I " ,I, - , \ , , , I � , � , 1,, \ , \ "'I"", , ", ,,, ", " \ ' \ \ - \ "I n " N, "'If", I \ �, , ", __1 �/ n REV. it DATE DRWN CHKD __ 12 � x x �� � /� � `� n �� /^m ^vu/ u/mE uu//u` ~' � ~` � � � X X ~~ X � /X �� ~X X. ` _ � � \ X! X X �� ~~ X X X � X \ ` X X �� � � | X X X X X X X X X\ `� X �X^ � �0 � \ / \ } / 11 � � ° ' n REV. it DATE DRWN CHKD __ 12 "- 4", ", " I I f�_ _1111-11 __11 ....... 211 ,,,I,. *,*-,,,, 11 ",' LJ 1 LJ lit i 3:: c-D ( ii'll I / � ,, �1; , -, - 1.11 . I -, U I y -1 1� 11 ; , �;R 11 I'll . f I/ i 11 Il / I i ' SWI 4� % 'tI­-,,__'///�, NO.5 "/) ", ,,,, - li�r / - m ADMINISTRATION BUILDING SECONDANY CLARIFIER SECONQA�Y CLARIFIER N0.3 1�1 11 11 77­1 1 ' 11"%'111 , V SSI \\'/,,__ t,Mli�i '., , � '0% , ,- ", ", "k ( � 0 q ^ 1,116 I � I " If,, i 11,11 I � \' , \ \ """ 4� i �/ ; ", 'u, \ \, I " /41 � � '!iiI%!I � 1� X 1',"�,, "." ,� ... . . ... �,, ",\, i I ,ft, � , , , �,, , ,_,­� j I 1i RASPUMP 11 , STATION NO.1-11 11 CL RI IER I o 1 ) �%a ,�,[�� V/ =0 2: �, / I il � I I A/ /Ori 11 /I \ 1'�",, I/ 7/7, `/ UB� , 04/// - � K// I z: C) � /11// 0 0) I/ � E/ -_;;, , m 1111/ M F__ / F= �__ 'CONDARY ARIFIER ff MET= ,.,/ CLARIFIER `kJ"I'l `-­ � CLARIFIER , /`N:7----A,-­v,-`­1 -,-,- I ,/ _p` I I � . .... ,-,/,%, ­11-1-1-0,0 ­ ]A " ­=,� " , , =-_ 11111-1-11­11­1 11 � 111111-1/11 11" $­,r­ | ` ~'�~��| �) > / m,x/ v� � - ^�- .�~ , � "11 -1 1:, 0 "\,", 111f,", ­­.�' ,� // 1, I � ) I /�, /�, / � -�,// "! li, � " �111; -, / DESIGNED BFT DRAWN BY: BFT SHEET CHK'D BY: CROSS CHK' D 8Y: PDS APPROVED Bt ALS DE�E�BER 2O14 ��/,�z --///, - /� " 1, /,�_:��­_,__,_ // �. , � , I �/ ,­­��, - �_ ", ", j / ) � 5�,�-��--­:"�� ��< . r\ ~���~�~ ��` �`�� ~�~ /�~/~� - "I r111-6 / , ,0/ _gNumv/0"010"" , 1111001 , " ` " f , / 11�1 I I -� "I 1� , 11"', I \ IN \ llk I V ,_ + * . ` . ) (4� ° 0 Ll `--RA8 STATION NO. =1 � __ / _������ � L� \ U ^i ' Dcr ,3, 0- `' ^, �\,Ic (I - - � ` 7 \—H7 � �­__-­­ __­ ,, ,­ �, " ,,,",�/,1',," , ,,,,, , ;��,--,� ;r­ f / �o,81 52,�­ / I �(\ �,,I, v � I \1 �`,, , "'r 1<7­ , .7i I � �� I , , � \ It 11. I�,'j \ ,11 I � , I / I/ // / I I / ,,, " ,,, / " / / / ,/ �, , I , , 6 "W\"", "I"', x / I "I LL 100 50 O C,|7-[- PLAN LEGEND ~}| | [' [-L-��|� ASPHALT PAVEMENT L���.- ...J 0 GRAVEL ROADWAY OR R|PRAP F0251004 1 TREE CONSERVATION AREA -------' PROPERTY LINE — ' — LIMIT OF CONSTRUCTION ------- EASEMENT LINE ---'x---- CHAIN LINK FENCE _ m %�� STORM DRAIN INLET (CB) ��v ` / _ ~_ ��`» %%-%%-.,/ ( � 3DWH) STORM DRAIN MANHOLE / ���� ��-� FLARED END SECTION /FES\ ` / HEADWALL /HyV\ ���~��~�~� EXISTING SANITARY SEWER — ~~-- -- EXISTING DRAIN LINE -~-~�41__--_-~ EXISTING WATER LINE ~­19�— EXISTING GAS LINE ---'u1GE:--- EXISTING UNDERGROUND ELECTRIC ---UFE---- D YY|RE3 /­r1e,v_~rY .- TREE LINE ---52---- INTERMEDIATE CONTOURS ---50--- INDEX CONTOURS DETAIL REFERENCE + SOIL BORING T[k�Fl/�[}�[}V [[}/�{�|/�N TEMPORARY | L_|\����|��|� ROLLED EROSION CONTROL MATTING CHANNEL LINING /RECM\ RECM SLOPE STABILIZATION �� �� STRAW WATTLE �� INLET PROTECTION �� ----SP---- SILT FENCE —TP�F—' SILT FENCE AND TREE ^- PROTECTION FENCE J -)--'''~->- SWALE OR DIVERSION CHANNEL ---T»F--- TREE PROTECTION FENCE STABILIZED OUTLET FOR -7M SILT FENCE �%����.*­A� TEMPORARY SLOPE DRAIN MODIFICATIONS AND UPGRADES NEVY �OR� - 8TRUCTURE3 cr_ ~�_��. r1l 100, 18178 �� 1\111111 CAR // Lu SEAL 0 DESIGNED BFT DRAWN BY: BFT SHEET CHK'D BY: CROSS CHK' D 8Y: PDS APPROVED Bt ALS DE�E�BER 2O14 ��/,�z --///, - /� " 1, /,�_:��­_,__,_ // �. , � , I �/ ,­­��, - �_ ", ", j / ) � 5�,�-��--­:"�� ��< . r\ ~���~�~ ��` �`�� ~�~ /�~/~� - "I r111-6 / , ,0/ _gNumv/0"010"" , 1111001 , " ` " f , / 11�1 I I -� "I 1� , 11"', I \ IN \ llk I V ,_ + * . ` . ) (4� ° 0 Ll `--RA8 STATION NO. =1 � __ / _������ � L� \ U ^i ' Dcr ,3, 0- `' ^, �\,Ic (I - - � ` 7 \—H7 � �­__-­­ __­ ,, ,­ �, " ,,,",�/,1',," , ,,,,, , ;��,--,� ;r­ f / �o,81 52,�­ / I �(\ �,,I, v � I \1 �`,, , "'r 1<7­ , .7i I � �� I , , � \ It 11. I�,'j \ ,11 I � , I / I/ // / I I / ,,, " ,,, / " / / / ,/ �, , I , , 6 "W\"", "I"', x / I "I LL 100 50 O C,|7-[- PLAN LEGEND ~}| | [' [-L-��|� ASPHALT PAVEMENT L���.- ...J 0 GRAVEL ROADWAY OR R|PRAP F0251004 1 TREE CONSERVATION AREA -------' PROPERTY LINE — ' — LIMIT OF CONSTRUCTION ------- EASEMENT LINE ---'x---- CHAIN LINK FENCE _ m %�� STORM DRAIN INLET (CB) ��v ` / _ ~_ ��`» %%-%%-.,/ ( � 3DWH) STORM DRAIN MANHOLE / ���� ��-� FLARED END SECTION /FES\ ` / HEADWALL /HyV\ ���~��~�~� EXISTING SANITARY SEWER — ~~-- -- EXISTING DRAIN LINE -~-~�41__--_-~ EXISTING WATER LINE ~­19�— EXISTING GAS LINE ---'u1GE:--- EXISTING UNDERGROUND ELECTRIC ---UFE---- D YY|RE3 /­r1e,v_~rY .- TREE LINE ---52---- INTERMEDIATE CONTOURS ---50--- INDEX CONTOURS DETAIL REFERENCE + SOIL BORING T[k�Fl/�[}�[}V [[}/�{�|/�N TEMPORARY | L_|\����|��|� ROLLED EROSION CONTROL MATTING CHANNEL LINING /RECM\ RECM SLOPE STABILIZATION �� �� STRAW WATTLE �� INLET PROTECTION �� ----SP---- SILT FENCE —TP�F—' SILT FENCE AND TREE ^- PROTECTION FENCE J -)--'''~->- SWALE OR DIVERSION CHANNEL ---T»F--- TREE PROTECTION FENCE STABILIZED OUTLET FOR -7M SILT FENCE �%����.*­A� TEMPORARY SLOPE DRAIN MODIFICATIONS AND UPGRADES NEVY �OR� - 8TRUCTURE3 cr_ ~�_��. r1l 100, 18178 �� 1\111111 CAR // Lu SEAL 0 PACKAGE 3 CONTRACTOR STAGING AND SPOILS HOLDING AREA ±4.4 AC � \ ` � 8 \ UU \ U8 | --NT --N''-T-R PARKING AREA 80 / 80 / 08 / » » FUTURE 1-785 HIGHWAY Ole «V / «0 � 0 �P'P COG 218-� el 8 NOTES: 1 CONTRACTOR SHALL NOT BE PERMITTED TO USE MAIN PLANT ENTRANCE FOR CONSTRUCTION TRAFFIC. ALL CONSTRUC�TION TRAFFIC SHALL BE ROUTED THROUGH THE CONSTRUCTION ENTRANCE. THE CONSTRUCTION ENTRANCE SHALL BE STABILIZED PER DETAIl_ 0257701R (TYP 2 PLACES). ,f fe 2. CONSTRUCTION ACTIVITIES, TO INCLUDE TRkFIC AND CONTRACTOR EMPLOYEE FOOT TRAFFIC, SHALL REMAIN WITHIN THE PROJECT LIMITS 3. TRAFFIC FLOW PATTERNS REQUIRE ADJUSTMENT WHEN PACKAGE 2 AND 3 CONTRACTORS ARE ON—SITE AT THE SANIJ TIME. THE CONTRACTORS SHALL CONFIRM TRAFFIC FLOW PATTERNS V�,'!.TH OWNER AND ENGINEER PRIOR TO COMMENCING CONSTRUCTION ACT[`dITIES. 4. LIMITS OF CONSTRUCTION SHOWN FOR PACK AGES 1 & 3 ARE APPROXIMATE AND SHOWN FOR INFORMATIO,-,I PURPOSES ONLY. 5. CONTRACTOR USE AREAS SHALL BE RESTOFEID WITH GRADING AND PERMANENT VEGETATION TO PRE—CONSTRUC:TION CONDITIONS OR BETTER. 6. SEE DRAWING Cl FOR SURVEY INFORMATION., 7. CITY OF GREENSBORO SITE CONTROL POINTS): COG 215 N 856411.7008 E 1796935.899,0 EL 744.9398 COG 216 N 855081.5195 E 1797642.1199' EL 705.9057 COG 218 N 855693.3154 E 1795452.87E2 EL 748.9690 , ............. __~�~ / / ' / \\ ' \ / / / CONSTRUCTION ENTRANCE ------------------------'-------- MATCH LINE 1 af 12/14 SNK RFP 1 ADDENDUM NO. 5 ISSUED FOR BIDDING REMARKS TOTAL PACKAGE 2 DISTURBED AREA = 22 ACRES / / / FUTURE STONE STAGING AREA - _ � APPROXIMATE EXTENTS OF PACKAGE 3 LIMITS OF DISTURBANCE---__ `\ \ \\ \ cL , \ � \\ / / / CONSTRUCTION ENTRANCE ------------------------'-------- MATCH LINE 1 af 12/14 SNK RFP 1 ADDENDUM NO. 5 ISSUED FOR BIDDING REMARKS TOTAL PACKAGE 2 DISTURBED AREA = 22 ACRES / / / FUTURE STONE STAGING AREA - _ � APPROXIMATE EXTENTS OF PACKAGE 3 LIMITS OF DISTURBANCE---__ 120 60 O 120' \ \ " / }^ 1 =120'-0" ^�-.-� / DESIGNED BY:___ DRAWN Bt___-_ SHEET CHM'D BY-.. CROSS CHN'D BY: APPROVED BY:-_- CONSTRUCTION ENTRANCE PACKAGE 1 CONTRACTOR STAGING AREA ±1.2 AC � 20J3' ~�^ CONTRACTOR AND ' ENGINEER TRAILER AREA PACKAGE 2 CONTRACTOR 3TAGNC, AND SPOILS HOLDING AREA ±3 AC APPROXIMATE EXTENTS OF PACKAGE 2------ � x � /Z � m APPROXIMATE EXTENTS OF PACKAGE 2----- INCINERATOR 1 11 IN CONTRACTOR If STAGING AREA o Y � APPROXIMATE EXTENTS WETLANDS FLOODWAY STREAM BUFFER, TYP. ­14— TRAFFIC FLOW DIRECTION PACKAGE 2 CONTRACTOR ALL CONTRACTORS STAGING AREA PACKAGE 1 CONTRACTOR ±2 AC PACKAGE 2 CONTRACTOR PACKAGE 3 CONTRACTOR INCINERATOR IMPROVEMENTS CONTRACTOR ------''------ LIMITS OF DISTURBANCE L|W|T3 OF WORK PACKAGE - COG 215-/ \ p� \ LIMITS OF DISTURBANCE APPROXIMATE EXTENTS 0F PACKAGE 2 LIMITS OF D|3TURBA � m z _ � ���� �l U W, OF PACKAGE 2 PACKAGE 3 CONTRACTOR STAGING AREA --APPROXIMATE EXTENTS OF PACKAGE 3 `\ \ \\ \ � /| \ � \\ 120 60 O 120' \ \ " / }^ 1 =120'-0" ^�-.-� / DESIGNED BY:___ DRAWN Bt___-_ SHEET CHM'D BY-.. CROSS CHN'D BY: APPROVED BY:-_- CONSTRUCTION ENTRANCE PACKAGE 1 CONTRACTOR STAGING AREA ±1.2 AC � 20J3' ~�^ CONTRACTOR AND ' ENGINEER TRAILER AREA PACKAGE 2 CONTRACTOR 3TAGNC, AND SPOILS HOLDING AREA ±3 AC APPROXIMATE EXTENTS OF PACKAGE 2------ � x � /Z � m APPROXIMATE EXTENTS OF PACKAGE 2----- INCINERATOR 1 11 IN CONTRACTOR If STAGING AREA o Y � APPROXIMATE EXTENTS WETLANDS FLOODWAY STREAM BUFFER, TYP. ­14— TRAFFIC FLOW DIRECTION PACKAGE 2 CONTRACTOR ALL CONTRACTORS STAGING AREA PACKAGE 1 CONTRACTOR ±2 AC PACKAGE 2 CONTRACTOR PACKAGE 3 CONTRACTOR INCINERATOR IMPROVEMENTS CONTRACTOR ------''------ LIMITS OF DISTURBANCE L|W|T3 OF WORK PACKAGE - COG 215-/ \ p� \ LIMITS OF DISTURBANCE APPROXIMATE EXTENTS 0F PACKAGE 2 LIMITS OF D|3TURBA � m z _ � ���� �l U W, OF PACKAGE 2 PACKAGE 3 CONTRACTOR STAGING AREA --APPROXIMATE EXTENTS OF PACKAGE 3 s N r'i N N I H Q Q N Q Z N 7- 0] w a N O W � J U � / Q J � � i N m U' Z_ Q g � N O .. O O> �� M N /� � � � O O N % 4j O Q D H � O _ J W � jr 56, II G s N O M N 0 'S p W r � J U N m U' Z_ Q � p Q � N O .. O O� I d- O � M N � Q O N % W O II p H w p � n. a a N � N <} O V O � M N N m �f w � N X E Z r ° M � U m OWE NOTE: ALL STRUCTURES C ORES SHALL COMPLY WITH T H CI Y OF GREENSEORO STANDARD DRAWINGS. �- ? � d t { � 5 ¢¢ P .0 { Y E /y s� g f E' r 1 �r _rg I \ f , r E I AERATION BASIN (� NO.12 sI MATCF� 1�1 ,SEE D,RAWI G C7 k E 4 � y �f f_. AREA (ac) RAS PUMP DRAINAGE STRUCTURE TABLE GUTTER FLOW E.G.L. STRUCTURE NAME: TO 3 INV. IN: 707.24' E , _ 3 (C.O.G. STD DWGS) DETAILS: SIZE (in) PIPES IN: / f ._. PIPES OUT i......, 16.41 4f DESIGN DATA SHEET 6. Of 1. D. 4.3 26. -9 0 721.92 722.40 36 0.96 DI 4 RIM: 720.58 MH 3 to DI 4 16.41 D14 to D15 23.2 4.3 26.&S 0 INV IN: 713.56 36° RCP INV IN: 71:; °56 36° RCP INV OUT: 711.23 (STD DWG 401,407) INV OUT: 711.23 5.0 23.9 4.2 26.25 0 715.19 720.18 36 1,50 6. Of 1. D. DI 4 D15 2.00 18.41 0.60 5.0 DI 5 RIM: 719.52 D14 to DI5 712.99 D15 to D16 7.06 (STD DWG 401,407 INV IN: 710.65 11 36 RCP INV IN: 710..65 f. 36 RCP INV OUT: 708.46 0 709.05 710 -21 INV OUT: 708.46 1.07 7.08 No gutter flow in channel. D16 MH4 1.00 19.56 0.75 5.0 6. Of 1. D. 4.0 33.34 0 708.54 709,03 36 0.99 DI 6 RIM: 713.65 D15 to D16 19.56 D16 to MH4 26.3 (STD DWG 4001407) INV IN: 707.29 36° RCP INV IN: 707,29 36° RCP INV OUT: 707.19 MH6 0 19.56 INV OUT: 707.19 5.0 26.5 4.0 33.015 0 706.52 707.02 HW 1 0.51 7.24 MH6 HW 1 to MH 2 0 19.56 0 5.0 INV OUT: 720.75 4.0 32.84 0 36° RCP INV OUT: 720.75 1.03 7.10 6. Of 1. D. MH7 2.00 2.00 1 5.0 5.0 7.2 MH 2 RIM: 728.98 HW 1 to MH 2 0.67 MH 2 to MH 3 MH 7 Outfall 0 21.56 INV IN: 720.27 36f RCP INV IN: 720.27 36° RCP INV OUT: 720.27 705.51 24 (2b) 0.33 INV OUT: 720.27 No gutter flow in channel. SEPARATE FROM THE WEEKLY SELF - MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR 6. Of 1. D. MH 3 RIM: 728.00 MH 2 to MH 3 MH 3 to DI 4 (STD DWG 401, 413) INV IN: 718.65 36" RCP INV IN: 718,.35 36° RCP INV OUT: 718.55 INV OUT: 718.55 6. Of 1. D. RIM: 714.00 D16 to MH4 MH4 to MH5 (STD DWG 401, 413) INV IN: 706.70 36° RCP INV IN: 706,.70 36° RCP INV OUT: 705.62 INV OUT: 705.62 6. Of 1. D. MH 5 RIM: 712.02 MH4 to MH5 MH5 to MH6 (STD DWG 401, 413) INV IN: 705.26 36° RCP INV IN: 705.26 36° RCP INV OUT: 705.16 INV OUT: 705.16 6. Of 1. D. MH 6 RIM: 710.37 MH5 to MH6 MH6 to MH7 (STD DWG 401, 413) INV IN: 704.69 36° RCP INV IN: 704069 36° RCP INV OUT: 704.59 INV OUT: 704.59 ? ? ?f I.D. MH6 to MH7 ( STD MH DWG 7 401 E 413 ) RIM: 709.30 INV IN: 7 04.21 EE 36 RCP INV IN. 704..21 NOTE: ALL STRUCTURES C ORES SHALL COMPLY WITH T H CI Y OF GREENSEORO STANDARD DRAWINGS. �- ? � d t { � 5 ¢¢ P .0 { Y E /y s� g f E' r 1 �r _rg I \ f , r E I AERATION BASIN (� NO.12 sI MATCF� 1�1 ,SEE D,RAWI G C7 k E 4 � y �f f_. SECONDARY %V CLARIFIER NO.6 I STABILIZED OUTLET FG`R ' SILT FENCE, TYP. 0227024R � I� , 3% i E , r f 1: _. . / l 0w r fir( Y � rr S .�S FF / .. .. ......... . ...... . ..... V) .. .... . ...... L! vii: 3 t € P ... ............. { 9 I r s f PAVEMENT R PAI , AREA (ac) RAS PUMP EXISTING STORM MANHO STATION NO.2 GUTTER FLOW E.G.L. I.. rt i 4- f RIM: 707.92E i g� TO 3 INV. IN: 707.24' E , _ 3 .... I SIZE (in) f / f ._. ' e ,,., .., -.,, ..,, ... m i......, 16.41 4f DESIGN DATA SHEET 4 4.3 SECONDARY %V CLARIFIER NO.6 I STABILIZED OUTLET FG`R ' SILT FENCE, TYP. 0227024R � I� , 3% i E , r f 1: _. . / l 0w r fir( Y � rr S .�S FF / .. .. ......... . ...... . ..... V) .. .... . ...... L! vii: 3 t € P ... ............. { 9 I r s f PAVEMENT R PAI , AREA (ac) EXISTING STORM MANHOLE EXISTING STORM MANHO Q =CA GUTTER FLOW E.G.L. I RIM: 722.09' RIM: 707.92E REMARKS TO FROM INV. IN: 707.24' INV. IN: 706.12 E , _ < I (in /hr) I SIZE (in) SLOP E ( /o) VEL, (ft /s) HW 1 MH 2 16.41 16.41 STORM DRAINAGE DESIGN DATA SHEET 4 Project T.Z. Osborne Water Reclamation Facility Engineer Hazen and Sawyer, Sarah Nash, EIT Location 2350 Huf6ne Mill Rd Date 12/23/2014 Storm Frequency 10 -year design storm LOCATION AREA (ac) C INTENSITY Q =CA GUTTER FLOW E.G.L. H.G.L. PIPE REMARKS TO FROM SUB TOTAL L. B. (min) T. C. (min) I (in /hr) (c SIZE (in) SLOP E ( /o) VEL, (ft /s) HW 1 MH 2 16.41 16.41 0.38 23.0 23.0 4.3 26. -9 0 721.92 722.40 36 0.96 6.73 No gutter flow in channel. M H 2 M H 3 0 16.41 0 5.0 23.2 4.3 26.&S 0 720.30 721.92 36 1.00 6.71 SHALL REQUIRE PRIOR APPROVAL M H 3 D14 0 16.41 0 5.0 23.9 4.2 26.25 0 715.19 720.18 36 1,50 6.68 DI 4 D15 2.00 18.41 0.60 5.0 25.4 4.1 30.3f5 0 712.41 712.99 36 0.99 7.06 No gutter flow in channel. DI 5 DI 6 0.15 18.56 0.60 5.0 25.7 4.1 30-E8 0 709.05 710 -21 36 1.07 7.08 No gutter flow in channel. D16 MH4 1.00 19.56 0.75 5.0 26.1 4.0 33.34 0 708.54 709,03 36 0.99 7.33 MH4 MH5 0 19.56 0 5.0 26.3 4.0 33.23 0 707.80 707.89 36 0.50 5.50 MH 5 MH6 0 19.56 0 5.0 26.5 4.0 33.015 0 706.52 707.02 36 0.51 7.24 MH6 M H 7 0 19.56 0 5.0 26.9 4.0 32.84 0 706.12 706.42 36 1.03 7.10 YI 8 MH7 2.00 2.00 1 5.0 5.0 7.2 10.85 0 706.12 706.14 24 (2b) 0.67 1.73 INSPECT A PROJECT AFTER EACH MH 7 Outfall 0 21.56 0 5.0 27.0 4.0 38.59 0 705.06 705.51 24 (2b) 0.33 6.81 No gutter flow in channel. J � ° d `. J U m -1. � I Z � 'b m x o ¢ r Q N 4 12/14 SNK „..: o6� N 3 d 2. CONTRACTOR SHALL NOTIFY THE DI 10/14 AKG 3:1 SIDE SLOPES ': `',,, ° •- TO START OF CONSTRUCTION TO I� C `" ' a: o " ' 2 9/14 BFT TYP. j� `',, � � N r _ '- °-- _.__,___ - 1. I:: O 1 6/14 BFT 0 227011 M .. pill ��• AND PARKING AREAS SHALL BE f Rte' SECONDARY 1 \4 LIMITS OF CONSTRUCTION. PARKING ° w o W N0. DATE DRWN CHKD J J K li d X CLARIFIER NO •`� i CHANGES TO THE LIMITS OF RFP 1 ADD -NDUM NO. 5 ADDENDUM NO. 4 ISSUES FOR BIDDING REMARKS DESIGNED BY:- DRAWN BY: SHEET CHK'D BY:. CROSS CHK'D BY: APPROVED BY:_ DATE: < � `. -1. r f 4 i i r l 12° DEEP SWALE „..: ON THE PLANS. d 2. CONTRACTOR SHALL NOTIFY THE DI fi `' 3:1 SIDE SLOPES ': `',,, ° •- TO START OF CONSTRUCTION TO I� C `" ' a: GRATE: 720.58` d r TYP. j� `',, r _ '- °-- _.__,___ - 1. I:: INV IN 713.56 i 0 227011 M .. pill ��• AND PARKING AREAS SHALL BE INV OUT: 711.23,. SECONDARY 1 \4 LIMITS OF CONSTRUCTION. PARKING W. . "� 0243103 ' CLARIFIER NO •`� i CHANGES TO THE LIMITS OF CONSTRUCTION BY THE CONTRACTOR SHALL REQUIRE PRIOR APPROVAL FROM THE ENGINEER. IF I ,g 9m, E2 =7:j E � .j{ r. rr „ i w SAWCUT AND MATCH a 9 EXISTING PAVEMENT - /- - a .' 0251301 g3 LF 36 fE RCP 1 MH 6` E _-RIM: 710.37 - - -.. ..... ..... ......�. INV IN: 704.69 ,Hn,�xrti„ i ..____..._INV OUT: 704.59 E , 37 LF 36° RCP -\1 t _- ................ 3 9/ rZ" ,,,,,,,,,,,,,,, ,,,,,, f P �7 E s /= r° W ,r f „_..._ . , r _ e, r{ f £ t� ��"�fr.,�, a, ,,, �„s• H %c�� ty - i 1 { yea' i i f, I ? 0 f I r I •/ IS DECEMBER 2014 { ASPHALT I f .. �'. RD Y 0251000 w, , V -'a w I i INLET _. -- �e -' � DI 5 PROTECTION / ��: �% � -'' GRATE: 719.52 �v_..._.....m -, TYP. ___.._. .. INV IN: 710.65 - 121 i 08.46 2 / `a 0243102. SECONDARY N,w . CLARIFIER N0.8 J CDM- 06 { _ M,w i SECONDARY s CLARIFIER NO.7 _ ' 109 LF 36° RCP STABILIZED OUTLET E FOR SILT FENCE - l 0227024R r CO ..``. ,1 6° HDPE DRAIN DI 6 1% MIN SLOPE _ i GRATE: 713.65 5' WIDE CONC. f N INV IN: 707.29 f �A SIDEWALK 6 PERF. CORK. HDPE °. INV OUT: 707.19 \ FOUNDATION DRAIN �245900 INV: 709.00 -� 0243102 �.e 7» L rr RAS PUMP STATION i, MH 4 � E4 1 72 LF 36 RCP. RIM: 714.00 $ v €`i ', CDM -107 �< INV IN: 706.70 . . 4 OUT: V IN 705.62 I> I w.u. 3 >F f u 3 s I. 7 t: MH 7 RIM: 709.30 INV IN: 704.21 ! O 1 . ► i, iii 1 a - -• ,.moo 7 SILT FENCE OUTLET, TYP. 0227024R SILT FENCE, TYP. 0227000R ASPHALT PAVEMENT 0251000 WATER BOUNDARY FRINGED WETLANDS 07►C�il s� 4 - STRAW WITH NET RECM SLOPE STABILIZATION, TYP. 1 W ; I_,. R 011 A 1 a 70:f., CONNECT PROPOSED FENCE WITH EXISTING 0244400 NOTES: -1. CONTRACTOR SHALL NOTIFY THE i i r l DO NOT MATCH CONDITIONS SHOWN ON THE PLANS. d 2. CONTRACTOR SHALL NOTIFY THE a STATE LAND QUALITY SECTION (919) `' 791 -4200 AT LEAST 48 HOURS PRIOR ° •- TO START OF CONSTRUCTION TO I� C SCHEDULE A PRE - CONSTRUCTION d ! ALL EROSION CONTROL MEASURES r _ '- °-- _.__,___ - ■ _ i MATCH LINE ` " ®4. �` pill ��• O 1 . ► i, iii 1 a - -• ,.moo 7 SILT FENCE OUTLET, TYP. 0227024R SILT FENCE, TYP. 0227000R ASPHALT PAVEMENT 0251000 WATER BOUNDARY FRINGED WETLANDS 07►C�il s� 4 - STRAW WITH NET RECM SLOPE STABILIZATION, TYP. 1 W ; I_,. R 011 A 1 a 70:f., CONNECT PROPOSED FENCE WITH EXISTING 0244400 NOTES: -1. CONTRACTOR SHALL NOTIFY THE ENGINEER IF CONDITIONS IN THE FIELD DO NOT MATCH CONDITIONS SHOWN ON THE PLANS. d 2. CONTRACTOR SHALL NOTIFY THE STATE LAND QUALITY SECTION (919) `' 791 -4200 AT LEAST 48 HOURS PRIOR ° •- TO START OF CONSTRUCTION TO SCHEDULE A PRE - CONSTRUCTION MEETING. ice- ALL EROSION CONTROL MEASURES SHALL BE IN PLACE BEFORE ANY _ '- °-- _.__,___ - LAND CLEARING, G, DEMOLITION, OR _ CONSTRUCTION ACTIVITIES MAY BEGIN. MATCH LINE ` " ®4. CONTRACTOR STAGING /STOCKPILING SEE DRAWING C7 AND PARKING AREAS SHALL BE CONFINED TO AREAS WITHIN THE 1 \4 LIMITS OF CONSTRUCTION. PARKING AREAS SHALL HAVE GRAVEL BASE .4 FOR ALL - WEATHER ACCESS. ANY CHANGES TO THE LIMITS OF CONSTRUCTION BY THE CONTRACTOR SHALL REQUIRE PRIOR APPROVAL FROM THE ENGINEER. 5. ALL EROSION CONTROL MEASURES t4, SHALL BE INSPECTED WEEKLY AND % WITHIN 24 HOURS AFTER EACH RAINFALL EVENT OF J INCH OR GREATER OF RAIN. MEASURES SHALL to BE REPAIRED OR REPLACED AS NECESSARY. 6. ALL EROSION CONTROL MEASURES n• ~ SHALL BE CLEANED OF ACCUMULATED "' w SEDIMENT ONCE THE MEASURE HAS NEW FENCE LOCATION BECOME HALF FULL BY VOLUME. 4 7. SEDIMENT SHALL LL BE DISPOSED OF IN x ,h AN APPROVED MANNER SUCH THAT FURTHER SEDIMENT TRANSPORT DOES " NOT OCCUR. OFFSITE DISPOSAL AREA, n ' IF USED, SHALL HAVE ALL NECESSARY LOCAL AND STATE ° PERMITS. � 8. TOPSOIL AND ANY EXCESS SOIL 12 DEEP SWALE, 3.1 RESULTING FROM EARTHWORK OPERATIONS NECESSARY FOR SIDE SLOPES, 12 WIDE CONSTRUCTION SHALL BE STOCKPILED ^ BOTTOM, USE TEMPORARY I ONSITE WITHIN THE LIMITS OF LINING WITH MIN SHEAR CONSTRUCTION. EROSION CONTROL STRESS OF 1.75 LBS SF MEASURES SHALL BE INSTALLED AS SHOWN ON DETAIL SHEETS AND SHALL 0227011 BE MAINTAINED AS NECESSARY TO SILT FENCE AND TREE ENSURE PROPER FUNCTION. PROTECTION E FENCE, TYP. 9. DE-WATERING OF STRUCTURES WITH 0227000R 0 227033R S - EDIMENT LADEN AT W ER DIRECTLY TO STREAMS IS PROHIBITED. FIBER FILTRATION TUBES,-\, DE- WATERING MUST BE DONE TYP. 0227039 THROUGH SILT BAGS, INTO SEDIMENT ,e TRAPS, OR OTHER APPROVED DEVICE. 10. CONTRACTOR STAGING AND LAYDOWN AREAS WILL BE LOCATED ONSITE WITHIN CURRENT LIMITS OF \� DISTURBANCE. ANY SOIL STOCKPILE OR WASTE AREAS SHALL HAVE APPROPRIATE EROSION AND SEDIMENT NEW TREE LINE CONTROL MEASURES AND PERIMETER SILT FENCE. 11. THE NORTH CAROLINA SEDIMENTATION POLLUTION CONTROL ACT REQUIRES PERSONS RESPONSIBLE FOR LAND - DISTURBING ACTIVITIES TO o INSPECT A PROJECT AFTER EACH z N PHASE OF THE PROJECT TO MAKE z SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. THE SELF - INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF - MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR ! 15 ! 31 If 11 ! CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF - INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION ° CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE s SELF- INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREADSHEET FROM THE LAND QUALITY WEB SITE: HTTP: / /WWW.DLR.ENR.STATE.NC.US/ PAGES /SEDIMENTATION- NEW.HTML _ cc v \A CAR9� �, CAR �i UJ �oF ESs /o�9 '�y =� °F ASS /0" � SEAL SEAL 18178 r 18560 Q U_ FNGI 9� F�/GINEF� �1/ NE- Q� EL PROJECT NO. 30841-90-005 GRADING AND EROS108"IN (ffkU01",NTR0L FILE NAME: C8 SHEET NO. PARTIAL SITE PLAN C8 0 0 > N Z 0 ° r m ° °W 0 v� O � J >Vi N (7 Z Q g o¢ � N O 6) W W z STEEL POST TOP STRAND GALV WIRE FABRIC AND FILTER FABRIC. BURY TOE OF FILTER FABRIC A MIN OF 8 °- -REE PROTECTION 3ARRIER FENCE WHERE ;ALLED FOR ON )RAWINGS BOTTOM STRAND GRADE LINE-----\ C', �� C) z N 6' -0" MAX TO 1 8" Mcr- I z z � FEI MIN ELEVATION SECTION NOTES: ,q 0 - BE TREE ',ONSERVATION SIGNS. REFER z - N APPROVED BY ENGINEER) WITH 6' -0° TO DETAIL 0227033R. i LuW I 1 MESH SUPPORT FENCE. N PRESSURE ON THE FENCE. AVOID TO UNDERMINING THE FENCE DURING 2. FILTER FABRIC SHALL BE WIRED 1. INSPECT WEEKLY AND AFTER EACH C', �� C) z N OVERLAP PERSPECTIVE \IEW ? DITCH r! MATTING NOTES: 1. STAPLES TO BE SPACED AT -0° MAX IN ALL 3 DIRECTIONS. 2. =OR CHANNEL APPLICATIONS, :MATTING SHALL EXTEND TO TOP OF BANK. MATTING 3 \ N 12 QVERLrf.? TYP 6' -0" MAX 1 1 8" MIN ELEVATION SECTION NOTES: 1. EXTRA STRENGTH FILTER FABRIC (AS TREE ',ONSERVATION SIGNS. REFER NECESSARY TO PROVIDE ADEQUATE APPROVED BY ENGINEER) WITH 6' -0° TO DETAIL 0227033R. STORAGE VOLUME FOR THE NEXT POST SPACING DOES NOT REQUIRE RAIN AND ALSO TO REDUCE MESH SUPPORT FENCE. MAINTENANCE REQUIREMENTS: PRESSURE ON THE FENCE. AVOID UNDERMINING THE FENCE DURING 2. FILTER FABRIC SHALL BE WIRED 1. INSPECT WEEKLY AND AFTER EACH CLEANOUT. DIRECTLY TO POST. RAINF -LL EVENT THAT PRODUCES 1/2 DATE INCH OR MORE OF RAIN. REMOVE 4. REPLACE FILTER FABRIC THREE (3) 3. WHERE DOUBLE SILT FENCE IS ANY ACCUMULATED SEDIMENT MONTHS AFTER INITIAL INSTALLATION CALLED FOR ON DRAWINGS ADD AND /!OR WOODY DEBRIS. AND EVERY THREE (3) MONTHS SECOND SILT FENCE TO FACE OF THEREAFTER UNTIL CONSTRUCTION FIRST SILT FENCE AND WIRE DIRECTLY 2. FILTER FABRIC THAT HAS COLLAPSED, HAS COMPLETED AND CONTRIBUTING TO POST. TORN, OR HAS IN ANY WAY HAS DRAINAGE AREA HAS BEEN BECO(, ±IE COMPRIMISED SHALL BE PERMANENTLY STABILIZED. 4. WHERE TREE PROTECTION FENCE AND REPAI'EED OR REPLACED IMMEDIATELY. SILT FENCE ARE CO- LOCATED (TPF /SF), SILT FENCE MUST INCLUDE 3. REMO',E ANY SEDIMENT DEPOSITS AS TEMPORARY SILT FENCE W /TREE PROTECTION BARRIER FENCE 022700OR OVERLAP PERSPECTIVE \IEW ? DITCH r! MATTING NOTES: 1. STAPLES TO BE SPACED AT -0° MAX IN ALL 3 DIRECTIONS. 2. =OR CHANNEL APPLICATIONS, :MATTING SHALL EXTEND TO TOP OF BANK. MATTING 3 \ N 12 QVERLrf.? TYP 1111111111211 MAINTENANCE REQUIREMENTS: 1. INSPECT MATTING WEEKLY AND AFTER EACH RAINFALL EVENT THAT PRODUCES J INCH OR MORE OF RAIN. REPAIR OR REPLACE IMMEDIATELY AS NECESSARY. 2. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH THE MATTING. 3. ANY AREAS OF THE MATTING THAT ARE DAMAGED OR NOT IN GOOD CONTACT WITH THE GROUND SHALL BE REPAIRED OR REPLACED AND STAPLED IMMEDIATELY. 4. IF EROSION DOES OCCUR, THE PROBLEM SHALL BE FIXED AND ERODED AREA REPAIRED AND PROTECTED FROM FURTHER DAMAGE. 5. CONTINUE MONITORING MATTED AREAS UNTIL PERMANENT GROUND COVER HAS BEEN ESTABLISHED. RECM AND TRM INSTALLATION 0227014 ISSUED FOR BIDDING REMARKS DESIGNED BY: DRAWN BY: SHEET CHK'D BY:. CROSS CHK'D BY: APPROVED BY:— DATE: nn r rrninr STEEL FENCE P( �61IRE FEN HARDWARE CLO 1" DIAMETER WAS . -IED STON BURY WIRE i=ENCE AND HARDWARE II U STEEL FENCE POST SET MAX 2' APART MIN. 18° INTO SOLI GROUND , FILTER FABRIC, AND HARDWARE CLOTH IN TRENCH 'Ny MAINTENANCE REQUIREMENTS: fj'c "; - -3' FILTER FABRIC °`��'P ` ON GROUND 1. INSPECT WEEKLY AND AFTER EACH 'OR, RAINFALL EVENT THAT PRODUCES INCH OR MORE OF RAIN. REMOVE SEDIMENT AND DEBRIS. TOPDRESSING WITH 1 -INCH ._ _----- CLEAN, WASHED STONE AS NECESSARY. u ( 2. REMOVE ACCUMULATED SEDIMENT. THE II CONTRACTOR SHALL DISPOSE OF CLOT4__- II BURY 8 OF UPPER EDGE OF SEDIMENT OFF -SITE IN ACCORDANCE WITH II FILTER FABRIC IN TRENCH ALL STATE AND LOCAL REGULATIONS. PROFILE VIEW u (DETAIL ADOPTED FROM THE TOWN OF HOLLY SPRINGS, NORTH CAROLINA - ENGINEERING DEPARTMENT). STABILIZED OUTLET FOR SILT FENCE 0227024R FORM BERM WITH EXCAVATED MATERIAL- - EXISTING GRADE 6' ° -8° RIPRAP USE WASHED STONE ON UPSTREAM — / / \ 2 — A /A /A 9° d ® _ _ 1/2 CHANNEL DEPTH TEMPORARY DIVERSION SWALE TRENCH 6 INTO 0227009 CHANNEL BED FLOW LINE OF DITCH 3/4" WASHED STONE FLOW 1 L= DISTANCE THAT POIP ARE EQUP i rie:!_rvvrr v nvry CIHIANNEL 1/2 CHANNEL DEPTH* DECEMBER 2014 LONGITUDINAL PROFILE NOTES: 1. THE MAXIMU�?i HEIGHT OF THE CHECK DAM AT THE CENTER SHALL NOT EXCEED ONE HALF THE DEPTH OF THE CHANNEL. 2. MAXIMUM SP..>CING SHALL BE SO THE TOE OF THE UPSTREAM DAM IS THE SAME: ELEVATION AS THE TOP OF THE DOWNSTREAM DAM. 3. REMOVE SED'41AENT WHEN 25% THE HEIGHT OF THE WEIR. 4. REMOVE CHE:«K DAMS WHEN SITE STABILIZATION IS ACHIEVED. �5 111 ■ I� FOOD OR METAL POST. ORANGE SAFETY FENCING IS REGUIRED. SPACE POSTS ON 8' INTERVALS. NOTES' 1, SEE" PLANS FOR LOC'ATIOW OF ALL TREE PROrFCT''DN FENCES. 2. ALL rREE PRoTEL'rrm DEa1r'ES MUST or .INSTALLED PRIOR TO LAND 101STURRANCF, . INCLUDING THE° CUTTING OF ANY TREES, AND Nusr 8E INSPEcTsD SY THE° URBAN FOREST R OR HIS DE'S `GA E'. 3, NO GRADING, TRENCHING, FILLING OR STORING OF MATERIALS IS TO OCCUR IN THE TREE PROTECTION AREA. d. TREE PROTECTION FENCE 41A Y NOT BE RENOVCD W17'HOUT THE APPROVAL OF THE URBAN FORESTER a9 HIS DESIGNEE. S, THE TREE CONSERVA TION AREA 5HOUL0 BE DE°S16NA TEO ATTH "TREE CONSERVATION AREA" 51610 POSTED VIS18LY ON THE OUTSIDE OF THE FENCED-11V AREA, 5I685 MAY NOT BE POS769 ON rHE TREES. SEE EXAMPLE BELOW, EXAMPLE SIGN IB" Y 32" SIGN I' BLOCK LETTER BLACK LETTERS ON WHITE BACKGROUND 1/A" BLACK BORDER ALL WEATHER MEDIA 100' SUGGESTED SPACING BETWEEN SIGNS Rom .. .:... � i y � � ■: ■ � lle � r#f 7R g i � a� MAINTENANCE REQUIREMENTS: 1. INSPECT MATTING WEEKLY AND AFTER EACH RAINFALL EVENT THAT PRODUCES j INCH OR MORE OF RAIN. REPAIR OR REPLACE IMMEDIATELY AS NECESSARY. 2. AFTER GRASS HAS BEEN ESTABLISHED, PERIODICALLY CHECK CHANNEL, INCLUDING OUTLET. EVALUATE FOR BANK STABILITY AND EVIDENCE OF PIPING OR SCOUR HOLES. MAKE ANY REPAIRS AS NECESSARY. 3. REMOVE ALL SIGNIFICANT SEDIMENT ACCUMULATION TO MAINTAIN THE DESIGNED CARRYING CAPACITY. 4. KEEP GRASS IN A HEALTHY, VIGOROUS CONDITION AT ALL TIME`. RECM DATA SECTION MIN SHEAR STRESS TEMPORARY/ PERMANENT CHANNEL EAST OF 1.75 LB /SF TEMPORARY PROPOSED CLARIFIERS - LB /SF - - LB /SF - GRASS LINED CHANNEL (PERMANENT) RECM (TEMPORARY) 1 IL 12° 3 alak A GRASS LINED CHANNEL (PERMANENT) TRM (PERMANENT) 1 \ / -� _ 3 1 12° PERMANENT ROLLED EROSION CONTROL MAT (RECM) 3 TURF REINFORCEMENT MAT (TRM) 7j� � 1 3 PERMANENT TYPICAL DITCH DETAIL SEE DETAIL 0227014 FOR INSTAL' LATION DETAIL 0227011 NONE LINING i i rc a �EOTEXTILE 0 SEPARATOR N CA /?o Q�6 ESSlolll SEAL 18178 � N � O \v °0 1 6/14 �Fv Rte' DATE DRWN CHKD J O w J � wax 1111111111211 MAINTENANCE REQUIREMENTS: 1. INSPECT MATTING WEEKLY AND AFTER EACH RAINFALL EVENT THAT PRODUCES J INCH OR MORE OF RAIN. REPAIR OR REPLACE IMMEDIATELY AS NECESSARY. 2. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH THE MATTING. 3. ANY AREAS OF THE MATTING THAT ARE DAMAGED OR NOT IN GOOD CONTACT WITH THE GROUND SHALL BE REPAIRED OR REPLACED AND STAPLED IMMEDIATELY. 4. IF EROSION DOES OCCUR, THE PROBLEM SHALL BE FIXED AND ERODED AREA REPAIRED AND PROTECTED FROM FURTHER DAMAGE. 5. CONTINUE MONITORING MATTED AREAS UNTIL PERMANENT GROUND COVER HAS BEEN ESTABLISHED. RECM AND TRM INSTALLATION 0227014 ISSUED FOR BIDDING REMARKS DESIGNED BY: DRAWN BY: SHEET CHK'D BY:. CROSS CHK'D BY: APPROVED BY:— DATE: nn r rrninr STEEL FENCE P( �61IRE FEN HARDWARE CLO 1" DIAMETER WAS . -IED STON BURY WIRE i=ENCE AND HARDWARE II U STEEL FENCE POST SET MAX 2' APART MIN. 18° INTO SOLI GROUND , FILTER FABRIC, AND HARDWARE CLOTH IN TRENCH 'Ny MAINTENANCE REQUIREMENTS: fj'c "; - -3' FILTER FABRIC °`��'P ` ON GROUND 1. INSPECT WEEKLY AND AFTER EACH 'OR, RAINFALL EVENT THAT PRODUCES INCH OR MORE OF RAIN. REMOVE SEDIMENT AND DEBRIS. TOPDRESSING WITH 1 -INCH ._ _----- CLEAN, WASHED STONE AS NECESSARY. u ( 2. REMOVE ACCUMULATED SEDIMENT. THE II CONTRACTOR SHALL DISPOSE OF CLOT4__- II BURY 8 OF UPPER EDGE OF SEDIMENT OFF -SITE IN ACCORDANCE WITH II FILTER FABRIC IN TRENCH ALL STATE AND LOCAL REGULATIONS. PROFILE VIEW u (DETAIL ADOPTED FROM THE TOWN OF HOLLY SPRINGS, NORTH CAROLINA - ENGINEERING DEPARTMENT). STABILIZED OUTLET FOR SILT FENCE 0227024R FORM BERM WITH EXCAVATED MATERIAL- - EXISTING GRADE 6' ° -8° RIPRAP USE WASHED STONE ON UPSTREAM — / / \ 2 — A /A /A 9° d ® _ _ 1/2 CHANNEL DEPTH TEMPORARY DIVERSION SWALE TRENCH 6 INTO 0227009 CHANNEL BED FLOW LINE OF DITCH 3/4" WASHED STONE FLOW 1 L= DISTANCE THAT POIP ARE EQUP i rie:!_rvvrr v nvry CIHIANNEL 1/2 CHANNEL DEPTH* DECEMBER 2014 LONGITUDINAL PROFILE NOTES: 1. THE MAXIMU�?i HEIGHT OF THE CHECK DAM AT THE CENTER SHALL NOT EXCEED ONE HALF THE DEPTH OF THE CHANNEL. 2. MAXIMUM SP..>CING SHALL BE SO THE TOE OF THE UPSTREAM DAM IS THE SAME: ELEVATION AS THE TOP OF THE DOWNSTREAM DAM. 3. REMOVE SED'41AENT WHEN 25% THE HEIGHT OF THE WEIR. 4. REMOVE CHE:«K DAMS WHEN SITE STABILIZATION IS ACHIEVED. �5 111 ■ I� FOOD OR METAL POST. ORANGE SAFETY FENCING IS REGUIRED. SPACE POSTS ON 8' INTERVALS. NOTES' 1, SEE" PLANS FOR LOC'ATIOW OF ALL TREE PROrFCT''DN FENCES. 2. ALL rREE PRoTEL'rrm DEa1r'ES MUST or .INSTALLED PRIOR TO LAND 101STURRANCF, . INCLUDING THE° CUTTING OF ANY TREES, AND Nusr 8E INSPEcTsD SY THE° URBAN FOREST R OR HIS DE'S `GA E'. 3, NO GRADING, TRENCHING, FILLING OR STORING OF MATERIALS IS TO OCCUR IN THE TREE PROTECTION AREA. d. TREE PROTECTION FENCE 41A Y NOT BE RENOVCD W17'HOUT THE APPROVAL OF THE URBAN FORESTER a9 HIS DESIGNEE. S, THE TREE CONSERVA TION AREA 5HOUL0 BE DE°S16NA TEO ATTH "TREE CONSERVATION AREA" 51610 POSTED VIS18LY ON THE OUTSIDE OF THE FENCED-11V AREA, 5I685 MAY NOT BE POS769 ON rHE TREES. SEE EXAMPLE BELOW, EXAMPLE SIGN IB" Y 32" SIGN I' BLOCK LETTER BLACK LETTERS ON WHITE BACKGROUND 1/A" BLACK BORDER ALL WEATHER MEDIA 100' SUGGESTED SPACING BETWEEN SIGNS Rom .. .:... � i y � � ■: ■ � lle � r#f 7R g i � a� MAINTENANCE REQUIREMENTS: 1. INSPECT MATTING WEEKLY AND AFTER EACH RAINFALL EVENT THAT PRODUCES j INCH OR MORE OF RAIN. REPAIR OR REPLACE IMMEDIATELY AS NECESSARY. 2. AFTER GRASS HAS BEEN ESTABLISHED, PERIODICALLY CHECK CHANNEL, INCLUDING OUTLET. EVALUATE FOR BANK STABILITY AND EVIDENCE OF PIPING OR SCOUR HOLES. MAKE ANY REPAIRS AS NECESSARY. 3. REMOVE ALL SIGNIFICANT SEDIMENT ACCUMULATION TO MAINTAIN THE DESIGNED CARRYING CAPACITY. 4. KEEP GRASS IN A HEALTHY, VIGOROUS CONDITION AT ALL TIME`. RECM DATA SECTION MIN SHEAR STRESS TEMPORARY/ PERMANENT CHANNEL EAST OF 1.75 LB /SF TEMPORARY PROPOSED CLARIFIERS - LB /SF - - LB /SF - GRASS LINED CHANNEL (PERMANENT) RECM (TEMPORARY) 1 IL 12° 3 alak A GRASS LINED CHANNEL (PERMANENT) TRM (PERMANENT) 1 \ / -� _ 3 1 12° PERMANENT ROLLED EROSION CONTROL MAT (RECM) 3 TURF REINFORCEMENT MAT (TRM) 7j� � 1 3 PERMANENT TYPICAL DITCH DETAIL SEE DETAIL 0227014 FOR INSTAL' LATION DETAIL 0227011 NONE LINING i i rc a �EOTEXTILE 0 SEPARATOR N CA /?o Q�6 ESSlolll SEAL 18178 MAINTENANCE REQUIREMENTS: 1. INSPECT MATTING WEEKLY AND AFTER EACH RAINFALL EVENT THAT PRODUCES INCH OR MORE OF RAIN. REPAIR OR REPLACE IMMEDIATELY AS NECESSARY. 2. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH THE MATTING. 3. ANY AREAS OF THE MATTING THAT ARE DAMAGED OR NOT IN GOOD CONTACT WITH THE GROUND SHALL BE REPAIRED OR REPLACED AND STAPLED IMMEDIATELY. SEDIMENT Q SEDIMENT 0 M N N H Q N z 0 0 U m 0 ow J �r �m z z 3 a � �Q 0 O N o� 4. IF EROSION DOES OCCUR, THE PROBLEM SHALL BE FIXED AND ERODED AREA REPAIRED ANID PROTECTED FROM FURTHER DAMAGE. 5. CONTINUE MIONITORING MATTED AREAS UNTIL PERM"."NENT GROUND COVER HAS BEEN ESTABLISHED. CONSTRUCTION SPECIFICATIONS 1. AREA SHALL 3E CLEARED AND GRUBBED ACCORDING TO SPECIFICATIONS. 2. SEED BANK ACCORDING TO PLAN SPECIFICATIONS. 3. SECURE MATS AT THE TOP OF THE SLOPE BY TOEING IT IN AND REINFORCING IT WITH A ROW OF AT LEAST FIVE (5) STAPLES, SPACING EACH ONE APPROXIMATELY 8 APART. 4. PLACE STAPLES 6 " -8" APART ALONG LENGTH OF MAT BLANKET TO SECURE TO THE SOIL SURFACE. ALL STAPLES MUST BE FLUSH TO THE SURFACE. TEMPORARY SLOPE DRAIN 2 TOWARD ITS OUTLET. SECTION OF PIPE UNDER THE DIKE 4' MIN LEVEL SECTION 3. HAND TAMP THE SOIL UNDER AND AROUND THE ENTRANCE 0227028 SECTION IN LIFTS NOT TO EXCEED 6 INCHES. nnll -.. nrnn ^PIT . nn� ISSUED FOR BIDDING REMARKS DESIGNED BY:_ DRAWN BY: SHEET CHK'D BY% CROSS CHK'D BY: APPROVED BY:- DATE: STAKE 'D ETAI L (WITH TIRENCH) --GB NO SCALE L E TO ONLY NETTING MAINTENANCE REQUIREMIENTS: 1. INSPECT WEEKLY A@IID AFTER EACH RAINFALL EVENT THAT PRODUCES 1/2 INCH OR MORE OF RAIN. REi�!iOVE ANY ACCUMULATED SEDIMENT AND /OR WOODY DEBRIS. 2. FFTs SHALL BE ENTRENCHED AS SHOWN TO PREVENT UNDERCUTTING. ANY EVIDENCE OF UNDERCUTTING AND /OR EROSION SHALL BE REPAIRED IMMEDIATELY. �pN 3. STAKES AND /OR S7APLES THAT HAVE BECOME LOOSE OR DISPLACED SHALL BE REPAIRED IMMEDIATELY. 4. WHEN SEDIMENT ACCUMULATION REACHES 1/2 THE DIAMETER OF THE FFT, IT SHALL BE REMOVED AND IDIISPOSED OFF -SITE BY THE CONTRACTOR IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. 5. ANY VISIBLE DAMAG;F TO THE FFT SHALL BE REPAIRED OR REPLACED IMMEDIATELY. 6 *1 GENERAL GUIDELINES FOR SPACING OF TUBE TRENCHES FOR SLOPE INSTALLATIONS SLOPE GRADIENT 4' MIN 1H:1V 15 FEET ISLAND OVER INLET 3H:1V 35 FEET 4H:1V 50 FEET DIVERSION DIKE 1.5' MIN HOLD DOWN STAKES _ -I - INLET TOP OF HAND- -_ � COMPACTED FILL PLASTIC CORRUGATE[ PIPE - I (ISLAND) DIAM. AS SHOWN ON iPLANS _ _ �- TOP OF 4' MIN DIVERSION �° - 0.5 MIN -__ NATURAL GROUND 1 MIN STABILIZE OUTLET - - -_ - - I) ICI -I - RIPRAP _ DIVERSION CHANNEL -_ NOTES: -- -_ -- 1. PLACE SLOPE DRAINS ON UNDISTURBED SOIL OR WELL COMPACTED FILL AT LOCATIONS AND ELEVATIONS SHOWN - ON PLANS. TEMPORARY SLOPE DRAIN 2 TOWARD ITS OUTLET. SECTION OF PIPE UNDER THE DIKE 4' MIN LEVEL SECTION 3. HAND TAMP THE SOIL UNDER AND AROUND THE ENTRANCE 0227028 SECTION IN LIFTS NOT TO EXCEED 6 INCHES. nnll -.. nrnn ^PIT . nn� ISSUED FOR BIDDING REMARKS DESIGNED BY:_ DRAWN BY: SHEET CHK'D BY% CROSS CHK'D BY: APPROVED BY:- DATE: STAKE 'D ETAI L (WITH TIRENCH) --GB NO SCALE L E TO ONLY NETTING MAINTENANCE REQUIREMIENTS: 1. INSPECT WEEKLY A@IID AFTER EACH RAINFALL EVENT THAT PRODUCES 1/2 INCH OR MORE OF RAIN. REi�!iOVE ANY ACCUMULATED SEDIMENT AND /OR WOODY DEBRIS. 2. FFTs SHALL BE ENTRENCHED AS SHOWN TO PREVENT UNDERCUTTING. ANY EVIDENCE OF UNDERCUTTING AND /OR EROSION SHALL BE REPAIRED IMMEDIATELY. �pN 3. STAKES AND /OR S7APLES THAT HAVE BECOME LOOSE OR DISPLACED SHALL BE REPAIRED IMMEDIATELY. 4. WHEN SEDIMENT ACCUMULATION REACHES 1/2 THE DIAMETER OF THE FFT, IT SHALL BE REMOVED AND IDIISPOSED OFF -SITE BY THE CONTRACTOR IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. 5. ANY VISIBLE DAMAG;F TO THE FFT SHALL BE REPAIRED OR REPLACED IMMEDIATELY. 6 *1 GENERAL GUIDELINES FOR SPACING OF TUBE TRENCHES FOR SLOPE INSTALLATIONS SLOPE GRADIENT TUBE INTERVAL 1H:1V 15 FEET 2H: 1V 25 FEET 3H:1V 35 FEET 4H:1V 50 FEET GENERAL GUIDELINES FOR SPACING OF TUBE TRENCHES FOR CHANNEL INSTALLATIONS TUBE SPACING CALCULATION TUBE HEIGHT (FT. ABOVE GRADE) /SLOPE GRADIENT (FT /FT) (EG. 20" TUBE W/ 1.416 FT. ABOVE GRADE) 1.416 / .01 = 142 FT. SPACING BACKFILL AND COMPACT LOOSE MATERIAL UPSTREAM OF TUBE 6 OR 8 INCH U- SHAPED WIRE STAPLES PLACED AT ONE FOOT INTERVALS DRIVEN THROUGH OUTER 1 INCH OF TUBE EXCAVATE A PLACEMENT TRENCH MIN 3" z t' e, SLOPE PROTECTION APPLICATIONS: 1. OVERLAP OR 'HOOK' ADJACENT ROLL ENDS BY A MINIMUM OF ONE FOOT AID REDUCE STAKING INTERVAL TO ONE FOOT WITHIN OVERLAP SECTION. 2. WHEN USED IN CONJUNCTION WITH WATERBARS, OVERLAP OR 'HOOK' FFT ROLL END A MINIMUM OF ONE FOOT ALONG DOWNSLOPE SIDE OF WATERBAR AND EMBED A MINIMUM OF 6 INCHES. REDUCE STAKING INTERVAL TO ONE FOOT. THE FFT ROLL TRUST HAVE GOOD CONTACT WITH THE WATERBAR IN ORDER TO PREVENT SHORT - CIRCUITING. 3. SMOOTH SOIL SURFACE AND REMOVE ALL OBSTRUCTIONS GREATER THAN V -2' IN DIAMETER. 4. WHEN PERFORMANCE - ENHANCING POLYMERS (PAMs) ARE USED, THE MOST DOWNSTREAM FFT SHALL BE A STAND -ALONE PRODUCT (NO PAMs). CHANNEL PROTECTION APPLICATIONS: 1. FOR CHANNEL APPLICATIONS, BOTH UPSTREAM AND DOWNSTREAM ANCHORING SHOULD BE AT 1 FOOT INTERVALS. 2. FOR CHANNEL APPLICATIONS, FFTs SHALL BE STAND -ALONE PRODUCTS WITHOUT PAMs. EXCAVATE A PLACEMENT TRENCH MIN 3" PROFILE VIEW - W /STAKING DETAIL 3. FFTs SHALL BE PLACED IN CHANNEL (AS DEMONSTRATED BELOW), IN ORDER TO ALLOW WATER TO POOL SUFFICIENTLY ON THE UPSTREAM SIDE OF THE FFT. 4. FFTs SHALL EXTEND TO THE TOP OF BANK IN ORDER TO PREVENT SHORT CIRCUITING OF FLOW. MAINTENANCE REQUIREMENTS: 1. INSPECT WEEKLY AND AFTER EACH RAINFALL EVENT THAT PRODUCES j INCH OR MORE OF RAIN. REMOVE ANY ACCUMULATED SEDIMENT AND /OR WOODY DEBRIS. 2. FFTs SHALL BE ENTRENCHED AS SHOWN TO PREVENT UNDERCUTTING. ANY EVIDENCE OF UNDERCUTTING AND /OR EROSION SHALL BE REPAIRED IMMEDIATELY. 3. STAKES AND /OR STAPLES THAT HAVE BECOME LOOSE OR DISPLACED SHALL BE REPAIRED IMMEDIATELY. 4. WHEN SEDIMENT ACCUMULATION REACHES j THE DIAMETER OF THE FFT, IT SHALL BE REMOVED AND DISPOSED OFF -SITE BY THE CONTRACTOR IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. 5. ANY VISIBLE DAMAGE TO THE FFT SHALL BE REPAIRED OR REPLACED IMMEDIATELY. WOOD STAKE TO PENETRATE THE OUTER 1 -INCH OF TUBE 18 TO 20 -INCH TUBE IN USE 36 -INCH (MIN) STAKE WITH 12 -zNCH MINIMUM EMBEDMENT SPACED AT TWO FOOT INTERVALS DRIVEN THROUGH OUTER 1 INCH OF TUBE, LEAFING ABOUT 3 INCHES OF THE STAKE PROTRUDING ABOUT THE TUBE 10 FT TYPICAL WOOD STAKE, SEE STAKING DETAIL F� r 2¢° CHANNEL CROSS SECTION STORM SEWER CURB INLET nn inn rr nn\irn UL I AIL 3 NTS C11 a'sf d CHANNEL BED i / • NOTES: 1. SEDIMENT LOG SHALL CONSIST OF RECYCLED SYNTHETIC FIBERS. 2. SEDIMENT LOG SHALL EXTEND A MINIMUM OF 12" BEYOND INLET OPENING. MAINTENANCE REQUIREMENTS: 3. INSPECT SEDIMENT LOG ON A ' "MEEKLY BASIS AND AFTER EACH RAINFALL EVENT PRODUCING j INCH OR MORE OF RAIN. ANY DEBRIS OR SEDIMENT VISIBLE SHALL BE REMOVED IMMEDIATELY. 4. DAMAGE TO THE SEDIMENT LOG SHALL BE REPAIRED IMMEDIATELY. 5. REMOVE SEDIMENT WHEN ACCUMULATION REACHES j THE DIAMETER OF THE LOG. SEDIMENT SHALL BE REMOVED OFF -SITE BY THE CONTRACTOR IN ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS. CIVIL FFT TO EXTEND TO TOP OF BANK N CARO\ Q�oF ESSio,�9�'Lv SEAL 18178 gNL.S�� M 20' FFT 61 AA 1110 LeVill M 1:1 TEMPORARY SEEDING SCHEDULE SPECIES RATE Ib/ac) SEEDING Df.7ES GERMAN MILLET 40 SUMP,_R: MAY 1ST - AUGUST 15TH RYE (GRAIN) 120 FALL: AUGUST 15TH- DECEMBER 30TH (SEE NOTE 1). RYE (GRAIN) 120 WINTERC JANUARY 1ST -MAY 1ST NOTES: NCDENWDivision of Water Quality 1. TOPDRESS WITH 50 Ib /ac NITROGEN IN MARCH. 2. APPLY 2000 Ib /ac GROUND AGRICULTURAL LIMESTONE AND 750 -1,000 Ib /ac 10 -10 -10 FERTILIZER. APPLICATION RATES AND CHEMICAL ANALYSIS SHALL BE CC'NFIRMED OR ESTABLISHED BY SOIL TEST. 3. APPLY 4,000 Ib /ac SMALL GRAIN STRAW MULCH. STABILIZATION 4. TACK MULCH BY APPLYING ASPHALT TACK AT A RATE OF 110 gal/yd' (10 gal /1,000 ft'). 5. REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER VISIBLE SIGNS OF DAMAGE. PERMANENT SEEDING SCHEDULE SPECIES RATE (Ib /ac) SEEDING E TES KY 31 TALL FESCUE 100 FALL., SEPTEMBER 1ST - NOVEMBER 30TH (SEE NOTE 1). LATE: WINTER: FEBRUARY 15TH -APRIL 1ST. NOTES: 1. FALL IS BEST FOR TALL FESCUE 2. BETWEEN MAY 1ST AND AUGUST 15TH, ADD 10 LB /AC GERMAN MILLET. 3. PRIOR TO MAY 1ST OR AFTER AUGUST 15TH ADD 40 LB /'AC RYE (GRAIN). 4. APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 4,000 LB /AC GROUND AGRICULTURAL LIMESTONE AND 1,000 LB /AC 10 -10 -10 FERTILIZER. 5. LIME AND FERTILIZER ARE TO BE DISKED INTO THE SOIL SURFACE TO A MINIMUM DEPTH OF 4 INCHES. 6. APPLY 4,000 LB /AC GRAIN STRAW OR EQUIVALENT COVE: OF ANOTHER SUITABLE MULCH. 7. ANCHOR BY TACKING WITH ASPHALT (0.10 GAL. /YD2), RCJING, OR NETTING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. 8. REFERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS FJLLY ADEQUATE. 9. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIA., ELY 1 12/14 SNK REV' DATE DRWN CHKD NO. RFP 1 REMARKS 1. CONTRACTOR SHALL PREPARE ALL AREAS TO RECEIVE TEMPORARY OR PERMANENT SEEDING MEASURES PRIOR TO PLANTING. 2. TOPSOIL SHALL BE PLACED INI AREAS TO BE SEEDED AND ROUGHENED WITH TRACKED EQUIPMENT OR OTHER SUITABLE MEASURES. SLOPES STEEPER THAN 3:1 MAY BE ROUGHENED BY GROOVING, FURROWING, TRACKING, OR STAIRSTEP GRADING. SLOPES FLATTER THAN 3:1 SHOULD BE GROOVED BY DISKING, HARROWING, RAKING, OPERATING PLANTING EQUIPMENT ON THE CONTOUR. 3. SOIL AMENDMENTS INCLUDING:. BUT NOT LIMITED TO, LIME AND FERTILIZER SHALL BE SPREAD AS NECESSARY, AND AT THE RATES SHOWN IN THE S', EDING SCHEDULE. SEEDING SHALL BE AS PER TYPE AND RATES SHOWN IN THE SEEDING SCHEDULE. SEED SMALL BE BROADCAST AS SOON AS POSSIBLE FOLLOWING ROUGHENING, BEFORE SURFACE HAS BEEN SEALED BY RAINFAILL. MULCHING AND TACKING AGENTS 1. MULCH MUST COVER A MINIM:JM OF 80 PERCENT OF THE SOIL SURFACE AND MUST BE SECURED BY TACKING OR NETTING. 2. WOOD CELLULOSE FIBER MUL<�H SHALL BE USED IN HYDROSEEDING GRASS SEED IN COMBINATION WITH FERTILIZERS AND OTHER APPROVED ADDITI'�,DNS. 3. NETTING WITH PLASTIC MESH :AND /OR PLASTIC TWINE SHALL BE USED IN WETLAND AND RIPARIAN BUFFERS TO PROTECT SMALL ANIMALS. HYDROSEEDING 1. HYDROSEEDING SHALL BE CAF=RIED OUT IN THREE STEPS. STEP ONE SHALL CONSIST OF THE APPLICATION OF LIME. IN STEP TWO THE SEED MIXTURE SHALL BE MIXED WITH THE FERTILIZER, WOOD CELLULOSE FIBER MULCH, AND ANY REQUIRED INOCULANTS AND APPLIED TO THE SEED BED. STEP THREE SHALL CONSIST OF APPLICATION OF TOP DRESSING DURING THE FIRST SPRING OR FALL, WHICHEVER COMES FIRST, AFTER STEP TWO. 2. INGREDIENTS FOR THE MIXTUF�,E AND STEPS SHOULD BE DUMPED INTO A TANK OF WATER AND THOROUGHLY MIXED TO A HOMOGENEOUS SLURRY AND SPRAYED OUT UNDER A MINIMUM OF 300 -350 POUNDS PRESSURE, IN SUITABLE PROPORTIONS TO ACCOMMODATE THE TYPE AND CAPACITY OF THE HYDRAULIC MACHINE TO BE USED. APPLICATIONS SHALL BE EVENLY SPRAYED OVER THE GROUND SURFACE. THE CONTRACTOR SHALL FREE THE TOPSOIL OF STONES, ROOTS, RUBBISH AND OTHER DELETERIOUS MATERIALS AND DISPOSE OF SAME OFF THE SITE. THE BARE SOIL, EXCEPT EXISTING STEEP EMB, °;NKMENT AREA, SHALL BE ROUGH RAKED TO REMOVE STONES, ROOTS, AND RUBBISH OVER 4 -INCH IN SIZE, AND ;.ETHER DELETERIOUS MATERIALS AND DISPOSE OF SAME OFF THE SITE. 3. NO SEEDING SHOULD BE UNDERTAKEN IN WINDY OR UNFAVORABLE WEATHER, WHEN THE GROUND IS TOO WET TO RAKE EASILY, WHEN IT IS IN A FROZEN CONDITIONS, OR TOO DRY. ANY BARE SPOTS SHOWN IN TWO TO THREE WEEKS SHALL BE RECULTIVAT =D, FERTILIZED AT HALF THE RATE, RAKED, SEEDED, AND MULCHED AGAIN BY MECHANICAL OR HAND BROADCAST METHOD ACCEPTABLE TO THE OWNER. DESIGNED BY: SJN DRAWN BY: SJN SHEET CHK'D BY: CROSS CHK'D BY: PDS APPROVED BY: DATE: I�7:[y:i�1:3:1:�l�IlL1 MAINTENANCE SCHEDULE EROSION CONTROL MAINTENANCE PLAN: ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF PRODUCING RAINFALL. STRUCTURES THAT SHALL BE INSPECTED INCLUDE: 1. SILT FENCE ANY FABRIC WHICH COLLAPSES, TEARS, DECOMPOSES OR BECOMES INEFFECTIVE SHALL BE REPLACED IMMEDIATELY. SEDIMENT DEPOSITS SHALL BE REMOVED WHEN SEDIMENT BEHIND THE FENCE REACHES SIX INCHES. 2. SEEDING, FERTILIZING, AND MULCHING SEEDED AREAS SHALL BE INSPECTED FOR FAILURE AND NECESSARY REPAIRS AND RE- SEEDINGS SHALL BE MADE WITHIN THE SAME SEASON, IF POSSIBLE. 3. CONSTRUCTION ENTRANCE AND EXIT INSPECT CONSTRUCTION ROAD SURFACE REGULARLY, MAINTAIN IN A CONDITION TO PREVENT SEDIMENT FROM LEAVING THE SITE, AND TOPDRESS WITH ADDITIONAL STONE WHEN NEEDED. SWEEP EXISTING ROADWAY TO REMOVE ANY ACCUMULATED SEDIMENT. 4. INLET PROTECTION REMOVE SEDIMENT FROM AROUND INLET AFTER EACH STORM. CLEAN OR REPLACE PROTECTIVE MEASURES AS NEEDED. CITY OF GREENSBORO NORTH CAROLINA t. WINE o 101 0 1, 1 SELF INSPECTION REQUIREMENTS THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND- DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. THE SELF - INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF- MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF - INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS MUST BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A -54.1 AND 15A NCAC 48.0131. THE SELF- INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREADSHEET FROM HTTP: / /WWW. DLR. ENR. STATE. NC. US /PAGES /SEDI MEN TATION- NEW.HTML. IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THIS OFFICE AT (919) 791-4200. NPDES Storrnwater Discharge Permit for Constluction Activities (NCG01) NCDENWDivision of Water Quality Nl~1N STA�I�,l�ATAi�hD TIMI�FRAMES ;���Gt�,r� Aug �, at►t�� SITE AREA DESCRIP71ON STABILIZATION TiMEFRAME EXCEPTIONS Perimeter dikes, swales, ditches, slopes 7 days None ,,. High Quality Water (HQW) Zones 7 days None \ Slopes steeper than 3:1': 7 days if e' a 10' or less length and are slop s are I �n g not steeper than 2:1, 14 days are allowed. Slopes 3:1 or flatter 14 days 7 days for slopes greater than 50' in length. All other areas with slopes flatter than 4:1 14, days None, except for perimeters and HQW Zones. 110,911 111 0 CARol �6 oti� 9 SEAL 18178 ii PROJECT NO. 30841 005 FILE NAME: RFP 1 -1 SHEET NO. s N M N � Li. � C J a S �= %} �� c� z ¢� as / n o `� O 6 � V � n O � M n /� � a � C M n � 4 O a II G ti w C a w 1/ f !; � 11\1 11 I I I , -, - / t_ 1 �,� ,..- f f fi � ! 1 /I !° d r> t1 � - , /' € F s r' / „�,, } f ' { f IJ /✓ f i i I I t I I f f 4 j ` I I ll ,IL I � I I \ I "I I 11 � 3,r s j SILT FENCE, TYP 1` `�,, Ij j taw, r'6 I " "." 11 I ,- LIMITS OF _' % DISTURBANCE, TYP I ,i /I l � �" _/ r,,, NOTE 10 1. i I_' ch ; !I # i 1 i, +I -n + S I f£ 11 11 A i� E a. 0 I z N s I ,. _ . € t z Fn ¢ m z 1, 1, I f z U ¢ m z . 1 f'I „ if 1 -7 1 `t( € . £ t ii I!ii i I I; 2 ( { I I; , I I I , .., I I ij t „s ­111,11 i r`I I il Ii i { f 1 / {, i i 1 it Ili I E. MATCH LINE SEE DRAWING RFP __ __ I __ __® __ _1-2_11 _ ® I 11 ,I f € JEI 1 1' 0 1 0 o r 0 I z z z € z z Fn ¢ m z 1, 1, I f z U ¢ m z z U ¢ m z € € z U) v„ I ¢ 5i m 1 III z ;i O ¢ w O ¢ w I O f= ¢ w 7 O 1i , ¢ ,`? Ii w 111 ¢ ¢ ¢ ¢ Ili t I 11 III I I +., E s ®_ __ __ I F I I I I 4 , E I y 7 - S 6 E 9� I E 7 3 11. E r_ 3 � 0 1 0 0 y 5, z s, z 0 I I I z I f z &, in I _z Cn E (n ; ¢ I f I11 I o ; I ' ,,,,,w,, <u , ww,.M ,,..,,,a.,aW,w., �` ». , «, ,., " " "- a «,� - . - -, „ <w ,,,r, a �„ ,,,,e z 1111,, . , «_ -I.___.. 1,1.11°_ .,.; I ,•`, �� °. 1111, „_. °_ 1111__,_ _, ,1111__° _ _..,;__,..... « _« 1111 ,,.,°,,.,,. .,. _ 1,1.- . ..,,°,..... „ _ ,....,.. f �; f a n,.,,«,... 1111... «.. ✓y , «°..,....,_,H.,,'., «1111.. ..... °..., .. _..,....... ... °1,111, °...°_..... .. i1 ! .. ........ .. .. 1111 _ 1 �... �,r „ 1111 ._„ ,..,.,,., �� � 11«„11._ 1111# «^",^`^"".«."..`«,^*o,,.,.,, «,. ,.«, 3 I # ,,,,.,-,,-,,,«,.^ 1111, «, ,,, Iw ;f I i(( s « «ire " I f 8 _, v_ «_ 11 °11. 1111,. «. „,,,,, :_. °.._ «... °..., _. 1111_ , 1,111 _, «�.......__ 1111 _ 1111 I i /, I £ it I €r , 1I 1, a, Y. y 6 I P If,, .y € el tt ! j 1 { i ! iy E 11 II I I$ ; #1 il ;''I ff . iEE I I E I :1,II I i 3: E ,f E E` ✓ <. ,< q i Ii ® I _ _ £f'r ft tl E "3 ' ,// � 11 Ii' l t f l I s If E I I ! }� € `1 1 544£ I` , ,.�, I�.11' --1 1, ; J_ L0 0 z Z V) m z O F- w F°ate _ w,. I/ / ", f 11 " __,rnF _._� .._��.,«_«. I �-_KA _ °,,., . , , .__ _ _ _,,,,,,,° ___„ � _ - _ ° 1111,,,_ _. /` / N /�, /` I / ,, . /, � / ,, I E __ __ �_ ®_ __ __ I Q , E I 7 � I r_ I � 0 1 0 0 z z s, z I I I z I f z &, in I _z Cn E (n ; ¢ I ¢ ¢ I m m m O I Q '£, 1 O I Of I ry Iw i(( w I w 8 ¢ k ¢ I ¢ I I I I I I CONSTRUCTION SEQUENCE: 1. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE(S), ALL OTHER TEMPORARY PERIMETER EROSION AND SEDIMENT CONTROL i MEASURES, INCLUDING INLET PROTECTION, SILT FENCE, AND TREE ,1i, I PERIMETER FENCE. I 2. INSTALL TWO TEMPORARY SEDIMENT BASINS AND ALL OTHER TEMPORARY EROSION CONTROL MEASURES AT LOCATIONS SHOWN ON CONTRACT 1 DRAWINGS RFP 1 -2 THROUGH RFP 1 -5. INLETS, OUTLETS, AND ALL BERMS OF THE TEMPORARY SEDIMENT BASINS SHALL BE IMMEDIATELY STABILIZED WITH EROSION CONTROL STONE OR OTHER PERMANENT GROUND COVER. CONSTRUCT THE BERM ON THE NORTHERN PORTION I OF THE PROJECT LIMITS AND THE PERMANENT STORMWATER DIVERSION " - "° "', CHANNEL RUNNING TO THE EAST AND _.­1.­J__ SOUTH. CUT AND FILL SLOPES OF STORMWATER DIVERSION CHANNEL SHALL BE PERMANENTLY STABILIZED ,I AND TEMPORARY SLOPE DRAINS 1111,_ 1111 7 _,1.117_ � _ -- , � 11 -� _ -- . .„„,,- _ _ �._._ ___ _„ _ 11.11,,,, - 11.11_. 1111. 1111 INSTALLED AT LOCATIONS AS PER _ «.« , _ «_.._._,._ _111.1°. °,__ , �_ __ _T � -�_ __ 1111..... „1111. « _ 11.11 ° 1111.. _ „.1111 _ «_. 11.11.°_ _. i CONTRACT DRAWINGS. NO 1111 ,,. w... f �, �. :n� 1. I 1 I €} � �" € I 11 ii= , SECONDARY €; £ i II ,, CLARIFIER I II I . I N0.1 {. Ii'i 5 11 ,( ; I e? I t I' .. \ ; " " 1 ` \6 I Y I 11 ft I <i -, ....1.. r / £'I .f i Y 11 (I I £ /' 1111 { 1f Is F i[11- ` `_ n I I n,! i 1111 I... ffi {i� ,€ 3 € g,n : v, i -. f` I € xl l , I =i i . €I f j ` i:`f ! f � a S 1 I i : £ ; ( 1111 + f d I , , G,,; , , ✓ j_._. 1111_° 1111 ., .,x._., "r �° £}... ._ 1111 . /1111 j -9 £s 1111, € sI t% , 11 , > °R,, 11 SECONDARY CLARIFIER NO.2 k: r ,_„ 111..1 ,,,,°_,,. „,_ _,,,_,,,..,.,___ _____ - - -- __.° .. ✓1111._„ ,_ „_ „„ 1111_ „,,,..,, °,,._. _ „1111 / ..,,,,,,., "" ,1111__ ...,....,._ 1111 .. .1111.., 1111 1111 ,, ., € ..,,,.r' ^w, 'L 11 e , ,(z„ 1111, « „^.,.,,w" ,«,« , « ^,.. ^.,, , '. € f �"" 3 I. 7 # l 4 N £'4J i t s r E ( , I S w,. Z ,. , : ',. , __,....,,....,_ �«._, 1111_"'_ ' .: , _ , s ; f /„ 1111.. ,,nf:.,,, 3 E l - % f ., «u ...,_.._,., 1111, 1111 , E I , ,''_ , ., € , € '...«..y,.,...«,..f, 1111 „1111 1111 .° _,.,...._ 1111._.' -. F i .a� " 1111.. ,,,.,,,,,, „1111, „, «,p, _,___._, 11.11__ „, .f, II «. ,,,"' 1111. „✓ r , , ,. 1111 „"'° ° f # ! ,,,' y. '4 4 :, ,F s f€ i (( z � t , i f / I f F t 1 1111. „1111. r " r H , t!'t ,: 1111 I 1 , „ -- r : r ( t 1111 •• -'.'- 1111... I 1111 1111..,......._.. .. ..........._,,,,., ___,__ ,,,, .. , o,m,r „ € t 3` ` 1111,° , i 1111,, .......... , «, .,„ _,,,,.....__. _ „ .. 1111 1111 , 1111., _ 1111,, F. t«, £ r 1111 ,r...�,..,w« 1 E E � '�. I i � RAS PUMP 1111 /� E :, a t i ` ' .......... .........„ . «1111..._ / 1111._ �: i € I , r 3 � 1111,, „,.,.m_..°__... , °.....,...., « °...._..__ . „_„ ..,,,,,_ , 1111 «.., „, _ ,.. ,. £ , , , ,, ..;. � °. � __y __� € L ,. € i , � „ , / 3 1111_ y t 3 3 w,.. -n I _ I_ .r : 1111_._ _. °_........° 1111._ . 11.11 . _ 1111.. STATION N , 1111. f _ .:;.. ° ....... 1111._.._ _ ,t,,,,,w „w,,,,,.wW <w� £ r � � ,..._... � -- �....,M 1111. 1111._ � ,� I, f``�,, -t w 1111 r{ , °.,« _ _ 1111. .° .�. .5 f, ;,s r 1111 , ! :: i r. 3 ,._,°....,,,,,,_.. _,,,,__, 1111._.,, -T""T .. „,,. ! `1 : € £, ,. , , , £ e ,.,�,,,w,a, «.i.'«.«.,.,. «,« «_, «,.,«.,..,..,., ::,- •.es....,, .°...,,,_ 1111_, _ { I % X , , 1111. ,......,. { s t 11««1;1., -.S.° .. ....,,,, 1111,. ,.°_,,..., ,_ „_,n i •1111 ` { {i i r S .,. # , . ,,, ., a # # �S 2 . 1111 _„ 1111 .. .. 1111 ,. 1111 ,. 11.11.._. .__._, °.. «, °. 1111... .. ,,,,,,,,,,,,«,,,,// ,,,,,,,.,�,..,, , <, ,,,,,..,.,,,<.,,w 1«111 <,a,...,N „«.,,,,,.,,,,,,,t w „.,a,�,v .«..,».:.,..,..,,<,,.. wu.. w, w..< w<,....,... Hw. w .,,,,,,, «<,,,w..w.w..,,,,,, « <w. .1 \ Ft' 1111 . ........ ................_.° ., . . , , _ , aE &1111 "> - 1 °_ «,_ 11.11 „° _..,.,._ .. °,.m.. .... 1111. «., 111,1._ ,1111,... «1111.._ . __m 1111__.. _.,°,,.....,,,, , wua... ^- ._.w, „ «„ a a,+.«rw,. «1111„.,, ' , .,, x .r .. r �; „, 1111 , � ; fs i I € ' &, j k-' f r. 11.11. # ..,i„ [. r. `1111 i., s , „E _tx,y ....._... ', , £t ; f s w s „ „ E, ,! E & 1111 s E , g t _. „_«. 1111__. _..,..,«,,,,,,,,,,,,, 1111,, «. «._«..,,«..:,,, ._._.A f : - »„1111,«, «, ,f`,. :r , r ;: i „ „ .l 3 1 €3 {3 E'€ € 'S.¢ .. ! s. : f r i I , ,' t , r , s � : : I � f 1 `2, - N 0 O N W M N. aa,..�xe,p . . oT �4°`"�"xx it a , c « ,__111.­_,_,__,__ 1.«11 - a_ « 1111_ I—, o ° ' o a„g i € a � .......... .......... 1111 _. ... 1,111 °....._.a s� O 4 w .lfl ,wi 1111 ,vm„w �, I'll cn ,..�_ .. .,,,.«,.,. 1111___. „.°,_..„ - , m E � .^� Q 3 4 t Z • E i am ,s. ,_ „,.,_.. _ .... _, .._.,,,,,° 11,11_,_ ,_ 1111.. ,_,__. __°_ € t _ '`, a ., __._,......�.�... - mm °111 «._... __ °...1111 1111_,._ ,. > 2, U Q ° yj W 1111. 1111 11,11, „ « «...,«,..«° ,.,amar,,,,,, �-' "/^ N � y l U I -W- j[€ 1- 11,1,,°, 1,1_°_11 1111,.._ ,_,,..11,11._ .11.,11, ¢- ._ ,_ 1111 1111, , ,I i ' 11 -- -, : , { { . g , < , ,, ( _• `. 9 'C.. "„1L_s , r ! r € i E a{ i S ;i ? S€ j E j .. a „1, .Wa�.,,ti..�,vaaw _ __- s I E r } a# it ^•., : ? # 3 s i £ € i i #E # ss § ,t h,' t y 1111 _ ,, , ..__.,,_ , I s. [ F ? I Z # j _ , . ,. . ,,. ... _ <�;r i .,� t..,,.£ f, l a : i s :, , i '£ I ;! i c { s I I 3 K / .,, i i 5 I 3✓ _ , S t ," g , s I € I w, i E -s. # i ' t ;. t s , t , 3 1 , s {I , _ s I f€ i' I f1 t( .__.. .._ °.... .. ,. _.. ......,. .,1111, .., 1111 ..1. 4 f_.._ii' .._E 1111. „, €.s s ,, E t. £ i; , E E E € I e r s E , £ £ £ £ ..Y i. £. ,i's' ,i...,.... -1. ..<d, _ / - x. r } / 1111.,, « .,,,.,„ ... .......... _,..,.,....____ _,.,..........„ ,., ,.,«...,,., .,. «.,, «. _,..„_...°......,,_ ,,....,.._. 1111___ ,„.._«.....,. € £ IiI £ . I i jj _ y _0,_ `r' 1111 f s f t g EE (( `¢ I { ° f_. ,,. # �,j `. € i w,1 C%w,,,,,. ^,,, „...5 € ', '-, f ,; ., s £ i € 4{ i 3 j ! 3; 11.11 «» ,.««,- .„,„,_�,«. f , p.....£.. W - 1111, , _ , _ „1111. _. _r _ _ 11.11, _, . ,1111. _ ° s _ i " 3 3 I ) s ., , • , s ;, , -£ f {' ° ! € i - f `'f, # °"<. rr'! } I , i; € E `hw.,„»»a„«,., i i " i i , r s, , 1111., s + s s , : z ' - , 1111 a,...,.. , ,✓ E 1111, s .. „,.. « .......,« 111«1«.^ 1111 «ra✓.«. «.. f e ,..t J 1111.., s ;,. ,. .� f si £ P r , I I ( i t EI I e E ;. I ii < f i' r E J s f [ *.. ! t a i ..�,....a� <,„<;,;,,. - «-._,� I t„w.:w , ars,.,4,,,H %1111, I ` \,, `� ^" .- .., -:,.< ..», + - f s r ✓ i . 1: 1 € ��pp ¢¢ E i , .. " 4 a VI i { ! s ! ` i `: r l Z. 4f #`''�, } �ti., ,reaFn`` IF 1 E g. € E, i s 1 Ty%m iW '? ­11111111 a: _ ya:' -� I € f § p ,f,,,,,,,�,awf,,, \ i n 'r°" iI ; I f I 1 j e rz it / rt ��° YY 11 ^... , ,: £ . 1 ;.. s I{ , ... °._.,_r......,_.. 1111° .. «1111..; ,�,' P'� ..,r 1111.._ i / £ / ._5, «1111 l .'' ,.z £ ' , „t n E ; 2 f.. . °Y, .,, fp. „ : ,£ #, I f fF .,,,E 1 , %l :r `R 3 "L , 1 `I # € f"" ` i s j E i f 1 i j . l �.. .,tom ^! f k I A t , i {i £ ' 3 t, S. I. ., rl i ,,,,/" �•..,. ,. 1111... _ £ § I E 1 h k Ec✓ a ^• 5 € I t + f ✓ 11 i , , I I°" "1111 " „,«,,..,,, ",,, , 3 ,3 11 1# ,f \` `" {„ I �, } E i `E F # s&,s .f 73 [ £ € fs f ! •, `�\ I •� 1 [ € s I ` ;,: I ? ijJ I G ? _ >" f f II, v I 1 , r E '•z .T' v E ,_. ; j I ,.: $ h ( y `t: "✓,w, ._I.... � r ; , £ t'9 : £ E j # 1 � Y ` 4 ff i ,! 1 #f f �a l ..,,, 3 ( > 1-Pt 1 E 1 £ I i I I 1 i s [ 1 S «a .rt h €< €^, > "pti. ' E E: £ ; 1 „,,,,L_!_,_1_,,, , € 3. € ` # E ! ? £ q S ; £` i i £ � j E ' [ I 1 # ; g,�'k d If 1 #r i i3 1 i ..,,xz, . I I€ € I€ E i x>yg I j£j t € I£ as E S agg I ! E 4 I€€€ 3 f f. ,+ I E £, `4'i "``"'c.,� € i 1 E f c t :�; f ! € E °' E f 1 1 g 1 I. {' €# if i t+ h I `'.i I I I I I P �IMARY ,_ ", `, " fl, I `, I i I E ;, :, SECONDARY , , % 11 I 3 SECONDARY `_ I SETTLING 1 , 11 3 I I I €€ €E$ _' f I CLARIFIER ° CLARIF;;ER "I I 13 I f ' 7 S `€ 3f E f l 1 i TANKS I 1 1 s 1I i ff I f I I 1, I i ! (j .y�q E: fi !`I I € £ ( # '3 E ( I € ( € `� E ;' f` r' 1 ; N 0.3 ,# N0. I f} , f •� E E S +f 4# I'3 1\: -4 t Et I I g if i i { '1 "g 11 4"s ! 151 ! €# 2 i 0.1 9 1 1 if ! £ 3 1 3, E £ £5 € [ I # ` i 1 i I i ( S (i I yq ; =J= {r I 4 :I ? s i 1 £ 1 ' I I1 i i f I ` I s ( ;' i 1 g E '11 f3 iii 1; {` j { ? £ i 1, 1 w i f 1?I f °€ 1 I £ f., ..;,,,1 r,. "1111., E f t, tr +a I %' I : £ , ! �" € "`«"","„ 3 f� +� i f f & I' i f 1 E , £ I i "y : # n i I , I -,.,y t 'jj 3 I E PRIMARY . I I !1 t If , II;I £ i 4` 'j3 1 t I fr I...I I I I'll, I SETTLING I `I ; I I <i V/ , i y f 1 i k? i j I \ f i I 1 TANK I t E I j y tI 1 f 1111. I h N0.5 1 i " 111 : ' I I - ,.`5 £f 3 '. I'll «, „, „11.11 . i 1 r"" s, :% h / g r,".:, .._i +s...,, I - i E{ f £ 11€11 '; °~F. `"° Y% 11 w € �w . 7, - , 11 I 11 ! I r ,,•, `1111 ;1111 I t ;a I 5 / >r a .. _, "° _ / _ / € ° z, # 11.11 _ . w, «1111« f,,,.. , ; l .�...._ a..,.._. 11.11 1111 _,,,r «1111, 1111. «..,.�, .. , i/ l.. E _1 ✓ //� f i # x s` rn /%m „1111,"" F „ / -.. .._.___ t 1111 _ _ 1111 �' ill 1111 1111.. 1111._ 11.11 w_ , i .,. °„ .11, °1111.,. ,_ „1:111 .. °,f 11`. ` I,.. i ; £ , 1�,r ",aa,,� e . ! . £ 1111. F I i 1 r ..t « 1111,; ,s 11 jam` „�'� I . r ✓ 4 } s ,e f, I'll E w,., ` s f «,,.,w,..zw,w«,,.n� °,,, 1111 ;,, , r.,. f ». i\ # f «,,,;,f_'"' f , 11.11,.. , , s. i' , s1 '_,.....,. $ , , , f _. 1111.,. « « « « «, _ (( , : r, , e S S t , ; s- : i r £ , i<` 1111. °.«......,,.._,__ , w, , , , ({ a', l , Ei 3 � C 1111 • f r. ._ , .,, , < m / °! Hh „ / , -9 ,,,,,,,,,,,,, �<w, «11:11, <. r,,...._..5 j v',,,b.,,, ,,,w." ,,s r R { fS t € _\ $ # F , s ,, ,;,, s i , ,, a % ;z , 1111 h' . I b, <e , ,r ✓' P^.. / t € , i '``, # .Y,_"`� / , s ",., " , 1..3 y .1ss x , , e. 1111# 1111 , t % € �� ( # wC 'x € , , � a , r f` i ; r t, % r 1t 1 € i •1111 ( "''� . 1,111 . 1111. _......_._.._.._.... ....... 1111. 1111. / , , ! s k + "Ia # ^- y».,,� ¢ e » `` € € r. # l`., I „ i f ,,. r' j E st i `^` ' f'a<.._. - 11,. 1111. ,,,r"' , \ 1 . -` <_ ...r.�,,„,: € ,,, 1111 n t r E s h f I , 1111 _ ° 1111, 1111, ... , I , , E f "ma ,lh ;€ .: y .1111 r, , „ _ r � � „„ a ,,, «,,.,. „,.,. „..._..... «., „�a, �,w v. �..a��. „,�,w,w,,, a a ,,,��.a„ti� «1111, « « <.,, «,,,ti.,,,,, ,,, _ -/ < . �, % ; r . , f 1111. € .:5," « >.. , t : - r , , : , s - - , A. �. ./.'y' �.J__,._ 1111.1111.... ........ ..,. 11,11_....._..... _......_...._ „ / , , s . .. '; ! ," /"' �" h" w:r, ,e, , E, l `""Y I ?'; y,. °.,,c":. _. %, . ; rf' ,, ', j ; f r'€ «F r.a,,,w .,.«s:,.,.:aww^ -,:* 1 s ,.I _.,, „ , '' 1 1111„ 7 .. ,, ,, 'i , +++ / . «._ _, . .,.,,..a.,. 1111 »,,. /k(! . £ s 5 , : f i £1111... } .,, , 3, : �,....%,: { 1111° ,�,.,,.«....,,.,.a 1111. f ✓ 3 „ , / y, , �� , 3 , i„, , , o ., s t f fs: r y J. „ 1'111 - "" ...,,,v_, %„ , , ,!r /' ...,<...,,«,." . ":.,, «....�,,, „. »,«r>m «...ro.w,. , /�, i < , z : "� � ... i 'o P , ✓,� i # �' f I ,, �, : a^°`r' � a,' ! „a««,„ ««1111,». 1111^ I j( � 1111, , "'r " ._ 1111.. 1111,, 1111, _,« , 1111 �¢¢ E x* v'u f , ._.,; « «,,,,« «1111. «..,„,.,„_ «„....«..„_ / , , f -, , . 1111. 1111., 1111.. s r ,,,...,,,,,, .,..1,w,.. , ,«„ ^...,,, _ .,a....,... ,w,.,.,..0 1«111 w ,�r� x Y , , / , , i$ a 5 % I 1 ; ; £ , , 2 ..,..t 1111, <v ,w E,A,.ue 11«11«,,,, «.,,,,«,,,.. « .,,,«<., .w.J ,, - <w,,,,.«. «,,,«w. «,w,,.« ,,, ,,,,,,,,,,, -- .,,,„,,.., ,w„.�,<., «< ,ra' , v r >6 ; . , " E..' 1111 ,,, „I.. w. -1111 11,11_ . _. „� , 1111 „- 1111,., m_„ 1111 « F, / I 1111° ,v h :: v "1 £"1'111, € i 1 i , .. .,v, r,. ,.",1.. r„ ✓ 1"�I £ I o. , ; 1111 1 €; / '=z, „! f , / .,f f s:, ;, '"'a� �^°.« ", ._._...__....._... a. 1111 / 1111._ ", w, 1111,_ ........ f,H y:,« E r "1111 r e , , . , , 'z !j f i ,✓" 1111 .,.wr «, 1111 „<,,,.<«.. ,,,<f,,,. .,:z.,".a r ,.ter." S `£ .. € _ «,,. , ..� , 1111,,. «� 11,11 . ✓r ., , , a <,,,,, ,.,,,,,,, ,. , + 1111.,, £, € s : , r. ,, •_ £ € rx r £ P ./ E .. +, , ,r" ;1111. , . .,. 1111. -" „ ",; , , 1111 , ..,,,�. : ' � 1111 1111 -.- ,,,«,.,,.,,,.«,,,,.,«.«,..«,. € , f 1111 m _ . �: ,a,»,.,� ,r �,,,,,,,.« „� «,„.„S ,, ,.,n ,. -1111 ..,,..,., . �" k,., ,„.,,....�,...,,,«,,,«., „,.,..„ /.,,,,.,,_,: y e „s 3:, " <' „r,,�' , {, ,,,,,,,, g t, �' >,,,pl,i 11,11, „„, «,,,,,,«..,,,,,«,,,,,,,. i „111«1«„ , «,,,__, «« f i"YI L', di s` °., <' I , i" L. , h' ,5,,,,,, , p. I `. L'. i £ : , v # t £ds, «,,,,..,, , 1111 11,11 6 / a „ v Yf, „ ,ays ,v Z i . r,. , 'I s' ,«wro r " , r , S, f ,,. s k: !.. . , , 11,11. ..s , ,.,..._. e` , ,/ „ a w 4,, ,,iii s,,,,,, ,m_ .." l,' 1,111, _..._..._ _ ..........., 1111.. I ., r , e 4. ,,,,t,,,,,i „,.na,., «,iii,, , r I t ,. 1,111__ ,°...._.., ,_ •1111_.» 1. 4 , ._ ,., 11.11. P xY / o° .,_....°. 1,1,°11,° / -` " -- /r .. 1111 _, f .. .. ,/ / / ' f .1111 « .,,_,..., , .« r f , Y " u, r ✓ , „ r i /. , # $. ,� . " � .. ., -.,, 1111 5 r / ., ; ., ([ ..,,,._,.,, .._.°.°..... ° ,..,,,...,° ,,....,, .._._.._ ._......,. «,«««...,,,,.,.._, 11«11... , « «.. «. 1111., , E ,. w 1111.. ,. ,,.w,«,,,,, <.<«.,«„«, ,«<,.,,<.,< «<an.«e ,,,,,,,,,,,,. ,,.,,.3,,,, .«,.,,,,,,< «.,, ,. _.0 ¢ a, «��_ «111«1. ,«,,,«,,,^ <,<«"„�„ «,„ «1«111 ,,,^ ,. « „a.) ..,,,,,, z�.h - � r.. -- ,,.,..� ,�;a:« &««««�a.„,w $ f r,,w, < «.„<,,,. 1111,,.«„ ,,,w,,,< «,,,,,,„ , recta /! //,Dr'C,s3 ,./ «., < :: «. « « :,, <.w .«,«m ° .md.«, «,,,,,,,.«,,,,,,,,«,,,,,,, ,,.,H „« ,.,w <.„.., «, s o . .�., f 1111.. /' ,v.,,,,�/ /.fi=r /' .,. 11.11. ,aiw ,w z r i ., ._ «„ 1111. �.,,,,,,,, a: E ,f , , r „ ruuN 1111,, s , € 1111 r ` '' ' % t, `;. �'' r C' 1 `i- r/. w I , 1111 «. _, 1111... „. _ 11.11« 1111 111,1_.. 11.11. __._......_._. M t_ 11°11.. «.„ _ _ _ , ,,, ,.. 1111 1111 f ,��.�tr 1111. ,. / ,. � , � °..°.... �,..._... «. «1111..,.« .,,,,,,,,_ _ 11,11 _11.11. r °^,, r+, , ".. i a, 1111 i t, .:. .., 1111, € - «1111,. � °,,..° °_ °........� ..... ............ ...,_°........°..°° ._...°_. . �, �,„ - 1111 . / , l t. ,, // y / 11.11 "„ s . °...._., s „ E , .._,.... I �! ,. S r i , # 1111 F` , r _ „r,__ _,P_..,. �, ,_ _t 1111. 1111___ ,.,.,._„ 1111_ 11,11._„ 1111,.._ .. .,. ju,« ,n q ,..h, s 1111. " • 1111_ . .,.,,.°.. ., , ,,, `({ . s ✓/ E £ ,.r, , , z t ,. r s,:: 1111. 1111_, , 1111 8 , F 4 t d # E Y b ,3 ,,. l , , £ ....,,,, .«.. «.,,« 1111.,, «.. «1111.«« ,,,,,,,,,,,,,,,__, +, _ �_, ...._...... s W. 1111. , /, , 1111., 1111 , r 1111 ', _ 1111.,. ,,,,....,.., 11,11 1111. .......a�." , !' „ ««1111,,, « «1111««, . ..............., , i S , «. �:..._...„„ 1111„.,. „««, «� „. 2 „ , ,,, «w<.«,<„«.«,�,�,,,,,««,N, <«,.,d , �e (( 1111 „„..,„,,,,,,,,,,,,,, 1111 , m.... 1111 ... E s „N,„..., 1111 _.,.,.,,,,,. _,.,,,.,,,,. _,.,,,.„, 11,11,.. «...«,..„.,. „ «1111, «. 11.11„. ,,,,„,,,,. „,,,,,,,_, ,,..^.„_, . « „a «...t,.0 i[ a E ",,,,., # ° ( a „,..,.w,,., f'}.�. ;«, „ 1111, y, . y „/� ,ha„ 1««1«11« „...„„„, ,,..,,,°,.,,_ ,1111_, 1 s '-^'r 3 I __ ........................_... __�_..,,.,.i 1111,. _� / 1111.._ ,1111.„ _„.W 1«111,,, ,,,,,,,,,,, ,�.« 1111___ .. i I I % f % ...... 1111.._ 1111.. _. ., 1111 „r,., " 1111. .....,.. 1111 1111_,,, ,,, ,.. € / „ „ <.. �. s €. _ 1111- 1111..° 1111,... ,_° ............... _ 1111 1111 1111.. 1111.. 1,111. . 1111, 1111. , ( i � � 1 1,1,11 _ 1111... _ < � 1111.. 11.11 1111 1111_ r s - r ° , W, 1111_,_. : .$ 11»11,. _,,,.„.>,,,,.w.w«««.. E. i . , .. 1111.,' , 1111__ 1111____ .......,... �.F�,_ :,.;;,.._ ,. ,.. ...r.. . ,:.:: 1111 1111,. „ 1111 «1111 _ ' ,.,,,,„. „, 1111_ 11«.11„.„ ' 11.11, '.,___,., _,.,.,„.. _„_.,,,:.« n « «1111. , « «„ 1111., «,.,.,,.,._,... _,.....,... 1111,«,,., -.,, .« «, ,,.« « «,,. 1111,, ,,,,,,,,,,, ,_,,,,.,,. 1111,__ _,._,._„ 11.11 .. �-° {{ .°.°...°, ...°_.,.,, _,„...W, ".°,.°,,,,,...,.,_,._ ....,,,°_ °,r °.. 1,1,11, 1,111.,. _ ................ 11.11__. ° /, � ,,,,,,,,,,,,,,,,,,,,,,, ,,, «,,,,....,: „.,.,,,,,,..,.,., ,«. « „ «,. «.«.,..,,,,,..« .. ,3, , "11.11..« _,_...,..,____. ,.,_..,, 1111, +1111 11,11, . � . _,_� I r,�c y / g ,y! .� 1 , ° ,, ;' 1,111._, _. _. «_, _ � "� .,.i f „� �.«"' .« > °„_°,,,. „°„°,,,, - .,, _°,.,....... °., ,,._,.,,, ,. 1111 ____. ,.,„,..,., _1111.. ,°,.,.,,,^ .,M, «,,, , 3 ,1.11„ , "^ « „__....., «..° ; «_ «. . ,.; 1111, __,,,.,,., _,,,_°,,..,,°,,..... 1111., « «, ......,, 1111,,. 1111 «.. °,,..«,,,,,.,,« 11«11,.. .. « «.« «1111. « «,,, . �._ 1111., «_„.„_ _ „. __,,, „._... _ «« 1111 ,.,..,,, .. «1111«. ,,.„.,..,. 1111 11.11 11°11. _,.,.,,,° 1111.. ° «. .__,„ .... ............ °.,..,r,,. _ ' s ... 1111.. °« , :_, , 1111. „. .,,,,... ^„^ _,__.,, °_....,m ............ ............,... " 11.11..,....,...... .1111.,.. «, , , .. ,. :' .,.......« ....._„_ .«. ....,.,,..., 1111., «.....«,_,_... °,..,,. .«,..«.«..._,.. 1111«. ««« «1111 «.,.„,...,. «1111 .. ............ '°",n.?..« w ._«...... 1111,..« 1111. �... „««« ., . „,�..,.. 1111 «.« y,� ... «1111. ,..,....,.« _._,..... _ «.,......._ .................° 1111, ° «.......... «," ...„«.,.,..., . «1111. °°,°,,... 111,1.... ,r s € 35 s ,. } N. 3 s, , s n r ' i e 1111 ... .......... _, 1111 _,,,,.,. °,_.°..... °.. 1,111.° 1,111, 11:1:1:`. ....,.„,.. .. °°....._ C i .6 1111 1111___ ......,, °.. «,.. «.«. .., _.«,r' , 9 e 11.11__ .$a%3- ...................... ._,....., ,.„„.,., „. .., «1111 ,........,. «1111« ...,,.,,,, ,.,,,,,,,,. „......„..._„., ....,°,....,. ,,,,..,.,." 1111 .., . 1111.. ,_ 1111 ... ,..,...... 1111 1111. .„� I r.,r. i a 2 .. � 4 I " _, , _ 1111 . . ........... 1111_ . 1111 , 1111.., . _ _ _ m « .., 1111 11.-11 ,s. .. , ,„ ,..,� ... „° _ „ _ , .. 111,1,, .._..,< 1111.,, «.., 1111.««.. °,.....,° ,°.._.,.... _. _11,,,, -_ „ 1,111 k` . ,..,, °,___ ___1,111._ 1,111" _ __,,,� °, °_°____ ,°. .. °,,,. «w/ f 11.11_,. .,, S . _. �... _° ......., « «, ,,,,,,,„ 1111_ 1111,,_. __.,,,..,° 1111.. � °_ m____° 1111.. ° °.......,, «1111, «,1111" ..,,,.., 1111. «„ , . , 11,11 1111_ _, °_. ° °. °._. °_ °...�__ «1111„° __,__..,,..__.. « „ , t« _ /( _, 11°11°, 3f _ „�._ 1111_ .. 1111 1111°... «1111„. 1111.« .« 11.11 _.._...,. 1111_°. . 1111..„ 11.11,,.. _ . 11.11_°. ,.°..._....,., � �' r 4 v r .€° �& , ,.. z, ..,..,.. 1111 .., _ ............. . 1111., f ..„_,,.... ,� °, 1111. 1111. .. .1111_.., «,. /�.. -1111. ... 1111 "�.�. 1111 F� „ -�,., i ni,,,, ._!.°.... 3 �� Mn„=, :�Ai _ " , „ 1111. «. _ °._ _ ., _ «. 1111, , �;�.__ _ °�a _, 1,111,__ � 11,11° � «.�,,.« 1111°.. 1111, 1111_. „..w °,_„ 1111,,,_„ „ «1111 «_ ,« «1«111 ,.,,_.„_ „.««_.._„„„.„ 11«11_„. 3 1111. „. ..�.„„ .�„_. 3 , " , "/ S . , , 'a, J . , ... a " + �- .�.`^'°" E ,,,� „ ,,..w 1^111,. «,. 1111„ ., 1111, ,,,,,.,,,:, . ,H,�,w,a,«.,,,, s.�h,t :.. , E s , m «,,,,,,a.,,zv,.,,,.,,«,,,,W,;, .«, ,,, ,.,,..,., ,,..w<�,,.,,/ ., .,�,„«, .,�,.«. .,,..«,,.,,.. ,i<..w, ✓, v ,.«u...v,v.!a,.W, 111 �...uiiio,,,,iiiiisrW.,,,,,.,i ,,,,,...::,.q.,.w ,.,.,,,,,,,,, a.,,,,,,,,,,,,,,,.,,,,,,,,, ,,,,,,,,,.»„i,.,,,rN,,,,,,«�«.w �' 13 , 1 ti , . «,., a «,,, H,,,,,, 1111,, 1111,, 1111 , ,, i , ; t r I . ,, 1 111«1.„.,« ...„...._ 1111_._ __....__ _..._,.,,..,,««,,,. - .,«..,,,, 111«1,. ,.,,,,,.,,,,, 1111„,°._ ..„«_._..,...._......�,« p. I F , 1 S i 1 I`1 I ."' y.,v. 1111 � £`. j 1 1 r .1111._., ...°.«.,., 111«1...', + r ^.,........ °......._ °°, ., 11.11. 3 _..,..,_. 1111.._. __.°,_..,, 1111. 11.11_. _. 1111 1111. ' / ... 11.11 . ............ .. .......... 1111 1 I I , 1 II , ' � € j f' 1 r , + 7 3 I i I 1111 ' t 1,111, ..-, " , , , ! ',.. + E 11.11.__... °° ...._...... 1111._, .... °.. °......_. _ 1111.11.11 ° - .. _1.1 -11.__,__ 1111,,° °...... °............ 7: i 1111 - 1,111 , } I I i £ # 3° s 1 _ _. _ 1111. _. .. .. .✓ i _ f £ , £ ,,, f � .. 1111 ! 1111. .._....... _, £1111 .°° £ - ( a € 't j [ I i � 1 # F. ,1111 { £ �„r, s� I I I / N ,,,,u„1,1,v,,, ( F f j ( f "`k" f t i I __6 , ✓ I ice« i i ,� ,. z,»,�,,.;,,,, x,nw�rL �, ,u;:,. ... ,,,_,.... «, _. «. « °. 1111.,... ._................_. 1111 _._.°°.. ._....°, .1111__, 11.11... __....... 1111 1111 .. .. ...._..° _ 1111_ _° ___ _ 1111 ", , -- f, , 1111 1111, , �, _ 1111 _1111° 1111 } ! £ t f � ° _. _ 1111 _ 1111_ _ 11°11 _ °_ _�__ _._ 11.11_ .. £ I i :3 i a Ns M _ 1111.. '4 s , , > ". 1111 - 1111 .. ....................._ ._......... ...___ °S'.,,.............r , .%r...° 1111. ''1111... 1111. ........ ... f, . ... 1111., .. 1111.... 1111, 1111..,_ _,.....°......, .._....... _., . � ... .. 11,11., 1111,. _. "11,11 $j £Y .. 1111 p ! <� - { 3 pm F 1 £ yi, i £ i , ,.. i k € z s E E F s "5.. y ,....I n.,.. _ .. a "1_,.'" .�f , ! t € .,h '°w". i w', , Q .5i°,,,.w,.,«ama„'e",.,m ,,,.,,, „,,,..«+�..«« z S # , _ -.. . «. .. .�„F,,,.n PARTIAL SITE L 3D 15 3°! o as i3' 1_n1QT1 IDOM ADCA - 77 A(`DDC 1 if -�nf nn 1 " =30' DESIGNED BY:_ DRAWN BY: SHEET CHK'D BY:. CROSS CHWD BY: APPROVED BY:- DATE: I B FT PDS ALS DECEMBER 2014 I^" .V CONSTRUCTION OR LAND DISTURBANCE ACTIVITIES MAY BEGIN UNTIL ALL TEMPORARY SEDIMENT AND EROSION CONTROL MEASURES ¢` I HAVE BEEN INSTALLED AND `era APPROVED BY LOCAL AUTHORITY. ,!j �r 3. ONCE ALL EROSION CONTROL AND 1k STORM WATER DIVERSION MEASURES I HAVE BEEN INSTALLED, LAND I CLEARING AND GRUBBING, AS REQUIRED, WITHIN THE LIMITS OF 2 DISTURBANCE (LOD) MAY BEGIN, AS SHOWN ON THE CONTRACT DRAWINGS. 1 4. ALL STRIPPED TOPSOIL SHALL BE STOCKPILED IN THE DESIGNATED If STOCK PILE /LAYDOWN AREAS AND TEMPORARY SEEDING MEASURES 11 SHOULD BE EMPLOYED THROUGHOUT CONSTRUCTION. STOCKPILE ` n_ LOCATIONS SHALL REMAIN MORE f w � THAN 50 -FT FROM STORM DRAINS *"•,,m 1 z_ � AND/ OR STREAMS. EARTHWORK, "',,; " °° = i STORAGE OF MATERIAL, ETC. IS , U (- PROHIBITED OUTSIDE THE DESIGNATED : ° LIMITS OF DISTURBANCE. _.,� 5. THE CONTRACTOR SHALL MAINTAIN ° & A ALL EROSION AND SEDIMENTATION CONTROL MEASURES INSTALLED fw DURING PHASE I ACTIVITIES, AND INSTALL ADDITIONAL EROSION 0.1 CONTROL AND TEMPORARY GROUND 1 STABILIZATION MEASURES AS MAY BE 1 REQUIRED AS DETERMINED BY THE W 1 " _ ENGINEER OR OWNER. ,: ' 6. ALL SEDIMENTATION CONTROL °11 a � DEVICES SHALL BE INSPECTED �''{ WEEKLY AND AFTER EACH RAINFALL ++ I EVENT OF 1/2-IN OR GREATER AND i '' REPAIRED OR REPLACED IMMEDIATELY I , ,, AS NECESSARY. SEDIMENT SHALL BE �a', REMOVED FROM BEHIND SILT FENCE, STABILIZED OUTLETS, AND INLET \ PROTECTION WHEN IT ACCUMULATES I TO ONE -HALF THE DESIGN DEPTH OF THE MEASURE. ALL REMOVED SEDIMENT SHALL BE DISPOSED OF IN A LOCATION AND IN SUCH A MANNER AS TO CAUSE NO FURTHER SEDIMENT TRANSPORT. THE CONTRACTOR SHALL I MAINTAIN ALL EROSION AND I SEDIMENTATION CONTROL MEASURES THROUGHOUT CONSTRUCTION ACTIVITIES AS INDICATED IN SPECIFICATION SECTION 022776. 1�, I 7. THE CONTRACTOR SHALL PROVIDE "' TEMPORARY GROUND COVER ON ALL /'�' DISTURBED AREAS WHERE WORK HAS \ '06 TEMPORARILY CEASED WITHIN SEVEN '�`�\ (7) WORKING DAYS. DISTURBED I � AREAS OF THE SITE WHERE I CONSTRUCTION ACTIVITIES HAVE � I PERMANENTLY CEASED SHALL BE �'°' Ar , STABILIZED WITH PERMANENT GROIN COVER WITHIN FOURTEEN (14) 0 Win..,.. ­.- ';. _,, CALENDAR DAYS FOLLOWING � , -­// COMPLETION. Y° ,. NCA CA R R 0 � Lu I � <i 1� Obi O A O Y SS S S O F F 0 � O '9 = O "9 q' 'V '9 9 Q l Q SEAL SEAL 18178 r 18560 �o z Pl' 40iN��� �i /C FNCINE�� �r`� NLs\ tigELSPN� PROJECT NO. 30841 005 I� CONTROL . �1� ,. -, i� 4 11 SHEET • 1` f t..� PLAN PHASE . CO a II C E CL ' | ` oil, Ill ry- Lij AERATION BASIN AERA'TON BASIN AERATION BASIN AERATION BASIN K / -j���� N{l9 ! N[\10 f NO]1 K N[.12 ry IN DARY CLARIFIER NO 2 CLARIFIER 1 � | MAYCIII LINE SEE DRAWING RFP 1 CLARIFIER NO.6 RAS PUMP STATION NO 1 STATION NO.2 Tj N. ft | ' EXISTING STORM MANHOLE I EXISTING STORM MANH SECONDARY CLARIFIER NO.4 /Z EFFLUENT AT FILTERS -4— 4W CD � � u� � . � < � � > LLJ || [u � un � CD > ID DISTURBED AREA 22 ACRES ° STABILIZED OUTLET FOR SILT FENCE, TYP. � \\\l\\\ -TEMPORARY SEDI az TEMPORARY DIVERSION CHANNEL SECONDARY CLARIFIER NO.7 STATION NO.3 ~ 0 PARTIAL S|TE PLAN CITY OF GREENSBORO NORTH CAROLINA ffo," M' = EOVi[o:;Jlmental EOgiO88[S & Scientists 4011 WeotChose Bou|evord, Suite 500 Ro!eigh, North Carolina 27607 License No. : C-0381 0 _ EMERGENCY SPILLWAY LINE WITH CLASS B EROSION CONTROL 5TONE. 12' TH|CK WRF 56MGD UPGRADE PROJEC] \` \ ` DIVERSION CHANNEL 02270111 , _ TEMPORARY SEDIMENT BASIN 2 CONSTRUCTION SEQUENCE: 1. INSTALL TEMPORARY GRAVEL � CON5TRUCTIONENTRANCF/3\. ALL OTHER TEMPORARY PERIMETER EROSION AND SEDIMENT CONTROL MEASURES, INCLUDING INLET ; PROTECTION, SILT FENCE, AND TREE X PERIMETER FENCE. � � 2. INSTALL TWO TEMPORARY SEDIMENT � BASINS AND ALL OTHER TEMPORARY EROSION CONTROL MEASURES AT LOCATIONS SHOWN ON CONTRACT DRAWINGS RFP 1-2 THROUGH RFP 1-5. INLETS, OUTLETS. AND ALL MATCH LINE BERMS OF THE TEMPORARY SEDIMENT BASINS SHALL BE IMMEDIATELY ---SEE STABILIZED WITH EROSION CONTROL STONE OR OTHER PERMANENT GROUND COVER. CONSTRUCT THE BERM ON THE NORTHERN PORTION OF THE PROJECT LIMITS AND THE PERMANENT 3T0RW0NTER DIVERSION CHANNEL RUNNING TO THE EAST AND SOUTH. CUT AND FILL SLOPES OF 3TORMWATER DIVERSION CHANNEL SHALL BE PERMANENTLY STABILIZED AND TEMPORARY SLOPE DRAINS INSTALLED AT LOCATIONS AS PER CONTRACT DRAWINGS. NO CONSTRUCTION OR LAND DISTURBANCE ACTIVITIES MAY BEGIN UNTIL ALL TEMPORARY SEDIMENT ~ AND EROSION CONTROL MEASURES �~ HAVE BEEN INSTALLED AND ~~ ~~ APPROVED BY LOCAL AUTHORITY. ~~ 3. ONCE ALL EROSION CONTROL AND STORM WATER DIVERSION MEASURES HAVE BEEN INSTALLED, LAND CLEARING AND GRUBB|NC, AS REQU|RED, WITHIN THE LIMITS OF DISTURBANCE (LOD) MAY BE0N, AS SHOWN ON THE CONTRACT DRAWINGS. 4. ALL STRIPPED TOPSOIL SHALL BE STOCKPILED IN THE DESIGNATED STOCK P|LE/AYDOWN AREAS AND TEMPORARY SEEDING MEASURES SHOULD BE EMPLOYED THROUGHOUT CONSTRUCTION. STOCKPILE ~~~� LOCATIONS SHALL REMAIN MORE THAN 50—FT FROM STORM DRAINS . AND/ OR STREAMS. EARTHWORK, . SILT F STORAGE OF MATERIAL, ETC IS FENCE AND TREE ' `. PROTECTION FENCE TYP. PROHIBITED OUTSIDE THE DESIGNATED LIMITS OF DISTURBANCE. 5. THE CONTRACTOR SHALL MAINTAIN ALL EROSION AND SEDIMENTATION CONTROL MEASURES INSTALLED DURING PHASE ACllV1llE3. AND INSTALL ADDITIONAL EROSION ` CONTROL AND TEMPORARY GROUND STABILIZATION MEASURES AS MAY BE REQUIRED AS DETERMINED BY THE ENGINEER OR OWNER. � 5. ALL SEDIMENTATION CONTROL DEVICES SHALL BE INSPECTED @ WEEKLY AND AFTER EACH RAINFALL � EVENT OF 1/2—|N OR GREATER AND REPA]RED OR �EPLACED |W�ED|ATELY A8 NECESSARY. SEDIMENT SHALL BE REMOVED FROM BEHIND SILT FENCE. 0 � STABILIZED OUTLETS, AND INLET / PROTECTION WHEN IT ACCUMULATES TO ONE—HALF THE DESIGN DEPTH OF THE MEASURE. ALL REMOVED SEDIMENT SHALL BE DISPOSED OF IN A LOCATION AND IN SUCH A MANNER AS TO CAUSE NO FURTHER SEDIMENT U� TRANSPORT. THE CONTRACTOR SHALL MAINTAIN ALL EROSION AND SEDIMENTATION CONTROL MEASURES THROUGHOUT CONSTRUCTION ACTIVITIES AS INDICATED IN SPECIFICATION SECTION 022775. 7. THE CONTRACTOR SHALL PROVIDE \ TEMPORARY GROUND COVER ON ALL \ � DISTURBED AREAS WHERE WORK HAS TEMPORARILY CEASED WITHIN SEVEN \ /7\ WORKING DAYS. DISTURBED AREAS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE PERMANENTLY CEASED SHALL BECO \� STABILIZED WITH PERMANENT CRC��O ` 14/ \ Z COVER WITHIN FOURTEEN / `�� CALENDAR DAYS FOLLOWING ^^ COMPLETION. _~ CARo CAR LU ~�^ �tSS/(������ ���^�r�_SS/Ov���r� LL SE L SEAL 0 LL- 18178 18560 z PROJECT NO. 30841 005 R|PRAP OUTLET PAD 10'VVX8'LX12" THICK CLASS B EROSION CONTROL 30 15 0 30' 1"=3O'—O" FILE NAME: RFP 1-5 EROSION CONTROL SHEET NO. CIVIL PARTIAL SITE PLAN - PHASE 1 RFP 1-5 Lq DATE DRWN CHKD NO. STABILIZED OUTLET FOR SILT FENCE, TYP. � \\\l\\\ -TEMPORARY SEDI az TEMPORARY DIVERSION CHANNEL SECONDARY CLARIFIER NO.7 STATION NO.3 ~ 0 PARTIAL S|TE PLAN CITY OF GREENSBORO NORTH CAROLINA ffo," M' = EOVi[o:;Jlmental EOgiO88[S & Scientists 4011 WeotChose Bou|evord, Suite 500 Ro!eigh, North Carolina 27607 License No. : C-0381 0 _ EMERGENCY SPILLWAY LINE WITH CLASS B EROSION CONTROL 5TONE. 12' TH|CK WRF 56MGD UPGRADE PROJEC] \` \ ` DIVERSION CHANNEL 02270111 , _ TEMPORARY SEDIMENT BASIN 2 CONSTRUCTION SEQUENCE: 1. INSTALL TEMPORARY GRAVEL � CON5TRUCTIONENTRANCF/3\. ALL OTHER TEMPORARY PERIMETER EROSION AND SEDIMENT CONTROL MEASURES, INCLUDING INLET ; PROTECTION, SILT FENCE, AND TREE X PERIMETER FENCE. � � 2. INSTALL TWO TEMPORARY SEDIMENT � BASINS AND ALL OTHER TEMPORARY EROSION CONTROL MEASURES AT LOCATIONS SHOWN ON CONTRACT DRAWINGS RFP 1-2 THROUGH RFP 1-5. INLETS, OUTLETS. AND ALL MATCH LINE BERMS OF THE TEMPORARY SEDIMENT BASINS SHALL BE IMMEDIATELY ---SEE STABILIZED WITH EROSION CONTROL STONE OR OTHER PERMANENT GROUND COVER. CONSTRUCT THE BERM ON THE NORTHERN PORTION OF THE PROJECT LIMITS AND THE PERMANENT 3T0RW0NTER DIVERSION CHANNEL RUNNING TO THE EAST AND SOUTH. CUT AND FILL SLOPES OF 3TORMWATER DIVERSION CHANNEL SHALL BE PERMANENTLY STABILIZED AND TEMPORARY SLOPE DRAINS INSTALLED AT LOCATIONS AS PER CONTRACT DRAWINGS. NO CONSTRUCTION OR LAND DISTURBANCE ACTIVITIES MAY BEGIN UNTIL ALL TEMPORARY SEDIMENT ~ AND EROSION CONTROL MEASURES �~ HAVE BEEN INSTALLED AND ~~ ~~ APPROVED BY LOCAL AUTHORITY. ~~ 3. ONCE ALL EROSION CONTROL AND STORM WATER DIVERSION MEASURES HAVE BEEN INSTALLED, LAND CLEARING AND GRUBB|NC, AS REQU|RED, WITHIN THE LIMITS OF DISTURBANCE (LOD) MAY BE0N, AS SHOWN ON THE CONTRACT DRAWINGS. 4. ALL STRIPPED TOPSOIL SHALL BE STOCKPILED IN THE DESIGNATED STOCK P|LE/AYDOWN AREAS AND TEMPORARY SEEDING MEASURES SHOULD BE EMPLOYED THROUGHOUT CONSTRUCTION. STOCKPILE ~~~� LOCATIONS SHALL REMAIN MORE THAN 50—FT FROM STORM DRAINS . AND/ OR STREAMS. EARTHWORK, . SILT F STORAGE OF MATERIAL, ETC IS FENCE AND TREE ' `. PROTECTION FENCE TYP. PROHIBITED OUTSIDE THE DESIGNATED LIMITS OF DISTURBANCE. 5. THE CONTRACTOR SHALL MAINTAIN ALL EROSION AND SEDIMENTATION CONTROL MEASURES INSTALLED DURING PHASE ACllV1llE3. AND INSTALL ADDITIONAL EROSION ` CONTROL AND TEMPORARY GROUND STABILIZATION MEASURES AS MAY BE REQUIRED AS DETERMINED BY THE ENGINEER OR OWNER. � 5. ALL SEDIMENTATION CONTROL DEVICES SHALL BE INSPECTED @ WEEKLY AND AFTER EACH RAINFALL � EVENT OF 1/2—|N OR GREATER AND REPA]RED OR �EPLACED |W�ED|ATELY A8 NECESSARY. SEDIMENT SHALL BE REMOVED FROM BEHIND SILT FENCE. 0 � STABILIZED OUTLETS, AND INLET / PROTECTION WHEN IT ACCUMULATES TO ONE—HALF THE DESIGN DEPTH OF THE MEASURE. ALL REMOVED SEDIMENT SHALL BE DISPOSED OF IN A LOCATION AND IN SUCH A MANNER AS TO CAUSE NO FURTHER SEDIMENT U� TRANSPORT. THE CONTRACTOR SHALL MAINTAIN ALL EROSION AND SEDIMENTATION CONTROL MEASURES THROUGHOUT CONSTRUCTION ACTIVITIES AS INDICATED IN SPECIFICATION SECTION 022775. 7. THE CONTRACTOR SHALL PROVIDE \ TEMPORARY GROUND COVER ON ALL \ � DISTURBED AREAS WHERE WORK HAS TEMPORARILY CEASED WITHIN SEVEN \ /7\ WORKING DAYS. DISTURBED AREAS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE PERMANENTLY CEASED SHALL BECO \� STABILIZED WITH PERMANENT CRC��O ` 14/ \ Z COVER WITHIN FOURTEEN / `�� CALENDAR DAYS FOLLOWING ^^ COMPLETION. _~ CARo CAR LU ~�^ �tSS/(������ ���^�r�_SS/Ov���r� LL SE L SEAL 0 LL- 18178 18560 z PROJECT NO. 30841 005 R|PRAP OUTLET PAD 10'VVX8'LX12" THICK CLASS B EROSION CONTROL 30 15 0 30' 1"=3O'—O" FILE NAME: RFP 1-5 EROSION CONTROL SHEET NO. CIVIL PARTIAL SITE PLAN - PHASE 1 RFP 1-5 N O N � 4 � C JG >� � � C� Z_ Q � a � IX O d 6 t � O � �e d- d � C O � � LL O y II C F J C W d AERATION BASIN AERATION BASIN AERATION BASIN AERATION BASIN N{\9 / 11010 NO]l N[\12 Lu Ij SECONDARY SECONDARY CLARIFIER NO.2 CLARIFIER N0,.5 ild LINE -___~.=��� . . | (D C]' Ln m DI 4 t 18 GRATE: 720.58 17 INV IN: 713.56 INV OUT: 711.23 SECONDARY CLARIFIER N0.6 STABILIZED OUTLET FOR !|| SILT FENCE, TYP. RAS PUMP �/ | � | RA3 PUMP �--- cr^no^/ un, ff�—�� �| �k' � � ~�/ r | D| 5 {RATE: 719.52 SECONDARY ---------- CLARIFIER N0.7 STORM DRAIN SEE PROFILE DWG RFP-10 INLET PROTECTION, TYP. RAS PUMP STATION NO.3 u/^nvm 110^1 INV IN: 705.26 3 LF 36 RC sF EXISTING STORM MANHOLE EXISTING STORM MAN SECONDARY CLARIFIER NO.4 'o" I EFFLUENT NX FILTERS nt � l!� � . LL- �| �� . � | ' | " ' | | " � | < < Ld DISTURBED AREA 22 ACRES < DESIGNED BY: BFT "o BFT 6i DRAWN BY: SHEET CHWD BY: CROSS CHK'D BY: PDS ALS d- APPROVED BY: DATE DRWN CHKD REMARKS DATE: DECEMBER 2014 \ L- SILT FENCE OUTLET TYP. FENCE, SILT TYP. CONTRACTOR TO VERIFY LOCATION OF EXISTING PIPING AND ADJUST STORM DRAIN AS NECESSARY WATER BOUNDARY FRINGED WETLAND BOUNDARY ZONE 1 01 NO � PARTIAL SITE PLAN_ WAIT-R ELEVA�ON *10111�� EMERGENCY SPILLWAY LINE WITH CLASS B EROSION CONTROL 3TDNE, 12^ THICK TEMPORARY SEDIMENT BASIN 2 � DI 6 1. TEMPORARY SEDIMENT BASIN 1 Lo INV IN: 707.29 DIVERSION CHANNEL AROUND INV OUT: 707-19 SECONDARY CLARIFIER NO.7 SHALL BE CONSTRUCTED. TEMPORARY INV IN: 706 70 OPERATIONAL UNTIL ALL CONSTRUCTION ACTIVITIES HAVE BEEN C0MPLETED, OR AS IN CONSTRUCTION SEQUENCE ALLOWS. 2. CONTRACTOR MAY BEGIN STORM DRAIN SEE PROFILE DWG RFP-10 INLET PROTECTION, TYP. RAS PUMP STATION NO.3 u/^nvm 110^1 INV IN: 705.26 3 LF 36 RC sF EXISTING STORM MANHOLE EXISTING STORM MAN SECONDARY CLARIFIER NO.4 'o" I EFFLUENT NX FILTERS nt � l!� � . LL- �| �� . � | ' | " ' | | " � | < < Ld DISTURBED AREA 22 ACRES < DESIGNED BY: BFT "o BFT 6i DRAWN BY: SHEET CHWD BY: CROSS CHK'D BY: PDS ALS d- APPROVED BY: DATE DRWN CHKD REMARKS DATE: DECEMBER 2014 \ L- SILT FENCE OUTLET TYP. FENCE, SILT TYP. CONTRACTOR TO VERIFY LOCATION OF EXISTING PIPING AND ADJUST STORM DRAIN AS NECESSARY WATER BOUNDARY FRINGED WETLAND BOUNDARY ZONE 1 01 NO � PARTIAL SITE PLAN_ WAIT-R ELEVA�ON *10111�� EMERGENCY SPILLWAY LINE WITH CLASS B EROSION CONTROL 3TDNE, 12^ THICK TEMPORARY SEDIMENT BASIN 2 � SILT FENCE AND TREE PROTECTION FENCE, TYP. ``—R|PRAP OUTLET PAD 12' YY X 10^ L X 0.7' THICK CLASS B 30 15 0 36 �/ �-./. � \ \ SEAL 4 el EROSION CONTROL CIVIL PARTIAL SITE PLAN - PHASE I CONSTRUCTION SEQUENCE: 1. TEMPORARY SEDIMENT BASIN 1 Lo SHALL BE FILLED AND THE DIVERSION CHANNEL AROUND � SECONDARY CLARIFIER NO.7 SHALL BE CONSTRUCTED. TEMPORARY SEDIMENT BASIN 2 SHALL REMAIN OPERATIONAL UNTIL ALL CONSTRUCTION ACTIVITIES HAVE BEEN C0MPLETED, OR AS IN CONSTRUCTION SEQUENCE ALLOWS. 2. CONTRACTOR MAY BEGIN LARGE—SCALE EARTHWORK, INCLUDING EXCAVATION OF TANKAGE AND FILLING OF AREAS A3 R[QU|RED TO �EET RNAL ' GRADE. 3. MON|T0R, MA|NTA|N, AND RECORD � ALL EROSION AND SEDIMENTATION CONTROL MEASURES AND ACTIVITIES IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONSTRUCTION STORMWATER NPDES PERMIT. 4. ONCE ALL PHASE U 3T0RWWATER DIVERSION AND EROSION AND SEDIMENT CONTROL MEASURES A ARE IN PLACE AND FUNCTIONAL, � ^ HEAVY CONSTRUCTION ACTIVITIES MAY BEGIN, INCLUDING THE CONSTRUCTION OF THE 35" | 3TORMWATER PIPING NETWORK AS SCHEDULE ALLOWS. 5. CONTRACTOR SHALL COORDINATE THE CLOSURE OF ACCESS ROADS ~�. WITH THE OWNER AND ENGINEER `~ BEFORE INSTALLATION OF 50" PCB. SILT FENCE AND TREE PROTECTION FENCE, TYP. ``—R|PRAP OUTLET PAD 12' YY X 10^ L X 0.7' THICK CLASS B 30 15 0 36 �/ �-./. � \ \ SEAL 4 el EROSION CONTROL CIVIL PARTIAL SITE PLAN - PHASE I 0 N N O ta. � G / Q �. N� Z Q � �a 6 � � 6 � � /� � � � C O � O 4 O a „ G