HomeMy WebLinkAbout20140351 Ver 2_Site Plan_20141230NoW
1.
A0ALST CN0TON3 MAY 0FR ROM CND|TON3SH0N C HE
°
CONTRACT DRAWINGS. CONTACT THE DESIGN ENGINEER IF A D|3CR�PANCY |3
-
FOUND.
2.
EXISTING SITE CONDITIONS SHOWN ON THE CONTRACT ORA0UN83 ARE F�0�
�~~
11
�
"
DIGITAL FILES PREPARED BY THE SURVEY0R, WITHERS AND RAYEMEL. PER THE
""�_
3URVEY0R, PLANS WERE PREPARED FROM
I
� , 11 I ,
)',�� ,,,,,
" �
. , If , " \ , , \ I . ..... " 1, 1,
X ','-\:'I'\'-- ,", 11
C0NDUCTED BETVYEEN MAY 21. 301� AND SEPTEMBER 21. 2D12.
3.
THE HORIZONTAL DATUM AND BEARINGS SHOWN HEREON REFER T0 NORTH
'/
�
CAROLINA STATE PLANE COORDINATE SYSTEM NAD83 AND ARE Bk3ED ON
/~`�/
C|TY0F
1�
GREENSBORO /CDC\ MONUMENT "215" AND ORIENTED TO�HE AZIMUTH
~
__1
OET�EEN CO� �0NU�ENT "215" AND COG MONUMENT "218" MADEBYYV|THER3
� /
�/
AND RA\ENEL ON MAY 24, 2012.
� '
4.
THE VERTICAL DATUM SHOWN HEREON REFERS TO NCVD 28 AND IS BASED ON
THE NCG3 MONUMENT "INFIRM", LOCATED ON 5-24-2012 BY YMTH�RS AND
�� /
n
RAVENE[,
---
it
DATE
DRWN CHKD
5.
UTILITY INVERT ELEVATIONS WERE CALCULATED FROM A FIELD SUFVEY NO
UND�RG�OUND UllL|T|E3 WERE DESIGNATED AS A PART OF THIS S0RVEY.
--
ONLYTHE �B0VE GROUND APPURTENANCE3 WERE LOCATED AS AP ART OF
THIS SURVEY. VISUAL EVIDENCE FOR STORM AND SANITARY SEWER WAS
�
UTILIZED TO COMPLETE CONNECTIVITY WHERE STRUCTURES WERE �(,,'CESS|BLE.
x
�� � /�
�
0.
WETLANDS SHOWN ON THE DRAWINGS WERE DELINEATED BYHAZE� AND
/
`�
SAWYER. P.C. ON SEPTEMBER 7, 2011 USING THE 1987 CORPS OF ENGINEERS
'
WETLAND DELINEATION MANUAL (ENVIRONMENTAL LABORATORY, 1907\. THE
�ETLAND FLAG� YYERE SURVEYED USING A HANDHELD GPS UNIT. T�E GP3
UNIT PROVIDED SUB-METER ACCURACY AND THE SETTINGS OF THE GP3 VYERE
/
AS PRESCRIBED BY THE U.S . ARMY CORPS OF ENGINEERS FOR DELINEATION
OF JURISDICTIONAL WATERS OF THE U.S.
�
7.
PRIOR TO BEGINNING ANY EXCAVATION W0RK, THE CONTRACTOR S�ALL.
n
�� /^m
THROUGH FIELD INVESTIGATIONS, DETERMINE ANY CONFLICTS OR
uu//u` ~'
� ~` � �
INTERFERENCES BETWEEN EXISTING UTILITIES AND PROPOSED UT|L|�E3 TO BE
�
C0N3TRUCTED UNDER THIS PROJECT. THIS DETERMINATION SHALL 3E BASED
X
~~
X � /X ��
~X X. `
ON THE ACTUAL LDCAT|ONS, ELEVA7lON5, 3LOPES, ETC., OF EX|3T|NG UTILITIES
_
�
�
\
X!
AS DETERMINED IN THE FIELD INVESTIGATIONS AND LOCATION3, ELEVAT|ON,
X
�� ~~
X X X � X
\ `
X X ��
SLOPE, ETC. OF PROPOSED UTILITIES AS SHOWN ON THE DRAWINGS. IF A
CONFLICT EX|ST3, THE CONTRACTOR SHALL BRING IT T0 THE ATTENTION OF
'
THE DESIGN ENGINEER AS SOON AS POSSIBLE. IF THE DESIGN ENG:\NEER
�
�
AGREES THAT A CONFLICT EX|3T3, HE SHALL MODIFY THE DESIGN AS
| X
X
X X X X X
REQUIRED.
/
�
8.
CONTRACTOR SHALL PROTECT TREES AS NECESSARY AND MINIMIZE REMOVAL
�
OF ANY TREES GREATER THAN 8" DIAMETER AT BREAST HEIGHT [0BH).
\ / \ }
/ 11
0.
ANY WETLANDS FLAGS THAT ARE LOST DURING CONSTRUCTION SHALL BE
REPLACED WITH BLUE FLAGGING AS SOON AS POSSIBLE AND VERIFIED BY THE
/
If
ENGINEER OR SURVEYOR OF RECORD.
10.
CITY OF GREENSBORO STANDARD DRAWINGS ARE TO BE USED THR0UGH0UT
////
|Ht pKUVLU| \H|W//WWW.yxtuvbuunu mU.Uuv/|wuLxaurxrt-e�7L Zono/ /
�-��= , / I I ;, / ") I I � t , ';�/,,, , , �/,"; lt� __ 11.1 " I I
' - - Wmrm I�f i, ,elll'll�I� "l", ; "", "';,,// , ,
(REFER TO THE CITY OF GREENSBORO LAND DEVELOPMENT /-- - " , -A//1/N// ,�/Ie X/ ��19I'i " /' "' ' ' "' � t - ,
" �'- /;:�//,, " ,�,4 /"
1 . CONTACT THE PLANNING DIRECTOR TO SCHEDULE A :�, ,
Mr
DISTURBANCE, EXCEPT AS NOTED IN SEC. I'll, r, /,/ ? ��
Z. ALL |K�t. UUNbLNV8||UN ULY1ULZ�) Mub| uL |mu|*LLLu
4. NO PARKING, STORAGE, DIRT STOCKPILING, CONCRETE
_ .._- PROTECTION ._.-_ AND _-. REQUIREMENTS FOR
THE TCA HAVE BEEN WAIVED BY THE URBAN
FORESTER.
\ � \
", " , , X` \ \ _-��u� �Wu*u/*||um ��|�� % ` VAULT /BY OTHERS)
\ \ \ `���`~~ ` � '
�
�
°
/
I
""�_
11
� , 11 I ,
)',�� ,,,,,
" �
. , If , " \ , , \ I . ..... " 1, 1,
X ','-\:'I'\'-- ,", 11
\
'*1 , " �__, e; ", "',
I ,�",
\ , , \_
,�, \ \ , 1,N, " - I ( ...... "", 1\ \ " NI, \ \ \_-, " 1, I'll
-
X
X --,
1�
/
,,,� / I X
,/
, I \
.... .... I
\ ,I \ "IN " "'�, I
" ,I, - , \
, , ,
I � , � , 1,,
\ , \ "'I"", , ", ,,, ", " \ ' \ \ - \ "I n
" N, "'If", I \ �, ,
",
__1
�/
n
REV.
it
DATE
DRWN CHKD
__ 12
�
x
x
�� � /�
�
`�
n
�� /^m
^vu/ u/mE
uu//u` ~'
� ~` � �
�
X
X
~~
X � /X ��
~X X. `
_
�
�
\
X!
X
X
�� ~~
X X X � X
\ `
X X ��
�
�
| X
X
X X X X X
X X\ `� X �X^
�
�0
�
\ / \ }
/ 11
�
�
°
'
n
REV.
it
DATE
DRWN CHKD
__ 12
"- 4", ", " I I f�_
_1111-11 __11 ....... 211
,,,I,. *,*-,,,, 11 ",' LJ 1 LJ lit i 3:: c-D
( ii'll I / � ,, �1; , -, - 1.11 .
I -, U I y -1 1� 11 ; , �;R 11 I'll .
f I/ i 11 Il / I i
'
SWI
4�
% 'tI-,,__'///�,
NO.5 "/) ", ,,,, - li�r / -
m
ADMINISTRATION
BUILDING
SECONDANY
CLARIFIER
SECONQA�Y
CLARIFIER
N0.3
1�1
11 11
771 1
'
11"%'111 , V SSI
\\'/,,__ t,Mli�i '., , � '0% , ,- ", ", "k ( � 0 q ^
1,116 I
� I " If,, i 11,11 I � \' , \ \ """ 4� i
�/
; ", 'u, \ \, I " /41 �
� '!iiI%!I � 1� X 1',"�,, "." ,� ... . . ... �,, ",\, i
I ,ft, � , , , �,, , ,_,� j
I 1i
RASPUMP 11
, STATION NO.1-11 11
CL RI IER I
o
1 ) �%a ,�,[�� V/ =0 2:
�, / I il � I I A/
/Ori 11 /I \ 1'�",, I/ 7/7, `/
UB� ,
04/// - � K//
I z:
C) � /11// 0
0) I/ � E/
-_;;, , m 1111/ M
F__ / F= �__
'CONDARY
ARIFIER
ff MET=
,.,/ CLARIFIER `kJ"I'l `- � CLARIFIER
, /`N:7----A,-v,-`1 -,-,- I ,/ _p` I I � . .... ,-,/,%, 11-1-1-0,0 ]A "
=,� " , , =-_ 11111-1-11111 11
�
111111-1/11 11" $,r
|
` ~'�~��| �)
> / m,x/ v�
�
-
^�- .�~ , � "11 -1 1:, 0
"\,", 111f,", .�' ,� // 1,
I � ) I /�, /�, / �
-�,// "! li, � " �111; -, /
DESIGNED BFT
DRAWN BY: BFT
SHEET CHK'D BY:
CROSS CHK' D 8Y: PDS
APPROVED Bt ALS
DE�E�BER 2O14
��/,�z --///, - /� " 1,
/,�_:��_,__,_ // �. , � , I
�/ ,��, - �_ ", ", j / ) �
5�,�-��--:"�� ��< .
r\
~���~�~ ��` �`�� ~�~ /�~/~�
- "I r111-6
/ , ,0/ _gNumv/0"010"" ,
1111001 ,
" ` " f , /
11�1
I I
-� "I 1� , 11"', I
\ IN \ llk I V ,_
+
*
.
`
. ) (4�
°
0
Ll
`--RA8
STATION NO.
=1
� __
/ _������ � L�
\ U
^i
'
Dcr ,3, 0-
`'
^,
�\,Ic (I
- -
�
`
7 \—H7
� �__- __ ,, , �, " ,,,",�/,1',," , ,,,,,
, ;��,--,� ;r
f /
�o,81 52,� / I �(\ �,,I, v � I \1 �`,, , "'r
1<7 , .7i I � �� I , , � \ It 11. I�,'j \ ,11 I � , I /
I/ // / I I / ,,, " ,,, / " / / / ,/ �, , I , ,
6 "W\"", "I"', x / I "I
LL
100 50 O
C,|7-[- PLAN LEGEND
~}| | [' [-L-��|�
ASPHALT PAVEMENT
L���.- ...J
0 GRAVEL ROADWAY OR
R|PRAP F0251004 1
TREE CONSERVATION AREA
-------' PROPERTY LINE
— ' — LIMIT OF CONSTRUCTION
------- EASEMENT LINE
---'x---- CHAIN LINK FENCE
_
m
%�� STORM DRAIN INLET (CB)
��v ` /
_ ~_
��`»
%%-%%-.,/ ( � 3DWH) STORM DRAIN MANHOLE /
����
��-� FLARED END SECTION /FES\
` /
HEADWALL /HyV\
���~��~�~� EXISTING SANITARY SEWER
— ~~-- -- EXISTING DRAIN LINE
-~-~�41__--_-~ EXISTING WATER LINE
~19�— EXISTING GAS LINE
---'u1GE:--- EXISTING UNDERGROUND ELECTRIC
---UFE---- D YY|RE3
/r1e,v_~rY .- TREE LINE
---52---- INTERMEDIATE CONTOURS
---50--- INDEX CONTOURS
DETAIL REFERENCE
+ SOIL BORING
T[k�Fl/�[}�[}V [[}/�{�|/�N
TEMPORARY | L_|\����|��|�
ROLLED EROSION CONTROL MATTING
CHANNEL LINING /RECM\
RECM SLOPE STABILIZATION
��
�� STRAW WATTLE
��
INLET PROTECTION
�� ----SP---- SILT FENCE
—TP�F—' SILT FENCE AND TREE
^- PROTECTION FENCE J
-)--'''~->- SWALE OR DIVERSION CHANNEL
---T»F--- TREE PROTECTION FENCE
STABILIZED OUTLET FOR
-7M SILT FENCE
�%����.*A� TEMPORARY SLOPE DRAIN
MODIFICATIONS AND UPGRADES
NEVY �OR� - 8TRUCTURE3
cr_
~�_��. r1l
100, 18178
��
1\111111 CAR // Lu
SEAL 0
DESIGNED BFT
DRAWN BY: BFT
SHEET CHK'D BY:
CROSS CHK' D 8Y: PDS
APPROVED Bt ALS
DE�E�BER 2O14
��/,�z --///, - /� " 1,
/,�_:��_,__,_ // �. , � , I
�/ ,��, - �_ ", ", j / ) �
5�,�-��--:"�� ��< .
r\
~���~�~ ��` �`�� ~�~ /�~/~�
- "I r111-6
/ , ,0/ _gNumv/0"010"" ,
1111001 ,
" ` " f , /
11�1
I I
-� "I 1� , 11"', I
\ IN \ llk I V ,_
+
*
.
`
. ) (4�
°
0
Ll
`--RA8
STATION NO.
=1
� __
/ _������ � L�
\ U
^i
'
Dcr ,3, 0-
`'
^,
�\,Ic (I
- -
�
`
7 \—H7
� �__- __ ,, , �, " ,,,",�/,1',," , ,,,,,
, ;��,--,� ;r
f /
�o,81 52,� / I �(\ �,,I, v � I \1 �`,, , "'r
1<7 , .7i I � �� I , , � \ It 11. I�,'j \ ,11 I � , I /
I/ // / I I / ,,, " ,,, / " / / / ,/ �, , I , ,
6 "W\"", "I"', x / I "I
LL
100 50 O
C,|7-[- PLAN LEGEND
~}| | [' [-L-��|�
ASPHALT PAVEMENT
L���.- ...J
0 GRAVEL ROADWAY OR
R|PRAP F0251004 1
TREE CONSERVATION AREA
-------' PROPERTY LINE
— ' — LIMIT OF CONSTRUCTION
------- EASEMENT LINE
---'x---- CHAIN LINK FENCE
_
m
%�� STORM DRAIN INLET (CB)
��v ` /
_ ~_
��`»
%%-%%-.,/ ( � 3DWH) STORM DRAIN MANHOLE /
����
��-� FLARED END SECTION /FES\
` /
HEADWALL /HyV\
���~��~�~� EXISTING SANITARY SEWER
— ~~-- -- EXISTING DRAIN LINE
-~-~�41__--_-~ EXISTING WATER LINE
~19�— EXISTING GAS LINE
---'u1GE:--- EXISTING UNDERGROUND ELECTRIC
---UFE---- D YY|RE3
/r1e,v_~rY .- TREE LINE
---52---- INTERMEDIATE CONTOURS
---50--- INDEX CONTOURS
DETAIL REFERENCE
+ SOIL BORING
T[k�Fl/�[}�[}V [[}/�{�|/�N
TEMPORARY | L_|\����|��|�
ROLLED EROSION CONTROL MATTING
CHANNEL LINING /RECM\
RECM SLOPE STABILIZATION
��
�� STRAW WATTLE
��
INLET PROTECTION
�� ----SP---- SILT FENCE
—TP�F—' SILT FENCE AND TREE
^- PROTECTION FENCE J
-)--'''~->- SWALE OR DIVERSION CHANNEL
---T»F--- TREE PROTECTION FENCE
STABILIZED OUTLET FOR
-7M SILT FENCE
�%����.*A� TEMPORARY SLOPE DRAIN
MODIFICATIONS AND UPGRADES
NEVY �OR� - 8TRUCTURE3
cr_
~�_��. r1l
100, 18178
��
1\111111 CAR // Lu
SEAL 0
PACKAGE 3 CONTRACTOR STAGING
AND SPOILS HOLDING AREA
±4.4 AC
� \ `
� 8 \
UU \
U8 |
--NT --N''-T-R
PARKING AREA
80 /
80 /
08 /
» » FUTURE 1-785 HIGHWAY
Ole
«V /
«0
� 0
�P'P
COG 218-�
el
8 NOTES:
1 CONTRACTOR SHALL NOT BE PERMITTED TO USE MAIN PLANT ENTRANCE
FOR CONSTRUCTION TRAFFIC. ALL CONSTRUC�TION TRAFFIC SHALL BE
ROUTED THROUGH THE CONSTRUCTION ENTRANCE. THE CONSTRUCTION
ENTRANCE SHALL BE STABILIZED PER DETAIl_ 0257701R (TYP 2 PLACES).
,f fe 2. CONSTRUCTION ACTIVITIES, TO INCLUDE TRkFIC AND CONTRACTOR
EMPLOYEE FOOT TRAFFIC, SHALL REMAIN WITHIN THE PROJECT LIMITS
3. TRAFFIC FLOW PATTERNS REQUIRE ADJUSTMENT WHEN PACKAGE 2 AND
3 CONTRACTORS ARE ON—SITE AT THE SANIJ TIME. THE CONTRACTORS
SHALL CONFIRM TRAFFIC FLOW PATTERNS V�,'!.TH OWNER AND ENGINEER
PRIOR TO COMMENCING CONSTRUCTION ACT[`dITIES.
4. LIMITS OF CONSTRUCTION SHOWN FOR PACK AGES 1 & 3 ARE
APPROXIMATE AND SHOWN FOR INFORMATIO,-,I PURPOSES ONLY.
5. CONTRACTOR USE AREAS SHALL BE RESTOFEID WITH GRADING AND
PERMANENT VEGETATION TO PRE—CONSTRUC:TION CONDITIONS OR BETTER.
6. SEE DRAWING Cl FOR SURVEY INFORMATION.,
7. CITY OF GREENSBORO SITE CONTROL POINTS):
COG 215 N 856411.7008 E 1796935.899,0 EL 744.9398
COG 216 N 855081.5195 E 1797642.1199' EL 705.9057
COG 218 N 855693.3154 E 1795452.87E2 EL 748.9690
, .............
__~�~
/
/
'
/ \\
' \
/
/
/
CONSTRUCTION ENTRANCE
------------------------'--------
MATCH LINE 1
af
12/14 SNK
RFP 1
ADDENDUM NO. 5
ISSUED FOR BIDDING
REMARKS
TOTAL PACKAGE 2 DISTURBED AREA = 22 ACRES
/
/
/
FUTURE STONE
STAGING AREA
-
_
�
APPROXIMATE EXTENTS
OF PACKAGE 3
LIMITS OF
DISTURBANCE---__
`\
\
\\ \
cL
,
\
�
\\
/
/
/
CONSTRUCTION ENTRANCE
------------------------'--------
MATCH LINE 1
af
12/14 SNK
RFP 1
ADDENDUM NO. 5
ISSUED FOR BIDDING
REMARKS
TOTAL PACKAGE 2 DISTURBED AREA = 22 ACRES
/
/
/
FUTURE STONE
STAGING AREA
-
_
�
APPROXIMATE EXTENTS
OF PACKAGE 3
LIMITS OF
DISTURBANCE---__
120 60 O 120' \ \
" / }^
1 =120'-0" ^�-.-�
/
DESIGNED BY:___
DRAWN Bt___-_
SHEET CHM'D BY-..
CROSS CHN'D BY:
APPROVED BY:-_-
CONSTRUCTION
ENTRANCE
PACKAGE 1
CONTRACTOR
STAGING AREA
±1.2 AC
�
20J3'
~�^ CONTRACTOR AND
' ENGINEER TRAILER AREA
PACKAGE 2 CONTRACTOR 3TAGNC,
AND SPOILS HOLDING AREA
±3 AC
APPROXIMATE EXTENTS
OF PACKAGE 2------
�
x
�
/Z
�
m
APPROXIMATE EXTENTS
OF PACKAGE 2-----
INCINERATOR 1 11
IN
CONTRACTOR If
STAGING AREA
o
Y
�
APPROXIMATE EXTENTS
WETLANDS
FLOODWAY
STREAM BUFFER, TYP.
14— TRAFFIC FLOW DIRECTION
PACKAGE 2 CONTRACTOR ALL CONTRACTORS
STAGING AREA
PACKAGE 1 CONTRACTOR
±2 AC
PACKAGE 2 CONTRACTOR
PACKAGE 3 CONTRACTOR
INCINERATOR IMPROVEMENTS
CONTRACTOR
------''------
LIMITS OF DISTURBANCE
L|W|T3 OF WORK PACKAGE
-
COG 215-/
\
p� \
LIMITS OF DISTURBANCE
APPROXIMATE EXTENTS
0F PACKAGE 2
LIMITS OF
D|3TURBA
�
m
z
_
�
����
�l
U
W,
OF PACKAGE 2
PACKAGE 3
CONTRACTOR
STAGING AREA
--APPROXIMATE EXTENTS OF PACKAGE 3
`\
\
\\ \
�
/|
\
�
\\
120 60 O 120' \ \
" / }^
1 =120'-0" ^�-.-�
/
DESIGNED BY:___
DRAWN Bt___-_
SHEET CHM'D BY-..
CROSS CHN'D BY:
APPROVED BY:-_-
CONSTRUCTION
ENTRANCE
PACKAGE 1
CONTRACTOR
STAGING AREA
±1.2 AC
�
20J3'
~�^ CONTRACTOR AND
' ENGINEER TRAILER AREA
PACKAGE 2 CONTRACTOR 3TAGNC,
AND SPOILS HOLDING AREA
±3 AC
APPROXIMATE EXTENTS
OF PACKAGE 2------
�
x
�
/Z
�
m
APPROXIMATE EXTENTS
OF PACKAGE 2-----
INCINERATOR 1 11
IN
CONTRACTOR If
STAGING AREA
o
Y
�
APPROXIMATE EXTENTS
WETLANDS
FLOODWAY
STREAM BUFFER, TYP.
14— TRAFFIC FLOW DIRECTION
PACKAGE 2 CONTRACTOR ALL CONTRACTORS
STAGING AREA
PACKAGE 1 CONTRACTOR
±2 AC
PACKAGE 2 CONTRACTOR
PACKAGE 3 CONTRACTOR
INCINERATOR IMPROVEMENTS
CONTRACTOR
------''------
LIMITS OF DISTURBANCE
L|W|T3 OF WORK PACKAGE
-
COG 215-/
\
p� \
LIMITS OF DISTURBANCE
APPROXIMATE EXTENTS
0F PACKAGE 2
LIMITS OF
D|3TURBA
�
m
z
_
�
����
�l
U
W,
OF PACKAGE 2
PACKAGE 3
CONTRACTOR
STAGING AREA
--APPROXIMATE EXTENTS OF PACKAGE 3
s
N
r'i
N
N
I
H
Q
Q
N
Q
Z
N
7-
0]
w
a
N
O W
� J
U �
/ Q
J
� �
i
N m
U'
Z_
Q g
� N
O ..
O O>
��
M N
/�
� �
� O
O N
% 4j
O Q
D
H
� O
_ J
W �
jr
56,
II G
s
N
O
M
N
0
'S
p W
r �
J U
N m
U'
Z_
Q �
p Q
� N
O ..
O O�
I
d-
O �
M N
� Q
O N
% W
O
II p
H
w p
� n.
a a
N �
N
<} O
V
O �
M N
N m
�f
w
� N
X
E
Z
r °
M
� U
m
OWE
NOTE: ALL STRUCTURES C ORES SHALL COMPLY WITH T
H CI Y OF GREENSEORO STANDARD DRAWINGS.
�-
? � d
t {
� 5
¢¢ P
.0
{ Y E
/y
s�
g
f
E' r
1
�r
_rg
I \
f
,
r
E
I
AERATION BASIN (�
NO.12
sI
MATCF� 1�1
,SEE D,RAWI G C7
k
E
4 � y
�f
f_.
AREA (ac)
RAS PUMP
DRAINAGE STRUCTURE
TABLE
GUTTER
FLOW
E.G.L.
STRUCTURE
NAME:
TO
3
INV. IN: 707.24'
E
, _
3
(C.O.G. STD DWGS)
DETAILS:
SIZE
(in)
PIPES IN:
/
f
._.
PIPES OUT
i......,
16.41
4f
DESIGN DATA SHEET
6. Of 1. D.
4.3
26. -9
0
721.92
722.40
36
0.96
DI
4
RIM: 720.58
MH
3 to DI 4
16.41
D14
to D15
23.2
4.3
26.&S
0
INV IN: 713.56
36°
RCP INV IN:
71:; °56
36°
RCP INV OUT:
711.23
(STD
DWG
401,407)
INV OUT: 711.23
5.0
23.9
4.2
26.25
0
715.19
720.18
36
1,50
6. Of 1. D.
DI 4
D15
2.00
18.41
0.60
5.0
DI
5
RIM: 719.52
D14
to DI5
712.99
D15
to D16
7.06
(STD
DWG
401,407
INV IN: 710.65
11
36
RCP INV IN:
710..65
f.
36
RCP INV OUT:
708.46
0
709.05
710 -21
INV OUT: 708.46
1.07
7.08
No gutter flow in channel.
D16
MH4
1.00
19.56
0.75
5.0
6. Of 1. D.
4.0
33.34
0
708.54
709,03
36
0.99
DI
6
RIM: 713.65
D15
to D16
19.56
D16
to MH4
26.3
(STD
DWG
4001407)
INV IN: 707.29
36°
RCP INV IN:
707,29
36°
RCP INV OUT:
707.19
MH6
0
19.56
INV OUT: 707.19
5.0
26.5
4.0
33.015
0
706.52
707.02
HW 1
0.51
7.24
MH6
HW 1 to MH 2
0
19.56
0
5.0
INV OUT: 720.75
4.0
32.84
0
36°
RCP INV OUT:
720.75
1.03
7.10
6. Of 1. D.
MH7
2.00
2.00
1
5.0
5.0
7.2
MH
2
RIM: 728.98
HW
1 to MH 2
0.67
MH
2 to MH 3
MH 7
Outfall
0
21.56
INV IN: 720.27
36f
RCP INV IN:
720.27
36°
RCP INV OUT:
720.27
705.51
24 (2b)
0.33
INV OUT: 720.27
No gutter flow in channel.
SEPARATE FROM THE WEEKLY
SELF - MONITORING PROGRAM OF THE
NPDES STORMWATER PERMIT FOR
6. Of 1. D.
MH
3
RIM: 728.00
MH
2 to MH 3
MH
3 to DI 4
(STD
DWG
401, 413)
INV IN: 718.65
36"
RCP INV IN:
718,.35
36°
RCP INV OUT:
718.55
INV OUT: 718.55
6. Of 1. D.
RIM: 714.00
D16
to MH4
MH4
to MH5
(STD
DWG 401,
413)
INV IN: 706.70
36°
RCP INV IN:
706,.70
36°
RCP INV OUT:
705.62
INV OUT: 705.62
6. Of 1. D.
MH
5
RIM: 712.02
MH4
to MH5
MH5
to MH6
(STD
DWG
401, 413)
INV IN: 705.26
36°
RCP INV IN:
705.26
36°
RCP INV OUT:
705.16
INV OUT: 705.16
6. Of 1. D.
MH
6
RIM: 710.37
MH5
to MH6
MH6
to MH7
(STD
DWG
401, 413)
INV IN: 704.69
36°
RCP INV IN:
704069
36°
RCP INV OUT:
704.59
INV OUT: 704.59
? ? ?f I.D.
MH6
to MH7
( STD
MH
DWG
7
401 E 413 )
RIM: 709.30
INV IN: 7 04.21
EE
36
RCP INV IN.
704..21
NOTE: ALL STRUCTURES C ORES SHALL COMPLY WITH T
H CI Y OF GREENSEORO STANDARD DRAWINGS.
�-
? � d
t {
� 5
¢¢ P
.0
{ Y E
/y
s�
g
f
E' r
1
�r
_rg
I \
f
,
r
E
I
AERATION BASIN (�
NO.12
sI
MATCF� 1�1
,SEE D,RAWI G C7
k
E
4 � y
�f
f_.
SECONDARY
%V
CLARIFIER NO.6 I
STABILIZED OUTLET FG`R '
SILT FENCE, TYP.
0227024R � I� ,
3%
i
E , r
f
1:
_. .
/
l
0w r
fir(
Y
� rr
S .�S
FF /
.. ..
......... . ...... . .....
V)
.. .... . ...... L!
vii:
3
t
€
P
... .............
{
9
I
r
s f
PAVEMENT R PAI
,
AREA (ac)
RAS PUMP
EXISTING STORM MANHO
STATION NO.2
GUTTER
FLOW
E.G.L.
I.. rt i 4-
f
RIM: 707.92E
i
g�
TO
3
INV. IN: 707.24'
E
, _
3
....
I
SIZE
(in)
f
/
f
._.
' e
,,., .., -.,, ..,, ... m
i......,
16.41
4f
DESIGN DATA SHEET
4
4.3
SECONDARY
%V
CLARIFIER NO.6 I
STABILIZED OUTLET FG`R '
SILT FENCE, TYP.
0227024R � I� ,
3%
i
E , r
f
1:
_. .
/
l
0w r
fir(
Y
� rr
S .�S
FF /
.. ..
......... . ...... . .....
V)
.. .... . ...... L!
vii:
3
t
€
P
... .............
{
9
I
r
s f
PAVEMENT R PAI
,
AREA (ac)
EXISTING STORM MANHOLE
EXISTING STORM MANHO
Q =CA
GUTTER
FLOW
E.G.L.
I RIM: 722.09'
RIM: 707.92E
REMARKS
TO
FROM
INV. IN: 707.24'
INV. IN: 706.12 E
, _
<
I
(in /hr)
I
SIZE
(in)
SLOP
E ( /o)
VEL,
(ft /s)
HW 1
MH 2
16.41
16.41
STORM DRAINAGE
DESIGN DATA SHEET
4
Project T.Z. Osborne Water Reclamation Facility Engineer Hazen and Sawyer, Sarah Nash, EIT
Location 2350 Huf6ne Mill Rd Date 12/23/2014
Storm Frequency 10 -year design storm
LOCATION
AREA (ac)
C
INTENSITY
Q =CA
GUTTER
FLOW
E.G.L.
H.G.L.
PIPE
REMARKS
TO
FROM
SUB
TOTAL
L. B.
(min)
T. C.
(min)
I
(in /hr)
(c
SIZE
(in)
SLOP
E ( /o)
VEL,
(ft /s)
HW 1
MH 2
16.41
16.41
0.38
23.0
23.0
4.3
26. -9
0
721.92
722.40
36
0.96
6.73
No gutter flow in channel.
M H 2
M H 3
0
16.41
0
5.0
23.2
4.3
26.&S
0
720.30
721.92
36
1.00
6.71
SHALL REQUIRE PRIOR APPROVAL
M H 3
D14
0
16.41
0
5.0
23.9
4.2
26.25
0
715.19
720.18
36
1,50
6.68
DI 4
D15
2.00
18.41
0.60
5.0
25.4
4.1
30.3f5
0
712.41
712.99
36
0.99
7.06
No gutter flow in channel.
DI 5
DI 6
0.15
18.56
0.60
5.0
25.7
4.1
30-E8
0
709.05
710 -21
36
1.07
7.08
No gutter flow in channel.
D16
MH4
1.00
19.56
0.75
5.0
26.1
4.0
33.34
0
708.54
709,03
36
0.99
7.33
MH4
MH5
0
19.56
0
5.0
26.3
4.0
33.23
0
707.80
707.89
36
0.50
5.50
MH 5
MH6
0
19.56
0
5.0
26.5
4.0
33.015
0
706.52
707.02
36
0.51
7.24
MH6
M H 7
0
19.56
0
5.0
26.9
4.0
32.84
0
706.12
706.42
36
1.03
7.10
YI 8
MH7
2.00
2.00
1
5.0
5.0
7.2
10.85
0
706.12
706.14
24 (2b)
0.67
1.73
INSPECT A PROJECT AFTER EACH
MH 7
Outfall
0
21.56
0
5.0
27.0
4.0
38.59
0
705.06
705.51
24 (2b)
0.33
6.81
No gutter flow in channel.
J
� ° d
`.
J U m
-1.
� I
Z �
'b m
x
o ¢
r
Q N 4
12/14
SNK
„..:
o6�
N 3
d
2.
CONTRACTOR SHALL NOTIFY THE
DI
10/14
AKG
3:1 SIDE SLOPES
': `',,,
° •-
TO START OF CONSTRUCTION TO
I� C
`" '
a:
o " ' 2
9/14
BFT
TYP. j�
`',,
� � N
r
_
'- °-- _.__,___ -
1. I::
O 1
6/14
BFT
0 227011 M ..
pill ��•
AND PARKING AREAS SHALL BE
f Rte'
SECONDARY
1 \4
LIMITS OF CONSTRUCTION. PARKING
°
w o W N0.
DATE
DRWN
CHKD
J J K
li d X
CLARIFIER NO •`�
i
CHANGES TO THE LIMITS OF
RFP 1
ADD -NDUM NO. 5
ADDENDUM NO. 4
ISSUES FOR BIDDING
REMARKS
DESIGNED BY:-
DRAWN BY:
SHEET CHK'D BY:.
CROSS CHK'D BY:
APPROVED BY:_
DATE:
< �
`.
-1.
r
f
4
i i
r
l
12° DEEP SWALE
„..:
ON THE PLANS.
d
2.
CONTRACTOR SHALL NOTIFY THE
DI
fi
`'
3:1 SIDE SLOPES
': `',,,
° •-
TO START OF CONSTRUCTION TO
I� C
`" '
a:
GRATE: 720.58`
d
r
TYP. j�
`',,
r
_
'- °-- _.__,___ -
1. I::
INV IN 713.56
i
0 227011 M ..
pill ��•
AND PARKING AREAS SHALL BE
INV OUT: 711.23,.
SECONDARY
1 \4
LIMITS OF CONSTRUCTION. PARKING
W.
.
"�
0243103
'
CLARIFIER NO •`�
i
CHANGES TO THE LIMITS OF
CONSTRUCTION BY THE CONTRACTOR
SHALL REQUIRE PRIOR APPROVAL
FROM THE ENGINEER.
IF I ,g
9m, E2 =7:j
E �
.j{
r.
rr „
i
w SAWCUT AND
MATCH
a 9 EXISTING PAVEMENT - /- -
a
.' 0251301 g3 LF 36 fE RCP
1
MH 6`
E _-RIM: 710.37 - - -.. ..... ..... ......�.
INV IN: 704.69
,Hn,�xrti„
i
..____..._INV OUT: 704.59
E
,
37 LF 36° RCP -\1
t
_- ................ 3
9/
rZ" ,,,,,,,,,,,,,,, ,,,,,,
f P �7
E s /= r°
W ,r
f
„_..._ .
,
r _
e,
r{
f £ t� ��"�fr.,�, a, ,,, �„s• H %c��
ty
- i
1 {
yea' i i f,
I ? 0
f
I
r I
•/
IS
DECEMBER 2014
{ ASPHALT
I f
.. �'.
RD Y
0251000
w,
,
V
-'a
w
I
i
INLET _. --
�e -' � DI 5
PROTECTION /
��: �% � -'' GRATE: 719.52 �v_..._.....m -,
TYP. ___.._. .. INV IN: 710.65 - 121 i
08.46
2 /
`a 0243102. SECONDARY
N,w .
CLARIFIER N0.8
J CDM- 06
{ _ M,w
i
SECONDARY s
CLARIFIER NO.7
_
' 109 LF 36° RCP
STABILIZED OUTLET E
FOR SILT FENCE - l
0227024R r CO ..``.
,1 6° HDPE DRAIN
DI 6 1% MIN SLOPE
_ i
GRATE: 713.65 5' WIDE CONC. f N
INV IN: 707.29 f �A SIDEWALK 6 PERF. CORK. HDPE °.
INV OUT: 707.19 \ FOUNDATION DRAIN
�245900 INV: 709.00 -�
0243102
�.e
7»
L
rr
RAS PUMP
STATION
i,
MH 4 � E4
1 72 LF 36 RCP. RIM: 714.00 $ v €`i ', CDM -107
�<
INV IN: 706.70
. .
4
OUT:
V
IN 705.62
I> I
w.u.
3
>F
f
u 3 s
I.
7
t:
MH 7
RIM: 709.30
INV IN: 704.21
!
O 1 . ► i, iii
1
a
- -• ,.moo 7
SILT FENCE OUTLET, TYP.
0227024R
SILT FENCE, TYP.
0227000R
ASPHALT PAVEMENT
0251000
WATER BOUNDARY
FRINGED WETLANDS
07►C�il
s�
4 - STRAW WITH NET
RECM SLOPE
STABILIZATION, TYP.
1
W ; I_,. R 011
A 1 a
70:f.,
CONNECT PROPOSED
FENCE WITH EXISTING
0244400
NOTES:
-1.
CONTRACTOR SHALL NOTIFY THE
i i
r
l
DO NOT MATCH CONDITIONS SHOWN
ON THE PLANS.
d
2.
CONTRACTOR SHALL NOTIFY THE
a
STATE LAND QUALITY SECTION (919)
`'
791 -4200 AT LEAST 48 HOURS PRIOR
° •-
TO START OF CONSTRUCTION TO
I� C
SCHEDULE A PRE - CONSTRUCTION
d
!
ALL EROSION CONTROL MEASURES
r
_
'- °-- _.__,___ -
■
_
i
MATCH LINE ` " ®4.
�`
pill ��•
O 1 . ► i, iii
1
a
- -• ,.moo 7
SILT FENCE OUTLET, TYP.
0227024R
SILT FENCE, TYP.
0227000R
ASPHALT PAVEMENT
0251000
WATER BOUNDARY
FRINGED WETLANDS
07►C�il
s�
4 - STRAW WITH NET
RECM SLOPE
STABILIZATION, TYP.
1
W ; I_,. R 011
A 1 a
70:f.,
CONNECT PROPOSED
FENCE WITH EXISTING
0244400
NOTES:
-1.
CONTRACTOR SHALL NOTIFY THE
ENGINEER IF CONDITIONS IN THE FIELD
DO NOT MATCH CONDITIONS SHOWN
ON THE PLANS.
d
2.
CONTRACTOR SHALL NOTIFY THE
STATE LAND QUALITY SECTION (919)
`'
791 -4200 AT LEAST 48 HOURS PRIOR
° •-
TO START OF CONSTRUCTION TO
SCHEDULE A PRE - CONSTRUCTION
MEETING.
ice-
ALL EROSION CONTROL MEASURES
SHALL BE IN PLACE BEFORE ANY
_
'- °-- _.__,___ -
LAND CLEARING,
G, DEMOLITION, OR
_
CONSTRUCTION ACTIVITIES MAY BEGIN.
MATCH LINE ` " ®4.
CONTRACTOR STAGING /STOCKPILING
SEE DRAWING C7
AND PARKING AREAS SHALL BE
CONFINED TO AREAS WITHIN THE
1 \4
LIMITS OF CONSTRUCTION. PARKING
AREAS SHALL HAVE GRAVEL BASE
.4
FOR ALL - WEATHER ACCESS. ANY
CHANGES TO THE LIMITS OF
CONSTRUCTION BY THE CONTRACTOR
SHALL REQUIRE PRIOR APPROVAL
FROM THE ENGINEER.
5.
ALL EROSION CONTROL MEASURES
t4,
SHALL BE INSPECTED WEEKLY AND
%
WITHIN 24 HOURS AFTER EACH
RAINFALL EVENT OF J INCH OR
GREATER OF RAIN. MEASURES SHALL
to
BE REPAIRED OR REPLACED AS
NECESSARY.
6.
ALL EROSION CONTROL MEASURES
n• ~
SHALL BE CLEANED OF ACCUMULATED
"' w
SEDIMENT ONCE THE MEASURE HAS
NEW FENCE LOCATION
BECOME HALF FULL BY VOLUME.
4 7.
SEDIMENT SHALL LL BE DISPOSED OF IN
x
,h
AN APPROVED MANNER SUCH THAT
FURTHER SEDIMENT TRANSPORT DOES
"
NOT OCCUR. OFFSITE DISPOSAL AREA,
n '
IF USED, SHALL HAVE ALL
NECESSARY LOCAL AND STATE
°
PERMITS.
� 8.
TOPSOIL AND ANY EXCESS SOIL
12 DEEP SWALE, 3.1
RESULTING FROM EARTHWORK
OPERATIONS NECESSARY FOR
SIDE SLOPES, 12 WIDE
CONSTRUCTION SHALL BE STOCKPILED
^ BOTTOM, USE TEMPORARY
I
ONSITE WITHIN THE LIMITS OF
LINING WITH MIN SHEAR
CONSTRUCTION. EROSION CONTROL
STRESS OF 1.75 LBS SF
MEASURES SHALL BE INSTALLED AS
SHOWN ON DETAIL SHEETS AND SHALL
0227011
BE MAINTAINED AS NECESSARY TO
SILT FENCE AND TREE
ENSURE PROPER FUNCTION.
PROTECTION E
FENCE, TYP. 9.
DE-WATERING OF STRUCTURES WITH
0227000R
0 227033R
S -
EDIMENT LADEN AT
W ER DIRECTLY TO
STREAMS IS PROHIBITED.
FIBER FILTRATION TUBES,-\,
DE- WATERING MUST BE DONE
TYP.
0227039
THROUGH SILT BAGS, INTO SEDIMENT
,e
TRAPS, OR OTHER APPROVED DEVICE.
10.
CONTRACTOR STAGING AND LAYDOWN
AREAS WILL BE LOCATED ONSITE
WITHIN CURRENT LIMITS OF
\�
DISTURBANCE. ANY SOIL STOCKPILE
OR WASTE AREAS SHALL HAVE
APPROPRIATE EROSION AND SEDIMENT
NEW TREE LINE
CONTROL MEASURES AND PERIMETER
SILT FENCE.
11.
THE NORTH CAROLINA SEDIMENTATION
POLLUTION CONTROL ACT REQUIRES
PERSONS RESPONSIBLE FOR
LAND - DISTURBING ACTIVITIES TO
o
INSPECT A PROJECT AFTER EACH
z
N
PHASE OF THE PROJECT TO MAKE
z
SURE THAT THE APPROVED EROSION
AND SEDIMENTATION CONTROL PLAN IS
BEING FOLLOWED. THE
SELF - INSPECTION PROGRAM IS
SEPARATE FROM THE WEEKLY
SELF - MONITORING PROGRAM OF THE
NPDES STORMWATER PERMIT FOR
! 15 ! 31
If 11 !
CONSTRUCTION ACTIVITIES. THE FOCUS
OF THE SELF - INSPECTION REPORT IS
THE INSTALLATION AND MAINTENANCE
OF EROSION AND SEDIMENTATION
° CONTROL MEASURES ACCORDING TO
THE APPROVED PLAN. THE
INSPECTIONS SHOULD BE CONDUCTED
AFTER EACH PHASE OF THE PROJECT
AND CONTINUED UNTIL PERMANENT
GROUND COVER IS ESTABLISHED. THE
s SELF- INSPECTION REPORT FORM IS
AVAILABLE AS AN EXCEL
SPREADSHEET FROM THE LAND
QUALITY WEB SITE:
HTTP: / /WWW.DLR.ENR.STATE.NC.US/
PAGES /SEDIMENTATION- NEW.HTML _
cc
v \A CAR9� �, CAR �i UJ
�oF ESs /o�9 '�y =� °F ASS /0" �
SEAL SEAL
18178 r 18560 Q U_
FNGI
9� F�/GINEF� �1/ NE- Q�
EL
PROJECT NO. 30841-90-005
GRADING AND EROS108"IN (ffkU01",NTR0L FILE NAME: C8
SHEET NO.
PARTIAL SITE PLAN C8
0
0
>
N
Z
0
°
r
m
°
°W
0
v�
O �
J
>Vi
N
(7
Z
Q g
o¢
� N
O 6)
W
W
z
STEEL POST
TOP STRAND
GALV WIRE FABRIC
AND FILTER FABRIC.
BURY TOE OF FILTER
FABRIC A MIN OF 8 °-
-REE PROTECTION
3ARRIER FENCE WHERE
;ALLED FOR ON
)RAWINGS
BOTTOM STRAND
GRADE LINE-----\
C', ��
C) z
N
6' -0" MAX
TO
1 8"
Mcr-
I z
z
�
FEI
MIN
ELEVATION
SECTION
NOTES:
,q 0
-
BE
TREE ',ONSERVATION SIGNS. REFER
z -
N
APPROVED BY ENGINEER) WITH 6' -0°
TO DETAIL 0227033R.
i
LuW
I
1
MESH SUPPORT FENCE.
N
PRESSURE ON THE FENCE. AVOID
TO
UNDERMINING THE FENCE DURING
2. FILTER FABRIC SHALL BE WIRED
1. INSPECT WEEKLY AND AFTER EACH
C', ��
C) z
N
OVERLAP
PERSPECTIVE \IEW
? DITCH
r!
MATTING
NOTES:
1. STAPLES TO BE SPACED AT
-0° MAX IN ALL
3
DIRECTIONS.
2. =OR CHANNEL APPLICATIONS,
:MATTING SHALL EXTEND TO
TOP OF BANK.
MATTING
3
\ N
12
QVERLrf.?
TYP
6' -0" MAX
1
1 8"
MIN
ELEVATION
SECTION
NOTES:
1. EXTRA STRENGTH FILTER FABRIC (AS
TREE ',ONSERVATION SIGNS. REFER
NECESSARY TO PROVIDE ADEQUATE
APPROVED BY ENGINEER) WITH 6' -0°
TO DETAIL 0227033R.
STORAGE VOLUME FOR THE NEXT
POST SPACING DOES NOT REQUIRE
RAIN AND ALSO TO REDUCE
MESH SUPPORT FENCE.
MAINTENANCE REQUIREMENTS:
PRESSURE ON THE FENCE. AVOID
UNDERMINING THE FENCE DURING
2. FILTER FABRIC SHALL BE WIRED
1. INSPECT WEEKLY AND AFTER EACH
CLEANOUT.
DIRECTLY TO POST.
RAINF -LL EVENT THAT PRODUCES 1/2
DATE
INCH OR MORE OF RAIN. REMOVE
4. REPLACE FILTER FABRIC THREE (3)
3. WHERE DOUBLE SILT FENCE IS
ANY ACCUMULATED SEDIMENT
MONTHS AFTER INITIAL INSTALLATION
CALLED FOR ON DRAWINGS ADD
AND /!OR WOODY DEBRIS.
AND EVERY THREE (3) MONTHS
SECOND SILT FENCE TO FACE OF
THEREAFTER UNTIL CONSTRUCTION
FIRST SILT FENCE AND WIRE DIRECTLY
2. FILTER FABRIC THAT HAS COLLAPSED,
HAS COMPLETED AND CONTRIBUTING
TO POST.
TORN, OR HAS IN ANY WAY HAS
DRAINAGE AREA HAS BEEN
BECO(, ±IE COMPRIMISED SHALL BE
PERMANENTLY STABILIZED.
4. WHERE TREE PROTECTION FENCE AND
REPAI'EED OR REPLACED IMMEDIATELY.
SILT FENCE ARE CO- LOCATED
(TPF /SF), SILT FENCE MUST INCLUDE
3. REMO',E ANY SEDIMENT DEPOSITS AS
TEMPORARY SILT FENCE W /TREE PROTECTION BARRIER FENCE
022700OR
OVERLAP
PERSPECTIVE \IEW
? DITCH
r!
MATTING
NOTES:
1. STAPLES TO BE SPACED AT
-0° MAX IN ALL
3
DIRECTIONS.
2. =OR CHANNEL APPLICATIONS,
:MATTING SHALL EXTEND TO
TOP OF BANK.
MATTING
3
\ N
12
QVERLrf.?
TYP
1111111111211
MAINTENANCE
REQUIREMENTS:
1. INSPECT MATTING WEEKLY AND
AFTER EACH RAINFALL EVENT THAT
PRODUCES J INCH OR MORE OF
RAIN. REPAIR OR REPLACE
IMMEDIATELY AS NECESSARY.
2. GOOD CONTACT WITH THE GROUND
MUST BE MAINTAINED, AND
EROSION MUST NOT OCCUR
BENEATH THE MATTING.
3. ANY AREAS OF THE MATTING THAT
ARE DAMAGED OR NOT IN GOOD
CONTACT WITH THE GROUND SHALL
BE REPAIRED OR REPLACED AND
STAPLED IMMEDIATELY.
4. IF EROSION DOES OCCUR, THE
PROBLEM SHALL BE FIXED AND
ERODED AREA REPAIRED AND
PROTECTED FROM FURTHER
DAMAGE.
5. CONTINUE MONITORING MATTED
AREAS UNTIL PERMANENT GROUND
COVER HAS BEEN ESTABLISHED.
RECM AND TRM INSTALLATION
0227014
ISSUED FOR BIDDING
REMARKS
DESIGNED BY:
DRAWN BY:
SHEET CHK'D BY:.
CROSS CHK'D BY:
APPROVED BY:—
DATE:
nn r rrninr
STEEL FENCE P(
�61IRE FEN
HARDWARE CLO
1" DIAMETER
WAS . -IED STON
BURY WIRE i=ENCE AND HARDWARE
II
U
STEEL FENCE POST
SET MAX 2' APART
MIN. 18° INTO SOLI
GROUND
,
FILTER FABRIC,
AND HARDWARE
CLOTH IN TRENCH
'Ny MAINTENANCE REQUIREMENTS:
fj'c "; - -3' FILTER FABRIC
°`��'P ` ON GROUND 1. INSPECT WEEKLY AND AFTER EACH
'OR, RAINFALL EVENT THAT PRODUCES INCH
OR MORE OF RAIN. REMOVE SEDIMENT
AND DEBRIS. TOPDRESSING WITH 1 -INCH
._ _----- CLEAN, WASHED STONE AS NECESSARY.
u ( 2. REMOVE ACCUMULATED SEDIMENT. THE
II CONTRACTOR SHALL DISPOSE OF
CLOT4__- II BURY 8 OF UPPER EDGE OF SEDIMENT OFF -SITE IN ACCORDANCE WITH
II FILTER FABRIC IN TRENCH ALL STATE AND LOCAL REGULATIONS.
PROFILE VIEW u (DETAIL ADOPTED FROM THE TOWN OF HOLLY
SPRINGS, NORTH CAROLINA - ENGINEERING
DEPARTMENT).
STABILIZED OUTLET FOR SILT FENCE
0227024R FORM BERM WITH
EXCAVATED MATERIAL-
- EXISTING GRADE
6' ° -8° RIPRAP
USE WASHED STONE ON UPSTREAM —
/ / \ 2 —
A /A /A
9° d
® _ _
1/2 CHANNEL DEPTH TEMPORARY DIVERSION SWALE
TRENCH 6 INTO 0227009
CHANNEL BED FLOW LINE OF DITCH
3/4" WASHED STONE
FLOW
1
L= DISTANCE
THAT POIP
ARE EQUP
i
rie:!_rvvrr v nvry
CIHIANNEL
1/2 CHANNEL DEPTH*
DECEMBER 2014
LONGITUDINAL PROFILE
NOTES:
1. THE MAXIMU�?i HEIGHT OF THE CHECK DAM AT THE CENTER
SHALL NOT EXCEED ONE HALF THE DEPTH OF THE CHANNEL.
2. MAXIMUM SP..>CING SHALL BE SO THE TOE OF THE UPSTREAM DAM
IS THE SAME: ELEVATION AS THE TOP OF THE DOWNSTREAM DAM.
3. REMOVE SED'41AENT WHEN 25% THE HEIGHT OF THE WEIR.
4. REMOVE CHE:«K DAMS WHEN SITE STABILIZATION IS ACHIEVED.
�5 111 ■
I�
FOOD OR METAL POST.
ORANGE SAFETY FENCING
IS REGUIRED. SPACE
POSTS ON 8' INTERVALS.
NOTES'
1, SEE" PLANS FOR LOC'ATIOW OF ALL TREE PROrFCT''DN FENCES.
2. ALL rREE PRoTEL'rrm DEa1r'ES MUST or .INSTALLED PRIOR TO LAND 101STURRANCF, .
INCLUDING THE° CUTTING OF ANY TREES, AND Nusr 8E INSPEcTsD SY THE° URBAN
FOREST R OR HIS DE'S `GA E'.
3, NO GRADING, TRENCHING, FILLING OR STORING OF MATERIALS IS TO OCCUR
IN THE TREE PROTECTION AREA.
d. TREE PROTECTION FENCE 41A Y NOT BE RENOVCD W17'HOUT THE APPROVAL
OF THE URBAN FORESTER a9 HIS DESIGNEE.
S, THE TREE CONSERVA TION AREA 5HOUL0 BE DE°S16NA TEO ATTH "TREE
CONSERVATION AREA" 51610 POSTED VIS18LY ON THE OUTSIDE OF THE
FENCED-11V AREA, 5I685 MAY NOT BE POS769 ON rHE TREES. SEE
EXAMPLE BELOW,
EXAMPLE SIGN
IB" Y 32" SIGN
I' BLOCK LETTER
BLACK LETTERS ON WHITE BACKGROUND
1/A" BLACK BORDER
ALL WEATHER MEDIA
100' SUGGESTED SPACING BETWEEN SIGNS
Rom
.. .:... � i y � � ■: ■ � lle � r#f 7R g i � a�
MAINTENANCE
REQUIREMENTS:
1. INSPECT MATTING WEEKLY AND
AFTER EACH RAINFALL EVENT THAT
PRODUCES j INCH OR MORE OF
RAIN. REPAIR OR REPLACE
IMMEDIATELY AS NECESSARY.
2. AFTER GRASS HAS BEEN
ESTABLISHED, PERIODICALLY CHECK
CHANNEL, INCLUDING OUTLET.
EVALUATE FOR BANK STABILITY
AND EVIDENCE OF PIPING OR
SCOUR HOLES. MAKE ANY REPAIRS
AS NECESSARY.
3. REMOVE ALL SIGNIFICANT SEDIMENT
ACCUMULATION TO MAINTAIN THE
DESIGNED CARRYING CAPACITY.
4. KEEP GRASS IN A HEALTHY,
VIGOROUS CONDITION AT ALL TIME`.
RECM DATA
SECTION MIN SHEAR STRESS TEMPORARY/
PERMANENT
CHANNEL EAST OF 1.75 LB /SF TEMPORARY
PROPOSED
CLARIFIERS
- LB /SF -
- LB /SF -
GRASS LINED CHANNEL (PERMANENT)
RECM (TEMPORARY)
1 IL 12°
3
alak A
GRASS LINED CHANNEL (PERMANENT)
TRM (PERMANENT)
1 \ / -� _
3
1 12°
PERMANENT
ROLLED EROSION CONTROL MAT (RECM)
3
TURF REINFORCEMENT MAT (TRM)
7j� � 1
3
PERMANENT
TYPICAL DITCH DETAIL
SEE DETAIL 0227014 FOR
INSTAL' LATION DETAIL
0227011
NONE LINING
i i rc a �EOTEXTILE 0
SEPARATOR
N CA /?o
Q�6 ESSlolll
SEAL
18178
� N �
O \v
°0
1
6/14
�Fv
Rte'
DATE
DRWN
CHKD
J O w
J �
wax
1111111111211
MAINTENANCE
REQUIREMENTS:
1. INSPECT MATTING WEEKLY AND
AFTER EACH RAINFALL EVENT THAT
PRODUCES J INCH OR MORE OF
RAIN. REPAIR OR REPLACE
IMMEDIATELY AS NECESSARY.
2. GOOD CONTACT WITH THE GROUND
MUST BE MAINTAINED, AND
EROSION MUST NOT OCCUR
BENEATH THE MATTING.
3. ANY AREAS OF THE MATTING THAT
ARE DAMAGED OR NOT IN GOOD
CONTACT WITH THE GROUND SHALL
BE REPAIRED OR REPLACED AND
STAPLED IMMEDIATELY.
4. IF EROSION DOES OCCUR, THE
PROBLEM SHALL BE FIXED AND
ERODED AREA REPAIRED AND
PROTECTED FROM FURTHER
DAMAGE.
5. CONTINUE MONITORING MATTED
AREAS UNTIL PERMANENT GROUND
COVER HAS BEEN ESTABLISHED.
RECM AND TRM INSTALLATION
0227014
ISSUED FOR BIDDING
REMARKS
DESIGNED BY:
DRAWN BY:
SHEET CHK'D BY:.
CROSS CHK'D BY:
APPROVED BY:—
DATE:
nn r rrninr
STEEL FENCE P(
�61IRE FEN
HARDWARE CLO
1" DIAMETER
WAS . -IED STON
BURY WIRE i=ENCE AND HARDWARE
II
U
STEEL FENCE POST
SET MAX 2' APART
MIN. 18° INTO SOLI
GROUND
,
FILTER FABRIC,
AND HARDWARE
CLOTH IN TRENCH
'Ny MAINTENANCE REQUIREMENTS:
fj'c "; - -3' FILTER FABRIC
°`��'P ` ON GROUND 1. INSPECT WEEKLY AND AFTER EACH
'OR, RAINFALL EVENT THAT PRODUCES INCH
OR MORE OF RAIN. REMOVE SEDIMENT
AND DEBRIS. TOPDRESSING WITH 1 -INCH
._ _----- CLEAN, WASHED STONE AS NECESSARY.
u ( 2. REMOVE ACCUMULATED SEDIMENT. THE
II CONTRACTOR SHALL DISPOSE OF
CLOT4__- II BURY 8 OF UPPER EDGE OF SEDIMENT OFF -SITE IN ACCORDANCE WITH
II FILTER FABRIC IN TRENCH ALL STATE AND LOCAL REGULATIONS.
PROFILE VIEW u (DETAIL ADOPTED FROM THE TOWN OF HOLLY
SPRINGS, NORTH CAROLINA - ENGINEERING
DEPARTMENT).
STABILIZED OUTLET FOR SILT FENCE
0227024R FORM BERM WITH
EXCAVATED MATERIAL-
- EXISTING GRADE
6' ° -8° RIPRAP
USE WASHED STONE ON UPSTREAM —
/ / \ 2 —
A /A /A
9° d
® _ _
1/2 CHANNEL DEPTH TEMPORARY DIVERSION SWALE
TRENCH 6 INTO 0227009
CHANNEL BED FLOW LINE OF DITCH
3/4" WASHED STONE
FLOW
1
L= DISTANCE
THAT POIP
ARE EQUP
i
rie:!_rvvrr v nvry
CIHIANNEL
1/2 CHANNEL DEPTH*
DECEMBER 2014
LONGITUDINAL PROFILE
NOTES:
1. THE MAXIMU�?i HEIGHT OF THE CHECK DAM AT THE CENTER
SHALL NOT EXCEED ONE HALF THE DEPTH OF THE CHANNEL.
2. MAXIMUM SP..>CING SHALL BE SO THE TOE OF THE UPSTREAM DAM
IS THE SAME: ELEVATION AS THE TOP OF THE DOWNSTREAM DAM.
3. REMOVE SED'41AENT WHEN 25% THE HEIGHT OF THE WEIR.
4. REMOVE CHE:«K DAMS WHEN SITE STABILIZATION IS ACHIEVED.
�5 111 ■
I�
FOOD OR METAL POST.
ORANGE SAFETY FENCING
IS REGUIRED. SPACE
POSTS ON 8' INTERVALS.
NOTES'
1, SEE" PLANS FOR LOC'ATIOW OF ALL TREE PROrFCT''DN FENCES.
2. ALL rREE PRoTEL'rrm DEa1r'ES MUST or .INSTALLED PRIOR TO LAND 101STURRANCF, .
INCLUDING THE° CUTTING OF ANY TREES, AND Nusr 8E INSPEcTsD SY THE° URBAN
FOREST R OR HIS DE'S `GA E'.
3, NO GRADING, TRENCHING, FILLING OR STORING OF MATERIALS IS TO OCCUR
IN THE TREE PROTECTION AREA.
d. TREE PROTECTION FENCE 41A Y NOT BE RENOVCD W17'HOUT THE APPROVAL
OF THE URBAN FORESTER a9 HIS DESIGNEE.
S, THE TREE CONSERVA TION AREA 5HOUL0 BE DE°S16NA TEO ATTH "TREE
CONSERVATION AREA" 51610 POSTED VIS18LY ON THE OUTSIDE OF THE
FENCED-11V AREA, 5I685 MAY NOT BE POS769 ON rHE TREES. SEE
EXAMPLE BELOW,
EXAMPLE SIGN
IB" Y 32" SIGN
I' BLOCK LETTER
BLACK LETTERS ON WHITE BACKGROUND
1/A" BLACK BORDER
ALL WEATHER MEDIA
100' SUGGESTED SPACING BETWEEN SIGNS
Rom
.. .:... � i y � � ■: ■ � lle � r#f 7R g i � a�
MAINTENANCE
REQUIREMENTS:
1. INSPECT MATTING WEEKLY AND
AFTER EACH RAINFALL EVENT THAT
PRODUCES j INCH OR MORE OF
RAIN. REPAIR OR REPLACE
IMMEDIATELY AS NECESSARY.
2. AFTER GRASS HAS BEEN
ESTABLISHED, PERIODICALLY CHECK
CHANNEL, INCLUDING OUTLET.
EVALUATE FOR BANK STABILITY
AND EVIDENCE OF PIPING OR
SCOUR HOLES. MAKE ANY REPAIRS
AS NECESSARY.
3. REMOVE ALL SIGNIFICANT SEDIMENT
ACCUMULATION TO MAINTAIN THE
DESIGNED CARRYING CAPACITY.
4. KEEP GRASS IN A HEALTHY,
VIGOROUS CONDITION AT ALL TIME`.
RECM DATA
SECTION MIN SHEAR STRESS TEMPORARY/
PERMANENT
CHANNEL EAST OF 1.75 LB /SF TEMPORARY
PROPOSED
CLARIFIERS
- LB /SF -
- LB /SF -
GRASS LINED CHANNEL (PERMANENT)
RECM (TEMPORARY)
1 IL 12°
3
alak A
GRASS LINED CHANNEL (PERMANENT)
TRM (PERMANENT)
1 \ / -� _
3
1 12°
PERMANENT
ROLLED EROSION CONTROL MAT (RECM)
3
TURF REINFORCEMENT MAT (TRM)
7j� � 1
3
PERMANENT
TYPICAL DITCH DETAIL
SEE DETAIL 0227014 FOR
INSTAL' LATION DETAIL
0227011
NONE LINING
i i rc a �EOTEXTILE 0
SEPARATOR
N CA /?o
Q�6 ESSlolll
SEAL
18178
MAINTENANCE REQUIREMENTS:
1. INSPECT MATTING WEEKLY AND AFTER
EACH RAINFALL EVENT THAT PRODUCES
INCH OR MORE OF RAIN. REPAIR OR
REPLACE IMMEDIATELY AS NECESSARY.
2. GOOD CONTACT WITH THE GROUND
MUST BE MAINTAINED, AND EROSION
MUST NOT OCCUR BENEATH THE
MATTING.
3. ANY AREAS OF THE MATTING THAT ARE
DAMAGED OR NOT IN GOOD CONTACT
WITH THE GROUND SHALL BE REPAIRED
OR REPLACED AND STAPLED
IMMEDIATELY.
SEDIMENT
Q
SEDIMENT
0
M
N
N
H
Q
N
z
0
0
U
m
0
ow
J
�r
�m
z
z
3
a �
�Q
0
O N
o�
4. IF EROSION DOES OCCUR, THE PROBLEM
SHALL BE FIXED AND ERODED AREA
REPAIRED ANID PROTECTED FROM
FURTHER DAMAGE.
5. CONTINUE MIONITORING MATTED AREAS
UNTIL PERM"."NENT GROUND COVER HAS
BEEN ESTABLISHED.
CONSTRUCTION SPECIFICATIONS
1. AREA SHALL 3E CLEARED AND GRUBBED
ACCORDING TO SPECIFICATIONS.
2. SEED BANK ACCORDING TO PLAN
SPECIFICATIONS.
3. SECURE MATS AT THE TOP OF THE SLOPE
BY TOEING IT IN AND REINFORCING IT
WITH A ROW OF AT LEAST FIVE (5)
STAPLES, SPACING EACH ONE
APPROXIMATELY 8 APART.
4. PLACE STAPLES 6 " -8" APART ALONG
LENGTH OF MAT BLANKET TO SECURE TO
THE SOIL SURFACE. ALL STAPLES MUST
BE FLUSH TO THE SURFACE.
TEMPORARY SLOPE DRAIN 2 TOWARD ITS OUTLET. SECTION OF PIPE UNDER THE DIKE
4' MIN LEVEL SECTION
3. HAND TAMP THE SOIL UNDER AND AROUND THE ENTRANCE
0227028 SECTION IN LIFTS NOT TO EXCEED 6 INCHES.
nnll -.. nrnn ^PIT . nn�
ISSUED FOR BIDDING
REMARKS
DESIGNED BY:_
DRAWN BY:
SHEET CHK'D BY%
CROSS CHK'D BY:
APPROVED BY:-
DATE:
STAKE 'D ETAI L
(WITH TIRENCH) --GB
NO SCALE
L
E TO ONLY
NETTING
MAINTENANCE REQUIREMIENTS:
1. INSPECT WEEKLY A@IID AFTER EACH RAINFALL EVENT THAT PRODUCES 1/2 INCH OR
MORE OF RAIN. REi�!iOVE ANY ACCUMULATED SEDIMENT AND /OR WOODY DEBRIS.
2. FFTs SHALL BE ENTRENCHED AS SHOWN TO PREVENT UNDERCUTTING. ANY EVIDENCE
OF UNDERCUTTING AND /OR EROSION SHALL BE REPAIRED IMMEDIATELY.
�pN 3. STAKES AND /OR S7APLES THAT HAVE BECOME LOOSE OR DISPLACED SHALL BE
REPAIRED IMMEDIATELY.
4. WHEN SEDIMENT ACCUMULATION REACHES 1/2 THE DIAMETER OF THE FFT, IT SHALL
BE REMOVED AND IDIISPOSED OFF -SITE BY THE CONTRACTOR IN ACCORDANCE WITH
ALL STATE AND LOCAL REGULATIONS.
5. ANY VISIBLE DAMAG;F TO THE FFT SHALL BE REPAIRED OR REPLACED IMMEDIATELY.
6 *1
GENERAL GUIDELINES FOR SPACING OF
TUBE TRENCHES FOR SLOPE INSTALLATIONS
SLOPE GRADIENT
4' MIN
1H:1V
15 FEET
ISLAND OVER
INLET
3H:1V
35 FEET
4H:1V
50 FEET
DIVERSION
DIKE
1.5' MIN
HOLD DOWN STAKES
_
-I -
INLET
TOP OF HAND-
-_ �
COMPACTED FILL
PLASTIC CORRUGATE[ PIPE
-
I
(ISLAND)
DIAM. AS SHOWN ON iPLANS
_
_
�-
TOP OF
4' MIN
DIVERSION
�° -
0.5
MIN
-__
NATURAL GROUND
1 MIN
STABILIZE OUTLET
- - -_
- -
I) ICI -I
-
RIPRAP
_
DIVERSION CHANNEL
-_
NOTES:
-- -_ --
1. PLACE SLOPE DRAINS ON UNDISTURBED SOIL OR WELL
COMPACTED FILL AT LOCATIONS AND ELEVATIONS SHOWN
-
ON PLANS.
TEMPORARY SLOPE DRAIN 2 TOWARD ITS OUTLET. SECTION OF PIPE UNDER THE DIKE
4' MIN LEVEL SECTION
3. HAND TAMP THE SOIL UNDER AND AROUND THE ENTRANCE
0227028 SECTION IN LIFTS NOT TO EXCEED 6 INCHES.
nnll -.. nrnn ^PIT . nn�
ISSUED FOR BIDDING
REMARKS
DESIGNED BY:_
DRAWN BY:
SHEET CHK'D BY%
CROSS CHK'D BY:
APPROVED BY:-
DATE:
STAKE 'D ETAI L
(WITH TIRENCH) --GB
NO SCALE
L
E TO ONLY
NETTING
MAINTENANCE REQUIREMIENTS:
1. INSPECT WEEKLY A@IID AFTER EACH RAINFALL EVENT THAT PRODUCES 1/2 INCH OR
MORE OF RAIN. REi�!iOVE ANY ACCUMULATED SEDIMENT AND /OR WOODY DEBRIS.
2. FFTs SHALL BE ENTRENCHED AS SHOWN TO PREVENT UNDERCUTTING. ANY EVIDENCE
OF UNDERCUTTING AND /OR EROSION SHALL BE REPAIRED IMMEDIATELY.
�pN 3. STAKES AND /OR S7APLES THAT HAVE BECOME LOOSE OR DISPLACED SHALL BE
REPAIRED IMMEDIATELY.
4. WHEN SEDIMENT ACCUMULATION REACHES 1/2 THE DIAMETER OF THE FFT, IT SHALL
BE REMOVED AND IDIISPOSED OFF -SITE BY THE CONTRACTOR IN ACCORDANCE WITH
ALL STATE AND LOCAL REGULATIONS.
5. ANY VISIBLE DAMAG;F TO THE FFT SHALL BE REPAIRED OR REPLACED IMMEDIATELY.
6 *1
GENERAL GUIDELINES FOR SPACING OF
TUBE TRENCHES FOR SLOPE INSTALLATIONS
SLOPE GRADIENT
TUBE INTERVAL
1H:1V
15 FEET
2H: 1V
25 FEET
3H:1V
35 FEET
4H:1V
50 FEET
GENERAL GUIDELINES FOR SPACING OF TUBE
TRENCHES FOR CHANNEL INSTALLATIONS
TUBE SPACING CALCULATION
TUBE HEIGHT (FT. ABOVE GRADE) /SLOPE GRADIENT (FT /FT)
(EG. 20" TUBE W/ 1.416 FT. ABOVE GRADE)
1.416 / .01 = 142 FT. SPACING
BACKFILL AND COMPACT
LOOSE MATERIAL
UPSTREAM OF TUBE
6 OR 8 INCH U- SHAPED
WIRE STAPLES PLACED
AT ONE FOOT INTERVALS
DRIVEN THROUGH OUTER
1 INCH OF TUBE
EXCAVATE A PLACEMENT
TRENCH MIN 3"
z
t' e,
SLOPE PROTECTION APPLICATIONS:
1. OVERLAP OR 'HOOK' ADJACENT ROLL ENDS BY A
MINIMUM OF ONE FOOT AID REDUCE STAKING INTERVAL
TO ONE FOOT WITHIN OVERLAP SECTION.
2. WHEN USED IN CONJUNCTION WITH WATERBARS, OVERLAP
OR 'HOOK' FFT ROLL END A MINIMUM OF ONE FOOT
ALONG DOWNSLOPE SIDE OF WATERBAR AND EMBED A
MINIMUM OF 6 INCHES. REDUCE STAKING INTERVAL TO
ONE FOOT. THE FFT ROLL TRUST HAVE GOOD CONTACT
WITH THE WATERBAR IN ORDER TO PREVENT
SHORT - CIRCUITING.
3. SMOOTH SOIL SURFACE AND REMOVE ALL OBSTRUCTIONS
GREATER THAN V -2' IN DIAMETER.
4. WHEN PERFORMANCE - ENHANCING POLYMERS (PAMs) ARE
USED, THE MOST DOWNSTREAM FFT SHALL BE A
STAND -ALONE PRODUCT (NO PAMs).
CHANNEL PROTECTION APPLICATIONS:
1. FOR CHANNEL APPLICATIONS, BOTH UPSTREAM AND
DOWNSTREAM ANCHORING SHOULD BE AT 1 FOOT
INTERVALS.
2. FOR CHANNEL APPLICATIONS, FFTs SHALL BE
STAND -ALONE PRODUCTS WITHOUT PAMs.
EXCAVATE A
PLACEMENT TRENCH
MIN 3"
PROFILE VIEW - W /STAKING DETAIL
3. FFTs SHALL BE PLACED IN CHANNEL (AS DEMONSTRATED
BELOW), IN ORDER TO ALLOW WATER TO POOL
SUFFICIENTLY ON THE UPSTREAM SIDE OF THE FFT.
4. FFTs SHALL EXTEND TO THE TOP OF BANK IN ORDER TO
PREVENT SHORT CIRCUITING OF FLOW.
MAINTENANCE REQUIREMENTS:
1. INSPECT WEEKLY AND AFTER EACH RAINFALL EVENT
THAT PRODUCES j INCH OR MORE OF RAIN. REMOVE ANY
ACCUMULATED SEDIMENT AND /OR WOODY DEBRIS.
2. FFTs SHALL BE ENTRENCHED AS SHOWN TO PREVENT
UNDERCUTTING. ANY EVIDENCE OF UNDERCUTTING
AND /OR EROSION SHALL BE REPAIRED IMMEDIATELY.
3. STAKES AND /OR STAPLES THAT HAVE BECOME LOOSE
OR DISPLACED SHALL BE REPAIRED IMMEDIATELY.
4. WHEN SEDIMENT ACCUMULATION REACHES j THE
DIAMETER OF THE FFT, IT SHALL BE REMOVED AND
DISPOSED OFF -SITE BY THE CONTRACTOR IN
ACCORDANCE WITH ALL STATE AND LOCAL REGULATIONS.
5. ANY VISIBLE DAMAGE TO THE FFT SHALL BE REPAIRED
OR REPLACED IMMEDIATELY.
WOOD STAKE TO PENETRATE THE
OUTER 1 -INCH OF TUBE
18 TO 20 -INCH TUBE
IN
USE 36 -INCH (MIN) STAKE WITH
12 -zNCH MINIMUM EMBEDMENT SPACED
AT TWO FOOT INTERVALS DRIVEN
THROUGH OUTER 1 INCH OF TUBE,
LEAFING ABOUT 3 INCHES OF THE
STAKE PROTRUDING ABOUT THE TUBE
10 FT TYPICAL
WOOD STAKE,
SEE STAKING DETAIL
F�
r
2¢°
CHANNEL CROSS SECTION
STORM SEWER
CURB INLET
nn inn rr nn\irn
UL I AIL 3
NTS C11
a'sf
d
CHANNEL BED
i / •
NOTES:
1. SEDIMENT LOG SHALL CONSIST OF
RECYCLED SYNTHETIC FIBERS.
2. SEDIMENT LOG SHALL EXTEND A
MINIMUM OF 12" BEYOND INLET
OPENING.
MAINTENANCE REQUIREMENTS:
3. INSPECT SEDIMENT LOG ON A
' "MEEKLY BASIS AND AFTER EACH
RAINFALL EVENT PRODUCING j
INCH OR MORE OF RAIN. ANY
DEBRIS OR SEDIMENT VISIBLE
SHALL BE REMOVED IMMEDIATELY.
4. DAMAGE TO THE SEDIMENT LOG
SHALL BE REPAIRED IMMEDIATELY.
5. REMOVE SEDIMENT WHEN
ACCUMULATION REACHES j THE
DIAMETER OF THE LOG. SEDIMENT
SHALL BE REMOVED OFF -SITE BY
THE CONTRACTOR IN ACCORDANCE
WITH ALL STATE AND LOCAL
REGULATIONS.
CIVIL
FFT TO EXTEND TO TOP
OF BANK
N CARO\
Q�oF ESSio,�9�'Lv
SEAL
18178
gNL.S��
M
20' FFT
61 AA 1110 LeVill M 1:1
TEMPORARY SEEDING SCHEDULE
SPECIES RATE Ib/ac) SEEDING Df.7ES
GERMAN MILLET 40 SUMP,_R: MAY 1ST - AUGUST 15TH
RYE (GRAIN) 120 FALL: AUGUST 15TH- DECEMBER 30TH (SEE NOTE 1).
RYE (GRAIN) 120 WINTERC JANUARY 1ST -MAY 1ST
NOTES:
NCDENWDivision of Water Quality
1.
TOPDRESS WITH
50 Ib /ac NITROGEN IN MARCH.
2.
APPLY 2000
Ib /ac GROUND AGRICULTURAL LIMESTONE AND 750 -1,000
Ib /ac 10 -10 -10 FERTILIZER.
APPLICATION
RATES AND CHEMICAL ANALYSIS SHALL BE CC'NFIRMED OR
ESTABLISHED BY SOIL TEST.
3.
APPLY 4,000
Ib /ac SMALL GRAIN STRAW MULCH.
STABILIZATION
4.
TACK MULCH
BY APPLYING ASPHALT TACK AT A RATE OF 110 gal/yd'
(10 gal /1,000 ft').
5.
REFERTILIZE
IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE
AND MULCH IMMEDIATELY FOLLOWING
EROSION OR
OTHER VISIBLE SIGNS OF DAMAGE.
PERMANENT SEEDING SCHEDULE
SPECIES RATE (Ib /ac) SEEDING E TES
KY 31 TALL FESCUE 100 FALL., SEPTEMBER 1ST - NOVEMBER 30TH (SEE NOTE 1).
LATE: WINTER: FEBRUARY 15TH -APRIL 1ST.
NOTES:
1. FALL IS BEST FOR TALL FESCUE
2. BETWEEN MAY 1ST AND AUGUST 15TH, ADD 10 LB /AC GERMAN MILLET.
3. PRIOR TO MAY 1ST OR AFTER AUGUST 15TH ADD 40 LB /'AC RYE (GRAIN).
4. APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 4,000 LB /AC GROUND AGRICULTURAL
LIMESTONE AND 1,000 LB /AC 10 -10 -10 FERTILIZER.
5. LIME AND FERTILIZER ARE TO BE DISKED INTO THE SOIL SURFACE TO A MINIMUM DEPTH OF 4 INCHES.
6. APPLY 4,000 LB /AC GRAIN STRAW OR EQUIVALENT COVE: OF ANOTHER SUITABLE MULCH.
7. ANCHOR BY TACKING WITH ASPHALT (0.10 GAL. /YD2), RCJING, OR NETTING OR BY CRIMPING WITH A MULCH
ANCHORING TOOL.
8. REFERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS FJLLY ADEQUATE.
9. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIA., ELY
1 12/14 SNK
REV' DATE DRWN CHKD
NO.
RFP 1
REMARKS
1. CONTRACTOR SHALL PREPARE ALL AREAS TO RECEIVE TEMPORARY OR PERMANENT SEEDING MEASURES PRIOR TO
PLANTING.
2. TOPSOIL SHALL BE PLACED INI AREAS TO BE SEEDED AND ROUGHENED WITH TRACKED EQUIPMENT OR OTHER
SUITABLE MEASURES. SLOPES STEEPER THAN 3:1 MAY BE ROUGHENED BY GROOVING, FURROWING, TRACKING, OR
STAIRSTEP GRADING. SLOPES FLATTER THAN 3:1 SHOULD BE GROOVED BY DISKING, HARROWING, RAKING, OPERATING
PLANTING EQUIPMENT ON THE CONTOUR.
3. SOIL AMENDMENTS INCLUDING:. BUT NOT LIMITED TO, LIME AND FERTILIZER SHALL BE SPREAD AS NECESSARY, AND AT
THE RATES SHOWN IN THE S', EDING SCHEDULE. SEEDING SHALL BE AS PER TYPE AND RATES SHOWN IN THE
SEEDING SCHEDULE. SEED SMALL BE BROADCAST AS SOON AS POSSIBLE FOLLOWING ROUGHENING, BEFORE SURFACE
HAS BEEN SEALED BY RAINFAILL.
MULCHING AND TACKING AGENTS
1. MULCH MUST COVER A MINIM:JM OF 80 PERCENT OF THE SOIL SURFACE AND MUST BE SECURED BY TACKING OR
NETTING.
2. WOOD CELLULOSE FIBER MUL<�H SHALL BE USED IN HYDROSEEDING GRASS SEED IN COMBINATION WITH FERTILIZERS
AND OTHER APPROVED ADDITI'�,DNS.
3. NETTING WITH PLASTIC MESH :AND /OR PLASTIC TWINE SHALL BE USED IN WETLAND AND RIPARIAN BUFFERS TO
PROTECT SMALL ANIMALS.
HYDROSEEDING
1. HYDROSEEDING SHALL BE CAF=RIED OUT IN THREE STEPS. STEP ONE SHALL CONSIST OF THE APPLICATION OF LIME.
IN STEP TWO THE SEED MIXTURE SHALL BE MIXED WITH THE FERTILIZER, WOOD CELLULOSE FIBER MULCH, AND ANY
REQUIRED INOCULANTS AND APPLIED TO THE SEED BED. STEP THREE SHALL CONSIST OF APPLICATION OF TOP
DRESSING DURING THE FIRST SPRING OR FALL, WHICHEVER COMES FIRST, AFTER STEP TWO.
2. INGREDIENTS FOR THE MIXTUF�,E AND STEPS SHOULD BE DUMPED INTO A TANK OF WATER AND THOROUGHLY MIXED
TO A HOMOGENEOUS SLURRY AND SPRAYED OUT UNDER A MINIMUM OF 300 -350 POUNDS PRESSURE, IN SUITABLE
PROPORTIONS TO ACCOMMODATE THE TYPE AND CAPACITY OF THE HYDRAULIC MACHINE TO BE USED. APPLICATIONS
SHALL BE EVENLY SPRAYED OVER THE GROUND SURFACE. THE CONTRACTOR SHALL FREE THE TOPSOIL OF STONES,
ROOTS, RUBBISH AND OTHER DELETERIOUS MATERIALS AND DISPOSE OF SAME OFF THE SITE. THE BARE SOIL,
EXCEPT EXISTING STEEP EMB, °;NKMENT AREA, SHALL BE ROUGH RAKED TO REMOVE STONES, ROOTS, AND RUBBISH
OVER 4 -INCH IN SIZE, AND ;.ETHER DELETERIOUS MATERIALS AND DISPOSE OF SAME OFF THE SITE.
3. NO SEEDING SHOULD BE UNDERTAKEN IN WINDY OR UNFAVORABLE WEATHER, WHEN THE GROUND IS TOO WET TO
RAKE EASILY, WHEN IT IS IN A FROZEN CONDITIONS, OR TOO DRY. ANY BARE SPOTS SHOWN IN TWO TO THREE
WEEKS SHALL BE RECULTIVAT =D, FERTILIZED AT HALF THE RATE, RAKED, SEEDED, AND MULCHED AGAIN BY
MECHANICAL OR HAND BROADCAST METHOD ACCEPTABLE TO THE OWNER.
DESIGNED BY: SJN
DRAWN BY: SJN
SHEET CHK'D BY:
CROSS CHK'D BY: PDS
APPROVED BY:
DATE:
I�7:[y:i�1:3:1:�l�IlL1
MAINTENANCE SCHEDULE
EROSION CONTROL MAINTENANCE PLAN:
ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSPECTED
WEEKLY AND AFTER EACH RUNOFF PRODUCING RAINFALL. STRUCTURES THAT
SHALL BE INSPECTED INCLUDE:
1. SILT FENCE
ANY FABRIC WHICH COLLAPSES, TEARS, DECOMPOSES OR BECOMES INEFFECTIVE
SHALL BE REPLACED IMMEDIATELY. SEDIMENT DEPOSITS SHALL BE REMOVED WHEN
SEDIMENT BEHIND THE FENCE REACHES SIX INCHES.
2. SEEDING, FERTILIZING, AND MULCHING
SEEDED AREAS SHALL BE INSPECTED FOR FAILURE AND NECESSARY REPAIRS AND
RE- SEEDINGS SHALL BE MADE WITHIN THE SAME SEASON, IF POSSIBLE.
3. CONSTRUCTION ENTRANCE AND EXIT
INSPECT CONSTRUCTION ROAD SURFACE REGULARLY, MAINTAIN IN A CONDITION TO
PREVENT SEDIMENT FROM LEAVING THE SITE, AND TOPDRESS WITH ADDITIONAL
STONE WHEN NEEDED. SWEEP EXISTING ROADWAY TO REMOVE ANY ACCUMULATED
SEDIMENT.
4. INLET PROTECTION
REMOVE SEDIMENT FROM AROUND INLET AFTER EACH STORM. CLEAN OR REPLACE
PROTECTIVE MEASURES AS NEEDED.
CITY OF GREENSBORO
NORTH CAROLINA
t. WINE
o 101 0 1, 1
SELF INSPECTION REQUIREMENTS
THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS
RESPONSIBLE FOR LAND- DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE
PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS
BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT
OCTOBER 1, 2010. THE SELF - INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY
SELF- MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES.
THE FOCUS OF THE SELF - INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF
EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE
INSPECTIONS MUST BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL
PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A -54.1 AND 15A
NCAC 48.0131. THE SELF- INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREADSHEET
FROM
HTTP: / /WWW. DLR. ENR. STATE. NC. US /PAGES /SEDI MEN TATION- NEW.HTML.
IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THIS OFFICE AT (919)
791-4200.
NPDES Storrnwater Discharge Permit for Constluction Activities (NCG01)
NCDENWDivision of Water Quality
Nl~1N STA�I�,l�ATAi�hD TIMI�FRAMES
;���Gt�,r� Aug �, at►t��
SITE AREA DESCRIP71ON
STABILIZATION
TiMEFRAME EXCEPTIONS
Perimeter dikes, swales, ditches, slopes
7 days
None
,,.
High Quality Water (HQW) Zones
7 days
None
\
Slopes steeper than 3:1':
7 days
if e' a 10' or less length and are
slop s are I �n g
not steeper than 2:1, 14 days are allowed.
Slopes 3:1 or flatter
14 days
7 days for slopes greater than 50' in length.
All other areas with slopes flatter than 4:1
14, days
None, except for perimeters and HQW Zones.
110,911 111
0
CARol
�6 oti� 9
SEAL
18178
ii
PROJECT NO. 30841 005
FILE NAME: RFP 1 -1
SHEET NO.
s
N
M
N
� Li.
� C
J a
S �=
%}
��
c�
z
¢�
as
/ n
o `�
O 6
� V
� n
O �
M n
/�
� a
� C
M n
� 4
O a
II G
ti
w C
a
w
1/ f
!;
�
11\1
11 I
I I , -,
- / t_
1 �,�
,..- f
f fi
�
!
1
/I
!° d
r> t1 � - ,
/' € F s
r' / „�,,
}
f '
{ f IJ /✓
f
i i
I
I t I I
f f 4 j
` I I
ll
,IL I �
I I \
I "I I
11 �
3,r s
j SILT FENCE, TYP
1` `�,, Ij
j taw,
r'6 I " "."
11 I ,- LIMITS OF
_' % DISTURBANCE, TYP
I
,i
/I l � �"
_/ r,,,
NOTE 10
1.
i
I_'
ch
;
!I # i 1 i,
+I
-n +
S I
f£
11
11 A i�
E a.
0 I
z
N
s I
,. _ .
€
t
z
Fn
¢
m
z
1,
1,
I
f
z
U
¢
m
z
.
1
f'I
„
if
1
-7
1 `t( € .
£ t
ii
I!ii
i I I;
2 ( {
I
I; , I
I
I ,
.., I
I ij
t „s 111,11 i
r`I
I
il
Ii i
{ f 1
/
{,
i
i
1 it
Ili I
E.
MATCH LINE
SEE DRAWING RFP
__ __ I __ __® __ _1-2_11
_ ® I
11
,I
f €
JEI
1
1'
0
1
0
o
r
0 I
z
z
z
€
z
z
Fn
¢
m
z
1,
1,
I
f
z
U
¢
m
z
z
U
¢
m
z
€
€
z
U) v„ I
¢ 5i
m 1
III
z ;i
O
¢
w
O
¢
w I
O
f=
¢
w
7
O 1i
,
¢ ,`?
Ii
w 111
¢
¢
¢
¢ Ili
t
I
11
III
I
I
+.,
E
s
®_
__
__
I
F
I
I
I
I
4
,
E
I
y
7
-
S
6
E
9�
I
E
7
3
11.
E
r_
3
�
0
1
0
0
y
5,
z
s,
z
0
I
I
I
z
I
f
z
&,
in
I
_z
Cn
E
(n
;
¢
I
f
I11
I
o
;
I
'
,,,,,w,, <u , ww,.M ,,..,,,a.,aW,w.,
�`
». , «,
,., " " "- a «,� - . - -, „ <w ,,,r, a �„ ,,,,e
z
1111,,
. , «_
-I.___.. 1,1.11°_ .,.; I
,•`, �� °.
1111, „_. °_ 1111__,_
_,
,1111__° _ _..,;__,.....
« _«
1111 ,,.,°,,.,,. .,. _ 1,1.- . ..,,°,..... „ _ ,....,..
f
�; f
a n,.,,«,...
1111... «.. ✓y , «°..,....,_,H.,,'., «1111.. ..... °...,
..
_..,....... ... °1,111, °...°_..... ..
i1 !
.. ........ .. .. 1111 _
1
�... �,r „
1111 ._„ ,..,.,,.,
�� �
11«„11._
1111#
«^",^`^"".«."..`«,^*o,,.,.,, «,. ,.«,
3
I
#
,,,,.,-,,-,,,«,.^
1111, «, ,,,
Iw
;f
I
i((
s « «ire "
I
f
8
_, v_ «_ 11 °11. 1111,. «. „,,,,, :_. °.._ «... °..., _.
1111_ ,
1,111 _, «�.......__ 1111
_ 1111
I
i /,
I
£
it I
€r
,
1I
1, a,
Y. y
6 I
P
If,, .y
€ el
tt ! j 1
{ i
! iy
E 11 II
I
I$ ; #1
il ;''I
ff .
iEE
I I E
I :1,II I
i
3:
E
,f E
E`
✓ <.
,<
q i Ii
® I _ _
£f'r ft tl E "3
' ,//
� 11 Ii' l
t
f l I s
If E I
I ! }� € `1 1 544£
I` ,
,.�,
I�.11' --1 1,
;
J_
L0
0
z
Z
V)
m
z
O
F-
w
F°ate _ w,.
I/ / ", f 11 " __,rnF _._� .._��.,«_«.
I �-_KA _ °,,., . , , .__ _ _ _,,,,,,,° ___„ � _ - _ ° 1111,,,_ _.
/`
/ N /�, /`
I / ,, . /,
� / ,, I
E
__
__
�_
®_
__
__
I
Q
,
E
I
7
�
I
r_
I
�
0
1
0
0
z
z
s,
z
I
I
I
z
I
f
z
&,
in
I
_z
Cn
E
(n
;
¢
I
¢
¢
I
m
m
m
O
I
Q
'£,
1
O
I
Of
I
ry
Iw
i((
w
I
w
8
¢
k
¢
I
¢
I
I
I
I
I
I
CONSTRUCTION SEQUENCE:
1. INSTALL TEMPORARY GRAVEL
CONSTRUCTION ENTRANCE(S), ALL
OTHER TEMPORARY PERIMETER
EROSION AND SEDIMENT CONTROL
i MEASURES, INCLUDING INLET
PROTECTION, SILT FENCE, AND TREE
,1i, I PERIMETER FENCE.
I
2. INSTALL TWO TEMPORARY SEDIMENT
BASINS AND ALL OTHER TEMPORARY
EROSION CONTROL MEASURES AT
LOCATIONS SHOWN ON CONTRACT 1
DRAWINGS RFP 1 -2 THROUGH RFP
1 -5. INLETS, OUTLETS, AND ALL
BERMS OF THE TEMPORARY SEDIMENT
BASINS SHALL BE IMMEDIATELY
STABILIZED WITH EROSION CONTROL
STONE OR OTHER PERMANENT
GROUND COVER. CONSTRUCT THE
BERM ON THE NORTHERN PORTION
I OF THE PROJECT LIMITS AND THE
PERMANENT STORMWATER DIVERSION
" - "° "', CHANNEL RUNNING TO THE EAST AND
_.1.J__ SOUTH. CUT AND FILL SLOPES OF
STORMWATER DIVERSION CHANNEL
SHALL BE PERMANENTLY STABILIZED
,I AND TEMPORARY SLOPE DRAINS
1111,_ 1111 7 _,1.117_ � _ -- , � 11 -� _ -- . .„„,,- _ _ �._._ ___ _„ _ 11.11,,,, - 11.11_. 1111. 1111 INSTALLED AT LOCATIONS AS PER
_ «.« , _ «_.._._,._ _111.1°. °,__ , �_ __ _T � -�_ __ 1111..... „1111. « _ 11.11 ° 1111.. _ „.1111 _ «_. 11.11.°_ _.
i CONTRACT DRAWINGS. NO
1111 ,,. w... f �, �. :n� 1.
I 1 I €} � �"
€ I 11
ii= , SECONDARY €; £ i
II ,, CLARIFIER I II
I . I N0.1 {.
Ii'i 5 11
,( ; I e?
I t I'
.. \ ; " "
1 ` \6 I Y
I 11 ft I <i -, ....1..
r / £'I
.f i Y 11 (I
I £ /' 1111 { 1f Is F i[11-
` `_
n
I
I
n,! i
1111
I...
ffi
{i� ,€
3
€
g,n
: v,
i -.
f`
I
€ xl l
,
I
=i
i . €I
f j `
i:`f ! f � a
S
1
I i
: £ ; ( 1111 + f
d
I , ,
G,,; ,
, ✓ j_._. 1111_° 1111 ., .,x._., "r �° £}... ._ 1111 .
/1111 j
-9
£s 1111,
€
sI
t%
, 11 ,
> °R,,
11
SECONDARY
CLARIFIER
NO.2
k: r ,_„ 111..1 ,,,,°_,,. „,_ _,,,_,,,..,.,___ _____ - - -- __.° .. ✓1111._„ ,_ „_ „„ 1111_ „,,,..,, °,,._. _ „1111 / ..,,,,,,., "" ,1111__ ...,....,._ 1111 .. .1111.., 1111 1111 ,, ., € ..,,,.r' ^w, 'L 11 e , ,(z„ 1111, « „^.,.,,w" ,«,« , « ^,.. ^.,, , '. € f �"" 3 I. 7 # l 4
N £'4J i t s r E ( , I S
w,.
Z ,. , : ',. , __,....,,....,_ �«._, 1111_"'_ '
.: , _ , s ; f /„ 1111.. ,,nf:.,,, 3 E l - % f
., «u ...,_.._,., 1111, 1111 ,
E I , ,''_ , ., € , € '...«..y,.,...«,..f, 1111 „1111 1111 .° _,.,...._ 1111._.' -. F i .a� "
1111.. ,,,.,,,,,, „1111, „,
«,p, _,___._, 11.11__ „, .f, II
«. ,,,"' 1111.
„✓ r , , ,. 1111 „"'° ° f # ! ,,,' y. '4
4 :, ,F s f€ i
(( z � t
, i f / I f F t
1 1111. „1111. r " r
H , t!'t ,: 1111 I 1
,
„ -- r
: r ( t 1111 ••
-'.'- 1111... I
1111 1111..,......._.. .. ..........._,,,,., ___,__ ,,,, .. , o,m,r „ € t 3` `
1111,° ,
i
1111,, .......... , «, .,„ _,,,,.....__. _ „
.. 1111 1111 , 1111., _ 1111,, F.
t«,
£ r
1111 ,r...�,..,w« 1 E E � '�. I i � RAS PUMP
1111
/� E :, a t i `
' .......... .........„ . «1111..._
/ 1111._ �: i € I
, r 3 � 1111,, „,.,.m_..°__... , °.....,...., « °...._..__ . „_„ ..,,,,,_ , 1111 «.., „, _ ,.. ,. £ , , , ,, ..;. � °. � __y __� €
L ,. € i , � „ , / 3 1111_ y t 3 3
w,.. -n I _
I_
.r :
1111_._ _. °_........° 1111._ . 11.11 . _ 1111.. STATION N
,
1111. f _ .:;..
° .......
1111._.._ _
,t,,,,,w „w,,,,,.wW <w� £ r � � ,..._... � -- �....,M 1111. 1111._ � ,� I, f``�,, -t
w
1111
r{ , °.,« _ _ 1111. .° .�.
.5 f, ;,s r 1111 , ! :: i r. 3 ,._,°....,,,,,,_.. _,,,,__, 1111._.,, -T""T .. „,,. ! `1 : €
£, ,. , , , £ e ,.,�,,,w,a, «.i.'«.«.,.,. «,« «_, «,.,«.,..,..,., ::,- •.es....,, .°...,,,_ 1111_, _ { I %
X , , 1111. ,......,.
{ s
t 11««1;1., -.S.° .. ....,,,, 1111,. ,.°_,,..., ,_ „_,n i •1111 ` { {i
i r S .,. # , . ,,, ., a # # �S 2
. 1111 _„ 1111 .. .. 1111 ,. 1111 ,. 11.11.._. .__._, °.. «, °. 1111... .. ,,,,,,,,,,,,«,,,,// ,,,,,,,.,�,..,, , <, ,,,,,..,.,,,<.,,w 1«111 <,a,...,N „«.,,,,,.,,,,,,,t w „.,a,�,v .«..,».:.,..,..,,<,,.. wu.. w, w..< w<,....,... Hw. w .,,,,,,, «<,,,w..w.w..,,,,,, « <w. .1 \ Ft'
1111 . ........ ................_.° ., . . , , _ , aE &1111 "> - 1
°_ «,_ 11.11 „° _..,.,._ .. °,.m.. .... 1111. «., 111,1._ ,1111,... «1111.._ . __m 1111__.. _.,°,,.....,,,, , wua... ^- ._.w, „ «„
a a,+.«rw,. «1111„.,, ' , .,, x .r .. r �;
„, 1111 , � ; fs i I € ' &, j k-' f r. 11.11. # ..,i„ [. r. `1111 i., s , „E _tx,y ....._...
', , £t ; f
s
w s „ „ E, ,! E & 1111
s E
, g t
_. „_«. 1111__. _..,..,«,,,,,,,,,,,,, 1111,, «. «._«..,,«..:,,, ._._.A f : - »„1111,«, «, ,f`,. :r , r ;: i „ „ .l 3 1 €3 {3 E'€ € 'S.¢ ..
!
s. : f r
i I
, ,' t , r , s � : :
I
� f 1
`2, -
N
0
O
N W
M
N. aa,..�xe,p . .
oT �4°`"�"xx
it a
,
c « ,__111._,_,__,__
1.«11 -
a_ « 1111_ I—,
o ° ' o a„g i €
a
� .......... .......... 1111 _. ... 1,111 °....._.a s�
O 4
w .lfl
,wi 1111 ,vm„w �,
I'll
cn ,..�_ .. .,,,.«,.,. 1111___. „.°,_..„
- ,
m
E � .^�
Q 3 4 t
Z
• E i
am ,s. ,_ „,.,_.. _ .... _, .._.,,,,,° 11,11_,_ ,_ 1111.. ,_,__. __°_ € t _ '`,
a ., __._,......�.�... - mm °111 «._... __ °...1111 1111_,._ ,.
> 2,
U
Q ° yj
W 1111. 1111 11,11, „ « «...,«,..«° ,.,amar,,,,,, �-' "/^
N � y
l
U
I -W-
j[€
1- 11,1,,°, 1,1_°_11 1111,.._ ,_,,..11,11._ .11.,11,
¢- ._ ,_ 1111 1111, , ,I i ' 11 -- -, : , { { . g , < , ,, ( _•
`. 9 'C.. "„1L_s , r ! r € i E a{ i S ;i ? S€ j E j .. a „1, .Wa�.,,ti..�,vaaw _ __-
s I E r } a# it
^•., : ? # 3 s i £ € i i #E # ss § ,t h,' t y 1111 _ ,, , ..__.,,_
, I s. [ F
? I Z # j _ , . ,. . ,,. ... _ <�;r i
.,� t..,,.£ f, l a : i s :, , i '£ I ;! i c { s I I 3 K / .,,
i i 5 I 3✓ _ ,
S
t
,"
g , s I € I w, i
E
-s. # i ' t ;. t s , t , 3 1 , s {I , _ s I f€ i' I f1 t( .__.. .._ °.... .. ,. _.. ......,. .,1111, .., 1111 ..1. 4 f_.._ii' .._E 1111. „,
€.s s ,, E t. £ i; , E E E € I e r s E , £ £ £ £ ..Y i. £. ,i's' ,i...,.... -1. ..<d, _ /
- x. r } / 1111.,, « .,,,.,„ ... .......... _,..,.,....____ _,.,..........„ ,., ,.,«...,,., .,. «.,, «. _,..„_...°......,,_ ,,....,.._. 1111___ ,„.._«.....,.
€ £ IiI £ . I i jj _
y
_0,_
`r'
1111 f s f t g EE (( `¢ I { ° f_. ,,. # �,j `. € i w,1 C%w,,,,,. ^,,, „...5
€ ', '-, f ,; ., s £ i € 4{ i 3 j ! 3; 11.11 «» ,.««,- .„,„,_�,«.
f ,
p.....£.. W - 1111,
,
_ , _ „1111. _. _r _ _ 11.11, _, . ,1111. _ ° s _ i " 3 3
I ) s ., , • , s ;, , -£ f {' ° ! € i - f `'f, # °"<. rr'! } I , i; € E `hw.,„»»a„«,.,
i
i
"
i i
, r s,
,
1111., s + s s , : z '
- , 1111 a,...,.. , ,✓ E 1111, s .. „,.. « .......,« 111«1«.^ 1111 «ra✓.«. «..
f e ,..t J 1111.., s
;,. ,. .� f si £ P
r , I I ( i t EI I e E ;. I ii < f i' r E J s f [ *.. ! t a i ..�,....a� <,„<;,;,,. - «-._,�
I t„w.:w , ars,.,4,,,H %1111, I ` \,, `� ^" .- .., -:,.< ..»,
+ - f s r ✓ i
. 1: 1 €
��pp ¢¢ E i ,
.. " 4 a VI i { ! s ! ` i `: r l Z. 4f #`''�, } �ti., ,reaFn`` IF
1
E
g. € E, i s 1 Ty%m iW '? 11111111 a: _ ya:'
-� I € f § p
,f,,,,,,,�,awf,,, \ i n
'r°" iI ; I f
I
1
j e
rz
it /
rt ��° YY
11
^... , ,: £ . 1 ;.. s I{ , ... °._.,_r......,_.. 1111° .. «1111..; ,�,' P'� ..,r 1111.._ i / £ / ._5, «1111 l
.'' ,.z £ ' , „t n E ; 2 f.. . °Y, .,, fp. „ : ,£ #, I f fF .,,,E 1 , %l :r `R
3 "L
, 1 `I
# € f"" ` i s j E i f 1 i j . l �.. .,tom
^! f k I A
t ,
i {i £ ' 3 t, S. I. ., rl
i ,,,,/"
�•..,. ,. 1111... _
£
§ I E 1 h k Ec✓ a
^• 5 € I t + f ✓ 11 i
,
, I
I°" "1111 " „,«,,..,,, ",,, , 3 ,3 11 1# ,f
\` `" {„ I �, } E i `E F # s&,s .f 73 [ £ € fs f ! •, `�\ I •�
1 [ € s I
` ;,: I ? ijJ I
G ? _ >" f f II, v I 1 , r E '•z .T'
v
E ,_. ;
j
I ,.: $ h ( y
`t: "✓,w, ._I.... � r ; , £ t'9 : £ E j # 1 � Y ` 4 ff i ,! 1 #f f �a l ..,,,
3
( > 1-Pt 1 E 1 £ I
i I I 1 i s [ 1 S «a .rt h €< €^, > "pti. ' E E: £ ; 1 „,,,,L_!_,_1_,,, , € 3. € ` # E ! ? £ q S ; £` i i £ � j E ' [ I 1 # ; g,�'k d If
1 #r i i3 1 i
..,,xz, . I I€ € I€ E i
x>yg I j£j t € I£ as E S agg I ! E 4 I€€€ 3 f f. ,+ I E £, `4'i
"``"'c.,� € i 1 E f c t :�; f ! € E °' E f 1 1 g 1 I. {' €# if i t+ h I `'.i
I I I I I P �IMARY ,_ ", `, " fl, I `, I i I E ;, :, SECONDARY , , % 11 I 3 SECONDARY
`_ I SETTLING 1 , 11 3
I I I €€ €E$ _' f I CLARIFIER ° CLARIF;;ER
"I I 13 I f ' 7 S `€ 3f E
f l 1 i TANKS I 1 1 s 1I i ff I f I I
1, I i ! (j .y�q E: fi !`I I € £ ( # '3 E ( I € ( € `� E ;' f` r' 1 ; N 0.3 ,#
N0.
I f} , f •� E E S +f 4# I'3 1\: -4 t Et I I g if i i { '1 "g 11 4"s ! 151 ! €# 2 i 0.1 9 1 1 if ! £ 3 1 3, E £ £5 €
[ I # ` i 1 i I i ( S (i I
yq ; =J= {r I
4 :I ? s i 1 £ 1 ' I
I1 i i f I ` I
s ( ;' i 1 g E '11 f3 iii 1; {` j { ? £ i 1,
1 w i f 1?I f °€ 1 I
£ f., ..;,,,1 r,. "1111., E f t, tr +a I
%' I : £ , ! �" € "`«"","„ 3 f� +� i f f & I' i f 1 E , £ I i "y : #
n i I , I -,.,y t 'jj 3 I E
PRIMARY . I I !1 t If , II;I £ i 4` 'j3
1
t I fr I...I I I I'll, I SETTLING I `I ; I I
<i V/ , i y f 1 i k? i j I \
f
i
I
1
TANK I t E I j y tI 1 f
1111.
I h
N0.5 1 i " 111 : ' I I - ,.`5 £f 3 '. I'll «, „, „11.11 .
i
1 r"" s, :% h / g r,".:, .._i +s...,, I - i E{ f £ 11€11 '; °~F. `"° Y%
11 w €
�w . 7, - ,
11 I 11 ! I
r
,,•, `1111
;1111 I t ;a I 5 / >r a .. _, "° _ / _ / € ° z,
# 11.11 _ . w, «1111« f,,,.. , ; l
.�...._ a..,.._. 11.11 1111 _,,,r «1111, 1111. «..,.�, ..
,
i/ l.. E _1 ✓ //� f i # x s` rn /%m „1111,"" F „ / -..
.._.___ t 1111 _ _ 1111 �' ill 1111 1111..
1111._ 11.11 w_
,
i .,. °„ .11, °1111.,. ,_ „1:111
.. °,f 11`. ` I,.. i
;
£ ,
1�,r ",aa,,�
e . ! . £ 1111.
F
I i 1 r ..t « 1111,; ,s 11 jam` „�'� I
. r ✓ 4 }
s ,e f, I'll E
w,.,
` s
f
«,,.,w,..zw,w«,,.n� °,,, 1111 ;,, , r.,. f ». i\
# f «,,,;,f_'"' f , 11.11,.. , , s. i' , s1 '_,.....,. $ , , , f _. 1111.,. « « « « «, _
(( , : r, , e
S S t , ; s- : i r £ , i<` 1111. °.«......,,.._,__ , w, , , , ({ a', l ,
Ei 3 � C 1111 • f
r. ._
, .,, , < m / °! Hh „ / , -9 ,,,,,,,,,,,,, �<w, «11:11, <. r,,...._..5 j v',,,b.,,, ,,,w." ,,s r R { fS t € _\
$ # F , s ,, ,;,, s i , ,, a % ;z , 1111 h' . I b, <e , ,r ✓' P^.. / t € , i '``, # .Y,_"`�
/ , s ",., " , 1..3 y .1ss x , , e. 1111# 1111 , t % € �� ( # wC
'x € , ,
� a , r f` i ; r t, % r 1t 1 € i •1111 ( "''� . 1,111 . 1111. _......_._.._.._.... ....... 1111. 1111.
/ , , ! s k + "Ia # ^- y».,,� ¢ e » `` € € r. # l`., I „ i f ,,. r' j E st i `^` ' f'a<.._. - 11,. 1111. ,,,r"' , \ 1 . -` <_ ...r.�,,„,:
€ ,,, 1111 n t r E s h f
I , 1111 _ ° 1111, 1111, ... ,
I ,
,
E
f "ma ,lh ;€ .: y .1111
r, ,
„ _
r � � „„ a ,,, «,,.,. „,.,. „..._..... «., „�a, �,w v. �..a��. „,�,w,w,,, a a ,,,��.a„ti� «1111, « « <.,, «,,,ti.,,,,, ,,, _
-/ < . �, % ;
r . , f 1111. € .:5," « >.. , t : - r , , : , s - - , A. �. ./.'y' �.J__,._ 1111.1111.... ........ ..,. 11,11_....._..... _......_...._ „
/ , , s . .. '; ! ," /"' �" h" w:r, ,e, , E, l `""Y I ?'; y,. °.,,c":. _. %, . ; rf' ,, ', j ; f r'€ «F r.a,,,w .,.«s:,.,.:aww^ -,:*
1 s ,.I _.,, „ , '' 1
1111„
7 .. ,, ,, 'i , +++ / . «._ _, . .,.,,..a.,. 1111 »,,.
/k(! . £ s 5 , : f i £1111... } .,, , 3, : �,....%,: { 1111° ,�,.,,.«....,,.,.a 1111.
f ✓ 3 „ , /
y, , �� , 3 , i„, , , o ., s t f fs: r y J. „ 1'111 - "" ...,,,v_, %„ , , ,!r /' ...,<...,,«,." . ":.,, «....�,,, „. »,«r>m «...ro.w,.
, /�, i < , z : "� � ... i 'o P , ✓,� i # �' f I ,, �, : a^°`r' � a,' ! „a««,„ ««1111,». 1111^
I j( � 1111, , "'r
" ._ 1111..
1111,, 1111, _,« , 1111
�¢¢ E x* v'u
f ,
._.,; « «,,,,« «1111. «..,„,.,„_ «„....«..„_ / , , f -,
, . 1111. 1111., 1111..
s r ,,,...,,,,,, .,..1,w,.. , ,«„ ^...,,, _ .,a....,... ,w,.,.,..0 1«111 w
,�r� x Y , , / , , i$ a 5 % I 1 ; ; £ , , 2 ..,..t 1111, <v ,w E,A,.ue 11«11«,,,, «.,,,,«,,,.. « .,,,«<., .w.J ,, - <w,,,,.«. «,,,«w. «,w,,.« ,,, ,,,,,,,,,,, -- .,,,„,,.., ,w„.�,<., «<
,ra' , v r >6 ; . , " E..' 1111 ,,, „I.. w. -1111 11,11_ . _.
„� , 1111 „- 1111,.,
m_„ 1111 « F, / I 1111°
,v h ::
v "1 £"1'111, € i 1 i , .. .,v, r,.
,.",1.. r„ ✓ 1"�I £ I o. , ; 1111 1 €; / '=z, „! f , / .,f f s:, ;, '"'a� �^°.« ", ._._...__....._...
a. 1111 / 1111._
", w, 1111,_ ........
f,H y:,«
E r "1111 r e , , . , , 'z !j f i ,✓"
1111 .,.wr «, 1111 „<,,,.<«.. ,,,<f,,,. .,:z.,".a
r
,.ter." S `£ .. € _ «,,.
, ..� , 1111,,. «�
11,11 .
✓r ., , ,
a <,,,,, ,.,,,,,,, ,. , + 1111.,, £, € s : , r. ,, •_ £ € rx r £ P ./ E ..
+, , ,r" ;1111. , . .,. 1111. -"
„ ",;
, , 1111 , ..,,,�. :
' � 1111 1111 -.-
,,,«,.,,.,,,.«,,,,.,«.«,..«,. € , f 1111 m _ .
�: ,a,»,.,� ,r �,,,,,,,.« „� «,„.„S ,, ,.,n ,. -1111 ..,,..,., . �" k,., ,„.,,....�,...,,,«,,,«., „,.,..„ /.,,,,.,,_,: y e „s 3:, " <' „r,,�' , {, ,,,,,,,, g t, �' >,,,pl,i 11,11, „„, «,,,,,,«..,,,,,«,,,,,,,. i
„111«1«„ , «,,,__, «« f i"YI L', di s` °., <' I , i" L. , h' ,5,,,,,, , p. I `. L'. i £ : , v #
t £ds, «,,,,..,, , 1111 11,11 6 / a
„ v Yf, „ ,ays ,v Z i . r,. , 'I s'
,«wro r " , r , S, f ,,. s k: !.. . , , 11,11. ..s , ,.,..._. e` , ,/
„ a
w 4,, ,,iii s,,,,,, ,m_
.." l,' 1,111, _..._..._ _ ..........., 1111..
I ., r , e 4. ,,,,t,,,,,i „,.na,., «,iii,, , r I t ,. 1,111__ ,°...._.., ,_ •1111_.»
1. 4 , ._ ,., 11.11.
P xY / o° .,_....°. 1,1,°11,° / -` " --
/r .. 1111 _, f .. .. ,/ / / ' f .1111 « .,,_,..., , .«
r f , Y " u, r
✓ , „ r i /. , # $. ,� . " � .. ., -.,, 1111
5 r /
., ; ., ([ ..,,,._,.,, .._.°.°..... ° ,..,,,...,° ,,....,, .._._.._ ._......,. «,«««...,,,,.,.._, 11«11... , « «.. «. 1111.,
, E ,.
w 1111.. ,. ,,.w,«,,,,, <.<«.,«„«, ,«<,.,,<.,< «<an.«e ,,,,,,,,,,,,. ,,.,,.3,,,, .«,.,,,,,,< «.,, ,.
_.0
¢ a, «��_ «111«1. ,«,,,«,,,^ <,<«"„�„ «,„ «1«111 ,,,^ ,. « „a.) ..,,,,,, z�.h - � r.. -- ,,.,..� ,�;a:«
&««««�a.„,w $ f r,,w, < «.„<,,,. 1111,,.«„ ,,,w,,,< «,,,,,,„ , recta /! //,Dr'C,s3 ,./ «., < :: «. « « :,, <.w .«,«m ° .md.«, «,,,,,,,.«,,,,,,,,«,,,,,,, ,,.,H „« ,.,w <.„.., «, s o . .�., f 1111..
/' ,v.,,,,�/ /.fi=r /' .,. 11.11.
,aiw ,w z r i ., ._ «„ 1111.
�.,,,,,,,, a: E ,f , , r „ ruuN
1111,, s , € 1111 r ` '' ' % t, `;. �'' r C' 1 `i- r/. w
I
, 1111 «. _, 1111... „. _ 11.11« 1111
111,1_.. 11.11. __._......_._. M
t_
11°11.. «.„ _ _ _
, ,,, ,.. 1111 1111 f
,��.�tr 1111.
,. /
,. � , � °..°.... �,..._... «. «1111..,.« .,,,,,,,,_ _ 11,11 _11.11.
r °^,, r+, , ".. i a, 1111 i t, .:. .., 1111, € - «1111,. � °,,..° °_ °........� ..... ............ ...,_°........°..°° ._...°_. . �, �,„ - 1111 .
/ , l t. ,, // y / 11.11
"„ s . °...._., s „ E , .._,.... I �! ,. S r i , # 1111 F` , r _ „r,__ _,P_..,. �, ,_ _t
1111. 1111___ ,.,.,._„ 1111_ 11,11._„ 1111,.._ ..
.,. ju,«
,n q ,..h, s 1111. " • 1111_ . .,.,,.°.. ., , ,,, `({ . s ✓/ E £ ,.r, , , z t ,. r s,:: 1111. 1111_, , 1111 8 , F 4 t d
# E Y b ,3 ,,. l , , £
....,,,, .«.. «.,,« 1111.,, «.. «1111.«« ,,,,,,,,,,,,,,,__, +, _ �_, ...._......
s W. 1111. , /, , 1111., 1111
, r
1111 ', _ 1111.,. ,,,,....,.., 11,11 1111. .......a�."
, !' „ ««1111,,, « «1111««, . ..............., , i S , «. �:..._...„„ 1111„.,. „««, «� „.
2 „ , ,,, «w<.«,<„«.«,�,�,,,,,««,N, <«,.,d , �e (( 1111 „„..,„,,,,,,,,,,,,,, 1111 , m.... 1111 ... E s
„N,„..., 1111 _.,.,.,,,,,. _,.,,,.,,,,. _,.,,,.„, 11,11,.. «...«,..„.,. „ «1111, «. 11.11„. ,,,,„,,,,. „,,,,,,,_, ,,..^.„_, . « „a «...t,.0 i[
a E ",,,,., # ° ( a „,..,.w,,., f'}.�. ;«, „ 1111, y, . y „/� ,ha„ 1««1«11« „...„„„, ,,..,,,°,.,,_ ,1111_, 1 s '-^'r 3 I __ ........................_... __�_..,,.,.i
1111,. _� /
1111.._ ,1111.„ _„.W 1«111,,, ,,,,,,,,,,, ,�.« 1111___ .. i I I % f % ...... 1111.._ 1111.. _. ., 1111 „r,.,
" 1111. .....,.. 1111 1111_,,, ,,, ,..
€ / „ „ <.. �. s €. _ 1111- 1111..° 1111,... ,_° ............... _
1111 1111 1111.. 1111..
1,111. . 1111, 1111.
, ( i � � 1 1,1,11 _ 1111... _ < �
1111.. 11.11 1111
1111_ r
s - r ° , W, 1111_,_. :
.$ 11»11,. _,,,.„.>,,,,.w.w«««.. E. i . ,
.. 1111.,' , 1111__ 1111____ .......,... �.F�,_ :,.;;,.._
,. ,.. ...r.. . ,:.:: 1111 1111,. „
1111 «1111 _ ' ,.,,,,„. „, 1111_ 11«.11„.„ ' 11.11, '.,___,., _,.,.,„.. _„_.,,,:.«
n
« «1111. , « «„ 1111., «,.,.,,.,._,... _,.....,... 1111,«,,., -.,, .« «, ,,.« « «,,. 1111,, ,,,,,,,,,,, ,_,,,,.,,. 1111,__ _,._,._„ 11.11 ..
�-° {{ .°.°...°, ...°_.,.,, _,„...W, ".°,.°,,,,,...,.,_,._ ....,,,°_ °,r °.. 1,1,11, 1,111.,. _ ................ 11.11__. ° /, �
,,,,,,,,,,,,,,,,,,,,,,, ,,, «,,,,....,: „.,.,,,,,,..,.,., ,«. « „ «,. «.«.,..,,,,,..« .. ,3, , "11.11..« _,_...,..,____. ,.,_..,, 1111, +1111 11,11, . � . _,_� I r,�c
y / g
,y!
.� 1 , °
,, ;' 1,111._, _. _. «_, _ � "� .,.i f „� �.«"' .«
> °„_°,,,. „°„°,,,, - .,, _°,.,....... °., ,,._,.,,, ,. 1111 ____. ,.,„,..,., _1111.. ,°,.,.,,,^ .,M, «,,, , 3
,1.11„ , "^ «
„__....., «..° ; «_ «. . ,.; 1111, __,,,.,,., _,,,_°,,..,,°,,..... 1111., « «, ......,, 1111,,. 1111 «.. °,,..«,,,,,.,,« 11«11,.. .. « «.« «1111. « «,,, .
�._ 1111., «_„.„_ _ „. __,,, „._... _ «« 1111
,.,..,,, .. «1111«. ,,.„.,..,. 1111 11.11 11°11. _,.,.,,,° 1111.. ° «. .__,„ .... ............ °.,..,r,,. _
' s ... 1111.. °« , :_, , 1111. „. .,,,,... ^„^ _,__.,, °_....,m ............ ............,... " 11.11..,....,...... .1111.,.. «,
, , .. ,. :' .,.......« ....._„_ .«. ....,.,,..., 1111., «.....«,_,_... °,..,,. .«,..«.«..._,.. 1111«. ««« «1111 «.,.„,...,. «1111 .. ............ '°",n.?..«
w ._«...... 1111,..« 1111. �... „««« ., . „,�..,.. 1111 «.«
y,� ... «1111. ,..,....,.« _._,..... _ «.,......._ .................° 1111, ° «.......... «," ...„«.,.,..., . «1111. °°,°,,... 111,1.... ,r
s € 35 s ,. }
N.
3
s, ,
s n
r
' i
e 1111 ... .......... _, 1111 _,,,,.,. °,_.°..... °.. 1,111.° 1,111, 11:1:1:`. ....,.„,.. .. °°....._ C i .6 1111 1111___ ......,, °.. «,.. «.«. .., _.«,r'
,
9 e 11.11__ .$a%3- ...................... ._,....., ,.„„.,., „. .., «1111 ,........,. «1111« ...,,.,,,, ,.,,,,,,,,. „......„..._„., ....,°,....,. ,,,,..,.,." 1111 .., . 1111.. ,_ 1111 ... ,..,...... 1111 1111. .„�
I r.,r. i a
2 .. � 4 I "
_, , _ 1111 . . ........... 1111_ . 1111 , 1111.., . _ _ _ m « .., 1111
11.-11 ,s. .. , ,„ ,..,�
... „° _ „ _ , .. 111,1,, .._..,< 1111.,, «.., 1111.««.. °,.....,° ,°.._.,.... _. _11,,,, -_ „ 1,111 k`
. ,..,, °,___ ___1,111._ 1,111" _ __,,,� °, °_°____ ,°. .. °,,,. «w/ f 11.11_,. .,, S . _. �... _° ......., « «, ,,,,,,,„ 1111_ 1111,,_. __.,,,..,° 1111.. � °_ m____° 1111.. ° °.......,, «1111, «,1111" ..,,,.., 1111. «„ , . , 11,11 1111_ _,
°_. ° °. °._. °_ °...�__ «1111„° __,__..,,..__.. « „ , t« _ /( _, 11°11°, 3f _ „�._ 1111_ .. 1111 1111°... «1111„. 1111.« .« 11.11 _.._...,. 1111_°. . 1111..„ 11.11,,.. _ . 11.11_°. ,.°..._....,., � �'
r 4 v r .€° �& , ,.. z, ..,..,.. 1111 .., _ ............. . 1111., f ..„_,,.... ,� °, 1111. 1111. .. .1111_.., «,. /�.. -1111. ... 1111 "�.�. 1111 F� „ -�,., i ni,,,, ._!.°.... 3 �� Mn„=, :�Ai
_ " , „ 1111. «.
_ °._ _ .,
_ «. 1111, , �;�.__ _ °�a _, 1,111,__ � 11,11° � «.�,,.«
1111°.. 1111, 1111_. „..w °,_„ 1111,,,_„ „ «1111 «_ ,« «1«111 ,.,,_.„_ „.««_.._„„„.„ 11«11_„. 3 1111. „. ..�.„„ .�„_. 3 , " , "/ S . , , 'a, J . , ... a " + �- .�.`^'°" E ,,,� „ ,,..w 1^111,. «,. 1111„ ., 1111, ,,,,,.,,,:, . ,H,�,w,a,«.,,,, s.�h,t :..
,
E s , m «,,,,,,a.,,zv,.,,,.,,«,,,,W,;, .«, ,,, ,.,,..,., ,,..w<�,,.,,/ ., .,�,„«, .,�,.«. .,,..«,,.,,.. ,i<..w, ✓, v ,.«u...v,v.!a,.W, 111 �...uiiio,,,,iiiiisrW.,,,,,.,i ,,,,,...::,.q.,.w ,.,.,,,,,,,,, a.,,,,,,,,,,,,,,,.,,,,,,,,, ,,,,,,,,,.»„i,.,,,rN,,,,,,«�«.w �'
13 , 1 ti , . «,., a «,,, H,,,,,, 1111,, 1111,, 1111 , ,, i , ; t r I . ,, 1
111«1.„.,« ...„...._ 1111_._ __....__ _..._,.,,..,,««,,,. - .,«..,,,, 111«1,. ,.,,,,,.,,,,, 1111„,°._ ..„«_._..,...._......�,« p. I F , 1 S i 1 I`1 I
."' y.,v. 1111 � £`.
j
1 1
r
.1111._., ...°.«.,., 111«1...', + r ^.,........ °......._ °°, ., 11.11. 3 _..,..,_. 1111.._. __.°,_..,, 1111. 11.11_. _. 1111 1111. ' / ... 11.11 . ............ .. .......... 1111
1
I I , 1 II , ' � € j f' 1
r , +
7 3
I
i I
1111 '
t
1,111, ..-, " , , , ! ',.. +
E
11.11.__... °° ...._...... 1111._, .... °.. °......_. _ 1111.11.11 ° - .. _1.1 -11.__,__ 1111,,° °...... °............ 7: i
1111 - 1,111 ,
} I
I
i £ # 3° s
1
_ _. _ 1111. _. .. .. .✓ i _
f £ ,
£ ,,, f � .. 1111 ! 1111. .._....... _, £1111 .°° £ - ( a € 't j
[ I
i � 1 #
F. ,1111 { £
�„r, s� I I I
/ N ,,,,u„1,1,v,,, (
F
f j (
f "`k" f t i I
__6 , ✓
I
ice« i i
,�
,. z,»,�,,.;,,,, x,nw�rL �, ,u;:,. ... ,,,_,.... «, _. «. « °. 1111.,... ._................_. 1111 _._.°°.. ._....°, .1111__, 11.11... __....... 1111 1111 .. .. ...._..°
_ 1111_ _° ___ _ 1111 ", , --
f,
,
1111 1111, ,
�, _ 1111 _1111° 1111 } ! £ t
f � ° _. _ 1111 _ 1111_ _ 11°11 _ °_ _�__ _._ 11.11_ .. £
I i
:3 i
a Ns
M
_ 1111.. '4 s , , > ". 1111 - 1111 .. ....................._ ._......... ...___ °S'.,,.............r , .%r...° 1111. ''1111... 1111. ........ ... f, . ... 1111., .. 1111.... 1111, 1111..,_ _,.....°......, .._....... _., . � ... .. 11,11., 1111,. _. "11,11
$j £Y .. 1111 p ! <� - { 3
pm F 1 £ yi, i £ i , ,.. i k € z s E E F s "5.. y ,....I n.,.. _ .. a "1_,.'" .�f , ! t € .,h '°w". i w', , Q .5i°,,,.w,.,«ama„'e",.,m ,,,.,,, „,,,..«+�..«« z S # , _ -.. . «. .. .�„F,,,.n
PARTIAL SITE L 3D 15 3°!
o as
i3' 1_n1QT1 IDOM ADCA - 77 A(`DDC 1 if -�nf nn
1 " =30'
DESIGNED BY:_
DRAWN BY:
SHEET CHK'D BY:.
CROSS CHWD BY:
APPROVED BY:-
DATE:
I
B FT
PDS
ALS
DECEMBER 2014
I^" .V CONSTRUCTION OR LAND
DISTURBANCE ACTIVITIES MAY BEGIN
UNTIL ALL TEMPORARY SEDIMENT
AND EROSION CONTROL MEASURES
¢` I HAVE BEEN INSTALLED AND
`era APPROVED BY LOCAL AUTHORITY.
,!j
�r
3. ONCE ALL EROSION CONTROL AND
1k STORM WATER DIVERSION MEASURES
I HAVE BEEN INSTALLED, LAND
I CLEARING AND GRUBBING, AS
REQUIRED, WITHIN THE LIMITS OF 2
DISTURBANCE (LOD) MAY BEGIN, AS
SHOWN ON THE CONTRACT DRAWINGS.
1 4. ALL STRIPPED TOPSOIL SHALL BE
STOCKPILED IN THE DESIGNATED
If STOCK PILE /LAYDOWN AREAS AND
TEMPORARY SEEDING MEASURES
11 SHOULD BE EMPLOYED THROUGHOUT
CONSTRUCTION. STOCKPILE
` n_ LOCATIONS SHALL REMAIN MORE
f w � THAN 50 -FT FROM STORM DRAINS
*"•,,m 1 z_ � AND/ OR STREAMS. EARTHWORK,
"',,; " °° = i STORAGE OF MATERIAL, ETC. IS
, U
(-
PROHIBITED OUTSIDE THE DESIGNATED
: ° LIMITS OF DISTURBANCE.
_.,� 5. THE CONTRACTOR SHALL MAINTAIN
° & A ALL EROSION AND SEDIMENTATION
CONTROL MEASURES INSTALLED
fw
DURING PHASE I ACTIVITIES, AND
INSTALL ADDITIONAL EROSION
0.1 CONTROL AND TEMPORARY GROUND
1
STABILIZATION MEASURES AS MAY BE
1 REQUIRED AS DETERMINED BY THE
W 1 " _ ENGINEER OR OWNER.
,:
' 6. ALL SEDIMENTATION CONTROL
°11 a � DEVICES SHALL BE INSPECTED
�''{ WEEKLY AND AFTER EACH RAINFALL
++ I EVENT OF 1/2-IN OR GREATER AND
i '' REPAIRED OR REPLACED IMMEDIATELY
I
, ,, AS NECESSARY. SEDIMENT SHALL BE
�a', REMOVED FROM BEHIND SILT FENCE,
STABILIZED OUTLETS, AND INLET
\ PROTECTION WHEN IT ACCUMULATES
I TO ONE -HALF THE DESIGN DEPTH OF
THE MEASURE. ALL REMOVED
SEDIMENT SHALL BE DISPOSED OF IN
A LOCATION AND IN SUCH A MANNER
AS TO CAUSE NO FURTHER SEDIMENT
TRANSPORT. THE CONTRACTOR SHALL
I MAINTAIN ALL EROSION AND
I SEDIMENTATION CONTROL MEASURES
THROUGHOUT CONSTRUCTION
ACTIVITIES AS INDICATED IN
SPECIFICATION SECTION 022776.
1�, I 7. THE CONTRACTOR SHALL PROVIDE
"' TEMPORARY GROUND COVER ON ALL
/'�'
DISTURBED AREAS WHERE WORK HAS
\ '06 TEMPORARILY CEASED WITHIN SEVEN
'�`�\ (7) WORKING DAYS. DISTURBED
I � AREAS OF THE SITE WHERE
I CONSTRUCTION ACTIVITIES HAVE
� I
PERMANENTLY CEASED SHALL BE
�'°' Ar , STABILIZED WITH PERMANENT GROIN
COVER WITHIN FOURTEEN (14) 0
Win..,.. .-
';. _,, CALENDAR DAYS FOLLOWING � ,
-// COMPLETION.
Y°
,.
NCA CA
R R
0 � Lu
I � <i 1� Obi
O A O Y
SS S
S
O
F F 0
� O '9 = O "9
q'
'V
'9 9
Q l Q
SEAL SEAL
18178 r 18560 �o z
Pl' 40iN��� �i /C FNCINE�� �r`�
NLs\ tigELSPN�
PROJECT NO. 30841 005
I� CONTROL .
�1� ,.
-, i� 4
11 SHEET •
1` f t..� PLAN PHASE .
CO a
II C
E CL
' | `
oil, Ill
ry-
Lij
AERATION BASIN AERA'TON BASIN AERATION BASIN AERATION BASIN
K / -j���� N{l9 ! N[\10 f NO]1 K N[.12
ry
IN
DARY
CLARIFIER NO 2 CLARIFIER
1 � |
MAYCIII LINE
SEE DRAWING RFP 1
CLARIFIER NO.6
RAS PUMP
STATION NO 1 STATION NO.2
Tj
N.
ft
|
'
EXISTING STORM MANHOLE
I EXISTING STORM MANH
SECONDARY
CLARIFIER NO.4
/Z EFFLUENT
AT
FILTERS
-4— 4W
CD
�
� u�
�
. �
<
�
� > LLJ ||
[u
�
un
� CD
>
ID
DISTURBED AREA 22 ACRES
°
STABILIZED OUTLET FOR
SILT FENCE, TYP.
�
\\\l\\\
-TEMPORARY SEDI
az
TEMPORARY
DIVERSION CHANNEL
SECONDARY
CLARIFIER NO.7
STATION NO.3
~
0
PARTIAL S|TE PLAN
CITY OF GREENSBORO
NORTH CAROLINA
ffo," M' =
EOVi[o:;Jlmental EOgiO88[S & Scientists
4011 WeotChose Bou|evord, Suite 500
Ro!eigh, North Carolina 27607
License No. : C-0381
0
_
EMERGENCY SPILLWAY LINE
WITH CLASS B EROSION
CONTROL 5TONE. 12' TH|CK
WRF 56MGD UPGRADE PROJEC]
\`
\
`
DIVERSION CHANNEL
02270111 ,
_
TEMPORARY
SEDIMENT BASIN 2
CONSTRUCTION SEQUENCE:
1. INSTALL TEMPORARY GRAVEL
� CON5TRUCTIONENTRANCF/3\. ALL
OTHER TEMPORARY PERIMETER
EROSION AND SEDIMENT CONTROL
MEASURES, INCLUDING INLET
;
PROTECTION, SILT FENCE, AND TREE
X
PERIMETER FENCE. �
�
2. INSTALL TWO TEMPORARY SEDIMENT �
BASINS AND ALL OTHER TEMPORARY
EROSION CONTROL MEASURES AT
LOCATIONS SHOWN ON CONTRACT
DRAWINGS RFP 1-2 THROUGH RFP
1-5. INLETS, OUTLETS. AND ALL
MATCH LINE BERMS OF THE TEMPORARY SEDIMENT
BASINS SHALL BE IMMEDIATELY
---SEE
STABILIZED WITH EROSION CONTROL
STONE OR OTHER PERMANENT
GROUND COVER. CONSTRUCT THE
BERM ON THE NORTHERN PORTION
OF THE PROJECT LIMITS AND THE
PERMANENT 3T0RW0NTER DIVERSION
CHANNEL RUNNING TO THE EAST AND
SOUTH. CUT AND FILL SLOPES OF
3TORMWATER DIVERSION CHANNEL
SHALL BE PERMANENTLY STABILIZED
AND TEMPORARY SLOPE DRAINS
INSTALLED AT LOCATIONS AS PER
CONTRACT DRAWINGS. NO
CONSTRUCTION OR LAND
DISTURBANCE ACTIVITIES MAY BEGIN
UNTIL ALL TEMPORARY SEDIMENT
~ AND EROSION CONTROL MEASURES
�~ HAVE BEEN INSTALLED AND
~~ ~~ APPROVED BY LOCAL AUTHORITY.
~~
3. ONCE ALL EROSION CONTROL AND
STORM WATER DIVERSION MEASURES
HAVE BEEN INSTALLED, LAND
CLEARING AND GRUBB|NC, AS
REQU|RED, WITHIN THE LIMITS OF
DISTURBANCE (LOD) MAY BE0N, AS
SHOWN ON THE CONTRACT DRAWINGS.
4. ALL STRIPPED TOPSOIL SHALL BE
STOCKPILED IN THE DESIGNATED
STOCK P|LE/AYDOWN AREAS AND
TEMPORARY SEEDING MEASURES
SHOULD BE EMPLOYED THROUGHOUT
CONSTRUCTION. STOCKPILE
~~~�
LOCATIONS SHALL REMAIN MORE
THAN 50—FT FROM STORM DRAINS
. AND/ OR STREAMS. EARTHWORK,
.
SILT F STORAGE OF MATERIAL, ETC IS
FENCE AND TREE '
`. PROTECTION FENCE TYP. PROHIBITED OUTSIDE THE DESIGNATED
LIMITS OF DISTURBANCE.
5. THE CONTRACTOR SHALL MAINTAIN
ALL EROSION AND SEDIMENTATION
CONTROL MEASURES INSTALLED
DURING PHASE ACllV1llE3. AND
INSTALL ADDITIONAL EROSION
`
CONTROL AND TEMPORARY GROUND
STABILIZATION MEASURES AS MAY BE
REQUIRED AS DETERMINED BY THE
ENGINEER OR OWNER.
�
5. ALL SEDIMENTATION CONTROL
DEVICES SHALL BE INSPECTED
@ WEEKLY AND AFTER EACH RAINFALL
� EVENT OF 1/2—|N OR GREATER AND
REPA]RED OR �EPLACED |W�ED|ATELY
A8 NECESSARY. SEDIMENT SHALL BE
REMOVED FROM BEHIND SILT FENCE.
0 � STABILIZED OUTLETS, AND INLET
/
PROTECTION WHEN IT ACCUMULATES
TO ONE—HALF THE DESIGN DEPTH OF
THE MEASURE. ALL REMOVED
SEDIMENT SHALL BE DISPOSED OF IN
A LOCATION AND IN SUCH A MANNER
AS TO CAUSE NO FURTHER SEDIMENT
U�
TRANSPORT. THE CONTRACTOR SHALL
MAINTAIN ALL EROSION AND
SEDIMENTATION CONTROL MEASURES
THROUGHOUT CONSTRUCTION
ACTIVITIES AS INDICATED IN
SPECIFICATION SECTION 022775.
7. THE CONTRACTOR SHALL PROVIDE
\
TEMPORARY GROUND COVER ON ALL
\
�
DISTURBED AREAS WHERE WORK HAS
TEMPORARILY CEASED WITHIN SEVEN
\ /7\ WORKING DAYS. DISTURBED
AREAS OF THE SITE WHERE
CONSTRUCTION ACTIVITIES HAVE
PERMANENTLY CEASED SHALL BECO
\�
STABILIZED WITH PERMANENT CRC��O
` 14/ \ Z COVER WITHIN FOURTEEN / `��
CALENDAR DAYS FOLLOWING
^^
COMPLETION. _~
CARo CAR
LU
~�^ �tSS/(������ ���^�r�_SS/Ov���r�
LL
SE L SEAL 0
LL-
18178 18560 z
PROJECT NO. 30841 005
R|PRAP OUTLET PAD
10'VVX8'LX12"
THICK CLASS B
EROSION CONTROL
30 15 0 30'
1"=3O'—O"
FILE NAME: RFP 1-5
EROSION CONTROL
SHEET NO.
CIVIL
PARTIAL SITE PLAN - PHASE 1 RFP 1-5
Lq
DATE DRWN CHKD
NO.
STABILIZED OUTLET FOR
SILT FENCE, TYP.
�
\\\l\\\
-TEMPORARY SEDI
az
TEMPORARY
DIVERSION CHANNEL
SECONDARY
CLARIFIER NO.7
STATION NO.3
~
0
PARTIAL S|TE PLAN
CITY OF GREENSBORO
NORTH CAROLINA
ffo," M' =
EOVi[o:;Jlmental EOgiO88[S & Scientists
4011 WeotChose Bou|evord, Suite 500
Ro!eigh, North Carolina 27607
License No. : C-0381
0
_
EMERGENCY SPILLWAY LINE
WITH CLASS B EROSION
CONTROL 5TONE. 12' TH|CK
WRF 56MGD UPGRADE PROJEC]
\`
\
`
DIVERSION CHANNEL
02270111 ,
_
TEMPORARY
SEDIMENT BASIN 2
CONSTRUCTION SEQUENCE:
1. INSTALL TEMPORARY GRAVEL
� CON5TRUCTIONENTRANCF/3\. ALL
OTHER TEMPORARY PERIMETER
EROSION AND SEDIMENT CONTROL
MEASURES, INCLUDING INLET
;
PROTECTION, SILT FENCE, AND TREE
X
PERIMETER FENCE. �
�
2. INSTALL TWO TEMPORARY SEDIMENT �
BASINS AND ALL OTHER TEMPORARY
EROSION CONTROL MEASURES AT
LOCATIONS SHOWN ON CONTRACT
DRAWINGS RFP 1-2 THROUGH RFP
1-5. INLETS, OUTLETS. AND ALL
MATCH LINE BERMS OF THE TEMPORARY SEDIMENT
BASINS SHALL BE IMMEDIATELY
---SEE
STABILIZED WITH EROSION CONTROL
STONE OR OTHER PERMANENT
GROUND COVER. CONSTRUCT THE
BERM ON THE NORTHERN PORTION
OF THE PROJECT LIMITS AND THE
PERMANENT 3T0RW0NTER DIVERSION
CHANNEL RUNNING TO THE EAST AND
SOUTH. CUT AND FILL SLOPES OF
3TORMWATER DIVERSION CHANNEL
SHALL BE PERMANENTLY STABILIZED
AND TEMPORARY SLOPE DRAINS
INSTALLED AT LOCATIONS AS PER
CONTRACT DRAWINGS. NO
CONSTRUCTION OR LAND
DISTURBANCE ACTIVITIES MAY BEGIN
UNTIL ALL TEMPORARY SEDIMENT
~ AND EROSION CONTROL MEASURES
�~ HAVE BEEN INSTALLED AND
~~ ~~ APPROVED BY LOCAL AUTHORITY.
~~
3. ONCE ALL EROSION CONTROL AND
STORM WATER DIVERSION MEASURES
HAVE BEEN INSTALLED, LAND
CLEARING AND GRUBB|NC, AS
REQU|RED, WITHIN THE LIMITS OF
DISTURBANCE (LOD) MAY BE0N, AS
SHOWN ON THE CONTRACT DRAWINGS.
4. ALL STRIPPED TOPSOIL SHALL BE
STOCKPILED IN THE DESIGNATED
STOCK P|LE/AYDOWN AREAS AND
TEMPORARY SEEDING MEASURES
SHOULD BE EMPLOYED THROUGHOUT
CONSTRUCTION. STOCKPILE
~~~�
LOCATIONS SHALL REMAIN MORE
THAN 50—FT FROM STORM DRAINS
. AND/ OR STREAMS. EARTHWORK,
.
SILT F STORAGE OF MATERIAL, ETC IS
FENCE AND TREE '
`. PROTECTION FENCE TYP. PROHIBITED OUTSIDE THE DESIGNATED
LIMITS OF DISTURBANCE.
5. THE CONTRACTOR SHALL MAINTAIN
ALL EROSION AND SEDIMENTATION
CONTROL MEASURES INSTALLED
DURING PHASE ACllV1llE3. AND
INSTALL ADDITIONAL EROSION
`
CONTROL AND TEMPORARY GROUND
STABILIZATION MEASURES AS MAY BE
REQUIRED AS DETERMINED BY THE
ENGINEER OR OWNER.
�
5. ALL SEDIMENTATION CONTROL
DEVICES SHALL BE INSPECTED
@ WEEKLY AND AFTER EACH RAINFALL
� EVENT OF 1/2—|N OR GREATER AND
REPA]RED OR �EPLACED |W�ED|ATELY
A8 NECESSARY. SEDIMENT SHALL BE
REMOVED FROM BEHIND SILT FENCE.
0 � STABILIZED OUTLETS, AND INLET
/
PROTECTION WHEN IT ACCUMULATES
TO ONE—HALF THE DESIGN DEPTH OF
THE MEASURE. ALL REMOVED
SEDIMENT SHALL BE DISPOSED OF IN
A LOCATION AND IN SUCH A MANNER
AS TO CAUSE NO FURTHER SEDIMENT
U�
TRANSPORT. THE CONTRACTOR SHALL
MAINTAIN ALL EROSION AND
SEDIMENTATION CONTROL MEASURES
THROUGHOUT CONSTRUCTION
ACTIVITIES AS INDICATED IN
SPECIFICATION SECTION 022775.
7. THE CONTRACTOR SHALL PROVIDE
\
TEMPORARY GROUND COVER ON ALL
\
�
DISTURBED AREAS WHERE WORK HAS
TEMPORARILY CEASED WITHIN SEVEN
\ /7\ WORKING DAYS. DISTURBED
AREAS OF THE SITE WHERE
CONSTRUCTION ACTIVITIES HAVE
PERMANENTLY CEASED SHALL BECO
\�
STABILIZED WITH PERMANENT CRC��O
` 14/ \ Z COVER WITHIN FOURTEEN / `��
CALENDAR DAYS FOLLOWING
^^
COMPLETION. _~
CARo CAR
LU
~�^ �tSS/(������ ���^�r�_SS/Ov���r�
LL
SE L SEAL 0
LL-
18178 18560 z
PROJECT NO. 30841 005
R|PRAP OUTLET PAD
10'VVX8'LX12"
THICK CLASS B
EROSION CONTROL
30 15 0 30'
1"=3O'—O"
FILE NAME: RFP 1-5
EROSION CONTROL
SHEET NO.
CIVIL
PARTIAL SITE PLAN - PHASE 1 RFP 1-5
N
O
N
� 4
� C
JG
>�
� �
C�
Z_
Q
� a
� IX
O
d 6
t �
O �
�e
d- d
� C
O �
� LL
O y
II C
F
J C
W d
AERATION BASIN AERATION BASIN AERATION BASIN AERATION BASIN
N{\9 / 11010 NO]l N[\12
Lu
Ij
SECONDARY SECONDARY
CLARIFIER NO.2 CLARIFIER N0,.5
ild
LINE
-___~.=���
. .
|
(D
C]'
Ln
m
DI 4
t 18 GRATE: 720.58
17 INV IN: 713.56
INV OUT: 711.23
SECONDARY
CLARIFIER N0.6
STABILIZED OUTLET FOR !||
SILT FENCE, TYP.
RAS PUMP �/ | � | RA3 PUMP
�---
cr^no^/ un, ff�—�� �| �k' � � ~�/ r |
D| 5
{RATE: 719.52
SECONDARY ----------
CLARIFIER N0.7
STORM DRAIN
SEE PROFILE
DWG RFP-10
INLET PROTECTION, TYP.
RAS PUMP
STATION NO.3
u/^nvm 110^1
INV IN: 705.26
3 LF 36 RC
sF
EXISTING STORM MANHOLE EXISTING STORM MAN
SECONDARY
CLARIFIER NO.4
'o" I EFFLUENT
NX
FILTERS
nt
� l!�
� .
LL-
�|
�� .
� |
' | " ' | |
"
� |
<
<
Ld
DISTURBED AREA 22 ACRES
<
DESIGNED BY: BFT
"o BFT
6i DRAWN BY:
SHEET CHWD BY:
CROSS CHK'D BY: PDS
ALS
d- APPROVED BY:
DATE DRWN CHKD REMARKS DATE: DECEMBER 2014
\ L- SILT FENCE OUTLET TYP.
FENCE, SILT TYP.
CONTRACTOR TO VERIFY LOCATION
OF EXISTING PIPING AND ADJUST
STORM DRAIN AS NECESSARY
WATER BOUNDARY
FRINGED WETLAND BOUNDARY
ZONE 1
01 NO �
PARTIAL SITE PLAN_
WAIT-R
ELEVA�ON
*10111��
EMERGENCY SPILLWAY LINE
WITH CLASS B EROSION
CONTROL 3TDNE, 12^ THICK
TEMPORARY SEDIMENT
BASIN 2
�
DI 6
1. TEMPORARY SEDIMENT BASIN 1
Lo
INV IN: 707.29
DIVERSION CHANNEL AROUND
INV OUT: 707-19
SECONDARY CLARIFIER NO.7 SHALL
BE CONSTRUCTED. TEMPORARY
INV IN: 706 70
OPERATIONAL UNTIL ALL
CONSTRUCTION ACTIVITIES HAVE
BEEN C0MPLETED, OR AS
IN
CONSTRUCTION SEQUENCE ALLOWS.
2. CONTRACTOR MAY BEGIN
STORM DRAIN
SEE PROFILE
DWG RFP-10
INLET PROTECTION, TYP.
RAS PUMP
STATION NO.3
u/^nvm 110^1
INV IN: 705.26
3 LF 36 RC
sF
EXISTING STORM MANHOLE EXISTING STORM MAN
SECONDARY
CLARIFIER NO.4
'o" I EFFLUENT
NX
FILTERS
nt
� l!�
� .
LL-
�|
�� .
� |
' | " ' | |
"
� |
<
<
Ld
DISTURBED AREA 22 ACRES
<
DESIGNED BY: BFT
"o BFT
6i DRAWN BY:
SHEET CHWD BY:
CROSS CHK'D BY: PDS
ALS
d- APPROVED BY:
DATE DRWN CHKD REMARKS DATE: DECEMBER 2014
\ L- SILT FENCE OUTLET TYP.
FENCE, SILT TYP.
CONTRACTOR TO VERIFY LOCATION
OF EXISTING PIPING AND ADJUST
STORM DRAIN AS NECESSARY
WATER BOUNDARY
FRINGED WETLAND BOUNDARY
ZONE 1
01 NO �
PARTIAL SITE PLAN_
WAIT-R
ELEVA�ON
*10111��
EMERGENCY SPILLWAY LINE
WITH CLASS B EROSION
CONTROL 3TDNE, 12^ THICK
TEMPORARY SEDIMENT
BASIN 2
�
SILT FENCE AND TREE
PROTECTION FENCE, TYP.
``—R|PRAP OUTLET PAD
12' YY X 10^ L X 0.7'
THICK CLASS B
30 15 0 36
�/
�-./.
� \ \
SEAL
4 el
EROSION CONTROL
CIVIL
PARTIAL SITE PLAN - PHASE I
CONSTRUCTION SEQUENCE:
1. TEMPORARY SEDIMENT BASIN 1
Lo
SHALL BE FILLED AND THE
DIVERSION CHANNEL AROUND
�
SECONDARY CLARIFIER NO.7 SHALL
BE CONSTRUCTED. TEMPORARY
SEDIMENT BASIN 2 SHALL REMAIN
OPERATIONAL UNTIL ALL
CONSTRUCTION ACTIVITIES HAVE
BEEN C0MPLETED, OR AS
IN
CONSTRUCTION SEQUENCE ALLOWS.
2. CONTRACTOR MAY BEGIN
LARGE—SCALE EARTHWORK,
INCLUDING EXCAVATION OF
TANKAGE AND FILLING OF AREAS
A3 R[QU|RED TO �EET RNAL
'
GRADE.
3. MON|T0R, MA|NTA|N, AND RECORD
�
ALL EROSION AND SEDIMENTATION
CONTROL MEASURES AND
ACTIVITIES IN ACCORDANCE WITH
THE REQUIREMENTS OF THE
CONSTRUCTION STORMWATER
NPDES PERMIT.
4. ONCE ALL PHASE U 3T0RWWATER
DIVERSION AND EROSION AND
SEDIMENT CONTROL MEASURES
A
ARE IN PLACE AND FUNCTIONAL,
�
^
HEAVY CONSTRUCTION ACTIVITIES
MAY BEGIN, INCLUDING THE
CONSTRUCTION OF THE 35"
|
3TORMWATER PIPING NETWORK AS
SCHEDULE ALLOWS.
5. CONTRACTOR SHALL COORDINATE
THE CLOSURE OF ACCESS ROADS
~�.
WITH THE OWNER AND ENGINEER
`~
BEFORE INSTALLATION OF 50"
PCB.
SILT FENCE AND TREE
PROTECTION FENCE, TYP.
``—R|PRAP OUTLET PAD
12' YY X 10^ L X 0.7'
THICK CLASS B
30 15 0 36
�/
�-./.
� \ \
SEAL
4 el
EROSION CONTROL
CIVIL
PARTIAL SITE PLAN - PHASE I
0
N
N
O ta.
� G
/ Q
�.
N�
Z
Q �
�a
6 �
� 6
� �
/�
� �
� C
O �
O 4
O a
„ G