HomeMy WebLinkAbout20221608 Ver 1_Shoreline Stabilization_20221115Shoreline Stabilization Application Form
NORTH CAROLINA
Environmental Quality
15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization
FORM: SSGP 10-2013
DRAFT -NOT FOR USE AT THIS TIME
Submission Form
I. Applicant Information [15A NCAC 02H .0502(a)]
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all
mandatory questions are answered.
Primary Contact Email*
hager@lakepermit.com
Please provide an email address for payment and requests for more information here.
Pre -Filing Meeting Date Request was 11/11/2022
submitted on: *
Owner Information:
Name: *
Email: *
Phone Number:
Mailing Address: *
DOUGLAS R JEFFERY
DOUGLAS.JEFFERY55 @GMAIL.COM
(858)242-9797
(xxx)xxx-xxxx
Street Address
168 Sunrise Circle
Address Line 2
City
Mooresville
Postal / Zip Code
28117-6675
Is there an agent working on the project? * Yes
No
Agent/Consultant Information
State / Province / Region
NC
Country
US
Name: * TAMARA HAGER
Company Affiliation: * LAKE PERMIT LLC
Email:* hager@lakepermit.com
Phone Number:*
(704)575-2227
(xxx)xxx-xxxx
Mailing Address:*
Street Address
PO BOX 5335
Address Line 2
City State / Province / Region
MOORESVILLE NC
Postal / Zip Code Country
28117 US
A signed and dated copy of the Agent Authorization letter:*
JEFFERY AUTH.pdf 164.44KB
Link to: Sample Agent Authorization Form
Project Information [15A NCAC 02H .0502(a) & (b)]
Project Name:*
JEFFERY
If your project has a formal name please use this. If your project does not have a formal name, please identify your project
by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses
any other names that have been used to identify the project in the past.
1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to
local landmarks such as towns, rivers, and roads. *
Upload File
Look up address
Upload Map: JEFFERY SURVEY.pdf
Latitude:*
35.544659
Longitude: *-80.934819
2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing,
structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below
Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under
section 12.normal pool lake level/normal water level*
JEFFERY SKETCH.pdf 100.86KB
Please use the diagram at the link below:
https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard
stick, shovel handle, etc.)
Jeffery pics.pdf 100.51 KB
4. Location of the property (where work is to be conducted)
Nearest Town: * MOORESVILLE
County: * Iredell
Lake/ river/ ocean adjacent to NORMAN/CATAWBA
property:
Subdivisions name or site address: *
THE HARBOUR LOT NUMBER 36
Include phase/lot number
Directions to site: *
FROM MARSHALL STEAM STATION TRAVEL NW ON HWY 150 11
MILES, TURN RIGHT ONTO MORRISON PLANTATION PKWY 1.1
MILES, TURN RIGHT ONTO BRAWLEY SCHOOL RD 3.6 MILES,
TURN RIGHT ONTO BAY HARBOUR RD .40 MILES, TURN LEFT
ONTO LAKE MIST DR .20 MILES, TURN RIGHT ONTO SUNRISE
CIR .20 MILES , PROPERTY ON RIGHT 325 FT.
Please include road names and numbers, landmarks etc.
5. Describe the existing land use or condition of the site at the time of this application: *
RESIDENTIAL
Residential, undeveloped, etc.
6. Property Size
1.04
Acres
7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or
why it is necessary):
RIP RAP MAINTENANCE
8. How will the work be done? *
From Land
From Water
9. Total amount of disturbance below the normal pool lake level/ normal water level: *
0
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
square feet
10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land-
ward: *
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
0
square feet
11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to
be impacted:*
(number of trees, for instance)
NONE BY BARGE
Sketch: JEFFERY SKETCH.pdf 100.86KB
Application Fee:
Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The
application fee is as follows (pursuant to G.S. 143-215.3D):
o $240.00 for impacts to lake (below normal water level) of less than 1 acre
o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre
By digitally signing below, I certify that:
o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best
of my knowledge and belief
o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of
the NC General Statutes (the "Uniform Electronic Transactions Act");
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act");
a I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
I intend to electronically sign and submit the Shoreline Stabilization online form.
Full Name:* DOUGLAS R JEFFERY
Signature:
.60WAS Ffe
Submittal Date: 11/11/2022
Initial Review
Is this accepted into the review process?* Yes No
Project Number: * 20221608 Version: * 1
Select Reviewer: * Andrew Pitner:eads\ahpitner
Select Reviewing Office: Mooresville Regional Office - (704) 663-1699
Has payment been received?* No Payment Needed
Fee Received
Need Fee - send electronic notification
What amount is owed?* $240.00
$570.00
i}mj'w.t Nsma)ad*w
n
Prlrit
LS ltnrrk �IUU34r,
ihs xppraVal is for the purpose and design described in your application. Itnpacts nat Indluned In the
AP011cation Is a viofaifan of the Bu,For Rule. Sftsapecffie work should be provided in the oppllcPtion_ j'A3A NCAT
02H .0506 and I A NCACO2B .024318p
Tress*(* not allowed to be removed from Zone 1 of the Surer {wfthIn30 ft of the nalI pond e4evation), uniese
ePPraVOC- areaptJon, those trees tilt im severmly undsrrnrned afongthl§ €mmedfate shoref ine cen he removed.
MIN meI shaafng Ynd sloping along the irnmedl*te shordlna is Clawed. (15A NCAC 028.024.3(6}?
Berichtng, grading fr+ the bufcar;s not allowed_ Excessilye d€st`urbance Crf Ira und coves. (15A NCAC 02B.0243 (d)'
3a2chas, lrnpe?viatcs pettoz, imper+rrous iAralkways, etc- are nat allowed In the buffer unless sp>=c3?lcally approved
by thS fJMsta,7. Them are Itmttatlon on siaeivr decks. i15A NCAC 026.132r43141 and (6))
Work to be conducted iron land mvrt IndIcate 8r i zcLness ;ind iindicats env trees that are to be removed, y rsE
work ooMdor should be desptbed. The eooroved access corridor steal] be restored_ Staging, spoil, constructior
material must be outside the buffer_ (i5A NCAC 028.0602 end l5A ,'fC:Ar 0s8 .0243 !A), IE), EBi
5ta�rnufater cannrrt ba PTged or channefed for dtract ditcherfe to tna ;;xa_ All cons`ru�'ea Drr.r�:ta'
dIsCr 8r9xs Must be st the natural sievetron end rdfacherwed prior to entering the buffer dIrecced as c1'Nsa cr
sheet flow st non-arosiva veloctdw to the Lake. MA NCAC 028 .0243 (5), (6),
i cknow liedgerne7t of Natift aeon
4 hareby state that I have been Informed V the Catawba
fter,an 8 er Rule. Any W_Orkco'Aductdl to the buffo=-, not specMally Tatted 1;1 the appucata on -and approved
by the Dfwislon of W*tar Resoearcts (DWR), is s violaticri and subject to enforcement. Due diilgsnce will ba
taken such that the eonsctructicj w(fj be auf tw€thIn substantial compliance and intent ofthe 401 Water
Quailty Cer;iftcstlon and Buffer Ru}as, the approved plan Is) and saecfPlcatan(s), and other supporting
materials_
5fgnature (owneit.
i
egg
4tp
M
Lake
* FL'11 Pond/Normal Water Level
1
Fi r l l Gn �,4 ■
,f:;,, -ve
73 3�iAgM
WiM6 L3N�
FCC VAT6,2—
v
Please apprgxlmately sketch the following information on this plan 1provid4r dlmens:ons foreoch
rt", such as IOft x 100 ft] *:
s- All proposed vegetation cfearfng
2. Location of rip rap or fill to be placed above the Full Pond/•Normal Water Level elevation
3. Location of rip rap or tlll to be placed below the Full Pond/ Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining walls, docks, etc.
5, location of any excavation or dredging below the Full Pond/ Normal Water Level elevatlon
�• Location of construction access corridors
F-DRPA: SSGp 10-2013
Page 3 of 3
From Tamara M&W ternwahagwO doud corn
&*Joct: 3ellery shormins pres
l]&ta_ NcnBmbor 5, 21M at 10.28 Aloe
To- TAMARA HAGER hagdrislak"rrnit com
M
Lake
* FL'11 Pond/Normal Water Level
1
Fi r l l Gn �,4 ■
,f:;,, -ve
73 3�iAgM
WiM6 L3N�
FCC VAT6,2—
v
Please apprgxlmately sketch the following information on this plan 1provid4r dlmens:ons foreoch
rt", such as IOft x 100 ft] *:
s- All proposed vegetation cfearfng
2. Location of rip rap or fill to be placed above the Full Pond/•Normal Water Level elevation
3. Location of rip rap or tlll to be placed below the Full Pond/ Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining walls, docks, etc.
5, location of any excavation or dredging below the Full Pond/ Normal Water Level elevatlon
�• Location of construction access corridors
F-DRPA: SSGp 10-2013
Page 3 of 3