Loading...
HomeMy WebLinkAboutWQ0001086_2012 Annual Biosolids Report_20130128Town of Spring Lake, North Carolina 2012 Annual Biosolids Report 0s;il CA 101i, o a �S....,,S/r,LOB!/' f� 7r.7�.1 EAL. e 033778 .4Qv .111111110 1Iy i 13 l Permit # WQ0001086 NPDES Permit # NC0030970 Prepared By MacConnell & Associates, P.C. P.O. Box 129 Morrisville, NC 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 DENR-FRO FEB 0 5 2013 " DWG RECEIVEDIDENRIDWQ FEB 01 2013 Aquifer Protection Section Ts� Town of Spring Lake, North. Carolina 2012 Annual Biosolids Report Summary Facility Name: Town of Spring Lake Wastewater Treatment Plant Address: P.O. Box 617, Spring Lake, North Carolina 28390-0617 Telephone: (910) 436-0241 Land Application Permit No.: WQ0001086 Facility's NPDES Permit No.: NC0030970 Responsible Official: Mr. Chris V. Rey, Mayor Address: P.O. Box 617, Spring Lake, North Carolina 28390-0617 Telephone: (910) 436-0241 Facility Operator: Mr. Richard E. Mendez, ORC Address: P.O. Box 617, Spring Lake, North Carolina 28390-0617 Telephone: (910) 436-0241 Report Preparer: Mr. Zachary L. Fuller, PE Address: MacConnell & Associates, P.C., P.O. Box 129, Morrisville, NC 27560-0129 Telephone: (919) 467-1239 Dry Tons Land Applied:. 33.31 Sludge Land Applied to Five Sites (Field 1-1 not used in 2012) Town of Spring Lake Field 1-1: Latitude 35°11'51", Longitude 78°57'52" Willie Calvin Brinkley Field 3-1: Latitude 35°14'34", Longitude 79°01'41" Willie Calvin Brinkley Field 3-2: Latitude 35°14'42", Longitude 79°01'33" Willie Calvin Brinkley Field 3-3:.Latitude 35°14'47", Longitude 79°01' 19" Maybob E. Paye Field 4-1: Latitude 35°14'42", Longitude 79°01'21" Maybob E. Paye Field 4-2: Latitude 35°14'38", Longitude 79°01'45" Permitted fields not listed above (2-1 - 2-9) have not been land applied by the Town. • Operational Data: 'On Site Laboratory Methods Used: As required by regulations Description of Sludge Processes: Class B, Alkaline Prepared By: MacConnell & Associates, P.C. P.O. Box 129 Morrisville, North Carolina 27560-0129 .Phone: (919) 467-1239 Fax: (919) 319-6510 RECEIVEDIDENRIDWQ FEE? 0 1 2013. AgerProtectio neon Town of Spring Lake, North Carolina 2012 Annual Biosolids Report NCDENR-DWQ Forms Permit # WQ0001086 NPDES Permit # NC0030970 Prepared By MacConnell & Associates, P.C. P.O. Box 129 Morrisville, NC 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 ANNUAL LAND APPLICATION CEK'1'1i !CAI ION 1+'OK1v1 Permit#: WQ0001086 County: Cumberland Year: 2012 Facility Name (as shown on permit): Land Application Operator: Spring Lake WWTP Richard E. Mendez Phone: (910) 436-0241 Land _apylication of residual solids as allowed by the permit occurred during the past calendar year? Yes ® No If No, skip Part A, and Part B and proceed to the certification. Also, if residuals were generated but not land applied, please attach an explanation on how the residuals were handled. Total number of application fields in permit: 15 Total number of fields land application occurred during the year: 5 Total amount of dry tons applied during the year for all application sites: 33.31 Total number of acres land application occurred during the year: '35.7 Part B: Facility was compliant during calendar year 2012 with all conditions of the land application permit (including but not limited to items 1-12 below). issued by the Division of Water Quality. "Yes 0 No If no please, provide a written description why the facility was not compliant, the dates, and explain corrective action taken. 1. Only residuals approved for this permit were applied to the permitted sites. 2. Soil pH was adjusted as specified in the permit and lime was applied (if needed) to achieve a soil pH of at least 6.0 or the limit specified in the permit.. 3. Annual soils analysis were perfoned on each h site receiving residuals during the past calendar year and three (3) copies of laboratory results are attached. 4. Annual TCLP analysis was performed and three (3) copies of certified laboratory results are attached. 5. All other monitoring was performed in accordance with the permit and reported during the year as required and three (3) copies of certified laboratory results are attached. 6. The facility did not exceed any of the Pollutant Concentration Limits in Table 1 of 40 CFR Part 503.13 or the Pollutant Loading Rates in Table 2 of 40 CFR part 503.13 (applicable to 40 CFR Part 503 regulated facilities). 7. All general requirements in 40 CFR Part 503.12 and management practices in 40 CFR Part 503.14 were complied with (applicable to 40 CFR Part 503 regulated facilities). 8. All operations and maintenance requirements in the permit were complied with or, in the case of a deviation, prior authorization was received from the Division of Water Quality. 9. No contravention of Ground Water Quality Standards occurred at a monitoring well or explanations of violations are attached to include appropriate actions and remediations. 10. Vegetative cover as specified in the permit was maintained on this site and the crops grown were removed in accordance with the crop management plan. 11. No runoff of residuals from the application sitesonto adjacent property or nearby surface waters has occurred: 12. All buffer requirements as specified on the permit were maintained during each application of residuals. "I certify, under penalty of law, that the above information is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing v$i ." •Chris V. Rey, Mayor Permittee Name and Title (type or print) I-2v-,?o0 Signature of Prepares* .(if different from Permittee) 'Preparer is defined in 40 CFR Part 503.9 (r) Date Sire of Permittee C. ate J -2g zd (3. Signature of Land App'Yier (if different from Permittee and Preparer) Date DENR FORM ACF (5/2003) -J r ) 1, -- i C_ �t ANNUAL DISTRIBUTION AND MARKETING/ SURFACE DISPOSAL CERTIFICATION AND SUMMARY FORM PERMIT #: WQ0001086 FACILITY NAME: Spring Lake WWTP PHONE: (910) 436-0241 COUNTY: Cumberland OPERATOR: Richard E. Mendez FACILITY TYPE (please check one): Surface Disposal (complete Part A (Source(s) and "Residual In" Volume only) and Part C) Distribution and Marketing (complete Parts A, B, and C) as the facility in operation during the past calendar year? V.Yes No, No If No skip parts A, B, C and certify form below Part A*. Part B*: Month Sources(s) (include NPDES # if applicable) Volume (dry tons) Recipient Information Amendment/ Bulking Agent Residual In Product Out Name(s) Volume (dry tons) Intended use(s) January SLWWTP 0 .. February SLWWTP 0 March SLWWTP 0 April. SLWWTP May . SLWWTP - , 0 June SLWWTP - 21.79 July SLWWTP 0 - - August SLWWTP 0 September - SLWWTP - 0 October _ _ SLWWTP 11.52 November SLWWTP 0 December SLWWTP Totals: . Annual_(drytons): 0 33.31... 0 . ;: :•: •>:•:•:•:•>:•: >: 0 • ........... ... Amendinent(s)used: _ .... Bulking Agent(s) used: * If more space than given is required, please attach additional information sheet(s). 0 Check box if additional sheet(h s) are attace Part C: - Facility was compliant during calendd year 2012 with all. conditions of the permit (including but not limited to items 1-3 below) issued by the Division of Water Quality. Yes 0 No If No, please provide a written description why the facility was not compliant. 1. All monitoring was done in accordance with the permit and reported for the year as required and three (3) copies of certified laboratory results are attached. 2. All operation and maintenance requirements were compiled with or, in the case of a deviation, prior authorization was received from the Division of Water Quality. 3. No contravention of Ground Water Quality Standards occurred at a monitoring well. "I certify, under penalty of law, that the above information is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there a ifi nalties for submitting false information, including the ossibility of fin and imprisonment for knowing violations." / z, / ,e /-28.208 Signatur oe thittee� D. e Signature of Preparer** Date (if different from Permittee) **Preparer is defined in 40 CFR Part 503.9(r) DENR FORM DMSDF (11/2005) ANNUAL RESIDUAL. SAMPLING SUMMARY FORM Attach this form to the corresponding Annual Report Please note that your permit may contain additional parameters to be analyzed than those required to be summarized on this form. Permit Number: Facility Name: NPDES # or WQ#: WWTP Name: WQ0001086 :Spring LakeWWTP NC0030970 Residual Analysis :Data Spring'Lake WVVTP Laboratory: 1) Meritech, Inc. 2) 3) 4) 5) Sample or Composite Date Percent Solids 10/4/12 1.08 a eD Arsenic 4.63 Cadmium 1.67 Chromium 8.61 Copper Lead 223 20.6 Mercury 0.972 Molybdenum Nickel 2.31 15.1 Selenilun 4.63 Zinc 1160 Total Phosphorus; 20300 TKN 54100 Ammonia -Nitrogen • 29800 Nitrate and Nitrite 926 "I certify, under penalty of law, that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 28 2O/3. Date Signature of Preparer DENR FORM RSSF (5/2003) Ann UAL 1V1L 1 AL r 1L' LLJ LUALIIN UIVIIVIAI'( Y 1' UK1V1-'- Attach this form to the corresponding Field Loading Summary Form to be submitted in Annual Report Facility Name: ` Permit #: WQ0001086 Cation Exchange Capacity (non 503 only): Operator: Spring Lake WWTP Acres Used: Richard E. Mendez Owner: Total Dry Tons Applied (Annual): 0 Spring Lake 8 Acres Permitted: 8 Site #: 1 Field #: 1 Residual Analysis Data (Heavy Metals and Total Phosphorus use mg/kg, % Solids use Raw Percent #): Sample or Com- posite Date 1 10/4/12 2 10/4/12 3 10/4/12 4 5 10/4/12 6 10/4/12 7 10/4/12 8 10/4/12 9J 10/4/12 10 10/4/12 11 10/4/12 12 10/4/12 10/4/12 % Solids 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 Arsenic ' 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 Cadmium 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 Chromium 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 Copper 223 223 223 223 223 223 223 223 '' 223 223 223 223 Lead 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 Mercury 0.972 0.972 0.972 0.972 0.972 0.972 0.972 0.972 0.972 0.972 0.972 . 0.972 1\4o1y1)- dennm 2.31 2.31 2.31 2.31 - 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 - Nickel 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 ' 15.1 Selenium 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 Zinc 1160 1160 1160 1160 1160 1160 1160 1160 1160 1160 1160 1160 Total Phos- phorus 20,300 20,300 20,300 20,300 20,300 20,300 20,300 20,300 , 20,300 20,300 20,300 20,300 _ Annual Heavy Metal Field Loadings (Calculated in lbs/acre): cy Total DT/Ac./ Yr./Applicatio n Event 1J 0 0 - 0 4] 0 5 0 6 0 7 0 8 0 91 0 10 0 11 0 12 0 Totals Arsenic 0 0 .0 -0 0 0 0 0 0 0 0 ' 0 0 Cadmium 0 0 0 0 0 0 0 0. 0 0 0 0 0 Chromiurr. ' 0 0 0 ' 0 0 0 0 0 0 0 0 0 0 Copper ': 0 0 0 0 0 0 0 0 0 0 0 0 0 Lead ' 0 0 ' 0 - 0 0 0 0 0 0 0 0 0 0 Mercury 0 0 0 0 0 0 - 0 0 0 0 0 0 0 Molyb- ' rlennm 0 0 0 . 0 0 0 0 0 0 0 0 '0 0 Nickel 0 0 0 0 0 . 0 0 0 0 0 0 0 , '0 Selenium 0 0 0 0 0 0 0 0 0 -0 0 0 0 Zinc -0 0 0 0 0 0 0 ' 0 0 0 0 0 0 Total Phos- phorus 0 0 0 0 '0 0 0 0 0 0 • 0 0 0 "I certify, under penalty of law, thatthisdocument was prepared under my direction or supervision in accordance with a system designed to assure that qualified ,personnel properly gathered and evaluated the information submitted. I am aware .that there are significant penalties for submitting false information,. including they possibility of firs and imprisonment for knowing violations" Signature of Land Applier /'2&'2CL3 Date * See .bottom of FSF Form 'for helpful instructions for this MFLSF Form and the mathematically linked FSF Form DENR FORM MFLSF (5/2003) L I -, i t , ) Facility Name: Owner: Site #: ANNUAL LAND APPLICATION FIELD SUMMARY FORM PLEASE -MAKE A COPY OF THIS -BLANK -FORM TO -BE -COMPLETED AND SUBMITTED FOR EACH APPLICATION FIELD. PLACE A "N/A" IN A BLANK OR BOX WHEN NOT APPLICABLE. Spring Lake WWTP Permit #: WQ0001086 Annual Dry Tons Applied: 0 Spring Lake Field #: Operator: 1 Richard E. Mendez Acres Utilized: Cation Exchange Capacity (non 503): Acres Permitted: o r o rd Q pecify Totals Per Acre %. Solid s Dry Tons Per Acre Residual Sources (Summarize) Site Cond. Dry, Wet, A.a,,;,,,- Inches Precip. Past 24 Hrs. ... . Appli- cation Meth- od* Vola- tili- zation Rate**Rate Miner- ali- zation TKN Amino- nia- Ni- trogen - Ni* trate and Nitrite PAN 1 PAN 2 Must Select Crop 1 or Crop 2 * rie Gal. Report `Totals in Gal. Crop 1 Crop 2 1-2012 0 .. _ 0 ._ 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 1 2-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 2 3-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 3 4-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 4 5-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 5 6-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 6 7-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 7 8-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 8 9-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 9 10-2012 0 0 1.08 0 SLWWTP S _ 0.5 0.3 54,100 29800 926 0 ####### Bermuda 10 11-2012 0 0 1.08. 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 11 12 2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 12 TOTALS: 0 ..:; .•.•:. ._. As Cd Cr Cu Pb Hg Mo Ni Se Zn P PAN 1 PAN 2 Lime Applied Date lbs/ac Annuallbs/acre 0 0 0 0 0 0 0 0 0 0 0 0 0 Current Cumulative lbs/ac 4.592326514 1.35743 3.49904 55.4475 10.4334 0.59822 3.47569 8.91083 2.97776 158.793 ::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::: > `'"""" w/ 0 Prior Years Cumulative lbs/ac 4.5.92326514 1.35743 3.49904 55.4475 10.4334 0.59822 3.47569 8.91083 2.97776 158.793 ::::::::::::::::::: ."• Biosolids Permitted C. P. L. R.*** 36 34 2,677 1,338 ' 267 15 16 ::•::•:•:•:•:•::.:...:...:.:.;:..:..:.:.:.:.:..,..;:.:.:.:.:.:..:..:.:.:.:.:.:.:.:.:..:.:.:.:.:...:...:::]:.:.:.:.:.:.:.:.•.:.:.::.:..:.:.: •...... 374 • 89 2,498 Permit PAN Limit l st/2nd Crop .....•..•.•.•.•.•:•......:...:.:.:.:.. ::::.....: 220 50 "I certify, under penalty of law, that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. I am aware that there are significant penalties for submitting falp information, including the possibility of fines and imprisonment for knowing violations." Signature of Land Appl /-28 -2o 13 Date *Application Method: S - Surface, IN - Injection, INC - Incorporation **Volatilization Rate: Surface - 0.5_ Tniectinn/Tncornnratinn - 1.0 ***C.P.T,.R.: Cumulative Pollutant Loading Rate **** The RSSF Data and the Dry Tons Per Acre are to be entered on the MFLSF Form. The FSF and MFLSF are.matlematically linked so this information needs to be entered into the same numbered column on the MFLSF as is entered on the identically numbered FSF row to properly complete the metals equations. ie. FSF row # 1 to MFLSF column # 1. DENR FORM FSF (5/2003) AI' IIN UAL ML'1'ALS 1+'1b;LD LOADING SUMMARY FORM'K Attach this form to the corresponding Field Loading Summary Form to be submitted in Annual Report Facility Name: Permit#: Operator: Acres Used: Spring Lake WWTP Total Dry Tons Applied (Annual): 4.5036 WQ00010.86 Cation Exchange Capacity (non 503 only): Richard E. Mendez Owner: Willie Calvin Brinkley 5.1 Acres Permitted: 5.1 Site #: 3 Field #: 1 Residual Analysis Data (Heavy Metals and Total Phosphorus use mg/kg, % Solids use Raw Percent #): Sample or Com- posite Date ' 1 2 10/4/12 3 10/4/12 4 10/4/12 5 10/4/12 6 10/4/12 7 10/4/12 8 10/4/12 9 10/4/12 10 10/4/12 11 10/4/12 12 10/4/12 10/4/12 % Solids 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 Arsenic 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 Cadmium 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 Chromium 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 Copper 223 223 223 223 223 223 223 223 223 223 223 223 Lead 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 Mercury 0.972 0.972 0.972 0.972 0.972 0.972. 0.972 0.972 0.972 0.972 0.972 0.972 1\4o1yb rlenum 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 Nickel' 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 ' . 15.1 15.1 15.1 Seleniurri 4.63 4.63 4.63 4.63 4.63 4.63 - 4.63 4.63... 4.63 4.63 4.63 . 4.63 Zinc 1 1160 1160 1160 1160 1160 1160 1160 1160 1160 1160 1160 1160 Total Phos- phorusi 20,300 ' 20,300 20,300 20,300 ' 20,300 20,300 20,300 20,300 , 20,300 , 20;300 20,300. 20,300 Total DT%Ac.2 Yr./Applicatio n Event 1. 0 2 0 3_1 0 4 0 5 0' 6 0.6358 7 0 8 : 0 9 0 10 0.2473 11 0 12 0 Totals: Arsenic` 0 0 0 0 .0 0.0059 0 0 0 0.0023 0 0 0.0082 Cadmium 0 0 0 0 0 0.0021 . 0 0 0 0.0008 0 '0 0.0029. Chromium: 0 0 . 0 0 0 . 0.0109 0 . 0 0 0.0043 0 , .0 0.0152 Copper; 0 0 0 0 0 0.2836 0 '0 . 0 0.1103 0 0 0.3938 Lead ` 0 0 0 '0 0 0.0262 0 0 0 0.0102 0 ' 0 0.0364 Mercury ` 0 0 0 0 0 0.0012 0 0 0 0.0005 0 0 0.0017 Molyb- i denum 0 0 . 0 0 0 0.0029 0 0 0 . 0.0011 0 . 0 0.0041 Nickel . 0 0 0 0 0 0.0192 0 0 0 0.0075 : 0 0 0.0267 Selenium 0 0 0 0 0 0.0059 0 0 0 0.0023 0 0 0.0082 Zinc 0 0 : 0 0 0 1.4751 0 0 0 0.5736 0 0 2.0487 Total Phos- phorus 0 ' 0 . 0 0 0 25.814 0 0 0 10.039L 0 0 35.852 "I certify, under penalty of law, that this document was ,prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. I am aware that there are significant penalties for submitting false information, including th ossibility of fine and imprisonment for knowing violations" Signature of Land Applier " Date x See bottom of FSF Form for helpful instructions for this MFLSF Form and the mathematically linked FSF Form DENR FORM MFLSF (5/2003) ANNUAL LAND APPLICATION FIELD SUMMARY FORM PLEASE MAKE A COPY OF THIS BLANK FORM TO BE COMPLETED AND SUBMITTED FOR EACH APPLICATION FIELD. PLACE A "N/A" IN A BLANK OR BOX WHEN NOT APPLICABLE. Facility Name: Spring Lake WWTP Owner: Willie Calvin Brinkley Site #: Field #: Operator: 1 Permit #: WQ0001086 Richard E. Mendez Acres Utilized: Annual Dry Tons Applied: 4.5036 Cation Exchange Capacity (non 503): 5.1 Acres Permitted: 5.1 Date or Month :::)specify Totals Per Acre % Solid s Dry Tons Per Acre Residual Sources (Summarize) -- Site Conti. Dry; Wet,od*Rate** rS�;n+ Inches Precip. Past 24 Hrs. Appli- cation Meth- Vola- tili- zation Miner- ali- zation Rate TKN Ammo- nia- Ni- trogen Ni- trate and Nitrite PAN .1 PAN 2 Must Select Crop1 or Crop - ,, * * - Gal. Cu.Yd. Report Totals in Gal. Crop 1 Crop 2 1-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 1 2-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 2 3-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 3 4-2012 0 _ 0 1.08 0 SLWWTP S 0.5 0.3 • 54,100 29800 926 0 ####### Bermuda 4. 5-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 5 6-2012 72,000 14118 1.08 0.635802353 SLWWTP S 0.5 0.3 54,100 29800 926 29.3944 ####### Bermuda 6 7-2012 0 0. 1.08 0 SLWWTP S ' 0.5 0.3 54,100. 29800 926 0 ####### Bermuda 7 8-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 8 9-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 9 10-2012 28000 5490.2 1.08 0.247256471 SLWWTP S 0.5 0.3 54,100 29800 926 11.4312 ####### Bermuda 10 11-2012 0 0 1.08 0 SLWWTP _ S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 11 12-2012 0 0 - . 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 12 TOTALS: 19608 : ::;:::::: As Cd _ Cr .._ Cu Pb Hg Mo Ni Se Zn P PAN 1 PAN 2 Lime Applied ::::: Annual lbs/acre 0.008177125 0.00295 0.01521 0.39384 0.03638 �0.00172 0.00408 0.02667 0.00818 2.0487 35.8522 40.8256 0 Date Ibs/ac Current Cumulative lbs/ac 0.039927892 0.0086 0.12263 2.1984 0.16027 0.01023 0.03434 0.19224 0.02973 10.7551 :::::: : ::::::::: :.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.>:,:.::.:.>:.:.:,:. :::::::::::::::::::::::::::.....: : ::::........ • w/ 784 Prior Years Cumulative lbs/ac 0.031750767 0.00565 0.10742 1.80456 0.12389 0.00851 0.03026 0.16557 0.02155 8.70642 Biosolids Permitted C. P. L. R.*** 36 34 2,677 1,338 267 15 16 374 89 2,498 Permit PAN Limit l st12nd Cro•••••••••••••••••••••••••• i 220 50 "I certify, under penalty of law, that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. I am aware that there are significant petrifies or submitting fJse information, including the possibility of fines and imprisonment for knowing violations." ***,- /zg2013 Date *Application Method: S - Surface, IN - Injection, INC - Incorporation **Volatilization Rate! Surface - 0.5. Tniection/Tncornnration - 1.0 ***C.P.T,.R-: Cumulative Pollutant T,nadinu Rate The RSSF Data and the Dry Tons Per Acre are to be entered on the MFLSF Form. The FSF and MFLSF are Mathematically linked so this information needs to be entered into the same numbered column on the MFLSF as is entered on the identically numbered FSF row to properly complete the metals equations. ie. FSF row # 1 to MFLSF column # 1. DENR FORM FSF (5/2003) n AININUAL 1V1L1'ALS 1+'L LL LUA1111N 1UMV11V1AKY rOK1V1' Attach this form to the corresponding Field Loading Summary Form to be submitted in Annual Report Facility Name: Spring Lake WWTP Total Dry Tons Applied (Annual): 9.187344 /-2g'20? Date ti Permit #: WQ0001086 Cation Exchange Capacity (non 503 only): Operator: Richard E. Mendez Owner: Willie Calvin Brinkley Acres Used: 8.2 Acres Permitted: 8.2 Site #: 3 Field #: 2 Residual Analysis Data (Heavy Metals and Total Phosphorus use mg/kg, % Solids use Raw Percent #): Sample or Com- posite Date 1 2 10/4/12 3 10/4/12 10/4/12 5 10/4/12 6 10/4/12 7 10/4/12 8 10/4/12 9 10/4/12 10 11 10/4/12 12 10/4/12 10/4/12 10/4/12 % Solids 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 Arsenic 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 Cadmium 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 Chromium 8.61 8.61 8.61 . 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 Copper 223 223 223 223 223 223 223 223 223 223 223 223 Lead . 20.6 20:6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 Mercury 0.972 0.972 0.972. 0.972 0.972 0.972 0.972 0.972 0.972 0.972 0.972 0.972. Molyb- dennm 2.31 2.31 2.31 ' 2.31 2.31 2.31 2.31 2.31 -2.31 2.31 2.31 2.31 Nickel 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 Selenium 4.63 4.63 4.63 • 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 ' 4.63 Zinc 1160 1160 1160 1160 1160 1160 1160 1160 1160 1160 1160 1160 Total Phos- phorus 20,300 20,300 20,300' 20,300 20,300 20,300 20,300 , 20,300 '20,300 20,300 20,300 20,300 Total DT/Ac./ Yr./Applicatio n Event 1 2 0 3i , 0 4_I . 0 5 ' 0 6 0.7469 7 0 . 8 0 . 9 0 10 . 0.3735 11 12 0 Totals: 0 ' 0 Arsenic 0 0 0 0 0 0.0069 0 0 0 0.0035 0 0 0.0104, Cadmium ' 0 0 0 0 0 0.0025 0 0 0 0.0012 0 0 0.0037 Chromiur 0 0 0 0 0 0.0129 0 0 0 0.0064 ' 0 0 0.0193 Copper 0 0 0 0 0 0.3331 '0 0 0 0.1666 0 0 0.4997' Lead 0 0 0 .0 0 0.0308 0 0 0 0.0154 0 0 .0.0462 Mercury 0 0 0 0 0 0.0015 0 0 0 0.0007 0 0 '0.0022 Molyb- dermm 0 0 0 0 0 0:0035 0 0 ' 0 0.0017 0 0 0.0052 Nickel 0 0 0 0 0 0.0226 0 0 0 . 0.0113 0 0 0.0338 Selenium 0 0 0 0 0 ' 0.0069 0 0 0 0.0035 0 0 0.0104 Zinc 0 0 0 0 0 1.7329 , 0 0 0 0.8664 0 0 2.5993 Total Phos- ' phorus ' 0 ' '0 0 0 0 30.326 0 0 0 15.163' 0 . 0 45.489; "I certify, under penalty of law, that this document was prepared under my direction or supervision in accordance with a system designed .to assure that qualified personnel properly gathered and evaluated the information submitted. I am aware that there are significant penalties for submitting false information, including the passibility of fines animprisonment for knowing violations" Signature of Land Applier * See bottom of FSF Form for helpful instructions :for this MFLSF Form and the mathematically linked FSF Form DENR FORM MFLSF (5/2003) Facility Name: Owner: Site #: ANNUAL LAND APPLICATION FIELD SUMMARY FORM PLEASE MAKE A COPY OF THIS BLANK FORM TO BE COMPLETED AND SUBMITTED FOR EACH APPLICATION FIELD. PLACE A "N/A" IN A BLANK OR BOX WHEN NOT APPLICABLE. Spring Lake WWTP Permit #: WQ0001086 Annual Dry Tons Applied: Willie Calvin Brinkley 3 Field #: Operator: 2 9.187344 Richard E. Mendez Cation Exchange Capacity (non 503): Acres Utilized: 8.2 Acres Permitted: 8.2 Date or Month ,Specify Totals per Acre % Solid s Dry Tons Per Acre Residual Sources (Summarize) Site Cond. Dry, Wet, r 4,,;.-+ Inches Precip. past 24 Hrs. Appli- cation Meth- od* Vola- tili- zation Rate** Miner- ali- zation Rate TKN Ammo- nia- Ni- trogen Ni- trate and Nitrite PAN 1 PAN 2 Must Select Crop1 or Crop 2 * :k * * Gal. _ . Cu.Yd. T Report Totals in Gal. Crop 1 Crop 2 1-2012 0 0 1.08. 0 SLWWTP .S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 1 2-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 2 3-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 4-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda _3 4- 5-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 5 6-2012 , 136,000 16585 1.08 0.746938537 SLWWTP S 0.5 0.3 54,100 29800 926 34.5325 ####### Bermuda 6 7-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800• 926 0 ####### Bermuda 7 8 2012 0 0 1.08 0 SLWWTP S 0.5 . 0.3 54,100 29800 926 0 ####### Bermuda 8 9-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 9 10-2012 68000 8292.7 1.08 0.373469268 SLWWTP S 0.5 0.3 54,100 29800 926 17.2662 ####### Bermuda 10 11-2012 0 0 _ 1.08 0 SLWWTP S 0.5 0.3 54,100. 29800 926 0 ####### Bermuda 111 12-20.12 0 0 1.08 _ 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 12 TOTALS. 24878 As Cd Cr Cu Pb__ Hg Mo Ni Se Zn P PAN 1 PAN 2 Lime Applied Annual lbs/acre 0.010374976 0.00374 0.01929 0.4997 0.04616 0.00218 0.00518 0.03384 0.01037 2.59935 45.4886 51.7987 0 Date lbs/ac CurrentCumulative lbs/ac 0.041553981 0.01252 0.15559 2.9859 0.2489 0.0162 0.04619 0.25184 0.04021 14.9025 :::::'''..::::::•?::::::::::: :.:.:.:.:.:.:.:.:.::.:.:.:::::::>: :::•:::::::::::•••• :, w/ 995 Prior Years Cumulative lbs/ac 0.031179005 0.00878 0.1363 2.4862 0.20274 0.01402 0.04101 0.218 0.02984 12.3032 Biosolids Permitted C. P. L. R.*** 36„ 34 2,677 1,338 267 15 16 374 89 2,498 Permit PAN Limit 1st/2nd Crop :::::::::::::::::.:.:::::::::::•:.:.:.:.:.:..-:.:.:.:.:.:.: • :.:::•:.:.:.:.:=:•:. 220 50 "I certify, under penalty of law, that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. I am aware that there are significantjnalties for subypitting false information, including the possibility of fines and imprisonment for knowing violations." 41 (n III / 282413 Date **** *Application Method: S - Surface, IN - Injection, INC - Incorporation **Vnlatilizatinn Rate: Surface - 0.5. Iniection/Tncornoratinn'- 1.0 ***C.P.T;,.R.: Cumulative Pollutant T,oariinn Rate The RSSF Data and the Dry Tons Per Acre are to be entered on the MFLSF Form. The FSF and MFLSF are mathematically linked so this information needs to be entered into the same numbered column on the MFLSF as is entered on the identically numbered FSF row to properly complete the metals equations. ie. FSF row # 1 to MFLSF column # 1. DENR FORM FSF (5/2003) t.11 1 Vt1L 111.11.o A .t LU A'Al'/Ll! LV!?Lu.v vi w •-• Attach this form to the corresponding Field Loading Summary Form to be submitted in Annual Report Facility Name: Permit #: _, Operator: Acres Used: Spring Lake WWTP Total Dry Tons Applied (Annual): 7.926336 WQ0001086 Cation Exchange Capacity (non 503 only): Richard E. Mendez Owner: Willie Calvin Brinkley 13.6 Acres Permitted: 13.6 Site #: 3 Field #: 3 Residual Analysis Data (Heavy Metals and Total Phosphorus use mg/kg, % Solids use Raw Percent #): ' Sample or Com- posite Date 2 10/4/12 3 5 10/4/12 10/4/12 7 10/4/12 8 10/4/12. 10/4/12 10 10/4/12 l 10/4/12 12 10/4/12 10/4/12 10/4/12 10/4/12 % Solids 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 Arsenic 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 Cadmium 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 Chromium 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 Copper 223 223 223 223 223 223 223 223 223 223 223 223 Lead 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 Mercury 0.972 0.972 ' 0.972 0.972 0.972 0.972 0.972 0.972 0.972 0.972 0.972 0.972 Molyb- 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 rlenum Nickel 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 Selenium 4.63 4.63 4.63 - 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 Zinc 1160 1160 1160 1160 1160 1160 1160 1160. 1160 1160 1160 1160 Total Phos- phorus 20,300 20,300 20,300 20,300 20,300 20,300 20,300 20,300 20,300 20,300 20,300 20,300 Field Loadings (C alculatetl m lbs/ acre ): s Total DT/Ac./ Yr./Applicatic n Event 4 61 7 8 9 10 11 12 Totals 0 0 0 0 0 0.3841 0 0 0 0.1987 0 0 Arsenic 0 0 0 - 0 0 0.0036. 0 0 0 0.0018 0 0 0.0054 Cadmium 0 0 0 0 0 0.0013 0 0 0 0.0007:. 0 0 0.0019 Chromium. 0 0 0 0 0 0.0066 ` 0 0 0 0.0034 0 0 0.01 Copper 0 0 0 0- 0 0.1713 ' 0 0 ' 0 0.0886 0 0 0.2599, Lead 0 0 0 0 0 0.0158 0 0 0 0.0082 , 0 0 0.024 . Mercury 0 0 0 0 0 0.0007 -0 0 0 0.0004 0 0 0.0011 Molyb- dennm 0 0 0 0 0 0.0018. 0 0 0 0.0009 0 0 0.0027 Nickel 0 0 0 0 0. 0.0116 0 0 0 0.006 " 0 0 0.0176, Selenium 0 0 0 0 0. 0.0036 0 ' 0 0 0.0018 . 0 0 0.0054 Zinc 0 0 0 0 0 0.8912 0 0 0 0.461 ; 0 0 1.3521 Total Phos- phorus 0 0 0 ' 0 . .0 15.596' 0" 0 0 8.0667. 0 0 23.662 "I certify, under penalty of law, that -this document was prepared under my direction or supervision m accordance with a system designed to assure that qualified :personnel properly gathered and evaluated the information submitted. I am aware that. there are significant penalties for submitting false information, including the pj ssibility of fines a l imprisonment for knowing violations" /'2g -2013 Signature of Land Applier Date * See bottom'of FSF Form for helpfulinstructionsfor this MFLSF Form and the mathematically linked FSF Form 'DENR FORM'MFLSF (5/2003) Facility Name: ANNUAL LAND APPLICATION FIELD SUMMARY FORM PLEASE MAKE A COPY OF THIS BLANK FORM TO BE COMPLETED AND SUBMITTED FOR EACH APPLICATION FIELD. PLACE A "N/A" IN A BLANK OR BOX WHEN NOT APPLICABLE. Spring Lake WWTP Owner: Willie Calvin Brinkley Site #: 3 Field #: Operator: 3 Permit #: WQ0001086 Richard E. Mendez Acres Utilized: 13.6 Annual Dry Tons Applied: 7.926336 Cation Exchange Capacity (non 503): Acres Permitted: 13.6 Date or Month _ $ ecifv DryTons Per Acre Residual Sources (Summarize) Site Cond. Dry, wet,-od*Rate** M,,;.,+_ Inches precip. past 24 Hrs. Appli- cation Meth- Vola- tili- zation Miner- ali- zatioii Rate TKN Ammo- nia- Ni- trogen Ni- trate and Nitrite PAN 1 PAN 2 Must Select Crop 1 or Crop 2 k * * -. E Gal. Totals % Cu.Yd. Per Solid Report :- Totals in Gal. Acre s Crop 1 Crop 2 1-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 1 2-2012 _ 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 2 3-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 3 42012 0 0 1.08 ' 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 4 5-2012 0 - 0 ,1.08 0 SLWWTP S 0.5 ; 0.3 54,100 29800 96 - 0 ####### Bermuda 5 116,000 8529.4 1.08 , 0.384130588 SLWWTP S 0.5 - 0.3 54,100 29800 926 17.7591 ####### Bermuda 6 _6-2012 7-2012 0 0 1.08„ 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 7 8-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 8 9-2012 0 0 - 1.08 . 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 9 10-2012 60000 4411.8 1.08 0.198688235 SLWWTP S 0.5 0.3 54,100 29800 926 9.18575 ####### Bermuda 10 11-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 11 12-2012 0 Y 0 . 1.08 _ _ 0 SLWWTP S 0.5 0.3 . 54,100 29800 926 0 ####### Bermuda 12 TOTALS:-. 12941 ::: As Cd__ Cr Cu Pb Hg Mo Ni . Se Zn P PAN 1 PAN 2 Lime Applied Date Ibs/ac _ ;:• �:: . . Annual lbs/acre 0.005396902 0.00195 0.01004 0.25994 0.02401 0.00113 0.00269 0.0176 0.0054 1.35214 23.6624 26.9449 0 Current Cumulative lbs/ac 0.009410228 0.00541 0.04326 0.95625 0.08959 0.00686 0.0133 0.08224 0.01301 5.2048 ::::::::::::::::::::::::::::::.•:::•:•:•:•::::: w/ 518 Biosolids Prior Years Cuinulativelbs/ac 0.004013326 0.00346 0.03322 0.69631 0.06558 0.00573 0.01061 0.06464 0.00761 3.85266 :::::::::::::::::::::::::::::::::::::;:::::.:::::,:. Permitted C. P. L. R.*** 36 34 2,677 1,338 267- 15 16 374 89 2,498 :::... , . • • . ......... ..... 220 50 ' ni lst/2nd Crop ' ANEW t Permit P "I certify, under penalty of law, that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. I am aware that there are significant penalties Ji - submitting false information, including the possibility of fines and imprisonment for knowing violations." **** Signature of Land Applie Date *Application Method: S - Surface, IN - Injection, INC - Incorporation **Volatilization Rate: Surface - 0_5. Tniectinn/Tncnrnnratinn - 1.0 ***C.P.T,.R.: Cumulative Pollutant Loading Rate Tlie RSSF Data and the Dry Tons Per Acre are to be entered on the MFLSF Form. The FSF and MFLSF are mathematically linked so this information needs to be entered into the same numbered column on the MFLSF as is entered on the identically numbered FSF row to properly complete the metals equations. ie. FSF row # 1 to MFLSF column # 1. DENR FORM FSF (5/2003) AININUAL IV1Li1ALJ 1IJ L.0 LUALl1vu Ju1v11v1HKX VUlclvl• Attach this form to the corresponding Field Loading Summary Form to be submitted in Annual Report Facility Name: Permit #: Operator: Acres Used: Spring Lake WWTP Total Dry Tons Applied (Annual): 6.124896 WQ0001086 Cation Exchange Capacity (non 503 only): Richard E. Mendez Owner: Maybob E. Paye 4.5 Acres Permitted: 4.5 Site #: 4 Field #: 1 al Analysis Data (Heavy Metals and Total Phosphorus use mg/kg, % Solids use Raw Percent #): Sample or Com- posite Date 1 i 10/4/12 3 10/4/12 41 10/4/12 5 10/4/12 6 10/4/12 7 10/4/12 8 10/4/12. 10/4/12 10 10/4/12 11 10/4/12 12 10/4/12 10/4/12 % Solids 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 Arsenic 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 - 4.63 Cadmium 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 . 1.67 Chromium 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 Copper 223 223 223 223 223 223 223 223 223 223 223 223 Lead 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 " 20.6 20.6 20.6 Mercury 0.972 0.972 0.972 0.972 0.972 0.972 0.972 0.972 0.972 0.972 0.972 0.972 Molyb- dennm 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 Nickel 15.1 15.1. 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 Selenium 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 .4.63 4.63 4.63 Zinc 1160 1160 1160 1160 1160 1160 1160 1160 1160 1160 1160 1160 Total Phos- phorus 20,300 20,300 20,300 20,300 20,300 20,300 20,300 20,300 20,300 20,300 20,300 20,300 .< o 1 2J 3 4 5 6 7_ _ 9 10 11 12 Totals:. o Y a t17 7 z s. �. O' , o � 0 0 0 0 0 0.5204 0 0 0 0.8407 0' 0 Arsenic - 0 0 0 0 0 0.0048 0 0 0 0.0078 0 0 0.0126. Cadmium 0 0 0 0 0 0.0017 0 • 0 0 0.0028 0 0 .0.0045 Chromiurr 0 0 0 0 '0 0.009 0 0 0 0.0145 0 0 0.0234 Copper 0 0 0 0 0 0.2321 0 0 0 0.3749. 0 0' 0.607 Lead 0 0 0 0. 0 0.0214 0 0 ' 0 0.0346 0 0 0.0561 Mercury : 0 0 0 0 0 0.001 . 0 0 0 ' 0.0016 0 0 0.0026 Molyb- dhnr 0 ' 0 0 . 0 0 0.0024 0 0 0 0.0039 0 0 0.0063 m Nickel 0 . 0 0 . 0 '0 0.0157 0 0 '0 . 0.0254 0 0 0.0411 Selenium, '0 0 0 0 0 0.0048 0 0 0 0.0078: 0 0 ' 0.0126: Zinc 0 0 0 0 0 1.2074 0 0 0 1.9504 , 0 0 3.1577 Total Phos- .phorus 0 0 0 0 '0 21.129 0 0 ' 0 ; 34.131 0 0 .. 55.26 "I certify, under penalty of law, that this document was •prepare d under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and .evaluated the information submitted. I am aware that there are significant. penalties for submitting false information, includipg,theossibility of fines and imprisonment for knowing violations" Signature of Land Applier * See bottom of FSF Form for helpful instructions for this MFLSF Form and the mathematically linked FSF Form 'DENR FORM MFLSF (5/2003) / -2g 1, -Date F=' Facility Name: Owner: Site #: ANNUAL LAND APPLICATION FIELD SUMMARY FORM PLEASE MAKE A COPY OF THIS BLANK FORM TO. BE COMPLETED AND SUBMITTED FOR EACH APPLICATION FIELD. PLACE A "N/A" IN A BLANK OR BOX WHEN NOT APPLICABLE. Spring Lake WWTP Permit #: WQ0001'086 Annual Dry Tons Applied: 6.124896 Maybob E. Paye Field #: Operator: 1 Richard E. Mendez Acres Utilized: Cation Exchange Capacity (non 503): 4.5 Acres Permitted: 4.5 o a, rd 4)': Q cify Per Acre % Solid s Dry Tons Per Acre Residual Sources (Summarize) . _..___ Site Cond. Dry, Wet, .x,r„u.t Inches Precip. Past 24 Hrs. Appli- cation Meth- od* Vola- tili- zation Rate** Miner- ali- zation Rate TKN Ammo- nia- Ni- trogen Ni- trate and Nitrite PAN 1 PAN 2 Must Select* Crop1 or Crop 2 * w Ual• -Totals Cu.Yd. Report T Totals in Gal. Crop 1 Crop 2 1-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 D ####### Bermuda 1 2-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 2 3 2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 , 0 ####### Bermuda 3 4-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 4 5-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 5 6-2012 52,000 11556 1.08 0.520416 SLWWTP S 0.5 0.3 54,100 29800 926 24.0599 ####### Bermuda 6 7-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 7 8-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 8 9-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 9 10-2012 84000 18667 1.08 0.840672 SLWWTP S 0.5 0.3 54,100 29800 926 38.8659 ####### Bermuda 10 11-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 11 12-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800_ _926 0 ####### Bermuda 12 TOTAL-S: 30222 As: Cd Cr:, Cu Pb Hg ' Mo Ni Se . Zn P PAN 1 PAN 2 Lime Applied Date Ibs/ac Annual lbs/acre 0.012603675 0.00455 0.02344 0.60705 0.05608 0.00265 0.00629 0.0411 0.0126 3.15772 55.2602 62.9258 0 Current Cumulative lbs/ac 0.021059412 0.01184 0.09408 2.08645 0.19537 0.01471 0.02879 0.17817 0.0.2871 11.3294 ::::::::::::::::::::::::::::::::::::::::::::::::: :.:.:.:. :.:.:.:.::.:.::<:.:.:.:.:, ': ... , ... • w/ 1209 Prior Years Cumulativelbs/ac 0:008455737 0.00729 0.07064 1.4794 0.13929 0.01206 0.0225. 0.13707 0.01611 8.17165 :::` >:::.:. ..... • .. Biosolids Permitted C. P. L. R.*** 36 34 2,677 1,338 267 15 16 374 89 2,498 PermityAN Limit 1 t 2nd Cro•p ........ . ........ .... 22 0 50 ... "I certify, under penalty of law, that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. I am aware that there are significant penalties fir submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of Land Applie **** j-� -2s) r3 Date *Application Method: S - Surface, IN - Injection, INC - Incorporation **VnlatilIi7atinn Rate: Surface.- 0.5. Tniection/Tneornoration - 1.0 ***C.P.T.R.: Cumulative Militant T,narlinu Rate The RSSF Data and the Dry Tons Per Acre are to be entered on the MFLSF Form. The FSF and MFI,SF are mathematically linked so this information needs to be entered into the same numbered column on the MFLSF as is entered on the identically numbered FSF row to properly complete the metals equations. ie. FSF row # 1 to MFLSF column # 1. DENR FORM FSF (5/2003) ANVly UAL METALS FIELD LOADING SUMMARY FORM* Attach this form to the corresponding Field Loading Summary Form to be submitted in Annual Report Facility Name: Permit #: Operator: Acres Used: Spring Lake WWTP Total Dry Tons Applied (Annual): WQ0001086 Cation Exchange Capacity (non 503 only): 5.584464 Richard E. Mendez Owner: Maybob E. Paye 4.3 Acres Permitted: 4.3 Site #: 4 Field #: Residual Analysis Data (Heavy Metals and Total Phosphorus use mg/kg, % Solids use Raw Percent #): Sample or Com- posite Date 1 2 10/4/12 3 10/4/12 4 10/4/12 5 10/4/12 6 10/4/12 21 10/4/12 8 10/4/12 9 10/4/12 10 10/4/12 11 10/4/12 12 10/4/12 10/4/12 % Solids 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 Arsenic 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 , 4.63 4.63 Cadmium 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 Chromium 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61 Copper 223 223 223 223 223 223 223 223 223 223 223 223 Lead 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 20.6 Mercury 0.972 0.972 0.972 0.972 0.972 0.972 0.972 0.972 0.972 ' 0.972 0.972 0.972 Molyb demur, 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 Nickel 15.1 15.1 15.1 ' 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 15.1 Selenium 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 4.63 Zinc 1160 1160 1160 1160 1160 1160 . 1160 1160 1160 1160 1160 1160 Total Phos- phorus 20,300 20,300 20,300 20,300 20,300 .-20,300 20,300 20,300 20,300 20,300 20,300 20,300 Annual Heavy Metal Field Loadings (Calculated in lbs/acre): Total DT/Ac./ Yr./Applicatio n Event 1 0 2 0 3 0 4 0 5 0 6� 1.1311 7 0 8 0 0 10 0.1676 11 0 12 0 0 AD y Arsenic _ 0 0 0 0 0 0.0105 0 0 0 0.0016 ' 0 0 0.012 Cadmium 0 .- 0 0' 0 0 0.0038 0 0 ' 0 .0.0006 0 0 0.0043 Chromium 0 0' ' 0 0 0 0.0195 ' 0 0 0 0.0029• 0 0 0.0224 Copper 0 0 0 0 0 0.5045 0 0 0 0.0747 0 , 0 0.5792 Lead 0 0 0 0 0 .0.0466 0 0 0 0.0069 0 0 0.0535 Mercury . 0 0 0 0 0 0.0022 0 0 0 0.0003 ' 0 0 0.0025 Molyb- denim 0 0 0 0 0 0.0052 0 0 .0 0.0008 0 0 0.006 Nickel 0 0 0 0 0 0.0342 0 0 0 0.0051 0 0 '0.0392 Selenium 0 0. 0 0 0 0.0105 0 . 0 0 0.0016 0 0 0.012 Zinc 0 0 0 0 0 ' 2.6242 ' 0 0 0 0.3888 0 0 3.013 Total Phos- phorus 0 . 0 0 ' .0 0 45.924 0 0 0 6.8036 0 0 52.728 "I certify, .under penalty of law, that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified ;personnel properly gathered and evaluated the information submitted. I am aware that there are significant penalties for submitting false information, including the ;possibility of fines and imprisonment for knowing violations" Signature of Land Applier f-zg-2o0 Date * See bottom of FSF Form for helpful instructions for this MFLSF Form and the mathematically linked FSF Form DENR FORM MFLSF (5/2003) Facility Name: ANNUAL LAND APPLICATION FIELD SUMMARY FORM PLEASE MAKE A COPY OF THIS BLANK FORM TO BE COMPLETED AND SUBMITTED FOR EACH APPLICATION FIELD. PLACE A "N/A" IN A BLANK OR BOX WHEN NOT APPLICABLE. Spring Lake WWTP Permit #: WQ0001086 Annual Dry Tons Applied: 5.584464 Owner: Site #: Maybob E. Paye Field #: Operator: 2 Richard E. Mendez Cation Exchange Capacity (non 503): Acres Utilized: 4.3 Acres Permitted: 4.3 o ° Q pecify Totals per Acre % Solid s Dry Tons Per Acre Residual Sources (Summarize) Site Cond. Dry, Wet,od*Rate** l,r,,;,,f Inches Precip. Past 24 Hrs. Appli- cation Meth- Vola- tili- zation Miner- ali- zation Rate TKN Amino- ilia- Ni- trogen Ni-* trate and Nitrite PAN 1 PAN 2 Must Select Crop 1 or Crop ? * Gal. Report : Totals Gal. Crop 1 Crop 2 1-2012 _in 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 1 2-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 2 3-2012 0 0 1.08 0 SLWWTP S _ 0.5 0.3 54,100 29800 926 0 ####### Bermuda 3 4-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 926 0 ####### Bermuda 4 5-2012 0 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800. 926 0 ####### Bermuda 5 6-2012 108,000 25116 1.08 1.131136744 SLWWTP S 0.5 , 0.3 54,100 29800 926 52.2947 ####### Bermuda 6: 7-2012 0 0 1.08 . 0 SLWWTP S 0.5 '_ 0.3 54,100 29800 926 0 ####### Bermuda 7 8-2012 .0 - 0 1.08 0 SLWWTP S 0.5 ,! 0.3 54,100 29800 926 0 ####### Bermuda 8 9-2012 0 0 1.08 0, SLWWTP S 0.5 i. 0.3 54,100 29800 926 0 ####### Bermuda 9 10-2012 16000 3720.9 1.08 0.167575814 SLWWTP S 0.5 ; 0.3 54,100 29800 926 7,74737 ####### Bermuda 1C 11-2012 0 0 1.08 0 SLWWTP S 0.5 ` 0.3 54,100 29800 926 0 ####### Bermuda 11 12 2012 0. 0 1.08 0 SLWWTP S 0.5 0.3 54,100 29800 . 926. 0 ####### Bermuda 11 TOTALS: 28837 As Cd _ Cr ,..._ Cu Pb_: Hg Mo _ Ni _ Se Zn P PAN 1 PAN 2 Lime Applied _.. Annual lbs/acre 0.012026078 0.00434 0.02236 0.57923 0.05351 0.00252 0.006 0.03922 0.01203 3.01301 52.7277 60.0421 0 Date lbs/ac Current Cumulative lbs/ac ' _ 0.044699901 0.01003 0.12201 2.24034 0.16335 0.01154 0.03512 0.19591 0.0329 11.1434 ::::::::::::::::::::::::::::::....'.... :.:.:.:.::::::::::::::::::::::::::::::::::::: ::::::::::::::: : ?; ... ; ; :: *. w/ 1153 Prior Years Cumulativelbs/ac 0.032673823 0.00569 0.09965 1.66111 0.10984 0.00902 0.02912 0.15669 0.02087 8.13039 ::: ......... Biosolids Permitted C. P. L. R.*** 36 34 2,677 1,338 267 15 16 374 89 2,498 Permit Limit 1st/ 2i C Pei ••50 ... .. ..... .... 220 "I certify, under penalty of law, that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. I am aware that there are significant penalties for submitting ffe information, including: the possibility of fines and imprisonment for knowing violations." ,r•.�''� Signature of Land App`ller J-2g 2013. Date *Application Method: S - Surface, IN - Injection, INC - Incorporation **Volatilization Rate: Surface - 0.5. Tniee.tinn/Tnenrnnratinn - 1.0 ***C.P.T,.R.: Cumulative Pollutant Loading/ Rate **** The RSSF Data and the Dry Tons Per Acre are to be entered on the MFLSF Form. The FSF and MFLSF are mathematically linked so this information needs to be entered into the same numbered column on the MFLSF as is entered on the identically numbered FSF row to properly complete the metals equations. ie. FSF row # 1 to MFLSF column # 1. DENR FORM FSF (5/2003) Facility Name: WWTP Name: Spring Lake WWTP Spring Lake WWTP Permit Number: WQ0001086 NPDES Number: NC0030970 L Monitoring Period: From January 1, 2012 To December 31, 2012 Pathogen Reduction (40 CFR 503.32) - Please indicate level achieved and alternative performed: Class A: Alternative 1 >r Alternative 2 0 • Alternative 3 0 ..•. ................. Alternative 40 Alternative 5 0 Alternative 6 0 If applicable to alternative performed (Class A only) indicate "Process to Further Reduce Pathogens": Compost 0 Heat Drying 0 Heat Treatment 0 Thermophilic 0 • Beta Ray 0 Gamma Ray 0 Pasteurization ........•....................... Class B: Alternative 10 Alternative 2 E Alternative 3 0 ..... . If applicable to alterna 've performed (Class B only) indicate "Process to Significantly Reduce Pathogens": Lime Stabilization La, Air Drying 0 Composting 0 Aerobic Digestion ...... .... . Anaerobic Diestion If applicable to alternative performed (Class A or Class B) complete the following monitoring data: Parameterof Allowable Level in Sludge Pathogen Density Number of Excee- Frequency „n,,� �;c Sample Type Analytical' Tech - r;„„A Minimum Geo. Mean Maximum Units Fecal Coliform 2x10tothe6th power MPN per gram of total solids or 2 x 10 to the 6th power CFT T ner gram of 1000 mpn per gram of total solid (dry weight) Salmonella bacteria (in lieu of fecal coliform) 3 MIN per 4 grams total solid (dry weight) Vector Attraction Reduction (40 CFR 503.33) - Please indicate option performed: ption 2 0 Option 6 L . l Option 1 0 Option 7 Option 3 0 Option 8- 0 Option 4 Option 9 No vector attraction reduction options were performed Option 5 0 Option 10 CERTJFICATION STATEMENT (please check the appropriate statement) "I certify, under penalty of law, that the pathogen requirements in 40 CFR 503.32 and the vector attraction reduction requirement in 40 CFR 503.33 have been met." "I certify, under penalty of law, that the :pathogen requirements in 40 CFR 503.32 and the vector attraction reduction requirement in 40 CFR 503.33 have not been met." (Please note if you check this statement attach an explanation why you have not met one or both of the requirements.) "This determination has been made under my direction and supervision in accordance with the system designed to ensure that qualified personnel properly gather and evaluate the information used to determine that the pathogen and vector attraction reduction requirements have been met. I am aware that there are significant .penalties for false certification including fine and imprisonment." Richard E. Mendez, ORC Richard E. Mendez, ORC Preparer Name and Title (type or print) Land Applier Name and Title (if applicable)(type or print) Signature of Preparer / :z4 -20 3 /-2g :100 Date Signature of Land Applier (i pplicable) Date DENR FORM RF (5/2003) Town of Spring Lake, North Carolina 2012 Annual Biosolids Report EPA Forms Permit # WQ0001086 NPDES Permit # NC0030970 Prepared By MacConnell & Associates, P.C. P.O. Box 129 Morrisville, NC 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 1i Report Submitted 1/25/2013 Permit No. Alternate Permit Facility TOWN OF Region GENERAL FACILITY INFORMATION TOWN OF SPRING LAKE WWTP NC0030970 NC0030970 WQ0001086 SPRING LAKE IV Hydrologic Unit Field Office N/A Facility -Physical Address: Street HARPS STREET City/St SPRING LAKE, NC County CUMBERLAND EPA ID Code WWTP Authority Name TOWN OF SPRING LAKE Use for -Analysis Latitude 35.189 Plant Type Zip Code 28390 Phone (910) 497-5748 Facility Mailing Address: Street PO BOX 617 City/St - SPRING LAKE, NC Zip Code Phone Operator -in -charge Phone License# Responsible Official Contact Person Title. E-mail. Phone ,RICHARD E. MENDEZ (910) 436-0241 ORC-989275 ' Land App.-991626 - CHRIS V. REY Permit Issued 02/08/2006 RICHARD E. MENDEZ - OPERATOR IN CHARGE 28390 Title Fax Longitude 78.971 OPERATOR IN CHARGE (910) 436-2667 Certification Grade • Title MAYOR (910) 436-'0241 Fax Influent Flow (MGD) 1.50 Activity Status? •(A/I) Indian -Lands? (Y/N) Facility send biosolids out -of Permit Expires 01/31/2014 (PER SESSION LAW 2009-406) Influent BOD .150.00 Major/Minor? Class 1? (Y/N) state? (Y/N) N (910) 436-2667 Last Inspection Date 9/27/2012 Influent TSS 75.00 J Pretreatment? (Y/N) N Report Required? .(Y/N) Y. Facility • BIOSOLIDS TREATMENT PROVIDED (No. of Units) TOWN OF SPRING LAKE WWTP NC0030970 TOWN OF SPRING LAKE WWTP Permit No. NC0030970 DEWATERING: 1.Gravity 30.22 15. Vacuum Filter 0 2.DAF 0 16. Pressure Filter 0 3.Centrifuge 0. 17. Belt Filter 0 4 0 18. Drying Bed 0 19. Drying Lagoon 0 STABILIZATION: '. 20. Heat Drying 0 21. Centrifuge 0 5. Aerobic Dig. 0 22. 6. Anaerobic Dig. 0 7. Heat Treat 0 OTHER:. 8., Wet Oxidation 0 9. Chemical (Lime) Stab.. 30.22 23. Wastewater Lagoon 0 10. Composting - - 0 24. Mixing of Biosolids. 0 11.'Biosolids Lagoons. 0 25. Oxidation Ditch - 0 .12. 26.'Incineration 0 27. Septage. 0 CONDITIONING: - 28.' - '0 13. Chemical Cond. 0 14 . 0 Li -1 . FINAL USE/DISPOSAL PRACTICES (dmt/yr) FOR MONITORING YEAR 2012 TOWN OF SPRING LAKE WWTP NC0030970 TOTAL ANNUAL PRODUCTION (Predigestion) TOTAL ANNUAL PRODUCTION (POST DIGESTION) LAND.APPLICATION (Total) Bulk Biosolids: 30.22 30.22 30.22 30.22 Derived Material: 0.00 Agricultural Land 30.22 Agricultural Land 0.00 Range Land -0-.00 Range Land 0.00 Forest 0.00 Forest .0.00 Public Contact Site " 0.00 Public -.Contact Site 0.00. Reclamation Site' . 0.00 Reclamation Site 0.00 Sold or Given Away, 0.00- Sold or-Gil/eh Away 0.00 Lawn or Garden . 0.00 Lawn or.Garden 0.00 SURFACE DISPOSAL (Total) 0.00 With Liner & LCS 0.00 Without Liner & LCS 0.00 LANDFILL (Total). 0.00 Landfill.Disposal 0.00 : Landfill Name 0 .00' Does landfill meet 40CRF258? (Y/N) INCINERATION TRANSPORTED TO ANOTHER, FACILITY (S) Name 0.00 0.00 ' RECEIVED FROM ANOTHER,FACILITY-(S) Name 0.00 Address Address • State(s). State(s) Phone Phone OTHER STORED 0.00 CALCULATED PRODUCED 30.22 LONG TERM TREATMENT 0.00 . Was,land'application usedfor any of the sites? Pathogen Certification? (Y/N/NA) ,VAR Certification? (Y/N/NA) Management Practice Certification? (Y/N/NA) Landfill Certification? (Y/N/NA) Y Y NA LAND APPLICATION SITE INFORMATION TOWN OF SPRING LAKE WWTP NCO030970 Monitoring Year 2012 Site No. 1 Site Name SITE 1 - FIELD 1 Hydrolic Unit N/A Owner TOWN OF SPRING LAKE Operator RICHARD E. MENDEZ-SPRING LAKE Applier RICHARD E. MENDEZ-SPRING LAKE Latitude 35°11'51" Longitude 78°57'52" Location Section Township Range Size (acres) 8.00 Size (hectares) 3.24 Crop , BERMUDA, FESCUE Application Rate (tons/acre) 0.00 Application Rate (MT/HA) 0.00 Maximum Rate (MT/HA) N/A Cumulative Load Required? (Y/N) Y Notification? (Y/N) Y Monitoring Year 2012 Site No.• 2 Site Name SITE 3 - FIELD 1 Hydrolic Unit N/A Owner WILLIE CALVIN BRINKLEY Operator RICHARD`E. MENDEZ-SPRING LAKE Applier RICHARD E. MENDEZ-SPRING LAKE Latitude 35°14'34" Longitude 79°01'41"' Location Section Township. Range Size (acres) 5.10 •Size (hectares) 2.06 BERMUDA, FESCUE Crop Application Rate (tons/acre) •0..88 Application Rate (MT/HA) 1.98 Maximum. Rate (MT/HA) N/A Cumulative' Load Required? (Y/N) Y Notification? (Y/N). Y Monitoring Year 2012 Site No. 3 Site Name SITE 3 - FIELD 2 Hydrolic Unit N/A Owner WILLIE CALVIN BRINKLEY Operator RICHARD E. MENDEZ-SPRING LAKE Applier RICHARD E. MENDEZ-SPRING LAKE Latitude 35°14'42" Longitude 79°01'33" Location Section Township Range Size (acres) 8.20 Size (hectares) 3.32 Crop BERMUDA, FESCUE Application Rate (tons/acre) 1.12 Application -Rate (MT/HA) 2.51 Maximum Rate (MT/HA) N/A Cumulative Load Required? (Y/N) Y Notification? (Y/N) Y Monitoring Year 2012 Site No. 4 Site Name SITE 3 - FIELD 3 Hydrolic Unit N/A . Owner WILLIE CALVIN MINKLEY ' Operator RICHARD E. MENDEZ-SPRING LAKE Applier RICHARD E. MENDEZ-SPRING LAKE Latitude 35°14'47" - Longitude 79°01'19" ' Location - Section - .Township Range ' Size '(acres) 13.60 Size (hectares) 5.50 Crop BERMUDA, FESCUE. Application Rate (tons/acre) 0.58 Application Rate (MT/HA) 1.31 Maximum Rate (MT/HA) N/A Cumulative Load Required? (Y/N) Y Notification? (Y/N) Y , Monitoring Year 2012 Site No. 5 Site Name SITE 4 - FIELD 1 Hydrolic Unit N/A Owner MAYBOB E. PAYE Operator RICHARD E. MENDEZ-SPRING LAKE Applier RICHARD E. MENDEZ-SPRING LAKE Latitude 35°14'42" Longitude 79°O1'21" Location Section Township Range Size (acres) 4.50 Size (hectares) 1.82 Crop BERMUDA, FESCUE Application Rate (tons/acre) • 1.36 Application Rate (MT/HA) 3.05 Maximum Rate (MT/HA) N/A Cumulative Load Required? .(Y/N) Y Notification? (Y/N) Y Monitoring Year 2012 Site No. 6 Site Name -SITE 4 - FIELD 2 • Hydrolic Unit .N/A Owner MAYBOB E. PAYE Operator .RICHARD E. MENDEZ-SPRING LAKE Applier RICHARD E. MENDEZ-SPRING LAKE Latitude • 35°14'38" Longitude 79°01'45" Location - 'Section Township Range ' Size (acres) 4.30 Size (hectares). 1.74 Crop .,BERMUDA, FESCUE Application Rate.(tons/acre) 1.30 Application Rate (MT/HA) 2.91' Maximum Rate (MT/HA) N/A Cumulative Load Required? (Y/N) Y' Notification? (Y/N) Y MONITORING DATA SUMMARY i- TOWN OF SPRING LAKE WWTP L I NC0030970 r-- Monitoring Year 2012 Use/disposal Practice LA BULK AGRICULTURAL LAND No. of Analysis required per monitoring year? 1, Approved methods? Y All in dry weight? (Y/N)• Y Required Metals? (Y/N)Y. Pollutant Average .Maximum . Analysis/yr' Comments'. Arsenic (mg/kg) .4.63 4.63 1 Cadmium (mg/kg) 1.67, 1.67 1 Chromium (mg/kg) 8.61' 8.61 1 Copper (mg/kg) 223 223. 1 Lead (mg/kg) - 20•.6 20.6 1 Mercury (mg/kg) '0.972 0.972 1 Molybdenum (mg/kg) •2.31 . 2.31 1 Nickel {mg/kg) .1.:5.1 15.1 1 Selenium '(mg/kg) 4.63 4.63 1 Zinc (mg/kg) ' 1; 1-60 '. . . '1,160 1 Fecal Coliform (#/g) NOT TESTED ' • NOT TESTED . 0 Salmonella (#/g) NOT TESTED NOT TESTED 0 Helminth.OUA #/g) NOT TESTED NOT 'TESTED 0 - Enteric Virus •(PFU./g) • NOT TESTED' NOT TESTED .0 Nitrite & Nitrate, '('mg/kg) 926' 926 1 TKN (mg/kg) 54;100, 54,100 1 Ammonia (mg/kg) ' 29,800 - 29,800 •. 1 Solids 0) 1.08 :. 1.08 1' ' Phosphorus {mg/kg) . .20,300 20000- -- 1 Paint Filter -test? ('P/F) F TCLP?-(P/-F)P' Monitoring Year 2012 PATHOGEN REDUCTION PATHOGEN REDUCTION AND VAR TOWN OF SPRING LAKE NC0030970 • VECTOR ATTRACTION"REDUCTION Class A 0 Method Used Time/Temperature (T&T) 0 38% Volatile Solids Reduction 0 Alkaline Treatment (PH&T&T) 0 BENCH -Anaerobic Digestion 0 Prior testing (EV or VHO) 0 BENCH -Aerobic Digestion 0 No prior testing (EV or VHO) 0 Aerobic Digestion (SOUR) 0 PFRP method 0 Aerobic Process (14DAYGT40) 0 1).composting Alkaline Stabilization (PH1222HR) 30.22 2) heat. drying • Drying (%TSGT75) 0 3) heat treatment Drying (%TSGT90) 0 4) aerobic digestion Injection . 0 5) beta ray irradiation.• Incorporation 0 6) gamma ray irradiation. Surface Disposal Daily Cover. 0 7) pasteurization Domestic Septage Treatment 0 999) no method reported UNDETERMINED 0 Equivalent PFRP. 0 Class B Prior testing for FecalColiform 0 PSRP Method 30.22 1) aerobic digestion 2) air drying 3) anaerobic •digestion 4) composting 5) lime stabilization- 30.22 . 999)- no method reported Equivalent PSRP 0. Class Undetermined '0 Geometric 'Mean? (Y/N) Town of Spring Lake, North Carolina 2012 Annual Biosolids Report Additional Information Permit # WQ0001086 NPDES Permit # NC0030970 Prepared By - MacConnell & Associates, P.C. P.O. Box 129 Morrisville, NC 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 I� Contact: Client: Richard Merdez Town of Spring Lake 300 Ruth Street Spring Lake, NC 28390 Meritech, Inc. Environmental Laboratory Laboratory Certification No.165 Report Date Revised Date: NPDES#: Date Sample Rcvd: Page 1 of 3 10/23/2012 1/22/2013 NC0030970 10/4/2012 Meritech Work Order # Parameters % Solids % Volatile Solids Ammonia, Nitrogen TKN Nitrate/Nitrite Nitrogen Nitrogen, total Aluminum, total Arsenic, total Cadmium, total Calcium, total Chromium, total Copper, total Lead, total Magnesium,. total Mercury, total Molybdenum, total Nickel, total Phosphorous, total Potassium, total Selenium, total Silver, total Zinc, total Cyanide, total Sulfide, total Paint Filter Test 10041217 Sample: Sludge Storage Tank Grab Result 1.08 % 0.55%. 29,800 mg/kg 54,100 mg/kg < 926 mg/kg 54,100 mg/kg 6,280 mg/kg < 4.63 -mg/kg 1,67 mg/kg 137,000 mg/kg 8.61 mg/kg 223 mg/.kg 20.6 mg/kg 6,520 mg/kg 0.972 mg/kg < 2.31 mg/kg 15.1 mg/kg 20,300 mg/kg 9,440 mg/kg < 4.63 mg/kg 3.06 mg/kg 1,160 mg/kg < 46.3 mg/kg 3,700 mg/kg Free Liquids Present Analysis Date 10/5/12 10/5/12 10/9/12" 10/15/12 10/5/12 10/10/12 10/11/12. 10/11/12 10/11/12 10/11/12 - 10/11/12 10/11/12 10/11/12 10/11/12. 10/8/12 10/11/12 10/11/12 10/11/12 10/11/12 10/11/12 10/11/12 10/11/12 10/12/12 10/11/12 10/8/12 Reporting Limit 0.2 % 0-100 % 10 mg/kg 20 mg/kg 926 mg/kg 20 mg/kg 5.00 mg/kg 4.63 mg/kg 0,200 mg/leg! 10.0 mg/kg 1.00 mg/kg 1.00 mg/kg 1.00 mg/kg 10.0 mg/kg 0.20 mg/kg 2.31 mg/kg 1.00 mg/kg 2.00 mg/kg 20.0 mg/kg 4.63 mg/kg 0.50 mg/kg 1.00 mg/kg 46.3 mg/kg 10 mg/kg 10/4/12 Method SM 2540B SM 2540E EPA 350.1 EPA 351.1 EPA 353.2 EPA 353.2 EPA 200.7 EPA 200.7 EPA 200.7 EPA 200.7 EPA 200.7 EPA 2.00.7 EPA 200.7 EPA 200.7 EPA 245.1 EPA 200.7 EPA 200.7 EPA 200.7 EPA 200.7 EPA 200.7 EPA 200.7 EPA 200.7 EPA 335.4 SM 4500 SD SW-846 9095B 642 Tamco Road, Reidsville, North Carolina 27320 tel.(336)342-4748 fax.(336)342-1522 Contact: Client: Richard Merdez Town of Spring Lake 300 Ruth Street Spring Lake, NC 28390 Merl -tech, Inc. Environmental Laboratory Laboratory Certification No. 165 Report Date Revised Date: NPDES#: Date Sample Rcvd: Page 2 of 3 10/23/2012 1/22/2013 NC0030970 10/4/2012 Meritech Work Order # 10041217 Sample: Sludge Storage Tank Grab 10/4/12 TCLP Metals Parameter Arsenic Barium Cadmium Chromium Lead Mercury Selenium Silver Result < 0.100 mg/L • 0.918 mg/L < 0.020 mg/L < 0.050 mg/L < 0.100 mg/L < 0.2 mg/L < 0.100 ing/L < 0.050 mg/L Analysis 10/12/12. 10/12/12 10/12/12 10/12/12, 10/12/12 10/11/12 10/12/12 10/12/12. Reporting Limit 0.100 mg/L 0.050 mg/L 0.020 mg/L 0.050 mg/L 0.100 mg/L 0.2 mg/L 0.100 mg/L 0.050 mg/L Method EPA 200.7 EPA 20.0.7 EPA 200.7 EPA 2.00.7 EPA 200.7 EPA 245.1 EPA 200.7 EPA 200.7 Parameter Volatiles 8260 Semi Vol. 8270 Pesticides 8080 Herbicides 8150 TCLP Organics Result Attached' Attached Attached Attached Analysis Reporting Limit 10/10/12" .. • .. 10/15/12 10/22/12 10/22/12. Method 8260 8270 8080 8150 Parameter :Ignitability pH • Result • *WNI • 7.4 S.U. Other Tests Analysis 10/22/12 10/22/12 Reporting Limit Method NA. NA EPA 1030 1.0 -14.0 S.U. SM 4500 HB * Will Not Ignite 642 Tamco Road, Reidsville, North Carolina 27320 tel.(336)342-4748 fax.(336)342-1522 P L_J Contact: Client: Richard Merdez Town of Spring Lake 300 Ruth Street Spring Lake, NC 28390 Meritech, Inc. Environmental Laboratory Laboratory Certification No. 165 Report Date Revised Date; NPDES#: Date Sample Rcvd: Page 3 of 3 10/23/2012 1/22/2013 NC0030970 10/4/2012 Meritech Work Order # 10041217 Sample: Sludge Storage Tank Grab. • 10/4/12 Method 1311- TCLP Pesticides & Herbicides Pesticide - SW-846 8081A Analysis Date: 10/22/12 Parameter Methoxychlor Toxaphene Gamma - BHC Chlordane Endrin Heptachlor Epoxide Heptachlor Result < 0.002 mg/L < 0.1 mg/L < 0.002 nig/L < 0.01 mg/L < 0.002 mg/L < 0:002 mg/L < 0.002 mg/L Analyst: Summit Det. Limit 0.0020 0.10 0.0020 0.01 0.0020 0.0020 0.0020 Reg. Limit Dilution Factor 10.0 0.5 0.4 0.03 0.02 0.008 0.008 1 1 1 1 1 1 1 Herbicides - SW-846 8151A Analysis Date: 10/22/12 Parameter 2,4,5-TP (Silvex) 2,4-D Result • 0.5 mg/L 5 mg/L • ' Analyst: Summit Det. Limit 'Reg. Limit 5.0 0.50 1.0 10.0 Dilution Factor 1 1 I hereby certify that I have reviewed and approve these data. Laboratory Representative 642 Tanico Road, Reidsville, North Carolina 27320 teL(336)342-4748 fax.(336)342-1522 ME!TECH, I Environmental Laboratories A Division of Water Technology and Controls, Inc. Client: Spring Lake Project: TCLP Client Sample ID: Sludge Storage Tank Sample Collection: 10/04/12 Meritech Sample ID:/0041217 Volatiles: SW-846 8260 Analysis: 10/10/12 Analyst: VWV Parameter 1311 - TCLP Organics Extracted: 10/08/11 Result Units Det. Limit Reg. Limit Dilution Factor Benzene < 0.0100 mg/L 0.0100 0.50 1 Carbon Tetrachloride < 0.0100 ,mg/L 0.0100 0.50 1 Chlorobenzene < 0.0100 mg/L 0.0100 100 1 Chloroform < 0.0100 ing/L 0.0100 6.0 1 1,2-Dichloroethane < 0.0100 mg/L 0.0100 0.50 1 1,1-Dichloroethene <0.0100 mg/L . 0.0100 0.70 1 Methyl Ethyl Ketone < 0.100 mg/L 0.100 200 1 Tetrachloioethylene < 0.0100 mg/L 0.0100 0.70 1 Trichloroethene < 0.0100 mg/L 0.0100 0.50 1 Vinyl Chloride <0.0200 mg/L 0.020 0.20 1 Semi-Volatiles: SW-846 8270 Extraction: .10/10/12 Analysis: 10/15/12 Analyst: MC Parameter " Result Units Det. Limit Reg. Limit Dilution Factor 1,4-Dichlorobenzene <0.100 mg/L 0,100 7.5 10 Hexachlorobenzene <0.100 mg/L 0.100 0.13 10 Hexachloro-1,3-butadicne <0.100 mg/L 0.100 0.5 10 Hexachloroethane <0.100 mg/L 0.100 3.00 10 o-cresol <0.100 mg/L 0.100 200 10 rn&p-cresol <0.200 mg/L ' 0.200 200 10 Total cresols <0.300 mg/L 0.300 200 10 Nitrobenzene <0.100 ing/L 0.100 2.00 10 Pentachlorophenol <0.500 mg/L 0.500 100 10 Pyridine <0.100 mg/L 0.100 5.0 10 2,4,5 Trichlorophenoi <0.100 mg/L 0.100 400 10 2,4,6-Trichlorophenoi <0.100 mg/L . 0.100 2.00 10 2,4-Dinitrotoluene <0.100 mg/L 0.100 0.13 10 I hereby certify that I have reviewed and approve these data. Laboratory Representative 642 Tamco Road * Reidsville, NC 27320 (336) 342-4748 Ph * (336) 342-1522 Fax Qhaiii of Cu tody Record (COC) = Client: Spring Lake NPbES #: /12 �'jCaa7c Phone: q1A—t-1cr1 MERITECH INC,_ ,<< •,.• 4Exlviroturmer%tal Laboratories d u��15rA DivDivision of Water Technology'azzcontrol,� 642 Tamco Rd Pherie 1436-342-4748 Reidsville, NC. Fax 1-336-342-1522 27320 Errtail wtclab(cr�,bellsouth.net . Inc. - Address: .300 Ruth St Fax Ernail: • , rtw.-- Mf��Sj%. Project . • 0 tl Spring Lake PO #: k\t-,s.. Attention: —B r i -Td'a :ci & \ Turn Around Time* td (10 days) 3 - 5 Day 24 - 48 Hr Web Site:.. www.fneritech-Iabs.corn 1 i ) ( r i Sample ` Location/ID # Sampling 'Dates & Times Person Taking Sample (Signature): Lab Use Only = START ! END Comp? stab? #of Canis. Tests Required- Annually On Ice? pH OK? o cizoK. Date Time Date Time ,{ ' Ptpt: j©1y 1 iz (_Deco 1b1,4 1 .. loc 5 < G 1 % Solids, % Volatile Solids, Paint Filter 1� 5NA G 1 NH3, TKN,NO2,NO3, Ntot - (H2SO4) `) 5Q� 't"Q1 :.. _... _ _ _ _._ � _ �'G 1 .Metals-AI,As,Cd;Ca,Cr,Cu,Pb,M9,H9,MosNi f.,. .i K ... _ Ptot K,Se,Ag;Na,Zn (w/HNO3) s l -- G 6 Full TCLP Method of Shipment: Comments: . . -9'0 L . ,.o.1r, ) D r fC.-"`- . 0 UPS . 0 Fed Ex Hand Delivery//__A [jOther = ' Will these -results b� used for regulatory purposes? *RUSH be Ye 5 ✓ ..ND,. { 1 work must approved prior to submitting samples. Relinquishe - ,-- Date: Time: ¢, AU Rece ed by. Date: Tf ' -�Reli /7: dished b : Date: Time:. 9 Y % jk; t-,...... _ .. ir:6/ q . Z- — 0 ReceiD e: .. by:Date: Time: Reli quished by: Date: Time: Received labppby: (t Da/te: Time: / 66 Town of Spring. Lake Wastewater Treatment Plant BIO-SOLIDS WASTING LOG DATE OPR INITIALS DIGESTER LEVE* _ TIME START PH TEMP. TIME STOP PH TEMP. GALS. WASTED 2/2/2 % 31/' 0 ”Ibr .rah/� A ,.x Pili2 O O /' : k' ::. //av 'tigl/ J9/D2, ' � 1 .//�/ /fL �� /� Q .L v,s .'St 5 A� 1-.{ ° t J`ry sk 2/.?d'/.2 ., V '/010.- t - MD `SSi �� V v,_I . r 3/47�� (7 .1 i/ 0830 4'i4o //y//2 , 0 ' 0**--7::40;1':- /DOO G' �j . y i�//02, t . l✓ �//� vn( �I ,7 ' ':97 P t /V,D'�cd l4 ^�t't r �",,tY` 4s:. �,a'',7A//,Q ,.sa �.' .�h x. 55 '`t •,'.�.. ,..t-.%1e.. h/i9---W a'OP-7:-.-440!,,..--A 07g4 4'�8.2 8y/Y 3/.1p/g 7� .17 / oa ° S . q 3 +M 377:r o a .'f 0 fe ' ' //1.2 4.� j y .25.5 27,/ 7/fili.g .29' a?/ VI".;r--z- _ . - '''''' ,,� � o S// 4 " r.r, .. F h" R� 2.23 G"322,/ , , 7y7/ 7 ep‘4 ,,?2 /40.0 1 / . ..,7---A.WA,.. //co • gs-6-77:./ g‘' oaf/ 6/9'5'4/: ' :1„,_ P,...v,fa. ii-l_A C T J'r .3/S/2 g/.e4A p " 00-1''40:0-,-,,,,,,. a90 G`i . .%02, ., g/. a. ,?i , 07sV 2e , /:? /2- 7/ e _,_ ±aza . .19 Ac8 V/i/i. 7,7 ,i' 09676 # , 0 '.ti F'k � �`.; �",,3 i .,,, -,-44fa: _ `414 ' /l// a � d ' D?/5' / 9 ,._ 1 .., 2#n l Ns ry'.,:'--i4 :k3 4 �//2 d '� f ` _ �, 4.� , oy/oa. 8, y ro/A ,74 ' O4/ g;/4y,s':s VA0A2'/? • y F. Lf// 2 ,2'vt 32 �do s,I V J1.111� . l 1 '3 of. 035,/ NOTE: Use one line for start and one for stop. * = Digester level is the inches on the valve stem at start and stop Town of Spring Lake Wastewater Treatment Plant BIO-SOLIDS WASTING LOG DATE OPR INITIALS DIGESTER LEVE* TIME START PH TEMP. TIME STOP PH TEMP. GALS. WASTED rh, ria " �' 59a• 3//. ' % � 9 -27 07`i`� /7 // H - 5;6. /Y r // a9 �/ ski y ,c �7/J2 � � D - :. o9/7 3re g/ ✓a W' 7I" oc'/i s y ,....., . I 6/ / 1 u /®�i(FP y/.25 G'/ D2.. " & _ $ . /�/ 7 o '' - H :.: /Doi ‘: ` za 3/0.2. _ .)1,c)//2 Aot AP 0g35 1102. G(' 'r 3 6cf50 ,j'3 S -90;7_ . 6 / �]` � 0 X � /2 ,/li iti 36 (I 1 1 / 6 1/2 J// 2 (i / 6 ' ' l �1 bo,.//v U L. xt t3� n k t o f iSt v :3,02; ' Y< 6 (lg Jig (41, oil 6�', ; � --io iz f<evl ,36" 73O 7 f ) lI z fim, 0 (' - bC� 5° - r, V7 //bio A , .. ' 3 9 ie-)..)‘• 71/J,hkt. .Li 3clr io/ 9�5.3 �., . � `: r : 7ia/ld. ('.L4i.- o,i a4`�. N_ I I5L/ �j'e:° 3Y O;IS 7)/7//2 (4''t /' (0 r� �, `.Y -7(i7/0 Pam, _36 l� (., I1 `15 � .7/fqp 1' � g � ,� [ 4 3 7/231/2 /1 i -A, ify 7 /3%/z �), 6'' i ? �a 5 7'z ( 3LI l 02 z212 / "'� ,6 �3����b'� 271 Jz (f. -1 l' 'S'� o2 NOTE: Use one line for start and one for stop. = Digester level is the inches on the valve stem at start and stop Town of Spring Lake Wastewater Treatment Plant BIO-SOLIDS WASTING LOG DATE OPR INITIALS DIGESTER LEVE* TIME START PH TEMP. TIME STOP PH TEMP. GALS. WASTED 7 /3 l (1 2 PI b� a ,,,I*ji. ; .3; c,. 4 I a �S 8 l 2 / s z l2 e 76 � 1 jeoo �J 6��0 4`ry�x 5��*'.'�, . , A : �rr��•"� � � �- .. fa y:_� 1 1 `� may( �j1j / f ! ( 1 2, AM 31 (I 0(,5 5s c �C �> _ #a -:.: - -, 1 1 I � - c n- Od r 3 is-3 way ?IHif2 R' 32 /' 0936 s. -7$za t r .Y J { 2, (1///�/ �, //�Jj ft. T r i Icy 5 s 2 32202 2 'W / /L P i& 36 ,/ ogao 6 •D°L4,� s-t: -, - , f �m {. rf?/l2 A‘ 0 '' .1_z. � 4.. /03c b__3c/02 8' 5131(i2 AA—. - n /i °Fn : W-15- 5 �8 3Li fog g 9/5/ r a mug 36'' !L 3 � 5'y5 k , 9/� % m, .z 0 ` t ` a 4.5�fz t rs a•i �iiJrf:- 4. () I)e) �®� 3 /i aC, (4110112 PM 36" 6 36 L 5'9727 `ham `1. y_ t J S -.w. 9 l to hi Om o '� y° ,; , /oo ,3 �?L1/ 2 g 10122112 rn .jmp— lox' y KZ tk . ys 4.Jks %1 .. .Y...4 lof_�i/z n. or �� ��-����� � ¢,H �, N rn o ion n • ��� o z �i • o 10fz111 /t b �� t ta • ,q_ f. ,,i (c ,mow, <:, c -t 0" lr Fs c � .F x z- �Y 113 o b 6 Ylo $ to si1 z 014 jcIZ.1a �1'�-' 36 rr 1100 • 6 5 • 3 GAY 'yK+f `Z � � tag i`.F. _ .. - l ®1 zt 1( O/b' o 7 toz. /6 ,2t.fir.: & '.^ /// /0,30 / /2 12 m Q / r xi b�t 7 5/, ,, 3 .0.Y9 . /" f/% u` " V JV e � I ./ / ]/1//2 nW / 0'` r . , ..rii57 .TC. ; :fig � �j`.Ln .. a / 3 6d JI0 1!/ (41g2 fit6 I 1oc) �. r. . 11/L1 /z 161-, 0 h j- ,..,. 4 ,: 12 38 ' -I1 6 3y10 z.8 NOTE: Use one line for start and one for stop. = Digester level is the inches on the valve stem at start and stop Town of Spring Lake I ' Wastewater Treatment_ Plant { BIO-SOLIDS WASTING LOG DATE OPR INITIALS DIGESTER 'LEVE* TIME START PR TEMP. TIME STOP PH TEMP. ' GALS. WASTED �/y� /�� �. #V ✓1 t .,, tO 3 g / ,�(� / o.i {VO' �ji N+ ? Y '.r �,flx.'a r+, �,1'� '� s �t -. t3' F'.X /10r�:;40 0 " r 6_.. 4.Yt • 3/3;‘ ao �f/2 Ml S4" 0./ P: 6' o 7,�:x'{ 4 - r x�� d oa i ., riled 0 " - r _ 5' 4. ; .,9 310Da, ' 2'7 Nou.l2, AM 36 " C 13 6 'o 0 3 '' vr A a II r5 b �' y o 3�►faa 8 G 1 NoV 1 Z. / M f o (/ oa f J ' � '" E rrr n i � its *t � 3 leI,Ncv la . att., 00 0 i Lf '1 tag �i' p gyp' �/� VW �'/ O OfV6ti V' ,'a`h yv 4k .w. k4. ^E t .%'btu CJ4tF v4` c ,l- 1i' i) 0 , ! y � : z•r=� i4r? /.5"5' 64 "IP/ 9 5 ,I I y Del- l z- ,,,; r• 11 c . 4 r 6�5" 3`i t o g• S 6D ,11 rVI A« D$op. 62$ .r5..z5,L,%r.: ,,3 $' -ram 4,p4,D, ,�•Dtr 17;;� �i `10 13t f 34toaT 19 -12 � M 6" ' . - .� �, JO'I " 2. r{3 ? Li (oz 1:et O r pn� 'KM, r 36 l' Q o O I } t C " i � � u _k !015 �'° :0 39162'8 21-�<<-.�2 // ®(M /� C36 C?�«� / 7 �r .:� 1. ' :'h Y l2-'3 Y r ...:a= `R"E t..=M Fe'�a V'Oc // 0''1 r1 4 J 030 b S3t6 9 LJ[0 se I VV � d h 14 `:t"t.�. _ - {� t..,, i Y -'4 ... yr # $ a s.- W art 5r - n i' NOTE: Use one line for start and one for stop. :Digester level 'is the inches on the valve stem at start and stop 2012 Biosolids Applied Gallons Per Field 1-1 MON/YEAR JANUARAY FIELD #1 GALLONS APPLIED GALLONS GALLONS MON/YEAR JANUARAY FIELD# 3-1 APPLIED MON/YEAR JANUARAY FIELD # 3-2 APPLIED FEBURARY . MARCH • APRIL MAY FEBURARY FEBURARY MARCH MARCH' APRIL •n. ,APRIL JUNE JULY to MAY ,MAY JUNE ' 72,000 JUNE 136,000 JULY JULY AUGUST SEPTEMBER OCTOBER AUGUST SEPTEMBER OCTOBER 28000 AUGUST SEPTEMBER OCTOBER 68,000 •NOVEMBER DECEMBER NOVEMBER .NOVEMBER • • DECEMBER DECEMBER TOTAL GAL 0 TOTAL GAL 100000 TOTAL GAL 204,000 GALLONS . GALLONS . MON/YEAR FIELD #3-3 APPLIED MON/YEAR FIELD 4-1 APPLIED MON/YEAR JANUARAY - FEBURARY : MARCH APRIL' MAY' JANUARAY JANUARAY . FIELD 4-2' GALLONS APPLIED FEBURARY MARCH FEBURARY MARCH, APRIL APRIL -MAY MAY a JUNE • 116000 JUNE JULY JULY 52, 000 . JUNE 108,000 'JULY'' AUGUST AUGUST AUGUST' SEPTEMBER OCTOBER SEPTEMBER SEPTEMBER 60000 OCTOBER • 84;000 OCTOBER 16000 NOVEMBER' DECEMBER NOVEMBER NOVEMBER DECEMBER TOTAL GAL '176000 DECEMBER , TOTAL GAL 136000 . TOTAL`GAL '124000 TOWN OF SPRING LAKE WASTEWATER TREATMENT PLANT BIO-SOLIDS APPLICATION LOG DATE DD/MO/YY FIELD NO. *TANK # OR S GALLONS APPLIED (*)TANK PH TEMP (F) OPERATORS INITIALS 4-Jun-12 3-2 S - 8,000 4-Jun-12 3-2 S 12,000 MSS 4-Jun-12 3-3 S 4,000 GC 5-Jun-12 3-2 S 48,000 JG 5-Jun-12 3-3 S 52,000 GC 5-Jun-12 4-1 S 44,000 MSS 6-Jun-12 3-1 S 32,000 GC 6-Jun-12 3-3 S 12,000 GC 6-Jun-12 3-2 S 44,000 JG 6-Jun-12 4-1 S 8,000 MRS 6-Jun-12 4-2 S 24,000 MRS 7-Jun-12 3-1 S 4,000 GC 7-Jun-12. 3-3 S 32,000 GC 7-Jun-12 3-3 S 16,000 MRS 7-Jun-12 4-2 S 20,000 MRS 7-Jun-12 3-2 S 12,000 JG -s,7-Jun-12 4-2 S 8,000 - „JG _ 15-Jun-12 3-1 S 36,000 GC 15-Jun-12 3-2 S 12,000 JG 15-Jun-12 4-2 S 16,000 JG 15-Jun-12 4-2 S 40,000 MRS 12-Oct-1.2 3-1 S 4,000 MS 15-Oct-12 3-2 S 28,000 - MS 15-Oct-12 3-3 S 4,000 JB 15-Oct-1.2 4-1 S 28,000 JG 17-Oct-12 3-2 S 40,000 MS 17-Oct-12 3-3 S 24,000 JB 17-Oct-12 4-1 S 36,000 JG 18-Oct-12 3-1 S 24,000 MS 18-Oct-12 3-3 S 32,000 JB 18-Oct-12 4-1' S 20,000 JG 18-Oct-12 4-2 S . 16,000 JG TOTAL 740,000 Field No. 1 is in and around plant. Brinkley Fields 3-1 / 3-2 / 3-3 Paye Fields 4-1 / 4-2 * use S only when bio-solids are from storage tank. (*) PH reading when bio-solids are from stabilization tanks only. Atlantic Dewatering Services Daily Load Sheet Firm Name Ar14' kit Li ContractorbCcOacr; DATE LOAD FIELD # DATE 6- 4 Tanker Size (Gallons) 4 000 1-773-Z-27- 2 3 4 5 1 6 7 8 START TIME RUN TIME UNLOAD RETURN TO TOTAL TO FARM TIME START GALLONS aat) 9 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Lj 28 29 30 DRIVER SIGNATURE 190 Commerce Center, Clayton, NC 27520 165 Airport Industrial Drive Clayton, NC 27520 8,000/ Special notes for day or field F.s.A4 7-z Atlantic Dewatering Services Daily Load Sheet Farris Name e7i/e egaS I Contractor DATE (//t/ /? Tanker Size (Gallons) 4.000 DATE LOAD i FIELD # START TIME RUN TIME UNLOAD RETURN TO TOTAL Special notes for day or field # # TO FARM TIME START GALLONS ("//Z 1 3-2 Wat, • ; 6/q 7i2_ 2 3 - Z 14000 ) ) gag V cloc) v//i/i% 3 3-Z ) (a "(.( 1'7!O c-(bc) 4 4 S 6 7 8 9 __ - 10 11 . 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 . 30 P A 11 WO 0 DRIVER SIGNATURE i _. (' 4/ 190 Commerce Center, Clayton, NC 27520 165 Airport Industrial Drive Clayton, NC 27520 3-2 Atlantic is Dewatering Services Daily Load Sheet Farm Name/ i-v% l e Contractor 47/-4-u c DATE C"G' D5I• G Z. Tanker Size (Gallons) 4,000 DATE LOAD FIELD # START TIME RUN TIME UNLOAD RETURN TO TOTAL Special notes for day or field # TO FARM TIME START GALLONS `9 ./ 2. I 3 7iOaG ... 2 3 4 4 5 5, 6 6 7 7 8 8 9 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 1 17 , 1 18 .19 20 2 21 . 2 22 2 23 • 24. 2 25 2 26 2 27 2 28 2 29 • 30 ee6 DRIVER SIGNATURE 190 Commerce Center, Clayton, NC 27520 165 Airport Industrial Drive Clayton, NC27520 Atlantic Dewatering Services Daily Load Sheet % !G-�i Farm Name 'c.J � N'2 i Contractor l (/ tc b �► DATE Le r. Tanker Size (Gallons) 4,000 DATE LOAD FIELD 4 START TIME RUN TIME UNLOAD RETURN TO TOTAL Special notes for day or field # TO FARM , TIME START . GALLONS , - - [ 22. 1 -3- 2., O b 406 6 _---__ (. =ST Z 2 3-2- .-5-,L 3 .-z 4oa0 _- S'". jZ. 4 3--1- LtoDc) --12 5 F--2. 40Db I'Z fi g- Z DpO (.-$=1.2 'tk. 7 3-2_ (�. -S-1 8 13,-- 2- bot a-5-t2 9 -2- Oa) -c=f2., 10 ab 517 11 4Do a- I 12 32-...., 14erp 13 14 15 .._..__ ... ... 16 .. 17 18 19 _. 20 \.-..., 21 22 23 24 25, 26 27 , 28 29 30 )elJ DRIVER SIGNATURE 190 Commerce Center, Clayton, NC 27520. 165"Airport Industrial Drive Clayton, NC 27520 Atlantic Dewatering Services Daily Load Sheet Farm Name 1-1 Contractor i I -1 DATE LOAD ; FIELD # START TIME RUN TIME UNLOAD' DATE Q'r'o_c` Tanker Size (Gallons) 4.000 RETURN TO TOTAL TO FARM TIME START GALLONS Special notes for day or field 6:5-/2 1 2 3 4 5 6 7 8 9 10 11. 1.2 13 14 3. 1-3 3-3 3 -7 3--3 3-3 3 3..3 3-3 3 Q.Coo a" 4, 000 Li el 0 0 ovo. C��t3 0o. 15 16 17 18 19 20 ,; 21 22 23 24 25 26 27 28 29 30 DRIVER SIGNATURE 190 Commerce Center,Clayton, NC.27520: 165 Airport Industrial' Drive Clayton, NC 27520 Cz ooG/ 3-3 Atlantic .Dewatering Services Daily Load Sheet Zeint--4C-1 Contractor ,5 Farm Name DATE 61/ 5 / z' Tanker Size (Gallons) ANL DATE LOAD FIELD $ START TIME RUN TIME UNLOAD .RETURN TO TOTAL Special notes for day or field. # TO FARM TIME START GALLONS (f/y ,t- 1. li _ / _ bid Yo-ow ., r- 3 y :) /4?) %64.4c f ci&67:, __ . . 4 L / is . . , .. /%.'g Gi'Oc 7 5 41-1 /732 . -CZ./ 6 `-1, • 6 .l / / zj 5 / S `-tom -. 7. z-[./ /'Z'✓'✓ l3 / C , (-i / �, 10 ,-(5' u 9 y - i /4 ... _ / Gtnov 10 `'1-1 Af- Zie /b -65 G/ .) 1 11 r tb �::_ .d _. /110 1 12 1 13 1 14 I IMM 1 17- ... 18 19 20 21 ' ..... 22 23 . 24 2526 27 28 . 29 30 ,p I e% a t'i' i 9.41o0o - DRIVER SIGNATURE 190 Commerce Center, Clayton, NC 27520 165 Airport Industrial Drive' Clayton, NC 27520 Imo! Atlantic Dewatering Services • Daily toad Sheet Farm Name Br- / /C/' 7 Contractor -/q TL.vi /C DATE SFr , 46 /2 Tanker Size (Gallons) _AM DATE. LOAD FIELD # START TIME RUN TIME TO FARM UNLOAD TIME RETURN TO TOTAL START GALLONS Special notes for day or field: 1 2 3 5 6 7 8 9 10 12 13 .; 14 15 16 17 18 19 20 21. 22 23 24 3 3 7 3 --- 3 —/ 3—, 3 r Moe Q '.9 0o fey:ad 1a' g //:g_ yiLeta 1, /6 : 3o (g30 l 5 1/ �S O Vo ova / Z o /Z '� 4 is 7 /z Q z c 1,6 : 3 .o codas o' ra ca 000 fO rJ 0o 0 G p 6j aao 25 26 27 28 29 30 DRIVER SIGNATURE 190 Commerce Center, Clayton, NC 27520 165 AirportIndustrial Clayton,NC 27520 Atlantic DeWatering Services Daily Load Sheet Farm Name � C�h�{` Contractor d r4—\ k4i . DATE — Le - C2- Tanker She (Gallons) 4.000 _ -DATE LOAD? a~I2 1 6 -(0—t2- 2 ,6_ 2' 3 _try 4 (0.-(o 1, 7 8 14-to--La 10' '--ti=1 2, 11 12 13 14 15 FIELD # START TIME RUN TIME TO FARM :3-2_ UNLOAD TIME RETURN TO START TOTAL. GALLONS 16 17 18 19 .. 20 21 22 23 24' 25 26 27 28. 29 30 3-z DRIVER SIGNATURE 190 Commerce'Center, Clayton, NC 27520 165 Airport lndustrialDrive 'Clayton, NC 27520 flog. obi ODb nob Vot, LW Special notes for day or field Atlantic Dewatering Services DailyLoadSheet Farm Name / €ale Contractor DATE 0//Z Tanker.Size (Gallons) 4,000 DATE . LOAD; FIELD # START TIME RUN TIME UNLOAD RETURN TO TOTAL Special notes for day or field # - TO FARM TIME START GALLONS . 6l/f2 1 Ay'-/ s Gq2 q b 2 -�--i -z-44 101- 3 4i. II0 /7 _ rl / e,- . ,ficiep c.(Irci I 5 . l-''L{ % 6- /55e) . 4r 6 '' 14 - izo'rz' / 4/00� Vim. 7 4.4z 4sz %off ..y 8 -i—v 45L /6 5z. 10 11, _. - _.. 12 3.3 14 ' 15 16 17 18 -.__.. 19 20 21 i 22 23 24 25 r 26 27 28 .... ,_. 29 30 _... ).H'loco 4-2. DRIVER SIGNATURE 190 Commerce Center, Clayton, NC 27520 165 Airport Industrial Drive Clayton, NC 27520 Atlantic Dewatering Services 6 69 Daily Load Sheet Farm Name J 'N lc el Contractor 4I Z441 ‘‘ 15 * Gv i9-7 DATE O 4' 0 7. Tanker Size (Gallons) 4; DATE LOAD a ' FIELD # . START TIME RUN TIME UNLOAD RETURN TO TOTAL Special notes for day or field • TO FARM TIME START GALLONS v6.07 / Z 1 -�/ 0 710 ,o 870 q ; Ja 7 :4 ° 4 000 : - -- 06.o7it .2 o9' , 1DOP /o:La /c_ld •e,.-,5 C ri 07/2 3 — , /0 Z o 1O y-s`" // e-C /'/ /S 6.0-<-; 0,e7,-a d • 07/2. 4 , / / // 20 . I/ 4/ 2-., i! cr 6. 407-/2- 5 . 3- 1 6S /2 /b /7 2' /3 - et. -0 t-, el ,.. ' s , --3.. / _s' l 2 5-f3.3 g 13 5-0 91 vo Co. ¢7•/2 . ?...., .. -_,.. . 5-6 / I / It / It 0 t,;. A,60 ('.pJ.i2. 8 .-3 ) Q.et. /. / 7,a /S. 2 lanfla i-07 / . 9 3- i JI /bPo / Zo /.K, d6v 10 c _... 11 = 12 13 14 15 , -_- q16 17 - 18 19 21 .r22 - -24 25 -- 26 27• • ' 28 .• 29 • ' • 30 DRIVER SIGNATURE 190 Commerce; Center, Clayton, NC 27520 165 Airport Industrial, Drive Clayton, NC 27520 yi000 13—'1 3t.jO o 3 3 Atlantic Dewatering Services Daily Load Sheet. Farm Name Contractor Tanker Size (Gallons) 4.000 DATE ' LOAD 1 FIELD # START TIME RUN TIME UNLOAD RETURN TO TOTAL Special notes for day or field . _ . TO FARM .... . . _ TIME START GALLONS WOZ.- 1 'V ....2 ___ .. . _ .7 3,-) .4 4c2,:6 - --Afxty 2 8-ci5 3 g-cf5- /04> 5 tvezz.) •4 5 //oh /o.05- Liervr..._ . 6 /26 "5- 7 '---3 ,'6".5 , s5-- Liere-,e_. 8 /.-I 3 .5- / c)e.> 9 / .-4:3"Cl, 42EYZ.7 10 11 12 13 14 15 , 16 17 18 , ...._, 19 20 21 22 23 24 25 26 , 27 28 29 30 2,04 Debo ) 142 doc. 3 -3 DRIVER SIGNATURE 190 Commerce Center, Clayton, NC 27520 165 Airport Industrial Drive Clayton, NC 27520 Atlantic Dewatering Services Daily Load Sheet Farm Name i >n K, L-c_ Contractor M-14_ _ {. f rrS DATE - - t Tanker Size (Gallons) ,,, QQa,,. DATE LOAD i FIELD # START TIME RUN TIME UNLOAD RETURN TO ' TOTAL Special notes for day or field # TO FARM TIME START GALLONS �,�---7-rZ.. i y."2- .. - . (p,1-J2 2 . - D fo-1--t2_ 3 3—Q va..) ^--j-j 4 c '- �- b a. /0-7--a 5 , --� 6 7 8 10 , ,.a �_ ., 1-1 • 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 • 28 29 .. .. 30 12. jc 3--2 DRIVER SIGNATURE 190 Commerce Center, Clayton, NC 27520 165 Airport Industrial Drive Clayton, NC 27520 Atlantic Dewatering Services Daily Load Sheet ....i/;‘) /qt./ Farm Name Contractor 4 e - DATE 0C • /5- /2 Tanker Size (Gallons) 4•A0X4 DATE LOAD; FIELD # START TIME RUN TIME UNLOAD RETURN TO TOTAL Special notes for day or field # TO FARM TIME START GALLONS 6E-dn. 1 - I .734 a 21,o4 s c7, i b 4 4-wc . IS' i Z 2 2 -- / C� q/d di5c D ? / 00 / L,�- a a o / /z 3I—I / 00/ j 09 ' /cl► /0 /7 4 -i idyl f/ 0/ /I. 6 ,-.,~/ 47 46e.,0 /./(-/Z 5 // if- S- 2 /2.. / S aa d r./_S./Z, 6 .3—/ ;7-/ /Z,1' 13/0 it-f'c'6 /t-c 1.3Z7 /q-1 r / �// 900o 000 ! ei, o / ,ii 7 -/ /327 /Vf/3_ f 3?. I /-_3o . -c-/ . 8 1./ : �/c/Z g f /.5// /S 20 1 - /4 d j adG 10 ., 11 12 13 14 15 16 17 18 . 19 20 21 .22 23 24 25 26 27 ' 28 29 30 , DRIVER SIGNATURE /j 34.1coo - 3-1 190 Commerce Center, Clayton, NC 27520 165 Airport Industrial Drive Clayton, NC 27520 Atlantic Dewatering Services Li Daily Load Sheet Farm Name Contractor -.._--Oelt-VAvyttc 1L:`)•) C' DATE t — — t 2- Tanker She (Gallons). ,4` DATE LOAD FIELD # START TIME RUN TIME UNLOAD RETURN TO TOTAL Special. notes for day or field. # TO FARM TIME START GALLONS 4',-- t ir,---0 2 - _ . da(a-/-"2 TD6 3 d -; . .. .. - (.n —ic.12, 4 -2 .... . __.. _ Dbc. 10 - !S-fl. 5 --2 tc--/7 6 , -Z .- . . ow (e - IT-1 .7 . . 'c ,- 2, _ 6 66 8 10 11 . 12 , 13 - 14 - 15 16 18 19 . 20 21 22 , 23 24 25 , 26 27 28 .. 29' 30 - DRIVER SIGNATURE' 190 Commerce Center, Clayton, NC 27520 165 Airport Industrial Drive Clayton, .NC 27520 121400-3--1 j 1C9 oe o' Lh Atlantic Dewatering Services Daily Load Sheet Farm Name Contractort7-5 DATE (+,�f.5l/4 Tanker Site (Gallons) 4,OQ0 DATE LOAD • FIELD It START TIME RUNTIME UNLOAD RETURN TO - TOTAL Special notes for day or field TO FARM TIME START GALLONS ej'lrgrz 1 Yam'' 2- 6,V5.-- _ rim ' E. 2 c- z fc,e-1 9rez e(Ge/ 3 Z_ �1 rc,s? c/o+t4 4 ' - - /G' / ///7 . 4/-026 5 Lf-Z. l//-7 // 91 4-1a64) 6 (1.'z . tic5g 17 r./ter:D• 7 Cj-7 /7-S-0 r$G/t) Gtw3.47 8 . K `7- /',/h) A' 36 c-/ 9 u-Z___ / YGc, . /-;zy 10 Z- rCiLi 11 12 13 14 15 16 17 18 19 20 • 21 • 22 • 23 24 . '- - - 25 26 . 27.... 28 r 29 ' 30 ,... DRIVER SIGNATURE 190 Commerce Center, Clayton, NC.27529 165 Airport Industrial Drive Clayton, NC 2/520 J. Atlantic Dewatering Services Daily Load Sheet Farm Name 13riwc./7 contractor iv-4m e P DATE Tanker Size (Gallons) 4.000 DATE 2 FIELD # START TIME 1 g RUN TIME TO FARM UNLOAD TIME RETURN TO START / 4 5q TOTAL GAU.ONS t•AMP(2 3- 4. 5 6 7 8 9 10 11 12 13. 14 15 ' 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Special notes for day or field 4/000 3-1 DRIVER SIGNATURE 0774010414.-1 190 Commerce Center, Clayton, NC 27520 165 Airport inciustrial Drive Clayton, NC 27520 Atlantic Dewatering Services Daily Load Sheet Farm Name Contractor / —44/ 1 / WA' ki J'I, DATE d 0 —% S �) Tanker Size (Gallons) 4.000 ecv DATE LOAD FIELD # START TIME RUN TIME UNLOAD RETURN TO TOTAL TO FARM TIME START GALLONS Special notes for day or field /9-) id -IS 1 2 3 4 5 6 7 8 3—A 3 ,-- 3~7 -� 3- v?.3� cy: 3 i;3/ ra;a.e 4 000 dyo. eV oPo kooa, cup 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 2 8l 000 - 3-as DRIVER SIGNATURE 190 Commerce Center, Clayton, NC 27520 165 Airport Industrial Drive Clayton, NC 27520 Atlantic Dewatering Services Daily Load Sheet Farm Name DATE 16, / — JP Tanker Size (Gallons) .4.000_ Contractor AtIA±10.4°4-34.4, E>ers/ DATE LOAD FIELD # START TIME RUN TIME UNLOAD RETURN TO TOTAL /6-1 10--1 1 174" 10-- 17 1 2 3 4 5 6 7 8 3- 3 -3 3-3 7-, TIME START I; 3 7 3 ? TO FARM X0 I GALLONS 41;400 000 4000 9 10 11 12 13 14 15 16 17 18 19 20 21 ; 22 23 24 25 26 27 28 29 30 Special notes for day or field DRIVER SIGNATURE • 190 Commerce Center, Clayton, NC 27520 165Airport Industrial Drive Clayton; :NC 27520 Atlantic. Dewatering Services. Daily Load Sheet Farm Name — Contractor _J ri kkj s',WheliWe DATE G U — 2- Tanker Size (Gallons) 4:000 DATE LOAD FIELD # START TIME RUN TIME UNLOAD RETURN TO TOTAL TO FARM TIME START GALLONS Special notes for day or field ld-�� 1 '-i, 6�0 tv—>� 2 3 4 y —� Ml600 Li Io®h. 5 6 7 8 "f `--tI®oo 9 10 11 12 13 14 15 16 17 18 19 20 1 21 22 23 24 25 26 27 28.. 29 30 DRIVER -SIGNATURE 190 Commerce Center, Clayton, NC 27520 165 Airport Industrial Drive Clayton, NC 27520 221Voo— 1-kw11 Atlantic Dewatering Services Daily Load Sheet Farm Name ir4 Vey Contractor /72/91/ TI (L DATE. Tanker. Size (Gallons) 4.000 w/}f _ SE DATE LOAD; FIELD # START TIME RUN TIME UNLOAD, RETURN TO TOTAL Special notes for day or field # TO FARM TIME START GALLONS 10 '17 1 3 7. CJ I' :'%s eitseo si®eo io-17 2 3—.X. !' 9:3i to - 17; 3 3- iv,' to g eeo /0 - 17 4 .. , 's" 7-- w s r liOBo /a - 7 5 3-P. / 'a 3 6i9e9t9 ,¢-!7 6 3-a- . 13:12› ii000 to - / 7 7 3- a. 13 Sg 4000 1a-n 8 3 1Sv 7 (ewe /O'•17 9 3-) I,lrisoa- 9'0 b Sv - /7 10 3 - 2 ' 11 '. 12 13, 14 .' 15 16 17 18 • 19 20 21. 22 23 24 25 26 27 28 29 30 Li Lcso0 - 3 - DRIVER SIGNATURE 7//41- 190 Commerce Center, Clayton, :NC 27520 165 Airport Industrial Drive Clayton, NC 27520 Atlantic Dewatering Services • I' • Daily Load Sheet Farm Name Contractor fr\U, b 5 DATE IG —17 _ /2 Tanker Size (Gallons) 4.000 DATE LOAD ; FIELD # START TIME RUN TIME UNLOAD RETURN TO TOTAL Iv"1? �.v-/7 7 1-7 Cp -17 Iv- j7- 1 2 3 4 5 6 7 8 9 10 �-r (I-1 �-1 --1 q--1 4-1 TO FARM. TIME START GALLONS 4-'11000 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Special notes for day or field DRIVER SIGNATURE-�� 190 Commerce Center, Clayton, NC 27520' 165 Airport- Industrial Drive Clayton, NC 27520 L�� 6� 36tooa Atlantic Dewatering Services Daily Load Sheet Farm Name Contractor DATE Tanker Tanker Size (Gallons) 4 000 /91644fs(c Pew") YlerPr co 1'-0 ;cc DATE LOAD FIELD # START TIME RUN TIME UNLOAD RETURN TO TOTAL 0- IS JO- i v lee 1 2 3 4 5 6 7 3 - / 3 -/ 3 / TO FARM TIME START GALLONS d-Avoo two gi deo ewe diver bobr 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Special notes for day or field DRIVER SIGNATURE 190 Commerce Center, Clayton, NC 27520 165 Airport Industrial Drive Clayton, NC 27520 2.9 3- 11 Atlantic Dewatering Services Daily Load Sheet Farm Name Er; A,r l c� Contractor f#,mil iC� DATE f% / --12 Tanker Size (Gallons) 4.000 DATE LOAD; FIELD # START TIME RUN TIME UNLOAD RETURN TO TOTAL Special notes for day or field # TO FARM TIME START GALLONS J ` 1. 1. 9' `e7c; 7iaay q; �3© oi4.5 ipo� tiaew / o -a 3: 3 i o 30 / 0 50 tl 5 l /1153 1/ D< / �../V 3 3 -.3 /l `() //,')••C j)4ice ii /101/ �,.,39' limo 1000 //0-/5 4 .3-3 //';,c /y Jc/ 5 3`3 �. iq %O fit)1 / 7 zidBD i°`le 6 ----3 f -•/1 I8 ,3.0 WO d 6-1 7 3- ::f 0 3 15 ,si3' '3� � yy��.c, QOM /0/4 8 3.3 3t 103 4; 7 a tom 9 ._- 10 11 12 13 14 15. 16 17 18 19 20 21. 22.. 23 24 25 , 26 27 28 29 ; 30 DRIVER SIGNATURE�/l'� 190 Commerce Center, Clayton, N,C 27520 165 Airport Industrial Drive. Clayton,, NC 27520 3z,6no — 3-3 Atlantic Dewatering Services Li Daily Load Sheet Farm Name f rt r; G �j Contractor )4 r DATE / U r ! 2- Tanker Size (Gallons) 4.000 DATE LOAD; FIELD # START TIME RUN TIME UNLOAD,. RETURN TO TOTAL 1b-/41 1 L/`l TO FARM TIME START GALLONS Special notes for day or field ▪ CoOr) !D-14 Cv�l� is 2 ;3 4 5 6 7 8 9 10 �I-2 • loot ti0o t10'ti. oca, Lit t•mc 1pao 12' 13 14', 15 -16 .17 18 19 20' 21 - 22 23 24 2 -26 27 28 29 30 DRIVER SIGNATURE �' A 190 Commerce Center, Clayton, NC;27520. 165 Airport.Industrial Drive. Clayton, NC 27520 TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATIONLOG DATE: ('^ 3 I- 2 0 1 .7 L.A. SITE APPLIED TO SST#tie 2.„ AMB.TEMP 92 St= XFER TO STORAGE TANK ;V\ WEATHER CONDITIONS C lG RESTART TRANSFER PUMP STARTED 0-73 b ,, LEVEL (feet on guage) LIME WATER MIX STARTED 0--?L15-- r LEVEL x 1000 x 0.08 LIME PUMP STARTED (.) - 5 OPR WHO STARTED BATCH P" I‘/1- �k2?5 #.+".X. a..` .^ars:M S`: 'K`"'i,:Edc�.Xi A: ,,;•, 4i�tp'r-' . frig ,-' ,N4.zs'.":Si?if%?' +2f"r-SSL z.-:ki '.°n-;'rt ,v: h'd??2'±s' 4L..'1,:.vsi 2 P._.ffi,,"�i¢'r '{fr'Es' 3,4v.. £4'4. R ,,e4 TIME DIGESTER PH TEMP I. FACTOR CORRECTED PH . OPR INITALS M TIME RESTART PH TEMP FACTOR . CORRECTED PH . OFR'-INITALS TIME BATCH PH TEMP FACTOR CORRECTED PH ' OPR INITALS 12,55' 12' 5 z 1LI' 2- c ;3c t z, z.Z Ra TIME 2•HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS ILO: 12, Li3 11-1‘3 y b 13, t3 14ivA TIME 24 HOUR PH TEMP FACTOR ..:.. CORRECTED PH ..... OPR INITALS 255 Zg05, JLI`2 -6 y3U .1 i► 75 • P fIN A- J1' ^w^f.£11r., L: ;..'.. :. _ ...�... rIS'Ax? ,"`` k '.:: ?" ,,414_4v.3:. `'S` 'fa�a.'kKifil4b-vliAt`ZAWS5 Y" s.s 13 TEMP C COR/ FACTOR 40 PLUS 0.45 I 39 PLUS 0.42 38 PLUS0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27. 33 PLUS 0.24 32 PLUS 0.21 31 •PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 - PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 - MINUS 0.06 22 - MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 MINUS 0.24 16 - . MINUS 0.27 15 MINUS 0.30 14 MINUS 0.33 13 - MINUS 0.36 12 - MINUS 0.39 - 11 MINUS 0.42 10 MINUS 0.45 OTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW. LIME BATCH -AND STARTING A NEW LOG SHEET. Signature of operator who finished stablization KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPICING LAKE BIO-SOLIDS STABLIZATION LOG DATE: ts. Vee,„„2,i 1 L.A. SITE APPLIED TO SST#/7,. AMB.TEMP l/g® ; XFERTOSTORAGETANK g WEATHER CONDITIONS ei/t%ifir' �r RESTART TRANSFER PUMP STARTED 0816 LEVEL (feet on guage) LIME WATER MIX STARTED 092v t V LEVELx 1000x 0.08 LIME PUMP STARTED //340 4 OPR WHO STARTED BATCH kzvI loz.z: 9-5. t *'4c war A c } 0 0:,, .. ..hi.t-z, e ? 011a � r? u w .�. g 3fi *i TIME . DIGESTER PH TEMP y FACTOR CORRECTED PH OPR INITALS TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME PH TEMP FACTOR CORRECTED PH OPR INITALS } �� ('BATCH .�a'`i.j ��%l '- i.31 li i - (O TIME 2 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS 706 2 tgaG '0,33 .51 tn RI TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS 15'60 i )"11 1 .b 33 2 3S. M .''..�' ,'1 ,X1,4 WAViatgb+s,.,''$Vm r, r,,,.i. g,--, `5:,,,=,'K`r .`is •se�i1e',`_+�r` `&�.'n aesr 'PCa� {? ,`.E `..' F -4. r." '�. •z "TZF-'',,• TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS0.03 23 MINUS0.06 22 MINUS 0.09 21 MINUS0.12 20 MINUS0.15 19 MINUS0.18 18 MINUS0.21 17 MINUS 0.24 16 MINUS 0.27 15 MINUS 0.30 14 MINUS0.33 13 MINUS 0.36 12 MINUS 0.39 11 MINUS 0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH ,HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. iv). Signature of operator who finished st�bII2 KEEP TIMES ACCURATE +/ - TEN MINUTES tion REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATIOIV LOG DATE: /V/ .01:441/7 0P®A. a L.A. SITE APPLIED TO SST#p J AMB.TEMP 57 :E XFERTO STORAGE TANK '7.07 WEATHER CONDITIONS diel7e igi' RESTART TRANSFER PUMP STARTED Ore, L LEVEL (feet on guage) LIME WATER MIX STARTED on x LEVEL x 1000 x 0.08 LIME PUMP STARTED L OPR WHO STARTED BATCH 7, A-z, . i- :0.5, - ..i a: .zz sw .s<?-.,.ac_ a z arr est i t. TIME DIGESTER PH TEMP r FACTOR CORRECTED PH OPR INITALS lDoo . „/7 No V ` -o. � 7 S-• 9 o TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP FACTOR CORRECTED.PH OPR INITALS g/5...._ /.?.7.7 8 -D,.2 i /2. Q. •_ '/ _ TIME ..e 2 HOUR PH TEMP r . FACTOR CORRECTED PH OPR INITALS TIME 24 HOUR PH ---- - TEMP FACTOR CORRECTED PH OPR INITALS ..- -,•2 -D./2 j rr F-.. 1.*_ ✓.-. .. - -.i ,': :a_.e nfr':��i-,.v.'. TEMP C COR/FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 - PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 'MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 MINUS 0.24 16 MINUS 0.27 15 MINUS0.30 14 •MINUS 0.33 13 MINUS0.36 12 MINUS 0.39 11 MINUS0.42 10 MINUS0.45 OTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of o. for who fini ed stablization KEEP TIMES ACCURATE +/ - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: / 9,5'e1'?0 2 L.A. SITE APPLIED TO SST#�? � AMB.TEMP � ^ XFERTO STORAGE TANK !V1' a, WEATHER CONDITIONS RESTART TRANSFER PUMP STARTED /pd p LEVEL (feet on guage) LIME WATER MIX STARTED' /D.?O i LEVEL x1000x0.08 LIME PUMP STARTED L/ OPR WHO STARTED BATCH -..:, ...: 1F9i: ,e.+:,d';e€ n¢. -e4Y+k:IF"w` `A(Ast, fi-W4441E:aJvoR cA,aPIteF*t rKYM .;r.. TIME DIGESTER PH TEMP FACTOR CORRECTED PH OPR INITALS D / Jt 0 /•Z / Z- •Z 1 i& / .4. ! / ti�i�' TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP x FACTOR CORRECTED PH OPR INITALS i kid g ! t ._. 2ok 0.0. 1 �'7® cf- m i, TIME 2 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS. TIME 24 HOUR PH TEMP =d FACTOR CORRECTED PH OPR INITALS .500 Z 1°5' n' 0• id, 2 3 r _ . . � "Sk r - _..,,, _ .„..,,... .». :!n', ..x...'%Sll 3zLrsSYa .mc :' ,,. • ' .z-. TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21• 17 'MINUS 0.24 16 MINUS 0.27 15 .MINUS 0.30 14 MINUS 0.33 13 MINUS 0.36 12 MINUS 0.39 11 MINUS 0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW 'LIME BATCH AND STARTING A NEW LOG SHEET. -Aaj Signature of operator who finished stablization KEEP TIMES ACCURATE + / -TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: ` ] e,fe� D/� LA. SITE APPLIED TO SST# 9 2. AMB.TEMP 5 XFER TO STORAGE TANK 4-���y� WEATHER CONDITIONS e/ei,41? RESTART TRANSFER PUMP STARTED ps/2 A LEVEL (feet on guage) LIME WATER MIX STARTED r eyS 4 LEVEL x 1000 x 0.08 1 LIME PUMP STARTED .r 0 4 OPR WHO STARTED BATCH n: -,,,, >....: .'.- TIME ` .:smi*Ta2...1 e DIGESTER PH S`i" { f:,. `., .. : ;T• ik44.1 `:'. , ,RA.V..' 04-s.?.mia'Ji°--"TA+ , "°0 t''44, .&+�.,4 -,K'Ag ks =2P.i$: TEMP r FACTOR CORRECTED PH OPR INITALS //V7._ G. 2s , f --adz G. /3 t7...._. TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME ,BATCH PH TEMP e FACTOR CORRECTED PH OPR INITALS / ? y. /2, .. RI, 2 `o. v 4 ig-3 G TIME 2 HOUR PH TEMP 1 FACTOR CORRECTED PH INITALS raZo 2. 37 23. s -0•1:4 /2. 3/ TIME 24 HOUR PH TEMP FACTOR CORRECTED PH PR INITALS /2 ' a 3,3 o. od /2. v- e TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 - MINUS 0.03 23 MINUS 0.06 22 MINUS 0.09 21 MINUS0.12 20 MINUS0.15 19 MINUS0.18 18 MINUS0.21 17 - MINUS0.24 16 MINUS 0.27 15 MINUS 0.30 14 MINUS 0.33 13 MINUS 0.36 12 ' MINUS0.39 11 MINUS 0.42 10 MINUS 0.45 NOTE: - IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of op . or who finish tablization KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO=SOLIDS STABLIZATION LOG. diewe 06-0 DATE: SST# 92 % aafel d/a AMB.TEMP WEATHER CONDITIONS TRANSFER PUMP STARTED LIME WATER, MIX STARTED LIME PUMP STARTED L.A. SITE APPLIED TO XFER TO STORAGE TANK RESTART LEVEL (feet on guage) LEVEL x 1000 x 0.08 OPR WHO STARTED BATCH orA TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME BATCH PH ?50 TEMP a CORRECTED PH 1S --V ko"1 FACTOR OPR INITALS TIME 2 HOUR PH TEMP r FACTOR CORRECTED PH OPR INITAIS /SO ia. Y 2 .q -0°oc, f2375 A ,A,- TIME 24 HOUR PH /a. 50 TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 •PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 - 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 - PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 MINUS 0.24 16 MINUS 0.27 15 MINUS 0.30 14 MINUS0.33 13 MINUS 0.36 12 MINUS 0.39 11 MINUS 0.42 10 MINUS 0.45 TEMP NOTE: FACTOR • CORRECTED PH IF AT THE TWO HOUR CHECK THE PH OPR INITALS HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU •'MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature • /. perator who fished stablization KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: SST#/r AMB.TEMP WEATHER CONDITIONS TRANSFER PUMP STARTED LIME WATER MIX STARTED 0,4/7 axes L.A. SITE APPLIED TO XFER TO STORAGE TANK RESTART LEVEL (feet on guage) LEVEL x 1000 x 0.08 LIME PUMP STARTED, TIME DIGESTER PH O / OPR WHO STARTED BATCH FACTOR CORRECTED PH OPR INITALS TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP /2r%S /9./ FACTOR CORRECTED PH OPR INITALS TIME 2 HOUR PH TEMP i FACTOR CORRECTED PH OPR INITALS /j'5-3 /92. %v 20, / -e,/5 /12•2S /7 TIME //50 24 HOUR PH TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS0.03 23 MINUS 0.06 22 MINUS0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 MINUS 0.24 16 MINUS0.27 15 MINUS 0.30 14 MINUS 0.33 13 MINUS0.36 12 MINUS 0.39 11 MINUS 0.42 10 MINUS 0.45 TEMP aQ.y NOTE: FACTOR CORRECTED PH /2, / S IF ATTHE TWO HOUR CHECK THE PH OPR INITALS HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of . • rator who finishe. tablization KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: SST# f 7L ),*a/10,V/2 AMB.TEMP �D WEATHER CONDITIONS TRANSFER PUMP STARTED LIME WATER MIX STARTED LIME PUMP STARTED D?2 09'/7 b LA. SITE APPLIED TO XFER TO STORAGE TANK RESTART LEVEL (feet on guage) LEVEL x 1000 x 0.08 OPR WHO STARTED BATCH z3,-.nss?ec'�+Sys.'�:,#€;��ti.X.S-4�a�ts�rracs+��::�A�r'"i�-rk=�i ,-�5r'•?�"�- TIME DIGESTER PH TEMP /f, ? " 9,a/ £. C2 FACTOR CORRECTED PH OPR INITALS TIME RESTART PH TEMP a FACTOR CORRECTED PH OPR INITALS TIME BA TEMP CORRECTED PH OPR INITALS TIME 2 HOUR PH TEMP 5E FACTOR CORRECTED PH OPR INITALS Pas- /a. 4/7 ,23.5 s 2 2.Ue /9 TIME 24 HOUR PH TEMP FACTOR CORRECTED PH. OPR INITALS TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 .PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 MINUS0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 MINUS 0.24 16 MINUS 0.27 15 MINUS 0.30 14 MINUS0.33 13 MINUS 0.36 12 MINUS0.39 11 MINUS0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of op• or who fin- d stablization KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: BATCH PH FACTOR TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: SST#/ 9,2_ 41?e,(://4/.2 AMB.TE WEATHER CONDITIONS TRANSFER PUMP STARTED p0 L.A. SITE APPLIED TO XFER TO STORAGE TANK RESTART LEVEL (feet on guage) • --4/7 LIME WATER MIX STARTED os D LEVEL x 1000 x 0.08 LIME PUMP STARTED g4ttii ,431 zA"cltct StaJk'a'A:[41 i"�.iro'v- `�LY'.'i-F '..'�f'•.: ASS TIME DIGESTER PH 09;e3 TEMP kj OPR WHO STARTED BATCH FACTOR CORRECTED PH OPR INITALS TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP a FACTOR CORRECTED PH OPR INITALS .l TIME 2 HOUR PH TEMP z r FACTOR CORRECTED PH OPR INITALS /9 3-4 /.? •'? " "2 . / I 7. o p /„. /2 7,7 TIME 24 HOUR PH wi TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS0.06 22 MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 - 18 MINUS 0.21 17 MINUS0.24 16 MINUS 0.27 15 MINUS 0.30 14 MINUS 0.33 13 _ MINUS 0.36 12 MINUS 0.39 , 11 MINUS 0.42 10 MINUS 0.45 TEMP FACTOR • P4.83*.M. : &. BWI e410. ' 1P CORRECTED PH OPR INITALS NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of o tor who finis -. stablization 'KEEP TIMES ACCURATE+/ -TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: SSTVj AMB.TE WEATHER CONDITIONS TRANSFER PUMP STARTED LIME WATER MIX STARTED LIME PUMP STARTED TIME 09 DIGESTER PH ‘'/5! cr elkwg v2€/-/ TEMP x.3 L.A. SITE APPLIED TO XFER TO STORAGE TANK RESTART LEVEL (feet on guage) LEVEL x 1000 x 0.08 OPR WHO STARTED BATCH FACTOR rO. CORRECTED PH OPR INITALS TIME RESTART PH TEMP a FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP FACTOR CORRECTED PH OPR INITALS o /J TIME 2 HOUR PH TEMP FACTOR CORRECTED PH R INITALS /`/as- /A 3v �2. 7 } 0 • o G /Q. 2 `/ ,r7 TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS TEMP C COR/FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 ' 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 ,PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 MINUS0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS0.21 17 MINUS0,24 16 MINUS 0.27 15 MINUS 0.30 14 MINUS 0.33 13 MINUS 0.36 12 MINUS 0.39 11 'MINUS 0.42 10 MINUS0.45 NOTE: IF AT THE TWO HOUR CHECK THEPH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of op(or who fin' ed stablization KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: SST# , AMB.TE P WEATHER CONDITIONS D L'/6,94 L.A. SITE APPLIED TO XFER TO STORAGE TANK RESTART ‘7# TRANSFER PUMP STARTED LIME WATER MIX STARTED D2T2 09567 LEVEL (feet on guage) LEVEL x 1000 x 0.08 LIME PUMP STARTED // 2 OPR WHO STARTED BATCH TIME DIGESTER PH TEMP FACTOR CORRECTED PH OPR INITALS 05: G, y lf,Y 0.2 / c, 4- TIME TIME RESTART PH` BATCH PH 2 HOUR PH 24 HOUR PH TEMP FACTOR TEMP f ,FACTOR • TEMP /9.2 - TEMP 4 TEMP C COR/ FACTOR 40 PLUS 0.45 39 'PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 MINUS0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 MINUS 0.24 16 MINUS0.27 15,MINUS 0.30 14 MINUS0.33 13 MINUS0.36 12 MINUS0.39 11 MINUS 0.42 10 MINUS 0.45 '3. FACTOR FACTOR y� -D CORRECTED PH CORRECTED PH CORRECTED,PH /2° '/S CORRECTED PH NOTE: IF AT THE TWO HOUR CHECK THE PH OPR INITALS OPR INITALS c7e OPR INITALS OPR INITALS HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of .'gyrator who fi ed stablization KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: SST# .i 2 fpr20 ( �► A - AMB.TEMP L.A. SITE APPLIED TO XFER TO STORAGE TANK WEATHER CONDITIONS RESTART TRANSFER PUMP STARTED LEVEL (feet on guage) LIME WATER MIX STARTED LIME PUMP STARTED 0get© tSlsfElaeY:viau�tt,2so-�&ss::Pa6t4:''k��nsa:?i1�?=x�i*.IOi s±{*w, TIME DIGESTER PH TEMP LEVEL x 1000 x 0.08 OPR WHO STARTED BATCH FACTOR CORRECTED PH OPR INITALS i5-9 TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP FACTOR CORRECTED PH OPR INITALS ‘2, TIME 2 HOUR PH TEMP a FACTOR CORRECTED PH OPR INITALS 1`13. la;t1 Icsp6 ~-6. 1 ra -li . TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS ,z35 Z, 5� TEMP C - COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 - PLUS 0.39 37 PLUS 0.36 36 - PLUS 0.33 35 PLUS 0.30 34 - . - PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24- MINUS 0.03 23 MINUS 0.06 22 - MINUS 0.09 21 MINUS 0:12 20 - MINUS 0.15 19 MINUS0.18 18 MINUS0.21 17 MINUS 0.24 16 MINUS 0.27 15. - MINUS0.30 14 MINUS 0.33 13 MINUS0.36 12 - , MINUS 0.39 11 MINUS0.42 10 MINUS'0.45 4' z- - 12.13 I R ,\'` NOTE: IF•ATTHE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of operator who finish tablization KEEP TIMES ACCURATE+/ - TEN MINUTES, REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: 2C/C, C a/2 D' L.A. SITE APPLIED TO r SST# / 7 4 AMB.TEMP 51/ r% XFER TO STORAGE TANK WEATHER CONDITIONS /�/� /�e wO RESTART TRANSFER PUMP STARTED �72,,/, ? LEVEL (feet on guage) T' LIME WATER MIX STARTED 007 LEVELx 1000 x 0.08 LIME PUMP STARTED ` D� OPR WHO STARTED BATCH "c.G. ,,A.,Z'. C.sai. L= r ,...4,+: b' ' r3` +ktiii' Y - ., .. 47.-.1"iif"Yitie .4't?:.*: e4e- t',:+k i-4 tis-Melt v,K i$t t.'a1,4- A.4i,'V 7` =ri ,4.44:"ff' 5E-. c.^Y, '"Y4%"}',f TIME DIGESTER PH TEMP FACTOR CORRECTED PH OPR INITALS TIME RESTART PH TEMP ; FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP FACTOR CORRECTED PH OPR INITALS g /a G2 , at D, g. TIME 2 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS /`/ `/ /.2, / 2. 6 °c 6, z y /_2,2r ,77////-, TIME 24 HOUR PH TEMP 'FACTOR CORRECTED PH OPR INITALS INITALS �^ /a�/t7 (fin /! i i4 /2, 4c.ti -' r� y "p1.?24f F>r."'.5s"A�,i'�?', TEMP C COR/FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 'PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS.0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 'PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 ,MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 MINUS 0.24 16 MINUS 0.27 15 MINUS 0.30 14 MINUS0.33 13 'MINUS 0.36 12 MINUS0.39 11 MINUS0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG.SHEET. Signature of oper.rKo finish stablization KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: / 25 /IRA2 Ne 0Q L.A. SITE APPLIED TO SST#/?2 AMB.TEMP a �� -XFERTOSTORAGETANK G� WEATHER CONDITIONS C'/uuv�7 RESTART TRANSFER PUMP STARTED D / �✓ :4 LEVEL (feet on guage) LIME WATER MIX STARTED Q d .7Q LEVEL 1000 x 0.08 LIME PUMP STARTED p /� 7 � _ OPR WHO STARTED BATCH 0'e. 5W.%tgWM&04, RT-6410. s , ,.4,- ,,.<- , i i‹MAII"-ai, , k :' ^"Nei: IA74g: V.S.:1.`11k+r+n' ; &z ltiC-41 t e,,ww_.ca. s^. y 5.1, ,` tS2v,b a ry ..: : TIME DIGESTER PH TEMP ; FACTOR CORRECTED PH OPR INITALS TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP , FACTOR CORRECTED PH OPR INITALS of 6-5- , /2:. h__,_ __. /8, D, 2/ / 2. t 9 TIME 2 HOUR PH TEMP ' FACTOR CORRECTED PH OPR INITALS 1500._..../.?._.!_ g.- -d=z( /2Ez.5 %1 A'► TIME 24 HOUR PH TEMP _ FACTOR .. CORRECTED PH OPR INITALS /LID° / y2 /Fl V 'v/ / 2. .. ..t.i-:1,:.=?:i§�0WL?a'�iac�,itz-?�,�.'.'+�.-�'�'.�:K-..�'�as.:��..�kG's TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 MINUS0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUSO.18 18 'MINUS0.21 17 MINUS0.24 16 MINUS 0.27 15 MINUS 0.30 14 MINUS 0.33 13 MINUS0.36 12 MINUS0.39 11 'MINUS0.42 10 MINUS0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of oper.. . finished s . ization KEEP TIMES ACCURATE+/ - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: �C /i a ,, L.A. SITE APPLIED TO SST#/ %2 AMB.TEM n XFER TO STORAGE TANK WEATHER CONDITIONS ai Aw RESTART TRANSFER PUMP STARTED 0I2, LEVEL (feet on guage) LIME WATER MIX STARTED /037 LEVELx1000x0.08 LIME PUMP STARTED 76--- ? OPR WHO STARTED BATCH .:... AA-4/4 F; itvw+G+ r++:..*)31---..- tL?„ ' - -.. 'TA.?.? ." . ' _ ✓ .., ;\:'4 W. . ', TIME DIGESTER PH FACTOR CORRECTED PH OPR INITALS � is i o, 2 , TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP FACTOR CORRECTED PH, OPR INITALS TIME 2 HOUR PH TEMP FACTOR CORRECTED PH - `OPR INITALS e r? • Z L it: -D,as2/ ./R, g 3 c"2"/ TIME 24 HOUR TEMP FACTOR CORRECTED _ OPR INITALS �PH D. DPPH ryt,.F. Ate- 'F�F-t`. +A�,'.i`'�,( .�liT: . ... _.':Ctil'.w�c".C'�:>T.�.h�. •:.li :. "a:�i. ��!:-��b:ts"5`i+'�` .{ is+-Sieia.�c7.�4�'�.as`�:�1: TEMP. C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 MINUS 0.24 16 MINUS 0.27 15 MINUS 0.30 14 .MINUS 0.33 13 MINUS0.36 12 MINUS 0.39 11 MINUS 0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART. BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of .i'or who finished % :lization KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: aVa L.A. SITE APPLIED TO SST#/.�11 AMB.TEM GD ® XFERTOSTORAGETANK WEATHER CONDITIONS C: 4d i% RESTART TRANSFER PUMP STARTED io/, LEVEL (feet on guage) LIME WATER MIX STARTED ///5.- LEVEL x 1000 x 0.08 LIME PUMP STARTED aga--- OPR WHO STARTED BATCH CORRECTED PH TIME DIGESTER PH TEMP FACTOR OPR INITALS G 3 /re .i-e9./ / "---20-7 TIME RESTART PH TEMP FACTOR CORRECTED PH , OPR INITALS TIME BATCH PH TEMP FACTOR CORRECTED PH OPR INITALS TIME 2 HOUR PH TEMP FACTOR CORRECTED PH ' . OPR INITALS TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS 3'i J2. 05 24, 4 1 O. /2 /R TAVNRiMe g ;tiliMg AMIT'b 3e'��` ,�fi`e ' 4&;,, �� >' kl 'r`3`"i6` 3 o ;w AW A y#-"A' TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS0.03 23 MINUS 0.06 22 'MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS0.21 17 MINUS 0.24 16 MINUS 0.27 15 MINUS0.30 14 MINUS0.33 13 MINUS 0.36 12 MINUS 0.39 11 MINUS 0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of ope 1 who finishe.. ablization KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: ty ,C ®/a LA. SITE APPLIED TO SST#/.? AMB.TEMP G �� XFER TO STORAGE TANK WEATHER CONDITIONS eV W. v RESTART TRANSFER PUMP STARTED 0 1,1,47• LEVEL (feet on guage) LIME WATER MIX STARTED D $96 a LEVEL-x 1000 x 0.08 LIME PUMP STARTED O9S0 x .OP R WHO STARTED BATCH �r ii��...'=xe�mx,`[tS_;�+XYn,3;"Y-S{rt=.g 4..t�„'; n;44G'rs%5•r.w Y&-ff.6s.��Ta'srsi M^,---ar-z: TIME FACTOR CORRECTED PH OPR INITALS TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP FACTOR CORRECTED PH OPR INITALS /gd,3 41.4 ? oqy 7 d'(:)9 /�. 4 / TIME 2 HOUR PH TEMP FACTOR • - CORRECTED PH , OPR INITALS /V/v /2.d 2V, _ d.v7 /2.4/__.:.. TIME 24 HOUR PH ' TEMP , ) .FACTOR CORRECTED PH ._._ . OPR INITALS hid[ / '. SG 29 f p., .7 / 2 S 7 l �4':.aC: .'rt §IV u'F 's' €$ 1isC" `,a.�45 7'#� -?i<r ;..-,_.'Dm.i.„JK,,,A . .i4 oug,,, -, �.'--"sr 'e 2 ^' i� - TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS0.03 23 MINUS 0.06 22 MINUS0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 MINUS 0.24 16 • :MINUS 0.27 15 MINUS 0.30 14 MINUS0.33 13 MINUS 0.36 12 MINUS 0.39 11 MINUS 0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of opera or who finise, stablization KEEPTIMES ACCURATE +/ - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: -7 -- J kz• " rt 2.6 i i L.A. SITE APPLIED TO SST# AMB.TEMP 6tter, •1 XFERTOSTORAGETANK nsfs.'i WEATHER CONDITIONS C i coci rt 4 RESTART TRANSFER PUMP STARTED 61 LEVEL (feet on guage) LIME WATER MIX STARTED og(5 3 LEVEL x 1000 x 0.08 LIME PUMP STARTED -.viz, vex,*vatV,#ztr: ,.. 0115 4 OPR WHO STARTED BATCH .,- 4., - sastvY TEMP TIME .staMaK. DIGESTER PH a-7s FACTOR , --al €K .�. .z;G - .:..��mrA CORRECTED PH OPR INITALS TIME RESTART PH • • CORRECTED PH OPR INITALS TIME BATCH PH TEMP t FACTOR CORRECTED PH OPR INITALS TIME 2 HOUR PH TEMP i FACTOR CORRECTED PH OPR INITALS i LI liS ' l I 3 2 : - \. . k g i \s, TIME 24 HOUR PH TEMP FACTOR .._.\ CORRECTED PH OPR INITALS a ` j rz a �r u.. ,,. =�, TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 .' 27 PLUS 0.06 26 PLUS 0.03 25 PLUS0.00" 24 MINUS 0.03 23 •MINUS 0.06 22 MINUS0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS0.21 17 MINUS 0.24 16 ;MINUS0.27 15 MINUS 0.30 14 MINUS 0.33 13 MINUS 0.36 12 MINUS 0.39 11 MINUS0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. • Signature of operator who finished stajrTiz ion KEEP TIMES ACCURATE + / - TEN MINUTES L' REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: rj d L.A. SITE APPLIED TO SST# f 2z AMB.TEMP %©U- 1 XFER TO STORAGE TANK AM WEATHER CONDITIONS de,,J/ RESTART TRANSFER PUMP STARTED d Too . LEVEL (feet on guage) LIME WATER MIX STARTED () g35 ' LEVEL x 1000 x 0.08 LIME PUMP STARTED 0135- OPR WHO STARTED BATCH hmaiw: ? v.ttor siakm #3,,z ' Saau vt xrr7p.�.�t' DIGESTER PH ;71i':r...,` F; on- TEMP sz z. : ' , 'r 3:.iirra: tsa[,2{-.: pp oz 9'M� plo. ss;x;::3k` TIME S FACTOR CORRECTED PH ,'.srr.N OPR INITALS 0950 5•35 TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS 5.' TIME• BATCH PH TEMP FACTOR CORRECTED PH OPR INITALS !3� � l2 56 29.3 x-0,43 0.,53 0m TIME 2 HOUR PH TEMP FACTOR _._. CORRECTED PH OPR INITALS TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS 130o .1 �3j 29' Utc g TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29. PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 MINUS0.09 21 MINUS0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS0.21 17 MINUS 0:24 16 MINUS'0.27 15 MINUS 0.30 14. MINUS0.33 13 MINUS 0.36- 12 MINUS 0.39 11 MINUS 0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BUDDING A NEW LIME BATCH AND STARTING ANEW LOG SHEET. Signature of operator who finis tablization KEEP TIMES ACCURATE + / - TEN MINUTES -REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: tQ' l s I41 Zo I Z L.A. SITE APPLIED TO SST# \0._ AMB.TEMP (gel,: XFERTO STORAGE TANK P,"A WEATHER CONDITIONS P Li6A% i RESTART TRANSFER PUMP STARTED i J-1 Li5 . LEVEL (feet on guage) LIME WATER MIX STARTED 6 g25 , LEVELx 1000 x 0.08 LIME PUMP STARTED t 15 OPR WHO STARTED BATCH `n°.!e - •.1 T3•i*°t.... �. .,' ro"k:.+a-.1'" .«`, TEMP ..11.afaas,;`G .M1;='4120, - TIME FACTOR .; CORRECTED PH OPR INITALS 13'15 OA' _l r, _-' ' 3 -' ' So Ate TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP 1 FACTOR CORRECTED PH OPR INITALS I L6 11' 11 29' - ^ ?'03 J ,1i TIME 2 HOUR PH _ TEMP FACTOR CORRECTED PH OPR INITALS TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS 2145 2•s0 2S. o • c� 2., 5 O 1: . W+.r�' .�:4:i�'r°,°1," ..:a.•,. -_ ..'.�-+'.o;5'T�'�. �",�: Nx:r.x��s+ry :+G^ _ _-.yv-*�7i�: S% rm.''�j,' .: J;i.�`at4� ,:� '` F� ��:a4�ah ^`a"`. } .:�_ "°'�a. .`at •...k',eh,'-s.�.d. ., ... TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS0.03 23 MINUS0.06 22 MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 MINUS 0.24 16 MINUS 0.27 15 MINUS 0.30 14 MINUS0.33 13 MINUS 0.36 12 MINUS 0.39 11 MINUS 0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU 'MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of operator who finished ablation KEEP TIMES ACCURATE + / - TEN MINUTES • REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: 6 I2 q / J2 i LA. SITE APPLIED TO SST# { e 2 AMB.TEMP "7 9 ? , XFER TO STORAGE TANK A WEATHER CONDITIONS C e k RESTART TRANSFER PUMP STARTED N t LEVEL (feet on guage) LIME WATER MIX STARTED a Er) t .LEVEL x 1000 x 0.08 LIME PUMP STARTED 1 a OPR WHO STARTED BATCH aVWSSG.",�1'+y S'S.ytij3iF`'p�y :ii -s S; 'i,5&I•Z.7:141i4Fl(,5er..17•1ti"i .5�a`+,01. Li.ei?,,*ar irA4.432:F,*`C:.,We-'i. 440P, ql• TIME DIGESTER PH TEMP FACTOR CORRECTED PH . OPR INITALS d OOb Ids , 22, O'C () ' 7 R TIME RESTART PH TEMP FACTORCORRECTED -_. -....._ PH ,... _. . --- OPR INITALS TIME BATCH PH TEMP FACTOR - CORRECTED PH OPR INITALS 1230 / -SS 27.s' +.c 12'6 i.--_- P"' TIME 2.HOUR PH TEMP r, FACTOR CORRECTED PH OPR INITALS 1 930 12•' 27 I .}-, 06 C2.5-3 (Z„--.. TIME 24 HOUR PH TEMP 4 FACTOR CORRECTED PH - OPR INITALS 13Q 1213g 2-7.$ '°' �'24 LI_ - �� . t4• .*� � j '=t ^ d3i4e��i :_e�i2 ids'P.m. i'R'*-'^'+'S'��CT .ti.. ..- ',� ..,.'•. .., '�a.'v... = :9. istiECIR l wit- . TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39. 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0A9 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 +MINUS 0.06 22 MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS0.21 17 ' MINUS 0.24 16 MINUS 0.27 15 MINUS 0.30 14 MINUS0.33 13 MINUS 0.36 12 MINUS 0.39 11 MINUS 0.42 10 MINUS0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST -RESTART BY ADDING A NEW LIME BATCH AND - STARTING A NEW LOG SHEET. m4,1 Signature of operator who finished stablization . KEEP TIMES ACCURATE +/ - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: 7/ V 20 /2 L.A. SITE APPLIED TO SST# 02 AMB.TEMP 9 of XFERTOSTOR ) d�AGETANK " WEATHER CONDITIONS a 2 .. RESTART 7 TRANSFER PUMP STARTED %� <S7C0. ; LEVEL (feet on guage) LIME WATER MIX STARTED og36 LEVEL x 1000 x 0.08 LIME PUMP STARTED , cq3 b !) OPR WHO STARTED BATCH 'stfrtfair`Y*---- siCa'SiS% `. ?`.r"s,4 '. -5. .' .. -'aka "."rx^vr. '3?4tkd file :. ,44?41F'3:3i! "r'. v's-- . Slti 'g."?d??ay.. TIME DIGESTER PH 1 TEMP k FACTOR CORRECTED PH OPR'INITALS .n9t). 51C1 s-9 .Ob . TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP FACTOR CORRECTED PH OPR INITALS I.3 CO 1 '5I fill ' -1-� '57 TIME 2 HOUR PH TEMP FACTOR CORRECTED PH _RAN ' OPR INITALS TIME 24 HOUR PH TEMP yn FACTOR CORRECTED PH OPR INITAIS )o 7's .F '° a '3 9 R. TEMP C COR/ FACTOR 40 PLUS 0.45 39. PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 . PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 MINUS 0.09 21 MINUS0.12 20' MINUS 0.15 19 MINUS0.18 18 MINUS0.21 j 17 MINUS 0.24 16 MINUS 0.27 15 MINUS0.30 14 MINUS 0.33 13 . MINUS 0.36 12 MINUS 039 11 MINUS0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of operator who finished(.st'bliiation KEEP TIMES ACCURATE+/ -TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: I/I g / 2 L 2 0' J L.A. SITE APPLIED TO SST# I Z AMB.TEMP --i r °^ ' XFERTO STORAGE TANK WEATHER CONDITIONS 7 ) Cet /1 • RESTART TRANSFER PUMP STARTED a 7'3o b LEVEL (feet on guage) LIME WATER MIX STARTED egg. i LEVEL x 1000 x 0.08 LIME PUMP STARTED '' OPR WHO STARTED BATCH ..r.n;n..g:€, ;sus s&-:'<s s.a zs; TIME DIGESTER PH TEMP FACTOR CORRECTED PH OPR INITALS 1.15' . __.. ' '2I , �' t 63 . TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS . TIME BATCH PH TEMP FACTOR CORRECTED PH OPR INITALS TIME 2 HOUR PH TEMP y; FACTOR CORRECTED PH - OPR INITALS m 24 HOUR PH TEMP t FACTOR CORRECTED PH OPR INITALS `3TIME 2s0� 1 2a R &ro1r©� - -5 .a. t5355 ' �� x:• :. 5e ass+ t �x 5 324�'t TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 - 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 .PLUS 0.00 24 MINUS 0.03 23 'MINUS 0.06 22 MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 MINUS 0.24 16 MINUS 0.27 15 MINUS 0.30 14 MINUS 0.33 13 MINUS 0.36 12 MINUS 0.39 11 MINUS 0.42 10 ,MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING ANEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of operator who finished sta KEEP TIMES ACCURATE + / - TEN MINUTES n REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: 7 f/ /2OC) .f�I. L.A. SITE APPLIED TO SST# ��� AMB.TEMP �.7 6 F XFERTOSTORAGETANK WEATHER CONDITIONS 4'eq R r RESTART TRANSFER PUMP STARTED �" I S LEVEL (feet on guage) LIME WATER MIX STARTED 690:1), iLEVEL x 1000 x 0.08 LIME PUMP STARTED OPR WHO STARTED BATCH �nw i . TIME DIGESTER PH TEMP FACTOR , CORRECTED PH OPR INITALS tty.5 b‘- (5 a6yb 3 16..2 �6.c1 I2sV\ TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS -a _ -- TIME BATCH PH TEMP FACTOR CORRECTED PH • OPR INITALS (3cc 163A _n•� f -f-a.bq. i,,Li5 1 ^ • TIME 2 HOUR PH TEMP FACTOR _ CORRECTED PH OPR INITALS TIME 24 HOUR PH TEMP FACTOR 1 CORRECTED PH . OPR INITALS � ° -11%`r 170'a 1' 23 t.. i .. J .Tie - ' Ae 'ten"ir 'E� 1`s'+S�' 6" .Y�'. ` . W"9 'Nt?'^3 4"'4�` `.. A „. - ', 'ir'3 '`i i.'n `.^.^a`:•. `F' S :9,. ... TEMP C COR/FACTOR 40 - PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 •PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS.0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS0.06 22 MINUS0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 1 18 MINUS 0.21 17 MINUS 0.24 16 :MINUS 0.27 15 MINUS 0.30 14 MINUS 0.33 13 MINUS 0.36 12 MINUS 0.39 11 MINUS0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING ANEW LOG SHEET. A Signature of operator who finished st tion KEEP TIMES ACCURATE +/ - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: 7 /23 / 20 12 i L.A. SITE APPLIED TO SST# AMB.TEMP lc, 0r { XFER TO STORAGE TANK R (Y\ WEATHER CONDITIONS s P-(100 RESTART I TRANSFER PUMP STARTED / ()goo LEVEL (feet on guage) LIME WATER MIX STARTED , 1571.45 LEVELx 1000 x 0.08 LIME PUMP STARTED •yV 3 OPR WHO STARTED BATCH TIME DIGESTER PH TEMP FACTOR CORRECTED PH OPR INITALS M D.5 1-tO.3 �Lt Rr'' TIME RESTART PH TEMP ; FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP FACTOR CORRECTED PH OPR INITALS 19%95 1,_gt 4 Li /1'8 ' + 0' 06 .1 a .50 R l , TIME 2 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS Iyys I131 TIME 24 HOUR PH TEMP s FACTOR CORRECTED PH OPR INITALS la.95 1 �-�. : 2', 8 L}°'o6 t a • 2 6 M TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS0.03 23 MINUS 0.06 22 MINUS0.09 , 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 ' MINUS0.24 16 MINUS0.27 15 MINUS 0.30 14 MINUS 0.33 13 MINUS 0.36 12 MINUS`0.39 11 MINUS 0.42 10 . . MINUS0.45 OTE: IF ATTHETWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCHAND STARTING A NEW LOG SHEET. 91) Signature of operator who finished st zation KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: 7 - 2 L. -2014 L.A. SITE APPLIED TO SST# ( 0.2_ AMB.TEMP 7 ' XFER TO STORAGE TANK WEATHER CONDITIONS C tc . -. RESTART TRANSFER PUMP STARTED 01\5 i LEVEL (feet on guage) LIME WATER MIX STARTED OVjb LEVEL x 1000 x 0.08 LIME PUMP STARTED 0 \ OPR WHO STARTED BATCH 'N� .R'd"'.,iTF. .�'S,Nwi,s'nPU ''.0:7�G:`ticr'a "..'�..�fb'N'4.r<19tkA?7��E'i!'ii:kXShii'[4rEtoa��.v4r4.::.�di,?.Yt*s.$)er'3l.''�s"hx'i.'t'+iH'.°a'C.�.2.gPS=., 485: TIME DIGESTER PH TEMP ' FACTOR CORRECTED PH OPR INITALS f73D 5-. b 2 a ' 'fl'6 s'A TIME RESTART PH TEMP 1 FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP FACTOR CORRECTED PH OPR INITALS TIME 2'HOUR PH TEMP . FACTOR CORRECTED PH OPR INITALS (So 214 1S2- t`4G '50 TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS C0 2.1 . :28 x 0,aci : 2.3b (� "i:9, f> :9F':." 'F?'�. Y G,' ¢ =y�r,' '?-r 0,n#' t£1/4"0 '''' TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 MINUS 0.24 16 MINUS 0.27 15 MINUS 0.30 14 MINUS 0.33 13 MINUS 0.36 12 MINUS 0.39 11 MINUS 0.42 10 . 'MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of operator who finished stablization KEEP TIMES ACCURATE+/ - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: a SO/ 20(2, Il L.A. SITE APPLIED TO SST## fA2_ AMB.TEMP `"7Z f_ ' XFER TO STORAGE TANK {f\ WEATHER CONDITIONS G! // el' (2. RESTART TRANSFER PUMP STARTED 0 "T-/3 y LEVEL (feet on guage) LIME WATER MIX STARTED Offs. -- LEVEL x 1000 x 0.08 LIME PUMP STARTED d /.25 * OPR WHO STARTED BATCH 9t.:'!"., rnl£&Zzrr: r' .a- ,s�.r'4�fas�±-,k,k= y TEMP 9 4,fmt, txi ...4,6 . r+ -z -',3 4o,N-A.. - �knx-to TIME DIGESTER PH a FACTOR CORRECTED PH OPR INITALS TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP FACTOR . CORRECTED PH OPR INITALS I330_, _..1z'5. _... 27.°9 (.3,06 12, 6i a. TIME 2 HOUR PH . TEMP f FACTOR . CORRECTED PH OPR INITALS I 5 3 0 .1.2-' 99 27' -t'0,b6 f 2 5o R TIME 24 HOUR PH TEMP �._.. FACTOR ..- CORRECTED PH OPR INITALS 3 , , !22 "7;'2 ,ono TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 ' 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 :MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 MINUS0.24 16 MINUS 0.27 15 MINUS 0.30 14 MINUS 0.33 13 MINUS0.36 12 'MINUS 0.39 11 MINUS 0.42 10 ;MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of operator who finishe stablization KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: i i) .� aO 12 tL.A. SITE APPLIED TO SST# w2 AMB.TEMP `1.2 °� z XFER TO STORAGE TANK ,-.� 0- WEATHER CONDITIONS e-ctw , RESTART TRANSFER PUMP STARTED Af �- - LEVEL (feet on guage) LIME WATER MIX STARTED 3 u + LEVEL x 1000 x 0.08 LIME PUMP STARTED 0G 0 e OPR WHO STARTED BATCH TIME DIGESTER PH TEMP FACTOR CORRECTED PH OPR INITALS 12a0 A -1 9 'L H.0,-3, (,tag 0.. fi-v. TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP v FACTOR CORRECTED PH OPR INITALS TIME 2 HOUR PH TEMP ' FACTOR ' CORRECTED PH OPR INITALS l5d 0 1s `�S 2b I a� 1z�s� (F.M TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS j 3 Do 12 3 lc- a 1-0 • co 12, 31 kn... a� k'��..•f�, t"rxib' -'t�T#,21`�j?�1�,�`(Ead�r A'w�'3�''SS•tii'�.?.�?n'�3Xak''��i•R.nd-.`ffi,-+-nT'�"�.;'�"z� "ibzY�z w...._ . .-. .� �_n TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 .PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 MINUS 0.09 21 MINUS 0.12 20 MINUS0.15 19 MINUS0.18 18 MINUS0.21 17 MINUS 0.24 16 MINUS 0.27 15 .MINUS 0.30 14 MINUS 0.33 13 MINUS 0.36 12 MINUS0.39 11, MINUS0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME'BATCH AND STARTING A NEW LOG SHEET. Signature of operator who finished st� ation KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: $ ! 2612, L.A. SITE APPLIED TO - • An-, SST# 1 Q. 2 AMB.TEMP V70 9= ; XFER TO STORAGE TANK R WEATHER CONDITIONS [.+ (Zcti U n RESTART TRANSFER PUMP STARTED (D-7 CIS" 1 LEVEL (feet on guage) LIME WATER MIX STARTED ) g3a 1 s LEVEL x 1000 x 0.08 LIME PUMP STARTED 0930 �; OPR WHO STARTED BATCH 'k`AIR`_s` .?R3's'EL?7 ' '." ?.' £ S--!kr,'1Y!ta`,_ ri .VMS kr .Ys 7�•OLUs7�^.�ki'+ f'ir',�$ "£ "drK at+!,VO, .s*5Y. '%f+0£141,1F}. 5,1:Z.? iR:fd:, 14A)W!FX&`'.. Sy:ti.2 7i TIME DIGESTER PH TEMP > FACTOR CORRECTED PH OPR INITALS Ii45 tP5--1 ,25''0 `�+'ob (,, 7 RAN TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS . ' f TIME BATCH PH TEMP FACTOR CORRECTED PH • OPR INITALS 1330 'I1'L1 26. g 6,03.._._I2,-`1`f TIME 2 HOUR PH TEMP FACTOR CORRECTED PH _ OPR INITALS TIME 24 HOUR PH TEMP i FACTOR CORRECTED PH OPR INITALS • l 2 2 21 • t o 14, 2.-S ^� TEMP C COR/ FACTOR • 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 - PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 -PLUS 0.03 25 PLUS 0.00 24 MINUS0.03 23 . MINUS 0.06 22 MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 ' MINUS0.18 18 MINUS 0.21 17 .MINUS 0.24 16 -MINUS 0.27 15 MINUS0.30 14 .MINUS0.33 13 MINUS 0.36 12 MINUS 0.39 11 MINUS 0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. . 2aCe s i Signature of operator who finished sta ization KEEP TIMES ACCURATE +/-TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: I L.A. SITE APPLIED TO SST# / 7 AMB.TEMP f8 XFER TO STORAGE TANK ('99. WEATHER CONDITIONS ,2,9,"r/y 0/41jg RESTART TRANSFER PUMP STARTED de,? 30 LEVEL (feet on guage) LIME WATER MIX STARTED OOsb ,LEVELx1000x0.08 LIME PUMP STARTED ode OPR WHO STARTED BATCH W ie4.x. v = '. 0.w., : -ytiu!sivo k -. -v z-r. - . ;` .' aims-.asr. TIME DIGESTER PH TEMP FACTOR CORRECTED PH OPR INITALS /2v0 ‘,, 8 .25.2 o O : L 2cf c-2� TIME RESTART PH TEMP : • FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP - rt FACTOR CORRECTED PH OPR INITALS /22s /1. 2 4 aa,r o. v3 la._ 4 _ ` TIME 2 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS 143c !2•rS 1l° t-or. 03 i213) TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS G• / D. 0 02. �Z •c« -Y' SAN61 „a, 13,-ETA'' IYit.olmiti4,04''�i"K"` TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 ' 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 MINUS 0.24 16 MINUS 0.27 15 MINUS 0.30 14 MINUS0.33 13 MINUS 0.36 12 MINUS 0.39 11 MINUS 0.42 10 MINUS0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU .MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of operjtQ/Grho finished stabl" KEEP TIMES ACCURATE +/- TEN MINUTES REMARKS: Te . IN Or SPRING a AI(F BIO-:SOLIDS STABLIZATION LOG. DATE: q! )61ac1 L.A. SITE APPLIED TO SST# fa AMB.TEMP 7-J j� I iewq XFER TO STORAGE TANK 1` , WEATHER CONDITIONS (le i R f RESTART TRANSFER PUMP STARTED 57 L( LEVEL (feet on guage) LIME WATER MIX STARTED Ogle) LEVELx 1000 x 0.08 LIME PUMP STARTED . 0 20 574407 OPR WHO STARTED BATCH r"?0-'`r:{.?,r:cAtW`�'°vas'�K'a',�'a5113,9t+w7':32c";r?S�F+`Ls�`,Yid;�F;G[s'7ori?E?e?ESg8ti,r-�.Za ti FACTOR CORRECTED PH TIME DIGESTER PH TEMP OPR INITALS TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP v FACTOR CORRECTED PH OPR INITALS 300 12- Lib zs-, ! _to, m I `46 fZ rv. TIME 2 HOUR PH TEMP s FACTOR CORRECTED PH OPR INITALS TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS 12rjI 12 3,� ?s• If :;.1- 6- co Z 33 (•C . TEMP C COR/FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 -PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 - 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 .'MINUS 0.03 23 MINUS 0.06 22 MINUS0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 ` 18 'MINUS 0.21 17 MINUS 0.24 16 MINUS 0.27 15 MINUS.0.30 14 ,MINUS0.33 13 MINUS 0.36 12 MINUS0.39 11 MINUS 0.42 10 MINUS 0.45 NOTE: IF AT THETWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU, MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of operator who finished KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: !) 1 3o 12o, 2 L.A. SITE APPLIED TO SST# f d2 AMB.TEIVIP 7S XFERTOSTORAGETANK , WEATHER CONDITIONS C f mac., , a RESTART TRANSFER PUMP STARTED 6745_ , LEVEL (feet on guage) LIME WATER MIX STARTED obi, j ; LEVEL x 1000 x 0.08 LIME PUMP STARTED Q'j Q ,.�„� OPR WHO STARTED BATCH .,?c, . r , �� .�+cvz�-=�t.�� ,.10-'ti"�',..�; ':";.q-..e � -. �?rF,F�3�a .�sifi�'a,m,y.wmu.^" .. � #K - � .4..- 'R TIME DIGESTER PH TEMP - FACTOR CORRECTED PH OPR INITALS ID33, 6' 3.14 - .'21-is 7 -0-63 .zi.i 1 3 fa TIME RESTART PH TEMP ;} FACTOR CORRECTED PH OPR INITAIS _ TIME BATCH PH TEMP ?' FACTOR CORRECTED PH OPRINITALS 1�30 1 '.?5' 24'Y -0•P3 Iz 13 6 TIME 2 HOUR PH TEMP f. FACTOR CORRECTED PH OPR INITALS l' 3 0 12,3 I _._ r. 29.3 ' -O ° i 2 . 2-g P'`' TIME 24 HOUR PH TEMP FACTOR CORRECTED PH ...__ OPR INITAIS IDS- IZ' 23 2yj "0'03 /2 I ^" TEMP C COR%FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 , 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 • 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18. 1 18 MINUS0.21 17 MINUS0.24. I6 MINUS0.27 ' 15 MINUS 0.30 14 MINUS 0.33' 13 MINUS 0.36 12 - MINUS 0.39 11 MINUSO.42 10 MINUS0.45 NOTE: IF AT THE TWO HOURCHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of operator who finished stablization KEEP TIMES ACCURATE + / - TEN MINUTES -REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: q-• Li •-.20I 2 L.A. SITE APPLIED TO SST# If "y AMB.TEMP % 0 F. I XFER TO STORAGE TANK KN.., WEATHER CONDITIONS GIec,Q r RESTART TRANSFER PUMP STARTED 07 45- .,, LEVEL (feet on guage) LIME WATER MIX STARTED 0'7?,� ✓ i' LEVEL 1000x 0.08 LIME PUMP STARTED3 i u OPR WHO STARTED BATCH `4" %[RX`ib.Cw'k'o'"SitkKk4R4& ..i�+`C.1tE:` !¢2;-,:e-'a'f w'Rilt iF4gM1JiG'}F*;'A .' ;AT?iatnAS A C '.2.#.22s ,,,,. ars4wk t"s''rY"?N,ri'i 4'Y':�t.R Ok'i1xlC-A�'Y »: ?SR4L?i.4b'.ia ppi--.A..::-C400,-.se: TIME DIGESTER PH TEMP FACTOR CORRECTED PH OPR INITALS I A5 - a 3 .5, ED g in TIME RESTART PH TEMP • • • TIME BATCH PH TEMP , , FACTOR CORRECTEDOPR INITALS 1, ' i• TIME 2 HOUR PH TEMP ; FACTOR CORRECTED PH OPR INITALS 1-to 12 5 23°R -6,0k 12 )2_c tvv TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS t ,lb 1121 23,E lab 12. 2 fir► l v�h. - 1fta.,.4 T. #3a�-'�`.c• ems. �:.> law. Y + �-.$`3i4 .-a m,-.AE„0.4R--.4i+` 6.,siot ms,.,A wetvfi '-'y "m. �a r'4 ��'bT `t�,..7 %� TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 ,PLUS 0.33 35 PLUS 0.30 34 • PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 ,PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 MINUS 0.09 21 .MINUS 0.12 20 ;MINUS 0.15 19 MINUS0.18 18 MINUS0.21 17 MINUS 0.24 16 :MINUS 0.27 15 MINUS 0.30 14 MINUS 0.33 13 MINUS0.36 12 :MINUS 0.39 11 MINUS 0.42 10 MINUS0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of operator who finished stab ;};:lion •KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BWO=SOLIDS STABLIZATION LOG DATE: 9- (0._ ,26/ L. L.A. SITE APPLIED TO SST# (I2 Z AMB.TEMP (o2 r a XFER TO STORAGE TANK WEATHER CONDITIONS ( /'eq(_ RESTART TRANSFER PUMP STARTED n 735 t LEVEL (feet on guage) LIME WATER MIX STARTED ogrs a LEVELx 1000 x 0.08 LIME PUMP STARTED 0 OPR WHO STARTED BATCH s. 0:404 A"` =4,3, as •�.: :.V a..a " •.-`' FkAv:'+i'.. f •*.m: ..MdP ,:.- 'WM TIME DIGESTER PH TEMP f FACTOR CORRECTED PH OPR INITALS TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP FACTOR CORRECTED PH OPR1NITALS 1166 �! TIME 2 HOUR PH TEMP i FACTOR CORRECTED PH OPR INITALS TIME 24 HOUR PH TEMP i1 FACTOR CORRECTED PH OPR INITALS , Ott 1 a • :1 -2. 25.0 , -CT . b 0 - 2-2- 0-4 -. �y>q wk.." C:;rt y.' 84Wi f �'t,. < 4!aci": R�-� ..✓-.".4,•$"S 3SC3+ 3*rTi=l':>Y �`%jr v.{O% TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 - PLUS 0,39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 • MINUS 0.06 22 MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 • 19 MINUS0.18 18 MINUS 0.21 17 MINUS0.24 16 MINUS 0.27 15 MINUS 0.30 14 - MINUS 0.33 13 MINUS.0,36 12 - 'MINUS 0,39 11 „MINUS 0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. • Signature of operator who finished stablization KEEP TIMES ACCURATE +/-TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG fl LJ _J DATE: I ®®' .19 ® 2O 12 L.A. SITE APPLIED TO SST# AMB.TEMP { 3 0 � XFER TO STORAGE TANK WEATHER CONDITIONS poip T t / lQ y y RESTART TRANSFER PUMP STARTED / OU 1 LEVEL (feet on guage} LIME WATER MIX STARTED 8.J`'' a LEVEL x 1000 x 0.08 LIME PUMP STARTED CO 0 ,1 OPR WHO STARTED BATCH ° +8'x 7i. rax.ptij'Fimm.t6 wlogr. r _SI„`{I-S -ce tip '= T3i+a-"S;,,,, ;t411-L'W,eo- 4? r.rS`:*If S-SRSk, 1,Y+►YS^i'.'.k-i? iL'Ttck dT" ,t1;t°wr .-et4..Yi .TIME DIGESTER PH TEMP FACTOR CORRECTED PH OPR INITALS 1c 106 ‘063 23.3 -o•06 6.•57 TIME RESTART PH TEMP "FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP FACTOR CORRECTED PH OPR INITALS TIME 2 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS TIME 24 HOUR PH TEMP FACTOR ' CORRECTED PH OPR INITALS 1.230 IZ .ZS 17.'/ -,O.zj , L2..av a„,, TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 . PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 .PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 •PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 MINUS 0.09 21 MINUS0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 ;MINUS 0.24 16 'MINUS 0.27 15 - ,MINUS 0.30 14 MINUS 0.33 13 MINUS 0.36 12 " MINUS 0.39 11 MINUS 0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU • MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG,SHEET. Ite Signature of operator who finished stabliza KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: ,I 0 " 22_ 2.. J ' L.A..SITE APPLIED TO SST#/22.,AMB.TEMP 16 r i XFER TO STORAGE TANK PAA, WEATHER CONDITIONS r f tAa. •. 4 RESTART 1 TRANSFER PUMP STARTED I pap LEVEL (feet on guage) LIME WATER MIX STARTED 1615 a LEVEL x 1000 x 0:08 LIME PUMP STARTED i ik [s % OPR WHO STARTED BATCH TIME DIGESTER PH TEMP FACTOR CORRECTED PH , OPR INITALS ()Tic 4 eio ' fLcI oo?? i(z3 gig_ TIME RESTART PH TEMP FACTOR - CORRECTED PH' OPR INITALS TIME BATCH PH TEMP r FACTOR CORRECTED PH OPR INITALS , 13 CP. 12t_5 [(,` Lk_ _0,li i2.°30 12,1ki TIME 2 HOUR PH TEMP FACTOR CORRECTED PH .-- - OPR INITALS TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS i+ .„0.„- a6 ii�? �` 4t'�'"wro iO" t y .i' e-.talitiN_•`R4Cq' Si" " '1'`uec!_'ti -;.75 TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 •PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 - 34 PLUS 0.27 33 .PLUS 0.24 32 - PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 -PLUS 0.09 27 , 'PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 , 23_ MINUS•0.06 22 • MINUS 0.09 21 MINUS 0.12 20 - ,MINUS0.15 19 MINUS0.18 18 MINUS 0.21 17 ' MINUS 0.24 16 •MINUS 0.27 15 MINUS 0.30 14 MINUS 0.33 13 MINUS0.36 12 MINUS0.39 11 . MINUS 0.42 , 10 MINUS 0.45 NOTE: -IF ATTHE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of operator who finished stablization -KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: %O `-2°1?,. L.A. SITE APPLIED TO SST# j .. AMB.TEMP 579� XFERTOSTORAGETANK WEATHER CONDITIONS C !f 'tar% RESTART TRANSFER PUMP STARTED ('$015 s LEVEL (feet on guage) LIME WATER MIX STARTED ani,C) . . LEVEL x 1000 x 0.08 LIME PUMP STARTED (Sq as OPR WHO STARTED BATCH .,.+eva-+Swe-iva�Raex�tles�ataa� .� . .- �; .,. r .. -.ate- -� .: - ;fir : . tzlr+rttf�F^',« ?xi�8�se'at�irs -'.. TIME •DIGESTER PH TEMP • FACTOR CORRECTED PH '' OPR INITALS /53 L1 ° 9SC 2I. > --c '2 LI t (c. 4 i TIME RESTART PH TEMP a FACTOR CORRECTED PH ' OPR INITALS - =Mt CM TIME BATCH PH TEMP FACTOR CORRECTED PH ' OPR INITALS I33o 1 t..mcl • 1ti5 -0.15.- ! Z•3' 14. TIME 2 HOUR PH TEMP FACTOR CORRECTED PH • OPR INITALS 24 HOUR PH TEMP z FACTOR CORRECTED PH OPR INITALS 2. 0 • 1 o -.6• S. Z• 1 i tom # W " -, . a / . ,. a . R s - ,+- F:-, s : TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 -PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 MINUS0.24 16 MINUS0.27 15 MINUS 0.30 14 MINUS 0.33 13 MINUS 0.36 12 MINUS 0.39 11 MINUS0.42 10 ,MINUS 0.45 NOTE: IF ATTHETWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of operator who finished stablizat on KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: I 0 ; 6 p 20,1 Z L.A. SITE APPLIED TO SST#`,2 AMB.TEMP 6'I : XFER TO STORAGE TANK WEATHER CONDITIONS (" h RESTART TRANSFER PUMP STARTED 0tIC LEVEL (feet on guage) LIME WATER MIX STARTED �$20 LEVEL x 1000 x 0.08 LIME PUMP STARTED vA OPR WH0 STARTED BATCH 3ik.::la+...v`CsSe'44 _ ,.":'.y.'n?# ua'Mil':-. Fl..-..,° r.-i3`"�r.AFYv TIME DIGESTER PH TEMPFACTOR CORRECTED PH OPR INITALS • • vn 2.0 0 ' TIME 'RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP . FACTOR CORRECTED PH OPR INITALS I a l 12 .E?. TIME 2 HOUR PH TEMP 4 FACTOR CORRECTED PH OPR INITALS TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS cz 4`3.3.,.`'� {'*' 's1` -...: "': = <-. _,o ..... "- :,. �-.,,...: - +a.r s_.. r - ,st:s,,, TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 . PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 'PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26. •PLUS 0.03 25 PLUS:0.00 24 . MINUS 0.03 23 MINUS0.06 22 MINUS0.09 21 , , •MINUS 0.12 20 ,MINUS0.15 19 MINUS0.18 18 MINUS0.21 17 MINUS0.24 16 MINUS 0.27 15 MINUS0.30 14 :MINUS 0.33 13 MINUS 0.36 12 'MINUS:0.39 11 ,MINUS 0.42 - 10 - MINUS0.45 OTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTERCORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of operator who finished stablization KEEP TIMES ACCURATE + / - TEN MINUTES' 'REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: �} (ri il a L.A. SITE APPLIED TO SST# pa , AMB.TEMP 3 cyi XFER TO STORAGE TANK p`',, WEATHER CONDITIONS C `el /ai Y RESTART TRANSFER PUMP STARTED ,16o Ik %LEVEL (feet on guage) LIME WATER MIX STARTED 016 LEVEL 1000 x 0.08 LIME PUMP STARTED 10PR WHO STARTED BATCH -,,V ✓ #'w i•Aw`4-v. r(' � :it, .f %- ,14,. x« d.,k:. 64A5 4istar.:_ -we :a3 ra zacto.o.wwdKii7llsc a i's4.Y«' `.,ifek't ,40,W43...0 Z; .-- wig TIME DIGESTER PH TEMP FACTOR CORRECTED PH, OPR INITALS 1130 6.63 o• 2 -. 1s 10 . t..1 g R nA TIME RESTART PH TEMP FACTOR CORRECTED -PH OPR INITALS f§ TIME BATCH PH TEMP FACTOR CORRECTED PH ' . OPR INITALS TIME 2 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS .: ' c'S" 1 E a� IR S TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 'PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 "PLUS.0.03 25 PLUS 0.00 24 MINUS0.03. 23 MINUS0.06 22 •MINUS0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS0.21 17 •MINUS 0.24 16 MINUS 0.27 25 . MINUS 0.30 14 MINUS 0.33 13 MINUS 0.36 ,12- MINUS 0.39 11 MINUS 0.42 10 • MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU •MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING ANEW LOG SHEET. Signature of operator who finished stablizat 'KEEP TIMES ACCURATE +/ - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: 10 - 3 I - 2. C3 a , L.A. SITE APPLIED TO SST# , L' AMB.TEMP 16 of XFER TO STORAGE TANK e,... , WEATHER CONDITIONS C I eq 0 g RESTART TRANSFER PUMP STARTED O TI S- LEVEL (feet on guage) LIME WATER MIX STARTED 09 66 ` LEVEL 1000 x 0.08 LIME PUMP STARTED ,; Ova OPRWHOSTARTEDBATCH . r,r s r Z_ 'saner *:. , .. .vim - n , r •las _ :. s TIME DIGESTER PH TEMP FACTOR . CORRECTED PH OPR INITALS (sry 5-• 70 /6. t, O,z7 5 `l3 R„IA TIME -RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP r FACTOR CORRECTED PH OPR INITALS II .30 I)-5o 11°.� k•=0.2..1 12 A TIME. 2 HOUR PH TEMP - FACTOR CORRECTED PH OPR INITALS TIME 24 HOUR PH ' TEMP FACTOR CORRECTED PH - OPR INITALS Q 2• 2.2 ��, , a k. ;..*x ,�. a ., ;�: ?"'-a,, E''-°- -... �"•T:Y �v�;r- TEMP C COR/ FACTOR 40 •PLUS 0.45 39 PLUS 0.42 38 . PLUS 0.39 37 . PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 • " 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 . PLUS 0.09 27 PLUS 0.06 26 .PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22. MINUS0.09 21 MINUS 0.12 20 -MINUS 0.15 19 ' MINUS0.18 18 -MINUS 0.21 17 "MINUS 0.24 16 MINUS 0.27 15 - MINUS 0.30 14 MINUS 0.33 13 MINUS 0.36 12 - ' 'MINUS 0.39 11 MINUS 0.42 10 MINUS 0.45 NOTE: - IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12:0 AFTER CORRECTION, YOU MUST RESTART BY ADDING ANEW LIME BATCH AND STARTING A NEW LOGSHEET. Signature of operator who finished stabliza KEEP TIMES ACCURATE +/ - TEN MINUTES • REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: .°. 1 . 20 )7 i LA. SITE APPLIED TO SST# 122 AMB.TEMP 4°F i XFER TO STORAGE TANK WEATHER CONDITIONS C 1 elk A- RESTART TRANSFER PUMP STARTED 0745 t„ LEVEL (feet on guage) ti LIME WATER MIX STARTED 0 , 0 0 LEVEL x 1000 x 0.08 LIME PUMP STARTED 0 0 0 OPR WHO STARTED BATCH -4.-", ' -nf-ZU...,...e.,er..,..s. - ,`" .. A i ...,4....,:- •• "7- ,',7,7 . , ,,,,,. nf, age _ ,• a , . ., ..IN ,"3 TIME DIGESTER PH - TEMP - FACTOR CORRECTED PH OPR INITALS • • 1 .., -0.27 - * a TIME RESTART PH TEMP ,FACTOR CORRECTED PH OPR NITALS il TIME BATCH PH : TEMP FACTO CORRECTED PH _., OPR INITA roo11 LI 4 t . i [2TIME 2 HOUR PH TEMP FAcTOR CORRETED PH OPR INITAIS 3 1 12 TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS 1 ' "."31.7 TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 'PLUS 0.09 27 <PLUS 0.06 26 , PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 .23 MINUS 0.06 22 MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 , 17 MINUS 0.24 • 16 MINUS 0.27 • 15 MINUS 0.30 • 14 MINUS 0.33 13 MINUS 0.36 12' - , MINUS 0.39 11 MINUS 0.42 • 10 MINUS 0.45 NOTE: : IF AT THE TWO HOUR CHECK THE !pH -HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU - MUST RESTART BY ADDING A NEW LIME BATCH AND_ STARTING A NEW LOG SHEET. Signature of operator who finished stahlization - KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: • TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: I 1 • / . 20 I xLA. SITE APPLIED TO SST# 12.9„ AMB.TEMP $ N XFERTO STORAGE TANK ` Y WEATHER CONDITIONS e... C t • Q J RESTART TRANSFER PUMP STARTED O$6p LEVEL (feet on guage) LIME WATER MIX STARTED Og►s ' LEVEL x 1000 x 0.08 LIME PUMP STARTED 611 a OPR WHO STARTED BATCH .. .zt,va � TIME 4,„..... a .{.,.om' f1"#; . ivs. Gi.iFa` .1:Ju`.2.m:b�1.,=..ni✓at_ 3r:S"3r�2'. 1.7 �idT^.,.. efi?�li. DIGESTER PH TEMP T R .CORRECTED PH OPR INITALS ■I�" - Y "O `l 6,03TIME RM RESTART PH FACTOR . CORRECTED PH OPR INITALS ® TIME BATCH PH TEMP FACTOR CORRECTED PH OPR INITALS I4:14 5 I11 c 1 16•3 '0'71 17:1%4 Rni - = • TIME 2 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS • 6 k I ...6•9,.? '12. 11 P TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS 17:• S•a r0• 3to - ' • 6 TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 ,18 •MINUS0.21 17 MINUS0.24 16 MINUS0.27 15 MINUS 0.30 14 .MINUS 0.33 13 MINUS 0.36 12 MINUS0.39 11 MINUS 0.42. 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART.BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. • Signature of operator who finished stab) KEEP TIMES ACCURATE+/ - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG t DATE: 1, 1 ! 1/ 2012. LA. SITE APPLIED TO SST# 14 2. AMB.TEMP Li 2 dr. t XFER TO STORAGE TANK 11 (Y\ WEATHER CONDITIONS C 1aa J RESTART TRANSFER PUMP STARTED 6100 a LEVEL (feet on guage) LIME WATER MIX STARTED n D 15 i, LEVEL x 1000 x 0.08 LIME PUMP STARTED 093CI OPRWHOSTARTEDBATCH TIME DIGESTER PH TEMP FACTOR CORRECTED PH OPR INITALS TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS ...._-_--- TIME BATCH PH TEMP ._ FACTOR ____ __.._. _.._..______ CORRECTED PH ____..--_-.e__.._ .._ __.._.------.,. __ .__.._. OPR INITALS 12f5 Iz 6 l6/..o ;0.2:„) �2 3y m TIME 2 HOUR PH TEMP -• FACTOR CORRECTED PH OPR INITALS Jy12 1ss /5.7 co.30 25 M _ TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS I�3o 2. Li I5.8 G-0•3o I • 11 ill TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 •PLUS 0.39 37 .PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 'MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 MINUS 0.24 16 MINUS 0.27 15 {MINUS 0.30 14 MINUS0.33 13 _ ;MINUS 0.36 12 MINUS 0.39 11 MINUS 0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING ANEW LOG SHEET. 1' sw< finished stab za Signature of operator whotion KEEP TIMES ACCURATE +/-TEN MINUTES. REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: I I - 2 (D `. 1 1` L.A. SITE APPLIED TO SST#10.2 AMB.TEMP y1 F. iXFER TO STORAGE TANK WEATHER CONDITIONS C 1 to,Q fg RESTART IR TRANSFER PUMP STARTED Cyl4 5 # LEVEL (feet on guage) LIME WATER MIX STARTED ; 0g00 ; ; LEVEL 1000 x 0.08 LIME PUMP STARTED' OPR WHO STARTED BATCH � ice, . ._ *'. � 209 psi""�'."�,-r`j_�+r'$#E`�#;9Ys2?v`'i �¢ 3s'��"��3.'[ia.3+',&s+^k?it'g,��t'�.w TIME. DIGESTER PH TEMP FACTOR CORRECTED PH OPR INITALS Igy5 (a, `l8 NI Q2% 21 M TIME RESTART PH TEMP FACTOR CORRECTED PH ,OPR INITALS TIME ;BATCH PH TEMP FACTOR CORRECTED PH OPR INITALS I2115" I1- Hi-i Ib•y -6-27 12.I1 g,M TIME 2 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS ILI y' (a 38 Ig 3 -o z� I z 11 m TIME 24 HOUR PH TEMP ` FACTOR CORRECTED PH OPR INITALS 11.50 19 Vo•1. 'O • 7.1 2 RM � . TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 :PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 - 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 :PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS0.06 22 MINUS 0.09 -21 MINUS 0.12 20 -MINUS 0.15 19 MINUS0.18 18- MINUS0.21 17 MINUS 0.24 16 MINUS 0.27 15 MINUS 0.30 14 MINUS 0.33 13 MINUS 0.36 12 MINUS0.39 11 MINUS0.42 10 MINUS0.45 NOTE: IF AT THE TWO-HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, -YOU 'MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of operator who finished sta li tion KEEP TIMES ACCURATE + / - TEN MINUTES. REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG 4 DATE: f 1 r? - aO 1'2. 1. LA. SITE APPLIED TO SST# 1 Q'L AMB.TEMP 37 0!: " XFER TO STORAGE TANK I\ IV\ WEATHER CONDITIONS ( I elf RESTART TRANSFER PUMP STARTED ©, 3D 0 LEVEL (feet on guage) LIME WATER MIX STARTED Ol Sa i LEVELx 1000 x 0.08 LIME PUMP STARTED 0 9 b0 OPR WHO STARTED BATCH iarAimot7 A' `e#,,R'+mazt_ "-BSA+ lv, watfomme. -.1,,.7. e++FA4iM,' .T'. .;w76�iA�e: na23 :5i�*+§: E,-:i'5:F.'78:C.Me'f3A57.4t; - :®2+ TIME DIGESTER PH TEMP FACTOR CORRECTED PH OPR INITALS tI15 6'31 (�'° 1-'3'33 5'q._.__ _ P-M TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP FACTOR CORRECTED PH OPR INITALS ►ZZo 11"62. 15•.6 $ • 30 12.3E RM TIME 2 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS lM-a P-(0y _..._._ IS's"_,. '0.3d 12•3` [_... TIME 24 HOUR PH TEMP FACTOR CORRECTED PH- OPR INITALS 1230 1 . Lit g 15•9 4 -0'3c. 1 l• I S ii, A-, TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36. PLUS 0.33 35 PLUS 0:30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS0.06 22 MINUS 0.09 21 MINUS 0.12 20 ,MINUS 0.15 19 MINUS0.18 18 MINUS0.21 17 MINUS0.24 16 MINUS0.27 15 MINUS 0.30 14 ;MINUS'0.33 13 MINUS 0.36 12 MINUS'0.39 11 MINUS 0.42 10 MINUS 0.45 i NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. - Signature of operator who finished stablization KEEP TIMES ACCURATE +/ - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG A j t DATE: • I I I 3o-ori. A . L.A. SITE APPLIED TO SST# laa AMB.TEMP 3t XFER TO STORAGE TANK Al...N • WEATHER CONDITIONS 6 lecIR , RESTART TRANSFER PUMP STARTED 0 0 :' LEVEL (feet on guage) LIME WATER MIX STARTED 01 1.0 4 ;, LEVEL x 1000 x 0.08 LIME`PUMP STARTED ' 0900 OPR WHO STARTED BATCH .:.,,, , --,a-, - , 4 Tago, - . ,kvolfor4;,,...4ktikooxifine*,..przw-A-Astereileow/PI4vkzazt 4.010tvw,00lma-vett. • . \ " . TIME DIGESTER PH TEMP f-. FACTOR CORRECTED PH OPR INITALS Oct 5 13.9 .7,0.36- 5.8.ct - , AP-1' TIME RESTART PH TEMP ' FACTOR _CORRECTED PH . OPR INITALS ' TIME - BATCH PH TEMP "`, FACTOR .., CORRECTED PH . . . , OPR INITALS I 416 12.56 - - • 91 k .013 i.2. z_,1 r,, • rtiu‘_ . , TIME 2 HOUR PH . TEMP FACTOR ' CORRECTED PH-- OPR INITALS itoo 1 z•vi TIME 24 HOUR PH TEMP . FACTOR CORRECTED PH OPR INITALS 1 ' Of . / ' /37 / -0,,le) . /A i - fv-t. ce..- . -AA: f - ' TEMP C COR/ FACTOR 40 PLUS CI.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 • 32' PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 .• 27 PLUS 0.06 • 26 PLUS 0.03 25 PLUS 0.00 -24 MINUS 0.03 • 23 MINUS 0.06 22 MINUS 0.09 ' 21 MINUS 0.12 20 i MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 .MINUS 0.24 16 'MINUS 0.27 15 MINUS0.30 14 , MINUS 0.33 13 MINUS 0.36 12 , MINUS 0.39 11 MINUS 0.42 10 MINUS 0.45 NOTE: IF AT THE TVVO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND . STARTING A NEW LOG SHEET. Signature of operator who finished stablization KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: /2.- 3 • 2.V 1 2 s LA. SITE APPLIED TO SST#1Q7. AMB.TEMP 4g of- 1XFERTOSTORAGE TANK ( rr WEATHER CONDITIONS C t Mg - RESTART TRANSFER PUMP STARTED 0"'Ippy 5 :1. LEVEL (feet on guage) LIME WATER MIX STARTED OO I S � LEVEL x 1000 x 0.08 LIME PUMP STARTED •Qq ZQ ' OPR WHO STARTED BATCH •Os alir.4W- a' :r;.'fvm" l ..., "vasamtk fttRqb ., ._•'witix. .. two,:v'S - sgts 'y..t. --.`-?S: - -. -, -.'-r-:: ....,-.. +i"•+<i e'S1R ,th+t TIME DIGESTER PH . TEMP FACTOR • CORRECTED PH OPR INITALS i •''o•z ••I? n� TIME RESTART PH TEMP FACTOR ' CORRECTED PH OPR INITALS TIME BATCH PH TEMP FACTOR CORRECTED PH OPR INITALS 1 1 P. TIME 2:HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS 2 I ao., TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS lit, 7. 44 (b• 1 0. 2? (2,. 1'i it M TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 . - PLUS 0.39 37 - PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23- MINUS 0.06 22 MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS0.21 17 MINUS0.24 16 MINUS0.27 15 ' MINUS 0.30 14 MINUS 0.33 13 MINUS 0.36 12 - MINUS0.39 11 MINUS 0.42 10 'MINUS 0.45 NOTE: IF ATTHE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. ct\c)A,S4 Signature of operator who finished stabl n • KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: `j ►kc r 2.0 t �i LA. SITE APPLIED TO SSTit t 2. AMB.TEMP 55. op s XFER TO STORAGE TANK WEATHER CONDITIONS C��-��"�� '/ RESTART TRANSFER PUMP STARTED 0"T1.� S � LEVEL (feet on guage) LIME WATER MIX STARTED O$1 f LEVEL x 1000 x 0.08 LIME PUMP STARTED 0115 _ OPR WHO STARTED BATCH WalulprialtUkatztVisnwooxiviN. if€taa. acaa i t ae * :; as ?aaw . _ rnaar0tre. arf &s 's' r?:: TIME DIGESTER PH TEMP FACTOR CORRECTED PH OPR INITALS TIME RESTART PH TEMP 1 FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP FACTOR CORRECTED PH OPR INITALS IP r M '0. 27 ) 2.2 M TIME 2 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS I4115. 1251 G. 2 TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS 9 '� TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 ,MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 ;MINUS 0.21 17 MINUS 0.24 16 MINUS 0.27 15 MINUS 0.30 14 MINUS 0.33 13 MINUS 0.36 12 MINUS 0.39 11 MINUS 0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND . STARTING A NEW LOG SHEET. Signature of operator who finished stablization KEEP TIMES ACCURATE + / - TEN MINUTES REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: //q '13 .. aD 2 L.A. SITE APPLIED TO SST# 2AMB.TEMP 37 Or I i �c XFER TO STORAGE TANK AN WEATHER CONDITIONS Op j ?' RESTART TRANSFER PUMP STARTED 0 LEVEL (feet on guage) LIME WATER MIX STARTED CYO 0 LEVEL 1000 x 0.08 LIME PUMP STARTED 6 vs- OPR WHO STARTED BATCH �: - ' i iF 4 'F, TIME , - y`.[.�.iSLT wxti' 7 a.�: 5,4yfri'� •+i�%i,' DIGESTER PH T:. . �,_d ' A+ =� ;h. 'k,°.-.& ♦.. - TEMP . FACTOR CORRECTED PH OPR INITALS 0PIO. 6.31 'L5.q -03o o •O/ t?.44 TIME RESTART, PH • TEMP • FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP FACTOR CORRECTED PH OPR INITALS P qs .tz •s6 P4,3 _o 3 l 2 • 2.3 Aft-7 TIME 2'HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS I y 4� I2.•5'y.._ _..,__._. I • 3 -0, 3 7.. 2I airy. TIME 24 HOUR PH TEMP FACTOR CORRECTED PH • OPR INITALS b 2' 43 t `k• 1 „ -o ' 33 I2 -10 apt, : TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 :PLUS 0.21 31` PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 . PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 MINUS 0.24 16 MINUS 0.27 15 ` MINUS 0.30 14 MINUS 0.33 13 MINUS0.36 12 MINUS 0.39 11 MINUS 0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of operator who finished sta KEEP TIMES ACCURATE + / - TEN MINUTES ion REMARKS: TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG ' DATE: 11 Dec- 2QIZ L.A. SITE APPLIED TO SST# IQa, AMB.TEMP •LI69: f XFERTOSTORAGETANK R PiN WEATHER CONDITIONS L#• Ilai/1.) I RESTART TRANSFER PUMP STARTED 0736 j LEVEL (feet on guage) LIME WATER MIX STARTED 67L c 1 LEVEL x1000x0.08 LIME PUMP STARTED 0 906 ; OPR WHO STARTED BATCH 40-1,1410..#i= ' "artg9JAY* tiot. l IR:7f.GYI'4ttA7. G- "�t�a MF4"'le`a'44's d1f1 TIME DIGESTER PH TEMP FACTOR CORRECTED PH OPR INITALS TIME RESTART PH TEMP " FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP FACTOR ' CORRECTED PH OPR INITALS 11' -`(5 12 • tz) 1 I S • 2- , 030 Z. 3 1 R it-• TIME 2 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS I4M5 i2• 57 153 0.36 12-Z7 (fir'', TIME 24 HOUR PH TEMP FACTOR CORRECTED PH OPR INITALS 1.2:VS [2• `I6 /P'.r -0•30 (2. 1 b. P el-N • . TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06 22 MINUS 0.09 21 MINUS 0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 17 MINUS 0.24 16 MINUS 0.27 15 MINUS 0.30 14 MINUS 0.33 13 MINUS 0.36 12 MINUS 0.39 11 MINUS 0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of operator who finished stablization KEEP TIMES ACCURATE +/ - TEN MINUTES REMARKS: -_J TOWN OF SPRING LAKE BIO-SOLIDS STABLIZATION LOG DATE: 2 (I)!' Dee-- 20!L s LA. SITE APPLIED TO SST# 1/2.2. AMB.TEMP 3 fit"" XFER TO STORAGE TANK WEATHER CONDITIONS I .v.cf RESTART TRANSFER PUMP STARTED r7IS r LEVEL (feet on guage) LIME WATER MIX STARTED b g20 LEVEL x 1000 x 0.08 • LIME PUMP STARTED 01130 : OPR WHO STARTED BATCH TIME DIGESTER PH TEMP FACTOR CORRECTED PH OPR INITALS 0 ' . •`0 : •8 -0-2( S. $3 1,4 TIME RESTART PH TEMP FACTOR CORRECTED PH OPR INITALS TIME BATCH PH TEMP FACTOR CORRECTED PH OPR INITALS /Z2s- l2. 6.3 U3.9 b-0-2.7 12-36 A M TIME 2 HOUR PH TEMP -FACTOR CORRECTED PH OPR INITALS TIME 24 HOUR PH TEMP . FACTOR CORRECTED PH OPR INITALS I 313 12• Li l J (:)•i -0 -'1:7 12-- 1 Anil TEMP C COR/ FACTOR 40 PLUS 0.45 39 PLUS 0.42 38 PLUS 0.39 37 PLUS 0.36 36 PLUS 0.33 35 PLUS 0.30 34 PLUS 0.27 33 PLUS 0.24 32 PLUS 0.21 31 PLUS 0.18 30 PLUS 0.15 29 PLUS 0.12 28 PLUS 0.09 27 PLUS 0.06 26 PLUS 0.03 25 PLUS 0.00 24 MINUS 0.03 23 MINUS 0.06- 22 MINUS 0.09 21 MINUS0.12 20 MINUS 0.15 19 MINUS0.18 18 MINUS 0.21 - 17 MINUS 0.24 16 MINUS 0.27 15 MINUS 0.30 14 MINUS 0.33 13 MINUS 0.36 12 MINUS 0.39 11 'MINUS 0.42 10 MINUS 0.45 NOTE: IF AT THE TWO HOUR CHECK THE PH HAS FALLEN BELOW 12.0 AFTER CORRECTION, YOU 'MUST RESTART BY ADDING A NEW LIME BATCH AND STARTING A NEW LOG SHEET. Signature of operator who finished stablization KEEP TIMES ACCURATE +/-TEN MINUTES . REMARKS: .., qNCDA&C. $ A-gr_ r' onom..c.. Dvs...i9-.: n. one:119),7433r-.2eb_ site:�:,w:w. wnca_r0 > ne:119 0 .ronomiLi <' 6 •' ke b o .., Y3 SL01.. 121.- • l~_-.� A�T F.2 tti. 1-__ ,. F_° "r`5J i) ,„ �t:;r Predictive , .,) it �,��' ;;.,,; Oi }. ! S e. sampled: 'mow illl S'�!r` • Client: Richard Mendez Advisor.' PO Box 617 Spring Lake, NC 28390 , Mehlich-3 Extraction l Report County: Cumberland Links to Helpful Information 10/18/2012 Received: 10/25/2012 Completed: 10/26/2012 Farm: Town of Spring Lake Agronomists Comments: ATTENTION: This report was flagged with a "C" and/or "Z".to alert you that copper and/or zinc have accumulated in the soil and are approaching a level that could be detrimental to crop production. The C and Z symbols are printed on your report for soil test index levels of 2000 or more; for peanuts with zinc, the level is 300. This note is designed to be a "trigger" that allows enough time to either reduce the rate of application or find another field,for application of biosolids and/or waste water. The CTL (critical toxic level) for Cu &amp; Zn has been set at 3000 index; for peanuts with zinc, the level is 500. These levels are used by DENR'as a benchmark to determine when application of waste products should be stopped. The CTL for copper and zinc was set to prevent levels from accumulating to: the point where they become toxic to crops grown on a field. . - Sample ID: 1-1 Lime History: Recommendations: Lime Nutrients (lb/acre) More Information Note: 12 Note: $ Crop (tons/acre) N P205 K20 Mg S Mn - Zn Cu B 1 -Berm Hay/Pas,M 0.0 180-220 0 140 0 0 pH$ Z 0 0 2 -Fes/OGtrim,M 0.0 120-200 0 60 0' 0 pH$ Z 0 0 Note: 12 Note: $ Test Results [units -W/V in HM% WN CEC BS% g/cn ; CEC and Na in meq/100 crn3; NO3-N in mg/drri3]: Soil Class: Mineral Ac pH P-I K-I Ca% Mg% S-I Mn-I Mn-AI1 Mn-Al2 n-I Zn-AI C -I Na ESP SS -I NO3-N 98 0.7 6.8 1263 38 93 , 68 47 - 33 33 2 815 2815 0.1 0 Sample ID: 3-1 Lime History: Recommendations: Lime Nutrients (Ib/ac' > / More Information Note: 12 Crop (tons/acre) N P205 K20 Mg S. Zn Cu B 1 -Berm Hay/Pas,M 0.6 180-220 0 140 0 0 0 0 0 0 2 -Fes/OG/Tim,M 0.0 120-200 0 60 0 0 0 - 0 0 0 Note: 12 Test Results [units -W/V in HM% WN CEC 'BS% 0.66 .1.20 .8.3 . g/cn; CEC and Na in meq/100 crri3; NO3-N in mg/drn3]: Soil Class: Mineral Ac pH P-I K-1 Ca% Mg% S-I Mn-I Mn-AI1 Mn-Al2 - Zn-AI •- Na ESP SS -I NO3-N 84 1.4 5 5 ......._ 358 ... 39 72 .. 9 49 77 63 63 563 302_ 0.1 1 Sample ID: 3-2 Lime History: Recommendations: Lime Nutrients (lb/acre More Information Note: 12 •Crop (tons/acre) N P205 K20 Mg S Mn Zn Cu B 1 -Berm Hay/Pas,M 0.5 180-220 0 180 ;0 0 0 0 0 0 2-Fes/OG/Tim,M 0.0 120-200 0 90 0 0 0 0 0 0 Note: 12 Test Results [units - WN in g/crri3; CEC and Na in meq/100 crrr3; NO3-N in mg/dnt3]: Soil Class: Mineral HM% W/V CEC BS% Ac pH P-I K-I Ca% Mg% S-I Mn-I Mn-AI1 Mn-Al2 .- Zn-AI Cu-I Na ESP SS -I NO3-N 0.66 • 1.34 5.1 77 1.2 5.6 207 25 64 10 33 96 , 75 75 M 342Aft 0.0 Reprogramming of the laboratory -information -management system that makes this report possible is being funded through a grant from the North Carolina Tobacco Trust Fund Commission. Thank you for using agronomic services to manage nutrients and safeguard environmental quality. - Steve Troxler, Commissioner of Agriculture s{ris.Y::� : YUS i"r�i€t1;�4�$}�tYifstiii>ap a' r a 9 33=265b� ,,: ' 61)-0 a f7www nca r: oV/a" ronomilt , ;:: ,NCDAZ£CStiAgronorn[c Drv�s�on �`` y,- Phone �(91 �)7 _ � *y g, g g � r � 4 .�;}t y 5 `+t�' x .S Y. j -� t, .�'i j 7i,', : i 3 r t.,:1`� ..:.`, , }. .. i �...�� � � , , J#.., `L'.;-'3.--,''- �._ -.. ..,� .... _..... ,. a...«� r..a, rc.. .... .... ..... .+L.. T.,.rt.7. t..�.. i-:- rt:- - .Re ort=No p F Y =SL0 :1210' 1 1 Richard Mendez Page 2 of 3 Sample ID: 3-3 Lime History: Recommendations: Lime . Nutrients (lb/acre) More Information Note: 12 Crop (tons/acre) N P205 1 -Berm Hay/Pas,M 1.3 180-220 0 2-Fes/OG/Tim,M 0.0 120-200 0 K20 10 0 Mg S Mn Zn • 0 0 0 0 '0 0 0 0 Cu 0 0 B 0 0 Note: 12 Test Results [units -WN in g/cm3; CEC and Na in meq/100 crrr3; NO3-N in mg/dirr3]: HM% WN CEC BS% Ac pH P-I K-I Ca% Mg% 0.66 _1.26 7.1, 69 . 2.2 ,. 5.2 179-_• 111 _ , 44 . , 16. , ,- S-I 49 Mn-I 79 . Soil Class: Mineral Pdn-AI1 Mn-Al2 -I Zn-AI , 64 64 300 300, -I ® Na 0.1 ESP 1 SS -I NO3-N .Sample ID: 4-1 Lime History: Recommendations: . Lime. Nutrients More Information Note: 12 (Ib/ac ) Crop , (tons/acre) - N P205 1 -Berm Hay/Pas;M 1.2 . 180-220 0 2 -Fes/OG/Tim,M 0.0 120-200 0 ' K20 90 30 Mg S Mn Zn 0 . 0 0 0 0 0 0 0 Cu 0 0 B 0 0 Note: 12 Test Results [units - WLV in g/cfn3; CEC and Na in meq/100 crn3; NO3-N in mg/dn33]: HM% W/V CEC BS%. Ac pH P-I K-I Ca% Mg% 0.66 __ .1.27. 5.9 64. ,. 2.1 5.1 _ 206 _.61 _.., _ .44 _ . _ 15 .. S-1 ' 50 _ - Mn-1 • 58 Soil Class: Mineral Mn-A11 Mn-AI2 - : Zn-AI 52 52 228. C -I 200 Na 0.1 ESP 2 SS -I NO3-N Sample ID: 4-2 Lime History: Recommendations: Lime Nutrients (Ib/ac : More Information Note: 12 Crop (tons/acre) N P205 1 -Berm Hay/Pas,M 0.6. 180-220 0 2- Fes/OG/Tim,M . 0.0 120-200 0 K20 120 50 Mg S Mn Zn 0 0 0 0 0 0 0 0 Cu 0 0 B 0 0 Note: 12 Test Results [units - WN in g/cm3; CEC and Na in meq/100 up': NO3-N in mg/dm3]: HM%o WN CEC BS%' Ac. ' pH P-I K-1 Ca% Mg% .. 0.60 , 1:29 . 4.5 74 1.2 _ 5.4 . _ 174 , 45 55 _ 14 S-I 36 Mn-I. 57 Soil Class: Mineral Mn-AI1 Mn-Al2 -1 Zn-AI . 51 51 244 244 C I 152 Na 0.1 ESP 2 SS -I NO3-N S t -' ... r .... r ic Fist :b .....4' ....e .�. , r. u,. k , '..i q ,tN' ,,t: +n.., .. 3..r. . -.. .. a i 1,. ,, 5, ., B, « : � . ��+ �- • �` �P '�.�^� . one.. 91�9 �733-2655� ;� ..Website..--ww:nca r: ov/a ronomili � � - s .� -� z ; ' ` Re ort o Y13SL011210; -: NCDA&CS,A ron%0_ Druisron Ph. ._ ,, +,; 9. l� g. p i. .,. ..,,. ,-_ -��., a _.", -e. �. ,^fi ,,.. ... ^<< ,.. t � } ... ..�i,.. �e;��. {:. _ r _�-1�!..w ,_ ti, „.? r .....,. y +,, w-'... �'r.. .. rt 1 .h= 5. i'h'Si -.y3'N ���F...t L i.. „T ((�� 4 i- :,.. {. �, h i'..� ti,. ,,, F. �.... ., 5:. :..... .. �" k.'. ... h� ftr.r :...F�h v... .ter". ,.,, ...-:a C..- _x.9�. 4....a„'k.....x., .. `..., �rvx:�'':t.. �... .i...'y :f3.Y,,.. v,s,lYx�[,d,.4, ., .. ....-.G.F ....:,1.. .... �,.-'IrL .w.r,.,..,.. .. ,.n... ... .. ..... .F.. .. � �'^.m .. 1. ifP 4t� 1t�'�, ', 4 �°', .�'. . l� Richard Mendez Page 3 of 3 Understanding the Soil Report: explanation of measurements, abbreviations and units Recommendations Liire Report Abbreviations Ac exchangeable acidity B boron BS% % CEC occupied by basic cations Ca% % CEC occupied calcium CEC cation exchange capacity Cu-I copper index ESP exchangeable sodium percent HM% percent humic matter K-I potassium index K20 potash Mg% %CEC occupied by magnesium MIN mineral soil class Mn manganese Mn-All Mn-availability index for crop 1 IVIn-Al2 Mn-availability index for crop 2 Mn-1 manganese index M-0 mineral -organic soil class N nitrogen Na sodium NO3-N nitrate nitrogen ORG organic soil class pH current soil pH P-1 phosphorus index P2O5 phosphate S-I sulfur index SS-1 soluble salt index W/V weight per volume Zn-AI zinc availability index Zn-I zinc index If testing finds that soil pH is too low for the crop(s) indicated, a lime recommendation will be given in units of either ton/acre or lb/1000 sq ft. For best results, mix the lime into the top 6 to 8 inches of soil several months before planting. For no -till or established plantings where this is not possible, apply no more than 1 to 1.5 ton/acre (50 Ib/1000 sq ft) atby one time, even if the report recommends more: You can apply the rest in similar increments every six months until the full rate is applied. If MG is recommended and lime is needed; use dolbrriitric lime. Fertilizer . . Recommendations for field crops Or other areas are listed separately for each nutrient to be added (in units of lb/acre unless otherwise specified). Recommendations for N (and sometimes -for B) are based on research/field studies for the crop being grown, not on soil test results. K-1 and P-1 values are based on test results and should be > 50. If they are not, follow the fertilizer recommendations given. If Mg is needed and no lime is recommended, 0-0-22 (11.5% Mg) is .an excellent source; 175 to 250 lb per acre alone or in a fertilizer blend will usually satisfy crop needs; SS -I levels appear only on reports for greenhouse soil or problem samples. Farmers and other commercial producers should pay special attention to micronutrient levels., If $, pH$, $pH, C or Z notations appear on the soil report, refer to $Note: Secondary Nutrients and Micronutrients. In general, homeowners do not need to be concerned about Micronutrients. Various crop notes also address lime fertilizer needs; visit ncagr.gov/agronomi/pubs.htm. - - Recommendations for small areas, such as home lawns/gardens; are listed in units of Ib/1000 f(. If you cannot find the exact fertilizer grade recommended on the report, visit www.ncaOrooviadrohomi/obpart4.htm#fs to find information that may help you choose a comparable alternate. For more information, read A Homeowner's Guide. to Fertilizer. , Test'Results - The first seven values [soil. class, HM%; WN, CEC, BS%o, Ac and pH] describe the soil and its degree of acidity. The remaining 16 [P-I, K-I, Ca%, Mg%,, Mn-I, Mn-All, Mn-Al2, Zn-I, Zn-Al, Cu-I, S-I, SS -I, Na, ESP, SS -I, NO3-N (not routinely available)] indicate levels of plant nutrients or other fertility measurement. Visit www•ncagr.gov/agronomi/uvrst.htm for More information..