Loading...
HomeMy WebLinkAboutNCC223814_ESC Approval Submitted_20221115ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director County of Ashe Attention: Adam Stumb, County Manager 150 Government Circle Suite 2500 Jefferson, NC 28640 NORTH CAROLINA Environmental Quality October 20, 2022 RE: Project Name: Ashe Co. Municipal Solid Waste Landfill Facility — Revision to Approved Plan Project ID: ASHE-2023-002 Acres Approved: 23 County: Ashe City: Crumpler Address: 739 Fred Pugh Road River Basin: New Stream Classification: C, ORW Submitted By: Municipal Engineering, Inc. Date Received by LQS: September 29, 2022 Plan Type: New Dear Mr. Stumb: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The modifications required for approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $ 100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.g_ov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources tg Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105 `rJj 336-776-9800 Letter of Approval with Modifications County of Ashe October 20, 2022 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCGOI permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval -is based in part on the accuracy of, the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, ' Tamera Eplin, PE Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval Municipal Engineering, Inc. Attention: Ben Clawson, PE 68 Shipwash Drive Garner, NC 27529 Letter of Approval with Modifications County of Ashe October 20, 2022 Page 3 of 3 Project Name: Ashe Co. Municipal Solid Waste Landfill Facility — Revision to Approved Plan Project ID: ASHE-2023-002 County: Ashe Modifications pursuant to applicable North Carolina General Statutes and/or Reg lationse 1. Any off -site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A NCAC 4B .0110] 2. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities