Loading...
HomeMy WebLinkAboutSW8090903_Historical File_20100903NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary September 3, 2010 Raiford G. Trask, Jr., Manager and Trustee BC & RT, LLC 1202 Eastwood Road Wilmington, NC 28403 Subject: State Stormwater Management Permit No. SW8 090903 South Bridge Subdivision — Phase 1 High Density Subdivision Project Onslow County Dear Mr. Trask: The Wilmington Regional Office received a complete State Stormwater Management Permit Application for South Bridge Subdivision — Phase 1 on September 1, 2010. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211, effective October 1, 2008 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 090903 dated September 3, 2010 for the construction, operation, and maintenance of the subject project. This permit shall be effective from the date of issuance until September 3, 2020, and shall be subject to th% conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611 -7447_ Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Steve Pusey, or me at (910) 796-7215. Sincerely, Georgette Scott Stormwater Supervisor Division of Water Quality GDS/sgp: S:IWQSISTORMWATERIPERMIT1090903.sep10 cc: John S. Tunstall, PE - NKT Onslow County Inspections Division of Coastal Management Steve Pusey Wilmington Regional Office Central Files Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX: 910-350-20041 Customer Service:1-877-623-6748 NorthCarolina Internet: www.ncwaterquality.org An Equal Opportunity( Affirmative Action Employer Admil i& State Stormwater Management Systems Permit No. SW8 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO BC & RT, LLC and Raiford G. Trask, Jr. South Bridge Subdivision — Phase 1 NC 172, Sneads Ferry, Onslow County FOR THE construction, operation and maintenance of three (3) wet detention ponds, two (2) secondary infiltration basins, and seven (7) sand filters in compliance with the provisions of Session Law 2008-211, effective October 1, 2008 and 15A NCAC 2H .1000 (hereafter separately and collectively referred to as the "stormwater rules`) and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until September 3, 2020 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Sections 1.8 —1.10 on pages 3 - 5 of this permit. The subdivision is permitted for 34 lots, each limited to a maximum amount of built - upon area as indicated in Section 11.20 (f) of this permit. 3. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control systems. The wet ponds, designated as #7-12, #13A/B, and #14, have been designed to treat the runoff from the following square feet of Built -Upon Area, respectively: 617,461, 499,117, and 548,957. The sand filters, designated as 1, 2, 3, 4, 5, 6A, & 613, have been designed to treat the runoff from the following square feet of Built - Upon Area, respectively: 43,911, 19,600, 84,049, 43,300, 28,669, 47,454, and 52,561. Page 2 of 13 State Stormwater Management Systems Permit No. SW8 090903 4. A 50' wide vegetative buffer must be provided adjacent surface waters, measured horizontally from the normal pool of impounded structures, the banks of streams and rivers and the mean high water line of tidal waters. The wet detention pond(s) may not be located within the buffer and no built -upon area is allowed within the buffer. 5. Stormwater runoff in excess of the design storm must flow overland through a vegetative filter strip with a minimum length of 50', measured from mean high water of Class SA waters. The filter strip and level spreader shall be designed per NCAC 2H.1008 (f) to pass the 10 year storm in a non -erosive manner. 6. The discharge from a wet detention pond shall not be considered a direct discharge to SA waters if a secondary stormwater BMP is provided to treat the discharge from the wet detention pond. The secondary BMP proposed for wet detention ponds #7-12 and #13A/B are described in Section 1.9 below. 7. Each lot within the commercial subdivision whose ownership is not retained by the permittee, must submit a separate Offsite Stormwater Management Permit application package to the Division of Water Quality and receive a permit prior to any construction on the lot. 8. The following design elements have been permitted for the wet detention pond stormwater facilities, and must be provided and maintained at design condition: Design Criteria Pond #742 Pond #13A/B Pond #14 a. Drainage Area, acres: 19.48 14.32 18.51 Onsite, : 848,684 623,896 806,367 Offsite, : 0 0 0 b. Total Impervious Surfaces, : 617,461 499;117 548,957 Buildings / Lot BUA, : 0 0 0 Roads / Parkin 45,500 0 47,647 Sidewalks, : 0 0 0 Future, : 571,961 499,117 501,310 c. Average Pond Design Depth, feet: 5 6 5.5 d. TSS removal efficiency: 90 90 90 e. Design Storm, inches: 3.67 3.67 1.5 f. Permanent Pool Elevation, fmsl: 19 18 34 g. Permanent Pool Surface Area, : 44,410 29,276 35,776 h. Permitted Storage Volume, ft : 173,247 139,174 74,093 i. Temporary Storage Elevation, fmsl: 22.25 21.75 35.75 j. Permitted Forebay Volume, f?: 44,766 34,863 40,710 k. Controlling Orifice, inches: 4 4 4 I. Average Orifice Flow Rate, cfs 0.43 0.46 0.31 m. Pre-dev.1 yr - 24hr discharge rate, cfs: 0.75 0.55 0.71 n. Maximum Fountain horsepower h) 1/2 1 1 o. Receiving Stream: UT Everett Creek p. River Basin: New River 19-32 q. Stream Index Number: r. Classification of Water Body: SA; HQW — /z mile SA: HQW — / mile SA: HQW Page 3 of 13 State Stormwater Management Systems Permit No. SW8 090903 9. The following design elements have been permitted for secondary infiltration basins #7-12 and #13A/13, and must be provided and maintained at design condition: Design Criteria Units Secondary Infiltration Basin #7-12 Secondary Infiltration Basin #13A/B 14.32 623,896 0 Drainage Area Onsite Offsite Acres ft2 ft 19.48 848,684 0 Total Impervious Surfaces Buildings Roads/Parking Sidewalks Future ft2 617,461 0 45,500 0 571,961 499,117 0 0 0 499,117 Design Storm in. 3.67 3.67 Basin Depth ft. 2.5 4 Bottom Elevation FMSL 12.5 11 Bypass Weir Elevation FMSL 14.75 14.75 Bottom Surface Area W 7,082 9,058 Required Storage Volume ft 42,863 14,688 Permitted Storage Volume ft 42,863 * 19,654 Stora a Elevation FMSL 14.75 14.75 Expected Infiltration Rate in/hr 1.98 1.98 Time to Draw Down Days 4.17 3.4 SHWT FMSL 10.8 10.8 Type of Soil Mary n Leon Receiving Stream _ UT Everett Creek River Basin New River Stream Index Number 19-32 Classification of Water Body SA; HQW Infiltration basins 7-12 and 13A/B are interconnected via pipe, therefore the total permitted storage volume is the sum of these amounts, or 62,517 ft?. Individual amounts are allocated according to their respective required volumes. 10. The following design elements have been permitted for the sand filter stormwater facilities, and must be provided and maintained at design condition: Design Criteria SF 1 - SF 2 SF 3 SF 4 SF 5 SF 6A SF 613 a. Drainage Area, ac. 1.79 1.3 3.62 2.91 1.61 2.40 2.46 On -site, ft2 77,772 56,662 157510 126,932 70,022 104,362 107,065 Off -site, ft2 0 0 0 0 0 0 0 b. Total Impervious Surfaces, ft2 43,911 19,600 84,049 43,300 28,669 47,453 52,561 Buildings, fe 19,600 19,600 45,179 28,975 28,669 39,623 41,711 Roads / Parking 24,311 0 38,870 14,325 0 ii' 7,830 10,050 Sidewalks, ft2 0 0 0 I 0 0 Existing, ft2 0 0 0 0 0 0 0 Offsite, ft2 0 0 0 0 0 0 0 c. Design Storm, inches 3.67 3.67 3.67 3.67 3.67 3.67 3.67 d. Sediment chamber depth, ft 2.67 2.67 2.67 2.67 2.67 2.67 2.67 e. Sand chamber 2 2 2 2 2 2 2 depth, ft Page 4 of 13 State Stormwater Management Systems Permit No. SW8 090903 f. Sediment chamber bottom elevation, fmsl 4 6 6 8 6 9 9 g. Sand chamber bottom elevation, fmsl 4.67 6.67 6.67 8.67 6.67 9.67 9.67 h. Sediment chamber surface area, ft2 1,201 521 _ 1,081 1,650 1,070 760 1,071 1,260 i. Sand chamber surface area, ftz 5,006 4,200 2,177 2,200 2,422 2,824 j. Weir elevation, fmsl 7 9 9 11 9 12 12 k. Maximum head on 2 3 3 3 2 3 3 filter, ft I. Permitted storage volume, fl 14,701 7,685 21,959 15,402 9,500 14,141 17,303 m. Orifice diameter, in. 4 4 4 4 4 4 4 n. Drawdown time, hrs. 12.42 25.67 28.33 28.16 18.45 27.73 26.35 o. SHWT, fmsl 4.83 6 10 6 6.33 7 6.5 p. Permeability - sand ft./da 3.5 3.5 3.5 3.5 3.5 3.5 3.5 q. Impermeable liner Yes Yes Yes No Yes No No q. Receiving Stream UT Everett Creek r. River Basin New River s. Stream Index Number 19-32 t. Classification of Water Body SA; HQW II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire project and for each lot does not exceed the maximum allowed by this permit. Once the lot transfer is complete, the lot owner may not increase the built -upon area above the permitted maximum for that lot without approval from both the permittee and the Division of Water Quality. 3. If an Architectural Review Board or Committee is set up by the permittee to review new and modified lot plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the Board or Committee on behalf of the permittee do not relieve the lot owner of the responsibility to maintain compliance with the BUA limit for that lot established by the permit and in the recorded deed restrictions. 4. The permittee must maintain compliance with the overall BUA limit for the project established by this permit and the supporting documentation. If any lot is found to have exceeded the permitted BUA limit for that lot, the permittee shall notify the lot owner in writing and require resolution. 5. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in. writing to the Director that the changes have been made. Page 5 of 13 State Stormwater Management Systems Permit No. SW8 090903 6. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 7. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction; for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further development, subdivision, acquisition, or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 8. The permittee shall submit for approval, final site layout and grading plans for any permitted future development areas shown on the approved plans, prior to construction. 9. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans: 10. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 11. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 12. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 13. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and re -vegetation of side slopes. U. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. Page 6 of 13 State Stormwater Management Systems Permit No. SW8 090903 14. After a wet detention pond is established, it should be inspected once per month and within 24 hours after every storm event greater than 1.5 inches depth. 15. Records of operation and maintenance should be kept in a known set location and must be available upon request. The records will indicate the date, activity, name of person performing the work and what actions were taken. Records must be submitted quarterly to the Regional DWQ Stormwater Supervisor, including pictures to demonstrate findings and compliance. Inspection activities shall be performed in accordance with the Operation and Maintenance (O&M) Agreement. Any problems that are found shall be repaired immediately and reported to DWQ within 24 hours in accordance with the O&M Agreement. 16. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 17. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The project and the stormwater facility must be in compliance with all permit conditions. Any items not in compliance must be repaired, replaced or restored to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 18. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below•the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for fountains in this project are as follows: % hp for pond #13A/B, and 1 hp for pond #s 7-12 and #14. 19. If permeable pavement credit is desired, the permittee must submit a request to modify the permit to incorporate such language as required by the Division of Water Quality. The request to modify must include a soils report identifying the type of soil, the Seasonal High Water Table elevation and the infiltration rate. Upon the successful completion of a permit modification, the individual lot owners that request to utilize permeable pavements shall submit the necessary forms and documentation to the permittee, or a designated agent, and receive approval prior to construction of the permeable pavement. 20. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 090903, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to Stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. Page 7 of 13 State Stormwater Management Systems Permit No. SW8 090903 e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built -upon area per lot is shown in the table below: a h. South Bridge Subdivision Lot Allotments February 23, 2010 Lot # Lot BUA (sf) Lot # Lot BUA (sf) 1 2,582 35 3,555 2 2,835 36 2,620 3 2,932 37 3,032 4 2,994 38 3,280 5 3,086 39 3,630 6 2,835 40 3,533 7 2,932 41 3,280 8 2,582 42 3,280 9 3,086 43 4,139 10 2,835 44 4,077 11 3,023 45 3,807 12 3,115 46 4,157 13 2,611 47 4,219 14 2,865 48 4,311 15 2,962 49 4,157 16 3,024 50 3,727 17 2,582 51 3,980 18 3,086 52 6,135.82 19 2,994 53 3,692 20 2,932 54 3,630 21 2,835 55 _ _ 3,533 22 2,582 56 3,280 23 2,582 57 3,784 24 2,932 58 3,702.61 25 2,994 59 2,970 26 3,086 • 60 2,873 27 3,652 61 2,622.73 28 3,302 62 2,800 29 2,582 63 2,800 30 3,593.5 64 2,800 31 3,690 65 2,800 32 3,798 66 2,800 33 3,752 67 2,800 34 4,248 68 2,800 This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion- of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. For those lots within CAMA's Area of Environmental Concern, where DCM calculates a different maximum lot built -upon area, the governing lot BUA shall be the most restrictive of the two numbers. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. Page 8 of 13 State Stormwater Management Systems Permit No. SW8 090903 i. Built -upon area in excess of the permitted amount will require a permit modification. j. Each lot within a commercial subdivision whose ownership is not retained by the permittee, must submit a separate Offsite Stormwater Management Permit application package to the Division of Water Quality and receive a permit prior to any construction on the lot. k. If permeable pavement credit is requested, the property owner must submit a request, with supporting documentation, to the permittee and receive approval prior to construction of BUA. 21. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form signed by both parties, to the Division of Water Quality, accompanied by the supporting documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves a request to transfer the permit. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. Riprap aprons are covered by the requirements of this condition. Should the riprap aprons fail to reduce the velocity into the wetlands to 2 fps or less, or should erosion, channelizing, or scouring of the wetlands occur, the Permittee shall repair the damage, restore the wetlands, and submit alternate velocity reduction measures to the Division for approval. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. Page 9 of 13 State Stormwater Management Systems Permit No. SW8 090903 9. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 10. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 11. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 3rd day of September, 2010. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 090903 Page 10 of 13 Permit Number: S W 8 010403 (to be prav'ded by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement NICT 4 090113 I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided.CZ �! This system (check one): ti ❑ does ® does not incorporate a vegetated filter at the outlet. "7 Zir This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. -- Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/ debris is present. Remove the trash debris. The perimeter of the wet detention basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a gro'ond covey and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too I Maintain vegetation at a height of long. a roximatel six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 BMP element: The inlet device: pipe or Swale The forebay The vegetated shelf The main treatment area Permit Number: SW $ O Q 6 9 0 3 (to be provided by DWQ) Drainage Area Number: /'/ Potential problem: The pipe is clogged. The pipe is cracked or otherwise damaged. Erosion is occurring in the swale. Sediment has accumulated to a depth greater than the original design depth for sediment storage. Erosion has occurred. Weeds are present. Best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or dying. Weeds are present. Sediment has accumulated to a depth greater than the original design sediment storage depth. Algal growth covers over 50% of the area. Cattails, phragmites or other invasive plants cover 50% of the basin surface. How I will remediate the probl Unclog the pipe. Dispose of the sediment off -site. Replace the pipe. Regrade the swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Prune according to best professional practices Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Consult a professional to remove and control the algal growth. Remove the plants by wiping them with pesticide (do not spray). Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: SW $ MOD& (to be provided by DWQ) Drainage Area Number: I H BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 14 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 6 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom 28 j FOREBAY BASIN DIAGRAM fIl in the blanks) Oft Min, Sediment Storage Permanent Pool Elevation 34 Pool Sediment Removal Elevation 20 Volume Bottom Elevation 18 MAIN POND Form SW401-Wet Detention Basin O&M-RevA Page 3 of 4 1-ft Storage Permit Number: SW S 090?0 3 (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible parry. Project name:South Bridge Subdivision - Phase I BMP drainage area number:14 Print name:Raiford G. Trask, Jr. Title:Mana.aer of BC & RT, LLC and Trustee Address:1202 Eastwood Road Wilmington NC 28403 Date: l � — (L — '--u o � Note: The Iegally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, , a Notary Public for the State of County of do hereby certify that personally appeared before me this A-� day of U Y q� , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, th'i s • NO,Q'�'� \4oTA Ry �. S. � VEIL\ 2 r � � I'll; IOVER a+` n•rrnu��a+++ SEAL n� My commission expires bs—bL 14 Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 DWQ USE ONLY Date Received Fee Paid I Permit Number Applicable Rules: ' ❑ Coastal SW —1995 Acoastal SW — R8 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WO Mznt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality " STORMWATER MANAGEMENT PERMIT APPLICATION FOI 0 This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on ans, specifications, letters, operation and maintenance agreements, etc.): South Bridge Subdivision - Phase I 2. Location of Project (street address): City:Sneads Ferry County:Onslow Zip:28460 3. Directions to project (from nearest major intersection): Take US 17 (Market St.) towards Jacksonville for approximately 29 miles Turn right at NC 172 Go approximately 5.4 miles The site is on the left beside Yopp's Tire & Garage 4. Latitude:34° 33' 43" N Longitude:770 24' 14" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) . and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major 0- ac of Disturbed Area ❑NPDES Industrial Stormwater NSedimentation/Erosion Control: 2,015 AC (07-24-08) & 32 AC (07-02- ❑404/401 Permit: Proposed. Impacts b. Tf any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:South Bridge Subdivision - Phase I & II I ONSLO-2009-002 (07-24-08) & ONSLO-2009-002 Mod. (07-02-09)Erosion Control Permit ICI. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:BC & RT. LLC and Raiford G. Trask, Jr Trustee Signing Official & Title:Raiford G. Trask, Jr. Manager and Raiford G Trask Jr Trustee b. Contact information for person listed in item 1a above: Street Address:1202 Eastwood Road City:Wiluting on State:NC Zip:28403 Mailing Address (if applicable):Same as Above City: State: Zip: Phone: (910 ) 313-0795 Fax: (910 ) 313-0797 Email:N/A c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ® Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization:BC & RT. LLC and Raiford G Trask, Jr Trustee Signing Official & Title:Raiford G. Trask, Jr. Manager and Raiford G Trask Jr Trustee b. Contact information for person listed in item 2a above: Street Address:1202 Eastwood Road City:Wilmington State:NC Zip:28403 Mailing Address (if applicable):Same as above City: State: Zip: Phone: (910 ) 313-0795 Fax: (910 ) 313-0797 Email:N/A 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:Norris. Kuske & Tunstall Consulting Engineers Inc Signing Official & Title:Tohn S. Tunstall, P.E. b. Contact information for person listed in item 3a above: Mailing Address:902 Market Street City:Wilmington State:NC Zip:28401 Phone: (910 ) 343-9653 Fax: (910 ) 343-9604 Email•jtunstall@nkteng.com 4. Local jurisdiction for building permits: Onslow County Planning Point of Contact:Angie Manning Phone #: (910 ) 455-3661 PROJECT INFORMATION 1. In the space provided below, bri—fly summarize how the stormwater runoff will be treated. A combination of sand filters and wet detention ponds 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.Identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW —1995 ® Ph II — Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 97.95 acres 5. Total Coastal Wetlands Area: 4.63 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) — Total Coastal Wetlands Area (5) — Total Surface Water Area (6) = Total Project Area+:93.32 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BLIA). Non -coastal wetlands Iandward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 49.01 % 9. How many drainage areas does the project have?16 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drains Area _ Drainage Area _ Drainage Area _ Drainage Area Receiving Stream Name See Attached _ Stream Class * Spreadsheet Stream Index Number * for All Total Drainage Area (sf) On -site Drainage Area (sf) Off -site Drainage Area (sf) Proposed Impervious Area** (sf) % Impervious Area- (total) Impervious' * Surface Area Dr I amage Area _ Drainage Area _ Drainage Area _ Drainage Area On -site Buildings/Lots (sf) On -site Streets (sf) On -site Parking (sf) On -site Sidewalks (sf) : Vo Other on -site (sf) Future (sf) -` Off -site (sef) Existing BUA*** (sf) Total (sf): arredm Ciuss and. index Number can ne aeterminea at: http://hzo.enr.state.nc.us/bhff /re orts/reportsWB html 'F* Im ervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 'Report only that amount of existing BUA that will remain after development. Do not report any existing BLIA that is to be removed and which will be replaced by new BUA. 1( =° O i m _ O _6 5 y LL q S V .J w � O w w M !n I la D O O g O J 76 Cpo p yp m G p00 O O O 2� Jj10 $ o O o ^ ig I J i V yP 4 � b { o o O b A r.� A A i v o) 0 M o V o o A a \ L C � O t N yJ W N b m b o � A $ c i 0 4y n r 0 o r O a N I $ I O i N � O t c �¢ t M N N ccT i 1 N Q o o r b r r r P S C o o b p e o N N N I N . 1R y + .i f C O O M $ g b Xv S ti � O O pM . O S � N to V w � a 3 X r� r ro a � E i 3 S' 7 �cn,• ` � p p � 1 w w v v pc! N l0 W N � � y w it S O O 8 m o e � a L i PS Cy I 1 a u y�ur � � tyit(t y O m O O N � N y ` ��rNr Y y 1 ' 11. How was the off -site impervious area listed above determined? Provide documentation. N/A Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded fromhttp://h2o.enr.state.nc.us/su/bmp forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from htip://h2o.enr.state.nc.us/su/bmp forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.nc.us/su/msi maps htm.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from hft://h2o.enr.state.nc.us/su/bm forms.htm. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed. signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to hM2://www.envl-telp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1h mile of the site boundary, include the viz mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9: Copy of any applicable soils report with the associated SHWT elevations (Please identify _ elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xl l" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit r DWQ to verify the JHWT prior to submittal, (910) 796-7378.) 1 LL( 10. A copy of the most current property deed. Deed book. il Page No: 11. For corporations and limited liability corporations (LLC): rovide documentation' i"roLn the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. hft://www.secretiU.state.nc.us/Con2orations/CSearch.aagx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://h2o.enr.state.nc.us/su/bmp forms.htm#deed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC: DWQ, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer John S. Tunstall, P.E. Consulting Firm: Norris, Kuske & Tunstall Consulting Engineers, Inc. Mailing Address:902 Market Street City:Wilmington State:NC Zip:28401 Phone: (910 ) 343-9653 Fax: (910 ) 343-9604 Email:jtunstall®nkteng.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) Raiford G. Trask, Jr., Manager and Raiford G. Trask, Jr., Trustee , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) RaifLord G. Trask, Jr., Manager and Raiford G. Trask, fr., Trustee with (print or type name of organization listed in Contact Information, item 1b) BC & RT, LLC and Raiford G. Trask, fr., Trustee to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Date: U q- Stateof.%UA County of before me this 10 L day of X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact In)ormation, item 2) Raiford G. Trask, Jr., Manager and Raiford G. Trask, fr., Trustee certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000, SL 2006-246 (Ph. H - Post Construction) or SL 2008-211. Date: 4-01-2, Permit No. 5 t" Tg Cr 9,0 9 t73 (to be provided by DINGI) ARA MCDENR Y"'V W AT�RQG o 6G3 This form must be filled o VT �� ut pririled and submitted. The Required Items Checkfist (Part 111) must be printed, filled out and submitted along with all of the required information. STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT I. PROJECT INFORMATION. Project name Contact person Phone number 910-343-9653 Date 2-Feb-10 Drainage area number #7-12 11. DESIGN INFORMATION Site Characteristics Drainage area Impervious area, post -development % impervious Design rainfall depth Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1yr24hrstorm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1 -yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume 848,684 fe 617,461 f? 72.76 % 1.5 in fe fe 74,769 ft3 12,978 fO 182,934 fP 169,956 ft3 173,247 f? Y (Y or N) TT in 0.20 (unitiess) 0.73 (unitless) 3.96 in/hr OK 15.58 fe/sec 56.32 felsec 40.74 felsec 22.25 fmsl 19.00 fmsl 18.00 fmsl 19.50 fmsl 18.50 fmsl 8.00 fmsl 6.00 fmsl 2.00 It N (Y or N) fmsl South Bridge Subdivision - Phase I John S. Tunstall, P.E. FEB 0 5 2010 BY: Data not needed for calculation option #1, but OK if provided. Data not needed for calculation option #1, but OK if provided. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts 1. & H. Design Summary, Page 1 of 2 Permit No..SW g 69090 3 (to be provided by DWQ) 11. DESIGN INFORINATION Surface Areas Area, temporary pool 60,157 fe Area REQUIRED, permanent pool 44,216 f? SAIDA ratio 5.21 (unrdess) Area PROVIDED, permanent pool, Ap,_,, 44,410 if OK Area, bottom of 1 Oft vegetated shelf, Air w�ff 23,680 W Area, sediment cleanout, top elevation (bottom of pond), Ab. „d 7,989 ft` Volumes Volume, temporary pool 173,247 ft3 OK Volume, permanent pool, V,,._pw 223,697 f13 Volume, forebay (sum of forebays if more than one forebay) 44,766 fe Forebay % of permanent pool volume 20.0% % OK SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vim„„ w Area provided, permanent pool, Ap rm,, d Average depth calculated Average depth used in SAIDA, d. (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Ap m,,�d Area, bottom of 1 Oft vegetated shelf, Ay�l_a df 90 % Y (Y or N) N (Y or N) 5.21 (unitiess) Y (Y or N) 223,697 if 44,410 fe 5.04 ft OK 5.0 it OK N (Y or N) 44,410 fe 23,680 fe Area, sediment cleanout, top elevation (bottom of pond), AbO-p,„ d 7,989 fe "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) 10.50 ft Average depth calculated It Average depth used in SAIDA, d. (Round to nearest 0.5ft) It Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (CD) Driving head (H.) Drawdown through weir? Weir type Coefficient of discharge (CW) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: (Y or N) 4.00 in in' 0.60 (unitless) 1.08 It (Y or N) _ (unitless) (unitless) —ft ft 15.58 ft'Isec 56.32 felsec 0.44 fe/sec 4.51 days "�C�tv Fes 06 OK, draws down in 2-5 days. 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 3.0 :1 OK Y (Y or N) OK 1.8 ft OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Pump Out Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 2 of 2 Permit No..5-W 8 O g 0 g o 3 (to be provided by DWQ) IIII. REQUIRED ITEMS GHEC,KLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan I Is Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROM, Overflow device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. Section view of the wet detention basin (1" 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7.The supporting calculations. 8 A copy of the signed and notarized operation and maintenance (0&M) agreement f ��r P. A copy of the deed restrictions (if required). '_ 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. Countv soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 Permit No. -5Wg 04090'Z (to be provided by DWQJ ATA�qfr O STORMWATER MANAGEMENT PERMIT APPLICATION FORM WDENR 401 CERTIFICATION APPLICATION FORM p INFILTRATION BASIN SUPPLEMENT WJ� b� This form must be idled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along wdh all of the required information. Project Name South Bridge Subdivision - Phase I Contact Person John S. Tunstall, P.E. Phone Number 910-343M53 Date 7-Jul-10 Drainage Area Number #7 - #12 Il DESM INFORMATION Site Characteristics Drainage area 848,684 00 fe Impervious area 617,461.00 fe Percent impervious 0.73 % Design rainfall depth 1.50 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hr discharge Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SA Waters Minimum design volume required Design volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Minimum required volume Volume provided Soils Report Summary Sal type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin length Basin width Bottom Surface Area 3.70 in 3.96 in/hr 15.58 0sec 56.32 felsec 40.74 ft /sec nla fe n/a fe -48i�34:g6.. fta yZrQb3 �r &9 ff3 fe marvyn 1.98 in/hr n/a �fmsl OK for non -SA waters ,Y2,8b3 f+3 ,509 4.17 days OK 3.00 :1 OK IZ50 fmsl 14.75 fmsl 15.00 hsl 85.00 ft 66.00 ft 7,082.00 f? Secnnda+-r +rea men` �RSea( on o�Isctjar5C rcx-k df POl^d - #VALUB RECEIVED JUL 4 8 2010 BY: -- Form SW401-Infiltration Basin-RevA Parts 1. & It. Design Summery, Page 1 of 2 Permit No. s W 8 D 9 0 9 t) 3 (to be provided by DWQ) Additional Information Maximum runoff to each inlet to the basin? nla ac-in Maximum of 2 acre -inches allowed Length of vegetative filter for overflow 50.00 ft OK Distance to structure 15.00 ft OK Distance from surface waters 1,282.00 ft OK Distance from water supply well(s) 100+ ft OK Separation from impervious soil layer nla It OK Naturally occuring soil above shwt n/a ft OK Bottom covered with 44n of clean sand? n (Y or N) OK Proposed drainage easement provided? y (Y or N) OK Capures all runoff at ultimate build -out? y (Y or N) OK Bypass provided for larger storms? y (Y or N) OK Pretreatment device provided wet detention pond CEIVED JUN 2 7 2010 BY: -.-- Form SW401-Infitration Basin-RevA Parts 1. & II. Design Summary, Page 2 of 2 Permit No. SVJ9 0' (0 q p 3 (to be provided by DWG) 10. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Sheet No. DA, C5, C18 1. Plans (1" - 50' or larger) of the entire site showing: C1 - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. C18 2. Partial plan (1" = 3V or larger) and details for the infiltration basin showing: - Bypass structure, - Maintenance access, Basin bottom dimensions, Basin cross-section with benchmark for sediment cleanout, Flow distribution detail for inflow, Vegetated filter, and Pretreatment device. C18 3. Section view of the infiltration basin (1" 20' or larger) showing: Pretreatment and treatment areas, and - Inlet and outlet structures. Calcs 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. N/A 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils inyesti9a ion re uest form. Cqun oil maps are not an acce le urce of soils information. US D YG� t5 ll�sed Se-0 ride, i i o. N/A 6. A construction sequence that sho how the infitiratio asin ill be protected from sediment until e entire drainage area is stabilized. Calcs 7. The supportingcalculations. S 0&M 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. Submitted 9. A copy of the deed restrictions (if required). 77 I N q 9 D Form SW401-Infiltration Basin-Rev.4 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1 Permit No. SW9 090903 (to be provided by DWG) ����4#/� 17) q�oF W a r,F,9p� NCDENR r o STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name South Bridge Subdivision - Phase I Contact person John S. Tunstall, P.E. Phone number 910 343 9557 Date 2-Feb-10 Drainage area number 13A & 13B IL DESIGN INFORMATION Site Characteristics Drainage area 623,896 fe Impervious area, post -development 499,117 le % impervious 80.00 % Design rainfall depth 1.5 in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr stone peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1 -yr, 24-hrstorm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the peen. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment deanout, bottom elevation Sediment storage provided Is there additional volume stored above the staLe-required temp. pool? Elevation of the top of the additional volume fe ft3 60,050 ft 9,541 fe 146,921 fe 137,380 fe 139,174 fO Y (Y or N) 3.7 in 0.20 (unitiess) 0.79 (unitiess) 3.96 inlhr OK 11.46 ec 44.81 ielsec 33.35 g9/sec 21.75 fmsl 18.00 fmsl 18.00 fmsl 18.50 fmsl 17.50 fmsl 4.00 fmsl 2.00 fmsl 2.00 ft N (Y or N) fmsl �eE ay FFe ° 5201� Data not needed for calculation option #1, but OK If provided. Data not needed for calculation option #1, but OK if provided. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 1 of 2 Permit No._5 W 8 n!j 0 go 3 (to be provided by DWQ) II: DESIGN INFORMATION Surface Areas Area, temporary pool 43,274 f? Area REQUIRED, permanent pool 28,699 ft? SAIDA ratio 4 Area PROVIDED, permanent pool, Awm_pw Area, bottom of 1 Oft vegetated shelf, A� ,han Area, sediment cleanout, top elevation (bottom of pond), Ay,,_p,„ d Volumes Volume, temporary pool Volume, permanent pool, Vwm_pw Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, VPm,,d Area provided, permanent pool, A,,,,yw Average depth calculated Average depth used in SAIDA, de,,, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Ap „_,d Area, bottom of 1Oft vegetated shelf, Aw helr Area, sediment cleanout, top elevation (bottom of pond), kIj�nd "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) Average depth calculated Average depth used in SAIDA, d. (Round to nearest 0.510) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (CD) Driving head (Hj Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of ilowpath to width ratio Length to width ratio Trash rack for overflow, & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: .60 (unitiess) 29,276 ft OK 16,854 ft1 1,661 ft 139,174 fO OK 168,943 f0 34,863 ft" 20.6% % OK 90 % Y (Y or N) N (Y or N) 4.60 (unitiess) Y (Y or N) 168,943 fe 29,276 ft` 5.77 It OK 6.0 It OK N (Y or N) 29,276 e 16,854 f? 1,661 fe 13.50 ft Tt It Y (Y or N) 4.00 in in 0.60 (unitiess) 1.25 It N (Y or N) (unitiess) (unitiess) ft It 11.46 fe/sec 44.81 fP/sec 0.47 felsec 3.40 days OK, draws down in 2-5 days. 3 :1 OK 10 :1 OK 10.0 It OK 3 :1 OK 3.0 :1 OK Y (Y or N) OK 2.3 It OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Pump Out Forth SW401-Wet Detention Basin-Rev.e-9/17/09 Parts I. & If. Design Summary, Page 2 of 2 Permit No._ SW 8 6q0l d? (to be provided by DWQ) Ill. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been inet. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. M— W LE Pagel Plan he No. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainaae basins (inrludP Rational C coefficient per basin), - Basin dimensions, Pretreatment system, High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. 3. Section view of the wet detention basin (1" - 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. A copy of the signed and notarized operation and maintenance (0&M) agreement. �t A copy of the deed restrictions (if required). r1U�f t . A soils report that is based uporr an actual field investigation, soil borings, and infiltration tests. soil maps are not an acceptable source of soils information. County Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 Permit No. SW? b c10903 (fo be provided by DWQ) ��F W n TF9 a O STORMWATER MANAGEMENT PERMIT APPLICATION FORM o NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. L PROJECT INFORMATION Project Name South Bridge Subdivision - Phase I Contact Person Jahn S. Tunstall, P.E. Phone Number 910-343-9653 Date 18Jun-10 Drainage Area Number 13A & 138 n. IDEMN INFORMATION Site Characteristics Drainage area 623,896.00 f? Impervious area 499,117.00 fe Percent impervious 0.80 % Design rainfall depth 1.50 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hr discharge Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SA Waters Minimum design volume required Design volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Minimum required volume Volume provided Solis Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin length Basin width Bottom Surface Area 3.70 in 3.96 in/hr 11.46 fe/sec 44.81 ft3/sec 33.35 fe/sec n/a 1? nla fe ^69669a ft3 --9,544 0 fe fe /�f, t'rv88 fe —;4;688:8E}— ft leon 1.98 in/hr nla fmsl 3.40 days 3.00 :1 11.00 fmsl 14.75 fmsl . 43,"6.60- fe 15.00 fmsl 141.00 ft 55.00 ft 9,058.00 fe OK for non -SA waters 19, W4 4'1 -,*' ' a N@W to previde additional volume Dnd�� OK OK #VALUE RECEIVED JUN 2 2 2010 BY. Forth SW401-Infiltration Basin-Rev.4 Parts I. & H. Design Summary, Page 1 of 2 Permit No. 'e-W O 0909,03 Additional Information (to be provided by DWQ) Maximum runoff to each inlet to the basin? n/a ac-in Maximum of 2 acre -inches allowed Length of vegetative filter for overflow WA ft OK Distance to structure 15.00 ft OK Distance from surface waters 1,400.00 ft OK Distance from water supply well(s) 100+ ft OK Separation from impervious soil layer n/a ft OK Naturally occuring soil above shwt n/a ft OK Bottom covered with 4-in of dean sand? n (Y or N) OK Proposed drainage easement provided? y (Y or N) OK Capures all runoff at ultimate build -out? y (Y or N) OK Bypass provided for larger storms? y (Y or-N) OK Pretreatment device provided wet detention pond RECEIVED JUN 2 2 2010 BY. Form SW401-InfilVation Basin-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 Permit No..5-14 $ Q a Q g Q z (to be provided by DWQ) Ili. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Ini ' Is Sheet No. �50, 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. Partial plan 0" = 3V or larger) and details for the infiltration basin showing: - Bypass structure, Maintenance access, Basin bottom dimensions, - Basin cross-section with benchmark for sediment cleanout, - Flow distribution detail for inflow, - Vegetated filter, and - Pretreatment device. 3. Section view of the infiltration basin (1" 20' or larger) showing: - Pretreatment and treatment areas, and - Inlet and outlet structures. 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils inve1s'ti�ti n reque form. County, soil aps are not arrk� acceptable soils information. l� VCL11k s Its 11 SEt.A1`�G1G,1'I, i h '� ; OY1 6. A construction sequence that shows oiv e I tlration basira�will be'Trotected from sediment until the entire drainage area is stabilized. ntWt 1 A S�J1�J S�, ((,Q �,� �51 (�y�. Uy�W 7. The supporting calculations. J 1�n 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). DECEIVED JUN 2 2 2010 BY: Form 5W401-Infiltration Basin-Rev.4 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1 Permit No. _5w 10 6( b T 0 3 (to be provided by DW(,1) WT #o%3 ��� o��F W ATFgQG NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. It ., , : . .. Project name South Bridge Subdivision - Phase I Contact person John S. Tunstall, P.E. Phone number 910-343-9653 Date 9/1/2009 (Revised 11-10-09) Drainage area number 14 1L RESIGN INIFOlil ATt I Site Characteristics Drainage area 806,367 fe Impervious area, post -development 548,957 fe % impervious 68.08 % Design rainfall depth 1.5 in Storage Volume: Non4A Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prelpost control of the 1 yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1 -yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the pens. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment cieanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool" Elevation of the top of the additional volume 67,805 fe 74,093 fO ft f? fe 0 if f? OK OK, volume provided is equal to or in excess of volume required. Y (Y or N) 3.7 in 0.20 (unitless) 0.69 (unitless) 3.96 in/hr OK 14.95 felsec 50.92 If/sec 35.97 fe/sec 35.75 fmsl 34.00 fmsl 34.00 fmsl 34.50 fmsl 33.50 fmsl 20.00 fmsl 18.00 fmsl 2.00 ft N (Y or N) fmsl Data not needed for calculation option #1, but OK if provided. Data not needed for calculation option #1, but OK if provided. Form SW401-Wet Detention Basin-Rev.74W3/09 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DVIRy li. DESWINFORMATION Surface Areas Area, temporary pool 46,927 if Area REQUIRED, permanent pool 35,319 fe SAIDA ratio 4.38 (unifless) Area PROVIDED, permanent pool, Ar,,,,,, 35,776 a OK Area, bottom of 1Oft vegetated shelf, AboL hw 20,248 tY Area, sediment cleanout, top elevation (bottom of pond), Ab,il„d 116 99 fti volumes Volume, temporary pool 74,093 if Volume, permanent pool, Vp,,,,_pw 199,394 fe Volume, forebay (sum of forebays if more than one forebay) 40,710 ft Forebay % of permanent pool volume 20.4% % SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, VP„„ w Area provided, permanent pool, Ap,,_,d Average depth calculated Average depth used in SAIDA, d,,,, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Ap,,_p01 Area. bottom of 1 Oft vegetated shelf, Ab,t_sh m Area, sediment cleanout, top elevation (bottom of pond), Ab.Lp w "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) Average depth calculated Average depth used in SAIDA, d,,, (Round to nearest 0.51t) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-iroular) Coefficient of discharge (CD) Driving head (H,) Drawdown through weir? Weir type Coefficient of discharge (C„) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies 90 % Y (Y or N) N (Y or N) 4.38 (unifless) Y (Y or N) 199,394 fe 35,776 ft` 5.57 ft 5.5 ft N (Y or N) ft fe ft ft ft ft Y (Y or N) 4.00 in in' 0.60 (unifless) 0.58 It N (Y or N) (unifless) (unifless) ft ft 14.95 fe/sec 50.92 fe/sec 0.33 fe/sec 2.42 days OK OK OK OK Check calculation. Need 3 ft min. Insufficient. Check calculation. OK OK OK, draws down in 2-5 days. OK, drawdown time is correct. 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 3.0 :1 OK Y (Y or N) OK 3.3 ft OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK pump out Forth SW401-Wet Detention Basin-Rev.7-8H3/09 Parts 1. & H. Design Summary, Page 2 of 2 Permit No. (to be provided by DIMQ) HI. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the foiiowing design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. -M_ 1. Plans 0" - 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, - Pretreatment system, High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROM, - Overflow device, and - Boundaries of drainage easement. 2. Partial plan (1" = 3V or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. _ 3. Section view of the wet detention basin (1" 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. _ 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, ^ to verify volume provided. 0 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. _CAW 7. The supporting calculations. ✓ 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). _ 10. A soils report that is based upon an actual field investigation, sal borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.7-8/13/09 Part III. Required Items Checklist, Page 1 of 1 Hiah Density Residential Subdivisions Deed Restrictions & Protective Covenances NKT #07063 In accordance with Title 15 NCAC 21-1.1000 and S.L. 2006-246, the Stormwater Management Regulations, deed restrictions and protective covenants are required for High Density ResidentiafSubdivisions where lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the design criteria used to size the stormwater control facility. I, Raiford G. Trask Jr., acknowledge, affirm and agree by my signature below, that I will cause the following deed restrictions and covenants td be recorded prior to the sale of any lot: 1. 2. 3. 4. 5. 6. 7. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW6 090903 as issued by the Division of Water Quality under the Stormwater Management Regu a roes. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. These covenants are to run with the land and be binding on all persons and parties claiming under them. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. The maximum built -upon area per lot, in square feet, is as listed below. • See Attached Chart Lot # BUA Lot # BUA Lot # BUA Lot # BUA This allotted amount includes any built -upon area constructed within the lot properly boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not united to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. Each lot will maintain a 30** foot wide vegetated buffer between all impervious areas and surface waters. **50 foot for projects located in the 20 coastal counties. a. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them into a component of the stormwater collection system. Lots that will naturally drain into the system are not required to provide these additional measures. ii I ll►.�►�►1��'�i��► - • 1tll 1 14 Coun of before me this the O 3 J day of the due a ecution of the foregoing instrument. Witness Signature My Commission expires Form DRPC-3 Rev.2 05Nov2009 Page 1 of 1 Notary Public in the my o 0 o �� i.l B OCJ m� •..v...•••°'GO NovE� o�.�*`• s,,slol1ll11AlA6114= appeared and acknowledge -5 � South Bridge Subdivision Lot Allotments February 23, 2010 NKT Project No. 07063 Lot # Lot BUA (SF) Lot # Lot BUA (SF) 1 2,582 35 3,555 2 2,835 36 2,620 3 2,932 37 3,032 4 2,994 38 3,280 5 3,086 39 3,630 6 2,835 40 3,533 7 2,932 41 3,280 8 2,582 42 3,280 9 3,086 43 4,139 10 2,835 44 4,077 11 3,023 45 3,807 12 3,115 46 4,157 13 2,611 47 4,219 14 2,865 48 4,311 15 2,962 49 4,157 16 3,024 50 3,727 17 2,582 51 3,980 18 3,086 52 6,135.82 19 2,994 53 3,692 20 2,932 54 3,630 21 2,835 55 3,533 22 2,582 56 3,280 23 2,582 57 3,784 24 2,932 58 3,702.61 25 2,994 59 2,970 26 3,086 60 2,873 27 3,652 61 2,622.73 28 3,302 62 2,800 29 2,582 63 2,800 30 3,593.50 64 2,800 31 3,690 65 2,800 32 3,798 66 2,800 33 3,752 67 2,800 34 1 4,248 68 2,800 JST/jkb/asn 07063 02-23-10-s-sw-lot bua-deed restriction attachment Pusey, Steven From: Pusey, Steven Sent: Friday, September 03, 2010 11:00 AM To: 'Jody Bland' Cc: 'John Tunstall'; anorris@nkteng.com Subject: RE: Sand filters - South Bridge Jody, Thanks for the explanation. We will use your Hydrocad values for the sand filter storage volume in the permit. Regards, Steye�user, Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven.Pusey@ncdenr.gov E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. From: Jody Bland [mailto:jbland@nkteng.com] Sent: Friday, September 03, 2010 10:15 AM To: Pusey, Steven Cc: 'John Tunstall'; anorris@nkteng.com Subject: RE: Sand filters - South Bridge It's basically a function of the additional volume gained from having a basin instead of a "box type" filter. We are picking up additional volume from the area of the side slopes on a 3:1. Also the additional volume prevents overtopping during a catastrophic event (hurricane) and allows flow out of the emergency spillway in a controlled manner. Its cheaper to slightly upsize the sand filters now than to go repair/replace them if they blowout and it limits/ eliminates any impacts associated with failure to the wetlands below. During design we have been very mindful about all the wetlands throughout the property and have attempted to protect them at all costs. John and I had ran the sand filters at a smaller size but modeling them in larger storm events identified some potential problems and the decision was made to adjust the sizing accordingly to remove the failure from the models. Everything is bypassing through the bypass box but with larger storms there is a lag/ backup in the models so the filters were sized accordingly to account for the lag' and prevent the failure mentioned above. Let me know if you need anything else. Thanks, Jody Bland Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. From: Pusey, Steven [mailto:steven.pusey@ncdenr.gov] Sent: Friday, September 03, 2010 9:33 AM To: Jody Bland Cc: John Tunstall Subject: Sand filters - South Bridge Importance: High One more thing. There is some confusion over the storage volume in the sand filters. The supplements list the following adjusted WQV for the sand filters: SF 1: 12,414 SF2: 4,046 SF3: 17,351 SF4: 8,939 SF5: 5,918 SF6A: 9,796 SF6B: 10,850 The adjusted WQV is defined as the volume that must be contained between the sediment chamber and the sand filter (above the sand). The storage volumes stated in your Hydrocad calculations are as follows: SF 1: 14,701 SF2: 7,685 SF3: 21,959 SF4: 15,402 SF5: 9,500 S F6A: 14,141 SF613: 17,303 Are these values supposed to be equal (or close) to the adjusted WQV? Why are they so much higher than the supplement values? Please explain. Thanks, Steve_Puse� Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven.Pusev@ncdenr.gov E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. Pusey, Steven From: Jody Bland Obland@nkteng.com] Sent: Friday, September 03, 2010 8:08 AM To: Pusey, Steven Cc: 'John Tunstall' Subject: RE: South Bridge Subdivision Yes, The total provided V @ elev 14.75' = 62517CF We've been through this thing on effective infiltration. Whatwas agreed upon was for us to provide the 50' VFS outside of the wetlands for all areas of effective infiltration and you guys would concur that this was effectively infiltrating. Remember you guys had to go to Raleigh to get an answer. Since there were questions of what was considered "effective infiltration" and questions regarding the vegetated buffer and what could and couldn't be counted inside the wetland areas because of the statement in the new rules regarding buffers that; they may contain in whole or part wetlands etc......... Finally, each filter is to be grassed (value identified for Manning's Equation) and the slopes (ft/ft) are all identified in the calcs in the vegetated filter strip worksheet Thanks, Jody Bland N'0RRiS. KusKE,,,TUNSTALL C:cr:suci+r:� Svc+rv��r�,. Inc. Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. From: Pusey, Steven [mailto:steven.pusey@ncdenr.gov] Sent: Thursday, September 02, 2010 3:23 PM To: Jody Bland Cc: John Tunstall; Johnson, Kelly Subject: South Bridge Subdivision Importance: High Jody, in the final review, it was noticed that you may have provided the required volume instead of the provided volume on the supplement. I have the volumes as follows: Infiltration basins 7-12: Req. volume = 42,863 cf 13A/B: Req. volume=14,688 cf Total Req. volume = 57,551 cf I have allocated the provided volume as follows, based on overflow from infil. Basin 7-12 flowing to Basin 13A/B: 7-12: 42,863 = req. volume 13A/B: 19,654 = remaining volume Total volume = 62,517 cf Please confirm these amounts are correct. Furthermore, I need a statement regarding effective infiltration for the vegetated filters. For this project, the filters have to meet the following criteria in the BMP Manual: 1. Soil type for infiltration 2. Vegetated cover 3. Slope of the vegetated buffer Regards, Steye�use� Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven.Pusev@ncdenr.gov E-mail correspondence to and from this address maybe subject to the NC Public Records Law and maybe disclosed to third parties. tI,,"e,le- 5&"-1- South Bridge Subdivision Lot Allotments 23-Feb-10 Lot # Lot BUA s Lot # Lot BUA sf 1 2,582 35 3,555 2 2,835 36 2,620 3 2,932 37 3,032 4 2,994 38 3,280 5 3,086 39 3,630 6 2,835 40 3,533 7 2,932 41 3,280 8 2,582 42 3,280 9 3,086 43 4,139 10 2,835 44 4,077 11 3,023 45 3,807 12 3,115 46 4,157 13 2,611 47 4,219 14 2,865 48 4,311 15 2,962 49 4,157 16 3,024 50 3,727 17 2,582 51 3,980 18 3,086 52 6,135.82 19 2,994 53 3,692 20 2,932 54 3,630 21 2,835 55 3,533 22 2,582 56 3,280 23 2,582 57 3,784 24 2,932 58 3,702.61 25 2,994 59 2,970 26 3,086 60 2,873 27 3,652 61 2,622.73 28 3,302 62 2,800 29 2,582 63 2,800 30 3,593.50 64 2,800 31 3,690 65 2,800 32 3,798 66 2,800 33 3,752 67 2,800 34 4,248 68 2,800 103,522 118,607 222,129 Total BUA Pusey, Steven From: Pusey, Steven Sent: Wednesday, September 01, 2010 5:13 PM To: 'Jody Bland' Cc: 'John Tunstall' Subject: RE: South Bridge - BUA Allotment OK. It does give the lots a safety factor. If someone needs to add some square footage later, they would just have to modify the deed restrictions and send us a copy so that we can verify that it still falls under the permit limits. Ster�e�useaf Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. Pusey aOncdenr.gov E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. From: Jody Bland [mailto:jbland@nkteng.com] Sent: Wednesday. September 01, 2010 4:24 PM To: Pusey, Steven Cc: 'John Tunstall' Subject: RE: South Bridge BUA Allotment Steve I think that it will be fine The deed restriction values total to 1228 less than the design values which equates to 18sf/ lot difference. At this point I say let it ride and that is just a conservative measure to help prevent the builders from exceeding their impervious allotments for the homesites Thanks, Jody Bland NORRIS, KUS#E &1 UN'STAL �.flri�t.4.ttyCe t=w�!N��Fya, itil,'. Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. From: Pusey, Steven[mallto:steven.pusey@ncdenr.gov] Sent: Wednesday, September 01, 2010 4:05 PM To: Jody Bland Subject: South Bridge - BUA Allotment Importance: High Jody, It appears that the Total BUA for the buildings (homesite allotment) is 223,357 sf according to the DA / BUA Summary for DA 1— 66. However, the deed restriction allotments add up to a total of 222,129 sf. Please advise if this is correct or if I need to make some changes. Thanks, Ster�e�user, Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. PusevCOncdenr.eov E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. NORRIS, KUSKE & TUNSTALL REC'D SEP 1 2010J. Phillip Norris, P.E. John S. Tunstall, P.E. John A. Kuske, lll, P.E. CONSULTING ENGINEERS, INC. James T. Pyrtle, P.E. J.A. Kuske, P.E. 902 Market Street • Wilmington, NC 28401-4733 • Phone (910) 343-9653 • Fax (910) 343-9604 E-Mail: office@nkteng.com LETTER OF TRANSMITTAL To: Steve Pusey Date: September 1, 2010 I Job No. 07063 NC DENR - Wilmington subject: South Bridge Subdivision Sneads Ferry, NC State SW No. SW8 090903 WE ARE SENDING YOU VIA HAND DELIVER ® ATTACHED ❑ UNDER SEPARATE COVER ❑ SHOP DRAWINGS ® PRINTS ❑ TRACINGS ❑ SPECIFICATIONS ❑ DISKS ❑ COPY OF LETTER ❑ FAX TRANSMITTAL: NUMBER OF PAGES INCLUDING THIS TRANSMITTAL Call 910-343-9653 if you have any difficulty receiving this message. COPIES DATE NO. DESCRIPTION 2 08-31-10 REV C2 - Grading & Drainage Plan 2 08-25-10 REV C17 - Sand Filter Details 2 08-25-10 REV C18 - Sand Filter Details 2 08-25-10 REV C19 - Sand Filter Details 1 08-31-10 Additional Calculations 1 08-31-10 Revised Sand Filter Supplements (#1-#5, #6A & #613) ❑ AS REQUESTED ❑ FOR YOUR USE ❑ FOR REVIEW AND COMMENT ❑ FOR APPROVAL ❑ FORBIDS DUE ❑ YOUR PRINTS LOANED TO US REMARKS: Per your comments. Please feel free to contact us if you need any additional information. Thank you. CC: SIGNED John S. Tunstall, P.E. f asn CONFIDENTIAL AND PRIVILEGED: Information contained in this document is privileged and confidential, intended for the sole use of the addressee. If you are not the addressee or the person responsible for delivering it to the addressee you are hereby .notified that any dissemination, distribution or copying of this document is strictly prohibited. If you have received this document in error please immediately notify the sender and return to the address above. Date Design KUSKE&TUNSTALL Wilmington, NC CONSULTING ENGINEERS, INC. Brunswick County, NC =SheetNORRIS, Check Job � For Job No. 81M�13 N 1%14 �IS`� �i2.• -F-,�S6- . r 17 ' As56V '�N t�•,�,' h►�2 , L,T � t �, Qt3bv S F� W T 4_Lt:2 �C I LTW-tZ.. v4 7. A4--j-r 55a4ZAC-- s�rg �l� w s" -I VPL29rn *,� Pf:� hr9, L, dPv&2, L+t-LSa, ZL�q r-y s k o I / tv!S-y!I 5,4, \AVBLStA£ d/er fG� 4 ,1 r'1 -302W so, Z"q 195It. s!:�-r3 �g3-7,5 # �tC715,6 1 �w-r- t'L- �!'�- �.► rL. Flo ���-tbM eLLA r� _ lea,. Grp 7, 4r`l- 5'�1 �-) = " I5%�,2'?J, � ��674;Z:�x/3o/Gt`'� J88 9ic9 �- Date Design NORRIS, KUSKE &TUNSTALL Wilmington, NC Sheet CONSULTING ENGINEERS, INC. Brunswick County, NC Cf Check Job For Job No. 74 ,�:/-Z-A�1*/'14 5 4r4e-.1 '►��. C� �1 t. a�.►�4:- l� n�' !�: �,•� fie.,. '�wt,r� �.. %try ti "1 Date Design FJb NORRIS KUSKE &TUNSTALL Wilmington, NCCONSIJLTmG E.4mNEERS, INC. . BrunswickCbunty NCi.,mill NIP Check Jain For ,, ` Dt grtA, Wllmin ton, NC he ' NORRIS, KUSKE &TUNSTALL 9 CONSULTING ENGINEERS. [KC. Brunswlck County NC: / Of Gtteok Jobs' Fore f Gv i Z Job No.. Vi e c:- SQL �� LAAeu- = � ' rtS 44/,:::tc SSA*- n LT6yt- ~ Sot L - GC sts) r�Cr) vu—o) 41P L4415 tc,x 12- .3 2,5lolo, eQ otS nlF SA*jj L.'tjA- ca,IC a rj 14 wT famT A c� S trt 5 - t.t,ngra< v tr► 4,14 C r•-t gut.) -to • 33 ' (Stfw7` �1= (e�tz"5). 64- 1i21S®n ............. LO '1Z ik 330, tom} 2;t�5 �'�'� 2151, V72,5 2� t. 7 W4,64 016), 44,Z,2 004-10 C Fr v C LA-r 17- W6ijj'' O�et-- C.+Mom- = 7W)[ 005,4 Pusey, Steven From: Pusey, Steven Sent: Tuesday, August 31, 2610 11:50 AM To: 'Jody Bland' Cc: 'John Tunstall' Subject: RE: Southbridge SW permit Importance: High Jody, The BMP manual states that a closed sand filter must have a 1' space between the bottom of sand and the SHWT. Therefore, you will need to submit anti -flotation calculations for ponds that exceed a positive SHWT difference of 6" We are giving you a -6" tolerance adjustment. Per my calculations, the following sand filters are affected: SF # 1: SHWT = 0.17' above bottom SF # 3: SHWT = 3.33' above bottom SF # 5: SHWT = 0.34' below bottom (needs to be at least 0.5' below bottom) * There is some confusion on this one as the drawing shows 7.16' bottom elevation, but the Hydrocad calculations show the bottom at 6.67'. 1 used the 6.67' value. Please advise. ��rG s 2R�v'(• . Other issues that need to be resolved are as follows: Sand filter supplements need to be revised as necessary. In particular, the separation from SHWT values have changed. Please use the bottom of the sand when calculating separation distance. /2. On SF #3, Hmax on drawing = 2'. Data shows 3' on Supplement. �3. On SF #6A, baffle wall elevation on drawing = 12.75'. Hydrocad data shows 14.1' elevation. r/4. Please add a note to the plans that the impervious liner material for the closed sand filters must have a certified hydraulic conductivity less than 1 x 10-6 cm/s. Please don't hesitate to call if you have any questions. Regards, StetleIPuser, Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. PuseyaOncdenr.gov E-mail correspondence to and from this address maybe subject to the NC Public Records Law and maybe disclosed to third parties. From: Jody Bland [maiito:jbland@nkteng.com] Sent: Tuesday, August 31, 2010 10:00 AM To: Pusey, Steven Cc: 'John Tunstall' Subject: RE: Southbridge SW permit Steve, We have had several discussions regarding the SHWT and the sand filters. Based on those conversations we raised several filters and the few that couldn't be raised had a liner installed. Those with the liners create a closed basin. This was all handled very early on in this process. Thanks, Jody Bland rvoi��rs, tcue�e �ruNs�A�>, C+�hE�LFLT7NG �11GIN��R5, I/aG. Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. From: Pusey, Steven[mailto:steven.pusey@ncdenr.gov] Sent: Tuesday, August 31, 2010 9:49 AM To: John Tunstall; Jody Bland Subject: RE: Southbridge SW permit John, I have run into a snag with the depth of the sand filters vs. the SHWT. I think we had discussed this before but don't have any notes on it. Wasn't this resolved a long time ago? Have the design changed since we discussed it? Please advise. .Steve-rrlserf Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. Pusey(&ncdenr.gov E-mail correspondence to and from this address maybe subject to the NC Public Records Law and maybe disclosed to third parties. From: John Tunstall [mailto:jtunstall@nkteng.com] Sent: Tuesday, August 31, 2010 9:25 AM To: Pusey, Steven Cc: 'Amy Norris' Subject: Southbridge SW permit Steve Please let me know the status of the stormwater permit for the reference project. Thanks John S. Tunstall, P.E. Norris, Kuske & Tunstall Consulting Engineers, Inc. N R ! AUG 2 6 20�8 = . . NORIMS, KUSKE & TUNSTALL J. Phillip Norris, P.E. John S. Tunstall, P.E. CONSULTING ENGINEERS, INC. James T. Pyrte, P.E. John J.A. Kuske, P.E. 902 Market Street • Wilmington, NC 28401-4733 a Phone (910) 343-9653 a Fax (910) 343-9604 E-Mail: office@nkteng.com LFTTFR OF TI2AN MITTAI To: Steve Pusey Date: August 26, 2010 Job No. 07063 NC DENR - Wilmington subject: South Bridge Subdivision Sneads Ferry, NC State SW No. SW8 090903 WE ARE SENDING YOU VIA HAND DELIVER ® ATTACHED ❑ UNDER SEPARATE COVER ❑ SHOP DRAWINGS ® PRINTS ❑ TRACINGS ❑ SPECIFICATIONS ❑ DISKS ❑ COPY OF LETTER ❑ FAX TRANSMITTAL: NUMBER OF PAGES INCLUDING THIS TRANSMITTAL Call 910-343-9653 If you have any difficulty receiving this message. COPIES DATE NO. DESCRIPTION 2 08-25-10 REV C1 - Grading & Drainage Plan 2 08-25-10 REV C2 - Grading & Drainage Plan 2 08-25-10 REV C17 - Sand Filter Details 2 08-25-10 REV C18 - Sand Filter Details 2 08-25-10 REV C19 - Sand Filter Details 2 08-25-10 REV C20 - Sand Filter Details 1 10-25-10 Revised Calculations ❑ AS REQUESTED ❑ FOR YOUR USE ❑ FOR REVIEW AND COMMENT ❑ FOR APPROVAL ❑ FORBIDS DUE ❑ YOUR PRINTS LOANED TO US REMARKS: Per your e-mail comments of August 19, 2010. Please feel free to contact us if you need any additional information. Thank you. CC: SIGNED. John S. Tunstall, P.E. / asn CONFIDENTIAL AND PRIVILEGED: Information contained in this document is privileged and confidential, intended for the sole use of the addressee. If you are not the addressee or the person responsible for delivering it to the addressee you are hereby notified that any dissemination, distribution or copying of this document is strictly prohibited. If you have received this document in error please immediately notify the sender and return to the address above. STORMWATER CALCULATIONS SOUTH BRIDGE SUBDIVISION (PHASE 1) Sneads Ferry, North Carolina For BC & RT, LLC and Raiford G. Trask, Jr., Trustee 1202 Eastwood Road Wilmington, NC 28403 (910) 313-0795 Revised August 2010 September 2009 Prepared by: NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 (Fax) NKT Project No. 07063 Pusey, Steven From: Pusey, Steven Sent: Tuesday, August 24, 2010 10:04 AM To: 'Jody Bland' Subject: Vegetated filter strip - velocity limitation Jody, Please use 4 ft/s as the max. velocity for the vegetated filter strip areas. In other words, the level spreader must slow the velocity down to 4 ft/s going into the filter strip with a maximum slope of 5%. This is assuming that your filter strip is established grass. Reference Section 13.3.5 and 13.3.7 from old BMP manual filter strip chapter. Please let me know if you have any problem areas. Regards, Stetle_Ir-Wey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection-Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven.Pusey@ncdenr.eov E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. Pusey, Steven From. Pusey, Steven Sent: Friday, August 20, 2010 9:32 AM To: 'Jody Bland' Cc: 'John Tunstall' Subject: RE: South Bridge I will check on the rule for the 13 If/cfs and get back with you. The <2 ft/s applies to flow into wetlands. This would definitely be non -erosive for an engineered vegetative filter. How much effect does the perforated pipe have on slowing down the velocity? Steve _PU_"_T Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. Pusey(&ncdenr.gov E-mail correspondence to and from this address may be subject to the NC Public Records Low and may be disclosed to third parties. From: Jody Bland [mailto:j bland@ nkteng.com] Sent: Friday. Auaust 20. 2010 9:22 AM To: Pusey, Steven Cc: 'John Tunstall' Subject: RE: South Bridge Good morning I am currently looking into this So although I am showing that the flows through the VFS are <2fUs they would still be required to meet the 131f/cfs to meet effective infiltration I see what you mentioned on SF# 5 & I will be correcting this for the 1 yr storm Thanks, Jody Bland a NORRIS. KUSKE. 7,TUNSTALL C'S7^1:xLa.P t« vr, '4- ;. INC Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. From: Pusey, Steven[mailto:steven.pusey@ncdenr.gov] Sent: Friday, August 20, 2010 9:11 AM To: Jody Bland Cc: 'John Tunstall' Subject: RE: South Bridge Thanks for the info. If you need to make the vegetated filters wider because of the 13 If/cfs rule, this would require a change to the drawings only. However, we will need a vegetated filter strip supplement for each one. Regards, .5441elftrser, Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven.Pusey@ncdenr.ao_v. E-mail correspondence to and from this address maybe subject to the NC Public Records Law and maybe disclosed to third parties. From: Jody Bland [mailto:jbland@nkteng.com] Sent: Thursday, August 19, 2010 5:42 PM To: Pusey, Steven Cc: 'John Tunstall' Subject: RE: South Bridge Nothing has changed on SF#s 2,4,5, & 6A. We merely separated out the flows from the under drains and the bypass structure into 2 separate VFS. The under drain flows all remain outside of the wetlands for effective infiltration purposes and the bypass structures use the scour holes. This required no change in the HydroCadd talcs for this to be accomplished. The flow master VFS worksheet was solved for the under drains only. The scour holes were designed per the BMP guidance verifying that we indeed meet the cfs requirement for the specified pipe size. An adjustment to the bypass pipe size was made (as mentioned below) for SF#s 1, 3, & 61B thus requiring that the HydroCadd model to be updated for those basins. OK I will take a look @ the 13 If/cfs requirement. Thanks, Jody Bland 'L'ORAIS. KUSK€ k.11UNSTALL Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. From: Pusey, Steven [mailto:steven.pusey@ncdenr.gov] Sent: Thursday, August 19, 2010 5:30 PM To: Jody Bland Cc: 'John Tunstall' Subject: RE: South Bridge From the review, it appears that sand filters 2, 4, 5, & 6A still have the same calculations in Hydrocad. I was wondering why those did not change, whereas sand filters 1, 3, and 613 did change. Concerning the sand filter underdrain vegetated filter strips, remember that they should be designed for 13 ft. / cfs flow rate for effective infiltration. Please advise. Regards, Ster�e�iste� Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. Pusey(a)ncdenr.gov E-mail correspondence to and from this address maybe subject to the NC Public Records Low and maybe disclosed to third parties. From: Jody Bland [mailto:jbland@nkteng.com] Sent: Thursday, August 19, 2010 4:27 PM To: Pusey, Steven Cc: 'John Tunstall' Subject: RE: South Bridge Hi Steve, All of the sand filter vegetated filter strip caics were revised to reflect the removal of the by-pass flow from the VFS. The discharge volume for the VFS is only what is identified as being received from the underdrains themselves. A couple of the bypass pipes were sized as 24" pipes but this is not allowable per the old BMP guidance for scour holes... max 18" pipe... therefore a couple of the pipes sizes were reduced to 2-15" pipes. I have permitted several scour holes like that in the past. The discharge is below 6 cfs for each pipe. wasn't aware that SF#5 is discharging as you say. I will look into this one. Thanks, Jody Bland ht RRIS. KL'SKE.&TUNSTALL Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. From: Pusey, Steven[mailto:steven.pusey@ncdenr.gov] Sent: Thursday, August 19, 2010 4:10 PM To: Bland, Jody Cc: Tunstall, John Subject: South Bridge Jody, I have some questions about the revised calculations on the South Bridge project. Why have some calculations been revised but others not? Also, sand filter #5 appears to be discharging through the emergency overflow and bypass scour hole during a 1-yr, 24-hr storm event. This doesn't seem right. Do you need to recalculate that? Please advise or give me a call to discuss. Thanks, Si 1, _Ir_userJ- Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. PuspLK ncdenr.eov E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. NORRIS, KUSKE TU NSTALL CONSULTING ENGINEERS, INC. August 11, 2010 Mr. Steve G. Pusey, Environmental Engineer NC DENR / Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: South Bridge Subdivision — Phase 1 State Stormwater Permit No. SW8 090903 Sneads Ferry, NC NKT Project No. 07063 Dear Mr. Pusey: J. Phillip Norris, P.E. John A. Kuske, III, P.E. John S. Tunstall, P.E. J.A. Kuske, P.E. of Counsel RECT AEQP. 13 201, Enclosed are two (2) sets of revised plans and one (1) set of revised calculations based on comments and discussions between John Tunstall, P.E., Jody Bland, Linda Lewis and yourself. These revisions reflect the requested removal of a combined vegetated filter for the underdrains and bypass culverts. As discussed, we have split the aforementioned discharges in two (2) separate filters. The calculations have been revised to reflect the split and the plans have been revised to indicate an underdrain vegetated filter strip and a preformed scour hole for the bypass discharge. A specific 50' area has not been specified as a VFS for the bypass scour hole but, all scour hole locations reside outside of the wetlands and are a minimum of 50' from MHW. We appreciate your time and clarification on this matter and look forward to the issuance of the stormwater permit. Sincerely, NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. � , IM" 0� 7AUG EOJo n S. Tunstall, P.E. 1 3 2010 JST/jkb/asn 07063 08-11 -1 0-s-sw response-Itr 902 Market Street • Wilmington, NC 28401-4733 • Phone: 910.343.9653 • Fax: 910.343.9604 STORMWATER CALCULATIONS SOUTH BRIDGE SUBDIViSlON (PHASE I) Sneads Ferry, North Carolina For BC & RT, LLC and Raiford G. Trask, Jr., Trustee 1202 Eastwood Road Wilmington, NC 28403 (910) 313-0795 9,e9trBBDUDB % %% °0 o Q` °1°11 ti� r _ SEA 7. C'?51 p�P�8o0t9a�e►aasia RECEIVED AUG 13 2010 Revised August 2010 B . September 2009 Prepared by: NORRIS, KUSKE & TUNSTALL CONSUTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 (Fax) NKT Project No. 07063 07063 Pre -Post 8-11-10 Type 1724-hr 07063 1yr -24hr Rainfall=3.67" Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 C 2005 HvdroCAD Software Solutions LLC 8 / 11 /2010 Pond SF# 1: Filter # 1 Inflow Area = 1.790 ac, Inflow Depth = 2.42" for 07063 lyr -24hr event Inflow = 6.54 cfs @ 12.01 hrs, Volume= 0.362 of Outflow = 1.03 cfs @ 12.33 hrs, Volume= 0.420 af, Atten= 84%, Lag= 19.1 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 1.03 cfs @ 12.33 hrs, Volume= 0.420 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 7.00' Surf.Area= 11,212 sf Storage= 2,526 cf Peak Elev= 7.55' @ 12.33 hrs Surf.Area= 11,843 sf Storage= 6,123 cf (3,597 cf above start) Flood Elev= 10.00' Surf.Area= 13,501 sf Storage= 17,227 cf (14,701 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= (not calculated: outflow precedes inflow) Volume Invert Avail.Storage Storage Description # 1 4.67' 2,500 cf Custom Stage Data (Prismatic) Listed below (Recalc) 10,025 cf Overall - 26 cf Embedded = 9,999 cf x 25.0% Voids #2 4.67' 26 cf 4.0"D x 50.00% Horizontal Cylinder S= 0.0050 '/' x 6 Insidei. #3 7.00' 14,701 cf Custom Stage Data (Prismatic) Listed below (Recalc) 17,227 cf Total Available Storage Elevation Surf Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 4.67 3,599 0 0 7.00 5,006 10,025 10,025 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 7.00 6,206 0 0 9.00 8,495 14,701 14,701 Device Routing Invert Outlet Devices # 1 Primary 6.25' 18.0" x 130.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 6.00' S= 0.0019 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 8.35' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 4.67' 4.0" Vert. Discharge Orfice from Underdrain C= 0.600 #4 Secondary 4.67' 1.750 in/hr Infiltration through Filter Media over Surface area above i Excluded Surface area = 3,599 sf #5 Discarded 8.50' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 07063 Pre -Post 8-11-10 Type 1724-hr 07063 Iyr -24hr Rainfall=3.67" Prepared by Norris, Kuske & Turistall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 8 / 11 /2010 Discarded OutFlov Max=0.00 cfs @ 0.00 firs HW=7.00' (Free Discharge) LS=Emergency Spillway ( Controls 0.00 cfs) Primary OutFlow Max--0.00 cfs @ 0.00 firs HW=7.00' (Free Discharge) t—I=Culvert (Passes 0.00 cfs of 1.66 cfs potential flow) =Baffle Wall ( Controls 0.00 cfs) Secondary OutFlow Max=1.03 cfs @ 12.33 firs HW=7.55' (Free Discharge) ::Infiltration Discharge Orfice from Underdrain (Orifice Controls 0.69 cfs @ 7.9 fps) through Filter Media (Exfiltration Controls 0.33 cfs) Pond SF# 1: Filter # 1 Hydrogr;3ph 7 6.54 cfs , 6. Inflow area=1.790 ac P6A Mew=7.55' 4 c , __ _ f' , 2 _ i 1. 33 cfs , 1 . 0.00 0 i . ,. 0 2 4 6 8 10 1214 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) 07063 Pre -Post 8-11-10 Type II24-hr 07063 Iyr -24hr Rainfall=3.67' Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 C 2005 HydroCAD Software Solutions LLC 8/ 11 /2010 m Pond SF# 1: Filter # 1 Stage -Discharge Discharge (cfs) — Total Discarded --= Primary Secondary 07063 Pre -Post 8-11-10 Type 1I24-hr 07063 1 yr -24hr Rainfall=3.67 Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 C 2005 HydroCAD Software Solutions LLC 8/ 11 /2010 Stage -Area -Storage for Pond SF# 1: Filter # 1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 4.67 3,599 0 4.77 3,659 92 4.87 3,720 187 4.97 3,780 287 5.07 3,841 388 5.17 3,901 488 5.27 3,961 587 5.37 4,022 686 5.47 4,082 788 5.57 4,142 891 5.67 4,203 995 5.77 4,263 1,101 5.87 4,324 1,208 5.97 4,384 1,317 6.07 4,444 1,427 6.17 4,505 1,539 6.27 4,565 1,652 6.37 4,626 1,767 6.47 4,686 1,884 6.57 4,746 2,002 6.67 4,807 2,121 6.77 4,867 2,242 6.87 4,927 2,364 6.97 4,988 2,488 7.07 11,292 2,963 7.17 11,407 3,597 7.27 11,521 4,243 7.37 11,635 4,900 7.47 11,750 5,569 7.57 11,864 6,249 7.67 11,979 6,941 7.77 12,093 7,644 7.87 12,208 8,358 7.97 12,322 9,084 8.07 12,437 9,821 8.17 12,551 10,570 8.27 12,666 11,330 8.37 12,780 12,102 8.47 12,894 12,885 8.57 13,009 13,680 8.67 13,123 14,486 8.77 13,238 15,303 8.87 13,352 16,132 8.97 13,467 16,973 9.07 13,501 17,227 9.17 13,501 17,227 9.27 13,501 17,227 9.37 13,501 17,227 9.47 13,501 17,227 9.57 13,501 17,227 9.67 13,501 17,227 9.77 13,501 17,227 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 9.87 13,501 17,227 9.97 13,501 17,227 07063 Pre -Post 8-11-10 Type IT 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 C 2005 HydroCAD Software Solutions LLC 8 / 11 /2010 Pond SF# 1: Filter # 1 Inflow Area = 1.790 ac, Inflow Depth = 5.48" for 07063 10yr -24hr event Inflow = 14.15 cfs @ 12.01 hrs, Volume= 0.817 of Outflow = 4.46 cfs @ 12.18 hrs, Volume= 0.876 af, Atten= 68%, Lag= 10.4 min Discarded = 2.10 cfs @ 12.18 hrs, Volume= 0.035 of Primary = 1.16 cfs @ 12.18 hrs, Volume= 0.044 of Secondary = 1.20 cfs @ 12.18 hrs, Volume= 0.797 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 7.00' Surf.Area= 11,212 sf Storage= 2,526 cf Peak Elev= 8.62' @ 12.18 hrs Surf.Area= 13,061 sf Storage= 14,044 cf (11,518 cf above start) Flood Elev= 10.00' Surf.Area= 13,501 sf Storage= 17,227 cf (14,701 cf above start) Plug -Flow detention time= 89.1 min calculated for 0.817 of (100% of inflow) Center -of -Mass det. time= 34.7 min (822.0 - 787.3) Volume Invert Avail.Storage Storage Description # 1 4.67' 2,500 cf Custom Stage Data (Prismatic) Listed below (Recalc) 10,025 cf Overall - 26 cf Embedded = 9,999 cf x 25.0% Voids #2 4.67' 26 cf 4.0"D x 50.00% Horizontal Cylinder S= 0.0050 '/' x 6 Inside; #3 7.00' 14,701 cf Custom Stage Data (Prismatic) Listed below (Recalc) 17,227 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 4.67 3,599 0 0 7.00 5,006 10,025 10,025 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 7.00 6,206 0 0 9.00 8,495 14,701 14,701 Device Routing Invert Outlet Devices # 1 Primary 6.25' 18.0" x 130.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 6.00' S= 0.0019 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 8.35' 3.0' long x 0.5' brssdth Baffle Fall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 4.67' 4.0" Vert. Discharge Orfice from Underdrain C= 0.600 #4 Secondary 4.67' 1.750 in/hr Infiltration through Filter Media over Surface area above i Excluded Surface area = 3,599 sf #5 Discarded 8.50' 20.0' long x 16.0' breadth Emergency Spillway Head (feet.) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 07063 Pre -Post 8-11-10 Type II24-hr 07063 1Oyr -24hr Rainfall=6.88" Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 C 2005 HydroCAD Software Solutions LLC 8/ 11 /2010 ><scarded OutFlow Max=2.08 cfs @ 12.18 hrs HW=8.61' (Free Discharge) =Emergency Spillway (Weir Controls 2.08 cfs @ 0.9 fps) Primary OutFlow Max=1.16 cfs @ 12.18 hrs HW=8.61' (Free Discharge) t1=Culvert (Passes 1.16 cfs of 8.37 cfs potential flow) L2=Baffle Wall (Weir Controls 1.16 cfs @ 1.5 fps) necondary OutFlow Max=1.20 cfs @ 12.18 hrs HW=8.61' (Free Discharge) 3=Discharge Orfice from iinderdrain (Orifice Controls 0.82 cfs @ 9.4 fps) =Infiltration through Filter Media (Exfiltration Controls 0.38 cfs) w 3 0 E Pond SF# 1: Filter # 1 Hydrograph 15 14.15 cfs 14 13 Inf, OW.: rea=1-.790 a u 12 1 _ : :ea eV 10 ;.. � Stor�ge�4-04 cf 8 6 5 4.46 cFs 3 2.10 ofs-------------- :.. 1.20 cfs 0, ,. 0 2 4 6 8 10 12 14 16 18 2022 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 B0 62 64 56 68 A 7: Time (hours) Inflow — outflow — Discarded Primary Secondary 07063 Pre -Post 8-11-10 Type 1T 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 0 2005 HydroCAD Software Solutions LLC 8 / 11 /2010 Pond SF# 1: Filter # 1 Stage -Discharge — Total Discarded Primary — Secondary u1scnarge (crs) 07063 Pre -Post 8-11-10 Type .U24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 8/ 11 /2010 Stage -Area -Storage for Pond SF# 1: Filter # 1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 4.67 3,599 0 4.77 3,659 92 4.87 3,720 187 4.97 3,780 287 5.07 3,841 388 5.17 3,901 488 5.27 3,961 587 5.37 4,022 686 5.47 4,082 788 5.57 4,142 891 5.67 4,203 995 5.77 4,263 1,101 5.87 4,324 1,208 5.97 4,384 1,317 6.07 4,444 1,427 6.17 4,505 1,539 6.27 4,565 1,652 6.37 4,626 1,767 6.47 4,686 1,884 6.57 4,746 2,002 6.67 4,807 2,121 6.77 4,867 2,242 6.87 4,927 2,364 6.97 4,988 2,488 7.07 11,292 2,963 7.17 11,407 3,597 7.27 11,521 4,243 7.37 11,635 4,900 7.47 11,750 5,569 7.57 11,864 6,249 7.67 11,979 6,941 7.77 12,093 7,644 7.87 12,208 8,358 7.97 12,322 9,084 8.07 12,437 9,821 8.17 12,551 10,570 8.27 12,666 11,330 8.37 12,780 12,102 8.47 12,894 12,885 8.57 13,009 13,680 8.67 13,123 14,486 8.77 13,238 15,303 8.87 13,352 16,132 8.97 13,467 16,973 9.07 13,501 17,227 9.17 13,501 17,227 9.27 13,501 17,227 9.37 13,501 17,227 9.47 13,501 17,227 9.57 13,501 17,227 9.67 13,501 17,227 9.77 13,501 1.7,227 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 9.87 13,501 17,227 9.97 13,501 17,227 SF DA #1 - Veg Filter - 10 yr stm Worksheet for Rectangular Channel Project Description Project File h:\projects\2007\07063 south bridge\calcs\07063 ve.fm2 Worksheet SF DA#1 - Veg Filter Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.060000 ft/ft Bottom Width 10.00 ft Discharge 1.20 cfs Results Depth 0.06 ft Flow Area 0.63 ftz Wetted Perimeter 10.13 ft Top Width 10.00 ft Critical Depth 0.08 ft Critical Slope 0.031527 ft/ft Velocity 1.90 ft/s Velocity Head 0.06 ft Specific Energy 0.12 ft Froude Number 1.34 Flow is supercritical. 08/25/10 FlowMaster v5.13 12:07:39 Phil Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1866 Page 1 of 1 H:IPROJECTS12007107063 SOUTH BRIDGE1CaicslHydroCadl 07063 Pre -Post 02-22-10 Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 sh 000479 ® 2005 HvdroCAD Software Solutions LLC 2/22/2010 Pond SF#2: Filter #2 Inflow Area = 1.300 ac, Inflow Depth > 2.08" for 070631yr -24hr event Inflow = 4.15 cfs @ 12.02 hrs, Volume= 0.225 of Outflow = 0.90 cfs @ 12.25 hrs, Volume= 0.226 af, Atten= 78%, Lag=14.2 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 0.90 cfs @ 12.25 hrs, Volume= 0.226 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 7.00' Surf.Area= 575 sf Storage= 50 cf Peak EIev=10.25' @ 12.25 hrs Surf.Area= 3,485 sf Storage= 2,979 cf (2,929 cf above start) Flood EIev=12.00' Surf.Area= 4,602 sf Storage= 8,150 cf (8,100 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time=17.8 min ( 840.3 - 822.5 ) Volume Invert Avail.Storage Storage Description #1 6.67 456 cf Custom Stage Data (Prismatic) Listed below (Recalc) 1,833 cf Overall -10 cf Embedded =1,822 cf x 25.0% Voids #2 6.67' 10 cf 4.0"D x 30.00'L Horizontal Cylinder S= 0.0060 7 x 4 Inside #1 #3 9.00, 7,685 cf Custom Stage Data (Prismatic) Listed below (Recalc) 8,150 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sg-ft) (cubic -feet) (cubic -feet) 6.87 492 0 0 9.00 1,081 1,833 1,833 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 9.00 1,602 0 0 12.00 3,521 7,685 7,685 Device Routing Invert Outlet Devices #1 Primary 7.00' 16.0" x 20.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 6.50' S= 0.0250 ? Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 1u. 7 0' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.80 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 6.67' 4.0" Vert. Discharge Orfice from Underdrain C= 0.600 #4 Secondary 6.67' 1.760 In/hr Infiitralon through Filter Media over Surface area above invert Excluded Surface area = 492 sf #5 Discarded 11.00' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coat. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 HAPROJECTS12007107063 SOUTH BRIDGE1CaicslHydroCadl 07063 Pre -Post 02-22-10 Type 1124-hr 070631 yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 2122i2010 iscarded Outflow Max--0.00 cfs @ 0.00 hrs HW=7.00' (Free Discharge) Emergency Spillway ( Controls 0.00 cfs) rimary OutFlow Max--0.00 cfs @ OAO hrs HW=7.00' (Free Discharge) Culvert ( Controls 0.00 cfs) 2 Baffle Wall (Controls 0.00 cfs) econ dary Outflow Max=0.90 cfs @ 12.25 hrs HW=10.25' (Free Discharge) 3=Discharge Orfice from Underdrain (Orifice Controls 0,78 cfs @ 8.9 fps) 11nfiltraion through Filter Media (EAltration Controls 0.12 cfs) Pond SF#2: Filter #2 Hydrograph M 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) HAPROJECTS12007107063 SOUTH BRiDGEICaIcslHydroCadl 07063 Pre -Past 02-22-10 Type // 24-hr 07063 1 yr -24hr Rainfall=3 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 8 2005 HydroCAD Software Solutions LLC 2/2212010 12 11 Pond SF#2: Filter #2 Stage -Discharge 0 5 10 15 20 25 30 35 40 45 50 55 90 e5 Discharge (efs) Total �g Dissar.'ied 32 Primary 0 Secondary RTROJECTS12007107063 SOUTH BRIDGE1CaIcs\HydroCadl 07063 Pre -Post 02-22-10 Type 11 24-hr 07063 Syr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD(M 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 2/22/2010 Stage -Area -Storage for Pond SF#2: Filter #2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 6.67 492 0 6.77 517 13 6.87 543 29- 6.97 568 45 7.07 593 62 7.17 618 77 7.27 644 93 7.37 669 109 7.47 694 126 7.57 720 144 7.67 745 162 7.77 770 181 7.87 795 201 7.97 821 221 8.07 846 242 8.17 871 263 8.27 896 286 8.37 922 308 8.47 947 332 8.57 972 356 8.67 998 380 8.77 1,023 406 8.87 1,048 431 8.97 1,073 458 9.07 2,728 580 9.17 2,792 748 9.27 2,856 922 9.37 2,920 1,103 9.47 2,984 1,290 9.57 3,048 1,483 9.67 3,112 1,683 9.77 3,176 1,889 9.87 3,240 2,102 9.97 3,303 2,321 10.07 3,367 2,546 10.17 3,431 2,778 1R0.2}7 3,495 3,016 10.3! J,JJ0 3,2V 1 10.47 3,623 3,512 10.57 3,687 3,769 10.67 3,751 4,033 10.77 3,815 4,304 10.87 3,879 4,580 10.97 3,943 4,863 11.07 4,007 5,153 11.17 4,071 5,448 11.27 4,135 5,751 11.37 4,199 6,059 11.47 4,263 6,374 11.57 4,327 6,696 11.67 4,391 7,023 Elevation Surface Storage (feet) (s2-ft) (cubic -feet) 11.77 4,455 7,358 11.87 4,519 7,698 11.97 4,583 8,046 H:\PROJECTS\2007\07063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 02-22-10 Type // 24-hr 07063 10yr -24hr RaintaIN6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 0 2005 HydroCAD Software Solutions LLC 2/22/2010 Pond SF#2m Filter #2 Inflow Area = 1.300 ac, Inflow Depth > 5.02" for 0706310yr -24hr event Inflow = 9.67 cfs @ 12.01 hrs, Volume= 0.543 of Outflow = 8.65 cfs @ 12.06 hrs, Volume= 0.544 af, Atten=10%, Lag= 2.9 min Discarded = 4.53 cfs C 12.061irs, Volume= 0.044 of Primary = 3.10 cfs @ 12.06 hrs, Volume= 0.072 of Secondary = 1.02 cfs @ 12.06 hrs, Volume= 0.427 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs 15 Starting Elev= 7.00' Surf.Area= 575 sf Storage= 50 cf Peak Elev= 11.19' @ 12.06 hrs Surf.Area= 4,085 sf Storage= 5,516 cf (5,465 cf above start) Flood Elev=12.00' Surf.Area= 4,602 sf Storage= 8,150 cf (8,100 cf above start) Plug -Flow detention time= 26.0 min calculated for 0.543 of (100% of inflow) Center -of -Mass det. time= 23.6 min ( 821.2 - 797.7 ) Volume Invert Avail.Storage Storage Description #1 6.6T 456 cf Custom Stage Data (Prismatic) Listed below (Recalc) 1,833 cf Overall - 10 cf Embedded =1,822 cf x 25.0% Voids #2 6.67' 10 cf 4.0"D x 30.001 Horizontal Cylinder S= 0.00607 x 4 Inside #1 #3 9.00' 7,685 of Custom Stage Data (Prismatic) Listed below (Recaic) 8,150 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (cubic -feet) 6.67 492 0 0 9.00 1,081__ _-. 1833. _.____ 1;833 Elevation. Surf.Area Inc.Store Cum.Store (feet) (sa-ft) (cubic -feet) (cubic -feet) 9.00 1,602 0 0 12.00 3,521 7,685 7,685 Device Routing Invert Outlet Devices #1 Primary 7.00' 15.0" x 20.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert-- 6.50' S= 0.0250 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 10.70' 3.0' long x ON breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 6.67' 4.0" Vert. Discharge Orfice from Underdrain C= 0.600 #4 Secondary 6.67' 1.750 in/hr Infiltraion through Filter Media over Surface area above invert Excluded Surface area = 492 sf #5 Discarded 11.00' 20.0' long x 16.0' breadth Emergency. Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 HAPROJECTS12007107063 SOUTH BRIDGE1Ca1cslHydroCaM 07063 Pre -Post 02-22-10 Type // 24-hr 07063 90yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADS 7.10 skt 000479 0 2005 HydroCAD Software Solutions LLC 2/22/2010 iscarded OutFlow Max=4.51 cfs @ 12.06 hrs HW=11.19' (Free Discharge) Emergency Spillway (Weir Controls 4.51 cfs @ 1.2 fps) Primary OutFlow Max=3.10 cfs @ 12.06 hrs HW=11.19' (Free Discharge) Culvert (Passes 3.10 cfs of 11.16 cfs potential flow) 2=Baff1e Wall (Weir Controls 3.10 cfs @ 2.1 fps) ondary OutFlow Max=1.02 cfs @ 12.06 hrs HW=11.19' (Free Discharge) 13=131scharge Orfice from Underdrain (Orifice Controls 0.88 cfs @ 10.0 fps) =lnfiltraion through Filter Media (E ltration Controls 0.15 cfs) Pond SF#2: Filter #2 Hydrograph C Inflow Outflow C Discarded Primary Secondary 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) H:IPROJECTS12007107063 SOUTH BRIDGE1Ca1cslHydroCadl 07063 Pre -Post 02-22-10 Type 1124-hr07063 90yr-24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 0 2005 HydroCAD Software Solutions LLC 2/22/2010 a 1 Ci LU Pond SF#2: Filter #2 Stage -Discharge 0 5 10 15 20 25 30 35 40 45 50 55 60 65 Discharge (cfs) .:s Total ■ Discarded 0 Primary © Secondary HAPROJECTS12007107063 SOUTH l3RIDGE1CaIcs\HydroCad% 07063 Pre -Post 02-22-10 Type 1124-hr 07063 10yr -24hr Rainfall=6. 88" Prepared by Norris, Kuske, & Tunstali Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 2/22/2010 Stage -Area -Storage for Pond SF#2: Filter #2 Elevation Surface Storage (feet) (SS-ft) (cubic -feet) 6.67 492 0 6.77 517 13 6.87 543 29 6.97 568 45 7.07 593 62 7.17 618 77 7.27 644 93 7.37 669 109 7.47 894 126 7.57 720 144 7.67 745 162 7.77 770 181 7.87 795 201 7.97 821 221 8.07 846 242 8.17 871 263 8.27 896 286 8.37 922 308 8.47 947 332 8.57 972 356 8.67 998 380 8.77 1,023 406 8.87 1,048 431 8.97 1,073 458 9.07 2,728 580 9.17 2,792 748 9.27 2,856 922 9.37 2.920 1,103 9.47 2,984 1,290 9.57 3,048 1,483 9.67 3,112 1,683 9.77 3,176 1.889 9.87 3,240 2,102 9.97 3,303 2,321 10.07 3,367 2,546 10.17 3,431 2,778 10.27 3,495 3,016 10.37 3,559 3,261 10.47 3,623 3,512 10.57 3,687 3,769 10.67 3,751 4,033 10.77 3,815 4,304 10.87 3,879 4,580 10.97 3,943 4,863 11.07 4,007 5,153 11.17 4,071 5,448 11.27 4,135 5,751 11.37 4,199 6,059 11.47 4,263 6,374 11.57 4,327 6,698 11.67 4,391 7,023 Elevation Surface Storage (feet) (sa-ft) (cubic -feet) 11.77 4,455 7,358 11.87 4,519 7,698 11.97 4,583 8,045. SF DA #2 - Veg Filter -10 yr stm Worksheet for Rectangular Channel Fog UN-Oi52-D2A/&J Dls,cHAtZ46 oNt-y Project Description Project File h:lprojects12007107063 south bridgelcalcs107063 ve.fm2 Worksheet SF DA#2 - Veg Filter Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.005000 ft/ft Bottom Width 10.00 ft Discharge 1.02 cfs Results Depth 0.12 ft Flow Area 1.21 ftz Wetted Perimeter 10.24 ft Top Width 10.00 ft Critical Depth 0.07 ft Critical Slope 0.032618 ft/ft Velocity 0.84 ft/s Velocity Head 0.01 ft Specific Energy 0.13 ft Froude Number 0.43 Flow is subcritical. 08/25/10 FlowMaster v5.13 12:08:01 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, c"r 06708 (203) 755-1666 Page 1 of 1 07063 Pre -Post 06-15-10 Type 1T 24-hr 07063 1 yr -24hr Rainfall=3. 67' Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 8/ 11 /2010 Pond SF#3: Filter#3 Inflow Area = 3.620 ac, Inflow Depth = 2.42" for 07063 lyr -24hr event Inflow = 13.23 cfs @ 12.01 hrs, Volume= 0.731 of Outflow = 1.19 cfs @ 12.59 hrs, Volume= 0.785 af, Atten= 91%, Lag= 34.6 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 1.19 cfs @ 12.59 hrs, Volume= 0.785 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 9.00' Surf.Area= 9,992 sf Storage= 2,324 cf Peak Elev= 10.79' @ 12.59 hrs Surf.Area= 11,744 sf Storage= 14,350 cf (12,026 cf above start) Flood Elev= 12.00' Surf.Area= 12,931 sf Storage= 24,283 cf (21,959 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 54.5 min ( 864.6 - 810.2 ) Volume Invert Avail.Storage Storage Description #1 6.67' 2,010 cf Custom Stage Data (Prismatic) Listed below (Recalc) 8,354 cf Overall - 314 cf Embedded = 8,040 cf x 25.0% Voids #2 6.67' 314 cf 4.0"D x 60.00% Horizontal Cylinder S= 0.0050 '/' x 60 Inside #3 9.00' 21,959 cf Custom Stage Data (Prismatic) Listed below (Recalc) 24,283 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 6.67 3,029 0 0 9.00 4,142 8,354 8,354 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 9.00 5.850 0 0 12.00 8,789 21,959 21,959 Device Routing Invert Outlet Devices # 1 Primary 7.50' 15.0" x 20.0' long Culvert X 2.00 CMP, square edge headwall, Ke= 0.500 Outlet Invert= 7.00' S= 0.0250 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device_. 1 11.15' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 6.67' 4.0" Vert. Discahrge Orfice from Underdrain C= 0.600 #4 Secondary 6.67' 1.750 in/hr Infiltration through Filter Media over Surface area above 1 Excluded Surface area = 3,029 sf #5 Discarded 11.50' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 07063 Pre -Post 06-15-10 Type 1I24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCADS 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 8/ 11 /2010 Discarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=9.00' (Free Discharge) ♦--5=Emergency Spillway ( Controls 0.00 cfs) Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=9.00' (Free Discharge) L1=Cu1vert (Passes 0.00 cfs of 11.05 cfs potential flow) Z 2=Baffle Wall ( Controls 0.00 cfs) Secondary OutFlow Max=1.19 cfs @ 12.59 hrs HW=10.79' (Free Discharge) 1:3=Discaarge Orifice from Underdrain (Orifice Controls 0.84 cfs @ 9.6 fps) 4=Infiltration through Filter Media (Exfiltration Controls 0.35 cfs) Pond SF#3: Filter#3 Hydrograph , r r 13.23 cfs r r , r r - 13 ................... 12 Inf. 0w- r.-e.a=3..620. 11 ea:k' Elegy=10.79'' 10 StQra a=14 3 8 r r „ , r r , r r r r • r r r r r , 6 , r , r - r r r , r r r r r 2 1.19 cfs 00 0 2 4 6 8 1012 1416 18 2022 2426 2830 3234 36 38 404244 .4. ;.. 42 44 46 450 52 54 66 58 60 62 6466 68 70 72 Time (hours) Inflow Outflow Discarded Primary Secondary 07063 Pre -Post 06-15-10 Type 1724-hr 07063 1 yr -24hr Rainfall=3.67' Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 8 / 11 /2010 Pond SF#3: Filter#3 Stage -Discharge Total — Discarded Primary Secondary 1 10 m r' o . 9 w 8 �L1h 7 D�scanr— Urfice hem Underr&mn + Infdtrailon through fqw, Av" 0 2 4 6 8 70 12 14 16 18 20 22 24 26 28 Discharge (cfs) 07063 Pre -Post 06-15-10 Type If 24-hr 07063 1 yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 m 2005 HydroCAD Software Solutions LLC 8/ 11 /2010 Stage -Area -Storage for Pond SF#3: Filter#3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 6.67 3,029 0 6.77 3,077 84 6.87 3,125 196 6.97 3,172 338 7.07 3,220 488 7.17 3,268 613 7.27 3,316 711 7.37 3,363 795 7.47 3,411 880 7.57 3,459 966 7.67 3,507 1,053 7.77 3,554 1,141 7.87 3,602 1,230 7.97 3,650 1,321 8.07 3,698 1,413 8.17 3,746 1,506 8.27 3,793 1,600 8.37 3,841 1,696 8.47 3,889 1,792 8.57 3,937 1,890 8.67 3,984 1,989 8.77 4,032 2,089 8.87 4,080 2,191 8.97 4,128 2,293 9.07 10,061 2,736 9.17 10,159 3,333 9.27 10,257 3,939 9.37 10,354 4,556 9.47 10,452 5,182 9.57 10,550 5,818 9.67 10,648 6,464 9.77 10,746 7,119 9.87 10,844 7,784 9.97 10,942 8,460 10.07 11,040 9,144 10.17 11,138 9,839 10.27 11,236 10,544 10.37 11,334 11,258 10.47 11,432 11,982 10.57 11,530 12,716 10.67 11,628 13,460 10.77 11,726 14,213 10.87 11,824 14,977 10.97 11,922 15,750 11.07 12,020 16,533 11.17 12,118 17,325 11.27 12,216 18,128 11.37 12,314 18,940 11.47 12,412 19,762 11.57 12,510 20,594 11.67 12,608 21,436 11.77 12,706 22,287 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 11.87 12,804 23,148 11.97 12,902 24,019 07063 Pre -Post 06-15-10 Type IT 24-hr 07063 1 Oyr -24hr Rainfall=6. 88" Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 C 2005 HydroCAD Software Solutions LLC 8 / 11 /2010 Pond SF#3: Filter#3 Inflow Area = 3.620 ac, Inflow Depth = 5.48" for 07063 10yr -24hr event Inflow = 28.62 cfs @ 12.01 hrs, Volume= 1.652 of Outflow = 21.48 cfs @ 12.09 hrs, Volume= 1.706 af, Atten= 25%, Lag= 4.5 min Discarded = 13.78 cfs @ 12.09 hrs, Volume= 0.206 of Primary = 6.36 cfs @ 12.09 hrs, Volume= 0.249 of Secondary = 1.34 cfs @ 12.09 hrs, Volume= 1.251 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 9.00' Surf.Area= 9,992 sf Storage= 2,324 cf Peak Elev= 11.90' @ 12.09 hrs Surf.Area= 12,835 sf Storage= 23,429 cf (21,105 cf above start) Flood Elev= 12.00' Surf.Area= 12,931 sf Storage= 24,283 cf (21,959 cf above start) Plug -Flow detention time= 105.1 min calculated for 1.652 of (100% of inflow) Center -of -Mass det. time= 78.9 min ( 866.3 - 787.3 ) Volume Invert Avail.Storage Storage Description #1 6.67' 2,010 cf Custom Stage Data (Prismatic) Listed below (Recalc) 8,354 cf Overall - 314 cf Embedded = 8,040 cf x 25.0% Voids #2 6.67' 314 cf 4.0"D x 60.00% Horizontal Cylinder S= 0.0050 '/' x 60 Inside #3 9.00, 21,959 cf Custom Stage Data (Prismatic) Listed below (Recalc) 24,283 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 6.67 3,029 0 0 9.00 4,142 8,354 8,354 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 9.00 5,850 _ _ 0 0 12.00 8,789 21,959 21,959 Device Routing Invert Outlet Devices # 1 Primary 7.50' 15.0" x 20.0' long Culvert X 2.00 CMP, square edge headwall, Ke= 0.500 Outlet Invert= 7.00' S= 0.0250 ' /' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 11.15' 3.0' long x 0.5' breadth Baffle !fall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 6.67' 4.0" alert. Discahrge Orffice from Underdrain C= 0.600 #4 Secondary 6.67' 1.750 in/hr Infiltration through Filter Media over Surface area above i Excluded Surface area = 3,029 sf #5 Discarded 11.50' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 07063 Pre -Post 06-15-10 Type if 24-hr 07063 I Oyr -24hr Rainfall=6.88" Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 8 / 11 /2010 Discarded OutFlow Max=13.62 cfs @ 12.09 hrs HW=11.90' (Free Discharge) tS=Emergency Spillway (Weir Controls 13.62 cfs @ 1.7 fps) tary OutFlow Max=6.31 cfs @ 12.09 hrs HW=11.90' (Free Discharge) 63l�-�- =Culvert (Passes 6.31 cfs of 22.96 cfs potential flow) . ' 3.1955u t-2=Baffle Wall (Weir Controls 6.31 cfs @ 2.8 fps) 2 f (` "c,, `LvgW) CbtiE Secondary OutFlow Max=1.34 cfs @ 12.09 hrs HW=11.90' (Free Discharge) t:3=Discahrge Orfiee from Underdrain (Orifice Controls 0.95 cfs @ 10.8 fps) =Infiltration through Filter Media (Exfiltration Controls 0.40 cfs) Pond SF#3: Filter#3 32 Hydrograph 30 28.62 cfs '. 26 tnflow_'Ar+ 22 Tl::;1.Peak; 77 zo ; : ,.. rr v 3 16 �_.-..,_.... �_.. ._ ...1.. - 0 13.78 cfs i r � r r : u. 1 12 .L. 10. r .1_ 8 6.36 cfs : r r � : : 1.34 cfs r r , 2 Inflow outflow — Discarded ia-3.62.0-`aC;- - — Primary — Secondary Etev=l1.90�: torage:F23 429 f rr r:rrr.: rr j_ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44.46 48 50 52 54 56 58 60 62 64 66 68 70 Time (hours) 07063 Pre -Post 06-15-10 Type 1724-hr 07063 1Oyr -24hr Rainfall=6.88" Prepared by Norris, .Kuske & 1unstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HYdroCAD Software Solutions LLC 8 / 11 /2010 Pond SF#3: Filter#3 12 Stage -Discharge Total Discarded Primary 11 i - ...... ... _ Secondary 10 0 m , 9 ro _.. ... iY 8 Discarree Orflce Faun LkWerdra r + inj%mRcr `,cr Media 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Discharge (cfs) 07063 Pre -Post 06-15-10 Type If 24-hr 07063 1Oyr -24hr Rainfall=6.88" Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 0 2005 HydroCAD Software Solutions LLC 8 / 11 /2010 Stage -Area -Storage for Pond SF#3: Filter#3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 6.67 3,029 0 6.77 3,077 84 6.87 3,125 196 6.97 3,172 338 7.07 3,220 488 7.17 3,268 613 7.27 3,316 711 7.37 3,363 795 7.47 3,411 880 7.57 3,459 966 7.67 3,507 1,053 7.77 3,554 1,141 7.87 3,602 1,230 7.97 3,650 1,321 8.07 3,698 1,413 8.17 3,746 1,506 8.27 3,793 1,600 8.37 3,841 1,696 8.47 3,889 1,792 8.57 3,937 1,890 8.67 3,984 1,989 8.77 4,032 2,089 8.87 4,080 2,191 8.97 4,128 2,293 9.07 10,061 2,736 9.17 10,159 3,333 9.27 10,257 3,939 9.37 10,354 4,556 9.47 10,452 5,182 9.57 10,550 5,818 9.67 10,648 6,464 9.77 10,746 7,119 9.87 10,844 7,784 9.97 10,942 8,460 10.07 11,040 9,144 10.17 11,138 9,839 10.27 11,236 10,544 10.37 11,334 11,258 10.47 11,432 11,982 10.57 11,530 12,716 10.67 11,628 13,460 10.77 11,726 14,213 10.87 11,824 14,977 10.97 11,922 15,750 11.07 12,020 16,533 11.17 12,118 17,325 11.27 12,216 18,128 11.37 12,314 18,940 11.47 12,412 19,762 11.57 12,510 20,594 11.67 12,608 21,436 11.77 12,706 22,287 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 11.87 12,804 23,148 11.97 12,902 24,019 SF DA#3 - Veg Filter - 10 yr stm Worksheet for Rectangular Channel UND157RD(LA14 Di -SC 0- aNL.!/ Project Description Project File h:\projects\2007\07063 south bridge\calcsk07063 veJm2 Worksheet SF DA#3 - Veq Filter Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.020000 ft/ft Bottom Width 12.00 ft Discharge 1.34 cfs Results Depth 0.08 ft Flow Area 1.01 ftz Wetted Perimeter 12.17 ft Top Width 12.00 ft Critical Depth 0.07 ft Critical Slope 0.031902 ft/ft Velocity 1.33 ft/s Velocity Head 0.03 ft Specific Energy 0.11 ft Froude Number 0.81 Flow is subcriticai. 08/25/10 FlowMaster v5.13 12,08:21 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, --T 08708 (203) 755-1666 Page 1 of 1 H:IPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 02-22-10 Type 1/24-hr07063 Syr-24hr Rainfall=3.67° Prepared by Norris, Kuske, & Tunstali Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 2/23/2010 Fond SF#4: Filter #4 Inflow Area = 2.910 ac, Inflow Depth > 2.00" for 070631yr -24hr event Inflow = 8.95 cfs @ 12.02 hrs, Volume= 0.484 of Outflow = 1.09 cfs @ 12.47 hrs, Volume= 0.485 A Atten= 88%, Lag= 27.0 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 1.09 cfs @ 12.47 hrs, Volume= 0.485 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 9.00' Surf.Area= 317 sf Storage= 29 cf Peak Eiev=12.74' @ 12.47 hrs Surf.Area= 6,509 sf Storage= 7,948 cf (7,918 cf above start) Flood Eiev=14.00' Surf.Area= 8,092 sf Storage= 15,783cf (15,754 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 55.7 min ( 881.4 - 825.7 ) Volume Invert Avail.Storage Storaae Description #1 8.67' 363 cf Custom Stage Data (Prismatic) Listed below (Recalc) 1,471 cf Overall -18 cf Embedded =1,453 cf x 25.0% Voids #2 8.67' 18 cf 4.0"D x 52.00'L Horizontal Cylinder S= 0.00507 x 4 Inside #1 #3 11.00, 15,402 cf Custom Stage Data (Prismatic) Listed below (Recalc) 15,783 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 8.67 193 0 d 11.00 1,070 1,471 1,471 Elevation Surf.Area Inc.Store . Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 11.00 3,246 0 0 14.00 7,022 15,402 15,402 Device Routing Invert Outlet Devices #1 Primary 9.00' 18.0" x 50.0' long Culvert X 2.00 CMP, square edge headwall, Ke= 0.500 Outlet Invert-- 8.00' S= 0.0200 Y Cc= 0.900 n= 0.011 Concrete p1W straight & clean #2 Device 1 12.85' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 8.67' 4.0" Vert. Discharge Orfice from Underdrain C= 0.600 #4 Secondary 8.67' 1.750 in/hr Infiltration through Filter Media over Surface area above invert Excluded Surface area =193 sf #5 Discarded 13.00' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 HAPROJECTS\2007\07063 SOUTH BRIDGE\CalcslHydroCad\ 07063 Pre -Post 02-22-10 Type 1124-hr 070631 yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HVdroCADM 7.10 s/n 000479 ® 2005 HvdroCAD Software Solutions LLC 2/23I2010 iscarded OutFiow Max=0,00 cfs @ 0.00 hrs HW=9.00' (Free Discharge) Emergency Spillway ( Controls 0.00 cfs) Primary Outflow Max--0.00 cfs @ 0.00 hrs HW=9.00' (Free Discharge) t-Culvert ( Controls 0.00 cfs) 2--Baffle Wall ( Controls 0.00 cfs) 1ecorldary Outflow Max=1.09 cfs @ 12.47 hrs HW=12.74' (Free Discharge) 3=Discharge Orfice from Underdrain (Orifice Controls 0.83 cfs @ 9.5 fps) -Infiltration through Filter Media (Exfiitration Controls 0.26 cfs) Pond SF#4: Filter #4 Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) HAPROJECTS12007\07063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 02-22-10 Type 1124-hr 07063 Syr-24hr Rainfall=3.67' Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479_0 2005 HydroCAD Software Solutions LLC 2/23/2010 iJ Pond SF#4: Filter #4 Stage -Discharge 0 5 10 15 20 25 30 35 40 45 50 55 60 65 Discharge (cfs) s Total Discarded ■ Primary p Secondary HAPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 02-22-10 Type 1124-hr 070631 yr -24hr Rainfall=3. 67 Prepared by Norris, Kuske, & Tunstail Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 2/23/2010 Stage -Area -Storage for Ponca SF#4: Filter #4 Elevation Surface Storage (feet) (sg-ft) (cubic -feet) 8.67 193 0 8.77 231 6 8.87 268 14 8.97 306 26 9.07 344 38 9.17 381 49 9.27 419 60 9.37 456 70 9.47 494 82 9.57 532 95 9.67 569 109 9.77 607 124 9.87 645 139 9.97 682 156 10.07 720 173 10.17 758 192 10.27 795 211 10.37 833 232 10.47 871 253 10.57 908 275 10.67 946 298 10.77 983 322 10.87 1,021 347 10.97 1,059 373 11.07 4,404 612 11:17 4,530 951 11.27 4,656 1.304 11.37 4,782 1,869 11.47" 4,908 2,046 11.57 5,033 2,436 11.67 5,159 2,839 11.77 5.285 3,254 11.87 5,411 3,682 11.97 5,537 4,122 12.07 5,663 4,575 12.17 5,789 5,041 12.27 5,915 5,519 12.37 66'0A0 6,010 12.47 6,166 6,513 12.57 6,292 7,029 12.67 6,418 7,557 12.77 6,544 8,099 12.87 6,670 8,652 12.97 6,798 9,218 13.07 6,921 9,797 13.17 7,047 10,389 13.27 7,173 10,993 13.37 7,299 11,609 13.47 7,425 12,239 13.57 7,551 12,880 13.67 7,677 13,535 Elevation Surface Storage (feet) (sQ-ft) (cubic -feet) 13.77 7,803 14,202 13.87 7,928 14,881 13.97 8,054 15,573 H:\PROJECTS\2007\07063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 02-22-10 Type If 24hr 0 7063 1 Oyr -24hr Rainfall= 6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.1.0 sh 000479 © 2005 HydroCAD Software Solutions LLC 2/23/2010 Pond SF#4: Filter #4 f nflow Area = 2.910 ac, Inflow Depth > 4.90" for 070631 Oyr -24hr event Inflow = 21.26 cfs @ 12.01 hrs, Volume= 1.189 of Outflow = 19.42 cfs @ 12.05 hrs, Volume= 1,189 af, Atten= 9°%, Lag= 2.5 min Discarded = 14.36 cfs @ 12.05 hrs, Volume= 0.248 of Primary = 3.87 cfs @ 12.05 hrs, Volume= 0.118 of Secondary = 1.19 cfs @ 12.05 hrs, Volume= 0.824 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs 15 Starting Elev= 9.00' Surf.Area= 317 sf Storage= 29 cf Peak Elev= 13.41' @ 12.05 hrs Surf.Area= 7,354 sf Storage= 11,882cf (11,853 cf above start) Flood Elev=14.00' Surf.Area= 8,092 sf Storage=15,783 cf (15,754 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 46.9 min ( 847.2 - 800.3 ) Volume Invert Avail.Storage Storage Description #1 8.67' 363 cf Custom Stage Data (Prismatic) Listed Flow (Recalc) 1,471 cf Overall -18 cf Embedded = 1,453 cf x 25.0% Voids #2 8.67' 18 cf 4.0"D x 52.001 Horizontal Cylinder S= 0.0050 T x 4 Inside #1 #3 11.00, 15,402 cf Custom Stage Data (Prismatic) Listed below (Recalc) 15,783 of Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 8.67 193 0 0 11.00 1,070 1,471 1,471 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 11.00 3,246 0 0 14.00 7,022 15,402 15,402 Device Routing Invert Outlet Devices #1 Primary 9.00' 18.0" x 50.0' long Culvert X 2.00 CMP, square edge headwall, Ke= 0.500 Outlet Invert= 8.00' S= 0.0200 T Cc= 0.900 n= 0.011 Concrete pipe, straight & ciean #2 Device 1 12.85' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 8.67' 4.0" Verb Discharge Orfice from Underdrain C= 0.600 #4 Secondary 8.67' 1.750 in/hr Infiltration through Filter Media over Surface area above invert Excluded Surface area =193 sf #5 Discarded 13.00' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 HAPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 02-22-10 Type 11 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 sln 000479 ® 2005 HydroCAD Software Solutions LLC 2/23/2010 iscarded OutFlow Max=14.26 cfs @ 12.05 hrs HW=13.41' (Free Discharge). L—S=Emergency Spillway (Weir Controls 14.26 cfs @ 1.7 fps) �nmary OutFlow Max=3.85 cfs @ 12.05 hrs HW=13.41' (Free Discharge) tCulvert (Passes 3.85 cfs of 32.56 cfs potential flow) 2 13affle Wall (Weir Controls 3.85 cfs @ 2.3 fps) if ndary OutFlow Max=1.19 cfs @ 12.05 hrs HW=13.41' (Free Discharge) Discharge Orfice from Underdrain (Orifice Controls 0.90 cfs @ 10.3 fps) Infiltration through Filter Media (Exfiltration Controls 0.29 cfs) Pond SF#4: Filter #4 Hydrograph Inflow . outflow F. Discarded Primary Secondary 0 1 2 3 4. 5 8 7 8 9 10 11 12 13 14 15 18 17 18 19 20 21 22 23 24 Time (hours) H:IPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 02-22-10 Type 1124-hr 07063 10yr -24hr Rainfal1=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s!n 000479 C 2005 HydroCAD Software Solutions LLC 2/23/2010 14 13 12 C O y 11 m to 10 Pond SF#4: Filter #4 Stage -Discharge D 5 10 15 20 25 30 35 40 45 50 55 60 65 Discharge (ds) t 1 Total L. Discarded 4 Primary © Secondary HAPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 02-22-10 Type 1124-hr 0706310yr -24hr Rainfall-6.88" Prepared by Dorris, Kuske, & Tunstall Consulting Engineers, Inc. HYdroCADO 7.10 s/n 000479 ® 2005 HvdroCAD Software Solutions LLC 2/23/2010 Stage -Area -Storage for Pond SF#4: Filter #4 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 8.67 193 0 8.77 231 6 8.87 268 14 8.97 306 26 9.07 344 38 9.17 381 49 9.27 419 60 9.37 456 70 9.47 494 82 9.57 532 95 9.67 569 109 9.77 607 124 9.87 645 139 9.97 682 158 10.07 720 173 10.17 758 192 10.27 795 211 10.37 833 232 10.47 871 253 10.57 908 275 10.67 946 298 10.77 983 322 10.87 1,021 347 10.97 1, 059 373 11.07 4,404 612 11.17 4,530 951 11.27 4,656 1,304 11.37 4,782 1,669 11.47 4,908 2,046 11.57 5,033 2,436 11.67 5,159 2,839 11.77 5,285 3,254 11.87 5,411 3,682 11.97 5,537 4,122 12.07 5,663 4,575 12.17 5,789 5,041 12.27 5,915 5,519 12.37 6,040 6,010 12.47 6,166 6,513 12.57 6,292 7,029 12.67 6,418 7,557 12.77 6,544 8,099 12.87 6,670 8,652 12.97 6,796 9,218 13.07 6,921 9,797 13.17 7,047 10,389 13.27 7,173 10,993 13.37 7,299 11,609 13.47 7,425 12,239 13.57 7,551 12,880 13.67 7,677 13,535 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 13.77 7,803 14,202 13.87 7,928 14,881 13.97 8,054 15,573 SF #4 - Veg. Filter - 10 yr stm Worksheet for Rectangular Channel ForC wJD6-JtzAifI DISCN. 6N1-Y Project Description Project File h:\projects\2007\07063 south bridge\calcs\07063 ve.fm2 Worksheet SF DA#4 - Veg Filter Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.010000 ft/ft Bottom Width 10.00 ft Discharge 1.19 cfs Results Depth 0.11 ft Flow Area 1.08 ftZ Wetted Perimeter 10.22 ft Top Width 10.00 ft Critical Depth 0.08 ft Critical Slope 0.031582 ft/ft Velocity 1.11 ft/s Velocity Head 0.02 ft Specific Energy 0.13 ft Froude Number 0.59 Flow is subcritical. 08/25/10 FlowMaster v5.13 12:08:37 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1668 Page 1 of 1 H:1PROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 8-20-10 Type ll 24-hr 07063 1 yr -24hr Rainfal1=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 8/23/2010 Pond SF#5: Filter #5 Inflow Area = 1.610 ac, Inflow Depth = 2.17" for 07063 1yr -24hr event Inflow = 5.33 cfs @ 12.02 hrs, Volume= 0.290 of Outflow = 0.99 cfs @ 12.29 hrs, Volume= 0.292 af, Atten= 81 %, Lag= 16.2 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 0.99 cfs @ 12.29 hrs, Volume= 0.292 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 7.00' Surf.Area= 731 sf Storage= 53 cf Peak Elev= 9.85' @ 12.29 hrs Surf.Area= 6,984 sf Storage= 4,151 cf (4,099 cf above start) Flood Elev= 11.00' Surf.Area= 8,674 sf Storage= 10,351 cf (10,299 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 26.3 min ( 847.1 - 820.7 ) Volume Invert Avail.Storage Storage Description #1 6.67' 845 cf Custom Stage Data (Prismatic) Listed below (Recalc) 3,385 cf Overall - 7 cf Embedded = 3,379 cf x 25.0% Voids #2 6.67' 7 cf 4.0"D x 25.00'L Horizontal Cylinder S= 0.0050 'P x 3 Inside #1 #3 9.00, 9,500 cf Custom Stage Data (Prismatic) Listed below (Recalc) 10,351 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 6.67 445 0 0 9.00 2,461 3,385 3,385 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 9.00 3,287 0 0 11.00 6,213 9,500 9,500 Device Routing Invert Outlet Devices #1 Primary 7.10' 18.0" x 30.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 6.50' S= 0.0200 7' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 'i 0.00' 3.0' iong x ON breadth Baffle WalI Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 6.67' 4.0" Vert. Discharge Orfice from Underdrain C= 0.600 #4 Secondary 6.67' 1.750 in/hr Infiltration through Filter Media over Surface area above invert Excluded Surface area = 445 sf #5 Discarded 10.71' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 HAPROJECTS12007107063 SOUTH BRIDGE1CaicslHydroCadl 07063 Pre -Post 8-20-10 Type // 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 8/23/2010 ? scarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=7.00' (Free Discharge) 5=Emergency Spillway ( Controls 0.00 cfs) Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=7.00' (Free Discharge) L1=Cuivert ( Controls 0.00 cfs) t2=13affle Wall ( Controls 0.00 cfs) Secondary OutFlow Max=0.99 cfs @ 12.29 hrs HW=9.84' (Free Discharge) t-3=Discharge Orfice from Underdrain (Orifice Controls 0.73 cfs @ 8.4 fps) =Infiltration through Filter Media (Exfiltration Controls 0.26 cfs) Pond SF#5: Filter #5 Hydrograph 5.33 cfs 5 InflowArea=1:6't0 A'c` Pe k EI ' V`9.85' 4 } Sto' 69e=4 '� 51 `. cf w 3 3 0 LL i 0.99 cfs 0.00 cfs 0 0 2...4..6 8 10 12 14 16 18 20 22 24 26 .2.... . ........... .... 6, ,;, ..., ..... ,...,...,..., ...,......... .....,.. 8 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) M HAPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 8-20-10 Type 11 24-hr 07063 Tyr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 8/23/2010 Pond SF#5: Filter #5 Stage -Discharge 11 -- Total !� Discarded Primary � —Secondary 10 w c 9 W ' 7 ; Discharge Oriice front, Underdran infWation through Filter Media 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Discharge (cfs) H:IPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 8-20-10 Type // 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 8/23/2010 Stage -Area -Storage for Pont! SF#5: Filter #5 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 6.67 445 0 6.72 488 6 6.77 532 13 6.82 575 20 6.87 618 28 6.92 661 37 6.97 705 47 7.02 748 57 7.07 791 67 7.12 834 77 7.17 878 88 7.22 921 99 7.27 964 111 7.32 1,007 123 7.37 1,051 136 7.42 1,094 149 7.47 1,137 163 7.52 1,180 178 7.57 1,224 193 7.62 1,267 208 7.67 1,310 224 7.72 1,353 241 7.77 1,397 258 7.82 1,440 276 7.87 1,483 294 7.92 1,527 313 7.97 1,570 332 8.02 1,613 352 8.07 1,656 373 8.12 1,700 394 8.17 1,743 415 8.22 1,786 437 8.27 1,829 460 8.32 1,873 483 8.37 1,916 507 8.42 1,959 531 8.47 2,002 556 8.52 2,046 581 8.57 2,089 607 8.62 2,132 633 8.67 2,175 660 8.72 2,219 687 8.77 2,262 715 8.82 2,305 744 8.87 2,349 773 8.92 2,392 803 8.97 2,435 833 9.02 5,777 917 9.07 5,850 1,085 9.12 5,924 1,256 9.17 5,997 1,431 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 9.22 6,070 1,610 9.27 6,143 1,792 9.32 6,216 1,978 9.37 6,289 2,168 9.42 6,362 2,361 9.47 6,436 2,558 9.52 6,509 2,758 9.57 6,582 2,963 9.62 6,655 3,170 9.67 6,728 3,382 9.72 6,801 3,597 9.77 6,875 3,816 9.82 6,948 4,038 9.87 7,021 4,265 9.92 7,094 4,494 9.97 7,167 4,728 10.02 7,240 4,965 10.07 7,313 5,206 10.12 7,387 5,450 10.17 7,460 5,698 10.22 7,533 5,950 10.27 7,606 6,206 10.32 7,679 6,465 10.37 7,752 6,727 10.42 7,825 6,994 10.47 7,899 7,264 10.52 7,972 7,538 10.57 8,045 7,815 10.62 8,118 8,096 10.67 8,191 8,381 10.72 8,264 8,669 10.77 8,338 8,961 10.82 8,411 9,257 10.87 8,484 9,556 10.92 8,557 9,859 10.97 8,630 10,166 H:IPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 8-20-10 Type 1124-hr 07063 1Oyr -24hr Rainfall=6. 88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 8/23/2010 Pond SFOM Filter #6 Inflow Area = 1.610 ac, Inflow Depth = 5.14" for 07063 10yr -24hr event Inflow = 12.17 cfs @ 12.01 hrs, Volume= 0.689 of Outflow = 6.83 cfs @ 12.12 hrs, Volume= 0.691 af, Atten= 44%, Lag= 6.4 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 5.69 cfs @ 12.12 hrs, Volume= 0.164 of Secondary = 1.14 cfs @ 12.12 hrs, Volume= 0.527 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 7.00' Surf.Area= 731 sf Storage= 53 cf Peak Elev= 10.71' @ 12.12 hrs Surf.Area= 8,244 sf Storage= 8,586 cf (8,534 cf above start) Flood Elev= 11.00' Surf.Area= 8,674 sf Storage= 10,351 cf (10,299 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 29.8 min ( 826.1 - 796.2 ) Volume Invert Avail.Storage Storage Description #1 6.67' 845 cf Custom Stage Data (Prismatic) Listed below (Recalc) 3,385 cf Overall - 7 cf Embedded = 3,379 cf x 25.0% Voids #2 6.67' 7 cf 4.0"D x 25.00'L Horizontal Cylinder S= 0.0050 'P x 3 Inside #1 #3 9.00, 9,500 cf Custom Stage Data (Prismatic) Listed below (Recalc) 10,351 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 6.67 445 0 0 9.00 2,461 3,385 3,385 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 9.00 3,287 0 0 11.00 6,213 9,500 9,500 Device Routing Invert Outlet Devices #1 Primary 7.10' 18.0" x 30.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 6.50' S= 0.0200 'P Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 10.00' 3.0` long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 6.67' 4.0" Vert. Discharge Orfice from tlnderdrain C= 0.600 #4 Secondary 6.67' 1.750 in/hr Infiltration through Filter Media over Surface area above invert Excluded Surace area = 445 sf #5 Discarded 10.71' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 HAPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 8-20-10 Type 11 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstali Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 8/23/2010 Discarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=7.00' (Free Discharge) 't-5=Emergency Spillway ( Controls 0.00 cfs) Primary OutFlow Max=5.68 cfs @ 12.12 hrs HW=10.71' (Free Discharge) L1=Culvert (Passes 5.68 cfs of 14.38 cfs potential flow) L2=Baffle Wall (Weir Controls 5.68 cfs @ 2.7 fps) Secondary OutFlow Max=1.14 cfs @ 12.12 hrs HW=10.71' (Free Discharge) 3=Discharge Orfice from Underdrain (Orifice Controls 0.83 cfs @ 9.5 fps) =Infiltration through Filter Media (Exfiltration Controls 0.32 cfs) Pond SF#5: Filter #5 Hydrograph 13 : 12.17 12 „ Inflow 'Area=1.610 ac : : Peak EIev-10:71' 9- 'St111I age=%5 6 cf 8 ' _ 6.83 cfs 7 a 6 5.69 cfs : 4- 3 2 1.14 cfs 0.00 cfs 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 2830 3234 36 3876774 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) H:IPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 8-20-10 Type //24-hr 07063 10yr -24hr Rainfal1=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 H droCAD Software Solutions LLC 8/23/2010 Pond SF#5: Filter #5 Stage -Discharge 11 --Total Discarded Primary Secondary 10 w e g _ . C w 8- 7- Discharge Orfice from Underdraw + Infiltration throucif: Filter Media 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Discharge (cfs) H:IPROJECTS12007107063 SOUTH BRIDGE1CaicslHydroCadl 07063 Pre -Post 6-20-10 Type // 24-hr 07063 1Oyr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 8/23/2010 Stage -Area -Storage for pond SF#5: Filter #5 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 6.67 445 0 6.72 488 6 6.77 532 13 6.82 575 20 6.87 618 28 6.92 661 37 6.97 705 47 7.02 748 57 7.07 791 67 7.12 834 77 7.17 878 88 7.22 921 99 7.27 964 111 7.32 1,007 123 7.37 1,051 136 7.42 1,094 149 7.47 1,137 163 7.52 1,180 178 7.57 1,224 193 7.62 1,267 208 7.67 1,310 224 7.72 1,353 241 7.77 1,397 258 7.82 1,440 276 7.87 1,483 294 7.92 1,527 313 7.97 1,570 332 8.02 1,613 352 8.07 1,656 373 8.12 1,700 394 8.17 1,743 415 8.22 1,786 437 8.27 1,829 460 8.32 1,873 483 8.37 1,916 507 8.42 1,959 531 8.47 2,002 556 8.52 2,046 581 8.57 2,089 607 8.62 2,132 633 8.67 2,175 660 8.72 2,219 687 8.77 2,262 715 8.82 2,305 744 8.87 2,349 773 8.92 2,392 803 8.97 2,435 833 9.02 5,777 917 9.07 5,850 1,085 9.12 5,924 1,256 9.17 5,997 1,431 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 9.22 6,070 1,610 9.27 6,143 1,792 9.32 6,216 1,978 9.37 6,289 2,168 9.42 6,362 2,361 9.47 6,436 2,558 9.52 6,509 2,758 9.57 6,582 2,963 9.62 6,655 3,170 9.67 6,728 3,382 9.72 6,801 3,597 9.77 6,875 3,816 9.82 6,948 4,038 9.87 7,021 4,265 9.92 7,094 4,494 9.97 7,167 4,728 10.02 7,240 4,965 10.07 7,313 5,206 10.12 7,387 5,450 10.17 7,460 5,698 10.22 7,533 5,950 10.27 7,606 6,206 10.32 7,679 6,465 10.37 7,752 6,727 10.42 7,825 6,994 10.47 7,899 7,264 10.52 7,972 7,538 10.57 8,045 7,815 10.62 8,118 8,096 10.67 8,191 8,381 10.72 8,264 8,669 10.77 8,338 8,961 10.82 8,411 9,257 10.87 8,484 9,556 10.92 8,557 9,859 10.97 8,630 10,166 SF #5 - Veg. Filter - 10 yr stm Worksheet for Rectangular Channel pot L4 4D j;;"&A vJ DL5e tj &IVL / Project Description Project File h:lprojects12007107063 south bridgelcalcs107063 ve.fm2 Worksheet SF DA#5 - Veg Filter Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.010000 ft/ft Bottom Width 10.00 ft Discharge 1.14 cfs Results Depth 0.10 ft Flow Area 1.05 ftz Wetted Perimeter 10.21 ft Top Width 10.00 ft Critical Depth 0.07 ft Critical Slope 0.031866 ft/ft Velocity 1.09 ft/s Velocity Head 0.02 ft Specific Energy 0.12 ft Froude Number 0.59 Flow is subcritical. 08/25/10 FlowMaster v5.13 12:08:52 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 H:IPROJECTS\2007107063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 02-22-10 Type I/ 24-hr 07063 1 yr -24hr Rainfall=3. 67' Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s!n 000479 ® 2005 HvdroCAD Software Solutions LLC 2/22/2010 Pond SF#6A: Filter 6A Inflow Area = 2.400 ac, Inflow Depth > 2.24" for 070631 yr -24hr event Inflow = 8.22 cfs @ 12.02 hrs, Volume= 0.449 of Outflow - 1.04 cfs @ 12.43 hrs, Volume= 0.475 af, Atten= 87%, Lag= 25.0 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 1.04 cfs @ 12.43 hrs, Volume= 0.475 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting Elev=12.00' Surf.Area= 5,909 sf Storage= 1,195 cf Peak Elev= 13.57'@ 12.43 hrs Surf.Area= 7,191 sf Storage= 7,668 cf (6,474 cf above start) Flood Elev= 15.00' Surf.Area= 8,362 sf Storage= 15,335 cf (14,141 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 9.6 min ( 825.5 - 815.9 ) Volume Invert Avail.Storage Storage Description #1 9.67' 1,179 cf Custom Stage Data (Prismatic) Listed below (Recalc) 4,731 of Overall -16 cf Embedded = 4,715 cf x 25.0% Voids #2 9.67' 16 cf 4.0"D x 30.00% Horizontal Cylinder S= 0.00607 x 6 Inside #1 #3 12.00' 14,141 cf Custom Stage Data (Prismatic) Listed below (Recalc) 15,335 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubicfeet (cubic -feet) 9.67 1,639 0 0 12.00 2,422 4,731 4,731 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 12.00 3,487 0 0 15.00 5,940 14,141 14,141 Device Routing Invert Outlet Devices #1 Primary 10.00' 24.0" x 60.0' long Culvert X 2.00 CMP, square edge headwall, Ke= 0.500 Outlet Invert= 9.00' S= 0.01677 Cc= 0.900 n= 0.01 i Concrete pipe, straight & clean #2 Device 1 14.10' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 9.67' 4.0" Vert. Discharge Orfice from Underdrain C= 0.600 #4 Secondany 9.6T 1.760 in/hr InfiltremiQn through Filter Media over Surface area above invert Excluded Surface area = 1,639 sf #5 Discarded 14.50' 20.W Long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 HAPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 02-22-10 Type // 24-hr 07063 Syr -24hr Rainfa#=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 sh 000479 0 2005 HydroCAD Software Solutions LLC 2/22/2010 iscarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=12.00' (Free Discharge) =Emergency Spillway ( Controls 0.00 cfs) rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=12.00' (Free Discharge) Culvert (Passes 0.00 cfs of 30.25 cfs potential flow) 2=Baffle Wall ( Controls 0.00 cfs) ecQndary OutFlow Max=1.04 cfs @ 12.43 hrs HW=13.57' (Free Discharge) �3=Discharge Orrice from Underdrain (Orifice Controls 0.81 cfs @ 9.3 fps) -Infiltraion through Filter Media (Exfiltration Controls 0.22 cfs) F u 9 0 LL Pond SFAA: Filter 6A Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) 01 Inflow ° Outran 0 Discarded O Primary rl Secondary HAPROJECTS12007107063 SOUTH BRIDGE1CaIcs\HydroGadl 07063 Pre -Post 02-22-10 Type 1124-hr07063 Syr-24hr Rainfall=3.67 Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 sln 000479 © 2005 HydroCAD Software Solutions LLC 2/2212010 i) 14 13 d e 0 0 12 d w Pond SFAA: Filter 6A Stage -Discharge 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Discharge (cfs) Total -� Discarded Primary Secondary H:IPROJECTS12007107063 SOUTH BRIDGE1Calcs\HydroCadl 07063 Pre -Post 02-22-10 Type i124-hr07063 Syr-24hr Rainfall-3.67' Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 0 2005 HydroCAD Software Solutions LLC 2/22/2010 Stage -Area -Storage for Pond SF#6A: Filter Spa Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 9.67 1,639 0 9.77 1,673 42 9.87 1,706 88 9.97 1,740 135 10.07 1,773 182 10.17 1,807 227 10.27 1,841 273 10.37 1,874 319 10.47 1,908 366 10.57 1,941 415 10.67 1,975 464 10.77 2,009 513 10.87 2,042 564 10.97 2,076 615 11.07 2,109 668 11.17 2,143 721 11.27 2,177 11.37 2,210 830 11.47 21244 885 11.57 2,277 942 11.67 2,311 999 11.77 2,345 1,058 11.87 2,378 1,117 11.97 2,412 1.176 12.07 5,966 1,441 12.17 6,048 1,799 12.27 6,130 2,166 12.37 6,212 2,541 12.47 6,293 2,924 12.57 6,375 3,315 12.67 6,457 3,714 12.77 6,539 4,122 12.87 6,620 4,538 12.97 6,702 4,962 13.07 6,784 5,394 13.17 6,868 5,834 13.27 6,947 6,282 13.37 7,029 6,739 13.47 7,111 7,204 13.57 7,193 7,677 13.67 7,275 8,158 13.77 7,356 81647 13.87 7,438 9,145 13.97 7,520 9,651 14.07 7,602 10,164 14.17 7,683 10,688 14.27 7,765 11,217 14.37 7,847 11,755 14.47 7,929 12,302 14.57 8,010 12,856 14.67 8,092 13,419 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 14.77 8,174 13,990 14.87 8,256 14,570 14.97 8,337 15,157 HAPROJECTS12007107063 SOUTH BRIDGE1Calcs\HydroCadl 07063 Pre -Post 02-22-10 Type 1124-hr 0706310yr-24hr Rainfall=6:88" Prepared by Morris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 sh 000479 _© 2005 HydroCAD Software Solutions LLC 2122/2010 Pond SFAA: Filter 6A Inflow Area = 2.400 ac, Inflow Deoth > 5.24" for 0706310yr -24hr event Inflow - 18.43 cfs @ 12.01 hrs, Volume= 1.048 of Outflow = 13.79 cis @ 12.09 hrs, Volume= 1.073 af, Atten= 25%, Lag= 4.5 min Discarded = 7.43 cfs a@ 12.09 hrs, Volume= 0.083 of Primary - 5,16 cfs @ 12.09 hrs, Volume= 0.165 of Secondary = 1.20 cfs @ 12.09 hrs, Volume= 0.825 of .Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting Elev=12.00' Surf.Area= 5, 909 sf Storage=1,195 cf Peak Elev= 14.77' @ 12.09 hrs Surf.Area= 8,172 sf Storage= 13,976 cf (12,781 cf above start) Flood Elev= 15.00' Surf.Area= 8,362 sf Storage= 15,335 cf (14,141 cf above start) Plug -Flow detention time= 66.2 min calculated for 1.044 of (100% of inflow) Center -of -Mass det. time= 42.9 min ( 834.9 - 792.1 ) Volume Invert Avail.Storage Storage Description #1 9.67' 1,179 cf Custom Stage Data (Prismatic) Listed below (Recalc) 4,731 cf Overall -16 cf Embedded = 4,715 cf x 25.0% Voids #2 9.67' 16 cf 4.0"D x 30.00'L Horizontal Cylinder S= 0.0050 T x 6 Inside #1 #3 12.00' 14,141 cf Custom Stage Data (Prismatic) Listed below (Recalc) 15,335 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 9.67 1,639 0 0 12.00 2,422 4,731 4,731 Elevation Surf.Area inc.Store Cum.Store (feet) (sq-ft) {cubic -feet) (cubic -feet) 12.00 3,487 0 0 15.00 5,940 14,141 14,141 Device Routing Invert Outlet Devices #1 Primary 10.00' 24.0" x 60.0' long Culvert X 2.00 CMP, square edge headwall, Ke= 0.500 Outlet Invert= 9.00' S= 0.0167'f Cc= 0.900 n= 0.011 Concrete pipe, straight &clean #2 Device 1 14.10' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.2.0 0.40 0.60 0.80 1.00 Coef.. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 9.67' 4.0" Vert. Discharge Orrice from Underdrain C= 0.600 #4 Secondary 9.67' 1.760 inlhr Infiltraion through Filter Media over Surface area above invert Excluded Surface area = 1,639 sf #5 Discarded 14.50' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef.. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 HAPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCad\ 07063 Pre -Post 02-22-10 Type 1124-hr 07063 10yr-24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 2/22/2010 iscarded OutFlow Max=7.27 cfs @ 12.09 hrs HW=14.76' (Free Discharge) Emergency Spillway (Weir Controls 7.27 cfs @ 1.4 fps) rtlmary OutFlow Max=5.11 cfs @ 1.2.09 hrs HW=14.76' (Free Discharge) Culvert (Passes 5.11 cfs of 58.69 cfs potential flow) 2=13affle Wall (Weir Controls 5.11 cfs @ 2.6 fps) econdary OutFlow Max=1.20 cfs @ 12.09 hrs HW=14.76' (Free Discharge) 3=Discharge Orfice from Underdrain (Orifice Controls 0.93 cfs @ 10.7 fps) -lnfiltralon through Filter Media (EAltration Controls 0.26 cfs) Pond SF#6A: Filter 6A Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) H:IPROJECTS\2007\07063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 02-22-10 Type 1124-hr 07063 1Oyr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 sln 000479 © 2005 HydroCAD Software Solutions LLC 2/22/2010 Pond SF#6A: Filter 6A Stage -Discharge •0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Discharge (cfs) HAPROJECTS\2007\07063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 02-22-10 Type 11 24-hr07063 10yr-24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HvdroCAD Software Solutions LLC 2/22/2010 Stage -Area -Storage for Pond SF##6A: Filter 6A Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 9.67 1,639 0 9.77 1,673 42 9.87 1,706 88 9.97 1,740 135 10.07 1,773 182 10.17 1,807 227 10.27 1,841 273 10.37 1,874 319 10.47 1,908 366 10.57 1,941 415 10.67 1,975 464 10.77 2,009 513 10.87 2,042 564 10.97 2,076 615 11.07 2,109 668 11.17 2,143 721 11.27 2,177 775 11.37 2,210 830 11.47 2,244 $85 11.57 2,277 942 11.67 2,311 999 11.77 2,345 1,058 11.87 2,378 1,117 11.97 2;412 1,176 12.07 5,966 1,441 12.17 6,048 1,799 12.27 8,130 2,166 12.37 6,212 2,541 12.47 6,293 2,924 12.57 6,375 3,315 12.67 6,457 3,714 12.77 6,539 4,122 12.87 6,620 4,538 12.97 6,702 4,962 13.07 6,784 5,394 13.17 6,866 5,834 13.27 6,947 6,282 13.37 7,029 6,739 13.47 7,111 7,204 13.57 7,193 7,677 13.67 7,275 8,158 13.77 7,356 8,847 13.87 7,438 9jtan 13.97 7,520 9,651 14.07 7,602 10,164 14.17 7,683 10,686 14.27 7,765 11,217 14.37 7,847 11,755 14.47 7,929 12,302 14.57 8,010 12,856 14.67 8,092 13,419 Elevation Surface Storage (feet) (sq-it) (cubic -feet) 14.77 8,174 13,990 14.87 8,256 14,570 14.97 8,337 15,157 SF #6A - Veg. Filter -10 yr stm Worksheet for Rectangular Channel Fort Ul�l4F.2JRA1JU ONLY Project Description Project File h:\projects\2007\07063 south bridge\calcs\07063 ve.fm2 Worksheet SF DA#6A - Veg Filter Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.060000 ft/ft Bottom Width 10.00 ft Discharge Results Depth 0.06 ft Flow Area 0.63 ft2 Wetted Perimeter 10.13 ft Top Width 10.00 ft Critical Depth 0.08 ft Critical Slope 0.031527 ft/ft Velocity 1.90 ft/s Velocity Head 0.06 ft Specific Energy 0.12 ft Froude Number 1.34 Flow is supercritical. 08/25/10 FlowMaster v5.13 12:09:07 PM Haestad iMethods, Inc. 37 8rookside Road Waterbury, % i 06708 (203) 755-1668 Page 1 of 1 07063 Pre -Poet 06-15-10 Type II24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 C 2005 HydroCAD Software Solutions LLC 8 / 11 /2010 Pond SF#6B: Filter 6B Inflow Area = 2.460 ac, Inflow Depth = 2.34" for 07063 lyr -24hr event Inflow = 8.71 cfs @ 12.01 hrs, Volume= 0.479 of Outflow = 1.07 cfs @ 12.44 hrs, Volume= 0.510 af, Atten= 88%, Lag= 25.4 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 1.07 cfs @ 12.44 hrs, Volume= 0.510 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 12.00' Surf.Area= 6,908 sf Storage= 1,310 cf Peak Elev= 13.42' @ 12.44 hrs Surf.Area= 8,502 sf Storage= 8,243 cf (6,933 cf above start) Flood Elev= 15.00' Surf.Area= 10,275 sf Storage= 18,612 cf (17,303 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 13.2 min ( 827.0 - 813.8 ) Volume Invert Avail -Storage Storage Description #1 9.67' 1,289 cf Custom Stage Data (Prismatic) Listed below (Recalc) 5,176 cf Overall - 21 cf Embedded = 5,155 cf x 25.0% Voids #2 9.67' 21 cf 4.0"D x 40.00% Horizontal Cylinder S= 0.0050 '/' x 6 Inside; #3 12.00' 17,303 cf Custom Stagte Data (Prismatic) Listed below (Recalc) 18,612 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 9.67 1,619 0 0 12.00 2,824 5,176 5,176 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 12.00 4,084 0 0 15.00 7,451 17,303 17,303 Device Routing Invert Outlet Devices # 1 Primary 12.00' 15.0" x 30.0' long Culvert X 2.00 CMP, square edge headwall, Ke= 0.500 Outlet Invert= 11.75' S= 0.0083 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 13.90' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 9.67' 4.0" Vert. Discharge Orfice from Underdrain C= 0.600 #4 Secondary 9.67' 1.750 in/hr Infiltration through Filter Media over Surface area above i Excluded Surface area = 1,619 sf #5 Discarded 14.00' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 CoeL (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 07063 Pre -Post 06-15-10 Type 1124-hr 07063 1 yr -24hr Rainfall=3.67' Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 C 2005 HydroCAD Software Solutions LLC 8 / 11 /2010 Discarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=12.00' (Free Discharge) L5=Emergency Spillway ( Controls 0.00 cfs) Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=12.00' (Free Discharge) t1=Culvert ( Controls 0.00 cfs) Z-2=Baffle Wall ( Controls 0.00 cfs) Secondary OutFlow Max=1.07 cfs @ 12.44 hrs HW=13.42' (Free Discharge) t: =Discharge Orfice from Underdrain (Orifice Controls 0.80 cfs @ 9.1 fps) =Inriltration through Filter Media (Exfiltration Controls 0.28 cfs) Pond SF#6B: Filter 6B Hydrograph 8.71 8 cfs — Inflow OutFlow — Discarded 8 I n#I ow Aroa=2.460 Eic -Primary Secondary 7 Peak Elev=13.42�` 6 torage�=O 243- cf LL 4 _L L 3 - 2 1.07 cfs : 1 _ .......................... : 0.0 s 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 2830 i ; 0 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 7072 Time (hours) 07063 Pre -Post 06-15-10 Type II24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 m 2005 HydroCAD Software Solutions LLC 8/11/2010 Pond SF#6B: Filter 6B Stage -Discharge Total Discarded Primary Secondary Discharge WS) 07063 Pre -Post 06-15-10 Type II24-hr 07063 1 yr -24hr Rainfall=3.67 Prepared by Norris, Kuske & T unstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 8 / 11 /2010 Stage -Area -Storage for Pond SF#6B: Filter 6B Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 9.67 1,619 0 9.77 1,671 42 9.87 1,722 88 9.97 1,774 137 10.07 1,826 186 10.17 1,878 234 10.27 1,929 282 10.37 1,981 331 10.47 2,033 381 10.57 2,084 432 10.67 2,136 485 10.77 2,188 539 10.87 2,240 594 10.97 2,291 651 11.07 2,343 709 11.17 2,395 768 11.27 2,446 829 11.37 2,498 891 11.47 2,550 954 11.57 2,602 1,018 11.67 2,653 1,084 11.77 2,705 1,151 11.87 2,757 1,219 11.97 2,808 1,289 12.07 6,987 1,598 12.17 7,099 2,020 12.27 7,211 2,453 12.37 7,323 2,898 12.47 7,435 3,353 12.57 7,548 3,820 12.67 7,660 4,298 12.77 7,772 4,787 12.87 7,884 5,288 12.97 7,997 5,799 13.07 8,109 6,322 13.17 8,221 6,856 13.27 8,333 7,402 13.37 8,446 7,958 13.47 8,558 8,526 13.57 8,670 9,105 13.67 8,782 9,695 13.77 8,895 10,296 13.87 9,007 10,909 13.97 9,119 11,533 14.07 9,231 12,168 14.17 9,343 12,814 14.27 9,456 13,472 14.37 9,568 14,141 14.47 9,680 14,821 14.57 9,792 15,512 14.67 9,905 16,215 14.77 10,017 16,928 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 14.87 10,129 17,653 14.97 10,241 18,389 07063 Pre -Post 06-15-10 Type II24-hr 07063 1Oyr -24hr Rainfall=6.88" Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 8/ 11 /2010 Pond SF#6B: Filter 6B Inflow Area = 2.460 ac, Inflow Depth = 5.36" for 07063 10yr -24hr event Inflow = 19.18 cfs @ 12.01 hrs, Volume= 1.099 of Outflow = 15.11 cfs @ 12.08 hrs, Volume= 1.130 af, Atten= 21%, Lag-- 4.1 min Discarded = 11.20 cfs @ 12.08 hrs, Volume= 0.184 of Primary = 2.69 cfs @ 12.08 hrs, Volume= 0.070 of Secondary = 1.21 cfs @ 12.08 hrs, Volume= 0.875 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 12.00' Surf.Area= 6,908 sf Storage= 1,310 cf Peak Elev= 14.35' @ 12.08 hrs Surf.Area= 9,547 sf Storage= 14,012 cf (12,703 cf above start) Flood Elev= 15.00' Surf.Area= 10,275 sf Storage= 18,612 cf (17,303 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 45.6 min (836.0 - 790.4) Volume Invert Avail.Storage Storage Description #1 9.67' 1,289 cf Custom Stage Data (Prismatic) Listed below (Recalc) 5,176 cf Overall - 21 cf Embedded = 5,155 cf x 25.0% Voids #2 9.67' 21 cf 4.0"D x 40.00'L Horizontal Cylinder S= 0.0050 '/' x 6 Inside #3 12.00' 17,303 cf Custom Stage Data (Prismatic) Listed below (Recalc) 18,612 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 9.67 1,619 0 0 12.00 2,824 5,176 5,176 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 12.00 4,084 0 0 15.00 7,451 17,303 17,303 Device Routing Invert Outlet Devices # 1 Primary 12.00' 15.0" x 30.0' long Culvert X 2.00 CMP, square edge headwall, Ke= 0.500 Outlet Invert= 11.75' S= 0.0083 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 13.90' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 9.67' 4.0" Vert. Discharge Orrice from Underdrain C= 0.600 #4 Secondary 9.67' 1.750 in/hr Infiltration through Filter Media over Surface area above i Excluded Surface area = 1,619 sf #5 Discarded 14.00' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 07063 Pre -Post 06-15-10 Type II24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCAD(T 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 8 / 11 /2010 Discarded OutFlow Max=11.19 cfs @ 12.08 hrs HW=14.35' (Free Discharge) t -5=Emergency Spillway (Weir Controls 11.19 cfs @ 1.6 fps) Primary OutFlow Max=2.69 cfs @ 12.08 hrs HW=14.35' (Free Discharge) L1=Cu1vert (Passes 2.69 cfs of 15.52 cfs potential flow) L2=Baffle Wall (Weir Controls 2.69 cfs @ 2.0 fps) necondary OutFlow Max=1.21 cfs @ 12.08 hrs HW=14.35' (Free Discharge) 3=Discharge Orfice from Underdrain (Orifice Controls 0.89 cfs @ 10.2 fps) =Infiltration through Filter Media (Exfiltration Controls 0.32 cfs) 0 2 Pond SF#6B: Filter 6B Hydrograph 21 --- 20 --119.18 cfs18 _;; - 19 Inflow .Area-2.°460 ac 16 15.11 cfs �, C J _..�: : : 15 V--- , I- : : - - - . ' .era, e - ; 14 , : I 13 ;.....;... - 12 11.20 cfs ' L. I ii I : 10 : 9 : : r : : 4 2.69 cfs *-. F..;...:. - 3 : 2 ....:..,...: 1.21cfs , , I , 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 57674 54 56 58 6062 6466 6870 7', Time (hours) ® Inflow Lflowardedaryondary 07063 Pre -Post 06-15-10 Type 1I24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCADOB 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 8 / 11 /2010 Pond SF#6B: Filter 6B Stage -Discharge Total Discarded -ram Primary 14 r Secondary 13 0 12 , i W 101 a+sei�a[ge O_ rfirce_frorri UnderdrainTlnfit_tratio_n ifiroFiitrrAdeC�a] 0 5 10 15 20 25 30 35 40 45 50 55 60 65 Discharge (cfs) 07063 Pre -Post 06-15-10 Type 17 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 8/ 11 /2010 Stage -Area -Storage for Pond SF#6B: Filter 6B Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 9.67 1,619 0 9.77 1,671 42 9.87 1,722 88 9.97 1,774 137 10.07 1,826 186 10.17 1,878 234 10.27 1,929 282 10.37 1,981 331 10.47 2,033 381 10.57 2,084 432 10.67 2,136 485 10.77 2,188 539 10.87 2,240 594 10.97 2,291 651 11.07 2,343 709 11.17 2,395 768 11.27 2,446 829 11.37 2,498 891 11.47 2,550 954 11.57 2,602 1,018 11.67 2,653 1,084 11.77 2,705 1,151 11.87 2,757 1,219 11.97 2,808 1,289 12.07 6,987 1,598 12.17 7,099 2,020 12.27 7,211 2,453 12.37 7,323 2,898 12.47 7,435 3,353 12.57 7,548 3,820 12.67 7,660 4,298 12.77 7,772 4,787 12.87 7,884 5,288 12.97 7,997 5,799 13.07 8,109 6,322 13.17 8,221 6,856 13.27 8,333 7,402 13.37 8,446 7,958 13.47 8,558 8,526 13.57 8,670 9,105 13.67 8,782 9,695 13.77 8,895 10,296 13.87 9,007 10,909 13.97 9,119 11,533 14.07 9,231 12,168 14.17 9,343 12,814 14.27 9,456 13,472 14.37 9,568 14,141 14.47 9,680 14,821 14.57 9,792 15,512 14.67 9,905 16,215 14.77 10,017 16,928 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 14.87 10,129 17,653 14.97 10,241 18,389 SF #613 - Veg. Filter - 10 yr stm Worksheet for Rectangular Channel FbA JAVDj�2p1LA/1V DISCN. OA/t_y Project Description Project File h:lprojects12007107063 south bridge\calcsk07O63 ve.fm2 Worksheet SF DA#6B - Veg Filter Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.010000 ft/ft Bottom Width 10.00 ft Discharge 1.21 cfs Results Depth 0.11 ft Flow Area 1.09 ft= Wetted Perimeter 10.22 ft Top Width 10.00 ft C riticHl Denth 01118 ft Critical Slope 0.031472 ft/ft Velocity. 1.11 `4ls Velocity Head 0.02 ft Specific Energy 0.13 f € Froude Number 0.59 Flow is subcritical. 08/25i10 RowMaster v5.13 12:09:21 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Date Design Wilmington, NC NORRIS, KUSKE &TUNSTALL g Sheet CONSULTING ENGINEERS, INC. Brunswick County, NC Ct Check Job For Job No. .' �;�6+'',.��• i to �6�. r._ 3��',��� M.9. ��'�: -- � � � ' ti � ��.f.s� 6� �t °,r""� • v6l fmfdd'{r14a�;Ly E j l�jC/'--i'+�,��'G` L.�r�w , , �r�. �,�,.�, ,+� ,,x' , ., � �Y _ - � 1.2 Date Design A, NORRIS, KUSKE&TUNSTALL Wilmington, NC Sheet 4/6 CONSULTING ENGINEERS, INC. Brunswick County, NC Ot Check Job For Job No. A smxl-�' cn�v pal 14 C4:�5 315 u5e i fzaL F"�;- 2-1 OFS 0 �31 t3 pe�e-P Pusey, Steven From: Amy [anorris@nkteng.com] Sent: Monday, August 09, 2010 11:24 AM To: Lewis,Linda; Pusey, Steven Subject: South Bridge Subdivision (NKT #07063) Attachments: Amy S Norris.vcf Expires: Wednesday, September 08, 2010 12:00 AM Linda & Steve, Thank you for the clarification on the above subject project (SW8 090903). We will evaluate sand filters #1-66 for both Options 1 & 2 and apply the appropriate solution for each filter. We anticipate having the revised plans back to you by mid week. Thanks again for all your help, Amy for John S. Tunstall, P.E. Amy S. Horrb Adnrusirative #swt,ant Noma, Kuske STunstaH ConsUting B1gineers, Inc. 902 Market Street 'A*nington, NC 28401 1910) 343-9653 Yrnne ,916) 343-96 It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. Pusey, Steven From: Lewis,Linda Sent: Wednesday, August 04, 2010 9:09 AM To: Pusey, Steven; Bland, Jody; Tunstall, John Cc: Johnson, Kelly Subject: RE: South Bridge - Sand filter level spreader Just a bit of clarification. Option 1 is a "split" system where the discharged underdrain design storm runoff from the sand filter is going through the required "effective infiltration" area which happens to be a VFS, to meet the "no discharge to SA waters" part of the rule. The bypass flow, i.e., the flow in excess of the design storm, is required to go through a vegetated filter. Per the rules, this vegetated filter can contain, in whole or in part, non -coastal wetlands. Any flow directed into wetlands must be non -erosive, i.e., 2 fps or less. The scour hole (level spreader) should be located outside of the wetlands in order promote the non -erosive flow into the wetlands. Option 2 uses the same area (a VFS) to accomplish both the required effective infiltration of the design storm runoff AND the required VFS for the bypassed excess design storm. If this option is chosen, a more substantial level spreader is needed to handle the increased flows. We are also recommending that the level spreader be oriented to receive flow from the underdrain and/or the bypass pipe/swale in a manner that doesn't involve making the runoff turn 90 degrees to get into the level spreader. Good LS design has the runoff entering the LS in -line with the pipe or swale delivering it to the LS. Linda Please note my new email address is Linda.Lewis@ncdenr.gov Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Pusey, Steven Sent: Wednesday, August 04, 2010 8:44 AM To: Bland, Jody; Tunstall, John Cc Lewis,unda; Johnson, Kelly Subject: South Bridge - Sand filter level spreader Gentlemen: I confirmed with Linda Lewis that you have two (2) options in this case. Because this project was started before the new regulations went into place eliminating scour holes, we will allow them in this case. However, since the subject vegetated filter must effectively infiltrate, we ask that you provide a concrete level spreader if you are sending both design flow and bypass flow to the same vegetated filter strip. The options are described in detail below. Option 1 is to use the current design with sand filter underdrain flow to a level spreader, except modify the bypass structure to route the overflow 10-year storm to a scour hole with non -erosive flow to the wetlands. Option 2 is to send both sand filter underdrain flow and bypss flow from 10-year storm through a properly designed concrete level spreader —vegetated filter strip. Please reference the sketch attached. Let me know if you have any questions. Regards, Steve j 141?- Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. PuseyOncdenr.eov E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. i OPTION 'Z ..__._ Aft Ift -�/--- `- - MHW ` TATIVE -PROVIDE 25 LF MIN. 4" ,.•, S.D► p PERFORATED DRAIN LINE. ` i y,, ES /T � �.��• .ram- ��� R CONNECT TO UNDERDRAIN r N ----' . ' d* :� I� �.� �2y- FES 4.5 AT ELEV. 4.50 OR AT TOE ' "L� • OF SLOPE. ; S W� W/CLASS 1 / /� \ i - • , ' /�S ENERGY DIS: �� B OW O , 1' - - _ 11. \ 20'Lx15'Wx1'I 24 RC SILT F� c SAND F[L1 �� 1 \\ • i} �,! I SEE SHEE 6 - 4" UNDERDRAIN Z \\ a, ! ��g l LINES X 501 f _ i1/ i h DOUBT �191 f �j' SILT F 1 1� It t y --EMERC CYSPI ` 1 l rDl� �' `✓p. 1=8.5 \ 18" FE5 �\ 1W/CLASS 1 RIP RAP , , , ENERGY DISSIPATOR 1 115'LxtO'Wx1'D 1 � OTli OWOF 24 / T=9.20 1 My E g I 1-5.65 DING! t! ¢� T CE,1 AL 180 ES ft AL rr f 1� SINGLE ROW F r j + 1 j p 1� I=9.9i SILT FENCE ! I f 1 I1=6.05 92 1 o I. I '.12 oc. \ v t DRAINAGI \ •� , `��` DOUB ROW OF ' / ! ; EASEMENT, S! `': ? I I 1 �. Pusey, Steven From: Pusey, Steven Sent: Monday, July 26, 2010 9:21 AM To: 'Jody Bland' Cc: 'John Tunstall'; Johnson, Kelly; Lewis,Linda s!�bject: RE: South Bridge Subdivision Please reference Session Law 2008-211, Sec. 2.(b)(1)b.4 which states that stormwater runoff from the development that is in excess of the design volume must flow overland through a vegetative filter designed in accordance with 15A NCAC 02H.1008 with a minimum length of 50 feet measured from mean high water of Class SA waters. Also please reference Session Law 2008-211, Sec. 2.(b)(1)b.5 which states that vegetative filters required by this section may be met concurrently and may contain, in whole or in part, coastal, isolated, or 404 jurisdictional wetlands that are located landward of the normal waterline. This statement allows you to use the wetlands as your vegetated filter for the "excess of the design volume" mentioned above. Keep in mind that the flow of stormwater must be at a non - erosive velocity, which is 2 fps for wetlands. This velocity can be achieved by using a level spreader to diffuse the flow. You may also reference item 6 of the major design elements for sand filters in the BMP manual which mentions that vegetated filters for overflows, bypass flows, or discharges are required within % miles of and draining to SA waters. I hope this clarifies the issue. Please let me know if you have any questions. Regards, .SJle fuser, Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. From: Jody Bland [mailto:jbland@nkteng.com] Sent: Monday; July 26, 2010 8:24 AM To: Pusey, Steven Cc: 'John Tunstall' Subject: RE: South Bridge Subdivision Hi Steve, Sorry I haven't gotten back until now. I was out of the office a bit last week on vacation and I have to be out today for some personal reasons but I wanted to at least get a response back to you. We talked about this sometime ago and this was a non -issue at that time since if you look at the calculations for the sand filters. There is no discharge for the one year storm other than that which is already routed through the under drain system which discharges to a level spreader/ pipe diffusion system. If I recall correctly from memory don't the rules state that the bypass discharge from the "design storm". So in our case we are already mitigating the entire design storm and any bypass that would occur above the 1 yr storm which is the regulated storm by NCDENR. We talked about this regarding the VFS supplement sheet because one of the comments there it explicitly tells you that any bypass flow should be routed to an energy dissipater prior to entering wetlands. This is what I can recall from memory. I don't have my BMP manual in front of me at this time. If you need further discussion I anticipate being back in the office sometime tomorrow. Thanks, Jody Bland A' NORRIS, KUSXE& UI .STAI-t, Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-51.2-81.48 It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. From: Pusey, Steven [mailto:steven.pusey@ncdenr.gov] Sent: Wednesday, July 14, 2010 2:48 PM To: Jody Bland Cc: John Tunstall; Johnson, Kelly; Lewis,Linda Subject: South Bridge Subdivision Importance: High Jody, After reviewing the file and drawings for the subject project, I discovered one additional requirement that needs to be met. It is concerning the sand filter overflow. In accordance with Session Law and the BMP manual, since this project drains within % mile of SA waters, it is necessary to route the overflow from the sand filters to a vegetated filter with level spreader. Your vegetated filter can be the wetlands in this case since the overflow does not have to be infiltrated. Therefore, you will need to provide an additional connection on your splitter box or add another splitter box to direct the overflow from the sand filter to a separate level spreader located at the edge (outside) of the wetlands. The vegetated filter area can be shown in the wetlands. This level spreader should be sized for the flow of a 10 year, 24 hr storm through the overflow pipe. You may use the old criteria in the BMP manual to select the length requirement (i.e.-13 ft./cfs) or the new criteria referenced in Table 8- 1 of the BMP manual. Please also reference pages 8-9 thru 8-13 of the BMP manual for other requirements regarding the additional level spreader / filter strip. We request your revised and/or additional drawings, supplements, and calculations no later than July 29, 2010. Please don't hesitate to call if you have any questions, or need additional time. Regards, .Stele Environmental Engineer NC DENR - Division of Water Quality NORRIS, KUSKE &TUNSTALL CONSULTING ENGINEERS, INC. July 7, 2010 Mr. Steve G. Pusey, Environmental Engineer NC DENR / Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: South Bridge Subdivision — Phase I State Stormwater Permit No. SW8 090903 Sneads Ferry, NC NKT Project No. 07063 J. Phillip Norris, P.E. John A. Kuske, III, P.E. John S.Tunstall, P.E. J.A. Kuske, P.E. of Counsel Dear Mr. Pusey: This is the summary of how the final infiltration calculations were conducted per your guidance. 1. Infiltration rate converted to FT/S. 2. Infiltration rate applied to the specified bottom area to obtain Qi„fi, in CFS. 3. AQ = We are required to provide storage for the difference between the pond orifice discharge and the infiltration area bottom flow rate = CFS 4. Required storage volume obtained by multiplying the AQ by the drawdown time from the pond = FT3. Drawdown time is from the pond spreadsheet. 5. Volume is verified to determine if ample storage is provided in each basin. * Note infiltration area 7-12 requires more storage area. A 12" PVC pipe will be bored beneath the wetlands to utilize the additional storage provided in infiltration area 13. Since both infiltration area storage elevations are set at 14.75', then equalization will take place. Both pond outlets utilitize a 4" orifice from the pond. Therefore, the 12" connective PVC piping will be sufficient for equalization purposes. A HydroCad model was provided to illustrate that this is indeed the case. This is the exact calculation method that was discussed and was requested by NC DENR. This was the last remaining issue regarding the approval of our stormwater permit. Attached is the revised Infiltration Basin Supplement (Page 1) for Ponds #7-12 and the clarified calculation sheet for your continued review and approval. Thank you for your assistance on this project Sincerely, NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. Joseph K. Bla JKB/ast/asn 07063 07-07-10-s-sw response-Itr 902 Market Street -Wilmington, NC 28401-4733 - Phone: 910.343.9653 - Fax: 910.343.9604 NORRIS, KUSKE & TUNSTALL J. Phillip Norris, P.E. CONSULTING ENGINEERS, INC. John s.. Pyrtal+, P.E. John A. Kuske, I, P.E. James T. Pyrtle, P.E. J.A. Kuske, P.E. 902 Market Street • Wilmington, NC 28401-4733 • Phone (910) 343-9653 • Fax (910) 343-9604 E Mail: office@nkteng_com LETTER OF TRANSMITTAL To: Steve Pusey Date: June 21, 2010 Job No. 07063 NC DENR - Wilmington subject: South Bridge Subdivision Sneads Ferry, NC State SW No. SW8 090903 WE ARE SENDING YOU VIA HAND DELIVER ® ATTACHED ❑ UNDER SEPARATE COVER ❑ SHOP DRAWINGS ® PRINTS ❑ TRACINGS ❑ SPECIFICATIONS ❑ DISKS ❑ COPY OF LETTER ❑ FAX TRANSMITTAL: NUMBER OF PAGES INCLUDING THIS TRANSMITTAL Call 910-343-9653 if you have any difficulty receiving this message. COPIES DATE NO. DESCRIPTION 2 Phase I Cover Sheet 2 03-05-10 --- DA - Drainage Area Plan Phase I 2 06-15-10 REV C1 - Grading & Drainage Plan C2 - Grading & Drainage Plan 2 06-15-10 REV 2 06-15-10 REV C3 - Grading & Drainage Plan 2 2 2010 2 05-06-10 R2 C4 - Grading & Drainage Plan BY: 2 04-29-10 R2 C5 - Grading & Drainage Plan 2 06-15-10 REV Cfi - Layout Plan 2 06-15-10 REV C7 - Layout Plan 2 06-15-10 REV C8 - Layout Plan ❑ AS REQUESTED ❑ FOR YOUR USE ❑ FOR REVIEW AND COMMENT El FOR APPROVAL ❑ FOR BIDS DUE ❑ YOUR PRINTS LOANED TO US REMARKS: Per your various e-mail comments with John Tunstali, P.E. and Jody Bland. Please feel free to contact us if you need any additional information. Thank you. CC: Page 1 or 3 SIGNED John S. Tunstall, P.E. / asn CONFIDENTIAL AND PRIVILEGED: Information contained in this document is privileged and confidential, intended for the sole use of the addressee. If you are not the addressee or the person responsible for delivering it to the addressee you are hereby notified that any dissemination, distribution or copying of this document is strictly prohibited. If you have received this document in error please immediately notify the sender and return to the address above. NORRIS, KUSKE & TUNSTALL J. Phillip Norris, P.E. CONSULTING ENGINEERS INC. John S. Tunstall, P.E. John A. Kuske, li+, P.E. James T. Pyrtle, P.E. J.A. Kuske, P.E. 902 Market Street • Wilmington, NC 28401-4733 • Phone (910) 343-9653 • Fax (910) 343-9604 E Mak office@nldeng_com LETTER OF TRANSMTTTAI eve Pusey Date: June 21, 2010 Job No. 07063 DENR - Wilmington subject: South Bridge Subdivision FWEAREE Sneads Ferry, NC State SW No. SW8 090903 SENDING YOU VIA HAND DELIVER ® ATTACHED ❑ UNDER SEPARATE COVER ❑ SHOP DRAWINGS ® PRINTS ❑ TRACINGS ❑ SPECIFICATIONS ❑ DISKS ❑ COPY OF LETTER ❑ FAX TRANSMITTAL: NUMBER OF PAGES INCLUDING THIS TRANSMITTAL Call 910-343-9653 if you have any difficulty receiving this message.. COPIES DATE NO. DESCRIPTION 2 06-15-10 REV C9 - Layout Plan 2 06-16-10 R2 C14 - Pond #13 Details 2 03-05-10 --- C15 - Pond #14 Details 2 06-16-10 R2 C16 - Pond #7-12 Details 2 03-16-10 A2 C17 -Sand Filter Details 2 03-16-10 A2 C18 - Sand Filter Details 2 03-16-10 A2 C19 - Sand Filter Details 2 03-16-10 A2 C20 - Sand Filter Details 2 03-05-10 ---- C21 - Sand Filter Details 2 06-16-10 R4 C22 - Grading and Drainage Notes and Details ❑ AS REQUESTED ❑ FOR YOUR USE ❑ FOR REVIEW AND COMMENT ❑ FOR APPROVAL ❑ FOR BIDS DUE ❑ YOUR PRINTS LOANED TO US REMARKS: Per your various e-mail comments with John Tunstall, P.E. and Jody Bland. Please feel free to contact us if you need any additional information. Thank you. Page 2 or 3 CC: SIGNED John S. Tunstall, P.E. / asn CONFIDENTIAL AND PRIVILEGED: Information contained in this document is privileged and confidential, intended for the sole use of the addressee. If you are not the addressee or the person responsible for delivering it to the addressee you are hereby notified that any dissemination, distribution or copying of this document is strictly prohibited. if you have. received- this document in error please immediately notify the sender and return to the address above. NORRIS, KUSKE & TUNSTALL J. Phillip Norris, P.E. CONSULTING ENGINEERS INC. Johns.. Tunstall, P.E. .tohrrA. Kuske, 11+, P.E. � James T. Pyrtle, P.E. J.A. Kuske, P.E. 902 Market Street • Wilmington, NC 28401-4733 • Phone (910) 343-9653 • Fax (910) 343-9604 E MaiL. ofke@nkteng_com LETTER OF TRANSMITTAL To: Steve Pusey Date: June 21, 2010 11 Job No. 07063 NC DENR - Wilmington subject: South Bridge Subdivision Sneads Ferry, NC State SW No. SW8 090903 WE ARE SENDING YOU VIA HAND DELIVER ® ATTACHED ❑ UNDER SEPARATE COVER ❑ SHOP DRAWINGS ® PRINTS ❑ TRACINGS ❑ SPECIFICATIONS ❑ DISKS ❑ COPY OF LETTER ❑ FAX TRANSMITTAL: NUMBER OF PAGES INCLUDING THIS TRANSMITTAL Call 910-343-9653 if you have any difficulty receiving this message. COPIES DATE NO. DESCRIPTION 2 03-05-10 ---- C23 - Grading and Drainage Notes and Details 2 03-05-10 ---- C24 - Erosion Control Details 1 06-21-10 Revised NC DENR Infiltration Basin Supplement (DA #7-12) 1 06-18-10 Revised NC DENR Infiltration Basin Supplement (DA #13A & 13B) 1 06-21-10 Revised Calculations ❑ AS REQUESTED ❑ FOR YOUR USE ❑ FOR REVIEW AND COMMENT ❑ FOR APPROVAL ❑ FOR BIDS DUE ❑ YOUR PRINTS LOANED TO US REMARKS: Per your various e-mail comments with John Tunstall, P.E. and Jody Bland. Please feel free to contact us if you need any additional information. Thank you. Page 3 or 3 CC: SIGNED John S. Tunstall, P.E. / asn CONFIDENTIAL AND PRIVILEGED: Information contained in this document is privileged and confidential, intended for the sole use of the addressee. If you are not the addressee or the person responsible for delivering it to the addressee you are hereby notified that any dissemination, distribution or copying of this document is strictly prohibited-. it you have received- this document in error ptease immediately notify the sender and return to the address above. STORMWATER CALCULATIONS SOUTH BRIDGE SUBDIVISION (PHASE 1) Sneads Ferry, North Carolina For BC & RT, LLC and Raiford G. Trask, Jr., Trustee 1202 Eastwood Road Wilmington, NC 28403 (910) 313-0795 �aassa���a/r �• ... .� r � C7 SEAL'' 19851 is •.+...+• e,- S 71JAeS e��e Revised June 2010 I JUN 2 2 2010 September 2009 Prepared by: NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 281401 (910) 343-9653 (910) 343-9604 (Fax) NKT Project No. 07063 § 1 E � 9 a Yj u� Date Design Sheel NORRIS, KUSKE&TUNSTALL Wilmington, NC Brunswick County CONSULTING ENN GIEERS, INC. , NC f Check Job For Job N-F 0 � a `. kc 1+4 1701,'T 7 Fr- Vj��-', vj'. "Z- v 5EC42V44.41 t—� > Flo" 11 lQFiL ATZ4 5 e-- 71 z V% t p3p; A (,3 &4 41 4 CIA, 1'r -7 An C"A 14 -7,5 (Lk.-I,51 UJ AWYPOIAL-V VIFI,-1 -IL 7A) 6C 5�U44 v rn -P,%3 vmsn� Nate Design Sheet s°�'� NORRIS, KUSKE &TUNSTALL Wilmington, NC y;s y r� CONSULTING ENGINEERS, INC. Brunswick County, NC Ot Check Job For Job No. S7- ��, { dd�'"Y�� t "�i dri 'atl.. .ui%r.�ab.f . k a • q as c, , i ay-. Y AbU ItWOA-L \obW,4,, 1-4— 4L IO1A f4:-' — 113, 61 I R3 12) y�t 1::�L -dose sr-( o, oq--0'+L Fr./c ) - �1 42 F;;3js 14 =�,�� 4D H:%PROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 06-15-10 Type 1l 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 C 2005 HydroCAD Software Solutions LLC 6/16/2010 Pond 7 -12 INFIL: Infiltration Inflow Area = 19.477 ac, Inflow Depth > 1.91" for 070631yr -24hr event Inflow = 0.65 cfs @ 24.12 hrs, Volume= 3.096 of Outflow = 0.64 cfs @ 18.19 hrs, Volume= 2.743 af, Men= 1 %, Lag= 0.0 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 0.42 cfs @ 68.19 hrs, Volume= 2.033 of Secondary = 0.30 cfs @ 18.19 hrs, Volume= 0.710 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.02 hrs / 5 Peak Elev= 14.39'@ 68.19 hrs Surf.Area= 9,230 sf Storage=15,418 cf Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 56.5 min (2,446.6 - 2,390.1 ) Volume Invert Avail.Storage Storage Description #1 12.50' 21,256 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (fleet) (sq-ft) (cubic -feet) (cubic -feet) 12.50 7,082 0 0 15.00 9,923 21,256 21,256 Device Routing Invert Outlet Devices #1 Primary 0.00' 1.980 in/hr Exfiltration over Surface area #2 Secondary 12.50' 12.0" x 90.0' long Culvert RCP, mitered to conform to fill, Ke= 0.700 Outlet Invert-- 11.00' S= 0.0167'f Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #3 Discarded 10.10' 15.0" x 40.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 10.00' S= 0.00257 Cc= 0.900 n= 0.012 Concrete pipe, finished #4 Device 3 14.75' 2.00' x 2.00' Horia. Orifice/Grate Limited to weir flow C= 0.600 iscarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=12.50' (Free Discharge) Culvert (Passes 0.00 cfs of 7.27 cfs potential flow) �_Orif lce/Gratee ( Controls 0.00 cfs) nmary OutFlow Max=0.42 cfs @ 68.19 hrs HW=14.39' (Free Discharge) 1=Exfiltration (Exfiltration Controls 0.42 cfs) Secondary OutFlow Max=0.30 cfs @ 18.19 hrs HW=12.79' TW=12.19' (Dynamic Tailwater) 2--Culvert (Inlet Controls 0.30 cfs @ 1.6 fps) HAPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 06-15-10 Type ll 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 6/16/2010 it m 14 e 0 d w 13 Pond 7 -12 INFIL: Infiltration Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Pond 7 -12 INFIL: Infiltration Stage -Discharge �e Culvert M Y 0 1 2 3 4 5 6 7 8 Discharge (cis) — Inflow — Outflow — Discarded — Primary — Secondary -- Total A Discarded Primary Secondary H:\PROJECTS\2007\07063 SOUTH BRIDGE\Caics\HydroCad\ 07063 Pre -Post 06-15-10 Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 0 2005 HydroCAD Software Solutions LLC 6/16/2010 Stage -Area -Storage for Pond 7 - 12 INFIL: Infiltration Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 12.50 7,082 0 12.55 7,139 356 12.60 7,196 714 12.65 7,252 1,075 12.70 7,309 1,439 12.75 7,366 1,806 12.80 7,423 2,176 12.85 7,480 2,548 12.90 7,537 2,924 12.95 7,593 3,302 13.00 7,650 3,683 1105 7,707 4,067 13.10 7,764 4,454 13.15 7,821 4,843 13.20 7,877 5,236 13.25 7,934 5,631 13.30 7,991 6,029 13.35 8,048 6,430 13.40 8,105 6,834 13.45 8,162 7,241 13.50 8,218 7,650 13.55 8,275 8,063 13.60 8,332 8,478 13.65 8,389 82896 13.70 8,446 9,317 13.75 8,503 9,740 13.80 8,559 10,167 13.85 8,616 10,596 13.90 8,673 11,028 13.95 8,730 11,464 14.00 8,787 11,901 14.05 8,843 12,342 14.10 8,900 12,786 14.15 8,957 13,232 14.20 9,014 13,681 14.25 9,071 14,134 14.30 9,128 14,589 14.35 9,184 15,046 14.40 9,241 15,507 14.45 9,298 15,970 14.50 9,355 16,437 14.55 9,412 16,906 14.60 9,468 17,378 14.65 9,525 17,853 14.70 9,582 18,330 14.75 9,639 18,811 14.80 9,696 19,294 14.85 9,753 19,781 14.90 9,809 20,270 14.95 9,866 20,762 15.00 9,923 21,256 H:1PROJECTS12007\07063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 06-15-10 Type // 24-hr 07063 9 yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 6/16/2010 Pond 13-Infil: Infiltration Inflow Area = 14.323 ac, Inflow Depth > 3.26" for 07063 1 yr -24hr event Inflow = 0.99 cfs @ 18.19 hrs, Volume= 3.887 of Outflow = 0.63 cfs @ 68.19 hrs, Volume= 3.002 af, Atten= 37%, Lag= 2,999.9 min Primary = 0.63 cfs @ 68.19 hrs, Volume= 3.002 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.02 hrs / 5 Peak Elev= 14.39'@ 68.19 hrs Surf.Area=13,752 sf Storage= 38,651 cf Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 212.1 min ( 2,532.8 - 2,320.7 ) Volume Invert Avail.Storage Storage Description #1 11.00, 47,312 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 11.00 9,058 0 0 15.00 14,598 47,312 47,312 Device Routing Invert Outlet Devices #1 Primary 0.00' 1.980 in/hr Exfiltration over Surface area #2 Secondary 10.75' 15.0" x 40.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 5.00' S= 0.1437 T Cc= 0.900 n= 0.012 Concrete pipe, finished #3 Device 2 14.75' 4.00' W x 4.00' H Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=0.63 cfs @ 68.19 hrs HW=14.39' (Free Discharge) 't-1=Exfiltration (Exfiltration Controls 0.63 cfs) econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=11.00' (Free Discharge) Culvert (Passes 0.00 cfs of 0.30 cfs potential flow) 3=Orifice/Grate ( Controls 0.00 cfs) HAPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 06-15-10 Type 1124-hr 07063 1 yr -24hr Rainfall a V" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 6/16/2010 Pond 13-Infil: Infiltration Hydrograph 1 OX 0 0.99 oft Inflow Area=14.323 ac Peak Elev=14.39' e=38,651' cf 0.63 cfs 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) Pond 13-Infil: Infiltration Stage -Discharge 4 6 a 1n 112 1d 1R Discharge (cfs) - Inflow — Outflow — Primary Secondary Total Primary Secondary HAPROJECTS\2007107063 SOUTH BRIDGE\Calcs\HydraCadl 07063 Pre -Post 06-15-10 Type 11 24-hr 07063 i yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 6/16/2010 Stage -Area -Storage for Pond 13-Infil: Infiltration Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 11.00 9,058 0 11.10 9,197 913 11.20 9,335 1,839 11.30 9,474 2,780 11.40 9,612 3,734 11.50 9,751 4,702 11.60 9,889 5,684 11.70 10,027 6,680 11.80 10,166 7,690 11.90 10,305 8,713 12.00 10,443 9,751 12.10 10,582 10,802 12.20 10,720 11,867 12.30 10,859 12,946 12.40 10,997 14,039 12.50 11,136 15,145 12.60 11,274 16,266 12.70 11,413 17,400 12.80 11,551 18,548 12.90 11,690 19,710 13.00 11,828 20,886 13.10 11,967 22,076 13.20 12,105 23,279 13.30 12,244 24,497 13.40 12,382 25,728 13.50 12,521 26,973 13.60 12,659 28,232 13.70 12,798 29,505 13.80 12,936 30,792 13.90 13,075 32,092 14.00 13,213 33,407 14.10 13,352 34,735 14.20 13,490 36,077 14.30 13,629 37,433 14.40 13,767 38,803 14.50 13,906 40,186 14.60 14,044 41,584 14.70 14,183 42.995 14.80 14,321 44,420 14.90 14,460 45,859 15.00 14,598 47,312 1 14,598 , 12 15.30 14, 598 47, 312 15.40 14,598 47,312 15.50 47,312 15.60 47,312 15.70 14,598 _ 47,312 15.80 14,598 47,312 1 §09de# 14,598 12 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 1 20 14,598 47,3 16. 0 14,598 47 12 16. 14,598 4 ,312 16.50 14,598 17,312 16.60 14,598 47,312 16.70 14,598 47,312 16.80 14,598 47,312 16.90 14,598 47,312 17.00 14,598 47,312 17.10 4,598 47,312 17.20 ,59 47,312 17.30 1 47,312 17.40 14 8 47,312 17.50 1 ,5 47,312 17.60 ,59 47,312 17.70 14,598 47,312 17.80 14,598 47,312 17.90 14,598 47,312 18.00 14,598 47,312 18.10 14,598 47,312 18.20 14,598 47,312 18.3 14,598 7,312 18. 14,598 312 1 0 14,598 4 , 12 .60 14,598 47, 14:15 = 45-706 Pusey, Steven From: Pusey, Steven Sent: Tuesday, June 08, 2010 11:29 AM To: 'John Tunstall' Cc: 'Jody Bland'; Lewis,Linda; Johnson, Kelly; 'Amy' Subject: RE: South Bridge permit John, We have discussed this issue with management in Raleigh and they have advised that you may proceed under the following guidelines. We concur that you can use SCS runoff method in order to produce complete inflow hydrographs. We do not believe that the infiltration rate would increase overtime, therefore, please revise your infiltration basin design using an exfiltraton flow curve that is horizontal, based on a constant infiltration rate. We will need your revised calculations, supplements, and plans submitted within 15 days from this date, or by latest June 23, 2010. Please advise if you need additional time or if you have any questions. Best regards, 54e91e_u11,/,, Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Stev-!n.Pusevr. rcci:c:nr.c.ov E-mail correspondence to and from this address maybe subject to the NC Public Records Law and maybe disclosed to third parties. From: John Tunstaii fmailto:itunstall@nkteng.com] Sent: Monday, June 07, 2010 4:25 PM To: Pusey, Steven Cc: 'Jody Bland'; Lewis,Linda; Johnson, Kelly; 'Amy' Subject: RE: South Bridge permit Steve In response to your questions below, please find the following: 1) The rational method is riot recommended for the design and analysis of storm water detention facilities. The hydrographs produced by using the rational method do not reflect the total storm runoff volume or the intensity variation of the storm over time. Therefore it is recommended to use SCS runoff mpthnd in nrripr to nrndi irA complete inflow hydrographs as required for accurate routing of the system. The rational method is intended to determine peak runoff and is totally dependent upon the correct "C" value and Intensity assigned. Your subsequent email ( listed below the original) references the standard orifice equation and the simple method to determine the volume required. Our discharge from the pond to the infiltration basin uses the circular orifice equation and The simple method is used to calculate volume in the stormwater pond. In regards to the volume required in the infiltration basin, the rules and regulations state the secondary device must treat discharge of design storm from the wet pond. Our model proves that the basin adequately stores and infiltrates the discharge of the design storm. We contend our storage volume of the basin meets the peak required storage and is adequate to meet the intent of the regulation. 2) The Hydrocad hydrograph does reflects the infiltration rate increasing with time. Infiltration into soils is complex because the hydraulic gradient varies over time as ponding depth varies and as the suction is altered by adding water. The model reflects infiltration only through the bottom of the basin and not the sides of the basin. I hope this answers your concerns. Please feel free to call if you have any other questions. Thanks John From: Pusey, Steven [mailto:steven.pusey@ncdenr.gov] Sent: Friday, May 14, 2010 4:39 PM To: Tunstall, John Cc: Jody Bland; Lewis,Linda; Johnson, Kelly Subject: South Bridge permit Dear Mr. Tunstall: In the absence of specific design guidance in the 2008 Rules for secondary BMP's after a wet pond within % miles of SA waters, we are considering your Hydrocad graph and calculations. We have the following concerns: 1. The orifice peak inflow rate stated in your calculations and graph, 0.64 cfs, seems low compared to the peak flow we calculated, 0.74 cfs. Our calculation uses the Rational method. Please try to explain this difference. The Hydrocad graph shows increasing exfiltration flow rate vs. increasing time. We do not believe that increasing head above the infiltration basin bottom would cause an increase in the exfiltration flow rate since the equation for this is simply infiltration rate (ft/s) x area (sf). The only thing that makes sense is that the area increases over time but we cannot allow for increasing area in the calculation. Therefore, in order to make this Hydrocad graph work, the exfiltration flow curve should be changed to a horizontal line based on a constant exfiltration flow rate. If you feel that we are in error, please submit your response to this e-mail with your concepts, and list any questions that you have about this project. If we mutually agree that a meeting is necessary, we will schedule this as soon as possible. Best regards, .54e11e f userl Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven.F'usncdenr.cjqv_ E-mail correspondence to and from this address maybe subject to the NC Public Records Law and maybe disclosed to third parties. John: I want to make a slight correction and clarification to my previous e-mail about item #1, peak flow from the orifice. This is based on the standard orifice equation. The rational method is used for peak flow of the storm. Our storage volume is based on the Simple method. This is the volume that must draw down through the orifice. Pusey, Steven From: Bennett, Bradley Sent: Tuesday, June 08, 2010 10:51 AM To: Pusey, Steven Cc: Lewis,Linda; Vinson, Scott; Dumpor, Samir; Patterson, Robert Subject: RE: South Bridge Subdivision Steve, I don't have a problem with what you are proposing. I will admit that I haven't looked at this issue really closely and Robert is out of the office until next Tuesday. I would say that for now you should ask for the revision as you have stated and that we should look at this issue as a group for further discussion. I have copied Scott and Samir on this also so they can be considering this as well. M. Bradley Bennett Stormwater Permitting Unit NC Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone: (919) 807-6378 Fax: (919) 807-6494 Email: bradlev�hPnnettancd1enr..go_v (New Email Address) Web: WI h2o, ni..state.nc us(su ind . l tm Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties From: Pusey, Steven Sent: Tuesday, June 08, 2010 10:46 AM To: Patterson, Robert; Bennett, Bradley Cc: Lewis,Linda Subject: South Bridge Subdivision Importance: High Gentlemen: You should have received an email from Linda Lewis yesterday about the South Bridge project. We need your response immediately as this project has been lingering on for a long time. The big question is how we calculate the volume required for the secondary infiltration basin. The engineer stated that their Hydrocad hydrograph reflects the infiltration rate increasing with time. They say this is because the hydraulic gradient varies over time as pond depth varies and as the suction is altered by adding water. From previous discussion with the engineer, I believe he is referring to the effect on the orifice pipe inlet to the infiltration basin. Head on top of the inlet pipe changes the flow characteristics through the orifice. From some research, I don't believe the infiltration rate would increase due to additional head on top of the infiltration basin unless the head is greater than 4' (not typical). Also concerning increasing infiltration rate with time, I don't know how we could ever calculate that. There is too much uncertainty and it would be complex. Therefore, I don't think we should consider increasing infiltration rate with time. However, the flow rate through the orifice does change with time so I think we should consider that. The bottom line is that they could use their inflow curve but their infiltration curve should be flat instead of increasing. This makes the required volume slightly lar than what they have provided. So, my opinion is that they need to revise their plans. Please advise your guidance on this matter as soon as possible. Thanks, SteUe J R-11ef- Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven.Pusey@ncdenr.gov E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. Pusey, Steven From: John Tunstall Tunstall@nkteng.com] Sent: Friday, May 21, 2010 7:25 AM To: Pusey, Steven Cc: 'Jody Bland' Subject: RE: South Bridge permit Thanks Steve. I will reply the first of next week to you email. John From: Pusey, Steven [mailto:steven.pusey@ncdenr.gov] Sent: Friday, May 14, 2010 4:51 PM To: Tunstall, John Cc: Jody Bland Subject: South Bridge permit John I want to make a slight correction and clarification to my previous e-mail about item #1, peak flow from the orifice. This is based on the standard orifice equation. The rational method is used for peak flow of the storm. Our storage volume is based on the Simple method. This is the volume that must draw down through the orifice. I think your calculations matched ours except for the orifice. Please let me know if you have further questions. Regards, Steve_11�trfetl Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Stev_en.Pusey ncdenr,g_nv E-mail correspondence to and from this address maybe subject to the NC Public Records Law and maybe disclosed to third parties. Pusey, Steven From: Lewis,Linda Sent: Friday, May 14, 2010 9:54 AM To: Pusey, Steven; Johnson, Kelly Subject: FW: Secondary BMP design guidance Steve & Kelly, These are my remaining concerns with the secondary BMP at the Southbridge project. If you set up a meeting with NKT, please make sure these issues are discussed. Thanks, Linda Please note my new email address is Linda.Lewis@ncdenr.gov Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Patterson, Robert Sent: Thursday, May 13, 2010 7:17 AM To: Lewis,Linda; Bennett, Bradley; Vinson, Scott Cc: Scott, Georgette Subject: RE: Secondary BMP design guidance I think this sounds acceptable. Robert D. Patterson, PE Environmental Engineer NCDENR I DWQ I Stormwater Permitting 1617 Mail Service Center, Raleigh, NC 27699-1617 (Mail) 512 N. Salisbury St, Raleigh, NC 27604 1 9th Floor (Location & Parcels) (919) 807-6375 Phone 1 (919) 807-6494 Fax Email: rrobert.pattersonOncdenneov Website: htW://nortal.ncdenr.or /g web/wq/ws/su ABefore printing this email, please consider your budget and the environment. If you must print, please print only what you need and save ink with the free Eco-Font. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Lewis,Linda Sent: Wednesday, May 12, 2010 12:45 PM To: Bennett, Bradley; Patterson, Robert; Vinson, Scott Cc: Scott, Georgette Subject: Secondary BMP design guidance In the absence of specific design guidance in the 2008 rules for secondary BMP's after a wet pond within 1/2 mile of SA waters, we are thinking about offering the following one-time proposal to NKT Engineering in order to issue the Southbridge permit that Steve Pusey has been working on. The consultants have submitted a design wherein the orifice inflow (discharge from the wet pond) and the infiltration outflow are modeled and routed through the infiltration basin. 1. For some reason, the orifice peak flowrate used as inflow in the HydroCAD report from the consultant is less than the calculated orifice peak flow under full head from our spreadsheet, which uses the Simple Method volume and the standard orifice equation. I intend to ask them to show a peak inflow in the HydroCAD report that equals the peak orifice flow as calculated via our spreadsheet. 2. The HydroCAD report also shows a curved output line depicting an increasing flowrate via infiltration as time goes by. The consultant believes that the rate at which the standing water infiltrates will increase as the standing water gets deeper. Our experience is that the infiltration rate is determined using a standard infiltrometer ring test with a standard beginning water depth, and the flowrate does not increase with the depth of the water column. I intend to ask them to recalculate the infiltration outflow curve on the hydrograph such that it is a straight line set at the corresponding outflow rate based on the available bottom surface area (sq. ft) and the infiltration rate in units of distance over time. Linda Please note my new email address is Linda.Lewis@ncdenr.gov Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to.third parties. Pusey, Steven From: Patterson, Robert Sent: Monday, May 10, 2010 9:58 AM To: Pusey, Steven Subject: RE: South Bridge project - 2nd BMP I think that makes sense. Robert D. Patterson, PE Environmental Engineer NCDENR ! DWQ I Stormwater Permitting 1617 Mail Service Center, Raleigh, NC 27699-1617 (Mail) 512 N. Salisbury St, Raleigh, NC 27604 (Location & Parcels) (919) 807-6375 Phone 1 (919) 807-6494 Fax Email: robert.patterson(lancdenr.eov Website: http://Portal.ncdenr.org/web/wq/ws/su Before printing this email, please consider your budget and the environment. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Pusey, Steven Sent: Thursday, May 06, 2010 3:58 PM To: Patterson, Robert Subject: RE: South Bridge project - 2nd BMP Yes, WIRO reviews infiltration basins based on the bottom area. Concerning wet ponds, we use the average flow rate normally. I think we should base the inflow to the secondary basin on the average flow rate through the pond orifice over the calculated drawdown time, then subtract the total outflow over a maximum 5-day period (via exfiltration from the secondary basin). The difference, if positive, would be the required storage volume in the secondary basin. Does this make sense to you? Steve Pusey Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven.Puseyt@ncdenr.eov<mailto:Jeff.Manning ncdenr.eov> E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. From: Patterson, Robert Sent: Thursday, May 06, 2010 2:26 PM To: Pusey, Steven Subject: RE: South Bridge project - 2nd BMP 1 Steve, We should review it consistent with other infiltration basins ... using the bottom SA, and not the sides. Isn't this how WiRO reviews normal inf. basins? Can you refresh me as to the inflow we discussed before? I don't think we want to use the Hydrocad data since we don't usually accept that for the drawdown calcs. Would you use the average or peak flow from the pond? Robert D. Patterson, PE Environmental Engineer NCDENR I DWQ I Stormwater Permitting 1617 Mail Service Center, Raleigh, NC 27699-1617 (Mail) 512 N. Salisbury St, Raleigh, NC 27604 1 9th Floor (Location & Parcels) (919) 807-6375 Phone 1 (919) 807-6494 Fax Email: robert.patterson(@ncdenr.Rov Website: http://portal.ncdenr.org/web/wq/ws/su P Before printing this email, please consider your budget and the environment. If you must print, please print only what you need and save ink with the free Eco- Font<http://www.ecofont.eu/downloads en.html>. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Pusey, Steven - Sent: Thursday, May 06, 2010 1:39 PM To: Patterson, Robert Subject: South Bridge project - 2nd BMP Robert, I hope you are doing well. I have some more questions on the same project we discussed a couple weeks ago. I am going over the final review on the subject project. The engineer is proposing to use the overall surface area under the water surface for calculating infiltration of the secondary BMP infiltration basin. This reduces the required storage volume. Can we consider this or does it conflict with our method of reviewing all infiltration basins? As a review process, I was thinking that we could use the average surface area between the storage volume and the bottom of the basin to calculate the surface area to be used for infiltration. This would approximate what they are trying to do. Also, concerning the inflow to the infiltration basin, should we use the average inflow for the drawdown period of the primary detention pond as discussed before, or can we use the total time according to their time of concentration using Hydrocad? It's in SA waters so they have to use the 1-yr, 24-hour storm. I would think that we have to use the initial method discussed. Look forward to hearing back from you as soon as possible. Thanks, Steve Pusey Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven.Pusey@ncdenr.Rov<mailto:leff.Mannine()ancdenr.Rov> z E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. NORRIS, KUSKE & TUNSTALL J. Phillip Norris, P.E. John S. Tunstall, P.E. CQNSULTING ENGINEERS, INC. James T. Pyrte, P.E. John J.A. Kuske, P.E. 902 Market Street • Wilmington, NC 28401-4733 • Phone (910) 343-9653 • Fax (910) 343-9604 E-Mail: office@nkteng.com LETTER OIL TRANSMITTAI To: Steve Pusey Date: April 29, 2010 Job No. 07063 NC DENR - Wilmington subject: South Bridge Subdivision Sneads Ferry, NC State SW No. SW8 090903 WE ARE SENDING YOU VIA HAND DELIVER ® ATTACHED ❑ UNDER SEPARATE COVER ❑ SHOP DRAWINGS ISI PRINTS ❑ TRACINGS ❑ SPECIFICATIONS ❑ DISKS ❑ COPY OF LETTER ❑ FAX TRANSMITTAL: NUMBER OF PAGES INCLUDING THIS TRANSMITTAL Call 910-343-9653 if you have any difficulty receiving this message. COPIES DATE NO. DESCRIPTION 1 Revised Infiltration Basin Supplement for DA #7412 1 Revised Infiltration Basin Supplement for DA #13A-#13B 1 04-10 Copy of Revised Stormwater Calculations 2 04-29-10 R1 C5 - Grading & Drainage Plan 2 04-29-10 R1 C14 - Pond #13 Details 2 04-29-10 R1 C16 - Pond #7-12 Details ❑ AS REQUESTED ❑ FOR YOUR USE ❑ FOR REVIEW AND COMMENT ❑ FOR APPROVAL ❑ FOR BIDS DUE ❑ YOUR PRINTS LOANED TO US REMARKS: Per your e-mail comments with Jody Bland. Please fee! free to contact us if you need any additional information. Thank you. CC: SIGNED John S. Tunstall, P.E. / asn �9. CONFIDENTIAL AND PRIVILEGED: Information contained in this document is privileged and confidential, intended for the sole use of the addressee. if you are not the addressee or the person responsible for delivering it to the addressee you are hereby notified that any dissemination, distribution or copying of this document is strictly prohibited. If you have received this document in error please immediately notify the sender and return to the address above. STORMWATER CALCULATIONS SOUTH BRIDGE SUBDIVISION (PHASE 1) Sneads Ferry, North Carolina For BC & RT, LLC and Raiford G. Trask, Jr., Trustee 1202 Eastwood Road Wilmington, NC 28403 (910) 313-0795 ,u4�;'r�r3• 4� r'l L 10 �'r1�37g1t1� 1'�•A ` ti Revised April 2010 September 2009 Prepared by: NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 (Fax) NKT Project No. 07063 Date Design A Sheet ,A- & NORRIS, KUSKE TUNSTALL Wilmington, NC 14/te) Aet'-t- CONSULTING ENGINEERS, INC. Brunswick County, NC Ot For MAiq46e - AF,#--A-1 -7-11 — TW IORLT[ n — Q-6-7 c.Fs A-r tt--,4jLW - / CALYT V*A (4 -3 Ll <! 1 97- IXAIKM� 13 -�}L li-jV14wO 0, -7D a-r-5 ,&Q = 0. 7» 0,- 50 —, c>, eo 4, eq r1r Job No. H:IPROJECTS12007107063 SOUTH BRIDGE1CaicslHydroCadl 07063 Pre -Post 04-28-10 Type 11 24-hr 070631 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 4/28/2010 Pond 7 -12: Infiltration Area Inflow Area = 19.477 ac, Inflow Depth > 1.51" for 070631yr -24hr event Inflow = 0.64 cfs @ 20.21 hrs, Volume= 2.453 of Outflow = 0.37 cfs @ 61.82 hrs, Volume= 1.651 af, Atten= 43%, Lag= 2,496.5 min Primary = 0.37 cfs @ 61.82 hrs, Volume= 1.651 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.02 hrs / 5 Peak Elev= 19.16'@ 61.82 hrs Surf.Area= 7,971 sf Storage= 35,327 cf Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 402.6 min ( 2,621.5 - 2,218.9 ) Volume Invert Avail.Storace Storage Description #1 12.00' 42,344 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 12.00 1,900 0 0 20.00 8,686 42,344 42,344 Device Routing Invert Outlet Devices #1 Primary 0.00' 1.980 in/hr EAltration over Surface area #2 Secondary 15.81' 15.0" x 60.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert=15.00' S= 0.0135 7 Cc= 0.900 n= 0.012 Concrete pipe, finished #3 Device 2 19.75' 2.00' x 2.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 Primary OutFlow Max=0.37 cfs @ 61.82 hrs HW=19.16' (Free Discharge) L1=EAltration (Exfiltration Controls 0.37 cfs) jecondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=12.00' (Free Discharge) 2=Culvert ( Controls 0.00 cfs) 3=Orifice/Grate ( Controls 0.00 cfs) HAPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 04-28-10 Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 4/28/2010 Pond 7 -12: Infiltration Area Hydrograph 0.7 0.64 d A — Inflow 0.65Outflow _ — Primary 0.6 �nflow Area= .477 aq _Secondary 0.5 -Peak: El 409. 61 0.45 _Stora.ge=35.327_Of _ u 0.4 0.3T Cfs S c 0.35 a 0.3 0.25 0.2 -jt,,4 0.15 - _ 000 cis 0 0 2 4 A. 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 466 68 70 72 Time (hours) Pond 7 -12: Infiltration Area Stage -Discharge — Total Primary Secondary 0 1 2 3 Discharge (cfs) HAPROJECTS\2007\07063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 04-28-10 Type/1 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 4/28/2010 Stage -Area -Storage for Pond 7 -12: Infiltration Area Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 12.00 1,900 0 12.10 1,985 194 12.20 2,070 397 12.30 2,154 608 12.40 2,239 828 12.50 2,324 1,056 12.60 2,409 1,293 12.70 2,494 1,538 12.80 2,579 1,791 12.90 2,663 2,054 13.00 2,748 2,324 13.10 2,833 2,603 13.20 2,918 2,891 13.30 3,003 3,187 13.40 3,088 3,491 13.50 3,172 3,804 13.60 3,257 4,126 13.70 3,342 4,456 13.80 3,427 4,794 13.90 3,512 5,141 14.00 3,597 5,497 14.10 3,681 5,860 14.20 3,766 6,233 14.30 3,851 6,614 14.40 3,936 7,003 14.50 4,021 7,401 14.60 4,105 7,807 14.70 4,190 8,222 14.80 4,275 8,645 14.90 4,360 9,077 15.00 4,445 9,517 15.10 4,530 9,966 15.20 4,614 10,423 15.30 4,699 10,889 15.40 4,784 11,363 15.50 4,869 11,846 15.60 4,054 12,337 15.70 5,039 12,836 15.80 5,123 13,344 ­MM- - -5;208-- 13;Wl- 16.00 5,293 14,386 16.10 5,378 14,920 16.20 5,463 15,462 16.30 5,547 16,012 16.40 5,632 16,571 16.50 5,717 17,139 16.60 5,802 17,714 16.70 5,887 18,299 16.80 5,972 18,892 16.90 6,056 19,493 17.00 6,141 20,103 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 17.10 6,226 20,721 17.20 6,311 21,348 17.30 6,396 21,984 17.40 6,481 22,627 17.50 6,565 23,280 17.60 6,650 23,941 17.70 6,735 24,610 17.80 6,820 25,288 17.90 6,905 25,974 18.00 6,990 26,669 18.10 7,074 27,372 18.20 7,159 28,083 18.30 7,244 28,804 18.40 7,329 29,532 18.50 7,414 30,269 18.60 7,498 31,015 18.70 7,583 31,769 18.80 7,668 32,532 18.90 7,753 33,303 19.00 7,838 34,082 19.10 7,923 34,870 19.20 8,007 35,667 19.30 8,092 36,472 19.40 8,177 37,285 19.50 8,262 38,107 19.60 8,347 38,937 19.70 8,432 39,776 19.80 8,516 40,624 19.90 8,601 41,480 20.00 8,686 42,344 H:IPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 04-28-10 Type 1124-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HYdroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 4/28/2010 Pond 13-Infil: Secondary Infiltration Inflow Area = 14.323 ac, Inflow Depth > 2.61" for 070631yr -24hr event Inflow = 0.70 cfs @ 19.99 hrs, Volume= 3.121 of Outflow = 0.50 cfs @ 65.75 hrs, Volume= 2.370 af, Atien= 28%, Lag= 2,745.5 min Primary = 0.50 cfs @ 65.75 hrs, Volume= 2.370 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.02 hrs / 5 Peak Elev= 14.72'@ 85.75 hrs Surf.Area=10,973 sf Storage= 32,898 cf Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 227.3 min ( 2,544.7 - 2,317.4 ) Volume Invert Avail.Storage Storage Description #1 11.00, 35,976 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 11.00 6,698 0 0 15.00 11,290 35,976 35,976 Device Routing Invert Outlet Devices #1 Primary 0.00' 1.980 in/hr Wiiltration over Surface area #2 Secondary 10.75' 16.0" x 40.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 5.00' S= 0.1437'f Cc= 0.900 n= 0.012 Concrete pipe, finished #3 Device 2 14.75' 4.00' W x 4.00' H Vert. Orifice/Grate C= 0.600 nmary OutFlow Max=0.50 cfs @ 65.75 hrs HW=14.72' (Free Discharge) =Exfiltration (Exfiltration Controls 0.50 cfs) tecondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=11.00' (Free Discharge) tCulvert (Passes 0.00 cfs of 0.30 cfs potential flow) 3=Orifice/Grate ( Controls 0.00 cfs) HAPROJECTS12007107063 SOUTH BRIDGE1Calcs\HydroCadl 07063 Pre -Post 04-28-10 Type 1124-hr 070631 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstali Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 4/28/2010 Pond 13-Infil: Secondary Infiltration Hydrograph 0.75 0.70 sfs — Inflow 0.7 - — Outflow — Primary BS inflow Area=14323 a� -Secondary 0.6 A-Ele:VO4.72r Ms Pond 13-Infil: Secondary Infiltration Stage -Discharge Total Primary Secondary Discharge (cfs) - HAPROJECTS12007107063 SOUTH BRiDGE1CalcslHydroCadl 07063 Pre -Post 04-28-10 Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstali Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 4/28/2010 Stage -Area -Storage for Pond 13-Infil: Secondary Infiltration Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 11.00 6,698 0 11.10 6,813 676 11.20 6,928 1,363 11.30 7,042 2,061 11.40 7,157 2,771 11.50 7,272 3,493 11.60 7,387 4,225 11.70 7,502 4,970 11.80 7,616 5,726 11.90 7,731 6,493 12.00 7,846 7,272 12.10 7,961 8,062 12.20 8,076 8,864 12.30 8,190 9,677 12.40 8,305 10,502 12.50 8,420 11,339 12.60 8,535 12,186 12.70 8,650 13,045 12.80 8,764 13,916 12.90 8,879 14,798 13.00 8,994 15,692 13.10 9,109 18,597 13.20 9,224 17,514 13.30 9,338 18,442 13.40 9,453 19,381 13.50 9,568 20,333 13.60 9,683 21,295 13.70 9,798 22,269 13.80 9,912 23,255 13.90 10,027 24,252 14.00 10,142 25,260 14.10 10,257 26,280 14.20 10,372 27,311 14.30 10,486 28,354 14.40 10,601 29,409 14.50 10,716 30,475 14.60 i0,831 31,552 14.70 10,946 32,641 14.80 11,060 33,741 ._.- -- 14.90 -�i75- - - ---34,8�3 - 15.00 11,290 35,976 15.10 11,290 35,976 15.20 11,290 35,976 15.30 11,290 35,976 15.40 11,290 35,976 15.50 11,290 35,976 15.60 11,290 35,976 15.70 11,290 35,976 15.80 11,290 35,976 15.90 11,290 35,976 16.00 11,290 35,976 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 16.10 11,290 35,976 16.20 11,290 35,976 16.30 11,290 35,976 16.40 11,290 35,976 16.50 11,290 35,976 16.60 11,290 35,976 16.70 11,290 35,976 16.80 11,290 35,976 16.90 11,290 35,976 17.00 11,290 35,976 17.10 11,290 35,976 17.20 11,290 35,976 17.30 11,290 35,976 17.40 11,290 35,976 17.50 11,290 35,976 17.60 11,290 35,976 17.70 11,290 35,976 17.80 11,290 35,976 17.90 11,290 35,976 18.00 11,290 35,976 18.10 11,290 35,976 18.20 11,290 35,976 18.30 11,290 35,976 18.40 11,290 35,976 18.50 11,290 35,976 18.60 11,290 35,976 18.70 11,290 35,976 Pusey, Steven From: Pusey, Steven Sent: Friday, April 09, 2010 2:03 PM To: 'Jody Bland' Cc: Tunstall, John Subject: South Bridge project I am still waiting to hear from you about your Hydrocad calculations on the subject project. However, in the meantime, we do have a confirmed way to review the calculations regarding the secondary BMP. After reviewing with this method, it appears that you do not have enough storage volume in basin #7-12 or #13. The required storage volume will depend on the geometry of the pond, the average orifice flow rate, the drawdown time of the pond, and the infiltration rate of the soil. Basically, the required storage volume for the secondary BMP (infiltration basin), is equal to the required wet pond storage volume minus the volume infiltrated through the secondary basin during the pond drawdown period. Please give me a call to discuss details. Thanks, Steve f'MIT Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. Pusey@ncdenr.eov E-mail correspondence to and from this address maybe subject to the NC Public Records Law and maybe disclosed to third parties. Pusey, Steven From: Patterson, Robert Sent: Friday, April 09, 2010 12:08 PM To: Pusey, Steven Subject: RE: Secondary BMP after detention pond Steve, I think this approach looks good. It makes sense not to have storage for the entire design store, when it gets attenuated in a wetpond first. From: Pusey, Steven Sent: Friday, April 09, 2010 11:42 AM To: Patterson, Robert Subject: RE: Secondary BMP after detention pond Here is the Excel spreadsheet for the basins. The permittee will need to provide more volume in the basins according to these calculations. They had previously sized the basins using Hydrocad but it is unclear what some of their assumptions were in this program. I don't think Hydrocad is the right tool for sizing the secondary BMP. Sterle-r-ufer, Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. Pusev@)ncdenr.00v E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties From: Patterson, Robert Sent: Friday, April 09, 2010 11:19 AM To: Pusey, Steven Subject: RE: Secondary BMP after detention pond sure From: Pusey, Steven Sent: Friday, April 09, 2010 11:18 AM To: Patterson, Robert; Bennett, Bradley Cc: Lewis,Linda; Scott, Georgette Subject: RE: Secondary BMP after detention pond Would you like for me to send my Excel spreadsheet for this project? .Stone fuser, Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. Pusey(cbncdenr.aoV E-mail correspondence to and from this address may be subject to the NC Public Records Low and may be disclosed to third parties. From: Patterson, Robert Sent: Friday, April 09, 2010 11:17 AM To: Pusey, Steven; Bennett, Bradley Cc: Lewis,Linda; Scott, Georgette Subject: RE: Secondary BMP after detention pond Nothing was attached? Robert D. Patterson, PE Environmental Engineer NCDENR I DWQ I Stormwater Permitting 1617 Mail Service Center, Raleigh, NC 27699-1617 (Mail) 512 N. Salisbury St, Raleigh, NC 27604 1 9th Floor (Location &.Parcels) (919) 807-6375 Phone 1 (919) 807-6494 Fax Email: robert.laa.ttersonliu.ncdenr.eov Website: http://1)ortal.ncdenr.org/weblw ws su '.ABefore printing this email, please consider your budget and the environment. If you must print, please print only what you need and save ink with the free Eco-Font. E-mail correspondence to and from this address may be subject to the North.Carolina Public Records Law and may be disclosed to third parties. From: Pusey, Steven Sent: Friday, April 09, 2010 9:56 AM To: Patterson, Robert; Bennett, Bradley Cc: Lewis,Linda; Scott, Georgette Subject: Secondary BMP after detention pond importance: High I am trying to finalize a permit for a project called Southbridge Subdivision in Onslow County adjacent to SA waters. The main issue has been how to analyze the design storm for the secondary BMP, which is an infiltration basin. After discussing this issue with Linda Lewis, I have come up with a spreadsheet that calculates the volume required for the secondary BMP, an infiltration basin. The volume calculation is based on the flow rate from the orifice for the drawdown period of the primary wet detention pond minus the volume infiltrated in the secondary basin. A more simple way to put this is that it's the temporary storage volume of the wet detention pond minus the volume infiltrated in the basin. The volume infiltrated in the basin is equal to the bottom surface area of the basin multiplied times the infiltration rate multiplied by the drawdown period of the pond. Basically, the drawdown period of the pond dictates how much water enters the secondary basin and how much water infiltrates from the basin, thus determining the required storage volume of the basin. I hope this makes sense to you. Please advise whether you agree to this concept of review so that we can wrap the project up. The 90 day statutory review time is fast approaching. I hope we can make this the standard for reviewing these types of projects. However, if not for all projects, at least for this one. I look forward to your earliest response. Regards, Ster�e�user, Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection - Stormwater Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. Pusey ncdenr.Rov E-mail correspondence to and from this address may be subject to the NC Public Records Low and may be disclosed to third parties. Pusey, Steven From: Pusey, Steven Sent: Thursday, March 11, 2010 3:52 PM To: 'Jody Bland' Cc: 'John Tunstall' Subject: RE: Southbridge 7-12 Infil Area It looks like you may have a solution to the problem on infiltration area 7-12. 1 will be reviewing this information. In the meantime, I am also waiting on policy from Raleigh regarding the design storm to be used in evaluating the secondary infiltration areas ("Secondary BMP Design"). I expect to have this information by the first week of April. In the absence of policy, we can give you the following options: 1) Use the entire design storm to size the infiltration basin; 2) Use another BMP; or 3) Put the application on hold pending the approval and implementation of a "Secondary BMP Design". I recommend using item 3, putting the application on hold pending the approval of "secondary BMP design" policy. I think there is a good chance that your design volume, or something similar, will be approved. Please advise ASAP. Regards, Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. Pusey(c ncdenr gov E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. From: Jody Bland [mailto:jblandC@nkteng.com] Sent: Wednesday, March 10, 2010 10:22 AM To: Pusey, Steven Cc: 'John Tunstall' Subject: Southbridge 7-12 Infil Area Good Morning Steve, Tunstall and 1 looked into your concerns regarding the SHVV7 issue with infiltration area 7-12. Bore B3 falls within the 7-12 Infiltration area and is identified @ 62". This bore was verified by Vincent Lewis from NCDENR. There should be a copy of his report in your file. Also included is a copy of the SHWT chart that was requested some time ago; @ bore B3 the elevation was found to be 16 and the SHWT was identified @ 10.833'. In review of this information the secondary infiltration area for 7-12 is above the currently identified SHWT. The original attached map is from an old design but the bore locations are correct. Finally, Mr. Tunstall and I discussed the issue regarding storage volume. VVe have discussed lowering the basin bottom to elevation 14; adding 2ff of additional storage. I have included extended hydrographs for both the 1 yr & 10 yr storms for this scenario. The basin operates and contains both the 1 yr & 10 yr storms without over topping the basin. The storm peaks are identified and the extended time graphically identifies that the outflow (infiltration) exceeds the inflow (from Pond 7-12) around 60 hrs. Please review and comment. Our clients are ready to begin construction and are currently awaiting the issuance of this permit to begin. We need to resolve this matter and get this permit issued ASAP. I appreciate your help in this matter. If this solution is acceptable we will update any supplements/ plans ASAP and have them delivered to you. Thanks, Jody Bland NORMS. KUSKE &TUNSTALL, -" CONSULTING ENG1N1EE*S. INC. Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. H:IPROJECTS12407107063 SOUTH BRIDGE1CaIcs\Hydro.Cad1. 07063 'Pre -Peat 03-02-10 Type 1! 24hr 0706310yr -24hr ReinfaW.88- Prepared by Morris, Kuske, & Tunstall Consulting Engineers, Inc. Page HydroCADO' 7.10 sin 000479 0 2005 HydroCAD Software -Solutions LLC 3/10/2010 Pond 7.12; Infiltration Area Inflow Area = 19.477 ac, Inflow Depth > 1.35" for 0706310yr-24hrevent Inflow = 0.65 cfs @ 12.33 hrs, Volume- 2.195 of Outflow 0'34 cfs Q 56.86 hrs, Volume= 1.555 +af; Atten= 49%0, L.ag= 2,671.7 rain Primary = 0134 ats i 56.88 hrs, Volume= 1.555 of Routing by Dyn-Stor--Ind method, Time Span= 0.00-72:00 hrs, dt= 0..02 hrs / 5 Peak Elev= 19.93' @ 56.86 hrs Surr.Area= 7,323 sf Storage= 28,578 cf Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass diet. time= 376.8 min ( 2,885.6 - 2,208.8 ) Volume Invert Avall.Storage . Storage Description #1 14M' 29,118 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store tfeet) (sg-ft) (cubic -feet) cubic -feet) 14.00 2,321 0 0 20.00 7,385 29,118 29,118. Device Routing Invert Outlet Devices #1 Primary 0.00' 1.980 In/hr Exfiltration over Surface area rimary OutFlow Max=0.34 cis @ 56.86 hrs HW=19.93' (Free Discharge) T—ImExtIltration (Exfiltration Controls 0.34 cis) Pond 7 -12: Infiltration Area Hydrograph 0.7' r- -C% 0.65 0.6' ._ Inflow Areal=19.477 ac 0.6 aPeak Elev-1.9.9 r o.s a4s horse--28,078 cf 0.4 . 0.35 1 0.2 0.15 0.1 0.05 0 0 2 4 6 8 10 12 14 18 18 20 22 24 28 26 30 32 34 38 38 40 42 44 48 48 50 52 54 58 58 60 62 U 66 68 70 72 Time (hours) -- Intbw Pnmry,,! HAPROJECTS\2007\07063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 03-02-10 Type 11 24-hr 0706310yr-24hr Rainfall=6.68" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 2 HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 3/10/2010 0 20 } 19 16 15 14 Pond 7 -12: Infiltration Area Stage -Area -Storage 500 1,000 1.500 2,000 2,500 3,000 3.500 4,000 4,500 5.000 5,500 6,000 6,500 7,000 12,600 14,000 16,000 18,000 20,000 22,000 24,000 26,000 Stor-ge (cubic -feet) - Surface Storaga H:IPROJECTS12007107063 SOUTH BRIDOE1Caics\HydroCadl 0706- Pre Paist 03-02-10 Type H 24-hr 07063 i yr -24hr Reinfail=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting. Engineers, Inc. Page 3 HYdroCADS 7.10 s/n .000479 0 2005 HydroCAD Srtftwam Solutions LLC ,3/10/2010 Pond'7 -12: Infiltration Area Inflow Area = 19.477 ac, Inflow Depth > 1.29" for 070631yr -24hr event Inflow - 0:57 cfs @ 22.61 hrs,. Volume-- 2.099 of Outflow - 0.33 cfs :Q 58.05 hrs, Volume= 1.476 of; Men= 42%, Lag= 2,126.4 mist. Primary = 0.33 cfs 0 68.05 hrs, Volume= 1.476 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.02 hrs / 5 Peak Elev=19.81' @:58.05 hrs Surf.Area= 7,228 sf Storage 27,755 cf Plug -Flow detention time (not calculated: outflow precedes inflow) Center -of -Mass det. time= 369.5 min ( 2,652.8 - 2,283.3 ) Volume Invert Avail.Storage Storage Description #1 14:00' 29,118 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) cubic -feet). (cubic -feet) 14.00 2,321 0 0 20.00 7,385 29,118 29,118 Device Routing Invert Outlet Devices #1 Primary 0.00' 1.980 in/hr Witration over Surface area primary OutFiow Max=0,33 cis Q 58,05 hrs HW=19.81' (Free Discharge) mExfiltration (Exfiltration Controls 0.33 cfs) Pond 7 -12: Infiltration Area Hydrogra ph "�•w Inflow Arad=19. 77 ac 45 . � `'�,. Peak Efev=1 9.8 14 35 25 ).2 15 05 1 J 0 0 2 4 8 8 10 12 14 18 18 20 22 24 28 28 SO 32 34 38 38' 40 42 44 AB 48 b0 87 54 58 58 Bo 82 84 68 68 70 75 Time (hours] .. . loffow =rM HAPROJECTS12007107063 SOUTH BRIDGEICalcslHydroCadl 07063 Pre -Post 03-02-10 Type 1124-hr 07063 Syr-24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 4 ydroCADO 7.10 sln 000479 © 2005 HydroCAD Software Solutions LLC 3/199010 Pond 7 -12: Infiltration Area Stage -Area -Storage nnn a ann 7 nnn fF8C8 0 bou !0 . . . .. 15 1,000 2,uuu 4,."1vu !,vw V,aw i ��- --- - --- - -- s � �nnn ad nnn �n nnn IR.000 20.000 22.000 24.000 26,000 28,000 Y - - --- -- Storage Ivibic-fs;et) Su $tOfAO@ s� South 'Bridge Soil Scrir8 Elevation Data Table X-A Location/ SB # $ore Location Elev (ft) SHWT Depth (Irv) SHWT Elev N. Location Utilized, B1 20 54 15:500. Y 62 7.75 26 5,5831 N B3 16 62 10.83,3 Y B4 11 34 8.167 Y B5� 11 48 7.000 Y 85b 11 54 6.500 -Y B6 7.834 22 6.001 Y B7 12.334 28 MOM Y B8 a 24 6.00.0 Y B9a 9 32 6.333 Y B9b 11 <12 10.083 N i B10 18 52 13.667 Y B12 25.75 45 22.000 N a B13 15 44 11.333. Y B14 31 <12 1 30.083. Y 0 Pusey, Steven From: Jody Bland Ubiand@nkteng.com] Sent: Monday, March 01, 2010 10:22 AM To: Pusey, Steven Cc: 'John Tunstall'; 'Amy' Subject: RE: Sizing for infil. basin #7-12 Attachments: D00030110.pdf Hi Steve, I went back through my notes and found the original drawdown time calculations for the infiltration basins. They had to be updated so I have included revised supplement sheets for each infiltration basin with the time correction. Nothing has changed on the plans regarding the basins and the initial pages are correct as submitted. Some discussion about these times 1. Infiltration Area for 7-12: The time reflects the required drawdown time plus the time for the excess discharge to infiltrate in the basin. (see calculation) The total time is 6.01 days. This should not be an issue since the rules state that effective infiltration must take place prior to any discharge reaching SA waters. The ponds are discharging into a self-contained area with no outlet to discharge to SA waters. I bring this up since the supplement indicates that this is in error but as I have stated before those supplement forms are setup for primary treatment BMPs. Finally I thought we had the issue regarding volume for the infiltration solved. I had previously provided to you an expanded hydrograph that illustrated the time at which the discharge (infiltration) began exceeding the inflow (discharge from the pond). The hydrograph also specified that the peak of the water surface elevation would be contained within the basin too thus sufficient volume had been provided. 2. Infiltration Area for 13: The specified discharge rate for the infiltration area exceeds the inflow rate of the pond orifice therefore the controlling factor for the basins drawdown time is directly related to the time required for the pond to drawdown. Thanks, Jody Bland %Or RIS.-IKUSKE &TUNSTALL Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. From: Pusey, Steven [mailto:steven.pusey@ncdenr.gov] Sent: Friday, February 26, 2010 3:42 PM To: Jody Bland Subject: Sizing for infil. basin #7-12 It appears that the provided volume of 22,634 cf is not met on basin #7-12. The required volume should be approx. 27,000 cf according to my calculations. I am basically using a weighted average method for inflow and outflow over a 44 hour period, the time it takes for the inflow to equal the outflow. Basin # 13A/B appears to be okay with a provided volume of 21,443 cf and a required volume of about 13,000 cf. Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven.Pusey@ncdenr.gov E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. NORRIS, KUSKE & TUNSTALL J. Phillip Norris, P.E. John S. Tunstall, P.E. John A. Kuske, III, P.E. -CONSULTING ENGINEERS, INC. James T. Pyrtle, P.E. J.A. Kuske, P.E. 902 Market Street • Wilmington, NC 28401-4733 • Phone (910) 343-9653 • Fax (910) 343-9604 E-Mail: office@nkteng.com LETTER OF TRANSMIT T AI To: Steve Pusey Date: February 24, 2010 Job No. 07063 NC DENR - Wilmington subject: South Bridge Subdivision Sneads Ferry, NC WE ARE SENDING YOU VIA HAND DELIVER ® ATTACHED ❑ UNDER SEPARATE COVER ❑ SHOP DRAWINGS ® PRINTS ❑ TRACINGS ❑ SPECIFICATIONS ❑ DISKS ❑ COPY OF LETTER ❑ FAX TRANSMITTAL: NUMBER OF PAGES INCLUDING THIS TRANSMITTAL Call 910-343-9653 if you have any difficulty receiving this message. COPIES DATE I NO. DESCRIPTION 1 02-23-10 Original High Density Residential Subdivisions Deed Restrictions & Protective Covenants with Attached Chart 1 02-22-10 Revised Calculations 2 02-23-10 DA Drainage Area Plan Phase 1 2 02-23-10 C1 Grading & Drainage Plan 2 02-23-10 C2 Grading & Drainage Plan 2 02-23-10 C3 Grading & Drainage Plan 2 02-23-10 C4 Grading & Drainage Plan 2 02-23-10 C5 Grading & Drainage Plan 2 02-23-10 C16 Pond #13 Details ❑ AS REQUESTED ❑ FOR YOUR USE ❑ FOR REVIEW AND COMMENT ❑ FOR APPROVAL ❑ FOR BIDS DUE ❑ YOUR PRINTS LOANED TO US REMARKS: Per your request to issue the State Stormwater Permit (SW8 090903). Thank you. PMCEEIV FEB 2 4 0010 BY: CC: Page 1 of 2 SIGNED John S. Tunstall, P.E. / asn CONFIDENTIAL AND PRIVILEGED: Information contained in this document is privileged and confidential, intended for the sole use of the addressee. If you are not the addressee or the person responsible for delivering it to the addressee you are hereby notified that any dissemination, distribution or copying of this document is strictly prohibited. If you have received this document in error nlease immediately notify the sender and return to the address above. NORRIS, KUSKE & TUNSTALL J. Phillip Norris, P.E. John S. Tunstall, P.E. John A. Kuske, III, P.E. CONSULTING ENGINEERS, INC. James T. Pyrtle, P.E. J.A. Kuske, P.E. 902 Market Street • Wilmington, NC 28401-4733 a Phone (910) 343-9653 a Fax (910) 343-9604 E-Mail: office@nkteng.com LETTER OF TRANSMITTAL To: Steve Pusey Date: February 24, 2010 11 Job No. 07063 NC DENR - Wilmington subject: South Bridge Subdivision Sneads Ferry, NC WE ARE SENDING YOU VIA HAND DELIVER ® ATTACHED ❑ UNDER SEPARATE COVER ❑ SHOP DRAWINGS ® PRINTS ❑ TRACINGS ❑ SPECIFICATIONS ❑ DISKS ❑ COPY OF LETTER 11 ❑ FAX TRANSMITTAL: NUMBER OF PAGES INCLUDING THIS TRANSMITTAL Call 910-343-9653 if you have any difficulty receiving this message. COPIES DATE NO. DESCRIPTION 2 02-23-10 C17 Pond Details 2 02-23-10 C18 Pond Details 2 02-23-10 C19 Sand Filter Details 2 02-23-10 C20 Sand Filter Details 2 02-23-10 C21 Sand Filter Details 2 02-23-10 C22 Sand Filter Details 2 02-23-10 C23 Sand Filter Details 2 09-28-09 R1 C24 - Grading and Drainage Notes and Details (02-23-10) 7 Revised Sand Filter Supplements (DA #1-5, 6A & 613) 7 Revised Filter Strip Supplements (DA #1-5, 6A & 613) ❑ AS REQUESTED ❑ FOR YOUR USE ❑ FOR REVIEW AND COMMENT ❑ FOR APPROVAL ❑ FOR BIDS DUE ❑ YOUR PRINTS LOANED TO US REMARKS: Per your request to issue the State Stormwater Permit (SW8 090903). Thank you. CC: Page 2 of 2 SIGNED John S. Tunstall, P.E. I asn CONFIDENTIAL AND PRIVILEGED: Information contained in this document is privileged and confidential, intended for the sole use of the addressee. If you are not the addressee or the person responsible for delivering it to the addressee you are hereby notified that any dissemination, distribution or copying of this document is strictly prohibited. If you have received this document in error please immediately notify the sender and return to the address above. STORMWATER CALCULATIONS SOUTH BRIDGE SUBDIVISION (PHASE 1) Sneads Ferry, North Carolina For BC & RT, LLC and Raiford G. Trask, Jr., Trustee 1202 Eastwood Road Wilmington, NC 28403 (910) 313-0795 I Revised February 2010 September 2009 Prepared by: NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 (Fax) N14T Project No. 07063 c m N A a m O O O O.O C-o { ;p O as CDP O CD ON J M9 fA .�.� i 7 tA�fA e �o C v V O 4C {'CA�� S o>oc c e fA Isre¢ oeeeo VI LE �G '�- e th e,_ CD to ecoc � rT t I � N f ". !2OD A w.+ w H.• N re �.+ hY � ... I eiweeo�osrofE����o� eta � f t f A V' b La Ch �7 a.,u W A+ •de +fie w E � Al cr in er fh a C °Wa : aka adaaty I P, > F; M o G I''e�', y L�JIj,R Ck dGo 17171.. CO �L s.z -4 � C1 �o pti W ;D' Lft �.N7 QC W N N LA �] Ct O ►+ F-� N O �O' �. j��'" n d G G C G7 C 4 C pp W W p o O NVI d 7 C7 C G G Ca G O G C p p (�Q N-+c�ocvaoow•vo�:o ;r;a � i'r, •O ' O C? C Q C C C A CI! 07 4 ry ..c �,+ � C4J n Lo. � t-x F+ :ice O G i�i C 000 G7 d t .� c O i O 4"� 0o 1 i` CD o CKW'WrA ... � w ' — I i 66 AANW A A. is U� rP R o a o a c a� o o O• e e e �` O 07063 lmmfvious Breakdown -Revised Areas for Builder Plans- 02-22-30 SAND FILTER DESIGN Drainage Area g DA 1 Drainage Area A.(fi=) 7777200 Step Y - Determine Required Treatment Volumes Requited Treatment Volume (t Adjusted treatment Volume (toWQVp{R) QVA M I 906488 Step i - Determine Filter Geometry Max Head on Sand Filter lhi- rM "Choose h— must nruae between 2.6 Ilrvrs (gl WQV fh)r453241 +Af 2.00 9064.86 ISO 9064.8855963D0 9064.88Qd 533.50 9064.8884960.00 90649E266.224SO 90669g014A2 sm129g SSO 90g496 164g.16 6.00 9.364.811 151091 Calculated Minimum Area of Sedimentation Basin Assumed Depth of Sand Filter »Minimum LS ft required Calculated Minimum Area of Sand Filter Proposed Geometric Properties Average Head >>Enter chosen hve from Table above As (ftz) 797.71 dr(ft)' Af (fej 2080.29 heu.,rw.,(Ip ha Ife) 1.00 Minimum Sedbnent & FllterChamberAreas based on chosen h,_ As (ft) - ?^rt.Lti7 - Meets Minimum Caculated Requirements Af (ftr) - - ;:Ori. Ct: =� Meets Minimum Calculated Requirements Step 3 - Verify Proposed Parameters VAR Contain WQV Deign ihrameMs As Iftall 1201.00 AUM 50011.00 2.00 (it) 1.00 Step 4 - Determine Minimtun Number of Pipes Needed for the Underdrain System Whare: Media Permeability alft/day) c:35u), or k(in/hr) Tota(ffead Ah(Al 400 Length of Flow through Media L(ft) 2000 Peak Inflow Qp (In/hr per unit area) 3.50 Fluw Rate through Soil Media Q(fe /serf 0.4056 »Apply a Safety Factor between 2 -10 _ Q(ft't/set 4.91 Determine Equivalent Diametet as Single Pipe Where: n = roughness factor s - internal slope of underdrain D=plpe diameter D(in)7362 See Table 5-1 pg 5.12 of NCDENR BMP manual Minimum N of Pipes Required In the Undetdrain Step S - Determine Forebay Containment Volume Forebaytypically required to contain between 18% to 22% at18% 1631.68 at 22% 199427 Provided volume 2470.50 OK Step 6 - Determine Drawdown Time WQVA4 (fta) 9064.88 Discharge Orfiice Size(ft) crosssecUomlarea(fe) O.0m Coefficient of Discharge NS Gravitational Constant(ft/sz) IMrnraw (fl) 2.00 Determine Iforlke Is controlling factor(hr) • (see NCDENItmanual pg3-13) 7.34 Determine if Filter Media is controlling factor (hr) 12.42 » if M r)-(WQV.4 (ft)/ff k (ft/dav)-s (0j/24(br)1 1.75 HAPROIECfSUD07V170fi1 SOUTH BRIDGklCalesk070631mperAours Breakdown -Revised Areas for Builder Plans • 02.22.10 HAPROJECTS12007107063 SOUTH BRIDGE1Calcs\HydroCadl 07063 Pre -Post 02-22-10 Type 1124-hr 07063 1 yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 2/22/2010 Subcatchment. DA 1: Pre Runoff — 3.52 cfs a@ 12.02 hrs, Volume= 0.193 af, Depth> 1.29" Runoff by SCS TR 20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type Il 24-hr 070631yr -24hr Rainfall=3.67" Area (ac) CN Description 1.790 73 Woods, Fair, HSG C Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment DA 1: Pre Hydrograph ZRunoff Type 1124-hr 07063 1yr -24hr Ralnfall=3.67" 3 Runoff Area=1.790 ac Runoff Volume=0.193 of Runoff Depth>1.29"F 3. 2 Tc=1O.0 ruin LL CN=73 0 0.rM-�- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time !hours) H:IPROJECTS12007107063 SOUTH BRIDGE1Caics\HydroCadl 07063 Pre -Post 02-22-10 Type 1124-hr 07063 1 yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 sh 000479 © 2005 HydroCAD Software Solutions LLC 2/22/2010 Subcatchment DA1: Post Runoff = 6.54 cfs @ 12.01 hrs, Volume= 0.361 af, Depth> 2.42" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67" Area (ac) CN Description 1.010 98 Paved parking & roofs 0.780 76 Woods/grass comb., Fair, HSG C 1.790 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment DA1: Post Hydrograph 7 Type 1124-hr 07063 1yr 6 Rainfall=3.67" Runoff Area=1.790 ac 5 Runoff Volume=0.361 of .........__....._......... 4 Runoff Depth>2.42" Tc=10.0 min LL 3 CN=88 1 0Mwda ,,. 0 1 2 3 4 5 8 7 8 9 10 11 12 13 14 15 18 17 i8 19 20 21 22 23 24 Time (hours) Date Design A Wilmington, n, NSheet �(/NORRIS, KUSKE &TUNSTALL CONSULTING ENGINEERS, INC. Brunswick County, NC .1pr Dof * Z Amor- lip, wasp Zu lqn s II A+ t� 5 13 a P4 Z t5 3 tb � MV6 = ql sp 2ow" AfA- 22 z+F -??a Z 2Ls f®io %2* �Bb 18114, -1W 2��L Z.t 15 '724 28 35 ZZt ?i -7u Zq 32 12-1+ -720 2974 1-7, L3 "INY4L iwQewas * 1°I W 51" IqWD 't 1,1415 (? -5v"ws = 1'71 IF LOT.* Ise 2�01 It v o5 t 101v+ 37063 Impervious 8reakdovm-Revised Areas ho Budder Plans = 02.22.10 SA= FILTER DMGN Drainage Area# DA2 DrainageArea /ytftj 566662M Step 1- betermine Required Treatment Volumes Required Treat re, tValume tf) WCNIM 53949f1 Adjusted Treatment Volume (ft) WQVm,4 (ft) 1 404618 Step 2 - Determine Filter Geometry Man Headnq Sandffear he„r (0) sir.- .... -->r._-_-'_` (Raeeea 01) W064 NO AsvAf 2.00 404618 202509 2.50 40" )61A47 3.00 404618 048.73 3.SD 4046-iB 1156.05 4.00 410,41111.18 M1.54 4.50 404628 89S-15 5.00 4046.15 804.24 5-W 404638 735.W 6.00 404616 . Calculated Minimum Area of Se llmematran Basin Assumed Depth of Sand Filter »Minfmum LS ftrequired Calouated Minrmum Area ofSand Filter Proposed Geometric Properties Average Had —Enter chosen hue from Table above As (fr=) 356A6 dr(ft) Af i 619.04 he IN hsbre-(m ,N'-7 NIM 1.50 Minimum Sediment 6 Filter Chamber Areas based an chosen hu. As (fts) w; ohs,. Meek Minimum Calculated Requirements Af (ft) F'- 56DdxiOA Meets Minimum Calediated Requirements Step 3- Verily Proposed Parameters Will Contain WQV Design Parameters As Mal 52135 =LOD iYr-rr 3.40 1.50 Step 4- Determine Minimum Number of Pipes Needed for the Underdraln System where: MediaPernmability k(ft/day) - of k(fn/hf) _ ......Iotal.tleaa... Ah (10 -5 Length of Firm through Media I. fit) 200 Peak Inflow Op fin%hr per unit area) 438 Flow Rate through Sall Media C1 W/seq D.Im "Apply a Salary Factor between 2 - 1C Qife/s"1 Dss Determine equivalent Dlameterassingle Pipe where; n = roughness factor 0.011 a- Internal slope of enderdraln 0.30% D-plpediameter D(In) 6352 See Table S.1 pg 5-12 of NOW BMP manual Minimum g of Pipes Required in the Underdrafn •s - z".;;ca . Step 5 - Determine Forebay Containment Volume Forebay typically required rocontain between 19%to 22% at 18% 72831 at22% 890.16 Provided volume swig OR Step 6 - Determine Drawdown'time WQVp(W) 404618 UrWerdrain Vne She(ft) :-�'. ''"=�CY33.fi '•' =^ �- cross sectional area(ft) 0AP73 --�, +.....+-.....+K...--....,.. Coefficient ofDischarge f L'::ab N Gravitetfanai Constant(ft/s) •_ 3i .. hrnrav(N ^ 3.0o Determine if orfice is CCAW ing farto.'thr) -(see MCDENR manual pg3.131 2.67 Determine if Filter Media is controlling facto (Its 25.67 - if T(hr)-(wgveg(ft'ililk (eldw)xAs. Ife)YM(ho) DR yOR f ES 1.75 HAPRWl1CT5\2007\D70Q SOUTH 88036EOks\07063 impervious Breakdown -Revised Areas for Budder Plans - 02-22-16 HAPROJECTS12007107063 SOUTH BRIDGE1Ca1cs\HydroCadl 07063 Pre -Post 02-22-10 Type // 24-hr 07063 Syr-24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 2/22/2010 Subcatchment DA 2: Pre Runoff = 2.56 cfs @ 12.02 hrs, Volume= 0.140 af, Depth> 1.29" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type 1124-hr 07063 1 yr -24hr Rainfall=3.67" Area (ac) CN Description 1.300 73 Woods, Fair, HSG C Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment DA 2: Pre Hydrograph - Runoff Type If 24-hr 07063 Tyr -24hr Rainfall=3.67" 2 Runoff Area=1.300 ac Runoff Volume=0.140 of y Runoff Depth>1.26" 3 Tc=10.0 min 0 LL CN=73 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hour) H:\PROJECTS12007\07063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 02-22-10 Type 1124-hr 07063 i yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Soitware Solutions LLC 2/22/2010 Subcatchment DA2: Post Runoff = 4.15 cfs @ 12.02 hrs, Volume= 0.225 at, Depths 2.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type 1124-hr 070631 yr -24hr Rainfall=3.67" Area (ac) CN Description _ 0,450 98 Paved parking & roofs 0.850 76 Woods/grass comb., Fair, HSG C 1.300 84 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment DA2: Post Hydrograph ■ Rurmif 4' Type if 24-hr 07063 iyr -24hr Rainfall=3.67" Runoff' Area= '1.300 ac 3 Runoff Volurne=0.225 of Runoff Depth>2.03" iTc=10.0 min LL 2 CN=84 1 0- 0 1 2 3 4 5 8 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 U 6J 24 Time (hours) SF DA #2 - Veg Filter -10 yr stet Worksheet for Rectangular Channel Project Description Project File hAprojectM2007107063 south bridgelcalcstflowmaster107063 ve.fm2 Worksheet SF DA#2 - Vag Filter Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.006000 fttfl: Bottom Wdth 10.00 ft Discharge 4.12 cfs Results Depth 0.28 ft Flow Area 2.83 ft2 Wetted Perimeter 10.57 ft Top Width 10.00 ft Critical Depth 0.17 ft Critical Slope 0.024584 ft/ft Velocity 1.46 ft/s Velocity Head 0.03 ft Specific Energy 0.32 ft Froude Dumber 0.48 Flow is subcritical. 02/23/10 FlowMaster v5.13 09:17:44 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-i 8e6 Page 1 of 1 Date Design NORRIS, KUSKE &TUNSTALL Wilmington, NC L7--05�1 f4v4p dv,5 CONSULTING ENGINEERS, INC. Brunswick County, NC A 7 = 1�751osr Puw WeA- I't t I8(ot, '12� 25 LOS, i� MICEP i %io Loe b l� fl* -7 Z, 1.19� f �a 221v ?z' 2937� Zt v DOW '7 to zm; ?N 1 low l u Z58L 23 I low TP 25ft" 2* 3 juv 720 2932 ZS 1+ 227+F '7%0 -v114 Vp -no 3oe& 612 - 14 3 1166 710 MAP 9.6 ! q31 W 11601 21 t II94v 7V 2562., HZ - 3o L 10,57.5 -1110 177?. S lira. � 18230 11 e3 t 1 c3 yz - 33 Af 1R 31 1 t55'7 1183 24 2 528.E lbsIL, .r- 366-B>+ +6 179. % = 9f, 04,9. 265r- 87063 Impervious Breakdown -Revised Areas for Builder Plans - U 22-M SAND FILTER DESIGN Drainage Area I OA 3 Drahm"Ara. A.(ft) i 15751CA0 Step 1- Determine Required Treatment Volumes Required Treatment Volume (ft') w4V (ft) 2313456 Adjusted T mtment Volume (ft) WOVy. (na) I 1735092 Step 2- Determine Filter Geometry Mae Head on Sand FBter 6wroo,M) hw.py(4 Ylf2tr {R) As*AffM 2A0 37350.92 8675.46 250 17350.92 694037 3.00 17350.92 5783.64 350 t7350.92 4957A0 4.00 17350.92 _.._ 4337.73 450 17350.92 3855.76 5.00 i735092 3470.18 s so 1735092 3154.71 6.0D 173SOM 2891.82 Calculated Minimum Arta of Sedimentation Basin Assumed Depth of Send Filter s>Minlmum 25 it required Calculated Minimum Area of Sand Filter Proposed Geometric Properties Average Head »Enterchosen - hoer from Table above As (fM r 1525.99 Af (ft') M4S7 h, Ifl1 7.50 Minlaum Sediment & Filter Chamber Arees based on chosen by As (ft) ••-.;:... 'bSOA�., Meets Minimum Calculated Requirements Af (ftr) _ a'r`:. ,�iL4�DD,D4"- • ' S. Meets Minimum Calculated Requirements Step 3- Verily Proposed Parameters Will Contain WQV Design Parameters M 011 100.00 Af 42Da00 hw„ra„ (Iq 3 DD 1.50 Step 4 - Determine Minimum Number of Pipes Needed for the Underdrain System Where: Media Permeability klft/day) i3. i1 or k(In/hr) _ _7'oblHead_ _. _ — _ _- Ah (M Length of Flow through Media 1(ft) Peak Inflow Op(In/hr pc r unit area) 4.39 Raw Rate through Sell Media O1n'/sec) O.n 53 »Applya Safety Factor between 2 -10 •.' i>n.= O(ks/sae) O.BS Determine Equivalent Diameter as Slagle Pipe Where: n - roughness factor 8.011 s - Intenal slope of underdrain OSO% D=pipe diameter D (In) 7A95 See Table 5-1pa Sit of NCDENR BMP manual Minimum R of Pipes Required In the Underdraln s •d`tf:n. Step 5 - Determine Forebay Containment Volume Forebay typically required to contain between M to 22% at 18% 3123.17 at 22% 3617.20 Provided volume 3514.35 OK Step 6 - Determine Orawdown Time WOVA00 1735092 —--T UnderdrainWeSke(h) -`=3='`�xI`^ti-'if, ti��:�':•=:`t>"=:i,'fz Cress aedbnrolarea (h� O=3 Coefficient of Discharge Gravitational Consfant(ft/s) lre.m,(l9 3A0 Determine tf orRce is controlling (actor (bli - (sea NCDENR manual p53.13) 11.47 Determine if FOter Media Is controBing factor (hr) 2333 sO IfT(hr)-(WD:Va,a(fes)/((k (ft/day)Ms. (ft1)/241W)( 1.7s hkt,PR01ECf5128Q7W067 SOUTH ORIDGE\CakakO7oO impervious Breakdown -Revised Areas for Builder Plans - 02-22-10 HAPRO,IECTS12007107063 SOUTH BRIDGE1CaIcs\HydroCadl 07063 Pre -Post 02-22-10 Type !l 24-hr 07063 9 yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 0 2005 HydroCAD Software Solutions LLC 2/2212010 Subcatchment DA 3: Pre Runoff = 7.12 cfs @ 12.02 hrs, Volume= 0.390 af, Depth> 1.29' Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type 1124-hr 070631 yr -24hr Rainfall=3.67" Area (ac) CN Description _ 3.620 73 'goods, Fair, HSG C Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) �ftJsec) (cfs) 10.0 Direct Entry, Subcatchment DA 3: Pre Hydrograph ■ Ranoff 7 ! Type 1124-hr070631yr-24hr I Ralnfall=3.67" 6 Runoff Area=3.620 Ac 5 Runoff Volume=0.390 of Runoff Depth>1.29"` 4 Tc=100 min LL C fN=73 3 ME 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) H;IPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Past 02-22-10 Type I/ 24-hr 070631 yr -24hr Raintaii=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 2/22/2010 Subcatchment DA3: Post Runoff — 13.23 cfs @ 12.01 hrs, Volume= 0.730.af, Depths 2.42" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type li 24-hr 07063 1yr -24hr Rainfall=3.67" Area (ac) CN Description 1.930 98 Paved parking & roofs 1.690 76 Woodstcrass comb., Fair, HSG C 3.620 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment DA3: Post Hydrograph 14 .13.23 eIs' 13 Type II 24-hr 07063 1yr 24hr 12 Rainfall=3.67" 11. Runoff Area=3.620 ac 10 - Runoff Volume=0.730 of 9 : ... Runoff Depth>2.42 8 _0 7 Tc='10.0 min LL 8 CN=88 5 4 3- 2 1• 0. 0 1 2 3 4 5 8 7 8 9 10 11 12 13 14 15 18 17 18 19 20 21 22 23 24 Time (hours} ® Runoff H:\PROJECTS\2007107063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 02-22-10 Type ll 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 0 2005 HVdroCAD Software Solutions LLC 2/22/2010 Pond SF#3: Filter#3 Inflow Area = 3.620 ac, inflow Depth > 2.42" for 070631yr -24hr event Inflow = 13.23 cfs @ 12.01 hrs, Volume= 0.730 of Outflow = 1.19 cfs @ 12.59 hrs, Volume= 0.777 af, Atten= 91 %, Lag= 34.6 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 1.19 cfs @ 12.59 hrs, Volume= 0.777 of Routing by Dyn-Stor-Ind method, lime Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 9.00' Surf.Area= 9,992 sf Storage= 2,324 cf Peak EIev=10.79' @ 12.59 hrs Surf.Area=11,744 sf Storage=14,350 cf (12,026 cf above start) Flood EIev=12.00' Surf.Area=12,931 sf Storage= 24,283 cf (21,959 cf above start) Plug -Flow detention time=114.4 min calculated for 0.723 of (99% of inflow) Center -of -Mass det. time= 49.0 min ( 857.8 - 808.8 ) Volume Invert Avail.Storage Storage Description #1 6.67' 2,010 cf Custom Stage Data (Prismatic) Listed below (Recalc) 8,354 cf Overall - 314 cf Embedded = 8,040 cf x 25.0% Voids #2 6.67' 314 cf 4.0"D x 60.001 Horizontal Cylinder S= 0.00607 x 60 Inside #1 #3 9.00, 21,959 cf Custom Stacae Data (Prismatic) Listed below (Recalc) 24,283 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 6.67 3,029 0 0 9.00 4,142 8,354 8,354 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 9.00 5,850 0 0 12.00 8,789 21,959 21,959 Device Routin4 Invert Outlet Devices #1 Primary 7.50' 240' x 20.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 7.00' S= 0.02507 Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 11.15' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 6.67' 4.0" Vert. Discahrge Orfice from Underdrain C= 0.600 #4 Secondary 6.67' 1.750 in/hr Infiltratlon through Filter Media over Surface area above invent Excluded Surface area = 3,029 sf #5 Discarded 11.50' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 HAPROJECTS12007107063 SOUTH BRIDGE1Calcs\HydroCad\ 07063 Pre -Post 02-22-10 Type 1124-hr 07063 Syr-24hr Rainfafl=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 sfn 0OC479 Cc 2005 HydroGAC Software Solutions LLC 2/22/2010 iscarded OutFlow Max--0.00 cfs @ 0.00 hrs HW=9.00' (Free Discharge) Emergency Spillway ( Controls 0.00 cfs) Lary OutFlow Max=0.00 cfs @ 0.00 hrs HW=9.00' (Free Discharge) Culvert (Passes 0.00 cfs of 10.54 cfs potential flow) 2-13affle Wall ( Controls 0.00 cfs) 1econdary OutFlow Max=1.19 cfs @ 12.59 hrs HW=10.79' (Free Discharge) 3=Discahrge Orfce from Underdrain (Orifice Controls 0.84 cfs @ 9.6 fps) -Infiltration through Filter Media (EAltration Controls 0.35 cfs) Pond SF#3: F11ter#3 Hydrograph ■ Inflow .� Outflow El Discarded ■ Primary Secondary 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) H:IPROJECTS12007107063 SOUTH BRIDGE1CaIcs\HydroCadl 07063 Pre -Post 02-22-10 Type U 24-hr 07063 Syr-24hr Rainfa11=3.67" Prepared by Nords, Kuske, & Tunstali Consulting Engineers, Inc. HydroCADV 7.10 sin 000479 © 2005 HydroCAD Software Solutions LLC 2/22/2010 12 11 m to Is c 0 m 9 W 8 Pond SF#3: FlIter#3 Stage -Discharge 0 2 4 a 8 10 12 14 18 18 20 22 24 26 28 Discharge (cis) Total ® Discarded ■ Primary © Secondary HAPROJECTS\2007\07063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 02-22-10 Type // 24-hr 070631 yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 sh 000479 ® 2005 HydroCAD Software Solutions LLC 2/22/2010 Stage -Area -Storage for Ported 5F#3: Filter#3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 6.67 3,029 0 6.77 3,077 84 6.87 3,125 196 6.97 3,172 338 7.07 3,220 488 7.17 3,268 613 7.27 3,316 711 7.37 3,363 795 7.47 3,411 880 7.57 3,459 966 7.67 3,507 1,053 7.77 3,564 1,141 7.87 3,602 1,230 7.97 3,650 1,321 8.07 3,698 1,413 8.17 3,746 1,506 8.27 3,793 1,600 8.37 3,841 1,896 8.47 3,889 1,792 8.57 3,937 1,890 8.67 3,984 1,989 8.77 4,032 2,089 8.87 4,080 2,191 8.97 4,128 2,293 9.07 10,061 2,736 9.17 10,159 3-.333 9.27 10,257 3,939 9.37 10,354 4,556 9.47 10,452 5,182 9.57 10,550 5,818 9.67 10,648 8,464 9.77 10,746 7,119 9.87 i 0.844 7,784 9.97 10,942 8,460 10.07 11,040 9,144 10.17 11,138 9,839 10.27 11,236 10,544 10.37 11,334 11,258 10.47 11,432 11,982 10.57 11,530 12,716 10.67 11,628 13,460 10.71 11,726 14,213 10.87 11,824 14,977 10.97 11,922 15,750 11.07 12,020 16,533 11.17 12,118 17,325 11.27 12,216 18,128 11.37 12,314 18,940 11.47 12,412 19,762 11.57 12,510 20,594 11.67 12,608 21,436 Elevation Surface Storage (feet) (sg-ft) (cubic -feet) 11.77 12,706 22,287 11.87 12,804 23,148 11.97 12,902 24,019 KNPROJECTS12007107063 SOUTH BRIDGE1Caics\HydroCadl 07063 Pre -Post 02-22-10 Type 1124-hr07063.10yr-24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstali Consulting Engineers, Inc. HydroCAOO 7.10 s/n 000479 Q 2005 HydroCAD Software Solutions LLC 2/22/2010 Pond SF#3: Filter#3 Inflow Area = 3.620 ac, Inflow Depth > 5.47" for 0706310yr -24hr event Inflow = 28.62 cfs @ 12.01 hrs, Volume= 1.649 of Outflow = 21.48 cfs @ 12.09 hrs, Volume= 1.686 af, Atten= 25%, Lag= 4.5 min Discarded = 13.78 cfs @ 12.09 hrs, Volume= 0.206 of Primary = 6.36 cfs @ 12.09 hrs, Volume= 0.249 of Secondary = 1.34 cfs @ 12.09 hrs,. Volume-- 1.231 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 9.00' Surf.Area= 9,992 sf Storage-- 2,324 cf Peak Elev= 11.90' @ 12.09 hrs Surf.Area= 12,835 sf Storage-- 23,429 cf (21,105 cf above start) Flood Elev=12.00' Surf.Area= 12,931 sf Storage= 24,283 cf (21,959 cf above start) Plug -Flow detention time= 105.8 min calculated for 1.633 of (99% of inflow) Center -of -Mass det. time= 72.7 min ( 858.8 - 786.1 ) Volume Invert Avail.Storage Storage Description #1 6.67' 2,010 cf Custom Stage Data (Prismatic) Listed below (Recalc) 8,354 cf Overall - 314 cf Embedded = 8,040 cf x 25.0% Voids #2 6.67' 314 cf 4.0"D x 60.WL Horizontal Cylinder S= 0.0050 T x 60 Inside #1 #3 9.00, 21,959 cf Custom Stage Data (Prismatic) Listed below (Recalc) 24,283 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (SA-ft) (cubic -feet) (cubic -feet) 6.67 3,029 0 0 9.00 4,142 8,354 8,354 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 9.00 5,850 0 0 12.00 8,789 21,959 21,959 Device Routing invert Outlet Devices #1 Primary 7.50' 24.0" x 20.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 7.00' S= 0.0250'P Cc-- 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device i 11.15' 3.ii ioiig x v.V tbraadthle 6afila "4va1l Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 6.67' 4.0" Vert Discahrge Office from Underdrain C= 0.600 #4 Secondary 6.67' 1.760 in/hr Infiltration through Filter Media over Surface area above invert Excluded Surface area = 3,029 sf #5 Discarded 11.50' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 HAPROJECTS12007\07063 SOUTH BRIDGE1Calcs\HydroCadl 07063 Pre -Post 02-22-10 Type 1124-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstali Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 02005 HydroCAD Software Solutions LLC 2/22/2010 Discarded OutFlow Max --I 3.62 cfs @ 12.09 hrs HW=11.90' (Free Discharge) t--5=Emergency Spillway (Weir Controls 13.62 cfs @ 1.7 fps) �nmary OutFlow Max=6.31 cfs @ 12.09 hrs HW=11.90' (Free Discharge) 1=Cuhrert (Passes 6.31 cfs of 27.89 cfs potential flow) 'L2=13affle Wall (Weir Controls 6.31 cfs @ 2.8 fps) econdary OutFlow Max=1.34 cfs @ 12.09 hrs HW=11.90' (Free Discharge) 3=Discahrge Office from Underdrain (Orifice Controls 0.95 cfs @ 10.8 fps) =Infiltration through Filter Media (Exfiltration Controls 0.40 cfs) Pond SF#3: Fiiter#3 Hydrograph 32 30 28- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) H:\PROJECTS\2007\07063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 02-22-10 Type 1124-hr 0706310yr -24hr Rainfall=6.88" Prepared by Dorris, Kuske, & Tunstail Consulting Engineers, Inc. HydroCAD® 7.10 sh 000479 © 2005 HydroCAD Software Solutions LLC 2/22/2010 m 1 m e 0 m m L Pond SF#3: F11ter#3 Stage -Discharge 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Discharge (efs) HAPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 02-22-10 Type 1124-hr 07063 1Oyr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 2/22/2010 Stage -Area -Storage for Pond SF#3: Filter#3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 6.67 3,029 0 6.77 3,077 84 6.87 3,125 196 6.97 3,172 338 7.07 3,220 488 7.17 3,268 613 7.27 3,316 711 7.37 3,363 795 7.47 3,411 880 7.57 3,459 966 7.67 3,507 1,053 7.77 3,554 1,141 7.87 3,602 1,230 7.97 3,650 1,321 8.07 3,698 1,413 8.17 3,746 1,506 8.27 3,793 1,600 8.37 3,841 1,696 8.47 3,889 1,792 8.57 3,937 1,890 8.67 3,984 1,989 8.77 4,032 2,089 8.87 4,080 2,191 8.97 4,128 2,293 9.07 10,061 2,736 9.17 10,159 3,333 9.27 10,257 3,939 9.37 10,354 4,556 9.47 10,452 5,182 9.57 10,550 6,818 9.67 10,648 6,464 9.77 10,746 7,119 9.87 10,844 7,784 9.97 10,942 8,460 10.07 11,040 9,144 10.17 11,138 9,839 10.27 11,236 10,544 10.37 11,334 11,258 10.47 11,432 11,982 10.57 11,530 12,716 10.67 11,628 13,460 10.77 11,726 14,213 10.87 11,824 14,977 10.97 11,922 15,750 11.07 12,020 16,533 11.17 12,118 17,325 11.27 12,216 18,128 11.37 12,314 18,940 11.47 12;412 19:762 11.57 12,510 20,594 11.67 12,608 21,436 Elevation Surface Storage (feet) (sg-ft) (cubic -feet) 11.77 12,706 22,287 11.87 12,804 23,148 11.97 12,902 24,019 SF DA##3 - Veg Filter -10 yr stm Worksheet for Rectangular Channel Project Description Project File h:\projects\2007\07063 south bridge\calcs\fiowmaster\07063 ve.fm2 Worksheet SF DA#3 - Veg Filter Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.020000 ft/ft Bottom Width 25.00 ft Discharge 7.65 cfs Results Depth 0.15 ft Flow Area 3.84 f 2 Wetted Perimeter 25.31 ft Top Width 25.00 ft Critical Depth 0.14 ft Critical Slope 0.025475 ft/ft Velocity 1.99 ft/s Velocity Head 0.06 ft Specific Energy 0.22 ft Froude Number 0.90 Flow is subcritical. 02/2'3/10 FlowMaster v5.13 09:18:27 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Date [� Design J 1* NORRIS, KUSKE &TUNSTALL Wilmington, NC CONSULTING ENGINEERS. INC. Brunswick County, NC A45' sneer Of Check Job For Job No. _ - ` 52 SriZE Av-64- z 2`, 9 32 f9= Im ►ws # sF ids - f - 21 3 11 t* '"I 21 i .931 —120 IbS� 30 Z 195`7.5 %Zap 17"s %/7. - 31 3 t10L. -72,L> I UP2u Tz' - 3� 5 11 e3 -714 «03 `,/.L - 33 A' l i r 720 / 1f 5-7 IIt ' 14, 5 1183 '11-11 1903 314 - 35 Z 115".Z5 7100 23o4..?� NP I 18b2 -tu 25BZ Z2?¢ 720 2994 3 M7. 740 21sz 60 2 2115 720 2635 bl 1 161dL 7� 256 a ?a sIo ?Q' SF 10TA • = i+3T4 -r 289"4. "YS = AJ3,-Z".-75 M53 impervious Breakdown -Revised Areas for Builder Plans-112.22-10 SAND FILTER DESIGN Drainage Area g DA 4 Drainage Area A. ifs) U6932 Step 1- Determine Required Treatment Volumes Required Treatment Volume (" wQV (ha) 119182E Adjusted Treatment Volume if.) WQV"(fta) I Ii938.n Step 2 -Determine Titer Geometry Max Read on Sand FIRar lya.aa.(flJ Rserea iM WQV jnlj A"Af 2.00 89311.ri9 446935 250 8438.as 3575.48 3.00 SM69 2M.66 3S0 8933189 255391 4.00 8938.69 2294.67 4.S0 893&69 198&38 5.00 8938.69 1797.74 5.50 8938.69 1675.22 6.00 8938.69 14"Ja Calculated Minimum Area of Sedimentation Basin Assumed Depth of Sand Filter »Mlydnxsm 15 ft required Calculated Minimum Area of Sand Fiter Proposed Geometric Properties Average Head »Enter chosen h� from Table above As(ftj =F= drift) AI!2m II Af(O 1367S6 It. Im hw.re.In) Is. im 7.50 Minimum Sediment& Filter Chamber Areas based on chosen by a As (fib :., :r:� 90 Meets Minimum Calculated Requlremerds At(ftsj 'd476 tl. _ Meetsmwmumrah tedRequlremsnts Step 3 - Verify Proposed Parameters Wrdil Contain WQV Dcsfgn Paremetefs As fP 1.Q69.67 Alf Iftl 2176.60 hN.re. SAO 1.50 Step 4 - Determine Minimum Number of Pipes Needed for the Underdrain System Where: Media Permeability k(ft/day) t,r3 °,? or k(dn/hd total Head .. Ah.(rt).. _5.W Length ofFirm through Media L(ft) 2.110 Peak Inflow DIP r'mlhr per unit area) 239 How Rate through Sol Media Q(felsec) 11:1201 a.Apply a Safety Factor between 2-10 92s.0 - Q(feisec) OSS Datemr se Equivalent Diameter as5ingle Pipe Where: n= roughness factor 0.611 s= internal slope of underdraln 050% D-pipe diameter 0 (in) 6369 See Table S-1 pg 5-12of NCOENR 8MP manual Minimum 6 of Pipes Required In the Undendmin : - a od7 Step S - Determine Forebay Containment Volume Forebay typically required to contain between 18% to 227E at 189E 3608.96 at2rA 1966.S7 Providad volume 189432 OK Step 6 - Determine Drawdown Time WQVA4(fO 8938.69 lMderdrafn floe Size (ft)?yea uaea sectioned area (ft) 0.0873 Coefficient of Discharge Gravitational Constant(ft/s) hut.wrlW ... Determine if orfice is controlling factor (hr) -(see NCDENR manual pg3.13) Sal Determine If Filter Media Is controlling factor (hr) 28.16 » If T(hr)= (WQVa,a (ft)/i(k (ft/day)xAs (ft))/24(hd) Y'APROJEtt5\2007N07063 SOUTH 8RrDGE%Calcs\07063Impervious Breakdown -Reused Areas for Suker Plans -02-22.10 HAPROJECTS12007107063 SOUTH BRIDGE1Caics\HydroCadl 07063 Pre -Post 02-22-10 Type 1124-hr 07063 9 yr -24hr Rainfall=3. 67" Prepared by Norris, Kuskce, & Tunstali Consulting Engineers, Inc. HydroCAD® 7.10 sh 000479 © 2005 HydroCAD Software Solutions LLC 2/22/2010 Subcatchment DA 4: Pre Runoff - 5.73 cfs cQ 12.02 hrs, Volume-- 0.313 af, Depth> 1.29" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type 1124-hr 07063 1 yr -24hr Rainfall=3.67" Area (ac) CN Description 2.910 73 Woods, Fair, HSG C Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment DA 4: Pre Wdroctranh A Runof} 6 5 4 31 2 1- Type 1124-hr 07063 lye -24hr Rainfall=3.97" Runoff Area=2.910 ac Runoff Volume=0.313 of Runoff Depth>1.29" Tc=10.0 min CN=73 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) H:IPROJECTS12007t07063 SOUTH BRIDGE1Caics\HydroCadl 07063 Pre -Post 02-22-10 Type /124-iir 07063 Syr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADe 7.10 sh 000479 © 2006 HydroCAD Software Solutions LLC 212312010 Subcatchment DA4: Post Runoff = 8.95 cfs @ 12.02 hrs, Volume= 0.484 af, Depth> 2.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type 1124-hr 070631 yr -24hr Rainfall=3.67" Area (ac) Cif Description 0.990 98 Paved parking & roofs 1.920 76 Woods/grass comb., Fair, HSG C 2.91.0 83 Weighted Average Tc Length Slope Velocity Capacity Description 10.0 Direct Entry, Subcatchment DA4: Post Hydrograph 10 9 Type II 24-hr 070631yr -24hr $ Rainfall=3.67" Runoff Aie&2.910 ac 7. . Runoff Volume=0.464 of .....:...._...... :__.._ 6 Runoff Depth>2.00"' 5 Tc=10:0 min LL 4 CN=83 3 2 1 0•• 0 1 2 3 4 5 6 7 5 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ■ Runoff SF #4 - Veg. Filter -10 yr stm Worksheet for Rectangular Channel Project Description Project Fife h:%projects12007107063 south bridgelcaicslfiowmaster107063 ve.fm2 Worksheet SF DA#4 - Veg Filter Flown Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.010000 ft/ft Bottom Width 10.00 ft Discharge 5.04 cfs Results Depth 0.26 ft Flow Area 2.59 ft2 Wetted Perimeter 10.52 ft Top Width 10.00 ft Critical Depth 0.20 ft Critical Slope 0.023659 fVft Velocity 1.96 ftts Velocity Head 0.06 ft Specific Energy 0.32 ft Froude Number 0.67 Flow is subcritical. 02/23/10 FlowMaster v5.13 09:19:07 AM Haestad Methods, Inc. 37 Brookside Road Waterbury. CT 06709 (203) 755-1666 Page 1 of 1 uate uesign A, Wifin ton, NC Sheet NORRIS, KUSKE &TUNSTALL mg CONSULTING ENGINEERS, INC. Brunswlck County, NC Ofl Check ,lob 1�, ` For Job No. JPs� — rrF S rAA- n D4 6s A2CA- = -70, 0 22 Lt a14 Loris Pw'_i- P _ a�sr 7h"4'1- �• t 2,1 i 5 72o Z6 35 4 S Z3tob '71.� 30 $b 17* 2e 3S 3 22AZ 72a 2q 32 1Y 18w, 730 25ev Z344 736 30igb �� Z 2i15 7� 2835 As thsi Afif el 07063 Impen(ous Breakdown -Revised Aram for Builder Plans - n?-�140 SAND FILTER DESIGN Drainage Area 8 DAS Drainage Area A.(fr) 70D22AO Step 1- Determine Required Treatment Volumes Required Treatment Vokune (f) WQV if?) 7891.14 AdjustedTreat:nentVolumetft) WQV..tr(M F 5918.36 Step 2 - Determine Filter Geometry Max Head on Sand Filter b--(M 5�.-iw... k--- ea.u. Irn.rn -. R hu.pow ) = (fe-) A. -A( ft 250 5928.36 2959.18 2S8 591836 236734 3A0 5911136 1972.79 I So 591936 .1. 1690.96 4.00 5918.36 1479-9 _ _ 4.So 5918.36 1315.19 5.00 591836 110.67 5.50 5918.36 1076Afi 6,00 591836 98639 Calculated Minimum Area of Sedimentation Basin Asramed Depth of Sand Filter "Minimum 15 ft required Calculated Minimum Area of Send Filter Proposed Geometric Properties Average Head »Enter chosen her from Table above As (fttl r 520.82 dr(k1 1Y,•pra4sr z Af (ft) r 1358.20 h. (ft) hs ra.,(R) ?d�k?'k2"u;: s� h. (ft) 1.00 Minimum Sediment & Filter ChamberAras based on chosen hm, 760;i70'.• Meets Minimum Calculated Requirements Meets Minimum W karlated Requirements Step 3 - Verify Proposed Parameters W111 contain WQV Design Parameters As MM M 2200-W hutr M 3.00 h (A) 1.50 Step 4 - Determine Minimum Number of Pipes Needed for the Underdrain System Where: Media Permeability k(ft/day) or itOn/hr) Total Had Ah (M. Length of flow through Media L(tt)Peaktnnow Qss(hW per unit area)Lfl� Flow Rota through Soil Media .Qve/sec)»Apply a Safety Factor between 2 - SOQ(reisec) Determine Equhrelent Diameter as Single Pipe Where: n - roughness factor 0.011 s = internal slope of undenlrain 0.50% 0-pipe dlameter D(In) 5.731 See Table 5.1 pg 5.12 of NCDENR SMP manual Minimum It of Pipes Required In the Underdrain "� ^ Step 5 - Determine Forebay Containment Volume Forebay typically required to contain between 18%to 27% at 19% 1065.30 at22% 1302.04 Provided volume 1067.25 OK Step 6 - Determine Drawdown Time WQV.4(fV) 5918.36 - Undardraln Line Stu (ft) ,33?-,W-jv; cress mokmal area (ft) 0.0873 CoefRdentafDlscharge Gravitational Constant(ft/s) `-3:-"Q '- `•r ��•. IvrwrpU ..,. Determine if office is controlling factor (hr) - (see NCDENR manual Rp-13) 4.79 Determine If Fi ter Media is controlling factor (hr) 18AS .IfT(hr)-(WQV,,4 (rt)/(tk ftVday)xft (f?))/24(br)I 1.75 H:\PROiECT%2007\07tI63 SOUTH BRIDGE\CakskQ7063 impervious Breakdown -Revised Areas for Builder Plans - 02-22.10 HAPROJECTS12007107063 SOUTH BRIDGE1CaicslHydroCadl 07063 Pre -Post 02-22-10 Type li 24-hr 07063 Tyr -24hr Rainfall=3.67N Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 2122/2010 Subcatchment DA 5: Pre Runoff = 3.17 cfs @ 12.02 hrs, Volume= 0.173 af, Depth> 1.29" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type II 24-hr 070631 yr -24hr Rainfall=3.67" Area (ac) CN Description 1.610 73 Woods, Fair, HSG C Tc Length Slope Velocity Capacity Description 10.0 - - - - Direct Entry, Subcatchment DA 5: Pre Hydrograph ■Runoff Type 11 24-hr 07063 1yr -24hr 3, Rainfall=3.67" Runoff Area=1.610 ac Runoff Volume=0.173 of 2. Runoff Depth>1.29" o Tc=10.0 coin LL CAI=73 0 0 1 2 3 4 5 8 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) H:IPROJECTS12007107063 SOUTH BRlDGE1CalcslHydroCad\ 07063 Pre -Post 02-22-10 Type 1124-hr 0706.3 9 yr -24hr Rainfall=3. 67" Prepared by Morris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 m 2005 HydroCAD Software Solutions LLC 2122/2010 Subcatchment DA5: Post Runoff = 5.33 cfs @ 12.02 hrs, Volume= 0.290 af, Depth> 2.16" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type II 24-hr 07063 1yr-24hr Rainfall=3.67" Area (ac) CM Description 0.660 98 Paved parking & roofs 0,950 76 Woods/grass comb. Fair, HSG C 1.610 85 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ftlft) (fUsec) (cfs) _ 10.0 Direct (Entry, Subcatchment DA5: Post Hydrograph Type 1124-hr 07063 1yr 5 Rainfall=3.67" Runoff` Area=1.610 ac 4 Runoff Vo' lume=0.290 of Runoff Depth>2.16" # 3 Tc=10.0 min LL CN=85 2 E 0 0 1 2 3 4 5 6t 7 8 9 10 11 12 13 14 15. 16 17 18 19 20 21 22 23 24 Time (hours) H:\PROJECTS\2007\07063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 02-22-10 Type 1124-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Pond SF#5: Filter #5 Inflow Area = 1.610 ac, Inflow Depth > 2.16" for 070631 yr -24hr event Inflow = 5.33 cfs @ 12.02 hrs, Volume= 0.290 of Outflow = 5.32 cis c@ 12.02 hrs, Volume= 0.290 af, Atten= 0%, Lag= 0.1 min Discarded = 2.64 cfs @ 12.02 hrs, Volume= 0.040 of Primary = 2.08 cfs @ 12.02 hrs, Volume= 0.063 of Secondary = 0.61 cis @ 12.02 hrs, Volume= 0.188 of Routing by Dyn-Stor End method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 7.00' Surf.Area= 482 sf Storage= 36 cf Peak Elev= 8.63' @ 12.02 hrs Surf.Area= 1,376 sf Storage= 417 cf (380 cf above start) Flood Elev= 10.00' Surf.Area= 6,326 sf Storage= 4,570 cf (4,533 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 0.2 min ( 819.4 - 819.2 ) Volume Invert Avail.Storaae Storage Description #1 6.67' 545 cf Custom Stage Data (Prismatic) Listed below (Recalc) 2,187 cf Overall - 7 cf Embedded = 2,180 cf x 25.0% Voids #2 6.67' 7 cf 4.0"D x 25.00'L Horizontal Cylinder S= 0.00607 x 3 Inside #1 #3 9.00, 9,499 cf Custom Stage Data (Prismatic) Listed below (Recalc) 10,051 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic-fee_t1 6.67 301 0 0 9.00 1,576 2,187 2,187 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 9.00 3,287 0 0 11.00 6,212 9,499 9,499 Device Routing Invert Outlet Devices #1 Primary 7.10' 15.0" x 30.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert-- 6.50' S= 0.0200 Y Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 8.25' 3.05 long x o.W breadth Baffle Wail Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 6.67' 4.0" Vert. Discharge Orrice from Underdrain C= 0.600 #4 Secondary 6.67' 1.750 in/hr Infiltration through Filter Media over Surface area above Invert Excluded Surface area = 301 sf #5 Discarded 8.50' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 H:IPROJECTS12007107063 SOUTH BRIDGENCalcs\HydroCadl 07063 Pre -Post 02-22-10 Type If 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 sh 000479 @ 2005 HydroCAD Software Solutions LLC 2/23/2010 iscarded OutFlow Max=2.63 cfs @ 12.02 hrs HW=8.63' (Free Discharge) Emergency Spillway (Weir Controls 2.63 cfs @ 1.0 fps) Primary OutFlow Max=2.08 cfs @ 12.02 hrs HW=8.63' `Free Discharge) Culvert (Passes 2.08 cfs of 5.63 cfs potential flow) 2-13affle Wall (Weir Controls 2.08 cfs @ 1.8 fps) 1dary OutFlow Max=0.61 cfs @ 12.02 hrs HW=8.63' (Free Discharge) Discharge Orfice from Underdrain (Orifice Controls 0.56 cfs @ 6.5 fps) -Infiltration through Filter Media (Exfiltration Controls 0.04 cfs) p w v I LL Pond SF#5: Filter #5 Hydrograph i ime inouml M H:IPROJECTS12007107063 SOUTH BRIDGMCalcslHydroCadl 07063 Pre -Post 02-22-10 Type /I 24-hr 07063 Syr -24hr RainfaA=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 sln 000479 © 2005 HydroCAD Software Solutions LLC 2/23/2010 m y Pond SF#5: Filter #5 Stage -Discharge Discharge (cfs) __ Total D"iscarded T Primary Secondary HAPROJECTS12007107063 SOUTH BRIDGE1Calcs\HydroCadl 07063 Pre -Post 02-22-10 Type 1124-hr 070631 yr -24hr Rainfaff=3.67' Prepared by Morris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD®7 10 s/n 000479 ® 2005 HvdroCAD Software Solutions LLC 2/23/2010 Stage -Area -Storage for Pond SF#5: Filter #5 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 6.67 301 0 6.72 328 4 6.77 356 9 6.82 383 14 6.87 410 20 6.92 438 26 6.97 465 32 7.02 493 39 7.07 520 46 7.12 547 53 7.17 575 60 7.22 602 67 7.27 629 75 7.32 657 83 7.37 684 91 7.42 711 100 7.47 739 109 7.52 766 118 7.57 793 128 7.62 821 138 7.67 848 149 7.72 876 159 7.77 903 170 7.82 930 182 7.87 958 194 7.92 985 206 7.97 1,012 218 8.02 1,040 231 8.07 1,067 244 8.12 1,094 258 8.17 1,122 272 8.22 1,149 286 8.27 1,177 300 8.32 1,204 315 8.37 1,231 331 8.42 1,259 346 8.47 1,286 362 0.�2 1,313 378 8.57 1,341 395 8.62 1,368 412 8.67 1,395 429 8.72 1,423 447 8.77 1,450 465 8.82 1,478 483 8.87 1,505 502 8.92 1,532 521 8.97 1,560 540 9.02 4,892 618 9.07 4,965 785 9.12 5,039 957 9.17 5,112 1,132 Elevation (feet) Surface (sg-ft) Storage (cubic -feet) 9.22 5,185 1,310 9.27 5,258 1,492 9.32 5,331 1,678 9.37 5,404 1,868 9.42 5,477 2,061 9.47 5,550 2,258 9.52 5,624 2,459 9.57 5,697 2,663 9.62 5,770 2,871 9.67 5,843 3,082 9.72 5,916 3,297 9.77 5,989 3,516 9.82 6,062 3,739 9.87 6,135 3,965 9.92 6,209 4,195 9.97 6,282 4,428 10.02 6,355 4,665 10.07 6,428 4,906 10.12 6,501 5,150 10.17 6,574 5,398 10.22 6,647 5,650 10.27 6,720 5,906 10.32 6,794 6,165 10.37 6,887 6,427 10.42 6,940 6,694 10.47 7,013 6,964 10.52 7,086 7,237 10.57 7,159 7,515 10.62 7,232 7,796 10.67 7,305 8,080 10.72 7,378 8,369 10.77 7,452 8,661 10.82 7,525 8,956 10.87 7,598 9,255 10.92 7,671 9,558 10.97 7,744 9,865 H:IPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 01063 Pre -Post 02-22-10 Type 1124-hr 0706310y► -24hr Rair/611=6.88" Prepared by Dorris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 2/23/2010 Pond SF#5: Filter #5 Inflow Area = 1.610 ac, Inflow Depth > 5.13" for 07063 10yr -24hr event Inflow = 12.17 cfs @ 12.01 hrs, Volume= 0.688 of Outflow = 12.17 cfs @ 12.01 hrs, Volume= 0.688 af, Atten= 0%, Lag= 0.1 min Discarded = 8.02 cfs @ 12.01 hrs, Volume= 0.168 of Primary = 3.51 cfs @ 12.01 hrs, Volume= 0.157 of Secondary = 0.63 cfs @ 12.01 hrs, Volume= 0.364 of Routing by Dyn-Stor-Inc! method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs 15 Starting Elev= 7.00' Surf.Area= 482 sf Storage= 36 cf Peak Elev= 8.78' @ 12.01 hrs Surf.Area= 1,456 sf Storage= 469 cf (432 cf above start) Flood Eiev=10.00' Surf.Area= 6,326 sf Storage= 4,570 cf (4,533 cf above start) Plug-Fiow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time=1.6 min ( 796.5 - 794.9 ) Volume Invert Avail.Storage Storage Description #1 6.67' 545 cf Custom Stage Data (Prismatic) Listed below (Recalc) 2,187 of Overall - 7 cf Embedded = 2,180 cf x 25.0% Voids #2 8.67' 7 cf 4.0"D x 25.00% Horizontal Cylinder S= 0.0050 T x 3 Inside #1 #3 9.00, 9,499 cf Custom Stage Data (Prismatic) Listed below (Recalc) 10,051 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sg-ft) (cubic -feet) (cubic -feet) 6.67 301 0 0 9.00 1,576 2.187 2,187 Elevation Surf.Area Inc.Store Cum.Store (feet) {soft) (cubic -feet) (cubic -feet) 9.00 3,287 0 0 11.00 6,212 9,499 9,499 Device Routing Invert Outlet Devices #1 Primary 7.10' 15.0" x 30.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert-- 6.50' S= 0.0200 T Cc-- 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 8.25' 3Z long x 0.5' breadth Bafiie Viall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 6.67' 4.0" Vert. Discharge Orfice from Underdrain C= 0.600 #4 Secondary 6.67' 1.750 in/hr Infiltration through Filter Media over Surface area above invert Excluded Surface area = 301 sf #5 Discarded 8.50' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 H:IPROJECTS12007107063 SOUTH BRIDGE1Calcs\HydroCadi 07063 Pre -Post 02 224 0 Type H 24-hr 0706310yr -24e r Rsir;,ar,'=6.88' Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD®7 10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 2/2312010 iscarded OutFlow Max=7.98 cfs @ 12.01 hrs HW=8.78' (Free Discharge) Emergency Spillway (Weir Controls 7.98 cfs @ 1.4 fps) Tnmary OutFlow Max--3.50 cfs @ 12.01 hrs HW=8.78' (Free Discharge) Culvert (Passes 3.50 cfs of 6.07 cfs potential flow) 2-Baffle Wall (Weir Controls 3.50 cfs @ 2.2 fps) Ccondary OutFlow Max=0.63 cfs @ 12.01 hrs HW=8.78' (Free Discharge) 3=Discharge Orfice from Underdrain (Orifice Controls 0.59 cfs @ 6.7 fps) -Infiltration through Filter Media (Exfiltration Controls 0.05 cfs) Pond SF#5: Filter #5 Hydrograph DDiscarded 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) H:IPROJECTS12007107063 SOUTH BRIDGE1Ca1cslHydroCad\ 07063 Pre -Post 02-22-10 Type // 24-hr 07063 90yr-24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD®7 10 s/n 000479 © 2005 H rydroCAD Software Solutions LLC 2/23/2010 M 10 Pond SF#5: Filter #5 Stage -Discharge 0 20 40 60 80 100 120 140 160 180 200 Discharge (cfs) i Total 0 Discarded ■ Primary ® Secondary H:IPROJECTS12007107063 SOUTH BRIDGE\CalcslHydroCadl 07063 Pre -Post 02-22-10 Type /l 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 0 2005 HydroCAD Software Solutions LLC 2/23/2010 Stage -Area -Storage for Pond SF# 6: Filter #6 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 6.67 301 0 6.72 328 4 6.77 356 9 6.82 383 14 6.87 410 20 6.92 438 26 6.97 465 32 7.02 493 39 7.07 520 46 7.12 547 53 7.17 575 60 7.22 602 67 7.27 629 75 7.32 657 83 7.37 684 91 7.42 711 100 7.47 739 109 7.52 766 118 7.57 793 128 7.62 821 138 7.67 848 149 7.72 876 159 7.77 903 170 7.82 930 182 7.87 958 194 7.92 985 206 7.97 1,012 218 8.02 1,040 231 8.07 1,067 244 8.12 1,094 258 8.17 1,122 272 8.22 1,149 286 8.27 1,177 300 8.32 1,204 315 8.37 1,231 331 8.42 1,259 346 8.47 1,286 362 8.52 1,313 378 8.57 1,341 395 8.62 1,368 412 8.67 1,395 429 8.72 1,423 447 8.77 1,450 465 8.82 1,478 483 8.87 1,505 502 8.92 1,532 521 8.97 1,560 540 9.02 4,892 618 9.07 4,965 785 9.12 5,039 957 9.17 5,112 1,132 Elevation Surface Storage (feet) (eg-ft) (cubic -feet) 9.22 5,185 1,310 9.27 5,258 1,492 9.32 5,331 1,678 9.37 5,404 1,868 9.42 5,477 2,061 9.47 5,550 2,258 9.52 5,624 2,459 9.57 5,697 2,663 9.62 5,770 2,871 9.67 5,843 3,082 9.72 5,916 3,297 9.77 5,989 3,516 9.82 6,062 3,739 9.87 6,135 3,965 9.92 6,209 4,195 9.97 6,282 4,428 10.02 6,355 4,665 10.07 6,428 4,906 10.12 6,501 5,150 10.17 6,574 5,398 10.22 6,647 5,650 10.27 6,720 5,906 10.32 6,794 6,165 10.37 6;867 6,427 10.42 6,940 6,894 10.47 7,013 6,964 10.52 7,086 7,237 10.57 7,159 7,515 10.62 7,232 7,796 10.67 7,305 8,080 10.72 7,378 8,369 10.77 7,452 8,661 10.82 7,525 8,950 10.87 7,698 9,255 10.92 7,671 9,558 10.97 7,744 9,865 SF #5 - Veg. Filter -10 yr stm Worksheet for Rectangular Channel Project Description Project File h:\projects\2007\07063 south bridge\catcs\flowmasterk07O63-1 .fm2 Worksheet SF DA#5 - Veg Filter Flaw Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.010000 ft/ft Bottom Width 10.00 ft Discharge 4.13 cfs Results Depth 0.23 ft Flow Area 2.29 ft2 Wetted Perimeter 10.48 ft Top Width 10.00 ft Critical Depth 0.17 ft Critical Slope 0.024573 ft/ft Velocity 1.80 ft/5 Velocity Head 0.05 ft Specific Energy 0.28 ft Froude Number 0.66 Flow is subcritical. 02/23/10 FlowMaster v5.13 09:44:13 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 00708 (203) 755-1666 Page 1 of 1 'DDate Design NORRIS, KUSKE &TUNSTALL Wilmington, NC sneer -/ r�i7 Allzt CONSULTING ENGINEERS, INC. Brunswick County, NC Ot Check Job For Job No. .50.�SL+ 0%'4jr~ 1 0+&E*9420�- CP7i7-/ &A- A� = leaf 3bZ So fik �. e 'tom Af15 ?2-- Zggtf 45 szo 210&v 4to 3 2241, Sao 301v 4-7 22'14 SOD 3Q'7'f LN S 23tolv aw qi 3 Zzty 660 3o tv � t ��ti I20 �i8ti S 1 Z 2415 `72c 2$3S ►)y- fsv � l l � 3 7�a t� 0, I'1Z Ifi.. 'r- 281-12 r ? e3:> s 3 to w d-jjtA - t1jf&4%-s #* % Ln*63•522 Sus f t+u5 = i 1, L 5 t Z- ep1= flow W #f L4r * 'nip. sr 43 A#13'1 LH 4%'1': 44 36 0r1 SfV silk W1 4,L11 ` 8 4511 LI g151 go 3-1-1 07053 Impervious areal doom-Revlsed Areas for Builder Plans - 02-22-20 SAND FILTER DESIGN Drainage Area a DA 6A DmInage Area Aoife) 104362D0 Step 1- Determine Required Treatment Volumes Required Treatment Volume (ftj W W (e) 106766 AcOusted Treatment Volume(fe) WQVp(ft) 979G25 Step 2 - Determine Filter Geometry Mae Head on Sand Filter hwm.irle) IYers (RI WQV (ft) A.+Af NO 240 9M25 4898.12 2S0 9796.25 am -so am 9796.25 326542 3.50 9796.25 2796M 4.00 9796 25 24".06 4.50 9756.1S 2176S4 5A0 9795JS 1959.7E 5.50 9796.25 37aL]4 6= 9796.7S 1r32.71 Calculated Minimum Area of Sedimentation gasin Assumed Depth of Sams Filter "Minimum 15 It required Calculated Minimum Area of Said Flitei Proposed Geometric Properties Average Head ,>Enter chosen hem Gam Table above At(f4 e62a7 dl(ft) Af (ft) 1498.76 hr.ararr(Ri ha(fQ 1_50 Minimum Sediment A Filter Chamber Areas based on chosen trio As (flir) _ _ a.- rlmo.p7,':: {�;�;� ":�•.:;: s,_ Meets Minimum Calculated Requirements Af((t) Meets MlnlmumCalculated Reaultements Step 3 - Verify Proposed Parameters W(() Contain WQV Design Pa2meten A: 10M.97 Af 2422.03 hsa.rr,i 1 3.00 hn 190 Step 4. Determine Minimum Number of Pipes Needed for the Underdrain System Where: MediaPermeabgity It(ft/day) Ior It(In1(u) Total Head Ahpq Length ofFbwthrough Media Lift) 7.110 Peat Inflow tlp(kowperunitares) 4.39 flow Rate through Soil Media gigs/eae) 0.2453 a Apply a Safety Factor between 2 - 40 Cans/sec) 096 Determine Equivalent Diameter as Single Pipe Where : n = roughness factor 071 s • internal slope of underdralo 05091 D•ploe diameter D (in) 7.52C See Table S-1 pill S-12 of NCDENR BMP manual Minimum 0 of Pipes Required in the Underdrain Step 5 - Determine Forebay Containment Volume Forebay typically required to contain between 18% to22N at le% 1763.32 at22% 215517 Provided volume 214619 ql 6K Step 6 - Determine Drawdown lime WQVae(Ity 9796.25 Undardraln Line Size(ft) _ _ *1+"3=�-- Y - mosssectional area (it) OAS73 Coefficient ofDlscharge Gravitational ConstaM(k/s) kvx.nr lPa S.CO Detemdne if orflee b controlling factor (hr) - (see NCDENR manual og=-131 SAB Determine R Filter Media Is controlling factor (hr) 27.73 » R T(hrp (WQV,,e (fts.V((R (fUday*As (Itt)/2A(h4) t7K YES LYS H:WROIECF3i2007W7063 SOt71H RRIDGEVWcA M63 impervious Brealula m.R.Oted Ames for Isullder Plans - 02-22-20 HAPROJECTS\2007\07063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 02-22-10 Type 1124-hr07063 Syr-24hr Rainfaft--3.67" Prepared by Norris, Kuske, & Tunstali Consulting Engineers, Inc. HydroCAD®7 10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 2/22/2010 Subcatchment DA 6A: Pre Runoff - 4.72 cfs @ 12.02 hrs, Volume= 0.258 af, Depth> 1.29' Runoff by SCS TR-20 method, UH=SCS, Time Span= 0,00-24.00 hrs, dt= 0.02 hrs Type II 24-hr 070631 yr -24hr Rainfall=3.67" Area (ac) CN Description 2.400 73 Woods, lair, HSG C Tc Length Slope Velocity Capacity Description (min) (feet) (0) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment DA 6A: Pre Hydrograph Runoff 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) KkPROJECTS12007107063 SOUTH BRIDGMCaicstHydroCadl 07063 Pre -Post 02-22-10 Type 1/ 24-hr 070631 yr -24hr Rainfal1=3.67" Prepared by Norris, Kuske, & Tunstali Consulting Engineers, Inc. HydroCADO 7 10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 2/22/2010 Subcatchrnent DAM: Past Runoff — 8.22 cfs @ 12.02 hrs, Volume= 0.449 af, Depths 2.24" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type II 24-hr 070631 yr 24hr Rainfall=3.67" Area (ac) CN Description 1.090 98 Paved parking & roofs 1.310 76 Woods/grass comb., Fair HSG C 2.400 86 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment DAM Post Hydrograph s � 8 Type 1124-hr 070631yr Rainfall=3.67" ' Runoff ,Area=2.400 ac 6 Runoff Volume=0.449 of y 5 Runoff Depth>2.24" 3 Tc=1Q0.0 min ti 4• CEO=86 3 2 O .a .�.:. 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) SF NA - Veg. Filter -10 yr stm Worksheet for Rectangular Channel Project Description Project File h:lprojects1200-A07063 south bridgelcalcslflowmaster107063 ve.fm2 Worksheet SF DA#6A - Veg Filter Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.060000 ft/ft Bottom Width 10.00 ft Discharge 6.31 cfs Results Depth 0.06 ft Flow Area 3.23 ft2 Wetted Perimeter 50.13 ft Top Width 50.00 ft Critical Depth 0.08 ft Critical Slope 0.030680 ft/ft Velocity 1.95 ft/s Velocity Head 0.06 ft Speck Energy 0.12 ft Froude Number 1.35 Flow is supercritical. 02/23/10 FlowMaster v5.13 09:2e:1" AM Heested Methods, Inc_.. 37 8rookside Road Waterbury, CT 06708 (203) 755-1888 Page 1 of 1 Date Ueslgn Wilmington, NC NORRIS, KUSKE &TUNSTALL runswick County, NC CONSULTING ENGINEERS, INC.ING. Ot LOT ZLA, s—F t4L4551= �e 1 1 �d�L �Z•� Z5 152 �q 3 12411 ?R 3z ?. 21115 zv-p5 1644, -721> 2592- 1 19W za® 2$e2- 15 111AA i2� '5cllw 54 3 2211- 29 32 SS Z V4 '??.� 24 3S St. 1 tmW Z2> 2=CL s't 1.3bV li zo op ffoV2. Ib1vpL - 10810 +- 04, 0IL-L = `f f 872 0TkIln4, Imp. *- - ft;15W.141 su" = Aor.646 Ldr (PT ihr I04ty 3g 3zeo Si '3 (03c qu 3513 41 VZOD 1#2< 1z9D 15-21 3Q.810 A)3 3V?ti 061 3(30 44 1535 560 1180 O2.161 =_ As (fF) Af Mai 0700Impervious Breakdow"ev"d Areas for guilder Plans • 02.12.10 SAND FILTER DESIGJV Drainage Area r r, DA 63 Drainage Area An (ft/ 20-,M.00 Step 1- Determine Required Treatment Volumes Required Treatment Volume ifta) WQV vel IMS731 Adjusted Treatment Volume (ftr} WQVr41As)1 10850.48 Step 2 - Determine Filter Geometry Max Head on Sams filter h�,rm.OD fke.rm ifs WQV (fta) A.-Af . 2.00 lOB5DA8 542524 250 20650.48 4340.19 3.00 1O85OA8 35115.83 350 1065OAB 3300.14 4.00 2O65OA8 27IZ42 450 2WSOA8 2411.22 5.00 1O85OA8 2170.1O SSG ia35aAll 197291 6A0 1085048 1308.41 Calculated Minimum Area of Sedimentation Basin Assumed Depth of Sand Filter »Minimum 1.S hrequired Calculated Minimum Area of Sand Finer Proposed Geometric Properties Average Head »Enter chosen h„d from Table above As (h) I dr(fd. Af (fta) 1660.05 14 (h) l4e.rr.fiq [ 141h) 1.SP Minimum Sedimatrt 8e Filter Chamber Areas based an chosen hur Meets MinhnumCalculated Requirements ---'��3ri2e.Y9' ` �.'.-'•',= _:� Meets Minimum Calculated Requirements Step 3 - Verily Proposed Parameters Will Contain WQV . Design Parameters Aa 1.35D.R? Af h 2ffi419 ISo Step 4 - Determine Minimum Number of Pipes Needed for the Underdrain System Where: Media Permeability it(f4day) k(N/hr) Total Head dh (M SA0 Length of Flow through Media Lift) 2.00 Peak Inflow Op pn/hr per unit area) 438 Flow Rata through Soil Media Q(ft'/sera »Apply a Safety Factor between 2 - 10 _ Q(fla/sect 0.86 Determine Equivalent Diameter. as Single Pipe Where: n = roughness factor 0.021 s: Internal sMnr of underdrafn o-%% D-pips diameter DIM) 7519 See Table 5.1 pg 5.12 of NCDENR BMP manual Minimum A of Pipes Required In the Underdmin Step 5 - Determine Forebay Containment Volume rorebay typically required to contain between 18%to 22% at IrA 1953.09 at22% 2387.11 Providedvolums 246521 OR P Step 6 - Determine Drawdown Time WQV,4tit) 10WOAB Underdrtin UrieSize (ft) 0:33''.: _3 cross sectional am(fta) 0.0873 coefficient Of Discharge c-W Gravitational Constant(ft/st)- haorrur (m 3.00 Determine if orfke is controlling factor (hr) -(see NCDENR manual pill-13) 7.17 Determine if Filter Media is controlling factor thr) 2635 - if T(hr)= (WQV.4 (0/(lk (ft/day)sAs (ft)Y24(hr)) 1.75 H",PRW ECTAMOM7063 SDUTH SAIDGEGkA07063 Impervious Breakdown -Revised Areas for Builder Plans - 02-22.10 HAPROJECTS12007107063 SOUTH BRIDGMCalcs\HydroCadl 07063 Pre -Post 02-22-10 Type 1124-hr 07063 Syr-24hr Rainfall=3.67" Prepared by Dorris, Kuske, & Tunstall Consulting Engineers, inc. HydroCADO 7.10 sln 000479 © 2005 HydroCAD Software Solutions LLC 2/22/2010 Subcatchment DA 6B: Pre Runoff - 4.84 cfs @ 12.02 hrs, Volume= 0.265 af, Depth> 1.29" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 his, dt= 0.02 hrs Type II 24-hr 07063 1yr -24hr Rainfall=3.67" Area (ac) CN Description 2.460 73 Woods, Fair, HSG C Tc Length min) (feet) 10.0 Velocity Capacity Description Direct Entry, Subcatchment DA 6B: Pre Hydrograph r Rurtaff 5� L Type 11; 24-hr 07063 1yr -24hr Rainfall=3.67" 4 Runoff Area=2.460 ac Runoff Volume=0.265 of Runoff Depth>1.29" a Tc=10:0 min LL CN=73 2 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) H:IPROJECTS12007107063 SOUTH BRIDGE1Caics\HydroCadl 07063 Pre -Past 02-22-10 Type 1124-hr 070631 yr -24hr Rainfall=3. 67 Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 C 2005 HydroCAD Software Solutions LLC 2/22/2010 Subcatchment DAM Post Runoff = 8.71 cfs @ 12.01 hrs, Volume= 0.478 af, Depth? 2.33" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type II 24-hr 07063 1yr -24hr Rainfali=3.67" Area (ac) CN Description 1.210 98 Paved parking & roofs 1.250 76 Woods/grass comb., Fair, HSG C 2.460 87 Weighted Average Tc Length Slope Veiocity Capacity Description 10.0 Direct Entry, Subcatchment DAM Post Hydrograph Type ll 24-hr 070631yr A Rainfall=3.67" 7 Runoff Area=2.460 ac (Runoff Volume=0.478 of 6- Runoff Depth>2.33" w 5 Tc=10.0 min U. 4 CN=87 2 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hows) � Runoff H:IPRO,IECTS\2007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 02-22-10 Type 11 24-hr 070631 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HvdroCAD Software Solutions LLC 2/22 010 Pond SF#6B: Filter 6B Inflow Area = 2.460 ac, Inflow Depth > 2.33`° for 070631 yr -24hr event Inflow = 8.71 cfs @ 12.01 hrs, Volume= 0.478 of Outflow = 1.07 cfs @ 12.44 hrs, Volume= 0.506 A Atten= 88%, Lag= 25.4 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 1.07 cfs @ 12.44 hrs, Volume= 0.506 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting EIev=12.00' Surf.Area= 6,908 sf Storage= 1,310 cf Peak EIev=13.42' @ 12.44 hrs Surf.Area= 8,502 sf Storage= 8,243 cf (6,933 cf above start) Flood EIev=15.00' Surf.Area=10,275 sf Storage=18,612 cf (17,303 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time=10.5 min ( 822.9 - 812.4 ) Volume Invert Avail.Storage Storage Description #1 9.67' 1,289 cf Custom Stage Data (Prismatic) Listed below (Recalc) 5,176 cf Overall - 21 cf Embedded = 5,155 cf x 25.0% Voids #2 9.67' 21 cf 4.0"D x 40.00'L Horizontal Cylinder S= 0.00507 x 6 Inside #1 #3 12.00' 17,303 cf Custom Stage Data (Prismatic) Listed below (Recalc) 18,612 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 9.67 1,619 0 0 12.00 2,824 5,176 5,176 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 12.00 4,084 0 0 15.00 7,451 17,303 17,303 Device Routing Invert Outlet Devices #1 Primary 12.00' 18.0" x 30.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert=11.75' S= 0.0083 ? Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 13.90' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 9.67' 4.0" pert_ Discharge Orfice from Underdrain C= 0.600 #4 Secondary 9.67' 1.750 In/hr Infiltration through Filter Media over Surface area above invert Excluded Surface area =1,619 sf #5 Discarded 14.00' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.2C 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 HAPROJECTS12007107063 SOUTH BRIDGE1Calcs\HydroCadl 07063 Pre -Post 02-22-10 Type 1124-hr 07063 l yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7 10 sin 000479 0 2005 HydroCAD Software Solutions LLC 2122/20/0 iscarded OutFlovv W.ax=0.00 cfs @ 0.00 hrs HW=12.00' (Free Discharge) Emergency Spillway ( Controls 0.00 cfs) nmary OutFlow Max=0.00 cfs @ 0.00 hrs HW=12.00' (Free Discharge) �Culvert ( Controls 0.00 cfs) Z—Baffle Wail ( Controls 0.00 cfs) Eecondary OutFlow Max=1.07 cfs @ 12.44 hrs HW=13.42' (Free [discharge) 3=Discharge Orfice from Underdrain (Orifice Controls 0.80 cfs @ 9.1 fps) =Infiltration through Filter Media (EAltration Controls 0.28 cfs) Pond SFAS: Filter 6B Hydrograph LPr'im ed ary 9 8 7 6 c+ 5 U. 4 3 2 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) HAPROJECTS12007107063 SOUTH BRIDGE1Calcs\HydroCadl 07063 Pre-Po3t 02-22-10 Type 1124-hr 070631 yr -24hr Rainfall=3.67' Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD®7 10 s/n 000479 m 2005 HydroCAD Software Solutions LLC 2/22/2010 Pond SF#6B: Filter 6B Stage -Discharge 0 5 10 15 20 25 30 35 40 45 50 55 60 65 Discharge (cfs) HAPRO,lECTS\2007\07063 SOUTH BRIDGE1Ca1cs\HydroCad\ 07063 Pre -Post 02-22-10 Type 11 24-hr 070631 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD®7 10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 2/22/2010 Stage -Area -Storage for Pond SF#6B: Filter 6B Elevation Surface Storage (feet) (sa-ft) (cubic -feet) 9.67 1,619 0 9.77 1,671 42 9.87 1,722 88 9.97 1,774 137 10.07 1,826 186 10.17 1,878 234 10.27 1,929 282 10.37 1,981 331 10.47 2,033 381 10.57 2,084 432 10.67 2,136 485 10.77 2,188 539 10.87 2,240 594 10.97 2,291 651 11.07 2,343 709 11.17 2,395 788 11.27 2,446 829 11.37 2,498 891 11.47 2,550 954 11.57 2,602 1,018 11.67 2,653 1,084 11.77 2,705 1,151 11.87 2,757 1,219 11.97 2,808 1,289 12.07 6,987 1,598 12.17 7,099 2,020 12.27 7,211 2,453 12.37 7,323 2,898 12.47 7,435 3,353 12.57 7,548 3,820 12.67 7,660 4,298 12.77 7,772 4,787 12.87 7,884 5,288 12.97 7,997 5,799 13.07 8,109 6,322 13.17 8,221 6,856 13.27 8,333 7,402 13.37 8,446 7,958 13.47 8,558 8,526 13.57 8,670 9,105 13.67 8,782 9,695 13.77 8,895 10,296 13.87 9,007 10,909 13.97 9,119 11,533 14.07 9,231 12,168 14.17 9,343 12,814 14.27 9,456 13,472 14.37 9,568 14,141 14.47 9,680 14,821 14.57 9,792 15,512 14.67 9,906 16,215 Elevation Surface Storage (feet) sp-ft) (cubic et) 14.77 10,017 16,928 14.87 10,129 17,653 14.97 10,241 18,389 H:IPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 02-22-10 Type Il24-hr070631Qyr-24hr Rafnfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADe 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 2/22/2010 Fond SF#6B: Filter 6B Inflow Area = 2.460 ac, Inflow Depth > 5.35" for 07063 10yr -24hr event Inflow = 19.18 cfs @ 12.01 hrs, Volume= 1.097 of Outflow = 15.11 cfs @ 12.08 hrs, Volume= 1.124 af, A'ten= 21 %, Lag= 4.1 min Discarded = 11.20 cfs @ 12.08 hrs, Volume= 0.184 of Primary = 2.69 cis @ 12.08 hrs, Volume= 0.070 of Secondary = 1.21 cfs @ 12.08 hrs, Volume= 0.870 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 12.00' Surf.Area= 6,908 sf Storage= 1,310 cf Peals Elev=14.35' @ 12.08 hrs Surf.Area= 9,547 sf Storage= 14,012 cf (12,703 cf above start) Flood Elev=15.00' Surf.Area=10,275 sf Storage= 18,612cf (17,303 cf above start) Plug -Flow detention time-- 67.9 min calculated for 1.093 of (100% of inflow) Center -of -Mass det. time= 43.7 min ( 832.8 - 789.1 ) Volume Invert Avail.Storaae Storage Description #1 9.67' 1,289 cf Custom Stage Data (Prismatic) Listed below (Recalc) 5,176 cf Overall - 21 cf Embedded = 5,155 cf x 25.0% Voids #2 9.67' 21 cf 4.0"D x 40.001 Horizontal Cylinder S= 0.0050 ? x 6 Inside #1 #3 12.00' 17,303 cf Custom Stage Data (Prismatic) Listed below (Recalc) 18,612 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feed (sq-ft) (cubic -feet) (cubic -feet) 9.67 1,619 0 0 12.00 2,824 5,176 5,176 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 12.00 4,084 0 0 15.00 7,451 17,303 17,303 Device Routing Invert Outlet Devices #1 Primary 12.00' 18.0" x 30.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert=11.75' S= 0.0083 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 'i 3.90' 3.0' iong x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 9.67' 4.0" Vert. Discharge Orfice from Underdrain C= 0.600 #4 Secondary 9.67' 1.750 in/hr Infiltration through Filter Media over Surface area above invert Excluded Surface area =1,619 sf #5 Discarded 14.00' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 HAPROJECTS12007107063 SOUTH BRIDGE1Calcs%HydroCadl 07063 Pre -Post 02-22-10 Type 1124-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD®710 sh 000479 © 2005 HydroCAD Software Solutions LLG 2/22/20 G iscarded OutFlow Max=11.19 cfs @ 12.08 hrs HW=14.35' (Free Discharge) Emergency Spillway (Weir Controls 11.19 cfs @ 1.6 fps) Primary OutFlow Max=2.69 cfs @ 12.08 hrs HW=14.35' (Free Discharge) Culvert (Passes 2.69 cfs of 10.77 cfs potential flow) 2--Baffle Wail (Weir Controls 2.69 cfs @ 2.0 fps) econdary OutFlow Max=1.21 cfs @ 12.08 hrs HW=14.35' (Free Discharge) 3=ischarge Orfice from Underdrain (Orifice Controls 0.89 cfs @ 10.2 fps) - infiltration through Filter Media (Exfiltration Controls 0.32 cfs) 21 20 19 18 17 Pond SF#6B: Filter 6B Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 rime (hours) M HAPROJECTS12007\07063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre-Post.O2-22-10 Type 1124-hr 07063 10yr-24hr Rainfal1=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Hydro .CAD®7 10 s/n 000479 0 2005 HydroCAD Software Solutions LLC 2/22/2010 a 6 Pond SF#6B: Filter 6B Stage -Discharge Discharge (dPs) H:\PROJECTS\2007\07063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 02-22-10 Type It 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by !Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HvdroCAD Software Solutions LLC 2/22/2010 Stage -Area -Storage for Pond SF#6B: Filter 68 Elevation Surface Storage (feet) (sQ-ft) (cubic -feet) 9.67 1,619 0 9.77 1,671 42 9.87 1,722 88 9.97 1,774 137 10.07 1,826 186 10.17 1,878 234 10.27 1,929 282 10.37 1,981 331 10.47 2,033 381 10.57 2,084 432 10.67 2,136 485 10.77 2,188 539 10.87 2,240. 594 10.97 2,291 661 11.07 2,343 709 11.17 2,395 768 11.27 2,446 829 11.37 2,498 891 11.47 2,550 954 11.57 2,602 1,018 11.67 2,653 1,084 11.77 2,705 1,151 11.87 2,757 1,219 11.97 2,808 1,289 12.07 6,987 1,598 12.17 7,099 2,020 12.27 7,211 2,453 12.37 7,323 2,898 12.47 7,435 3,353 12.57 7,548 3,820 12.67 7,660 4,298 12.77 7,772 4,787 12.87 7,884 5,288 12.97 7,997 5,799 13.07 8,109 6,322 13.17 8,221 6,856 13.27 8,333 7,402 13.37 8,446 7,958 13.47 8,558 8,526 13.57 8,670 9,105 13.67 8,782 9,695 13.77 8,895 10,296 13.87 9,007 10,909 13.97 9,119 11,533 14.07 9,231 12,168 14.17 9,343 12,814 14.27 9,456 13.472 14.37 9,568 14,141 14.47 9,680 14,821 14.57 9,792 15,512 14.67 9,905 16,215 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 14.77 10,017 16,928 14.87 10,129 17,653 14.97 10,241 18,389 SF ##613 - Veg. Filter -10 yr stm Worksheet for Rectangular Channel Project Description Project File h:lprojects12007107063 south bridgelcalcsVlowmaster107063 ve.fm2 Worksheet SF DA##68 - Veg Filter Flow Element Rectangular Channel Method Manning`s Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.010000 fv t Bottom Width 10.00 ft Discharge 3.90 cfs Results Depth 0.22 ft Flow Area 2.21 ft' Wetted Perimeter 10.44 ft Top Width 10.00 ft Critical Depth 0.17 ft Critical Slope 0.024846 fit t Velocity 1.76 ft/s Velocity Head 0.05 ft Specific Energy 0.27 ft Froude Number 0.66 Flow is subcritical. 02/23/10 FlowMaster v5.13 09,28:51 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 05708 (203) 755-1888 Page 1 of 1 Swg o9o9o3 of WATT qD NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM �v ' LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACK ..._ .. _ .._ ,,..�.,.,�,.,, �.�V /7v4 _ 1� ITEMS (NEXT WORKSHEET)I I. PROJECT INFORKATON Project name South Bridge Subdivision - Phase I Contact name John S. Tunstall, P.E. Phone number 910-343 9653 Date 12512009 (Revised 02-23-10) Drainage area number 1 IL DESIGN INEOC T]ION. For Level Spreaders Receiving Flow From a BMP Type of BMP Sand Filter Drawdown flow from the BMP 1.20 cfs For Level Spreaders Receiving Flow from the Drainage Area Drainage area ff Impervious surface area fe Percent impervious % Rational C coefficient Peak flow from the 1 in/hr storm cfs Time of concentration min Rainfall intensity,l0-yr storm in/hr Peak flow from the 10-yr storm cis Where Does the Level Spreader Discharge? To a grassed bioretention cell? n _ (Y or N) To a mulched bioretention cell? n (Y or N) To a wetland? y (Y or N) To a filter strip or riparian buffer? y (Y or N) Other (specify) Filter Strip or Riparian Buffer Characterization (If applicable) Width of grass 50.00 ft Width of dense ground cover 0.00 ft Width of wooded vegetation 0.00 ft Total width 50.00 ft Elevation at downslope base of level lip 4.50 fmsl Elevation at top of bank of the receiving water 2.00 fmsl Slope (from level lip to to top of bank) 5.00 % Are any draws present? n (Y or N) Level Spreader Design Forebay surface area 0.00 sq ft Feet of level lip needed per cfs 13 fgcfs Answer 'Y" to one of the following: Length based on the 1 in/hr storm? n (Y or N) Length based on the 10-yr stone? y (Y or N) Length based on the BMP discharge rate? n (Y or N) Design flow 2.36 cfs Is a bypass device provided? n (Y or N) Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. Please complete filter strip characterization below. Please complete filter strip characterization below. OK OK No forebay is needed. A bypass device is not needed. Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Ray.5 Parts I. and II. Design Summary, page 1 of 2 Length of the level lip Are level spreaders in series? Bypass Channel Design (If applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M B W y Peak velocity in the channel during the 10-yr storm Channel lining material , tul 25.00 ft #VALUE! n (Y or N) (Y or N) Do not complete this section of the worksheet. (Y or N) Do not complete this section of the worksheet. Do not complete this section of the worksheet, ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. W IY , 1 B j cfs Do not complete this section of the worksheet Do not complete this section of the worksheet � 1 M t Form SW401-Level Spreader, Fifter Strip, Restored Riparian Buffer-Rev.5 Parts L and II. Design Summary, page 2 of 2 5 w 9 690go3 AOf warg9 AC*AaJ f MCDENR o STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely frllsd out, pOnted artd subw# d. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)l I. PROJECT IWORMATION . Project name South Bridge Subdivision - Phase I Contact name John S. Tunstall, P.E. Phone number 910-343-9653 Date 11/25/2009 (Revised 02-23-10) Drainage area number 2 IL DESIGN INFORWOON For Level Spreaders Receiving Flow From a BMP Type of BMP Sand Filter Drawdown flow from the BMP 1.02 cis For Level Spreaders Receiving Flow from the Drainage Area Do not complete this section of the worksheet. Drainage area fe Do not complete this section of the worksheet. Impervious surface area fe Do not complete this section of the worksheet. Percent impervious % Do not complete this section of the worksheat. Rational C coefficient Do not complete this section of the worksheet. Peak flow from the 1 in/hr storm cis Do not complete this section of the worksheet. Time of concentration min Rainfall intensity, 1 0-yr storm in/hr Do not complete this section of the worksheet. Peak flow from the 10-yr storm cis Do not complete this section of the worksheet. Where Does the Level Spreader Discharge? To a grassed bioretention cell? n (Y or N) To a mulched bioretention cell? n (Y or N) To a wetland? y (Y or N) 'lease complete finer strip characterization below. To a filter strip or riparian buffer? y (Y or N) 'lease complete filter strip characterization below. Other (specify) Filter Strip or Riparian Buffer Characterization (If applicable) Width of grass 50.00 ft Width of dense ground cover 0.00 ft Width of wooded vegetation 0.00 ft Total width 50.00 ft Elevation at downslope base of level lip fmsl Elevation at top of bank of the receiving water fmsl Slope (from level lip to to top of bank) % Are any draws present? n (Y or N) Level Spreader Design Forebay surface area sq ft Feet of level lip needed per cfs 13 ft/cfs Answer "Y" to one of the following: Length based on the 1 in/hr storm? n (Y or N) Length based on the 10-yr storm? y (Y or N) Length based on the BMP discharge rate? n (Y or N) Design flow 4.12 cfs Is a bypass device provided? n (Y or N) OK No forebay is needed. A bypass device is not needed, Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 1 of 2 Length of the level lip Are level spreaders in series? 10.00 ft Level spreader must be at least 13 feet long. n (Y or N) Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M B W y Peak velocity in the channel during the 10-yr storm Channel lining material t 1 ---------- M 1 (Y or N) Do riot complete this section of the worksheet. (Y or N) Do not complete this section of the worksheet. Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. W Y B j cfs Do not complete this section of the worksheet Do not complete this section of the worksheet 1 M t Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and It. Design Summary, page 2 of 2 '1QFWATfq MCDEG Qf w+•�®O Y r R j STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM I I VJ LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be complefety filled out, printed and submiffed' DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)l I. PROJECT INFORMATION Project name South Bridge Subdivision - Phase I Contact name John S. Tunstall, P.E. Phone number 910-343-9653 Date 11/2512009 (Revised 02-23-10) Drainage area number 3 II. QESIGi�1,-1NFOF�FATI For Level Spreaders Receiving Flow From a BMP Type of BMP sand filter Drawdown flow from the BMP 1.34 CIS For Level Spreaders Receiving Flow from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the 1 in/hr storm Time of concentration Rainfall intensity, 10-yr stonnn Peak flow from the 10-yr storm Where Does the Level Spreader Discharge? To a grassed bioretention cell? To a mulched bioretention cell? To a wetland? To a filter strip or riparian buffer? Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass Width of dense ground cover Width of wooded vegetation Total width Elevation at downslope base of level lip Elevation at top of bank of the receiving water Slope (from level lip to to top of bank) Are any draws present? Level Spreader Design Forebay surface area Feet of level lip needed per cis Answer "Y" to one of the following: Length based on the 1 inlhr storm? Length based on the 10-yr storm? Length based on the BMP discharge rate? Design flow Is a bypass device provided? le ftz CIS min in/hr cfs n (Y or N) n (Y or N) y (Y or N) y (Y or N) Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. Do not complete this section of the wodksheet. Do not complete this section of the worksheet. Do not complete this section of the worksheet. lease complete filler strip characterization below. lease complete filter strip characterization below. 50.00 ft ft _ __0.00_ 0.00 -- ^it 50.00 ft 6.50 fmsl 6.00 fmsl 1.00 % OK (Y or N) OK sq ft 13 Wds n (Y or N) y (Y or N) n (Y or N) 7.65 cis n (Y or N) No forebay is needed. A bypass device is not needed. Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and It. Design Summary, page 1 of 2 Length of the level lip Are level spreaders in series? Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M 0 W y Peak velocity in the channel during the 10-yr storm Channel lining material M 25.00 ft #VALUE! n (Y or N) (Y or N) Do not complete this section of the worksheet. (Y or N) Do not complete this section of the workshest. Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. Do not complete this section of the worksheet. $ Do not complete this section of the worksheet. ft Do not complete this section of the workshest. W Y 1 B 1 ds Do not complete this section of the workshest. Do not complete this section of the worksheet. t Form SW401-Level Spreader, Fitter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 2 of 2 Sv�rs �gogo3 of warfiR O�dl � y WDENR p < STORMWATER MANAGEMENT PERMIT APPLICATION FORM NVJ 401 CERTIFICATION APPLICATION FORM vvv 1�J LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)I I. PROJECT INFORMATION Project name South Bridge Subdivision - Phase I Contact name John S. Tunstall, P.E. Phone number 910-343-9653 Date 11/25/2009 (Revised 02-23-10) Drainage area number 4 Ill. Dili" INPORMATION For Level Spreaders Receiving Flow From a BMP Type of BMP Sand Filter Drawdown flow from the BMP 1.19 cfs For Level Spreaders Receiving Flow from the Drainage Area Do not complete this section of the worksheet. Drainage area Do not complete this section of the worksheet. Impervious surface area Do not complete this section of the worksheet. Percent impervious % Do not complete this section of the worksheet. Rational C coefficient Do not complete this section of the worksheet. Peak flow from the 1 inlhr storm cis Do not complete this section of the worksheet Time of concentration min Rainfatl intensity, 10-yr storm inthr Do not complete this section of the worksheet. Peak flow from the 10-yr storm cis Do not complete this section of the worksheet. Where Does the Level Spreader Discharge? To a grassed bioretention cell? n (Y or N) To a mulched bioretention cell? n (Y or N) To a wetland? y (Y or N) 'Iesse complete filter strip characterization below. To a filter strip or riparian buffer? y (Y or N) 'lease complete filter strip characterization below. Other (specify) Filter Strip or Riparian Buffer Characterization (If applicable) Width of grass Width of dense ground cover Width of wooded vegetation Total width Elevation at downslope base of level lip Elevation at top of bank of the receiving water Slope (from level lip to to top of bank) Are any draws present? Level Spreader Design Forebay surface area Feet of level lip needed per cis Answer "Y" to one of the following: Length based on the 1 inmr storm? Length based on the 10-yr storm? Length based on the BMP discharge rate? Design flow Is a bypass device provided? 50.00 ft 0.00 ft 0.00 ft 50.00 ft 7.25 fmsl 7.00 fmsl 0.50 % n (Y or N) 0.00 sq ft 13 ft/cfs n (Y or N) y (Y or N) n (Y or N) 5.04 cis n (Y or N) OK OK No forabay is needed. 1 bypass device is not needed. Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and It. Design Summary, page 1 of 2 Length of the level lip Are level spreaders in series? Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M B W Y Peak velocity in the channel during the 10-yr storm Channel lining material 10.00 ft Level spreader must be at least 13 feet long. n (Y or N) WA 1 B 1 (Y or N) )a not complete this section of the worksheet. (Y or N) )o not complete this section of the worksheet. Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. Cls Do not complete this section of the worksheet. Do not complete this section of the worksheet. 1 M t Form SW401-Level Spreader, Filter Strip. Restored Riparian Butter-Rev.5 Parts I. and Il. Design Summary, page 2 of 2 SW S O Rorf03 aoF warms AC*A MC_" .` O �[ STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT I his roan must be completely h7led out, printed and submNed. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)l 1. PFtC'P INF>Ai IqN Project name South Bridge Subdivision - Phase I Contact name John S. Tunstall, P.E. Phone number 910-343-9653 Date 11/25/2009 (Revised 02-23-10) Drainage area number 5 liE lIMFOIZNWT�N For Level Spreaders Receiving Flow From a BMP Type of BMP Sand Filter Drawdown flow from the BMP 0.63 cis For Level Spreaders Receiving Flow from the Drainage Area Do not complete this section of the worksheet. Drainage area f? Do not complete this section of the worksheet. Impervious surface area ftz Do not complete this section of the worksheet. Percent impervious % Do not complete this section of the worksheet. Rational C coefficient Do not complete this section of the worksheet. Peak flow from the 1 inmr storm Cis Do not complete this section of the worksheet. Time of concentration min Rainfall intensity, 10-yr storm Mr Do not complete this section of the worksheet. Peak flow from the 10-yr storm cis Do not complete this section of the worksheet. Where Does the Level Spreader Discharge? To a grassed bioretention cell? n (Y or N) To a mulched bioretention cell? n _ (Y or N) To a wetland? y (Y or N) Please complete filter strip characterization below To a filter strip or riparian buffer? y (Y or N) Please complete filter strip characterization below Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass 50.00 ft Width of dense ground cover 0.00 ft Width of wooded vegetation 0.00 ft Total width 50.00 ft Elevation at downslope base of level lip 6.50 fmsl Elevation at top of bank of the receiving water 6.00 fmsl s Slope (from level lip to to top of bank) 1.00 % OK ;. Are any draws present? n (Y or N) OK u�.. Level Spreader Design f Forebay surface area 0.00 sq It No forebay is needed. Feet of level lip needed per cis 13 fticfs Answer "Y" to one of the following: Length based on the 1 inmr storm? n (Y or N) Length based on the 10-yr storm? y (Y or N) Length based on the BMP discharge rate? n (Y or N) Design flow 4,13 cis Is a bypass device provided? n (Y or N) A bypass device is not needed. Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 1 of 2 Length of the level lip Are level spreaders in series? Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M B W y Peak velocity in the channel during the 10-yr storm Channel lining material t 1 i--------- M 1 10.00 It Level spreader must be at lest 13 feet long. n (Y or N) (Y or N) Do rat complete this section of the worksheet. (Y or N) Do not complete this section of the worksheet. Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. W Y B j cfs Do not complete this section of the worksheet. Do not complete this section of the worksheet. M t Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 2 of 2 Star$ ojog03 g?�OfWntFR� � qi= hh A�u� o MCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM j� VJJ LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLia i r - ALL ,.�wwv d ITEMS (NEXT WORKSHEET)i L PROJECT INFORMATION Project name South Bridge Subdivision - Phase I Contact name John S. Turistall, P.E. Phone number 910-343-9653 Date 1110/2009 (Revised 02-23-10) Drainage area number 6A II. DESIGN INFORMATION, For Level Spreaders Receiving Flow From a BMP Type of BMP Sand Filter Drawdown flow from the BMP 1.20 GIs For Level Spreaders Receiving Flow from the Drainage Area Do not complete this section of the worksheet. Drainage area fe Do not complete this section of the worksheet. Impervious surface area fe Do not complete this section of the worksheet. Percent impervious % Do not complete this section of the worksheet. Rational C coefficient Do not complete this section of the worksheet. Peak flow from the 1 inihr storm Cis Do not complete this section of the worksheet Time of concentration min Rainfall intensity, 10-yr storm inlhr Do not complete this section of the worksheet. Peak flow from the 10-yr storm cis Do not complete this section of the worksheeL Where Does the Level Spreader Discharge ? To a grassed bioretention cell? n (Y or N) To a mulched bioretention cell? n (Y or N) To a wetland? y (Y or N) 'lease complete filter strip characterization below. To a fitter strip or riparian buffer? y (Y or N) Please complete filter strip characterization below. Other (specify) Finer Strip or Riparian Buffer Characterization (if applicable) Width of grass Width of dense ground cover Width of wooded vegetation Total width Elevation at downslope base of level lip Elevation at top of bank of the receiving water Slope (from level lip to to top of bank) Are any draws present? Level Spreader Design Forebay surface area Feet of level lip needed per cis Answer "Y" io one of the hollowing: Length based on the 1 inlhr storm? Length based on the 10-yr storm? Length based on the BMP discharge rate? Design flow Is a bypass device provided? 50.00 it 0.00 ft 0.00 ft 50.00 ft 9.00 fmsl 6.00 fmsl 6.00 % OK n (Y or N) OK 0.00 sq ft No forebay is needed. 13 fticfs n (Y or N) y (Y or N) n (Y or N) 6.31 cis n (Y or N) A bypass device is not needed. Form SW401-Level Spreader, Flier Strip, Restored Riparian Buffer-Rov.5 Parts I. and It. Design Summary, page 1 of 2 Length of the level lip Are level spreaders in series? Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M B W y Peak velocity in the channel during the 10-yr storm Channel lining material M 10.00 It Level spreader must be at least 13 feet long. n (Y or N) (Y or N) Do not complete this section of the worksheet (Y or N) Do not complete this section of the workshee.. Do not complete this section of the worksheet. It Do not complete this section of the worksheet. fl Do not complete this section of the worksheet. ft Do rat complete this section of the worksheet. ft Do not complete this section of the worksheet. W Y 1 B 1 cfs Do rat complete this section of the worksheet. Do rat complete this section of the worksheet. �t M t Form SW401-Level Spreader, Fier Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 2 of 2 S w 8 090107 OF WAZc4 wAE WDEW o STORMWATER MANAGEMENT PERMIT APPLICATION FORM I\I �[ ' I U 63 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)I i" PRO,JE t INFORt A'I 110N Project name South Bridge Subdivision - Phase I Contact name John S. Tunstall, P.E. Phone number 910-343-9653 Date 11125/2009 (Revised 02-23-10) Drainage area number 6B N.. I3180I0" INFORMATION For Level Spreaders Receiving Flow From a BMP Type of BMP Sand Filter Drawdown flow from the BMP 1.21 cis For Level Spreaders Receiving Flow from the Drainage Area Do not complete this section of the worksheet. Drainage area ftz Do not complete this section of the worksheet. Impervious surface area ftz Do not complete this section of the worksheet. Percent impervious % Do not complete this section of the worksheet. Rational C coefficient Do not complete this section of the worksheet. Peak flow from the 1 inlhr storm ofs Do not complete this section of the worksheet. Time of concentration min Rainfall intensity, 10-yr storm ��— inittr Do not complete this section of the worksheet. Peak flow from the 10-yr storm cis Do not complete this section of the worksheet. Where Does the Level Spreader Discharge? To a grassed bioretention cell? n (Y or N) To a mulched bioretention cell? n (Y or N) To a wetland? y (Y or N) 'lease complete filter strip characterization below. To a filter strip or riparian buffer? y (Y or N) Please complete filter strip characterization below. Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass Width of dense ground cover Width of wooded vegetation Total width Elevation at downslope base of level lip Elevation at top of bank of the receiving water Slope (from level lip to to top of bank) Are any draws present? Level Spreader Design Forebay surface area Feet of level lip needed per cis Answer "Y" to one of the following: Length based on the 1 inlhr storm? Length based on the 10-yr storm? Length based on the BMP discharge rate? Design flow Is a bypass device provided? 50.00 ft 0.00 ft 0.00 it 50.00 ft 9.50 fmsl 9.00 fmsl 1.00 % OK n (Y or N) OK 0.00 sq ft No forebay is needed. 13 fttcfs n (Y or N) y (Y or N) n (Y or N) 3.90 cis n (Y or N) FEB 2, 4 2010 A bypass device is not needed. Form SW401-1-evel Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 1 of 2 Length of the level lip 10.00 ft Level spreader must be at least 13 feet long. Are level spreaders in series? n (Y or N) Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M B W y Peak velocity in the channel during the 10-yr storm Channel lining material M W Y 1 B 1 (Y or N) Do not complete this section of the worksheet. I Y or N) Do not complete this section of the worksheet. Do not complete this section of the worksheet. It Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. cfs Do not complete this section of the worksheet. Do not complete this section of the worksheet. �1 M Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 2 of 2 Pusey, Steven From: Jody Bland Obland@nkteng.com] Sent: Tuesday, February 23, 2010 4:26 PM To: Pusey, Steven Subject: Southbridge Subdivision Hi Steve, I just wanted to give you a brief synopsis of the changes that are going to be submitted to you today. The layout changed removing a cul-de-sac therefore changing some of the drainage. We have updated the drainage areas to reflect the current layout. In the revised calculation package I have included a drainage area breakdown sheet for each DA. DA #1 has basically not changed. The DA reduced slightly and I held the impervious as submitted. I have updated any supplements that may have changed based on these revisions. Feel free to contact me if you have any questions. Thanks, Jody Bland - NORRIS. !CUSKEX,TUNSTALL Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. ( �)K ■ �;§if �)£ $.��)§.■ #a k E... ■ f 2 2 ,. §i0 0t§/|. kEi � � �•2. k■: =E2.I 2kE`| §$0 0 ..-| i §ic s4 ■§$7 kf a. !a� � W I- I I $ ■ � f | E-1 ■ -n m co � � � 0 Pusey, Steven From: Jody Bland Obland@nkteng.com] Sent: Thursday, February 11, 2010 8:31 AM To: Pusey, Steven Subject: RE: South Bridge Subdivision Attachmerltcs image001.gif; image002.ipg; image004.jpg; 07063 infil 7-12 expanded calc.pdf Attached is the requested calculation. I extended the Hydrograph time to 72 hours so you could see that indeed the discharge from the pond continues to reduce and is less than the exfiltration out of the basin. Thanks, Jody Bland ILORRIS- KUSA &TUNSTALL Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 %�GLii 9(I'�Caviio., � .f 0���;i.rayc aGrC<i It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. From: Pusey, Steven[mailto:steven.pusey@ncdenr.gov] Sent: Wednesday, February 10, 2010 10:10 AM To: Jody Bland Subject: RE: South Bridge Subdivision Please send your revised Hydrocad modeling data for Infiltration Basin 7-12. 1 still have the old data which shows that discharge and inflow do not cross within 24 hours. Give me a call if you have any questions or comments. Thanks, Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. Pusey@ncdenr.gov E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. From: Jody Bland [mailto:jbland@nkteng.com] Sent: Tuesday, February 09, 2010 9:50 AM To: Pusey, Steven Subject: RE: South Bridge Subdivision set the storage by assuming a basin size and modeling it in HydroCadd. When the hydrograph shows the discharge and inflow crossing & the peak is contained within the basin then it sized for the 1 yr storm. Thanks, Jody Bland NORRIS. KUSItE &TUNS'!"ALL CO%-ut rrstidi C`NWNFEIM (NC. Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. From: Pusey, Steven [mailto:steven.pusey@ncdenr.gov] Sent: Monday, February 08, 2010 4:30 PM To: Jody Bland Subject: South Bridge Subdivision Jody, Please advise how you calculated your drawdown time on the infiltration basins. It appears from my calculations that there is not enough storage volume on Basin 7-12. Thanks, Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven.PuseyC@ncdenr.gov E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. HAPROJECTS12007107063 SOUTH BRIDGE1CaicslHydroCadl 07063 Pre -Post 02-02-10 Type 1l 24-hr 07063 1 yr -24hr Rainfall=3.67° Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. H rydroCADS 7.1.0 sin 000479 0 2006 HydroCAD Software Solutions LLC 2/9/2010 Pond 7 -12: Infiltration Area Hydrograph 0.6 . 0.57 cis %{ Inflow ....... _ .. 0.55 !hom A a4ii I v z — Primary. 0.5 Peak Elev=19.90' 0.45 ^a ti i 0.4: 1t+ r ye= 1,` 27 cf 0.35 � 0.3 LL 0.25 0.2 0.16 r 0.1 0.05 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 Time (hours) a NORRIS, KUSKE TU NSTALL CONSULTING ENGINEERS, INC. February 4, 2010 Mr. Steve G. Pusey, Environmental Engineer NC DENR / Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: South Bridge Subdivision — Phase I State Stormwater Permit No. SW8 090903 Sneads Ferry, NC NKT Project No. 07063 Dear Mr. Pusey: J. Phillip Norris, P.E. John A. Kuske, III, P.E. John S.Tunstall, P.E. J.A. Kuske, P.E. of Counsel Per your e-mail comments of February 1, 2010 and February 3, 2010 and your phone conversation with Jody Bland of our office on February 2, 2010, we offer the following responses: 1. Enclosed is the revised Wet Detention Basin Supplement for Ponds #7-12. / 2. Enclosed is the revised Wet Detention Basin Supplement for Ponds #13A & 13B. 3. Enclosed is the revised Infiltration Basin Supplement for Ponds #13A & 13B. i Enclosed are two (2) copies of the revised plan sheets C5 and C18, one (1) set of revised calculations (Drainage Areas #13A & 13B), the revised SW-401 Wet Detention Basin Supplement forms (Drainage Areas #7-12 and Drainage Areas #13A & 13B) and the revised SW-401 Infiltration Basin Supplement form (Drainage Areas #13A & 13B). Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. �cEY-VED FEB 0 5 2010 Joh S. Tunstall, P. E. SY: JST/asn 07063 02-04-10-s-sw response-Rr Enclosures 902 Market Street -Wilmington, NC 28401-4733 - Phone: 910.343.9653 - Fax: 910.343.9604 STORMWATER CALCULATIONS SOUTH BRIDGE SUBDIVISION (PHASE 1) Sneads Ferry, North Carolina For BC & RT, LLC and Raiford G. Trask, Jr., Trustee 1202 Eastwood Road Wilmington, NC 28403 (910) 313-0795 .� ZCA:" .. 'fl!'IIIIItI"" Revised February 2010 September 2009 Prepared by: NORRIS, KUSKE & TUNS7ALL CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 (Fax) NKT Project No. 07063 Pusey, Steven From: Pussy, Steven Sent: Wednesday, February 03, 2010 2:33 PM To: 'Jody Bland' Subject: RE: South Bridge Subdivision For Pond 7-12, a 4" orifice will be okay since it is still less than 5 days. That makes each pond have a 4" orifice, correct? Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. Pusey@ncdenr.gov E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. From: Jody Bland [mailto:jbland@nkteng.com] Sent: Wednesday, February 03, 2010 2:26 PM To: Pussy, Steven Subject: RE: South Bridge Subdivision Please see my comment below..... Thanks, Jody Bland �,^_ NORRIS. KUSKE A TUNSTALL, . Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. From: Pusey, Steven[mailto:steven.pusey@ncdenr.gov] Sent: Monday, February 01, 2010 4:30 PM To: Jody Bland Subject: South Bridge Subdivision Jody, I just finished reviewing the wet ponds on this project, Pond 7-12, Pond 13A&B, and Pond 14, and have the following questions: Pond 7-12: On Supplement, sediment cleanout elevation is shown as 16' & 14' for bottom. Shouldn't this be 8' and 6' respectively? Also, we recommend 5" orifice to draw it down more quickly. Please revise. Why is an outlet revision needed? A 4" orifice falls with the required 2 to 5 day period. I understand that a 5" increases the discharge to the infiltration basin but I don't understand the difference between holding it in the pond or holding it in the infiltration area. We would rather contain and control the discharge from the pond and allow additional time for anything to settle out/etc. prior to entering the infiltration area since it is the more high maintenance of the two BMPs. Pond 13A & B: On Supplement, volume provided should be 139,174 cf, not 139. Also, we recommend a 4" orifice in lieu of a 5". Please revise. Pond 14: OK Thanks, Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven.Pusev@ncdenr.gov E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. Pusey, Steven From: Jody Bland jjbland@nkteng.com] Sent: Wednesday, February 03, 2010 2:24 PM To: Pusey, Steven Subject: RE: South Bridge calculations Yes, we have adjusted the basin sizing based on the Hydrocadd model and contain the'difference in the two amounts. The Hydrocadd model takes into account continual infiltration as one of the calculation variables too. Thanks, Jody Bland XORFUS— KUSKi=&1'LIP+STALL Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. From: Pusey, Steven [mailto:steven.pusey@ncdenr.gov] Sent: Wednesday, February 03, 2010 2:20 PM To: Jody Bland Subject: RE: South Bridge calculations I understand your equations here. Hopefully, I can fix our spreadsheet so that it can calculate the amount of storage required. As I understand it, basically, you have to store the difference between inflow and outflow (infiltrated) of the infiltration basin for at least a 24-hour period. This should closely match with your Hydrocad. Agree? Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. PuseyOncdennuov E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. From: Jody Bland [mailto:jbland@nkteng.com] Sent: Wednesday, February 03, 2010 1:50 PM To: Pusey, Steven Subject: RE: South Bridge calculations Attached is a quick calculation that I used to get a starting point to model the infiltration basin in Hydrocadd. I approximate the basin's bottom area and then assume a depth for storage. The data for those areas is then input into hydrecadd and the model is run. The excess volume which is being discharged into the basin but is not able to infiltrate is stored. The peak is verified to ensure that we are not overtopping the basin and are therefore containing all of the discharge from the 1 yr storm for infiltration. Thanks, Jody Bland Ct]NSUL'r;?.r_ CNG'Nx rq&. INC.. Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. From: Pusey, Steven [mailto:steven.pusey@ncdenr.gov] Sent: Wednesday, February 03, 2010 1:05 PM To: 'Jody Bland' Subject: South Bridge calculations Importance: High Jody, I don't think you can use the volumetric infiltration rate (by multiplying it by the bottom surface area) to calculate the storage volume required. Doesn't your Hydrocad program already assume that the maximum infiltration has already taken place? If so, then shouldn't you store a volume purely equal to the rate (difference between outflow and inflow) at which excess flow is entering the basin? I would assume that the required storage volume is based on a 24-hour time period (i.e.-24-hr storm). Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven.Pusev@ncdenr.eov E-mail correspondence to and from this address maybe subject to the NC Public Records Law and maybe disclosed to third parties. Date Design NORRIS, KUSKECoTUNSTALL Wilmington, NC CONSULTING ENGINEERS, INC. BrunswIck Count)6 NC Check Job i For Y. -:k a7m'w 17t,> Tl IM f 14,,; 1� e-luvv 1 -1- bl 1--le, 4 -� 1 FW&I 'Exlvr-1 , twNix -s�'` ts-Wl^ . NORRIS, KUSKE TUNSTALL CONSULTING ENGINEERS, INC. 2/212010 WET DETENTION BASIN CALCULATIONS Prolect Name: Souflh.Brf cYge.S�lsdlv�ldri �:..:'' : � . ::. NKT No: 07063 Contact Person Joint-iurall, PE .: Phone: (910) 343-9653 For projects with multiple basins, specify which basin this worksheet applies to: DA: 13A a 13B Description Qty Units Notes: 1-year,24-hour rain event 3-4 inches from NOAA & project location Drainage Area, DA = '.14;a,: ac total to pond Pre-existing Impervious Area = O.Ob ac Pre-existing Overall % Impervious, IPre = 0.00 % Proposed Impervious Area = 1,1 AS8 ac total BUA to pond Post Development Pervious Area =:a8: ac total proposed impervious to pond Post Deveoplment Overall % Impervious, Ipcst = 80_00 % Volume Within 0.5 mile & drain to SA waters? Design Rainfall Depth, D = Pre Develpoment Runoff Volume factor, Rvpre = Pre -Development Runoff Volume, Vp.= Post Develpoment Runoff Volume factor, Rvp�t = Post Development Runoff Volume, Vpt= Required Storage Volume = Permanent Pool Elevation Permanent Pool surface area State Temporary Pool Elevation State Temporary Pool Surface Area Provided Storage Volume = Peak Flow C value pre -developed C value post -developed Tc = Time of Concentration Depth @ Tc & 1-yr = d Intensity Peak, 1 YR= I Pre -development runoff rate (rational method) Post -development runoff rate (rational method) !red .Y USE DIFFERENCE OF PRE -POST VOLUME 3.67 in 0.05 in/in Rvpre = 0.05 + 0.009*IPre 9,541 Vp. = D/12 x Rvpre x DA*43560 0.77 inrn Rvp„r = 0.05 + 0.009*IPm 146,921 Vpd = D/12 x Rvpt x DA*43560 137,380 ft3 Diff of Pre -Post V 18.00 ft 29,276 sf 21.75 ft 43,274 sf 139,174 ft3 OKI 0:20. 0.79 15 ' min 0:99 inches 3.96 in/hr 11.46 cis Qpre Cpre x I x DA 44.81 cfs Qpm--C .t x I x DA H:IPROJECTS12007W7063 SOUTH BRIDGEICalcM07063 DWO PnNMI.3, S-P„sey Req. SIMPLE VOLUME 1-18-10 NORRIS, KUSKE TUNSTALL CONSULTING ENGINEERS, INC. 2/=010 Main Pond Volume (Excluding Forebay) Area of Top of Pond ...32;980: sf Area of State Stg Elevation : 28,i€54 sf Area of Top of Vag Shelf Elevation 22�421: sf Area of Normal Pool Elevation 19�Sg Area of Bottom of Veg Shelf Elevation 16�$ry� sf Area of Sediment Removal Elevation $ $f Top of Pond Elevation State Stg Elevation 2175: ft Top of Vag Shelf Elevation 18.50 ft Normal Pool Elevation 18.00 ft Bottom of Vag Shelf Elevation 17 501t Sediment Removal Elevation 4. ft Volume of Normal Pool Elevation to Sediement Removal Elevation 134,080 fe Forebay #1 Volume (Excluding Main Pond) Area of Top of Pond 18; w sf Area of State Stg Elevation sf Area of Normal Pool Elevation 9717 sf Area of Sediment Removal Elevation 4�228 sf Top of Pond Elevation 24. ft 94 State Stg Elevation 21. 2175 ft Normal Pool Elevation .ft Sediment Removal Elevation 13- ft Forebay #2 Volume (Excluding Main Pond) Area of Top of Pond 0 sf Area of State Stg Elevation . 0 Area of Normal Pool Elevation O sf Area of Sediment Removal Elevation 0 sf Top of Pond Elevation O..ft State Stg Elevation 21.75 ft Normal Pool Elevation 18.00 ft Sediment Removal Elevation .. 0 ft Forebay Volume - Normal Pool Elevation to Sediment Removal Elevation 34,863 fe nt_Forebay Volume: 1 20 6% (18 22% Required) OKI H:IPROJECTS12007107063 SOUTH BRIDGE1Caics107063 DWQ POND413. S-Pusey Req. SIMPLE VOLUME 1-18-10 NORRIS, KUSKE TUNSTALL CONSULTING ENGINEERS, INC. Average Depth & Required Surface Area Permanent Pool Area 29,276 sf Permanent Volume 168,942 cf Average Depth 5.77 ft D = V/A Average Depth, Davg = 5.77 ft Rounded Avg Depth SA/DA # from "Green Sheet' of Interpolated values for Coastal Region SA/DA at 800A w/ 6.00 ft avg depth = 4:80- 900/6 TSS removal, no filter strip Required Surface Area = 28,700 sf Provided Surface Area = 29,276 sf OKI Avg. Head = Drawdown Time = Internal Diameter - Internal Diameter = Drawdown Time = Internal Diameter = Internal Diameter = Avg Internal Diameter = Design Orifice Diameter = Design Drawdown rate Design Drawdown time 1.25 ft 2 days 0.43 ft 5.20 In 5 days 0.27 ft 3.29 in 4.25 in 4.66 in one third of flood stage 172,800 s 432,000 s OKI H:IPROJECTS12007107063 SOUTH BRIDGE1Calcs\n70A3 DWQ POND#13..S-Rucey Req. SI ."PLE .VOLUME 1-18-10 2=010 H:\PROJECTS\2007\07063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 12-15-09 Type 1l 24-hr 07063 1 yr -24hr Rainfall=3.67' Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/18/2010 Sub -catchment 13Pre: DA13 Runoff = 28.69 cfs @ 12.08 hrs, Volume= 1.851 af, Depth> 1.55" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67" Area (ac) CN Description 14.323 77 Woods, Poor, HSG C Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 13Pre: DA13 Hydrograph 32 ® Runoff 30 zesa ers -- - ----=------------------ ---_*----- -- -- -- -- z-----:-- 28 Type 1124-hr 07063 1yr -24hr --- -------------- --- ----- - - -- 26 _EZaillfel=3.67" _ _ 24-Run'affArea=14.32--aE--�-- 22 -F�uirioff�/oiurrre=1:g51f - - ------------_-®---=-----=--= ---- 20 18 - Min Depihy°�.55 1s fc=150min- X 14 CIV=7- -- --- - - --= -- =-- -- ------ - - ----- 12 10 6 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Tirne (hours) H:\PROJECTS12007\07063 SOUTH BRIDGE\Calcs\HydroCadl 07063 Pre -Post 12-15-09 Type 1124-hr 07063 1 yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstail Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/18/2010 Subcatchment 1317ost: DA 13 Runoff = 51.34 cfs @ 12.06 hrs, Volume= 3.450 af, Depth> 2.89" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type II 24-hr 070631 yr -24hr Rainfall=3.67 Area (ac) CN Description 11.458 98 Impervious Allocation 2.865 74 >75% Grass cover, Good, HSG C 14.323 93 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, H:IPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 12-15-09 Type 1124-hr 07063 1 yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/18/2010 Pond FB 13: Forebay 13 Inflow Area = 14.323 ac, Inflow Depth > 2.89" for 07063 1 yr -24hr event Inflow = 51.34 cfs @ 12.06 hrs, Volume= 3.450 of Outflow = 39.94 cfs @ 12.13 hrs, Volume= 2.580 af, Atten= 22%, Lag= 4.1 min Primary = 39.94 cfs @ 12.13 hrs, Volume= 2.580 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Peak Elev= 21.18' @ 20.29 hrs Surf.Area= 14,246 sf Storage= 38,106 cf Flood Elev= 24.00' Surf.Area= 18,262 sf Storage= 83,937 cf Plug -Flow detention time= 114.0 min calculated for 2.578 of (75% of inflow) Center -of -Mass det. time= 26.7 min ( 817.8 - 791.1 ) Volume Invert Avail.Storage Storage Description #1 18.00' 83,937 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 18.00 9,717 0 0 24.00 18,262 83,937 83,937 Device Routing Invert Outlet Devices #1 Primary 18.00' 36.0" x 150.0' long Connective Piping X 2.00 RCP, end -section conforming to fill, Ke= 0.500 Outlet Invert= 17.90' S= 0.0007 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Secondary 23.25' 50.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=39.81 cfs @ 12.13 hrs HW=20.38' TW=19.67' (Dynamic Tailwater) L1=Connective Piping (Barrel Controls 39.81 cfs @ 4.5 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=18.00' (Free Discharge) 2=Emergency Spillway ( Controls 0.00 cfs) H:IPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 12-15-09 Type/1 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstali Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/18/2010 Pond FIB 13. Forebay 13 Hydrograph Inflow --=----�--- ------ --- -- 51.34 ds ..- _ _ _- - D OL'tflow f oflow Area, ac - - - - -. - i Primary low - - , 55 ---- - -- -:- �- .--=-----------=-- Secondary Peak Elev=21 ,.1 8' 50--------- _-- -_-- - -- ----:--� ---•- ---- -, 45 Storage-3&'�06cf39.9«, - - -�-- -- ---:--=- -- -- __-- -- 39.94 - - 40 -�-------------- ---- - ---------------3---- --� - 35 - --- - -- - - --;-- - -- ------------ -- ---- -- 30 - ---- - - -- - - .----------•- - -_---- -- LL25 --- -- -- -- ------ --- ---- .--.--.----- - -: - 20-.--.-- ----------•- -- -• ---- - -.--- - - - 15 --- ---- - -- -- -- -- -- 10 m d c 0 .W a m Luu 0 1 2 3 4 5 67 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Pond FB 13: Forebay 13 Stage -Discharge 0 20 40. 60 80 100 120 140 160 180 200 Discharge (cfs) Total rl Primary U Secondary HAPROJECTS12007107063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 12-15-09 Type/1 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 0 2005 HydroCAD Software Solutions LLC 1/18/2010 Stage -Area -Storage for Pond FB 13: Forebay 13 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 18.00 9,717 0 18.10 9,859 979 18.20 10,002 1,972 18.30 10,144 2,979 18.40 10,287 4,001 18.50 10,429 5,037 18.60 10,572 6,087 18.70 10,714 7,151 18.80 10,856 8,229 18.90 10,999 9,322 19.00 11,141 10,429 19.10 11,284 11,550 19.20 11,426 12,686 19.30 11,568 13,836 19.40 11,711 14,999 19.50 11,853 16,178 19.60 11,996 17,370 19.70 12,138 18,577 19.80 12,281 19,798 19.90 12,423 21,033 20.00 12,565 22,282 20.10 12,708 23,546 20.20 12,850 24,824 20.30 12,993 26,116 20.40 13,135 27,422 20.50 13,277 29,743 20.60 13,420 30,078 20.70 13,562 31,427 20.80 13,705 32,790 20.90 13,847 34,168 21.00 13,990 35,560 21.10 14,132 36,966 21.20 14,274 38,386 21.30 14,417 39,821 21.40 14,559 41,269 21.50 14,702 42,733 21.60 14,844 44,210 21.70 14,986 45,701 21.80 15,129 47,207 21.90 15,271 48,727 22.00 15,414 50,261 22.10 15,556 51,810 22.20 15,699 53,373 22.30 15,841 54,950 22.40 15,983 56,541 22.50 16,126 58,146 22.60 16,268 59,766 22.70 16,411 61,400 22.80 16,553 63,048 22.90 16,695 64,710 23.00 16,838 66,387 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 23.10 16,980 68,078 23.20 17,123 69,783 23.30 17,265 71,503 23.40 17,408 73,236 23.50 17,550 74,984 23.60 17,692 76,746 23.70 17,835 78,522 23.80 17,977 80,313 23.90 18,120 82,118 24.00 18,262 83,937 H:IPROJECTS12007107063 SOUTH BRIDGE1Caics\HydroCadl 07063 Pre -Post 02-02-10 Type 11 24-hr 070631 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 sh 000479 C 2005 HydroCAD Software Solutions LLC 2/2/2010 Pond I_�ffP13: Man Pond 13 Inflow Area = 14.323 ac, Inflow Depth > 2.16" for 07063 1yr -24hr event Inflow = 39.94 cfs @ 12.13 hrs, Volume= 2.580 of Outflow = 0.69 cfs @ 16.36 hrs, Volume= 0.811 af, Aden= 98%, Lag= 253.4 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 0.69 cfs @ 16.36 hrs, Volume= 0.811 of Secondary = 0.00 cis @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Peak Elev= 21.18' @ 20.29 hrs Surf.Area= 27,567 sf Storage= 77,485 cf Flood Elev= 24.00' Surf.Area= 32,980 sf Storage= 162,848cf Plug -Flow detention time= 331.8 min calculated for 0.811 of (31 % of inflow) Center -of -Mass det. time= 181.7 min ( 999.5 - 817.8 ) Volume Invert Avail.Storage Storage Description #1 18.00' 162,848 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 18.00 19,559 0 0 18.50 22,421 10,495 10,495 24.00 32,980 152,353 162,848 Device Routine Invert Outlet Devices #1 Primary 15.00' 4.0" x 75.0' long Low Flow Orfice to Secondary Infiltration Area CMP, projecting, no headwall, Ke= 0.900 Outlet Invert=13.00' S= 0.02677 Cc= 0.900 n= 0.010 PVC, smooth interior #2 Device 1 18.00' 2.00' W x 2.00' H Vert. Orifice/Grate C= 0.600 #3 Secondary 13.10' 18.0" x 55.0' long Culvert CMP, projecting, no headwall, Ke= 0.900 Outlet Invert=13.00' S= 0.0018 'P Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #4 Device 3 21.75' 4.00' x 4.00' Horiz. Top of Box Limited to weir flow C= 0.600 #5 Discarded 23.25' 60.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Riscarded OutFlow Max=0.00 cis @ 0.00 hrs HW=18.00' (Free Discharge) --5=Emergency Spillway ( Controls 0.00 cfs) rimary OutFlow Max=0.69 cis @ 16.36 hrs HW=21.10' TW=13.33' (Dynamic Tailwater) tow Flow Orfice to Secondary Infiltration Area (Barrel Controls 0.69 cfs @ 7.9 fps) 2=0rifice/Grate (Passes 0.69 cfs of 27.65 cfs potential flow) tscondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=18.00' (Free Discharge) r Culvert (Passes 0.00 cfs of 13.68 cfs potential flow) -4-Top of Box ( Controls 0.00 cfs) HAPROJECTS12007107063 SOUTH BRIDGE1CaIcs\HydroCadl 07063 Pre -Post 02-02-10 Type I! 24-hr 07063 lyr-24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAM 7.10 sin 000479 ® 2005 HydrOCAD Software Solutions LLC 2/2/2010 Pond MP13: Main Pond 13 Hydrograph - ------------- --- - - as.aaea - -- - -- -- -- - ' _ ■Inflow Fs FF ;//��,-.�.,,�� ■ Outflow _Erlflowi A: i �, 02 -- ----- ----- - --- - ■Discarded ■ Primary --------------- 44-�+ei�14�e1F=�rFA,�,s -------•--.------ -- ------ ■Secondary 42 38 34------i- - --- -- -- - -F -- 32 -- ---- ---- --- -'-- --- - - --S - - 30 --.- - - ----i- -r- -- - --.- - - - -- - 28 ff. - - ----- -- - -- - --------- - - = - --- 3� 24 f - - --•- --'-- ----r- ---r-•--• -- - -�-� -- b' 20 '. ---- -� *-.------ ---- - ----------T- - --- ----- 14 �,----�.. --- --- - ----j - -- - ------------L - --- 12 ----i-------------i--r---- --------------r--------- to f 8 a.sa cr. g 'fo.00� A f . OAR da 0 1 2 3 4 5 8 7 8 9 10 11 12 13 14 15 18 17 1S 19 20 21 22 23 24 Time (hours) Pond MP13: Main Pond 13 M 50 80 70 80 90 100 Discharge (cfs) H:IPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 02-02-10 Type II 24-hr 070631 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 2/2/2010 Stage -Area -Storage for Pond MP13: Main Pond 13 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 18.00 19,559 0 18.10 20,131 1,985 18.20 20,704 4,026 18.30 21,276 6,125 18.40 21,849 8,282 18.50 22,421 10,495 18.60 22,613 12,747 18.70 22,805 15,018 18.80 22,997 17,308 18.90 23,189 19,617 19.00 23,381 21,945 19.10 23,573 24,293 19.20 23,765 26,660 19.30 23,957 29,046 19.40 24,149 31,451 19.50 24,341 33,876 19.60 24,533 36,320 19.70 24,725 38,782 19.80 24,917 41,265 19.90 25,109 43,766 20.00 25,301 46,286 20.10 25,493 48,826 20.20 25,685 51,385 20.30 25,877 53,963 20.40 26,069 56,560 20.50 26,261 59,177 20.60 26,453 61,812 20.70 26,645 64,467 20.80 26,837 67,141 20.90 27,029 69,834 21.00 27,221 72,547 21.10 27,413 75,279 21.20 27,605 78,029 21.30 27,796 80,799 21.40 27,988 83,589 21.50 28,180 86,397 21.60 28,372 89,225 21.70 28,564 92,072 21.80 28,756 94,938 21.90 28,948 97,823 22.00 29,140 100,727 22.10 29,332 103,651 22.20 29,524 106,594 22.30 29,716 109,556 22.40 29,908 112,537 2 2.5 0 30,100 115,538 22.60 30,292 118,557 22.70 30,484 121,596 22.80 30,676 124,654 22.90 30,868 127,731 23.00 31,060 130,828 Elevation Surface Storage (feet) (sg-ft) (cubic -feet) 23.10 31,252 133,943 23.20 31,444 137,078 23.30 31,636 140,232 23.40 31,828 143,405 23.50 32,020 146,598 23.60 32,212 149,809 23.70 32,404 153,040 23.80 32,596 156,290 23.90 32,788 159,559 24.00 32,980 162,848 NORRIS, KUSKE &TUNSTALL CONSULTING ENGINEERS, January 20, 2010 Mr. Steve G. Pusey, Environmental Engineer NC DENR / Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: South Bridge Subdivision — Phase I State Stormwater Permit No. SW8 090903 Sneads Ferry, NC NKT Project No. 07063 Dear Mr. Pusey: INC. J. Phillip Norris, P.E. John A. Kuske, III, P.E. John S.Tunstall, P.E. J.A. Kuske, P.E. of Counsel RECEIVED JAN 21 2010 BY: Per your e-mail comments of January 8, 2010, we offer the following responses: Sand filter calculations for the 10-year storm are enclosed. 2. Pond calculations for the 10-year storm are enclosed for Pond #14. 3. Discharge from the pipe will occur through the numerous small perforations along the entire length of the perforated pipe section, therefore providing diffuse flow. 4. The requested pond calculations are enclosed. 5. The corrected Operation & Maintenance Agreements (Ponds #7-12 [Page 3 of 4], Ponds #13A & 13B [Page 3 of 41 and Pond #14 [Page 1 of 4] are enclosed. 6. Calculations for Sand Filters #2 and #4 are enclosed. 7. Infiltration calculations for Ponds #7-12 and #13 are enclosed. Pond #14 lies outside of the % mile line and does not require a secondary infiltration area. 8_ No discharge is present for the 1-year storm. All stormwater is routed through to the infiltration area. The energy dissipator is supplied in accordance with the comments contained within the filter strip supplement (see cell comments contained in cell A38). It indicates that bypass flow to wetlands should be routed to an energy dissipator prior to entering wetlands. Since all stormwater generated by the 1-year storm is treated by the infiltration area, then any discharge from the culvert would be in accordance and consistent with the supplement comment. 902 Market Street -Wilmington, NC 28401-4733 - Phone: 910.343.9653 - Fax: 910.343.9604 Mr. Steve G. Pusey / NC DENR January 20, 2010 Page 2 As we discussed during our telephone conversation on 01-14-10, we were in agreement that since Ponds #7-12 did not have any discharge for the 1-year storm, that it was designed in accordance with current regulations. In regards to Pond #13, based on meeting notes from 10-29-09 (Item #2), the design of Pond #13 has been modified to prevent any discharge during the 1-year storm as well. Enclosed are two (2) copies of the revised plan sheets C5 and C16, one (1) set of revised and requested calculations, the revised SW-401 Wet Detention Basin Supplement form (Drainage Areas 13A & 13B), the revised SW-401 Infiltration Basin Supplement form (Drainage Areas 13A & 13B) and the revised Wet Detention Basin Operation and Maintenance Agreement forms (Drainage Areas 7-12, 13A & 13B and 14). Based on changes to Pond #13, please remove the previously supplied filter strip calculations and supplement as they are not needed. Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. Jo n S. Tunstall, P. E. JST/asn 07063 01-20-10-s-sw response-Itr Enclosures STORMWATER CALCULATIONS SOUTH BRIDGE SUBDIVISION (PHASE 1) Sneads Ferry, North Carolina For BC & RT, LLC and Raiford G. Trask, Jr., Trustee 1202 Eastwood Road Wilmington, NC 28403 (910) 313-0795 F. ' e ,sfai?a9aa�°" Revises! January 2010 September 2009 Prepared by: RECEIVED JAN 2 12010 BY: NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 (Fax) NKT Project No. 07063 Kaop+i #� H:IPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 12-16-09 Type 1124-hr 07063 10yr -24hr Rainfall=6. 88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond SF#1: Filter #1 Inflow Area = 1.890 ac, Inflow Depth > 5.81" for 07063 10yr -24hr event Inflow = 15.51 cfs @ 12.01 hrs, Volume= 0.915 of Outflow = 7.33 cfs @ 12.14 hrs, Volume= 0.968 af, Atten= 53%, Lag= 7.6 min Discarded = 4.41 cfs @ 12.14 hrs, Volume= 0.071 of Primary = 1.71 cfs @ 12.14 hrs, Volume= 0.058 of Secondary = 1.21 cfs @ 12.14 hrs, Volume= 0.839 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 7.00' Surf.Area= 11,212 sf Storage= 2,526 cf Peak Elev= 8.69' @ 12.14 hrs Surf.Area= 13,145 sf Storage= 14,642 cf (12,116 cf above start) Flood Elev= 10.00' Surf.Area= 13,501 sf Storage= 17,227 cf (14,701 cf above start) Plug -Flow detention time= 84.6 min calculated for 0.909 of (99% of inflow) Center -of -Mass det. time= 31.9 min ( 807.9 - 775.9 ) Volume Invert Avail.Storage Storage Description #1 4.67' 2,500 cf Custom Stage Data (Prismatic) Listed below (Recalc) 10,025 cf Overall - 26 cf Embedded = 9,999 cf x 25.0% Voids #2 4.67' 26 cf 4.0"D x 50.001 Horizontal Cylinder S= 0.00507 x 6 Inside #1 #3 7.00' 14,701 cf Custom Stage Data (Prismatic) Listed below (Recalc) 17,227 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 4.67 3,599 0 0 7.00 5,006 10,025 10,025 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 7.00 6,206 0 0 9.00 8,495 14,701 14,701 Device Routing Invert Outlet Devices #1 Primary 6.25' 24.0" x 130.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert-- 6.00' S= 0.0019 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 8.35' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 4.67' 4.0" Vert. Discharge Orfice from Underdrain C= 0.600 94 Secondary 4.67' 1.750 in/hr Infiltration through Filter Media over Surface area above invert Excluded Surface area = 3,599 sf #5 Discarded 8.50' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 H:IPROJECTS12007107063 SOUTH BRIDGE1CaicslHydroCadl 07063 Pre -Post 12-15-09 Type 1124-hr 07063 10yr -24hr Rainfall=6. 88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 m 2005 HydroCAD Software Solutions LLC 1/13/2010 Discarded OutFlovr 1hh1ax=4.39 cf @ 12.14 hrs HW=8.69' (Free Discharge) t-5=Emergency Spillway (Weir Controls 4.39 cfs @ 1.2 fps) Primary OutFlow Max=1.70 cfs @ 12.14 hrs HW=$.69' (Free Discharge) t1- $�S S,uc Culvert (Passes 1.70 cfs of 14.38 cfs potential flow) 2=13affle wall (Weir Controls 1.70 cfs @ 1.7 fps) n3condary OutFlow Max=1.21 cfs @ 12.14 hrs HW=8.69' (Free Discharge) =Discharge Orfce from Underdrain (Orifice Controls 0.82 cis @ 9.5 fps) =Infiltration through Filter Media (FAItration Controls 0.39 cis) Pond SF#1: Filter #1 Hydrograph Inflow Outflow Inflow Area=1.890 ad..- ? Discarded . Primary 17. Peak Elev=8.69' - Secondary 1s= 15 Storage=14,642 cf ` 14: 13 12 11 ' w 10, iM cfs {' ; O B . 7': 4.41 de r. s A.:ems! .. :✓^ _... %--.'Lsf�: .. 11 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 1 H:IPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 12-15-09 Type 11 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstail Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond SF#1: Filter #1 Stage -Discharge `3 Total Discarded Primary Secondary Discharge (cfg) HAPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 12-15-09 Type 11 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstail Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HYdroCAD Software Solutions LLC 1/13/2010 Stage -Area -Storage for Pond SF#1: Filter #1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 4.67 3,599 0 4.77 3,659 92 4.87 3,720 187 4.97 3,780 287 5.07 3,841 388 5.17 3,901 488 5.27 3,961 587 5.37 4,022 686 5.47 4,082 788 5.57 4,142 891 5.67 4,203 995 5.77 4,263 1,101 5.87 4,324 1,208 5.97 4,384 1,317 6.07 4,444 1,427 6.17 4,505 1,539 6.27 4,565 1,652 6.37 4,626 1,767 6.47 4,686 1,884 6.57 4,746 2,002 6.67 4,807 2,121 6.77 4,867 2,242 6.87 4,927 2,364 6.97 4,988 2,488 7.07 11,292 2,963 7.17 11,407 3,597 7.27 11-,521 4,243 7.37 11,635 4,900 7.47 11,750 5,569 7.57 11,864 6,249 7.67 11,979 6,941 7.77 12,093 7,644 7.87 12,208 8,358 7.97 12,322 9,084 8.07 12,437 9,821 8.17 12,551 10,570 8.27 12,666 11,330 8.37 12,780 12,102 8.47 12,894 12,885 8.57 13,009 13,680 8.67 13,123 14,486 8.77 13,238 15,303 8.87 13,352 16,132 8.97 13,467 16,973 9.07 13,501 17,227 9.17 13,501 17,227 9.27 13,501 17,227 9.37 13,501 17,227 9.47 13,501 17,227 9.57 13,501 17,227 9.67 13,501 17,227 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 9.77 13,501 17,227 9.87 13,501 17,227 9.97 13,501 17,227 H:IPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 12-16-09 Type 1124-hr 07063 10yr -24hr Rainfall=6. 88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 0 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond SF#2: Filter #2 Inflow Area = 1.090 ac, Inflow Depth > 5.13" for 07063 10yr -24hr event Inflow = 8.24 cfs @ 12.01 hrs, Volume= 0.466 of Outflow = 6.31 cfs @ 12.09 hrs, Volume= 0.466 af, Atten= 23%, Lag= 4.4 min Discarded = 2.73 cfs @ 12.09 hrs, Volume= 0.021 of Primary = 2.56 cfs @ 12.09 hrs, Volume= 0.055 of Secondary = 1.02 cfs @ 12.09 hrs, Volume= 0.390 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 7.00' Surf.Area= 575 sf Storage= 50 cf Peak Elev= 11.14' @ 12.09 hrs Surf.Area= 4,050 sf Storage= 5,352 cf (5,301 cf above start) Flood Elev= 12.00' Surf.Area= 4,602 sf Storage= 8,150 cf (8,100 cf above start) Plug -Flow detention time= 27.3 min calculated for 0.465 of (100% of inflow) Center -of -Mass det. time= 24.5 min ( 819.4 - 794.9 ) Volume Invert Avail.Storage Storage Description #1 6.67' 456 cf Custom Stage Data (Prismatic) Listed below (Recalc) 1,833 cf Overall - 10 cf Embedded = 1,822 cf x 25.0% Voids #2 6.67' 10 cf 4.0"D x 30.00'L Horizontal Cylinder S= 0.0060 7' x 4 Inside #1 #3 9.00, 7,685 cf Custom Stage Data (Prismatic) Listed below (Recalc) 8,150 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 6.67 492 0 0 9.00 1,081 1,833 1,833 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 9.00 1,602 0 0 12.00 3,521 7,685 7,685 Device Routing Invert Outlet Devices #1 Primary 7.00' 15.0" x 20.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 6.50' S= 0.0250 ? Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 10.70' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 6.67' 4.0" Vert. Discharge Orfice from Undardrain C= 0.600 #4 Secondary 6.67' 1.750 in/hr Infiltraion through Filter Media over Surface area above invert Excluded Surface area = 492 sf #5 Discarded 11.00' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 HAPROJECTS12007107063 SOUTH BRIDGE1Caics\HydroCadl 07063 Pre -Post 12-16-09 Type 1l 24-hr 07063 10yr -24hr Rainfal1=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Discarded OutFlow Max=2.64 cis L 12.09 nrs HW=11.13' (Free Discharge) t-6=Emergency Spillway (Weir Controls 2.64 cfs @ 1.0 fps) Primary OutFlow Max=2.53 cfs @ 12.09 hrs HW=11.13' (Free Discharge) t�Culvert (Passes 2.53 cfs of 11.07 cfs potential flow) Bi�i�r.N¢i, 5t 2=13affle wall (Weir Controls 2.53 cfs @ 1.9 fps) Secondary OutFlow Max=1.02 cfs @ 12.09 hrs HW=11.13` (Free Discharge) 1:-Discharge Orfce from Underdrain (Orifice Controls 0.87 cfs @ 10.0 fps) %cpA -infiltralon through Filter Media (EAltration Controls 0.14 cfs) P1�' Pond SF#2: Filter #2 Hydrograph LDiscarded s24cfsInflow Area=1.090 ac Peak Elev=11.14' ary 8: Storage=5,352 cf ea 7- 6 3- r ace f r�r�,r�u 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) HAPROJECTS\2007107063 SOUTH BR1DGE\Calcs\HydroCad\ 07063 Pre -Post 12-15-09 Type /I 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 0 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond SF#2: Filter #2 Stage -Discharge - Total 77- 7 Discarded Primary Secondary EmergencySpillmy 7-i Discharge CVke torn Undwdrw - 1.1fiftion thmugh Fifts, Media 0 5 1 1 0 1 . 5 210 ' iS 3'0' ' 315 ' 40 4 1 5 5 . 0 . 55 60 Discharge (cft) H:\PROJECTS12007\07063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 12-15-09 Type // 24-hr 07063 10yr -24hr Rainfalh6. 88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 C 2005 HydroCAD Software Solutions LLC 1/13/2010 Stage -Area -Storage for Pond SF#2: Filter #2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 6.67 492 0 6.77 517 13 6.87 543 29 6.97 568 45 7.07 593 62 7.17 618 77 7.27 844 93 7.37 669 109 7.47 694 126 7.57 720 144 7.67 745 162 7.77 770 181 7.87 795 201 7.97 821 221 8.07 846 242 8.17 871 263 8.27 896 286 8.37 922 308 8.47 947 332 8.57 972 356 8.67 998 380 8.77 1,023 406 8.87 1,048 431 8.97 1,073 458 9.07 2,728 580 9.17 2,792 748 9.27 2,856 922 9.37 2,920 1,103 9.47 2,984 1,290 9.57 3,048 1,483 9.67 3,112 1,683 9.77 3,176 1,889 9.87 3,240 2,102 9.97 3,303 2,321 10.07 3,367 2,546 10.17 3,431 2,778 10.27 3,495 3,016 10.37 3,559 3,261 10.47 3,623 3,512 10.57 3,687 3,769 10.67 3,751 4,033 10.77 3,815 4,304 10.87 3,879 4,580 10.97 3,943 4,863 11.07 4,007 5,153 11.17 4,071 5,448 11.27 4,135 5,751 11.37 4,199 6,059 11.47 4,263 6,374 11.57 4,327 6,696 11.67 4,391 7,023 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 11.77 4,455 7,358 11.87 4,519 7,698 11.97 4,683 8,045 6 v� H:\PROJECTS12007\07063 SOUTH BRIDGE\CalcslHydroCadl 07063 Pre -Post 12-15-09 Type 1124-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond SF#3: Filter#3 Inflow Area = 3.650 ac, Inflow Depth > 5.35" for 07063 10yr -24hr event Inflow = 28.46 cfs @ 12.01 hrs, Volume= 1.628 of Outflow = 21.14 cfs @ 12.09 hrs, Voiume= 1.665 af, Atten= 26%, Lag= 4.5 min Discarded = 13.52 cfs @ 12.09 hrs, Volume= 0.202 of Primary = 6.28 cis @ 12.09 hrs, Voiume= 0.247 of Secondary = 1.34 cfs @ 12.09 hrs, Volume= 1.217 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 9.00' Surf.Area= 9,884 sf Storage= 2,324 cf Peak Elev= 11.90' @ 12.09 hrs Surf.Area= 12,827 sf Storage= 23,223 cf (20,899 cf above start) Flood Elev= 12.00' Surf.Area= 12,931 sf Storage= 24,121 cf (21,797 cf above start) Plug -Flow detention time= 105.8 min calculated for 1.612 of (99% of inflow) Center -of -Mass det. time= 72.2 min ( 861.3 - 789.1 ) Volume Invert Avail.Storage Storage Description #1 6.67' 2,010 cf Custom Stage Data (Prismatic) Listed below (Recalc) 8,354 cf Overall - 314 cf Embedded = 8,040 cf x 25.0% Voids #2 6.67' 314 cf 4.0"D x 60.001 Horizontal Cylinder S= 0.0050 '/' x 60 Inside #1 #3 9.00, 21,797 cf Custom Stage Data (Prismatic) Listed below (Recalc) 24,121 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 6.67 3,029 0 0 9.00 4,142 8,354 8,354 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 9.00 5,742 0 0 12.00 8,789 21,797 21,797 Device Routing Invert Outlet Devices #1 Primary 7.50' 24.0" x 20.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 7.00' S= 0.0250 ? Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 11.15' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 6.67' 4.0" Vert. Discandge Orfice from Underdrain C= 0.600 #4 Secondary 6.67' 1.760 in/hr Infiltration through Filter Media over Surface area above invert Excluded Surface area = 3,029 sf #5 Discarded 11.50' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 HAPROJECTS12007107063 SOUTH BRIDGE1Caics\HydroCadl 07063 Pre -Post 12-15-09 Type 1124-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Discarded OutFlow Max=13.33 cfs @ 12.09 firs HW=11.89' (Free Discharge) 1--S=Emergency Spillway (Weir Controls 13.33 cfs @ 1.7 fps) rimary OutFlow Max-6.23 cfs @ 12.09 hrs HW=11.89' (Free Discharge) Culvert (Passes 6.23 cfs of 27.87 cfs potential flow) 2--Baffle Wall (Weir Controls 6.23 cfs @ 2.8 fps) Mjk� :3—=Discahrge ndary OutFlow Flax=1,34 cfs @ 12.09 hrs HW=11.89' (Free Discharge) Orfice from Underdrain (Orifice Controls 0.94 cfs @ 10.8 fps) Infiltration through Filter Media (Efittration Controls 0.40 cfs)kWj%0 pig Pond SF#3: Filter#3 Hydrograph Inflow Area=3.650 ac 30- Peak EIev=11.90' 28= Storage=23,223 CG.44' 918 v 9 16 LL 14 10 8 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) i0 Inflow Outflow w, Discarded 9 Primary ❑ Secondary H:IPROJECTS\2007107063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 12-15-09 Type/1 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond SF#3: Filter#3 Stage -Discharge Total Discarded Primary Al Secondary Discharge (cfs) H:IPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 12-15-09 Type 11 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/13/2010 Stage -Area -Storage for Pond SF#3: Filter#3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 6.67 3,029 0 6.77 3,077 84 6.87 3,125 196 6.97 3,172 338 7.07 3,220 488 7.17 3,268 613 7.27 3,316 711 7.37 3,363 795 7.47 3,411 880 7.57 3,459 966 7.67 3,507 1,053 7.77 3,554 1,141 7.87 3,602 1,230 7.97 3,650 1,321 8.07 3,698 1,413 8.17 3,746 1,506 8.27 3,793 1,600 8.37 3,841 1,696 8.47 3,889 1,792 8.57 3,937 1,890 8.67 3,984 1,989 8.77 4,032 2,089 8.87 4,080 2,191 8.97 4,128 2,293 9.07 9,955 2,729 9.17 10,057 3,315 9.27 10,158 3,912 9.37 10,260 4,518 9.47 10,361 5,135 9.57 10,463 5,762 9.67 10,564 6,399 9.77 10,666 7,047 9.87 10,768 7,704 9.97 10,869 8,372 10.07 10,971 9,050 10.17 11,072 9,737 10.27 11,174 10,436 10.37 11,275 11,144 10.47 11,377 11,862 10.57 11,479 12,591 10.67 11,580 13,330 10.77 11,682 14,079 10.87 11,783 14,838 10.97 11,885 15,607 11.07 11,986 16,386 11.17 12,088 17,176 11.27 12,190 17,975 11.37 12,291 18,785 11.47 12,393 19,605 11.57 12,494 20,435 11.67 12,596 21,276 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 11.77 12,697 22,126 11.87 12,799 22,987 11.97 12,901 23,857 H:IPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 12-15-09 Type // 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstali Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond SF#4: Filter #4 Inflow Area = 2.590 ac, Inflow Depth > 5.02" for 07063 10yr -24hr event Inflow = 19.26 cfs @ 12.01 hrs, Volume= 1.083 of Outflow = 16.89 cfs @ 12.06 hrs, Volume= 1.083 af, Atten= 12%, Lag= 3.0 min Discarded = 12.28 cfs @ 12.06 hrs, Volume= 0.199 of Primary = 3.42 cfs @ 12.06 hrs, Volume= 0.100 of Secondary = 1.18 cfs @ 12.06 hrs, Volume= 0.784 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 9.00' Surf.Area= 317 sf Storage= 29 cf Peak Elev= 13.37` @ 12.06 hrs Surf.Area= 7,303 sf Storage= 11,627 cf (11,598 cf above start) Flood Elev= 14.00' Surf.Area= 8,092 sf Storage= 15,783 cf (15,754 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 47.7 min (845.3 - 797.7) Volume Invert Avail.Storage Storage Description #1 8.67' 363 cf Custom Stage Data (Prismatic) Listed below (Recalc) 1,471 cf Overall - 18 cf Embedded = 1,453 cf x 25.0% Voids #2 8.67' 18 cf 4.0"D x 52.001 Horizontal Cylinder S= 0.00507 x 4 Inside #1 #3 11.00, 15,402 cf Custom Stage Data (Prismatic) Listed below (Recalc) 15,783 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 8.67 193 0 0 11.00 1,070 1,471 1,471 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 11.00 3,246 0 0 14.00 7,022 15,402 15,402 Device Routing Invert Outlet Devices #1 Primary 9.00' _ 18.0" x 50.0' long Culvert X 2.00 CMP, square edge headwall, Ke= 0.500 Outlet Invert= 8.00' S= 0.0200 ? Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 12.85' 3.0' long x ON breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 8.67' 4.0" Vert. Discharge Orfrce from Underdraln C= 0.600 #4 Secondary 8.67' 1.750 in/hr Infiltration through Filter Media over Surface area above invert Excluded Surface area = 193 sf #5 Discarded 13.00' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 HAPROJECTS\2007\07063 SOUTH BRIDGE\Calcs\HydroCadl 07063 Pre -Post 12-15-09 Type Il 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstail Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Discarded OutFlow "flax=12.21 cfs @ 12.06 hrs HW=13.37' (Free Discharge) t-5=Emergency Spillway (Weir Controls 12.21 cfs @ 1.6 fps) rlmary OutFlow Max=3.41 cis @ 12.06 hrs HW=13.37' (Free Discharge) Culvert (Passes 3.41 cis of 32.38 cfs potential flow) c,u 2-Baffle Wall (Weir Controls 3.41 cfs @ 2.2 fps) r:3-=DIscharge ndary CtutFlow Max=1.18 cis @ 12.06 hrs HW=13.3T (Free Discharge) Crime from Underdraln (Or�ce Controls 0.89 cis @ 10.3 fps) Infiltration through Filter Media (EAltration Controls 0.29 cfs) 'M �Pz Pond SF#4: Filter #4 Hydrograph Inflow telears - Outflow Inflow Area=2.590 ac 7 Discarded 0 Primary 21 Peak Elev=13.37' +e: Sewn " 19Storage=11,627 cf 12- •' 11= c 10= a 9- 8= 5 Time (hours) H:IPROJECTS12007107063 SOUTH BRIDGE%CaIcslHydroCadl 07063 Pre -Post 12-15-09 Type 1124-hr 07063 90yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstali Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 W Pond SF#4: Filter #4 Stage -Discharge Discharge (cfs) =) Total Discarded Primary Secondary HAPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 12-15-09 Type 1124-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Stage -Area -Storage for Pond SF#4: Filter #4 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 8.67 193 0 8.77 231 6 8.87 268 14 8.97 306 26 9.07 344 38 9.17 381 49 9.27 419 60 9.37 456 70 9.47 494 82 9.57 532 95 9.67 569 109 9.77 607 124 9.87 645 139 9.97 682 156 10.07 720 173 10.17 758 192 10.27 795 211 10.37 833 232 10.47 871 253 10.57 908 275 10.67 946 298 10.77 983 322 10.87 1,021 347 10.97 1,059 373 11.07 4,404 612 11.17 4,530 951 11:27 4,656 1,304 11.37 4,782 1,669 11.47 4,908 2,046 11.57 5,033 2,436 11.67 5,159 2,839 11.77 5,285 3,254 11.87 5,411 3,682 11.97 5,537 4,122 12.07 5,663 4,575 12.17 5,789 5,041 12.27 5,915 5,519 12.37 6,040 6,010 12.47 6,166 6,513 12.57 6,292 7,029 12.67 6,418 7,557 12.77 6,544 8,099 12.87 6,670 8,652 12.97 6,796 9,218 13.07 6,921 9,797 13.17 7,047 10,389 13.27 7,173 10,993 13.37 7,299 11,609 13.47 7,425 12,239 13.57 7,551 12,880 13.67 7,677 13,535 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 13.77 7,803 14,202 13.87 7,928 14,881 13.97 8,054 15,573 H:1PROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 12-15-09 Type 11 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond SF#5: Filter #5 Inflow Area = 1.610 ac, Inflow Depth > 5.13" for 07063 10yr -24hr event Inflow = 12.17 cis @ 12.01 hrs, Volume= 0.688 of Outflow = 8.93 cis @ 12.09 hrs, Volume= 0.701 af, Atten= 27%, Lag= 4.6 min Discarded = 4.25 cis @ 12.09 hrs, Volume= 0.042 of Primary = 3.55 cfs @ 12.09 hrs, Volume= 0.099 of Secondary = 1.13 cis @ 12.09 hrs, Volume= 0.560 of Routing by Dyn-Star-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 7.00' Surf.Area= 3,802 sf Storage= 552 cf Peak Elev= 9.18' @ 12.09 hrs Surf.Area= 6,463 sf Storage= 8,322 cf (7,770 cf above start) Flood Elev= 10.00' Surf.Area= 7,456 sf Storage= 12,711 cf (12,159 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 20.4 min ( 815.3 - 794.9 ) Volume Invert Avail.Storage Storage Description #1 4.67' 545 cf Custom Stage Data (Prismatic) Listed below (Recalc) 2,167 cf Overall - 7 cf Embedded = 2,180 cf x 25.0% Voids #2 4.67' 7 cf 4.0"D x 25.00% Horizontal Cylinder S= 0.0060 T x 3 Inside #1 #3 7.00' 12,159 cf Custom Stage Data (Prismatic) Listed below (Recalc) 12,711 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 4.67 301 0 0 7.00 1,576 2,187 2,187 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 7.00 2,226 0 0 10.00 5,880 12,159 12,159 Device Routing Invert Outlet Devices #1 Primary 7.10' 15.0" x 15.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 7.00' S= 0.00677 Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 8.65' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 4.67' 4.0" Ve,.-L Discharge Orfice from Underdrain C= 0.600 #4 Secondary 4.67' 1.760 in/hr Infiltration through Filter Media over Surface area above invert Excluded Surface area = 301 sf #5 Discarded 9.00' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 HAPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 12-15-09 Type 11 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Discarded OutFlow IVax=4.13 cfs @ 12.09 hrs HVv=9.18` (Free Discharge) t 5=Emergency Spillway (Weir Controls 4.13 cfs @ 1.1 fps) Primary OutFlow Max--3.51 cfs @ 12.09 hrs HW=9.18' (Free Discharge) Culvert (Passes 3.51 cfs of 7.13 cfs potential flow) 2--Baffle Wall (Weir Controls 3.51 cfs @ 2.2 fps) "'"' S v�dt2� Secondary OutFlow Max --I. 13 cfs @ 12.09 hrs HW=9.18' (Free Discharge) 1::—Infiftration Discharge Orlice from Underdrain (Orifice Controls 0.88 cfs @10.0 fps) '•, � 1 through Filter Media (EAltration Controls 0.25 cfs) w 3 0 U. Pond SF#5: Filter #5 Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) JA Inflow Outflow Discarded ® Primary 0 Secondary H:IPROJECTS12007107063 SOUTH BRIDGE1Ca1cslHydroCadl 07063 Pre -Post 12-15-09 Type 1l 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solubons LLC 1/13/2010 w m d Pond SF#5: Filter #5 Stage -Discharge Discharge (cfs) Total w : Discarded Primary Secondary HAPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 12-15-09 Type 1124-hr 07063 10yr -24hr Rainfall=6. 88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Stage -Area -Storage for Pond SF#5: Filter #5 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 4.67 301 0 4.77 356 9 4.87 410 .20 4.97 465 32 5.07 520 46 5.17 575 60 5.27 629 75 5.37 684 91 5.47 739 109 5.57 793 128 5.67 848 149 5.77 903 170 5.87 958 194 5.97 1,012 218 6.07 1,067 244 6.17 1,122 272 6.27 1,177 300 6.37 1231 331 6.47 1,286 362 6.57 1,341 395 6.67 1,395 429 6.77 1,450 465 6.87 1,505 502 6.97 1,560 540 7.07 3,887 710 7.17 4,009 948 7.27 4,131 1,197 7.37 4,253 1,459 7.47 4,374 1,732 7.57 4,496 2,018 7.67 4,618 2,316 7.77 4,740 2,627 7.87 4,862 2,949 7.97 4,983 3,284 8.07 5,105 3,631 8.17 5,227 3,990 8.27 5,349 4,361 8.37 5,471 4,744 8.47 5,592 5,140 8.57 5,714 5,548 8.67 5,836 5,967 8.77 5,958 6,400 8.87 6,080 6,844 8.97 6,201 7,300 9.07 6,323 7,769 9.17 6,445 8,250 9.27 6,567 8,743 9.37 6,689 9,248 9.47 6,810 9,765 9.57 6,932 10,295 9.67 7,054 10,837 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 9.77 7,176 11,390 9.87 7,298 11,956 9.97 7,419 12,536 C�-' D H:IPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl / 07063 Pre -Post 12-15-09 Type 1! 24-hr 07063 10yr -24hr Rainfal1=6. 88" Prepared by Norris, Kuske, & Tunstali Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 m 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond SF#6A: Filter 6A Inflow Area = 2.500 ac, inflow Depth > 5.24" for 07063 10yr -24hr event Inflow = 19.20 cfs @ 12.01 hrs, Volume= 1.092 of Outflow = 15.09 cfs @ 12.08 hrs, Volume= 1.116 af, Atten= 21%, Lag= 4.1 min Discarded = 8.41 cfs @ 12.08 hrs, Volume= 0.098 of Primary = 5.47 cfs @ 12.08 hrs, Volume= 0.178 of Secondary = 1.20 cfs @ 12.08 hrs, Volume= 0.843 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 12.00' Surf.Area= 5,909 sf Storage= 1,195 cf Peak Elev= 14.79' @ 12.08 hrs Surf.Area= 8,191 sf Storage= 14,108 cf (12,913 cf above start) Flood Elev= 15.00' Surf.Area= 8,362 sf Storage= 15,335 cf (14,141 cf above start) Plug -Flow detention time= 65.3 min calculated for 1.088 of (100% of inflow) Center -of -Mass det. time= 42.9 min (834.9 - 792.1 ) Volume Invert Avail.Storage Storage Description #1 9.67' 1,179 cf Custom Stage Data (Prismatic) Listed below (Recalc) 4,731 cf Overall - 16 cf Embedded = 4,715 cf x 25.0% Voids #2 9.67' 16 cf 4.0"D x 30.001 Horizontal Cylinder S= 0.0050'/• x 6 Inside #1 #3 12.00' 14,141 cf Custom Stage Data (Prismatic) Listed below (Recalc) 15,335 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 9.67 1,639 0 0 12.00 2,422 4,731 4,731 Elevation Surf.Area Inc.Store Cum.Store _ (feet) (sq-ft) (cubic -feet) (cubic -feet) 12.00 3,487 0 0 15.00 5,940 14,141 14,141 Device Routing Invert Outlet Devices #1 Primary 10.00' 24.0" x 60.0' long Culvert X 2.00 CMP, square edge headwall, Ke= 0.500 Outlet Invert= 9.00' S= 0.0167 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 14.10' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 9.67' 4.0" Vert. Discharge Orfice from Underdrain C= 0.600 #4 Secondary 9.67' 1.750 in/hr Infiltraion through Filter Media over Surface area above invert Excluded Surface area = 1,639 sf #5 Discarded 14.50' 20.0' long x: 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 HAPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 12-15-09 Type // 24-hr 07063 10yr -24hr Rainfal1=6. 88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Discarded OutFiow Max=8.39 cfs @ 12.08 hrs HW=14.79' (Free Discharge) t -6=Emergency Spillway (Weir Controls 8.39 cfs @ 1.4 fps) Primary OutFlow Max=5.46 cfs @ 12.08 hrs HW=14.79' (Free Discharge) Culvert (Passes 5.46 cis of 58.90 cfs potential flow)Y„��� 5-tR+u�c�.tRc 2=Baffle Wail (Weir Controls 5.46 cfs @ 2.6 fps) ecandary OutFlow Max=1.20 cfs @ 12.08 hrs HW=14.7W (Free Discharge) 3=Discharge Orfice from Underdrain (Orifice Controls 0.94 cis @ 10.7 fps) — -Infiltraion through Filter Media (Exfiltration Controls 0.27 cis) ftF 21 20 19 18 17 16 15 14 .. 13 12 11 u 10 LL 9 8- 7- 6 Pond SF#6A: Filter 6A Hydrograph Inflow Area=2.500 al Peak Elev=14.79' Storage=14,108 ci "I 1= 0' 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1B 77 18 19 20 21 22 23 24 Time (hours) Inflow 1 Outflow -7 Discarded Primary Secondary HAPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 12-15-09 Type 1124-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/13/2010 . m t Pond SF#6A: Filter 6A Stage -Discharge Discharge (cis) y; Total Discarded Primary _ Secondary H:IPROJECTS12007107063 SOUTH BRIDGE1CaIcs\HydroCadl 07063 Pre -Post 12-15-09 Type fi 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 sin 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Stage -Area -Storage for Pond SF#6A: Filter SA Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 9.67 1,639 0 9.77 1,673 42 9.87 1,706 88 9.97 1,740 135 10.07 1,773 182 10.17 1,807 227 10.27 1,841 273 10.37 1,874 319 10.47 1,908 366 10.57 1,941 415 10.67 1,975 464 10.77 2,009 513 10.87 2,042 564 10.97 2,076 615 11.07 2,109 668 11.17 2,143 721 11.27 2,177 775 11.37 2,210 830 11.47 2,244 885 11.57 2,277 942 11.67 2,311 999 11.77 2,345 1,058 11.87 2,378 1,117 11.97 2,412 1,176 12.07 5,966 1,441 12.17 6,048 1,799 12.27 6,130 2166 12.37 6,212 2,541 12.47 6,293 2,924 12.57 6,375 3,315 12.67 6,457 3,714 12.77 6,539 4,122 12.87 6,620 4,538 12.97 6,702 4,962 13.07 6,784 5,394 13.17 6,866 5,834 13.27 6,947 6,282 13.37 7,029 6,739 13.47 7,111 7,204 13.57 7,193 7,677 13.67 7,275 8,158 13.77 7,356 8,647 13.87 7,438 9,145 13.97 7,520 9,651 14.07 7,602 10,164 14.17 7,683 10,686 14.27 7,765 11,217 14.37 7,847 11,755 14.47 7,929 12,302 14.57 8,010 12,856 14.67 8,092 13,419 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 14.77 8,174 13,990 14.87 8,256 14,570 14.97 8,337 15,157 H:\PROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 12-15-09 Type 11 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond SF#6B: Filter 613 Inflow Area = 3.050 ac, Inflow Depth > 5AW for 07063 10yr -24hr event Inflow = 23.06 cfs @ 12.01 hrs, Volume= 1.303 of Outflow = 20.55 cfs @ 12.06 hrs, Volume= 1.329 af, Atten= 11 %, Lag= 2.8 min Discarded = 15.73 cfs @ 12.06 hrs, Volume= 0.285 of Primary = 3.60 cfs @ 12.06 hrs, Volume= 0.100 of Secondary = 1.23 cfs @ 12.06 hrs, Volume= 0.944 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 12.00' Surf.Area= 6,908 sf Storage= 1,310 cf Peak Elev= 14.44' @ 12.06 hrs Surf.Area= 9,646 sf Storage= 14,611 cf (13,301 cf above start) Flood Elev= 15.00' Surf.Area= 10,275 sf Storage= 18,612 cf (17,303 cf above start) Plug -Flow detention time= 65.2 min calculated for 1.299 of (100% of inflow) Center -of -Mass det. time= 44.2 min ( 839.1 - 794.9 ) Volume Invert Avail.Storage Storage Description #1 9.67' 1,289 cf Custom Stage Data (Prismatic) Listed below (Recalc) 5,176 cf Overall - 21 cf Embedded. = 5,155 cf x 25.0% Voids #2 9.67' 21 cf 4.0"D x 40.00'L Horizontal Cylinder S= 0.00607 x 6 Inside #1 #3 12.00' 17,303 cf Custom Stage Data (Prismatic) Listed below (Recalc) 18,612 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 9.67 1,619 0 0 12.00 2,824 5,176 5,176 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 12.00 4,084 0 0 15.00 7,451 17,303 17,303 Device Routing Invert Outlet Devices #1 Primary 12.00' 18.0" x 30.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 11.75' S= 0.0083'/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 13.90' 3.0' long x 0.5' breadth Baffle !Nall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 9.67' 4.0" Vert. Discharge Orfice from Underdrain C= 0.600 #4 Secondary 9.67' 1.760 in/hr Infiltration through Filter Media over Surface area above invert Excluded Surface area = 1,619 sf #5 Discarded 14.00' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 H:IPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 12-16-09 Type 1124-hr 07063 10yr -24hr Rainfall=6. 88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Discarded OutFlow Max=15.70 cfs @ 12.06 hrs HW=14.44' (Free Discharge) 1-S=Emergency Spillway (Weir Controls 15.70 cfs @ 1.8 fps) Primary OutFlow Max--3.60 cfs @ 12.06 hrs H"1=14.44' (Free Discharge) -Culvert (Passes 3.60 cfs of 11.06 cfs potential flow) 2=Baffle Wall (Weir Controls 3.60 cfs @ 2.2 fps)���TM� econdary OutFlow Max=1.23 cfs @ 12.06 hrs HW=14.44' (Free Discharge) 3=Discharge Orfice from Underdrain (Orifice Controls 0.90 cfs @ 10.3 fps) Onfiitration through Filter Media (Exfiiltration Controls 0.33 cfs) Pond SF#6B: Filter 6B Hydrograph Inflow Area=3.050 a�j Peak Elev=14.44' 2 24' p- 22- Storage=14,611 cf 4- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Inflow Outflow -i Discarded Primary Secondary HAPROJECTS\2007\07063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 12-15-09 Type l! 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 0 2005 HydroCAD Software Solutions LLC 1/13/2010 m Pond SF#63: Filter 6B Stage -Discharge Discharge (cfs) Total Discarded Primary Secondary H:IPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 12-15-09 Type Il 24-hr 07063 10yr -24hr Rainfal1=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/13/2010 Stage -Area -Storage for Pond SF#6B: Filter 6B Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 9.67 1,619 0 9.77 1,671 42 9.87 1,722 88 9.97 1,774 137 10.07 1,826 186 10.17 1,878 234 10.27 1,929 282 10.37 1,981 331 10.47 2,033 381 10.57 2,084 432 10.67 2,136 485 10.77 2,188 539 10.87 2,240 594 10.97 2,291 651 11.07 2,343 709 11.17 2,395 768 11.27 2,446 829 11.37 2,498 891 11.47 2,550 954 11.57 2,602 1,018 11.67 2,653 1,084 11.77 2,705 1,151 11.87 2,757 1,219 11.97 2,808 1,289 12.07 6,987 1,598 12.17 7,099 2,020_ 12.27 7211 2,453 12.37 7,323 2,898 12.47 7,435 3,353 12.57 7,548 3,820 12.67 7,660 4,298 12.77 7,772 4,787 12.87 7,884 5,288 12.97 7,997 5,799 13.07 8,109 6,322 13.17 8,221 6,856 13.27 8,333 7,402 13.37 8,446 7,958, 13.47 8,558 8,526 13.57 8,670 9,105 13.67 8,782 9,695 13.77 8,895 10,296 13.87 9,007 10,909 13.97 9,119 11,533 14.07 9,231 12,168 14.17 9,343 12,814 14.27 9,456 13,472 14.37 9,568 14,141 14.47 9,680 14,821 14.57 9,792 15,512 14.67 9,905 16,215 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 14.77 10,017 16,928 14.87 10,129 17,653 14.97 10,241 18,389 HAPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 1-18-10 Rev P13 Type 1124-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/19/2010 Subcatchment DA 8: Pre Runoff = 8.81 cfs @ 12.02 hrs, Volume= 0.482 af, Depth> 1.29" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type II 24-hr 070631 yr -24hr Rainfall=3.67" Area (ac) CN Description 4.479 73 Woods, Fair, HSG C Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment DA 8: Pre Hydrograph 0 Runoff a.at cfs 9 T e I[ 24-hr 07063 1 r -24hr 8 Raihfall=3.6V, - -Runoff-Area=4:479 ac---= - F -: -- -- - - - -- -Run: off Voltime' =Q.482-af 6 Runoff --- ®e pthsl 29 --.----- .--- --. --,- - -- - = - -- _5 Tc=10:0 min o 4 3 2 1 06 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) H:IPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Plat 1-18-10 Rev P13 Type 1124-hr 07063 1 yr -24hr Rainfall=3. 67 Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 sh 000479 0 2005 HydroCAD Software Solutions LLC 1/19/2010 Subcatchment DA8: Post Runoff = 18.80 cfs @ 12.01 hrs, Volume= 1.080 af, Depth> 2.89" Runoff by SGS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67 Area (ac) CN Description 3.583 98 Paved parking & roofs 0.896 74 >75% Grass cover, Good, HSG C 4.479 93 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, HAPROJECTS12007107063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 1-18-10 Rev P13 Type // 24-hr 07063 Syr-24hr Rainfall=3.67 Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/19/2010 Subcatch rent DA 8: Pre Runoff = 9.28 cfs @ 12.02 hrs, Volume= 0.508 af, Depth> 1.29" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67" Area (ac) CN Description 4.719 73 Woods, Fair, HSG C Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, H:IPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 1-18-10 Rev P13 Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/19/2010 Subcatchment DA9: Post Runoff = 19.80 cfs @ 12.01 hrs, Volume= 1.138 af, Depth> 2.89" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67" Area (ac) CN Description 3.775 98 Paved parking & roofs 0.944 74 >75% Grass cover, Good, HSG C 4.719 93 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, HAPROJECTS12007107063 SOUTH BRIDGE1Calcs\HydroCadl 07063 Pre -Past 1-18-10 Rev P13 Type 11 24-hr 07063 Syr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/19/2010 Subcatchment DA 10: Pre Runoff = 9.87 cfs @ 12.02 hrs, Volume= 0.540 af, Depth> 1.29" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type II 24-hr 07063 1 yr -24hr Rainfall=3.67" Area (ac) CN Description 5.017 73 Woods, Fair, HSG C Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, .rr- Time (hows) H:\PROJECTS12007107063 SOUTH BRIDGE\Caics\HydroCadl 07063 Pre -Post 1-16-10 Rev P13 Type 1124-hr 07063 Syr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/19/2010 Subcatchment DA10: Post Runoff = 21.05 cfs @ 12.01 hrs, Volume= 1.210 af, Depth> 2.89" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type II 24-hr 07063 1yr -24hr Rainfall=3.67" Area (ac) CN Description 4.014 98 Paved parking & roofs 1.003 74 >75% Grass cover, Good, HSG C 5.017 93 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, HAPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 1-18-10 Rev P13 Type 1l 24-hr 07063 1 yr -24hr Rainfall=3.67 Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HvdroCADO 7.10 s/n 000479 © 2005 HvdroCAD Software Solutions LLC 1/19/2010 Subcatchment DA 11: Pre Runoff = 1.43 cfs @ 12.02 hrs, Volume= 0.078 af, Depth> 1.29" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type If 24-hr07063 1yr-24hr Rainfall=3.67" Area (ac) CN Description 0.726 73 Woods, Fair, HSG C Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, © Runof" 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) HAPROJECTS12007107063 SOUTH BRIDGE1CaicslHydroCadl 07063 Pre -Post 1-18-10 Rev P13 Type 1124-hr 07063 Tyr -24hr Rainfall=3.67 Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 sh 000479 © 2005 HydroCAD Software Solutions LLC 1/19/2010 Subcatchment DA11: Post Runoff = 1.50 cfs @ 12.02 hrs, Volume= 0.082 af, Depth> 1.35" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type II 24-hr 07063 1 yr -24hr Rainfall=3.67" Area (ac) CN Description 0.726 74 >75% Grass cover, Good, HSG C Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment DA11: Post Hydrograph 0 Runoff Type If 24-hr 07063 1yr -24hr = Rainfall=3.67" Runoff Area=0�726 ac Run 9ff_Yols m =0-08-2 aif _ ---------------------------- Runoff Depth>1.35" Tc=100 min LL CN=74 wa MIM01WIL 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Ti�iiE (hours) HAPROJECTS12007107063 SOUTH BRIDGE\CalcslHydroCadl 07063 Pre -Post 1-16-10 Rev P13 Type 1124-hr 07063 Syr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstali Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/19/2010 Subcatchment DA 12: Pre Runoff = 2.31 cfs @ 12.02 hrs, Volume= 0.127 af, Depth> 1.29" Runoff by SGS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type II 24-hr 07063 lyr -24hr Rainfall=3.67 Area (ac) CN Description 1.176 73 Woods, Fair, HSG C Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment DA 12: Pre Hydrograph ®Runoff Type II 24-hr 07063 1yr -24hr 2 -Ra'rnfaN=16.7" _ -- Runoff Area=1 A 76 ac Runoff Volume:=0.127 of Runoff Depth:�1.29" ... Tc=10:0 rinin CN=73- , .�.�.✓',}°%r �,r.�+',1���';�`./�/".d".�"d�r`.d��ir.....,w'r�",�...,'�.F .r; !'`..,�f'e,3^'`� .et F: Time (hours) HAPROJECTS\2007107063 SOUTH BRIDGE\Caics\HydroCad\ 07063 Pre -Post 1-18-10 Rev P13 Type 1124-hr07063 Syr-24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HvdroCAD® 7.10 s/n 000479 © 2005 HvdroCAD Software Solutions LLC 1/19/2010 Subcatchment DA12: Post Runoff = 2.44 cfs @ 12.02 hrs, Volume= 0.133 af, Depth> 1.35" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type 1124-hr 07063 1 yr -24hr Rainfall=3.67" Area (ac) CN Description 1.176 74 >75% Grass cover, Good, HSG C Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, 2 0 Subcatchment DA12: Post Hydrograph .ram 0 1 2 3 4 5 6 7 6 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ©Runoff 07063 Impervious Breakdown -revised areas-1041-09 SAND FILTER DESIGN Drainage Area # Drainage Area Step 1- Determine Required Treatment Volumes Required Treatment Volume (ft) Adjusted Treatment Volume (ft) Step 2 - Determine Filter Geometry Max Head an Sand Alter .10--1.- n...ar -- Mw.1.e. I - c DA2 A. (fe) 47662.00 wQV (fe) 539a.90 WQV or) 4046.18 huwr (19 WQV (ft) As+Af 2.00 4046.18 2023.09 2S0 4046.18 1618A7 SAO 4046.18 1348.73 350 4046.18 1156.0S 4M 4046.18 2M1.54 4S0 4046.18 899.1S 5.00 4046.28 809.24 5S0 4046.18 73S.67 6.00 40411.18 67436 Calculated Minimum Area of Sedimentation Basin Assumed Depth of Sand Filter »Minimum 1S ft required Calculated Minimum Area of Sand After Proposed Geometric Properties Average Head »Enter chosen h.. from Table above As (ft) _ 356.06 dr(ft) Af(M h. (ft) h. (ft) 1.50 Minimum Sediment 8: Filter Chamber Areas based an chosen h� As (ft') _ _ 521.35 Meats Minimum Calculated Requirements Af (ffz) _ 1081.00Meets Minimum Calculated Requirements Step 3 - Verify Proposed Parameters Will Contain WQV Design Parameters AsM 52135 Af ft: 1081.00 bl, FO (0) 3.00 $11.50 h. (ft) Step 4 - Determine Minimum Number of Pipes Needed for the Underdrain System Where: Media Permeability k(ft/day) 3.s0 or k(in/hr) Total Head Ah (ro 5.00 Length of Flow through Media L (ft) 2.00 Peaklnflow QP(in/hr per unit area) 438 Flow Rate through Soil Media Q (fts/sect 0.1095 >>Apply a Safety Factor between 2 -10 Q(fts/sec) 055 Determine Equivalent Diameter as Single Pipe Where: n = roughness factor 0.012 s = internal slope of underdrain OSO% D=pipe diameter D (in) 6.352 See Table 5-1 pg 5-12 of NCDENR BMP manual Minimum # of Pipes Required in the Underdrain a _ 1 1;1_ Step 5 - Determine Forebay Containment Volume Forebay typically required to contain between 18%to 22% at 19% 72831 at 22% 89016 Provided volume 867M OK Step 6 - Determine Drawdown Time WQVA4(ft) 4046.18 _ Underdrain Line Sze (ft) 0.3l cross sectional area (ft) 0.0873 Coefficient of Discharge 0.60 Gravitational Constant (ft/sz) 3._20 hur (ft) 3.00 Determine if arflo° Is controlling factor (hr) - (see NCDENR manual pg3-13) 2.67 Determine if Filter Media Is controlling factor (hr) 25.67 » if T(hr )= (K'QV,4 (f )/((k (ft/dav)xAs (R'))/24(hr)) OK W�OK 1.75 H:\PROJECrS\2007\07063 SOUTH BRIDGE\Calcs\U7063 Impervious Breakdown-revlsed areas-10.21-09 HAPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 1-18-10 Rev P13 Type 1124-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/19/2010 Subcatchment DA 2: Pre Runoff = 2.14 cfs @ 12.02 hrs, Volume= 0.117 af, Depth> 1.29" Runoff by SGS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type II 24-hr 07063 1yr -24hr Rainfall=3.67" Area (ac) CN Description 1.090 73 Woods, Fair, HSG C Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment DA 2: Pre Hydrograph jiTi i i eTi � 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) H:IPROJECTS12007107063 SOUTH BRIDGE1CaicslHydroCadl 07063 Pre -Post 1-18-10 Rev P13 Type 1124-hr 07063 1 yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstail Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/19/2010 Subcatchment DA2: Post Runoff = 3.61 cfs @ 12.02 hrs, Volume= 0.196 af, Depth> 2.16" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type II 24-hr 07063 1yr -24hr Rainfall=3.67" Area (ac) CN Description 0.450 98 Paved parking & roofs 0.640 76 Woods/grass comb., Fair, HSG C 1.090 85 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, ® Runoff 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) H:IPROJECTS12007107063 SOUTH BRIDGE1CaicslHydroCadl 07063 Pre -Post 12-15-09 Type 1124-hr 07063 1 yr -24hr Rainfal1=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADOD 7.10 s/n 000479 C 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond SF#2: Filter #2 Inflow Area = 1.090 ac, Inflow Depth > 2.16" for 07063 1yr -24hr event Inflow = 3.61 cis @ 12.02 hrs, Volume= 0.196 of Outflow = 0.87 cfs @ 12.23 hrs, Volume= 0.197 af, Atten= 76%, Lag= 12.9 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 0.87 cfs @ 12.23 hrs, Volume= 0.197 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 7.00' Surf.Area= 575 sf Storage= 50 cf Peak Elev= 10.04' @ 12.23 hrs Surf.Area= 3,347 sf Storage= 2,475 cf (2,424 cf above start) Flood Elev= 12.00' Surf.Area= 4,602 sf Storage= 8,150 cf (8,100 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 13.6 min ( 832.8 - 819.2 ) Volume Invert Avail.Storage Storage Description #1 6.67' 456 cf Custom Stage Data (Prismatic) Listed below (Recalc) 1,833 cf Overall - 10 cf Embedded = 1,822 cf x 25.0% Voids #2 6.67' 10 cf 4.0"D x 30.001 Horizontal Cylinder S= 0.0050 'P x 4 Inside #1 #3 9.00, 7,685 cf Custom Stage Data (Prismatic) Listed below (Recalc) 8,150 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 6.67 492 0 0 9.00 1,081 1,833 1,833 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 9.00 1,602 0 0 12.00 3,521 7,685 7,685 Device Routing Invert Outlet Devices #1 Primary 7.00' 15.0" x 20.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 6.50' S= 0.0250 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 10.70' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 6.67' 4.0" Vert. Discharge Orfice from Underdrain C= 0.600 #4 Secondary 6.67' 1.750 in/hr Inflitralon through Filter Media over Surface area above invert Excluded Surface area = 492 sf ;r5 Discarded 11.00' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 HAPROJECTS\2007107063 SOUTH BRIDGE1Calcs\HydroCadl 07063 Pre -Post 12-15-09 Type 1124-hr 07063 Syr -24hr Rainfal/=3.67" Prepared by Norris, Kuske, & Tunstail Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Discarded OutFiow Max=0.00 cfs @ 0.00 hrs HW=7.00' (Free Discharge) T 5=Emergency Spillway ( Controls 0.00 cfs) Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=7.00' (Free Discharge) L1=Culvert ( Controls 0.00 cfs) L2=13affle Wall ( Controls 0.00 cfs) Secondary OutFlow Max=0.87 cfs @ 12.23 hrs HW=10.04' (Free Discharge) ti-Discharge Orfice from Underdrain (Orifice Controls 0.75 cfs @ 8.6 fps) ---Infiltraion through Filter Media (Exfiltration Controls 0.12 cfs) 0 a 0-1 0 Pond SF#2: Filter #2 Hydrograph 1 2 3 4 5 8 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) N Inflow -? Outflow Discarded _] Primary Secondary HAPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 12-15-09 Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 m AS Pond SF#2: Filter #2 Stage -Discharge Discharge (cfs) y Total Discarded Primary Secondary HAPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 12-15-09 Type 1124-hr 07063 1 yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Stage -Area -Storage for Pont! SF#2: Filter #2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 6.67 492 0 6.77 517 13 6.87 543 29 6.97 568 45 7.07 593 62 7.17 618 77 7.27 644 93 7.37 669 109 7.47 694 126 7.57 720 144 7.67 745 162 7.77 770 181 7.87 795 201 7.97 821 221 8.07 846 242 8.17 871 263 8.27 896 286 8.37 922 308 8.47 947 332 8.57 972 356 8.67 998 380 8.77 1,023 406 8.87 1,048 431 8.97 1,073 458 9.07 2,728 580 9.17 2,792 748 9.27 2,856 922 9.37 2,920 1,103 9.47 2,984 1,290 9.57 3,048 1,483 9.67 3,112 1,683 9.77 3,176 1,889 9.87 3,240 2,102 9.97 3,303 2,321 10.07 3,367 2,546 10.17 3,431 2,778 10.27 3,495 3,016 10.37 3,559 3,261 10.47 3,623 3,512 10.57 3,687 3,769 10.67 3,751 4,033 10.77 3,815 4,304 10.87 3,879 4,580 10.97 3,943 4,863 11.07 4,007 5,153 11.17 4,071 5,448 11.27 4,135 5,751 11.37 4,199 6,059 11.47 4,263 6,374 11.57 4,327 6,696 11.67 4,391 7,023 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 11.77 4,455 7,358 11.87 4,519 7,698 11.97 4,683 8,045 07063 Impervious Breakdown -revised areas-10-21-09 SAND FILTER DESIGN Drainage Area B Drainage Area Step 1- Determine Required Treatment Volumes Required TreatmentVolume (fts) Adjusted Treatment Volume (ft) Step 2- Determine Rker Geometry Mae Head on Sand Finer vr3.,.,.. h.._ - i DA 4 Ao (ft) 112607J70 WQV (M r 1107736 WQVA4(ft) 1 8309.02 hsr,F1W(M herr QQ WQV (ft) As+Af 2-00 8308.02 4154.01 250 8308.02 3323.21 3.00 8308.02 2769.34 350 8308A2 2373.72 4.00 8308A2 2077.01 4.50 830IL02 1846.23 5.00 8308.02 1661.60 5.50 8308.02 153055 6.00 8308.02 1384.67 Calculated Minimum Area of Sedimentation Basin Assumed Depth of5and Filter »Minimum 15 ft required Calculated Minimum Area of Sand Haber Proposed Geometric Properties Average Head >>Enter chosen hu. from Table above As (fe) 731.11 - dr(ft) oe Af (ft) mow• a h. (ft) hraararr(ft) 360 h. (ft) 1.50 - -- Minimum Sediment & Filter Chamber Areas based on chosen h� As (fts) w6y,fi` Meats Minimum Calculated Requirements Af (fta) Meets Minimum Calculated Requirements Step 3 - Verify Proposed Parameters Will Contain WQV Design Parameters As 2069.67 Af Ltial2176.60 h�(1q 3.00 ft 250 Step 4 - Determine Minimum Number of Pipes Needed for the Underdrain System Where: Media Permeability k (ft/day) J.SO or k (in/hr) Total Head Ah (It) 5.00 Length of Fknv through Media L (ft) 2.00 Peak Inflow Op (in/hr per unit area) 4.38 Flow Rate through Soil Media q (f?/sec) 0.2294 >>Apply a Safety Factor between 2 -10 Q(felsec) 0.55 Determine Equivalent Diameter as Single Pipe Where : n = roughness factor 0.011 s = internal slope of underdrain p,5096 D=plpe diameter D (in) 6369 See Table 5-1 pg 5-12 of NCDENR BMP manual Minimum M of Pipes Required In the Underdmin Step 5 - Determine Forebay Containment Volume Forebay typically required to contain between 18%to 22% at 18% 1495.44 at 22% 1827.76 Provided volume 189432 1 OK 71 Step 6 - Determine Drawdown Time wQVp (M 9308.02 Underdrain Une Sae - (ftj 0.33 cross sectional area (ftr) 0,0873 Coefficient of Discharge 0.L43 Gravitational Constant (ft/4 �,?n hefty PU Determine Rorfice is controlling factor (hr) -(see NCDENR manual pg3-13) SA9 Determine If Filter Media is controlling factor (hr) 26.17 IfT(hr)= (WQV„ s (ft)/((k (ft/day)xAs (ft))/24(hrj) OK OK 2.75 H:\PR0JECTS\2007A07063 SOUTH BRIOGE\Cala\07063 Impervious Breakdown -revised areas-30.21.09 HAPROJECTS12007107063 SOUTH BRIDGE1CaicslHydroCadl 07063 Pre -Post 1-18-10 Rev P13 Type/1 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/19/2010 Subcatchment De 4: Pre Runoff = 5.10 cfs @ 12.02 hrs, Volume= 0.279 af, Depth> 1.29" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67 Area (ac) CN Description 2.590 73 Woods, Fair, HSG C Tc Length Slope Velocity Capacity Description 10.0 Direct Entry, © Runoff H:IPROJECTS12007107063 SOUTH BRIDGE1Caicsll-IydroCadl 07063 Pre -Post 1-18-10 Rev P 13 Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/19/2010 Subcatchment DA4: Post Runoff = 8.27 cfs @ 12.02 hrs, Volume= 0.448 af, Depths 2.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type II 24-hr 07063 1 yr -24hr Rainfall=3.67" Area (ac) CN Description 0.920 98 Paved parking & roofs 1.670 76 Woods/grass comb., Fair, HSG C 2.590 84 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment DA4: Post Hydrograph . - cfs 8.27 - - 6 Type 1-t 24-hr 07063 . y- -20r - - - - _ - -Raktfala=3.67--- -- -- - 7 Runoff Area=2590 ac -------_--=------------_--- -- - --------- - -- 6 Runoff Volume==-0.448 of ;------:--------- v 5 3 Tc=100_rnin --- :--,--------- ---- :-- :--T 4 CN=84 - - - ----- .-- - 2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) H:IPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 12-15-09 Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond SF##4: Filter #4 Inflow Area = 2.590 ac, Inflow Depth > 2.08" for 07063 1yr -24hr event Inflow = 8.27 cfs @ 12.02 hrs, Volume= 0.448 of Outflow = 1.06 cl's @ 12.43 hrs, Volume= 0.449 af, Atten= 87%, Lag= 24.9 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 0.00 cis @ 0.00 hrs, Volume= 0.000 of Secondary = 1.06 cfs @ 12.43 hrs, Volume= 0.449 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 9.00' Surf.Area= 317 sf Storage= 29 cf Peak Elev= 12.61' @ 12.43 hrs Surf.Area= 6,337 sf Storage= 7,215 cf (7,185 cf above start) Flood Elev= 14.00' Surf.Area= 8,092 sf Storage= 15,783 cf (15,754 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 50.0 min ( 872.5 - 822.5 ) Volume Invert Avail.Storage Storage Description #1 8.67' 363 cf Custom Stage Data (Prismatic) Listed below (Recalc) 1,471 cf Overall - 18 cf Embedded = 1,453 cf x 25.0% Voids #2 8.67' 18 cf 4.0"D x 52.00'L Horizontal Cylinder S= 0.0060 '/' x 4 Inside #1 #3 11.00, 15,402 cf Custom Stage Data (Prismatic) Listed. below (Recalc) 15,783 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 8.67 193 0 0 11.00 1,070 1,471 1,471 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 11.00 3,246 0 0 14.00 7,022 15,402 15,402 Device Routing Invert Outlet Devices #1 Primary 9.00' 18.0" x 60.0' long Culvert X 2.00 CMP, square edge headwall, Ke= 0.500 Outlet Invert= 8.00' S= 0.0200 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 12.85' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 8.67' 4.0" Vert. Discharge Orfice from Underdrain C= 0.600 #4 Secondary 8.67' 1.750 in/hr Infiltration through Filter Media over Surface area above invert Excluded Surface area = 193 sf #5 Discarded 13.00' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 HAPROJECTS\2007\07063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 12-16-09 Type 1124-hr 07063 9 yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADG 7.10 s/n 000479 ® 2005 HVdrOCAD Software Solutions LLC 1/13/2010 Discarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=9.00` (Free Discharge) t-5=Emergency Spillway ( Controls 0.00 cfs) Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=9.00' (Free Discharge) Culvert ( Controls 0.00 cfs) 2=13affle Wall ( Controls 0.00 cfs) Secondary OutFlow Max=1.06 cfs @ 12.43 hrs HW=12.61' (Free Discharge) L3=Discharge Orrice from Underdrain (Orifice Controls 0.82 cfs @ 9.3 fps) 4-inflitration through Filter Media (Exfiltration Controls 0.25 cfs) Pond SF#4: Filter #4 Hydrograph Inflow Outflow Discarded Primary 1 Secondary 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) HAPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 12-15-09 Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond SF#4: Filter #4 Stage -Discharge Total Primary 14 Emergency S01-ay •S m 12- v C W l[ 10 Discharge Orfice from UWardrain + inSlivaiwo [wough rdter Media 0 5 10 15 20 25 30 6 35 40 45 50 55 60 65 Discharge (cfs) HAPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 12-16-09 Type 1124-hr 07063 Syr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Stage -Area -Storage for Pond SF#4: Filter #4 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 8.67 193 0 8.77 231 6 8.87 268 14 8.97 306 26 9.07 344 38 9.17 381 49 9.27 419 60 9.37 456 70 9.47 494 82 9.57 532 95 9.67 569 109 9.77 607 124 9.87 645 139 9.97 682 156 10.07 720 173 10.17 758 192 10.27 795 211- 10.37 833 _ 10.47 871 253 10.57 908 275 10.67 946 298 10.77 983 322 10.87 1,021 347 10.97 1,059 373 11.07 4,404 612 11.17 4,530 951 11.27 4,656 1,304 11.37 4,782 1,669 11.47 4,908 2,046 11.57 5,033 2,436 11.67 5,159 2,839 11.77 5,285 3,254 11.87 5,411 3,682 11.97 5,537 4,122 12.07 5,663 4,575 12.17 5,789 5,041 12.27 5,915 5,519 12.37 6,040 6,010 12.47 6,166 6,513 12.57 6,292 7,029 12.67 6,418 7,557 12.77 6,544 8,099 12.87 6,670 8,652 12.97 6,796 9,218 13.07 6,921 9,797 13.17 7,047 10,389 13.27 7,173 10,993 13.37 7,299 11,609 13.47 7,425 12,239 13.57 7,551 12,880 13.67 7,677 13,535 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 13.77 7,803 14,202 13.87 7,928 14,881 13.97 8,054 15,573 Pusey, Steven From: Pusey, Steven Sent: Wednesday, January 20, 2010 10:01 AM To: 'Jody Bland' Subject: RE: Southbridge pond 13 You can just send the sheets referencing pond 13 with your response. Be sure to make 2 copies though. Thanks, Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. Pusey(a)ncdenr.gov E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. From: Jody Bland [maiito:jbiand@nkteng.com] Sent: Wednesday, January 20, 2010 9:51 AM To: Pusey, Steven Subject: Southbridge pond 13 Good Morning Steve, We are finishing the pond correction to pond 13 based on the meeting minutes today. For our response package; do you want only the sheets referencing pond 13 with the response submittal or a whole new plan package? Thanks, Jody Bland Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. it shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. Pusey, Steven From: Jody Bland obland@nkteng.com] Sent: Thursday, January 14, 2010 9:29 AM To: Pusey, Steven Subject: Southbridge Comments Good Morning Mr. Pusey, I have been working through the comments provided below. I have ail of them complete and ready for resubmittal except for the final item # 8 which I have a question about. Please explain why a vegetated filter is needed? This pond is designed to contain and infiltrate the 1-yr storm into the secondary treatment area (infiltration area). Any discharge that would occur through the culvert would be outside of the NCDENR regulations/ requirements. Please see the bypass comment on the vegetated filter supplement cell A38. It states that prior to any bypass discharge (which is the bypass from the level spreader & vegetated filter) entering any wetlands that it should be routed to an energy dissipater prior to entering wetlands. Therefore in lieu of the level spreader we are required to contain and infiltrate the 1-yr storm and all bypass is unregulated by NCDENR. Our treatment method would fall into category 1. of section 5.c of the high density option which is infiltration of the design storm. Please advise Thanks, Jody Bland NORRIS, KUSK .TUNSTALL Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. NORRIS, KUSKE TUNSTALL CONSULTING ENGINEERS, INC. 1/13/2010 WET DETENTION BASIN CALCULATIONS Project Name: $©uthrtd a $utidivrsiarj NKr No QTtI Contact Person: John Ttriaflf, P Phone: (910) 343-9653 For projects with multiple basins, specify which basin this worksheet applies tn: QAA� .14 ; Description 1-year,24-hour rain event Drainage Area, DA = Pre-existing Impervious Area = Pre-existing Overall % Impervious, Ipre = Proposed Impervious Area = Post Development Pervious Area = Post Deveopiment Overall % Impervious, Qty Units 3:67. inches y ;18.512 ac 0 0007 ac 0.00 % 12.6Q2 ac ac 68.08 % Volume Required Within 0.5 mile & drain to SA waters? Design Rainfall Depth, D = Pre Devolpoment Runoff Volume factor, Rvpre Pre -Development Runoff Volume, Vp.= Post Devolpoment Runoff Volume factor, Rvp,Bt Post Development Runoff Volume, Vpt= Required Storage Volume = Permanent Pool Elevation Permanent Pool surface area State Temporary Pool Elevation State Temporary Pool Surface Area Provided Storage Volume = Notes: from NOAA & project location total to pond total BUA to pond total proposed impervious to pond USE FIRST 1.5 INCH 1.50 in 0.05 infin Rvp. = 0.05 + 0.009*Ipre 5,040 Vpre = D/12 x RvPre x DA*43560 0.67 in/in Rvpt = 0.05 + 0.009*Ipt 67,805 VP.at = D/12 x Rvpt x DA*43560 67,805 fe Post Dev. @ 1.5 inch Rainfall Depth = 34.QO ft 35,776 sf 35.75 ft 46,927 sf 74,093 fe OKI Peak Flow Calculations (Rational Method) C value pre -developed - 0.20 C value post -developed 0.69 Tc =Time of Concentration � min Depth @ Tc & 1-yr = d ".Q 99 inches Intensity Peak, 1 YR= 1 3.96 in/hr Pre -development runoff rate (rational method) 14.96 cfs Post -development runoff rate (rational method) 50.92 cfs from NCDENR BMP Manual determined from site conditions from NOAA & project location QPre= Cpre x I x DA xIxDA H:\PROJECTS12007107063 SOUTH BRIDGE1Caicsi07063 DWQ POND #14 SIMPLE VOLUME 11-03-09 NORRIS, KUSKE TUNSTALL CONSULTING ENGINEERS, INC. 1/13/2010 Main Pond Volume (Excluding Forebay) JArea of Top of Pond '.?'sf Area of State Stg Elevation ;447'sf Area of To of Veg Shelf Elevation P g `�'q' ' �.: 26,101'sf Area of Normal Pool Elevation ` 4 078 sf Area of Bottom of Veg Shelf Elevation ? 2€kf248 sf Area of Sediment Removal Elevation tfi t9'sf Top of Pond Elevationg;ft State Stg Elevation :: 35-75 ft Top of Veg Shelf Elevation 34.50 ft Normal Pool Elevation 34.00 ft Bottom of Veg Shelf Elevation 33.50 ft Sediment Removal Elevation.20 ft Volume of Normal Pool Elevation to Sediement Removal Elevation 158,684 ft3 Forebay #14A Volume (Excluding Main Pond) Area of To of Pond P •' �`.� 111667'sf Area of State Stg Elevation �° 8,81J!# sf Area of Normal Pool Elevation sf Area of Sediment Removal Elevation tE404 sf Top of Pond Elevation w. ;: 3 .ft State Stg Elevation 35.75 ft Normal Pool Elevation 34.00 ft Sediment Removal Elevation Forebay #14B Volume (Excluding Main Pond) Area of Top of Pond = - 9.653 sf Area of State Stg Elevation 6,.871, sf Area of Normal Pool Elevation Y. 4,915'sf Area of Sediment Removal Elevation 4613 sf Top of Pond Elevation Y = 39 ft State Sig Elevation 35.75 ft Normal Pool Elevation 34.00 ft Sediment Removal Elevation 28 ft Total Forebay Volume - Normal Pool Elevation to Sediment Removal Elevation 40,710 ft3 Percent Forebay Volume: 20.4°A (18 - 22% Required) OKI H:\PROJECTS\2007\07063 SOUTH SRIDGE%Calcs;07063 DWC POND #14 SIMPLE VOLUME 11-03-09 NORRIS, KUSKE TUNSTALL 1/13/2010 CONSULTING ENGINEERS, INC. Average Depth & Required Surface Area Permanent Pool Area 35,776 sf Permanent Volume 199,394 cf Average Depth 5.57 ft D = V/A Average Depth, Davg = 5.57 ft Rounded Avg Depth = ;.,. 50 ft SA/DA # from "Green Sheet" of Interpolated values for Coastal Region SA/DA at 68% w/ 5.50 ft avg depth = 4.38 90% TSS removal, no filter strip Required Surface Area = 35,319 sf Provided Surface Area = 35,776 sf OKI Drawdown Calculations Avg. Head = 1 -0.58 ft one third of flood stage Drawdown Time = 2 days 172,800 s Internal Diameter = 0.37 ft Internal Diameter = 4.42 in Drawdown Time = 5 days 432,000 s Internal Diameter = 0.23 ft Internal Diameter = 2.80 in Avg Internal Diameter = 3.61 in Design Orifice Diameter = 4.Q4 in OKI Design Drawdown rate 0.- cfs Design Drawdown time 7 AS I rlays H:IPROJECTS'QOOT%07063 SOUTH BRIDGE%Caics107063 DWQ POND #14 SIMPLE VOLUME 11-03-09 HAPROJECTS\2007\07063 SOUTH BRIDGE\Caics\HydroCad\ 07063 Pre -Post 1-18-10 Rev P13 Type 1124-hr07063 Syr-24hr Rainfall=3.67 Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/ 19/2010 Subcatchment 14Pre: DA 14 Runoff = 30.24 cfs @ 12.08 hrs, Volume= 1.988 af, Depth> 1.29" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type II 24-hr 07063 1 yr -24hr Rainfall=3.67 Area (ac) CN Description 18.510 73 Woods, Fair, HSG C Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, H:\PROJECTS\2007\07063 SOUTH BRIDGE\Calcs\HydroCadl 07063 Pre -Post 1-18-10 Rev P13 Type 1124-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstail Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 © 2005 HvdroCAD Software Solutions LLC 1/19/2010 Subcatchment 14PostA: DA 14 Runoff = 30.57 cfs @ 12.07 hrs, Volume= 2.004 af, Depth> 2.60" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67" Area (ac) CN Description 6.300 98 Paved roads w/curbs & sewers 2.955 74 >75% Grass cover, Good, HSG C 9.255 90 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 14PostA: DA 14 Hydrograph 34 --- -- ------------------w--T --- ----------- ..---------- ®Runoff 32' -- - ---------- - 30.57M 30 _Tyne Ii 24-hr O063.1yr -24hr -- - - - =- - -- - - - - -- _ - - 28 Rai-rtfall-3-.67 ' r - =- -- -v--, ----- ------------ - --- -- --- 28 -----=-- ----=- 24 Runo#fATea-9.259 4c--- -- ;------=----- 22 Rurioff Volume-2.004 of _ 20 -Ruoff -Depth>'2.-60"--- -------=--�--- - --------- c=750-mrn- --- ----- ---=--=-- ----- ------ - --- -- 16 u_ 14 CN-g--- ----r----- ----� 12 _ _ .:------- -- - - ---------- .. ------ 10 - -- .- - - -- .- -- -- - �- - 8 ' ------------ Time (houm) H:\PROJECTS\2007107063 SOUTH BRIDGE\Caics\HydroCad\ 07063 Pre -Post 1-18-10 Rev P13 Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/19/2010 Subcatchment 14PostB: DA 14 Runoff = 30.57 cfs @ 12.07 hrs, Volume= 2.004 af, Depth> 2.60" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type 11 24-hr 070631 yr -24hr Rainfall=3.67" Area (ac) CN Description 2.955 74 >75% Grass cover, Good, HSG C 6.300 98 Paved roads w/curbs & sewers 9.255 90 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, 26 f Subcatchment 14PostB: DA 14 Hydrograph ® �S 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) H:\PROJECTS12007107063 SOUTH BRIDGE\Calcs\HydroCadl 07063 Pre -Post 12-1 "9 Type 1124-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HYdroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond FB14A: Forebay14A Inflow Area = 9.255 ac, Inflow Depth > 2.60" for 07063 1yr -24hr event Inflow = 30.57 cfs @ 12.07 hrs, Volume= 2.004 of Outflow = 21.74 cfs @ 12.09 hrs, Volume= 1.422 af, Atten= 29%, Lag= 1.7 min Primary = 21.74 cfs @ 12.09 hrs, Volume= 1.422 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Peak Elev= 37.23' @ 23.38 hrs Surf.Area= 9,428 sf Storage= 25,385 cf Plug -Flow detention time= 121.5 min calculated for 1.421 of (71 % of inflow) Center -of -Mass det. time= 27.6 min ( 832.5 - 804.8 ) Volume Invert Avail.Storage Storage Description #1 34.00' 44,024 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 34.00 6,783 0 0 36.00 7,926 14,709 14,709 38.00 10,368 18,294 33,003 39.00 11,674 11,021 44,024 Device Routing Invert Outlet Devices #1 Primary 34.00' 36.0" x 80.0' long Culvert X 2.00 - RCP, end -section conforming to fill, Ke= 0.500 Outlet Invert= 33.90' S= 0.0013'/' Cc= 0.900 n= 0.011 Concrete pipe, straight &clean. #2 Secondary 38.50' 60.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=21.69 cfs @ 12.09 hrs HW=35.91' TW=35.59' (Dynamic Tailwater) t1=Culvert (Outlet Controls 21.69 cfs @ 3.3 fps) $econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=34.00' (Free Discharge) 2=13road-Crested Rectangular Weir ( Controls 0.00 cfs) H:IPROJECTS12007107063 SOUTH BRIDGE1CaIcs\HydroCadl 07063 Pre -Post 12-15-09 Type // 24-hr 07063 1 yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 m 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond FB14A: Forebay14A Hvdroaranh Inflow Outflow Primary Secondary 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Pond FB14A: Forebay14A Stage -Discharge Total 13 Primary p Secondary 0 20 40 60 80 100 120 140 160 Discharge (cfs) HAPROJECTS1200-A07063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 12-15-09 Type/1 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/13/2010 937 .. c a W m 36 W Pored FB14A: Forebay14A Stage -Area -Storage SiH'7a%$irifiPa�OFii.3ii vt�c?iiBa1 Area (sq-aj 0 1,000 2,000 3,000 4,000 5,000 e,000 7,000 5,000 9,000 10,000 11,000 '—FEW , v 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 Storage (cubic -feet) U Surface 2 Storage H:IPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 12-15-09 Type I! 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 C 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond F1314B: Forebay1413 Inflow Area = 9.255 ac, Inflow Depth > 2.60" for 07063 1yr -24hr event Inflow = 30.57 cfs @ 12.07 hrs, Volume= 2.004 of Outflow = 24.23 cfs @ 12.09 hrs, Volume= 1.563 af, Atten= 21%, Lag= 1.4 min Primary = 24.23 cfs @ 12.09 hrs, Volume= 1.563 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Peak Elev= 37.23' @ 23.38 hrs Surf.Area= 7,469 sf Storage= 19,217 cf Plug -Flow detention time= 102.2 min calculated for 1.563 of (78% of inflow) Center -of -Mass det. time= 18.8 min ( 823.6 - 804.8 ) Volume Invert Avail.Storage Storage Description #1 34.00' 34,333 cf Custom Stage Data (Prismatic) Listed below (Recalc) - Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 34.00 4,915 0 0 36.00 6,010 10,925 10,925 38.00 8,381 14,391 25,316 39.00 9,653 9,017 34,333 Device Routing Invert Outlet Devices #1 Primary 34.00' 36.0" x 80.0' long Culvert X 2.00 RCP, end -section conforming to fill, Ke= 0.500 Outlet Invert= 33.90' S= 0.0013'/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Secondary 38.50' 50.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=24.16 cfs @ 12.09 hrs HW=35.94' TW=35.56' (Dynamic Tailwater) L1=Culvert (Outlet Controls 24.16 cfs @ 3.6 fps) $econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=34.00' (Free Discharge) 2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) HAPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 12-15-09 Type // 24-hr 07063 1 yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond FB14B: Forebay14B Hydrograph 34_ Inflow Area=9.255 a 30= Peak Elev=37.23' 28 24.23 Storage=19,217 24�� 26= 24= 22= 20= 18- c 16- a 14- 12. 10= 8: 6 4 000as 0 ,.. ............... 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Pond FB14B: Forebay14B Discharge (cfs) N Inflow Outflow 9� Primary 0 Secondary 3 Total ® Primary ❑ Secondary H:IPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 12-15-09 Type Il 24-hr 07063 l yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 W Pond FB14B: Forebay14B Stage -Area -Storage ia�rfz �t<yLYed Area s,-ft) 0 500 1,0001,5002,0002,5003,00cM'5004,0004,5005,0005,5006,0006,5007.0007.5008.0008,5009.0009.500 Storage (cubic -feet) Surface ® Storage H:IPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 12-15-09 Type Il 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/1312010 Pond MP14: Alain Pond 14 Inflow Area = 18.510 ac, Inflow Depth > 1.94" for 07063 1yr -24hr event Inflow = 45.95 cfs @ 12.09 hrs, Volume= 2.985 of Outflow = 0.74 cfs @ 23.38 hrs, Volume= 0.703 af, Atten= 98%, Lag= 677.3 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 0.74 cfs @ 23.38 hrs, Volume= 0.703 of Secondary = 0.00 cfs @ 0.00 hrs, Voiume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Peak Elev= 37.23' @ 23.38 hrs Surf.Area= 35,160 sf Storage= 99,407 cf Plug -Flow detention time= 418.2 min calculated for 0.703 of (24% of inflow) Center -of -Mass det. time= 262.9 min ( 1,090.7 - 827.8 ) Volume Invert Avail.Storage Storage Description #1 34.00' 165,746 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 34.00 24,078 0 0 34.50 28,101 13,045 13,045 38.00 37,150 114,189 127,234 39.00 39,874 38,512 165,746 Device Routing Invert Outlet Devices #1 Secondary 30.10' 36.0" x 60.0' long Culvert RCP, end -section conforming to fill, Ke= 0.500 Outlet Invert= 30.00' S= 0.0017'f Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 37.25' 4.00' x 4.00' Horiz. Top of Outlet Structure Limited to weir flow C= 0.600 #3 Primary 34.00' 6.0" x 60.0' long Solid Line to Perforated Diffusion Pipe CPP, square edge headwall, Ke= 0.500 Outlet Invert= 33.90' S= 0.0017 7' Cc= 0.900 n= 0.020 Corrugated PE, corrugated interior #4 Device 3 34.00' 4.0" Vert. NCDENR Orfice C= 0.600 #5 Device 4 35.75' 2.00' x 2.00' Horiz. Top of Box Limited to weir flow C= 0.600 #6 Discarded 38.50' 50.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 HAPROJECTS12007107063 SOUTH BRIDGE1CaIcs\HydroCadl 07063 Pre -Post 12-15-09 Type ll 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Discarded OutFlow Max=0.00 cfs �w 0.00 i rs HW=34.00' (Free Discharge) t-6=Emergency Spillway ( Controls 0.00 cfs) Primary OutFlow Max=0.74 cfs @ 23.38 hrs HW=37.23' (Free Discharge) t-3=Solid Line to Perforated Diffusion Pipe (Passes 0.74 cfs of 0.74 cfs potential flow) t -4=NCDENR Orfice (Orifice Controls 0.74 cfs @ 8.4 fps) t-6=Top of Box (Passes 0.74 cfs of 23.43 cfs potential flow) Secondary OutFlow Max--0.00 cfs @ 0.00 hrs HW=34.00' (Free Discharge) t-1=Culvert (Passes 0.00 cfs of 43.88 cfs potential flow) t-2=Top of Outlet Structure ( Controls 0.00 cfs) 40 LL Pond MP14: Main Pond 14 Hydrograph Inflow Area=18.510 ac Peak Elev=37.23' Storage=99,407 cf �'i U, 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Inflow outflow Discarded Primary Secondary HAPROJECTS12007107063 SOUTH BRIDGEICaics\HydroCadl 07063 Pre -Post 12-15-09 Type/1 24-hr 07063 Syr-24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 _© 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond MP14: Main Pond 14 Stage -Discharge -:� Total Discarded 49 Primary ❑ Secondary 0 20 40 so 80 100 120 140 Discharge (cfs) Pond MP14: Main Pond 14 Stage -Area -Storage Surface/HOrizontalMetted Area (sq-ft) 0 00 10,000 15,000 20,000 25,000 30,000 as an,0 Surface eo Storage m 37 34 E 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 Storage (cubic -feet) 14,Cf mu t H:IPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 6)kftu.T 4" 07063 Pre -Post 12-15-09 Type // 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstail Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond MP14: Main Pond 14 Inflow Area = 18.510 ac, Inflow Depth > 5.01" for 07063 10yr -24hr event Inflow = 84.95 cfs @ 12.10 hrs, Volume= 7.722 of Outflow = 51.02 cfs @ 12.28 hrs, Volume= 5.378 af, Atten= 40%, Lag= 11.0 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 0.85 cfs @ 12.28 hrs, Volume= 0.763 of Secondary = 50.17 cfs @ 12.28 hrs, Volume= 4.615 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Peak Elev= 38.22' @ 12.28 hrs Surf.Area= 37,756 sf Storage= 135,565 cf Plug -Flow detention time= 177.0 min calculated for 5.374 of (70% of inflow) Center -of -Mass det. time= 77.7 min ( 884.2 - 806.5 ) Volume Invert Avail.Storage Storage Description #1 34.00' 165,746 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 34.00 24,078 0 0 34.50 28,101 13,045 13,045 38.00 37,150 114,189 127,234 39.00 39,874 38,512 165,746 Device Routing Invert Outlet Devices #1 Secondary 30.10' 36.0" x 60.0' long Culvert RCP, end -section conforming to fill, Ke= 0.500 Outlet Invert-- 30.00' S= 0.0017 ? Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 37.25' 4.00' x 4.00' Horiz. Top of Outlet Structure Limited to weir flow C= 0.600 #3 Primary 34.00' 6.0" x 60.0' long Solid Line to Perforated Diffusion Pipe CPP, square edge headwall, Ke= 0.500 Outlet Invert= 33.90' S= 0.00177 Cc= 0.900 n= 0.020 Corrugated PE, corrugated interior #4 Device 3 34.00' 4.0" Vert NCDENR Orfice C= 0.600 #5 Device 4 35.75' 2.00' x 2.00' Horiz. Top of Box Limited to weir flow C= 0.600 #6 Discarded 38.50' 60.0' long x 10.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 HAPROJECTS12007107063 SOUTH BRIDGE1CaicslHydroCadl 07063 Pre -Post 12-15-09 Type/1 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Discarded OutFlow Max=0.00 cis @ 0.00 hrs HW=34.00' (Free Discharge) t-6=Emergency Spillway ( Controls 0.00 cfs) Primary OutFlow Max=0.85 cis @ 12.28 hrs HW=38.22' (Free Discharge) t— =Solld Line to Perforated Diffusion Pipe (Passes 0.85 cis of 0.86 cfs potential flow) P p L—f=NCDENR Orfice (Orifice Controls 0.85 cfs @ 9.7 fps) =Top of Box (Passes 0.85 cis of 30.28 cfs potential flow) Secondary OutFlow Max=50.11 cfs @ 12.28 hrs HW=38.22' (Free Discharge) t-1=Culvert (Passes 50.11 cfs of 87.58 cfs potential flow) t-2=Top of Outlet Structure (Weir Controls 50.11 cis @ 3.2 fps) Pond MP14: Main Pond 14 Hydrograph s4 15 cre Inflow Area=18.510 ac 90� Peak Elev=38.22' 85. Storage=135,565 cf 80. 75: 70' 51.02 cfs 60 R W.17 ds 5o 45 40: r; 35_ I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) HAPROJECTS12007107063 SOUTH BR1DGE1CaIcslHydroCadl 07063 Pre -Post 12-15-09 Type Il 24-hr 07063 10yr -24hr Rainfall=6. 88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond MP14: Main Pond 14 Stage -Discharge Total Discarded Primary Secondary 0 20 40 80 80 100 120 140 Discharge (cfs) Culvert H:\PROJECTS\2007\07063 SOUTH BRIDGE\Calcs\HydroCad\ 07063 Pre -Post 12-15-09 Type 11 24-hr 07063 10yr -24hr Rainfall=6.88" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Stage -Area -Storage for Pond MP14: Main Pond 14 Elevation Surface Storage (feet) (sg-ft) (cubic -feet) 34.00 24,078 0 34.05 24,480 1,214 34.10 24,883 2,448 34.15 25,285 3,702 34.20 25,687 4,977 34.25 26,090 6,271 34.30 26,492 7,585 34.35 26,894 8,920 34.40 27,296 10,275 34.45 27,699 11,650 34.50 28,101 13,045 34.55 28,230 14,453 34.60 28,360 15,868 34.65 28,489 17,289 34.70 28,618 18,717 34.75 28,747 20,151 34.80 28,877 21,591 34.85 29,006 23,038 34.90 29,135 24,492 34.95 29,264 25,952 35.00 29,394 27,418 35.05 29,523 28,891 35.10 29,652 30,371 35.15 29,782 31,857 35.20 29,911 33,349 35.25. 30,040 34,848 36.30 36,169 36,363 35.35 30,299 37,865 35.40 30,428 39,383 35.45 30,557 40,907 35.50 30,686 42,438 35.55 30,816 43,976 35.60 30,945 45,520 35.65 31,074 47,071 35.70 31,204 48,627 35.75 31,333 50,191 35.80 31,462 51,761 35.85 31,591 53,337 35.90 31,721 54,920 35.95 31,850 56,509 36.00 31,979 58,105 36.05 32,108 59,707 36.10 32,238 61,316 36.15 32,367 62,931 36.20 32,496 64,552 36.25 32,626 66,180 36.30 32,755 67,815 36.35 32,884 69,456 36.40 33,013 71,103 36.45 33,143 72,757 36.50 33,272 74,418 Elevation Surface Storage (feet) (sg-ft) (cubic -feet) 36.55 33,401 76,084 36.60 33,530 77,758 36.65 33,660 79,437 36.70 33,789 81,124 36.75 33,918 82,816 36.80 34,047 84,516 36.85 34,177 86,221 36.90 34,306 87,933 36.95 34,435 89,652 37.00 34,565 91,377 37.05 34,694 93,108 37.10 34,823 94,846 37.15 34,952 96,590 37.20 35,082 98,341 37.25 35,211 100,099 37.30 35,340 101,862 37.35 35,469 103,633 37.40 35,599 105,409 37.45 35,728 107,193 37.50 35,857 108,982 37.55 35,987 110,778 37.60 36,116 112,581 37.65 36,245 114,390 37.70 36,374 116,205 37.75 36,504 118,027 37.80 36,633 119,856 37.85 36,762 121,691 37.90 36,891 123,532 37.95 37,021 125,380 38.00 37,150 127,234 38.05 37,286 129,095 38.10 37,422 130,963 38.15 37,559 132,837 38.20 37,695 134,718 38.25 37,831 136,607 38.30 37,967 138,502 38.35 38,103 140,403 38A0 38,240 142,312 38.45 38,376 144,227 38.50 38,512 146,150 38.55 38,648 148,079 38.60 38,784 150,014 38.65 38,921 151,957 38.70 39,057 153,906 38.75 39,193 155,863 38.80 39,329 157,826 38.85 39,465 159,796 38.90 39,602 161,772 38.95 39,738 163,756 39.00 39,874 165,746 NORRIS, KUSKE TUNSTALL CONSULTING ENGINEERS, INC. WET DETENTION BASIN CALCULATIONS /13/2,01+0' I ���11J 1�►1� 'j Project Name: South Bridge Subdivision NKT No: 07063 Contact Person: John Tunstall, PE Phone: (910) 343-9653 For projects with multiple basins, specify which basin this worksheet applies to: DA Os 7-12 Description Qty Units Notes: 1-year,24-hour rain event 3.67 inches from NOAA & project location Drainage Area, DA = 19.483 ac total to pond Pre-existing Impervious Area = 0.000 ac Pre-existing Overall % Impervious, Ip, = 0.00 % Proposed Impervious Area = 14.175 ac total BUA to pond Post Development Pervious Area = 5.308 ac total proposed impervious to pond Post Deveoplment Overall % Impervious, IPost = �- 72.76 % Volume Within 0.5 mile & drain to SA waters? Design Rainfall Depth, D = Pre Devolpoment Runoff Volume factor, Rvpr. _ Pre -Development Runoff Volume, Vpr.= Post Devolpoment Runoff Volume factor, Rvpost = Post Development Runoff Volume, Vpogt= Required Storage Volume = Permanent Pool Elevation Permanent Pool surface area State Temporary Pool Elevation State Temporary Pool Surface Area Provided Storage Volume = uired (Sim Y USE DIFFERENCE OF PRE -POST VOLUME 3.67 in 0.05 in/in Rvpr. = 0.05 + 0.009*lpre 12,978 Vpre = D/12 x Rvpr, x DA*43560 0.70 in/in Rvpost = 0.05 + 0.009*Ipost 82,934 Vpom = D/12 x Rvpost x DA*43560 69,956 fe Diff of Pre -Post V 19.00 ft 44,410 sf 22.25 ft 60,157 sf 73,247 fe OKI Peak Flown Calculations C value pre -developed 0.20 C value post -developed 0.73 Tc = Time of Concentration 15: min Depth @ Tc & 1-yr = d 0.99 inches Intensity Peak, 1 YR= 1 3.96 in/hr Pre -development runoff rate (rational method) 15.58 cfs Post -development runoff rate (rational method) 56.32 cis Qpre Cpr. x I x DA Qoost=Coost x I x DA H:XPROJECTS12007107063 SOUTH BRIDGEICaicst07063 DWQ PON€#7-12 SIMPLE VOLUME 10-12-09 NORRIS, KUSKE TUNSTALL CONSULTING ENGINEERS, INC. 1/13/2010 Main Pond Volume (Excluding Forebay) Area of Top of Pond ;:}'',409 sf Area of State Stg Elevation ''3s,Z54 sf Area of Top of Veg Shelf Elevation _ 3U:541: sf Area of Normal Pool Elevation $ . 26 993„sf Area of Bottom of Veg Shelf Elevation .``.23,680�sf Area of Sediment Removal Elevation .:.7986:sf Top of Pond Elevation ft State Stg Elevation " 22:25'ft Top of Veg Shelf Elevation 19.50 ft Normal Pool Elevation 19.00 ft Bottom of Veg Shelf Elevation 18.50 ft Sediment Removal Elevation Volume of Normal Pool Elevation to Sediement Removal Elevation 178,931 ft3 Forebay #1 Volume (Excluding Main Pond) Area of Top of Pond '.. 26;573. sf Area of State Stg Elevation :1, 23,463; sf Area of Normal Pool Elevation 17,417; sf Area of Sediment Removal Elevation 12,421 sf Top of Pond Elevation �„:.241ft State Stg Elevation 22.25 ft Normal Pool Elevation 19.00 ft Sediment Removal Elevation loft Forebay 02 Volume (Excluding Main Pond) Area of Top of Pond 0 sf Area of State Stg Elevation : '0 sf Area of Normal Pool Elevation :i ' 0; sf Area of Sediment Removal Elevation =:' 0'sf Top of Pond. Elevationft- State Stg Elevation 22.25 ft Normal Pool Elevation 19.00 ft Sediment Removal Elevation Q. ft Total Forebay Volume - Normal Pool Elevation to Sediment Removal Elevation 44,766 ft3 Percent Forebay Volume: 20.0% (18 - 22% Required) OKI H:\PROJECTS\2007\07063 SOUTH BRIDGE\CaIcs107063 DWQ POND#7-12 SIMPLE VOLUME 10-12-09 NORRIS, KUSKE TUNSTALL CONSULTING ENGINEERS, INC. 1/13/2010 Average Depth & Required Surface Area Permanent Pool Area sf Permanent Volume cf M.5.014 Average Depthft D = VIA Average Depth, Davg = 5.04 ft Rounded Avg Depth = .d.,5:GO. ft SAIDA # from "Green Sheet" of Interpolated values for Coastal Region SAIDA at 73% w/ 6.00 ft avg depth = 5.21 90% TSS removal, no filter strip Required Surface area = 44,216 sf Provided Surface Area = 44,410 sf OK! I Drawdown Calculations Avg. Head = Drawdown Time = Internal Diameter = Internal Diameter = Drawdown Time = Internal Diameter = Internal Diameter = Avg Internal Diameter = Design Orifice Diameter = Design Drawdown rate Design Drawdown time 1.08 ft 2 days 0.50 ft 6.00 in 5 days 0.32 ft 3.79 in 4.90 in '4 w in 0.44 cfs 4.51 one third of flood stage 172,800 s 432,000 s OKI H:lPROJECTS12007'%D7063 SOUTH BRIDGE\Calcs107063 DWQ POND#7-12 SIMPLE VOLUME 10-12-09 H:IPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 1-18-10 Rev PI Type // 24-hr 07063 Syr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 m 2005 HydroCAD Software Solutions LLC 1/19/2010 Subcatchment DA 7: Pre Runoff = 4.93 cfs @ 12.03 hrs, Volume= 0.279 af, Depth> 1.00" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type II 24-hr 07063 1 yr -24hr Rainfall=3.67" Area (ac) CN Description 2.010 73 Woods, Fair, HSG C - Marvyn 1.350 60 Woods, Fair, HSG B - Leon 3.360 68 Weighted Average Tc Length Slope Velocity Capacity Description 10.0 Direct Entry, ;.y-"Y''o;';✓ aRunoff H:IPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 1-18-10 Rev P13 Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstali Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/19/2010 Subcatchment DA7: post Runoff = 14.10 cfs @ 12.01 hrs, Volume= 0.810 af, Depth> 2.89" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs Type II 24-hr 07063 1 yr -24hr Rainfall=3.67" Area (ac) CN Description 2.800 98 Paved parking & roofs 0.420 74 >75% Grass cover, Good, HSG C 0.140 61 >75% Grass cover, Good, HSG B 3.360 93 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, 15 14 13 12 11 10 u 9 9 7 . 3 2 1 Subcatchment DA7: Post Hydrograph Time (hours) m Runoff KkPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 12-15-09 Type 1124-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Dorris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond 7-12: Forebay Inflow Area = 18.301 ac, Inflow Depth > 2.83" for 07063 lyr -24hr event Inflow = 75.25 cfs @ 12.01 hrs, Volume= 4.320 of Outflow = 40.58 cfs @ 12.10 hrs, Volume= 2.827 af, Atten= 46%, Lag= 5.1 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 40.58 cfs @ 12.10 hrs, Volume= 2.827 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Peak Elev= 22.20' @ 24.00 hrs Surf.Area= 23,307 sf Storage= 65,024 cf Flood Elev= 24.00' Surf.Area= 26,873 sf Storage= 110,301 cf Plug -Flow detention time= 134.1 min calculated for 2.827 of (65% of inflow) Center -of -Mass det. time= 34.4 min ( 822.9 - 788.4 ) Volume Invert Avail.Storage Storage Description #1 19.00, 110,301 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 19.00 17,417 0 0 22.00 22,921 60,507 60,507 24.00 26,873 49,794 110,301 Device Routing Invert Outlet Devices #1 Primary 19.00' 60.0" x 705.0' long Connective Piping CMP, end -section conforming to fill, Ke= 0.500 Outlet Invert= 18.09 S= 0.0014'/' Cc= 0.900 n 0.0-13- Concrete pipe, bends & connections #2 Discarded 23.25' 75.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Discarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=19.00' (Free Discharge) t2=Emergency Spillway ( Controls 0.00 cfs) Primary OutFlow Max=40.51 cfs @ 12.10 hrs HW=21.94' TW=20.33' (Dynamic Tailwater) t'l=Connective Piping (Outlet Controls 40.51 cfs @ 4.9 fps) H:IPROJECTS12007107063 SOUTH BRlDGEICalcslHydroCadl 07063 Pre -Post 12-15-09 Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. ydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 1/13/2010 W Pond 7-12: Forebay Hydrograph Time (hours) Pond 7-12: Forebay 0 20 40 60 80 100 120 140 160 180 200 220 Discharge (cfs) Inflow outflow Discarded Primary W; Total Discarded IV Primary HAPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 12-15-09 Type // 24-hr 07063 1 yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond 7-12: Forebay Stage -Area -Storage Surface Storage 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 100,000 110,000 Storage (cubic -feet) H:IPROJECTS12007107063 SOUTH BRIDGE1CaicslHydroCadl 07063 Pre -Post 12-15-09 Type Il 24-hr 07063 Syr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 Pond 7-12: Main Pond Inflow Area = 19.477 ac, Inflow Depth > 1.82" for 07063 1yr -24hr event Inflow = 42.39 cfs @ 12.09 hrs, Volume= 2.960 of Outflow = 0.57 cfs @ 18.70 hrs, Volume= 0.552 af, Atten= 99%, Lag= 396.7 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 0.57 cfs @ 18.70 hrs, Volume= 0.552 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Peak Elev= 22.20' @ 24.00 hrs Surf.Area= 36,634 sf Storage= 104,877 cf Plug -Flow detention time= 398.7 min calculated for 0.552 of (19% of inflow) Center -of -Mass det. time= 245.3 min (1,069.5 - 824.2 ) Volume Invert Avail.Storage Storage Description #1 19.00, 174,866 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 19.00 26,993 0 0 19.50 30,541 14,384 14,384 22.00 36,171 83,390 97,774 24.00 40,921 77,092 174,866 Device Routing Invert Outlet Devices #1 Primary 19.00' 4.0" x 60.0' long Low Flow Orfice to Secondary Infiltration CMP, projecting, no headwall, Ke= 0.900 Outlet Invert=16 00' S= 0 0500 'f -Cc= 0.900 n= 0.010 PVC, smooth interior #2 Device 1 19.00' 2.00' x 2.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Secondary 13.10' 36.0" x 50.0' long Culvert RCP, end -section conforming to fill, Ke= 0.500 Outlet Invert= 13.00' S= 0.0020 T Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #4 Device 3 22.25' 6.00' x 4.00' Horiz. Top of Box Limited to weir flow C= 0.600 #5 Discarded 23.50' 75.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Discarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=19.00' (Free Discharge) t-S=Emergency Spillway ( Controls 0.00 cfs) Primary OutFlow Max--0.57 cfs @ 18.70 hrs HW=22.09' TW=17.68' (Dynamic Tailwater) t- 1=Lnw Flew Orflce to Secondary Infiltration (Inlet Controls 0.57 cfs @ 6.5 fps) t--2=Orifice/Grate (Passes 0.57 cfs of 33.86 cfs potential flow) econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=19.00' (Free Discharge) Culvert (Passes 0.00 cfs of 71.39 cfs potential flow) =Top of Box ( Controls 0.00 cfs) HAPROJECTS12007107063 SOUTH BRIDGE1CalcslHydroCadl 07063 Pre -Post 12-15-09 Type 1124-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCAD® 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 LL 0 m w e 0 m w Pond 7-12: Main Pond Hydrograph Inflow Area=19.477 Peak Elev=22.20' Storage=104,977 cf 0.57 ds 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Pond 7-12: Main Pond Stage -Discharge 0 20 40 60 80 100 120 140 160 Discharge (cfs) Inflow Outflow u' Discarded Primary Secondary Total 0 Discarded M Primary p Secondary HAPROJECTS12007107063 SOUTH BRIDGE1CaIcslHydroCadl 07063 Pre -Post 12-1 "9 Type 1124-hr 07063 1 yr -24hr Rainfall=3. 67" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. HydroCADO 7.10 s/n 000479 ® 2005 HydroCAD Software Solutions LLC 1/13/2010 23 2e e 0 Pond 7-12: Main Pond Stage -Area -Storage S: ac�i�;or;zcr•a;fe u�f:?a i Atea 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 Storage (cubic -feet) 40,000 Surface ® Storage Pusey, Steven From: Pusey, Steven Sent: Friday, January 08, 2010 1:52 PM To: Tunstall, John Cc: Bland, Jody Subject: South Bridge Subdivision - SW8 090903 Please reference the following letter requesting additional information on subject project: The Wilmington Regional Office received and accepted a revised State Stormwater Management Permit Application for South Bridge Subdivision on December 17, 2009. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. For sand filters SF 1-613, please show the calculations of how the following data were determined: a. Flow from bypass structure for 10-year storm b. Flow from perforated pipe for 10-year storm 2. For wet ponds in DA 13 and 14, please show the calculations of how the following data were determined: a. Flow from perforated pipe for 10-year storm 3. Concerning flow through the vegetated filter, if perforated pipe is capped, how does that flow enter into the vegetated filter area? Please explain. 4. Please provide wet detention basin calculations and hydrocad modeling data for revised ponds in DA 7-12, 13, and 14. 5. Please provide O&M Agreements for these revised wet detention ponds. It appears that the O&M Agreements (received 11/12/09) had some errors. Page 3 of the O&M for DA 7-12 has the elevations of ponds 13A&B. Page 3 of the O&M for DA 13 has the same elevations as that for DA 14. 6. Please provide calculation pages for revised sand filters #2 and #4. 7. Please provide calculations for revised infiltration basins in DA 7-12, 13, and 14. 8. A vegetated filter area needs to be added at the outlet of the wet detention pond in DA 7-12. Calculations and Supplements are also needed for this filter area. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to January 29, 2010, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you have any questions, please don't hesitate to call. Regards, Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. Pusey(a)ncdenr.gov E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. NORRIS, KUSKE &TUNSTALL CONSULTING ENGINEERS, INC. December 17, 2009 Mr. Steve G. Pusey, Environmental Engineer NC DENR / Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: South Bridge Subdivision — Phase I State Stormwater Permit No. SW8 090903 Sneads Ferry, NC NKT Project No. 07063 Dear Mr. Pusey: J. Phillip Norris, P.E. John A. Kuske, III, P.E. John S.Tunstall, P.E. J.A. Kuske, P.E. of Counsel REM D E C 17 2009 Per your e-mail comments of November 20, 2009, we offer the following responses: Calculations have been provided for discharges through the vegetated filter for the 10- year storm. 2. A Filter Strip Supplement and Operation and Maintenance Agreement have been filled out and are enclosed for each BMP. 3. An Infiltration Supplement has been filled out and is enclosed for each infiltration area that is used for secondary treatment. 4. As stated during your telephone conversation with Jody Bland of Norris, Kuske & Tunstall (NKT), we explained our wishes to use the capped perforated sock pipes in lieu of level spreaders based on our maintenance concerns and siting issues. The perforated pipes will provide diffuse flow of any discharge and velocity calculations for each filter strip has been provided for your use. 5. Again, as indicated in your telephone conversation with Jody Bland of NKT, it was our understanding from our meeting that if the filter strips were removed from the wetlands and we demonstrated that any runoff in fact enters the wetlands at a non erosive velocity then it would be assumed that effective infiltration would take place prior to reaching mean high water. In review of the outfall structures for the sand filters, two (2) discharge inverts were found to be below grade, as you questioned. Sand Filters #2 and #4 elevations were both raised by 2'. Based on these modifications, no changes were needed for Sand Filter #2 Supplement and Operation and Maintenance Agreement forms. By raising Sand Filter #4, we were able to obtain the minimum 2' separation from the Seasonal High Water Table, thus eliminating the liner and the Supplement form has been updated to reflect this change. 902 Market Street • Wilmington, NC 28401-4733 • Phone: 910.343.9653 • Fax: 910.343.9604 Mr. Steve G. Pusey / NC DENR December 17, 2009 Page 2 Enclosed are two (2) sets of revised plans, which includes the drainage area plans, one (1) set of revised calculations, the SW-401 Filter Strip Supplement forms (Drainage Areas 1, 2, 3, 4, 5, 6A, 6B, 13A & 13B and 14) , U;e SW-401 Infiltration Supplement forms (Drainage Areas 7- 12 and 13A & 13B), the revised SW-401 Sand Filter Supplement form (Drainage Area 4), the Filter Strip Operation and Maintenance Agreement forms (Drainage Areas 1, 2, 3, 4, 5, 6A, 66, 13A & 13B and 14) and the Infiltration Basin Operation and Maintenance Agreement forms (Drainage Areas 7-12 and 13A & 13B). Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. JJon S. Tunstall, P. E. JST/asn 07063 12-17-09-s-sw response-Itr Enclosures STORMWATER CALCULATIONS SOUTH BRIDGE SUBDIVISION (PHASE 1) Sneads Ferry, North Carolina For BC & RT, LLC and Raiford G. Trask, Jr., Trustee 1202 Eastwood Road Wilmington, NC 28403 (910) 313-0795 �iseea50idg9� _ ,xID Revised December 2009 September 2009 Prepared by: NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 (Fax) NKT Project No. 07063 7Date Design A Sheet NORRIS, KUSKE &TUNSTALL 902 Market Street 'Z , CONSULTING ENGINEERS, INC. Wilmington, NC 28401-4733 vs . Of Check Job For Job No. CJt'LGS 1 07 C-4a 3 liw6% Cofi.C.c� LAr'hanS jVEf-r> �C-w(w-S 2 . of D4TV-0 4E;F- *-Z 4 ' &(tCS ,o Q.1 2 ° CCu-,. C440tJ5-- SF DA #1 - Veg Filter - 10 yr stm Worksheet for Rectangular Channel Project Description Project File h:lprojects12007107063 south bddgelcalcslflowmaster107063 ve.fm2 Worksheet SF DA#1 - Vag Filter Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.060000 ft/ft Bottom Width 25.00 ft Discharge 2.91 cfs Results Depth 0.06 ft Flow Area 1.54 ft2 Wetted Perimeter 25.12 ft Top Width 25.00 ft Critical Depth 0.07 ft Critical Slope 0.031353 ft/ft Velocity 1.89 ftls Velocity Head 0.06 ft Specific Energy 0.12 ft Froude Number 1.34 Flow is supercritical. 011-� I - -1 o r� -f>l ass 11/30/09 FlowMaster v5.13 12:53:57 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 SF DA #2 - Veg Filter - 10 yr stm Worksheet for Rectangular Channel Project Description Project File h:lprojects12007107063 south bridgelcalcslflowmaster107063 ve.fm2 Worksheet SF DA#2 - Vag Filter Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.005000 ft/ft Bottom Width 10.00 ft Discharge 3.55 cfs Results Depth 0.26 ft Flow Area 2.58 ft2 Wetted Perimeter 10.52 ft Top Width 10.00 ft Critical Depth 0.16 ft Critical Slope 0.025304 ft/ft Velocity 1.37 ft/s Velocity Head 0.03 ft Specific Energy 0.29 ft Froude Number 0.48 Flow is subcritical. QVIKL 2. 6 3 • t'7>1 ?h`'S 51-Y-vc xvxz ! • a z F?-O*% V"p` 11/30/09 FlowMaster v5.13 09:16:21 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 SF DA#3 - Veg Filter -10 yr stm Worksheet for Rectangular Channel Project Description Project File h:lprcjects12007107063 south bridgelcaicslflowmaster107063 ve.fm2 Worksheet SF DA#3 - Veg Filter Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.020000 fttft Bottom Width 25.00 ft Discharge 7.57 cfs Results Depth 0.15 ft Flow Area 3.82 ft2 Wetted Perimeter 25.31 ft Top Width 25.00 ft Critical Depth 0.14 ft Critical Slope 0.025532 fUft Velocity 1.98 ftts Velocity Head 0.06 ft Specific Energy 0.21 ft Froude Number 0.90 Flow is subcritical. Q•I1M = 11/30/09 FlowMaster v5.13 11:05:21 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 SF #4 - Veg. Filter -10 yr stm Worksheet for Rectangular Channel Project Description Project File h:\projects\2007\07063 south bridge\calcs\flowmaster\07063 ve.fm2 Worksheet SF DA#4 - Veg Filter Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.010000 ft/ft Bottom Width 10.00 ft Discharge 4.59 cfs Results Depth 0.24 ft Flow Area 2.45 ft2 Wetted Perimeter 10.49 ft Top V\fidth 10.00 ft Critical Depth 0.19 ft Critical Slope 0.024081 ft/ft Velocity 1.88 ft/s Velocity Head 0.05 ft Specific Energy 0.30 ft Froude Number 0.67 Flow is subcritical. ` Iwv t 3.41, c.--s fWvq\k ?-, eA5 r I•Is r.FS s---\ P&-Fw� f e 11/30/09 FlowMaster v5.13 09:18:25 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 SF #5 - Veg. Filter - 10 yr stm Worksheet for Rectangular Channel Project Description Project File h:lprojects\2007107063 south bridgelcalcs\flowmaster\07063 ve.fm2 Worksheet SF DA*5 - Veg Filter Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.010000 ft/ft Bottom Width 10.00 ft Discharge 4.64 cfs Results Depth 0.25 ft Flow Area 2.46 fta Wetted Perimeter 10.49 ft Top Width 10.00 ft Critical Depth 0.19 ft Critical Slope 0.024032 ft/ft Velocity 1.88 ft/s Velocity Head 0.06 ft Specific Energy 0.30 ft Froude Number 0.67 Flow is subcritical. 3. s+ �,Fs ;$..A 'f I. • t3 cj=�; fir- Q� ram 11/30/09 FlowMaster v5.13 09:19:12 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 SF NA - Veg. Filter -10 yr stm Worksheet for Rectangular Channel Project Description Project File h:\projects12007107063 south bddgelcaicslflowmaster107063 ve.fm2 Worksheet SF DA#6A - Veg Filter Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.060000 ft/ft Bottom Width 10.00 ft Discharge 6.66 cfs Results Depth 0.37 ft Flow Area 3.71 ftz Wetted Perimeter 10.74 ft Top Width 10.00 ft Critical Depth 0.24 ft Critical Slope 0.249671 ft/ft Velocity 1.79 ft/s Velocity Head 0.05 ft Specific Energy 0.42 ft Froude Number 0.62 Flow is subcritical. QIMVI- af'.4Iv or'S Flaw N.s. t.ZZl Gl*� Gaew- YCCRA-t� �de- 12/03/09 FlowMaster v5.13 04:10:22 PM Haestad Methods, ine. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 SF #66 - Veg. Filter - 10 yr stm Worksheet for Rectangular Channel Project Description Project File h:lprojects12007\07063 south bridgelcalcslflowmaster107063 ve.fm2 Worksheet SF DA#613 - Veg Filter Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.010000 ft/ft Bottom Width 10.00 ft Discharge 4.83 cfs Results Depth 0.25 ft Flow Area 2.52 ft2 Wetted Perimeter 10.50 ft Top Width. 10.00 ft Critical Depth 0.19 ft Critical Slope 0.023850 ft/ft Velocity 1.91 ft/s Velocity Head 0.06 ft Specific Energy 0.31 ft Froude Number 0.67 Flow is subcritical. QT..14- z 3 • t.� F� i�pkss 11/30/09 FlowMaster v5.13 09:23:20 AM Haestad Methods, ine. 37 Brookside Road Waterbury, CT 067u6 (203) 755-1666 Page 1 of 1 Pond #13 - Veg Filter - 10 yr stm Worksheet for Rectangular Channel Project Description Project File h:\projects\200A07063 south bridgelcalcslflowmaster107063 ve.fm2 Worksheet Pond DA#13 - VPg Filter Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.080000 ft/ft Bottom Width 25.00 ft Discharge 0.26 cfs Results Depth 0.01 ft Flow Area 0.33 ftz Wetted Perimeter 25.03 ft Top Width 25.00 ft Critical Depth 0.01 ft Critical Slope 0.053286 ft/ft Velocity 0.78 ft/s Velocity Head 0.01 ft Specific Energy 0.02 ft Froude Number 1.20 Flow is supercritical. 12/03/09 FlowMaster v5.13 10:43:04 P.M uaestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Pond #14 - Veg Filter -10 yr stm Worksheet for Rectangular Channel Project Description Project File h:lprojects12007\07063 south bridgelcalcs\flowmaster107063 ve.fm2 Worksheet Pond DAA14 - Veg Filter Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 0.100000 ft/ft Bottom Width 25.00 ft Discharge 0.83 cfs Results Depth 0.02 ft Flow Area 0.62 ft2 Wetted Perimeter 25.05 ft Top Width 25.00 ft Critical Depth 0.03 ft Critical Slope 0.041247 ft/ft Velocity 1.33 ft/s Velocity Head 0.03 ft Specific Energy 0.05 ft Froude Number 1.49 Flow is supercritical. D . 6 3 Naop cv %% f'P?- 12/03/09 FlowMaster v5.13 10:44:16 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, Gt 08708 (203) 755-1666 Page 1 of 1 07063 Pre -Post 12-11-09 Type 11 24-hr 07063 Syr -24hr Rainfall=3.67" Prepared by {enter your company name here} HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 12/14/9nnA Pond SF#2: Filter #2 Inflow Area = 1.090 ac, Inflow Depth > 2.16" for 07063 1yr -24hr event Inflow = 3.61 cfs @ 12.02 hrs, Volume= 0.196 of Outflow = 0.87 cfs @ 12.23 hrs, Volume= 0.197 af, Atten= 76%, Lag=12.9 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 0.87 cfs @ 12.23 hrs, Volume= 0.197 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 7.00' Surf.Area= 575 sf Storage= 50 cf Peak Elev= 10.04' @ 12.23 hrs Surf.Area= 3,347 sf Storage= 2,475 cf (2,424 cf above start) Flood Elev= 12.00' Surf.Area= 4,602 sf Storage= 8,150 cf (8,100 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 13.6 min ( 832.8 - 819.2 ) Volume Invert Avail.Storage Storage Description #1 6.67' 456 cf Custom Stage Data (Prismatic) Listed below (Recalc) 1,833 cf Overall -10 cf Embedded =1,822 cf x 25.0% Voids #2 6.67' 10 cf 4.0"D x 30.001 Horizontal Cylinder S= 0.00507 x 4 Inside #1 #3 9.00, 7,685 cf Custom Stage Data (Prismatic) Listed below (Recalc) 8,150 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 6.67 492 0 0 9.00 1,081 1,833 1,833 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 9.00 1,602 0 0 12.00 3,521 7,685 7,685 Device Routing Invert Outlet Devices #1 Primary 7.00' 15.0" x 20.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 6.50' S= 0.02507' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 10.70' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 6.67' 4.0" Vert. Discharge Orrice from Underdrain C= 0.600 #4 Secondary 6.67' 1.750 in/hr Infiltraion through Filter Media over Surface area above invert Excluded Surface area = 492 sf #5 Discarded 11.00' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.54 2.53 2.64 2.64 2.63 07063 Pre -Post 12-11-09 Type ff 24-hr 07063 1yr -24hr Rainfaff=3.67" Prepared by (enter your company name here) HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 12/14/2009 Discarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=7.00' (Free Discharge) '?-'-�€mergency Spillway ( Controls 0.00 cfs) Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=7.00' (Free Discharge) t1=Culvert ( Controls 0.00 cfs) t-2=13affle Wall ( Controls 0.00 cfs) econdary OutFlow Max=0.87 cfs @ 12.23 hrs HW=10.04' (Free Discharge) 3=Discharge Orfice from Underdrain (Orifice Controls 0.75 cfs @ 8.6 fps) -Infiltralon through Filter Media (Exfiltraticn Controls 0.12 cfs) 3 1L 21- imi Pond SF#2: Fitter #2 Hydrograph 3.61 ft y :nflow Area=1.:090 a Perak EIev=10.04' Storage=2A7v cf i . I : Muds 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Time (hours) 07063 Pre -Post 12-11-09 Type II 24-hr 07063 Syr -24hr Rainfall=3.67" Prepared by {enter your company name here} HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 12/14/2009 m w c 0 m W Pond SF#2: Filter #2 Stage -Discharge Discharge (cfs) 0 Total 171 Discarded 0 Prmary ❑ Secondary 07063 Pre -Post 12-11-09 Prepared by {enter your company name here} HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Sof Type 1124-hr 07063 1 yr -24hr Rainfall=3.67" LLC Stage -Area -Storage for Pond SF#2: Filter ##2 Eievation Surface Storage (feet) (sq-ft) (cubic -feet) 6.67 492 0 6.77 517 13 6.87 543 29 6.97 568 45 7.07 593 62 7.17 618 77 7.27 644 93 7.37 669 109 7.47 694 126 7.57 720 144 7.67 745 162 7.77 770 181 7.87 795 201 7.97 821 221 8.07 846 242 8.17 871 263 8.27 896 286 8.37 922 308 8.47 947 332 8.57 972 356 8.67 998 380 8.77 1,023 406 8.87 1,048 431 8.97 1,073 458 9.07 2,728 580 9.17 2,792 748 9.27 2,856 922 9.37 2,920 1,103 9.47 2,984 1,290 9.57 3,048 1,483 9.67 3,112 1,683 9.77 3,176 1,889 9.87 3,240 2,102 9.97 3,303 2,321 10.07 3,367 2,546 10.17 3,431 2,778 10.27 3,495 3,016 10.37 3,559 3,261 10.47 3,623 3,512 10.57 3,687 3,769 10.67 3,751 4,033 10.77 3,815 4,304 10.87 3,879 4,580 10.97 3,943 4,863 11.07 4,007 5,153 11.17 4,071 5,448 11.27 4, i 35 5,751 11.37 4,199 6,059 11.47 4,263 6,374 11.57 4,327 6,696 11.67 4,391 7,023 11.77 4,455 7,358 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 11.87 4,519 7,698 11.97 4,583 8,045 07063 Pre -Post 12-11-09 Type 11 24-hr 07063 Syr -24hr Rainfall=3.67" Prepared by {enter your company name here} HydroCADO 7.10 s/n 000479 © 2005 HvdroCAD Software Solutions LLC 12/14/2009 Pond SF#4: Filter #4 Inflow Area = 2.590 ac, inflow Depth > 2.08' for 07063 1 yr -24hr event Inflow = 8.27 cfs @ 12.02 hrs, Volume= 0.448 of Outflow = 1.06 cfs @ 12.43 hrs, Volume= 0.449 af, Atten= 87%, Lag= 24.9 min Discarded = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 1.06 cfs @ 12.43 hrs, Volume= 0.449 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.02 hrs / 5 Starting Elev= 9.00' Surf.Area= 317 sf Storage= 29 cf Peak Elev= 12.61' @ 12.43 hrs Surf.Area= 6,337 sf Storage= 7,215 cf (7,185 cf above start) Flood Elev= 14.00' Surf.Area= 8,092 sf Storage= 15,783cf (15,754 cf above start) Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 50.0 min ( 872.5 - 822.5 ) Volume Invert Avail.Storage Storage Description #1 8.67' 363 cf Custom Stage Data (Prismatic) Listed below (Recalc) 1,471 cf Overall -18 cf Embedded = 1,453 cf x 25.0% Voids #2 8.67' 18 cf 4.0"D x 52.00'L Horizontal Cylinder S= 0.0050 'l' x 4 Inside #1 #3 11.00, 15,402 cf Custom Stage Data (Prismatic) Listed below (Recalc) 15,783 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 8.67 193 0 0 11.00 1,070 1,471 1,471 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 11.00 3,246 0 0 14.00 7,022 15,402 15,402 Device Routing Invert Outlet Devices #1 Primary 9.00' 18.0" x 50.0' long Culvert X 2.00 CMP, square edge headwall, Ke= 0.500 Outlet Invert= 8.00' S= 0.0200 7' Cc-- 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 12.85' 3.0' long x 0.5' breadth Baffle Wall Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Secondary 8.67' 4.0" Vert. Discharge Or%ce from Underdrain C= 0.600 #4 Secondary 8.67' 1.750 in/hr Infiltration through Filter Media over Surface area above invert Excluded Surface area =193 sf #5 Discarded 13.00' 20.0' long x 16.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 07063 Pre -Post 12-11-09 Type 1124-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by (enter your company name here) HydroCADO 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 12/14/2009 iscarded OutFlow Max=0.00 cfs @ 0.00 hrs HW=9.00' (Free Discharge) =Emergency Spillway ( Controls 0.00 cfs) Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=9.00' (Free Discharge) t-1=Culvert ( Controls 0.00 cfs) t2=13affle Wall ( Controls 0.00 cfs) condary OutFlow Max=1.06 cfs @ 12.43 hrs HW=12.61' (Free Discharge) 3=Discharge Orfice from Underdrain (Orifice Controls 0.82 cfs @ 9.3 fps) —infiltration through Filter Media (EAltration Controls 0.25 cfs) it Inflow E3 Outflow M Discarded E3 Primary E7 Secondary !fir / s%l'/,�///�.,------------------ 07063 Pre -Post 12-11-09 Type 11 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by {enter your company name here} HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 12/14/2009 Pond SF#4: Filter #4 Stage -Discharge p Total - ® Discarded 14- ...__,- ----- -- © Primary i7 Secondary 12 a +-...__. m ' w 10 d 9 Psch$v' rfx.e from . - E97p_ y 0 5 10 15 20 25 30 35 40 45 50 55 60 65 Discharge (cfs) 07063 Pre -Post 12-11-09 Type // 24-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by {enter your company name here} HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 12/14/2009 Stage -Area -Storage for Pond SF#4: Filter #4 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 8.67 193 0 8.77 231 6 8.87 268 14 8.97 306 26 9.07 344 38 9.17 381 49 9.27 419 60 9.37 456 70 9.47 494 82 9.57 532 95 9.67 569 109 9.77 607 124 9.87 645 139 9.97 682 156 10.07 720 173 10.17 758 192 10.27 795 211 10.37 833 232 10.47 871 253 10.57 908 275 10.67 946 298 10.77 983 322 10.87 1,021 347 10.97 1,059 373 11.07 4,404 612 11.17 4,530 951 11.27 4,656 1,304 11.37 4,782 1,669 11.47 4,908 2,046 11.57 5,033 2,436 11.67 5,159 2,839 11.77 5,285 3,254 11.87 5,411 3,682 11.97 5,537 4,122 12.07 5,663 4,575 12.17 5,789 5,041 12.27 5,915 5,519 12.37 6,040 6,010 12.47 6,166 6,513 12.57 6,292 7,029 12.67 6,418 7,557 12.77 6,544 8,099 12.87 6,670 8,652 12.97 6,796 9,218 13.07 6,921 9,797 13.17 7,047 10,389 13.27 7,173 10,993 13.37 7,299 11,609 13.47 7,425 12,239 13.57 7,551 12,880 13.67 7,677 13,535 13.77 7,803 14.202 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 13.87 7,928 14,881 13.97 8,054 15,573 Pusey, Steven From: Pusey, Steven Sent: Tuesday, December01, 2009 12:14 PM To: 'Jody Bland' Cc: 'Amy; 'John Tunstall' Subject: RE: South Bridge Subdivision Jody, Your plan sounds feasible, therefore, please continue as planned. You may consider this our formal request for additional information, which was originally started on Nov. 20. Therefore, your deadline is Dec. 18. 1 hope this is enough time for you to complete. Please advise if you need extra time or have any questions. Regards, Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. PuseyCa ncdenr.gov E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. From: Jody Bland [mailto:jbland@nkteng.com] Sent: Tuesday, November 24, 2009 5:26 PM To: Pusey, Steven Cc: 'Amy; 'John Tunstall' Subject: RE: South Bridge Subdivision Hi Steve, Sorry I haven't been able to respond to you since our telephone conversation earlier today but please see my responses below. Thanks, Jody Bland . NORRIS. KUSKF TUNS TALL Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 From: Pusey, Steven [mailto:steven.pusey@ncdenr.gov] Sent: Friday, November 20, 2009 2:40 PM To: Bland, Jody; Tunstall, John Subject: South Bridge Subdivision I have some questions and requirements regarding your latest submittal. Can you please advise on the following items? 1. What are the flow rates and velocities for a 10-year storm through the vegetative filter areas? I will provide the 10 yr storm discharge through the vegetated filters. 2. Please complete a filter strip Supplement and O&M Agreement for each vegetated filter strip. The filter strip supplement and O & M will be executed and submitted 3. Please complete an infiltration basin Supplement and O&M Agreement for each infiltration area in the project. Reference drawing sheet C5. The infiltration supplements and O & M agreements for the secondary treatment areas will be executed and submitted 4. Please advise whether you plan to effectively infiltrate into the vegetated filter strip or into the wetlands, or both. In the filter strip area, the filter strip must include a level spreader to provide diffuse flow. Size of level spreader should be such that flow is non -erosive into wetlands (i.e.- less than 2 ft/s). Based on our previous meeting; it was our understanding that utilizing a slotted sock pipe that was capped on the end as a means to provide diffuse flow at a non -erosive was an acceptable alternative to the typically required level spreader. A calculation; illustrating that the discharge from the sock pipes was less than 2 ft/sec; was provided for the 1 yr storm. As indicated above; additional calculations will be provided for the 10 yr storm as well. 5. If infiltrating into the wetlands, please provide calculations to show effective infiltration. Based on our previous meeting; it was our understanding; and from guidance obtained in the meeting; that it would be assumed that effective infiltration would take place if we removed the indications of any vegetated filters being contained in whole or part within the wetlands. By doing so places any discharge from the BMP's an excessive distance from MHW. Finally; based on our previous telephone discussion; the under drains discharge to the slotted "sock" pipes. A solid plastic line will connect the under drain system to the discharge point and no additional discharge will be picked up if the aforementioned drain line crosses a berm or swale. All line will discharge to daylight and none are to remain underground. I will clarify the solid line from the slotted line by modifying the line type of the solid line so that you may better differentiate between the two. Please let me know if you have any questions. Thanks, Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Steven. Pusey@ncdenr.lov E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties. Pusey, Steven From: Jody Bland abland@nkteng.com] Sent: Tuesday, November 24, 2009 5:26 PM To: Pusey, Steven Cc- 'Amy'; 'John Tunstall' Subject: RE: South Bridge Subdivision Hi Steve, Sorry I haven't been able to respond to you since our telephone conversation earlier today but please see my responses below. Thanks, Jody Bland %O_R1415, iGl]SKf ,%�. JN TALL G F_ by 6 t N, 'Cf_ R. a . .mow. Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 From: Pusey, Steven [mailto:steven.pusey@ncdenr.gov] Sent: Friday, November 20, 2009 2:40 PM To: Bland, Jody; Tunstall, John Subject: South Bridge Subdivision I have some questions and requirements regarding your latest submittal. Can you please advise on the following items? 1. What are the flow rates and velocities for a 10-year storm through the vegetative filter areas? I will provide the 10 yr storm discharge through the vegetated filters. 2. Please complete a filter strip Supplement and O&M Agreement for each vegetated filter strip. The filter strip supplement and O & M will be executed and submitted 3. Please complete an infiltration basin Supplement and O&M Agreement for each infiltration area in the project. Reference drawing sheet C5. The infiltration supplements and O & M agreements for the secondary treatment areas will be executed and submitted 4. Please advise whether you plan to effectively infiltrate into the vegetated filter strip or into the wetlands, or both. In the filter strip area, the filter strip must include a level spreader to provide diffuse flow. Size of level spreader should be such that flow is non -erosive into wetlands (i.e.- less than 2 ft/s). Based on our previous meeting; it was our understanding that utilizing a slotted sock pipe that was capped on the end as a means to provide diffuse flow at a non -erosive was an acceptable alternative to the typically required level spreader. A calculation; illustrating that the discharge from the sock pipes was less than 2 fUsec; was provided for the 1 yr storm. As indicated above; additional calculations. will be provided for the 10 yr storm as well. 5. If infiltrating into the wetlands, please provide calculations to show effective infiltration. Based on our previous meeting; it was our understanding; and from guidance obtained in the meeting; that it would be assumed that effective infiltration would take place if we removed the indications of any vegetated filters being contained in whole or part within the wetlands. By doing so places any discharge from the BMP's an excessive distance from MHW. Finally; based on our previous telephone discussion; the under drains discharge to the slotted "sock" pipes_ A Solid plastic line will connect the under drain system to the discharge point and no additional discharge will be picked up if the aforementioned drain line crosses a berm or swale. All line will discharge to daylight and none are to remain underground. I will clarify the solid line from the slotted line by modifying the line type of the solid line so that you may better differentiate between the two. Please let me know if you have any questions. Pusey, Steven From: Johnson, Kelly Sent: Friday, November 20, 2009 9:19 AM To: Pusey, Steven Subject: FW: Update on New LSNFS guidance This should answer your Southbridge filter strip questions. 114 From: Lewis,Linda Sent: Thursday, November 19, 2009 11:50 AM To: Baker, Chris; Cox, David; Hammers, Angela; Russell, Janet; Casmer, Jo; Johnson, Kelly; Lau, Aisha; Naugle, Mary; Nelson, Christine; Pusey, Steven; Scott, Georgette; Shiver, Rick; Weaver, Cameron Subject: Update on New LS/VFS guidance It appears that the proposed new level spreader guidance for the coast will cut the required length of level spreader to 5 feet per cfs (10 year storm peak flow) when the VFS slope is 0-3.5%. For VFS slopes 3.5-5%, the required length will be 6.5 feet per cfs. This is based on achieving a non -erosive flow in the filter. Unless Bill Hunt comes up with some changes to this, it will probably be our new guidance. Another issue is where a VFS is proposed within the buffer and within a wetland. The new 2008 coastal rules specifically allow "buffers and filters required by the stormwater rules, to contain, in whole or in part, 401 wetlands". This has understandably caused some confusion when a project proposes to locate the filter strip in a wetland. It would appear on the surface that the rules allow grading in a wetland. Filter strips in a wetland are not considered good engineering practice. We have always subscribed to the understanding that where one program's requirements were less stringent than another, the more stringent should apply. Grading is allowed in the stream buffer under stormwater rules, but that should not translate to permission to grade in the wetlands without a 401/404 permit. The new LS guidance is scheduled to be released on December 1 and will most likely become effective on February 1, 2010. Linda Please note my new email address is Linda.Lewis@ncdenr.gov Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. NORRIS, KUSKE &TUNSTALL CONSULTING ENGINEERS, INC. November 12, 2009 Mr. Steve G. Pusey, Environmental Engineer NC DENR / Division of Water Quality Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: South Bridge Subdivision — Phase I State Stormwater Permit No. SW8 090903 Sneads Ferry, NC NKT Project No. 07063 Dear Mr. Pusey: J. Phillip Norris, P.E. John A. Kuske, III, P.E. John S.Tunstall, P.E. J.A. Kuske, P.E. of Counsel RECD UfaT t 2 Z009 Per your Request for Additional Information letter dated October 27, 2009, we offer the following responses: v1. The proposed deed restrictions were originally provided to you. The Deed Restrictions are correct. The residential Deed Restrictions will apply to Drainage Areas 1-613. The commercial Deed Restrictions will apply to Drainage Areas 7-14. The number of lots identified within each drainage area has been recounted and verified. The calculations have been updated to reflect any corrections. 1 2.} All discharges for the 1-year storm that is in excess of the required storage volume is �r now being routed to a minimum 25 foot long perforated drain pipe for diffusion prior to entering wetlands. All vegetated filter strips have been moved outside of any wetlands. The wet detention ponds that reside within the % mile line now discharge to secondary infiltration areas. See the calculations for velocity calculation regarding perforated pipe discharges. ✓3. All VFS have been removed from the wetlands. V4. No swales are proposed to discharge directly to wetlands. ,5. ? The stage -storage graphs have been replaced with stage -storage tables from the _" HydroCad modeling software (see calculations). Note that the calculated volume within ? the supplement does not take into account the slopes sides of the basin. Therefore, the total available storage found on the HydrCad calculations differs from the NC DENR supplement. 6.) The formulas have been added to reflect the operation performed within the `-' spreadsheet. An example calculation has been provided for your review. 7. The requested additional information has been added to the sand filter details: a. Weir elevations within the sand filter. b. See HydroCad storage tables. Baffle wall tops are set at or above required storage volume. 902 Market Street -Wilmington, NC 28401-4733 - Phone: 910.343.9653 - Fax: 910.343.9604 Mr. Steve G. Pusey / NC DENR November 12, 2009 Page 2/ c. Hmax indication on the open sand filter detail. Please note that our submittal package was accepted on September 3, 2009. Additional guidance regarding sand filters was issued and the BMP Manual chapter was revised on September 20, 2009. The current sand filter design is consistent with the cross sectional detail found on each supplement. J8. Descriptions have been added to clarify the discharge conditions and their purpose within the HydroCad calculations. 9. SHWT elevations have been added to the wet detention pond detail sheets. J 10. All supplements have been filled out completely. / 11. As discussed during our meeting, the reasoning for the utilization of dual pipes rather than the typical forebay berm is based on aesthetic concerns from our client and the clients request to minimize possible maintenance issues associated with forebay berms between the forebay and main pond. J 12. A 50' buffer line is identified on the plans from the MHW line. No BUA is proposed within this area. 13. All proposed BMP's are located outside of any wetlands and are landward of the MHW line. 14. The plans have been reviewed for consistency. Enclosed are two (2) sets of revised plans, which includes the drainage area plans, one (1) set of revised calculations, the revised Page 3 of the State Stormwater permit application, the revised SW-401 Sand Filter Supplement forms (Drainage Areas 1, 2, 3, 4, 5, 6A and 613), the revised SW-401 Wet Detention Basin Supplement forms (Drainage Areas 7-12, 13A & 13B and 14) and the revised Wet Detention Basin Operation and Maintenance Agreement forms (Drainage Areas 7-12, 13A & 13B and 14). Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. Jo Skt ns P. E. JST/asn 07063 11-12-09-s-sw response-Itr Enclosures cc: Raiford Trask, Jr. Pusey, Steven From: Pusey, Steven Sent: Friday, October 30, 2009 10:49 AM To: 'Amy'; Johnson, Kelly Cc: 'Jody Bland'; jtunstall@nkteng.com Subject: RE: South Bridge Subdivision (NKT #07063) Amy, Thanks for the information. I would like to expand on your item #3. We advise that you refer to the Guidance Document from March, 2009 regarding vegetated filter requirements for sand filters. See the link below: http://h2o.enr.state.nc.us/su/documents/SandfiIteroverflow-bypass Original pdf Also mentioned in your item#3, effective infiltration will be evaluated for each BMP where necessary, based on your next submittal. It is assumed that the design storm effectively infiltrates in a vegetated area provided that vegetated area meets the vegetated filter strip requirements in the stormwater rules and the BMP manual. The design must take into account the soil type, vegetated cover, and slope of the vegetated area. The design must also provide a properly designed level spreader to deliver diffuse flow at a non -erosive velocity to the vegetated area. Finally, the elevation of the vegetated area cannot be below the SHWT and still be expected to effectively infiltrate. We will review and get back with you on the following issues: 1. Recommendation for sand filter covers 2. Baffle wall height determination Regards, Steve Pusey Environmental Engineer NC DENR - Division of Water Quality Surface Water Protection Tel: (910) 796.7215 Fax: (910) 350-2004 E-mail: Stev_en.Pusev@ncdenr.00v Please note email address has chanced. E-mail correspondence to and from this address may be subject to the NC Public Records Law and may be disclosed to third parties From: Amy [mailto:anorris@nkteng.com] Sent: Friday, October 30, 2009 9:57 AM To: Pusey, Steven; Johnson, Kelly Cc: 'Jody Bland'; jtunstall@nkteng.com Subject: South Bridge Subdivision (NKT #07063) Steve & Kelly, Attached (PDF) are the Meeting Minutes from yesterday's meeting at NC DENR on the above subject project review Please review and let us know if there is something you do not agree with. Thanks, NORRIS, KUSKE &TU NSTAL.L CONSULTING ENGINEERS, South Bridge Subdivision Meeting Minutes INC. October 29, 2009 at 10:00 AM at NC DENR Attendees: John S. Tunstall, P.E. / Norris, Kuske & Tunstall Consulting Engineers, Inc. Jody Bland / Norris, Kuske & Tunstall Consulting Engineers, Inc. Steve Pusey, Environmental Engineer / NC DENR Kelly Johnson, Environmental Engineer / NC DENR J. Phillip Norris, P.E. John A. Kuske, III, PE. John S.Tunstall, P.E. J.A. Kuske, P.E. of Counsel The meeting took place to discuss the comment letter issued on October 27, 2009 by Steve Pusey of NC DENR. 1. Specify which drainage areas the residential deed restrictions apply to - Identify portions of the property to be held as common area. Update the Drainage Area Table on the drainage area sheet. 2. Refers specifically to DA #3 pond. Since a portion of the drainage area resides within the % mile line, we must adhere to rules governing within the l mile and draining. 3. VFS must be located outside of the wetland boundaries. Level spreader and filter strips are required, if used to meet effective infiltration requirements. Ok to use USDA values for effective infiltration. 4. 5. 6. 7. 8. 9. N/A — no swales discharge directly to wetlands. Provide storage data tables rather than storage / elevation graphs in the calculations from HydroCad. Expand / explain the drawdown calculations = explain limiting factors based on soil K values. Identify additional items as requested within the details. Discharges from HydroCad calculations were explained. SHWT to be noted on the details. 902 Market Street • Wilmington, NC 28401-4733 • Phone: 910.343.9653 • Fax: 910.343.%04 South Bridge Subdivision Meeting Minutes October 29, 2009 10. SHWT to be filled out in the supplements. 11. Forebay I main pond piping was explained. 12. Clearly identify MH waterline on the plans and identify the 50' buffer from the MH waterline and note that no BUA is to be installed within the buffer. 13. Ensure that no BMP's encroach within the wetland area. 14, Ok. Additional Comments I Discussion: 1. "Use good Engineers judgement' when determining SHWT for large areas (i.e. regional ponds). Typical method is to provide a minimum of 3 bores and average results. 2. Discussed the sand filter weir elevation at the top of the sheet pile wall and why it should not be set at the top of the structure. 3. Discussed how storage volume was determined as well as Hmax. 4. Kelly Johnson of NC DENR agreed with our "good housekeeping" practice of installing emergency spillways above the required storage elevation to prevent major failure during hurricanes, etc. 5. Discussed the issue of 4" of topsoil and grassing on top of the sand filters. A more viable solution may be to line the sand filter areas with pea.gravel. Jsrrkbtasn 0706310-29-09-"w-mt9. notes A7 w� CCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director October 217, 2C09 Raiford G. Trask, Jr., Manager and Trustee BC & RT, LLC 1202 Eastwood Road Wilmington, NC 28403 Subject: Request for Additional Information Stormwater Project No. SW8 090903 South Bridge Subdivision — Phase 1 Onslow County Dear Mr. Trask: Dee Freeman Secretary The Wilmington Regional Office received and accepted a State Stormwater Management Permit Application for South Bridge Subdivision on September 3, 2009. A preliminary in-depth review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Please provide a copy of the proposed deed restrictions to include all required conditions and limitations. One of the current documents submitted refers to 2,800 sf / lot. Is this for drainage areas 1 to 7A? Lots are not shown on plans for drainage area 7A. Also, number of lots does not match for all drainage areas. Please review and advise. 2. Please eliminate all direct discharges to SA waters. For projects subject to the 2008 coastal rules, which are within % mile of and draining to SA waters, the discharge from the wet pond must be directed into a secondary BMP. The vegetated filter strip can qualify as the secondary BMP if the consultant can demonstrate that the design storm infiltrates completely within the filter and there is no discharge to surface waters. 3. If used for infiltration, the vegetated filter strip (VFS) cannot be located below the SHWT. Also, concerning location, the VFS cannot be located in the wetlands and must be landward of the mean high water line. 4. Swales with velocities in excess of 2 fps that discharge to wetlands must provide a velocity reduction device such as a level spreader, which provides non -erosive diffuse sheet flow into and through the wetland. 5. Please show your calculation of total provided storage volume in the sand filter to show that it is equal to or greater than the adjusted volume. 6. Please show your calculations of sand filter drawdown time, controlled by orifice and/or filter media. 7. Please check the values and show the following information on the sand filter drawing detail sheets: a. Weir elevation on cross-section of sand filter and bypass structure b. Top of storage elevation on cross-section of bypass structure C. Hma,r on cross-section of sand filter (between top of sand & weir) Wilmington Regional Office 127 Cardinal Drive Extension., Wilmington, North Carolina 28405 Phone: 910-796-72151 FAX: 910-350-20041 Customer Service: "77-623-6748 One Cam.© �a Internet: vrww.ncwaterquallty.org tllrQ!! An Equal Opportunity 1 Affirmative Action Employer k BC & RT, LLC and Raiford Trask, Jr. October 27, 2009 Stormwater Application No. SW8 090903 Explain secondary outflow on Hydrocad spreadsheet. It shows 0.7 cfs at 8.1 fps to the wetlands? 9. Please make a note of the SHWT elevation on the wet pond sectional drawings. 10. Please ensure that the SHWT amount is filled in on supplements for both wet ponds. 11. Explain reason for using dual pipes in lieu of a vegetated forebay berm on the wet ponds. 12. Please show a 50' buffer line from the MHW line on all plan sheets. No BUA is allowed in this buffer. 13. BMPs can be located in the buffer but cannot be located in wetlands area, and must be landward of the MHW line. 14. Please remember that a change to one number may have a domino effect on other numbers. Please check all plans, calculations and forms and make changes as needed. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to November 19, 2009, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at steven.pusey@ncdenr.gov. Sincerely, i .-'�t le';? - Steve G. Pusey Environmental Engineer GDS/sgp: S:\WQS\STORMWATER\ADDINFO\2009\090903.oct09 cc: John Tunstall, PE — Norris, Kuske, & Tunstali Consulting Engineers, Inc. Steve Pusey Wilmington Regional Office Stormwater File Page 2 of 2 Project Name: 0 Reatwer: ! Date: 9 8 d Project Received Date: q -9 IeA 'Acce tee acted, circle one Project Location: L Add in o re uired (yes/ o))Date received: I Symbols for completing form- '✓'= Yes/OK 'x'= No/Deficient 'n/a' or'1' or'/' Rule(s) Subject (check all that apply), ❑ 1995 Coastal I.eP2008 Coastal ❑ Phase II ❑ Universal Papeerwoo k. Ct7 Check for $505 (must be no older than 6 months) Er'Application form with correctloriginal signatures (original plus 1 copy) If Corporation or LLC also: o Print the info from the NCSO5 o Either, 1.) The applicant is listed on the NCSOS with his/her correct title or, 2.) A notarized letter of authorization has been provided: Omc ?) &O'Supplements (1 original per BMP). BMP type(s): 5a7A.QXU -- % i-,� i�ae�� ° a (M}s� SA Iwo D"^O&M with correct/original signatures (1 original per BMP, except level spreaders/filter strips and swales) C21"'Deed restrictions (if outparcel or subdividing) (original plus 1 copy) o Deed restriction template (signed and notarized) or o Proposed Declaration of Covenants and Restrictions (signed and notarized) Soils report identifying the SHWT C]�Supporting calculations, signed & sealed (if necessary) E "`'Receiving stream classification: 5A % fthy`1 , If SA or ORW also- o SA USGS topo map with the site, the receiving waters and the % mile radius shown to scale. o ORW: 575 ft of MHWL for Area of Environmental Concern and max BUA per rule. Modifications 1 ) If built: Designer's Cert., 2 ) If partially built Partial Cart, 3 ) If not built. No Cert needed. Development Type (check all that apply): V esidential or ElCommercial ❑ Deed restrictions match? ubdivision or ❑ Single Lot ❑ Deed restrictions match? 5"'O'High Density or ❑ Low Density 13 Deed restrictions match? 0%#1 ❑ Offsite protect ® Redevelopment ® Modification ❑ Exempt 441t�,❑ NCG02 (bulkhead) ❑ NCG03 (clear/grade) ❑ NCG04 (linear) Density ❑ BUA calculations include common areas, clubhouse, sidewalks, etc. ❑ BUA % , Matches high/low density requirement for rule and receiving stream class. ❑ No obvious math errors ❑ If High Density: Design storm correct for rule and receiving stream class. Plus, signed and sealed (2 sets): � ❑ Two sets received El Layout (with proposed BUA dimensions) G Grading ® Drainage area map (all HD systems & curb outlet swales) ® Vicinity map ❑ Project Boundaries ❑ Legend ❑ Wetlands: ❑ Details Delineated on plans o "No wetlands onsite" on plans o Roads o Cul-de-sacs o Curbing o Sidewalk o BMPs/ Level spreaders/ Filter strips/ Curb outlet swales o Buildings (Apts or Condos) Offsite Projects: ® De ner's Certification has been submitted for the Offsite BMP receiving the runoff from the project. ❑ eed restrictions have been recorded and a copy submitted for the Offsite BMP permit. Lot size has not changed from what was approved under the Master Plan. ❑ Correct lot number is referenced on the supplement form. ❑ Offsite system is in compliance with its permit, if known. Infiltrat' Projects: Soils report: SHWT, soil type, and expected infiltration rate are provided. ❑ DWQ has conducted a site visit? Date: Wet Ponds: Permanent Pool Meets One ofthe Following: pbM W3 - o'bAM'S I 1 5 ASAYA A .7% Ciro S 1 MAls located no lower than W below the estimated SHWT. wq%L #vo, _ 34Fwn6 r, ; S"nTl Li�incoming groundwater is quantified and evaluated, AND Storage volume verified, AND Outlet evaluatedlforieeSl drainage to the receiving waters under SHWT conditions. Decisiorheck one): C3' Complete- Return file to admin (Jo Casmer) to log in. (Stamped in received date = BIMS date) ❑ Slightly incomplete: E-mail consuitant, request information to be returned within one business day (24 hours after request. Info requests on Friday, allow a return on the following business day). If info not returned, issue an application return letter and give everything to admin. (Add info received date = BIMS date) ❑ Substantially incomplete. Issue an application return letter and give everything to admin. September 3, 2009 J. Phillip Norris, P.E. NORRIS, KUSKE &TUNSTALL John A.Kuske,111,RE. John S.Tunstall, P.E. CONSULTING ENGINEERS, INC. J.A.Kuske,RE. ofCounsel RECb Sef 0 3 zon q;1(,.D IV Ms. Kelly Johnson, Environmental Engineer NC DENR / Division of Water Quality Water Quality Section 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: State Stormwater Permit Resubmittal South Bridge Subdivision — Phase I Sneads Ferry, NC NKT Project No. 07063 Dear Ms. Johnson: p,mcniNnsn S E P 0 3 2009 In reference to your Application Return letter of July 1, 2009 we offer the following responses (in red) for our resubmittal: Pond 13, SA Waters: The receiving stream is SA/HQW. I see a summary in your calculations package comparing the 1.5" to the 1 yr 24 hr storm volume, and that the volume for the 1 yr 24 hr storm is greater. I also see that the treatment volume for the 1 yr 24 hr storm is used as the "design volume" for all of the sand filters on their supplements and the "volume provided" on the infiltration basin's supplement, which is correct. But, I am confused about the wet ponds. The SA sections of the two wet pond supplements (DA's 13 & 14) are not filled out, and the temporary pool volume reported on each supplement matches the non -SA volume values reported on the supplements. This may be because the outlet of each pond is outside of the half -mile radius for SA waters. However, a portion of the drainage area to Pond 13 is inside the half -mile line. Any BMP that has a drainage area (in whole or in part) within the half -mile line must meet the SA requirements. It appears that the entire drainage area for Pond 14 is outside of the half -mile line. If so, then Pond 14 is not subject to SA. Please correct any discrepancies related to this issue. Both ponds are outside of the % mile line and have been designed accordingly. Please see our previous e-mail correspondence. 2. Coastal Wetlands: This project excludes 4.63 acres of coastal wetlands. Coastal wetlands are shown on the cover page (DA) of the plan set, and wetlands are shown throughout the plan set. It appears that all of the wetlands onsite are coastal wetlands. Is that correct? No. Only 4.63 AC are identified as coastal wetlands. This is based on 15A NCAC 07H. 205 — Coastal Wetlands, which identifies coastal wetlands as salt marsh or other marsh which is influenced by tides. It must also contain specific vegetation types. 3. SHWT: 1. All BMP's used in the design: The soils report indicates the SHIWT depth. A map is provided as to the location of each bore, but I do not see a summary of 902 Market Street -Wilmington, NC 28401-4733 - Phone: 910.343.9653 - Fax: 910.343.9604 Ms. Kelly Johnson / NC DENR September 3, 2009 Page 2 the existing grade fmsl, the depth from that level to the SHWT, and the calculated SHWT fmsl. The boring markers on the plans show a center point, but the existing grade can only be estimated from this information. Please provide a summary table. A summary table nas peen provided for your use 2. Infiltration Basin: Has Vincent Lewis from our office been to the site to look at the soils? I do not see his report in the submittal package. Mr. Lewis' report must be submitted with any infiltration design before it is accepted for review. He can be reached at 910.796.7378. 1 took a quick look at the design, and it appears from the data provided that it will comply with the design requirements, but Vincent's report is still required for each infiltration basin project. (The soils report indicates that the SHWT at boring #10 in drainage area 7 is 52" (4.33') from the existing surface. The existing grade appears to be at 18 fmsl, which would put the SHWT at 13.66 fmsl. The bottom of the basin is at 16 fmsl, which would meet the BMP manual's requirement that the bottom of the basin be a minimum of 2ft above the SHWT). We spoke with Vincent Lewis, of your office, on Tuesday, July 21, 2009 about this comment. He stated that he did not send us a report and that his report was in your files at NC DENR. He went and spoke with you and then called us back to let us know you had everything you needed and we did not have to submit anything with our resubmittal. All infiltration basins have been redesigned into sand filters. 3. Wet Ponds: Both ponds are situated right next to wetland areas, which creates a potential for wetland impacts. You may be aware that the Division has issued wet pond SHWT guidance, which is available online at, http://h2o.enr.state.nc.us/su/documents/PondSHWT OriQinal.pdf, outlining specific guidance for dealing with SHWT concerns. In general, the permanent pool must be set no lower than 6" below the SHWT. This accomplishes 2 things: one, it assures that the adjacent wetlands will not be adversely impacted and two, it assures that sufficient volume will be available in the pond to store the design storm volume. If the permanent pool is located more than 6" below the SHWT, calculations must be provided demonstrating compliance with the four criteria as outlined in the guidance. 1. DA 14: From the soils report, it does not appear that a soil boring was done for this pond. The supplement also does not have a SHWT value reported. Please provide a SHWT determination for the pond. The / bore(s) should show a SHWT that is representative of the entire wet pond. J See attached Field Observation Report dated July 31, 2009. 2. DA 13: Why was Boring 61 drilled outside of the pond? The SHWT was found to be 54" (4.33') below the existing grade, which appears to be 20 fmsl, which puts the SHWT at 15.66 fmsl. The SHWT reported on the Ms. Kelly Johnson / NC DENR September 3, 2009 Page 3 supplement is 15.5 fmsl, which is in line with this value. The permanent pool is at 21 fmsl, which meets the 6" requirement. But, Boring B2 was drilled near (but outside of) the pond in a lower area also surrounded by wetlands. The SHWT was found to be 26" (2.17') below the existing grade, which appears to be 7.75 fmsl, which puts the SHWT at 5.58 fmsl. The SHWT level therefore varies greatly in this area. Please provide bore(s) that show a SHWT that is representative of the entire wet pond. ,ee attached Field Observation Report dated July 31, 2006. 4. Infiltration basin upper and lower infiltration areas: Why are there two areas? Are these two infiltration basins? They do not appear to be hydraulically connected other than to share a vegetated filter strip for the bypassed volume. If there are two basins, please provide two supplements. InfiltraLlun oasms nave been revised into sand filters. 5. Infiltration basin emergency spillways: Infiltration basins should be designed such that the excess volume bypasses the basin as opposed to entering the basin and spilling over, per 15A NCAC 2H .1008. Please reconfigure the design such that the emergency overflows are eliminated. Additionally, the basin could be redesigned to comply with one of the four options outlined in the infiltration policy document, found at http://h2o.enr.state.nc.us/su/documents/Infiltrationoverflow-bypass Original pdf. J Infiltration basins have been revised into sand filters. 6. Infiltration basin filter strip: Excess volume shall be evenly distributed across a vegetated filter. Please use the 10-year storm attenuated peak flow to determine the Level Spreader length, and consequently the Vegetated Filter Strip length, and provide a completed Level Spreader and Vegetated Filter Strip supplement and signed O&M. J Infiltration basins have been revised into sand filters. 7. Sand filter emergency spillways: As similar to the previous comment about infiltration basins, the excess design storm in a sand filter must be bypassed. Please eliminate the emergency overflows in the sand filters. JEmergency spillways have been removed from our design 8. Sand filter underdrains: There are three options to establish that there is "no direct discharge" to SA waters per SL2008-211, Section 2(b), (1)(c). Paraphrasing, Option 1 is to infiltrate the design storm. Option 2 is to provide diffuse flow at a non -erosive velocity to an area capable of providing effective infiltration, and Option 3 is to have a wet pond with a secondary BMP. It appears that you intend to comply with the second option for the sand filters in this design. Is that correct? A sand filter with an underdrain inside the liner can be Ms. Kelly Johnson / NC DENR September 3, 2009 Page 4 used in SA waters under Option 2 if the underdrain is directed non -diffusely and non-erosively to an area capable of providing effective infiltration. One option would be to install level spreaders (for diffuse flow) with 50-ft filter strips (both designed for the 10-year peak and demonstrating non -erosive velocity), and to also provide calculations that "effective infiltration" exists. Because this is a new rule, we have not had many projects seek to comply with the "effective infiltration" option. The rule does not define this term, unfortunately. This is an area where the Division is in the process of developing more guidance for implementation. In the meantime, if it can be shown that either the entire design storm will be infiltrated in the vegetated filter or that the infiltration rate of the soil in the filter is greater than the rate of water flowing to the filter, then I believe "effective infiltration" could be established. It is also not clear from the information provided that the energy dissipaters in the current design provide diffuse, non -erosive flow or that "effective infiltration" is provided. Please provide a discussion and supporting calculations as to how this design complies with SL2008-211, Section 2(b), (1)(c). Underdrains will discharge into a 4" - 6" perforated pipe for diffusion prior to entering vegetated buffer (see effective infiltration calculations which are enclosed). 7 9. Sand filter liners: If a sand filter is lined, it is considered a closed (as opposed to open) sand filter. 1. If the SHWT is as high as or higher than the bottom of the lined sand filter please provide anti -buoyancy calculations showing that the liner will be able to stay in place under the weight of the sand. ✓ An anti -buoyancy calculation is enclosed. 2. Please demonstrate that the liner will not contribute to draining the water table. ✓ Since the liners will be installed to prevent groundwater from infiltrating into the sand filters, no adverse affects to the water table is anticipated. 3. Please correct any applicable plan sheets that refer to lined open sand filters. See enclosed revised plans. 10. Wet Pond, DA14: Please label the wet pond on sheet C-4. ,i See enclosed revised plans. 11. Wet Pond, DA 13: Please label the wet pond on sheet C-5. JSee enclosed revised plans. Ms. Kelly Johnson / NC DENR September 3, 2009 Page 5 12. Master permit or plan: Is this project a part of a master permit or plan that was permitted for BUA previously? Is so, what is the permit number? If not, please submit a master plan for this development showing both Phase I and Phase II. This will help us keep track of the development as a whole. Please see, http://h2o.enr.state.nc.us/su/documents/MasterPlans Original.pdf, for further information. V No additional phases are planned for construction at this time. Only concept designs have been performed for additional phases. 13. Deed restrictions: The deed restriction for the commercial areas has an attachment of the BUA summary from the application package. This summary is missing the column from the left side indicating what numbers are in each row. Please add the descriptive column. Please see revised table. 14. Application BUA summary: Please also add the descriptive column to the application's BUA summary table. J mease see revised table Enclosed are two (2) sets of plans for the subject project, which includes the drainage area plans, one (1) set of calculations, one (1) copy of the stormwater narrative, one (1) USGS map, one (1) copy of the soils / infiltration system report, one (1) copy of the deed, one (1) copy of the Articles of Organization, one (1) copy of the Declaration of Covenants and Restrictions, the original Division of Water Quality Stormwater Management Permit application, the original SW-401 Sand Filter Supplement forms (Drainage Areas 1-12), the original SW-401 Wet Detention Basin Supplement forms (Drainage Areas 13-14), the original Sand Filter Operation and Maintenance Agreement forms (Drainage Areas 1-12), the original Wet Detention Basin Operation and Maintenance Agreement forms (Drainage Areas 13-14) and a $505.00 check for the permit review fee. Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. �J Jo S. Tun stall,, P. E. JST/asn 07063 09-03-09-s-sw resubmittal-Itr Enclosures cc: Raiford Trask, Jr. STORMWATER SYSTEM & EROSION CONTROL NARRATIVE SOUTH BRIDGE SUBDIVISION - PHASE I Sneads Ferry, North Carolina For BC & RT, LLC and Raiford G. Trask, Jr., Trustee 1202 Eastwood Road Wilmington, NC 28403 (910) 313-0795 September 2009 Prepared by: NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 (Fax) NKT Project No. 07063 NARRATIVE PHASE DESCRIPTION: The project site is a 185 acre tract located off of NC 172 in Sneads Ferry, North Carolina. The soils of the site consist of silty sands. The site is moderately wooded with grades ranging from 1 % to 20%. Approximately 29 acres will be graded for Phase I for future street right-of-ways, infrastructure installation, drainage & stormwater BMP installation. We will also install the culverts in the ditches within the right-of-ways during these construction phases. The runoff from the site is estimated using the SCS peak discharge method 10-year design storm and rainfall data for the area. Grading is scheduled to begin as soon as all permits and approvals are obtained. EROSION CONTROL MEASURES: The attached plans and specifications outline the requirements for erosion control measures. Silt fencing will be provided along each side of the entrance drive where stormwater would be expected to sheet flow from disturbed areas directly to adjacent property. A double row of silt fencing has been specified along areas where grading is proposed in proximity to wetland locations. The stormwater BMP's will be utilized as temporary sediment basins to accommodate the specified limits of disturbance for each drainage basin. Gravel check dams will not be provided unless the Contractor has to temporarily discharge into an open ditch instead of the proposed storm drain outfall. Two (2) gravel construction entrances will be constructed at the existing Highway 172 entrances. Maintenance will be provided by the grading contractor and developer. STORMWATER MANAGEMENT MEASURES: The project site is located in Onslow County. Land disturbing on the site will exceed one (1) acre, which requires the site to comply with the State Regulations. The stormwater runoff from the development will be directed to the proposed stormwater basins. The stormwater basins that have been designed to accommodate the residential portions of this site include a lot impervious allotment of 2,800 SF each as well as the corresponding access roads. The stormwater basins designed to accommodate the commercial portions of this site have been designed to accommodate various amounts of BUA (see calculations) as well as their corresponding access roads. Currently, no impervious surfaces are proposed to be installed within the designated commercial areas. It is noted that prior to commercial development that a plan revision is required to be submitted to NC DENR for review and approval. CONSTRUCTION SEQUENCE: The Contractor will install the gravel construction entrance and silt fence prior to beginning any clearing and grading operations. Additional silt fence will be installed when and if conditions warrant during construction. Disturbed areas will be landscaped or seeded upon completion. EROSION CONTROL NOTES AND MAINTENANCE PLAN All erosion and sediment control measures will be checked for stability and operation following every runoff -producing rainfall, but in no case, less than once every week and within 24 hours of every half -inch rainfall. 2. All points of egress will have construction entrances that will be periodically top - dressed with an additional 2 inches of #4 stone to maintain proper depth. They will be maintained in a condition to prevent mud or sediment from leaving the site. Immediately remove objectionable material spilled washed or tracked onto the construction entrance or roadways. 3. Sediment will be removed from behind the sediment fence when it becomes half filled. The sediment fence will be repaired as necessary to maintain a barrier. Stakes must be steel. Stake spacing will be 6 feet max. with the use of extra strength fabric, without wire backing. Stake spacing will be 8 feet max. when standard strength fabric and wire backing are used. If rock filters are designed at low points in the sediment fence, the rock will be repaired or replaced if it becomes half -full of sediment, no longer drains as designed or is damaged. 4. All seeded areas will be fertilized, reseeded as necessary and mulched according to specifications in the vegetative plan to maintain a vigorous, dense vegetative cover. All slopes will be stabilized within 21 calendar days. All other areas will be stabilized within 15 working days. 5. If any turbidity issues arise, then flocculants will be used to address turbidity issues. The pumps, tanks, hoses and inject systems will be checked for problems or turbid discharges daily. SECTION 02920 SOIL EROSION AND SEDIMENTATION CONTROL 1, GENERAL 1.1 Contractor shall take every reasonable precaution throughout construction to prevent the erosion of soil and the sedimentation of streams, lakes, reservoirs, other water impoundments, ground surfaces, or other property as required by State and Local regulations. 1.2 The Contractor shall install all required silt fences, and construction entrances at the initiation of work, and have these measures reviewed and approved by the local permit authority prior to clearing and grading operations. 1.3 The Contractor shall, within 21 days of suspension or completion of land disturbing activities, provide permanent protective covering for disturbed areas. Temporary and permanent erosion control measures shall be coordinated to assure economical, effective, and continuous erosion and siltation control throughout the construction and post -construction period. Use the specified seed for both temporary and permanent seeding. 2. PRODUCTS 2.1 Asphalt for anchoring mulch shall be Type SS-1 Emulsion. 2.2 Fertilizer shall be 10-10-10 grade or equivalent. 2.3 Lime shall be dolomitic agricultural ground limestone containing not less than 10 percent magnesium oxide. 2.4 Mulch shall be small grain straw, hay, wood chips, asphalt emulsion, jute or other suitable material free of undesirable weed seed. 2.5 Phosphate shall be 20 percent superphosphate or equivalent. 2.6 Seed shall be 20% carpet grass, 24% Bermuda, 20% turf Fescue, 10% Creeping Red Fescue, and 24% Annual Rye grain. Bermuda seed shall be hulled for warm weather planting and unhulled for cool weather planting. Purity of seed shall be a minimum of 98 percent and germination shall be a minimum of 85 percent. 2.7 Silt fence shall consist of NCDOT Class A fabric supported by metal posts spaced not more than 6 feet on center. The bottom of the fabric shall be buried a minimum of 6 inches. 2.8 Gravel for check dams shall be #57 washed stone. 2.9 Aggregate for construction entrance shall be #4 washed stone. 2.10 Stone rip rap for check dams and erosion control shall be NCDOT Class A or B as shown. 3. EXECUTION 3.1 General: Take every practicable measure during construction or suspension to work to minimize erosion and siltation. Measures should include good construction practices, temporary physical barriers to sediment travel, settling basins for new ditches, and establishment of vegetative cover. 3.2 Construction Practices 3.2.1 Avoid dumping soil or sediment into any wetland or watercourse. 3.2.2 Maintain an undisturbed vegetative buffer where possible between a natural watercourse and trenching and grading operations. 3.2.3 Avoid equipment crossings of streams, creeks, and ditches where practicable. 3.2.4 Grade all cut, fill and ditch slopes to minimum slope of 3:1, unless otherwise shown or directed. 3.3 Temporary Physical Barriers are required where sedimentation on off site property or excessive erosion is a problem. 3.3.1 Mulch shall be used for temporary stabilization of areas subject to excessive erosion and for protection of seedbeds after planting where required. 1. Apply grain straw and hay at a rate of 75 to 100 pounds per 1000 square feet and wood chips at a rate of 500 pounds per 1000 square feet. Jute and mesh should be installed as per manufacturer's instructions. 2. Asphalt emulsion for slope stabilization should be applied at a rate of 1,000 gallons per acre. Asphalt emulsion used for anchoring straw should be applied at a rate of 150 gallons per ton of straw. 3.3.2 Silt Fences shall be used at the base of slopes to restrict movement of sediment from the site. Clean silt fence of accumulated sediment after each rainfall event or when it exceeds a depth of 0.5 feet above natural grade. 3.3.3 Stone Check Dams, placed at the discharges of creeks, ditches, and swales, shall consist of Class A or Class B erosion control stone at minimum two feet high and three feet thick across the watercourse, with a one foot thick layer of gravel on upstream side. Remove sediment if accumulated to a depth of 1.0 feet at upstream face. 3.4 Vegetative Cover: Establish and maintain permanent vegetative cover on all unpaved areas disturbed by the work. 3.4.1 Preparation of Seedbed: Areas to be seeded shall be scarified to a depth of 4 inches and until a firm, well pulverized, uniform seedbed is prepared. Lime, phosphorous and fertilizer shall be applied during the scarification process in accordance with the following rates: Lime: 45 pounds per 1000 square feet Phosphorous: 20 pounds per 1000 square feet Fertilizer: 17 pounds per 1000 square feet 3.4.2 Seeding: Disturbed areas shall be seeded with 2 to 3 pounds per 1000 square feet of the specified seed mixture. Seed shall be worked into the bed to a depth of 1/4 inch. Regrade and seed eroded areas immediately 3.4.3 Mulch all areas immediately after seeding. Mulch shall be applied and anchored as specified hereinbefore. Reapply as necessary to retain cover until grass is established. 3.5 Construction Entrance: Provide an aggregate drive, 20 feet wide by 50 feet long by 6 inches thick at each entrance to the site used by construction vehicles, until such time as the permanent roadway is constructed. Remove soil if accumulated to a depth greater than 0.5 inches. 3.6 Maintenance: The Owner and Contractor shall be responsible for maintaining all temporary and permanent erosion control measures. Temporary structures shall be maintained until such time as vegetation is firmly established in the area protected by the structure. Permanent streambank protection and grassed areas shall be maintained until completion of the project. Areas that fail to show a suitable stand of grass or which are damaged by erosion shall be immediately repaired. END OF SECTION STORMWATER CALCULATIONS SOUTH BRIDGE SUBDIVISION (PHASE 1) Sneads Ferry, North Carolina For BC & RT, LLC and Raiford G. Trask, Jr., Trustee 1202 Eastwood Road Wilmington, NC 28403 (910) 313-0795 O`9 September 2009 Prepared by: NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 (Fax) NKT Project No. 07063 1�1 D.� T �C?t$.� F� � � ODA� ODAOB ODATA OVA78 'E34 O14Pre Pre ODAI Pre 'ODA 2 Pre R Pre ODA Pre OM Pre GAS Pre (0A, Pre DA7A Pre t7�6 DA13 04- DA 14 ,4� 014P4M Pqs[ 1`11 Pt Pt Pgst Pt Pt P1 Pt Dt3 Dt 14 AF Filter #1 Filter#2 Filter#3 Filter#4 Fitter #5 Filter 6A Fitter 6B Fitter 7A Filter 7B Fot 13 Forebayt Fab--1 " R1 XIP At Main Pond 13 Main Pond 14 �R � A8 013�1() DAS1 J Pre Pre O Pre n-4410 Pre JR Pre COA Pgst Pat Pest Pit Past A 24 A A A Fitter#6 Filter#9 Fitter#10 Filter#11 Fitter#12 '"t[ Reach a Link Drainage diagram for 07063 tyre -Post 8-2549 Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. 8/31/2009 HydroCADG) 7.10 s/n 000479 0 2005 HydroCAD Software Solutions LLC � W, 0 •� C O Oi O C .7 7 tl tl G O G O O 9 n b N It W,rri en d �r t- oc v oC x 00 0o tic n e $ O � tins �r, �1 00 V V b0 o �t`�- � allo• � a�Dc 7 O W � In `O V = ° o �1 4 :y � Q ti° ova tip:% �f �i Ki .�^ r, a 00 o n N M cIn � M c !0 n C� do n u7 e� 00 a0 r i 0G 4t N n '7 W, V a0 N n ,c `* W, a lc 3 rx+lk �✓ E O ~' o v y tiG tr3 N O In n p a 0 O n O M G C C C C C G C p p C G� C+ C0 x tiC x 00 00 00 o of N v a a o rA o oa0 0 N tiD � A a ca eq O •• rr7 N r-i N N ri C d N Z. cf r- i .- 4 wi .--I do N ti H F n r. a G � � � a r►s in 00 n r M tip In IZ 'n x 00 rn ono V3 C Cl W; O ,y 00 �L.^ G 1! Oti OQ O en V N M 7 n o DC V i "~y [� OC Q Cl N *x-i r. Rf 0000 F W G7 fn'rin��n�xcly �"� Ii -iCA�ACA�AACg�CQ� A G e i u m e a d C o �o e 'R w 6ii d :Y, N _ 0® 'a!O L+ apt ''•I _' M M x Q v.l O ^t �O �.'? N 3 WS n iC tn 'g OC •T I e� G r+s 'k N ��. el �C � s l rl rl rF ^•j Q K Q -• N .w L 0. � i I a P• h 1 I^-lh M O �n O -a O 7 •�-�Q -� ia;fh Q�n -•O st; O o cl O 'Q CS"o h nW o=iote -c �e n ` 1 M.+ F a h Ord- N h O h O 'anh O O h•". O10 I O ��'O i E I (It n M b T • N '1W j4 N a > W h a OWO a ,e •aI In; ib , h a, `o ri h h h h r Q W Vl'!i}! MV lO+ 7a^ p 'd� p o o tto 'o `o�o - ep o w a � N ta Q aW7 C � q STORMWATER CALCULATIONS SOUTH BRIDGE SUBMISION (PHASE 1) Sneads Ferry, North Carolina For BC & RT, LLC and Raiford G. Trask, Jr., Trustee 1202 Eastwood Road Wilmington, NC 28403 (910) 313-0795 Revises! November 2009 September 2009 Prepared by: NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 (Fax) NKT Project No. 07063 y i y tiD N r + r•, c 1 �„� A�' �n ' O O a Q O, O O ,� OC C ll# O �? M 'r M 00 at: 00 00 � ao aq ,z r ` u `' •y R y r•1 �n � O 00 N CT d' '�' O O ti4 O 00 00 'A 00 �a O 'O t� ':mil 1� O � al'r'3 i'+l. l� .O O O 00 i v 0A p "l. O v C• O O O 3@ M l� a Ni 00 00 00 20 O O r O N O O y P°col _ . % t- 00 o c N p 0 lO M N C e� O S a0 O Q 00 N G1 i 20 O N e M 1 VSO d' O O O O O C�O O t Cr1 O � 1 00i in 1%0 %Z « � ®«td! � O O O .v; O a 4 O °� �'i q"i �" "` i rl '�•!l � � Fd'�'c,aiic�«io'usr- ,00 o do to *0 on o M en t : ad, rr n p.cc d cc d 00. N cn 0 , r 00 PD �O FPf r :40 ,,,� M t„{. t 0 PW � . 74-: ,� "46 N . :�% to 000- F� W : C7 CG, A .Q � { r �a � Ei- m O V O O S � N N Y�c% C = m m ri N m - H � N b T a V W = O O V P O o0 o 0 o 0 o 8 m m m u' O O = n n 5 `V N m.88 ^ X S O O H n 7 V� N O j N u0+ 5 o 0 S 0 o X W e rQ u v ai a o = li. w 8 m a = m m w e -• Ez�"°1 � C� ! E e < aai •> m > ti > O y S �0 ip S w o 0 0 0$ m m � ,8m Q b m o 0 0 0 0 m h Q O 9 8 o 0 0 o 8 g N 1 G ^ r g o 0 0 0 ry m O1 e �i 8 m m a v m Y}l d 8 8 0 0 0 0 8 Ict O LY rt as o L E 3 a w a � � w 6T. c IY2 •m r .� � C O g O y C c O 0 O t ;O r dm u 8 8 0 G m N 7 vi A.0. m dNj m a0 W 1p • � O Q= W 3 m m o o a o C7 /nrf +Ij Y ` N m 0 0 ff O = N m . ? n ' ip0 �pa0 O a O O p 0 O G a = T m 5 a 8 D O �. . m m P Y W = N ~ M1 m 5 8 D S N N 7 aa N •�. N m � ' W N ro = Obi Ymi 5 N Y m% Lcr o 0 0 7 N �•1 w r O O n N zCC y^ 1 a a Q+ I �� NGm ^� m o .O • �❑`❑ a a e�j E E•� •> E❑ � � e Lt]L 8o a o� Q O h P Y1 Q �i O o Q O O O N N O W N N O 8 0 0 o N m o N m 0 c 0 o 8 d :p 0 O 0 G 0 0 O 0 O 0 O 0 C - O d S n ti O O O O O & o O I�. a$• m 0 8 0 o a o 0 4l1 N m P n N L E d C v _ G. w 'y •q � •y � c•' O 0 0 m 0 E r O OU irq �0. rl � n n �C "n `� N O h", A� V* w d Lifd Pi ..: �ry M !• m N i4i IO M; GF .y j S N a r"n '? iQ � r Vf N T �J V) 0e1 ? n M "r rl L L L O a M G, tgir e�mq •gi;rnro�nr.�a e o a o 0O 0 0 o d o e o m o ;i v a 00 T r e; ST '4 '►; I ery N � � w N � Y n m b O N '7 fn N N S. G e 1 > 'oW.inWtnW,in =_o_ot'�o I �lo�lo_�-� =e -'leC. r, h Iz a,, k no, _ 1`-Z n� N1*1 0 I ` 'b � � o s 1 ol0 O�O ,liO .OM i N bl� lle�;M Y R YIn nrt� �I o q n z �tlo co oho o�o'alo =to o 0 o ado L to d N1('�y R AO �D�A �,/��A�2'� D 3 DA4, D Pre Pre Pre Pre Pre Pre ' ODA1 C�AZ ®A3 I�FDA4 t 0.45 ` (:6DA6 P St P st P St Pit P st P st SF#1 SF SF SF SF ZSF;s\ Filter #1 Filter #2 Filter#3 Filter #4 Filter #5 Filter 6A 5 Reach on Llnk Pre Pr SF#6B Filter 6B 07063 Pre -Post 11-10-09 Type // 24-hr 07063 Syr -24hr Rainfall=3.67" Prepared by {enter your company name here} HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 11/12/2009 Time span=0.00-24.00 hrs, dt=0.02 hrs, 1201 points x 5 Runoff by SCS TR-20 method, UH=SCS Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment DA 1: Pre Runoff Area=1.890 ac Runoff Depth>1.29" Tc=10.0 min CN=73 Runoff=3.72 cfs 0.203 of Subcatchment DA 2: Pre Runoff Area=1.090 ac Runoff Depth>1.29" Tc=10.0 min CN=73 Runoff=2.14 cfs 0.117 of Subcatchment DA 3: Pre Runoff Area=3.650 ac Runoff Depth>1.29" Tc=10.0 min CN=73 Runoff=7.18 cfs 0.393 of Subcatchment DA 4: Pre Runoff Area=2.590 ac Runoff Depth>1.29" Tc=10.0 min CN=73 Runoff=5.10 cfs 0.279 of Subcatchment DA 5: Pre Runoff Area=1.610 ac Runoff Depth>1.29" Tc=10.0 min CN=73 Runoff=3.17 cfs 0.173 of Subcatchment DA 6A: Pre Runoff Area=2.500 ac Runoff Depth>1.29" Tc=10.0 min CN=73 Runoff=4.92 cfs 0.269 of Subcatchment DA 613: Pre Runoff Area=3.050 ac Runoff Depth>1.29" Tc=10.0 min CN=73 Runoff=6.00 cfs 0.328 of Subcatchment DA1: Post Runoff Area=1.890 ac Runoff Depth>2.70" Tc=10.0 min CN=91 Runoff=7.54 cfs 0.425 of Subcatchment DA2: Post Runoff Area=1.090 ac Runoff Depth>2.16" Tc=10.0 min CN=85 Runoff=3.61 cfs 0.196 of Subcatchment DA3: Post Runoff Area=3.650 ac Runoff Depth>2.33" Tc=10.0 min CN=87 Runoff=12.92 cfs 0.709 of Subcatchment DA4: Post Runoff Area=2.590 ac Runoff Depth>2.08" Tc=10.0 min CN=84 Runoff=8.27 cfs 0.448 of Subcatchment DA5: Post Runoff Area=1.510 ac Runoff Depth>2.16" Tc=10.0 min CN=85 Runoff=5.33 cfs 0.290 of Subcatchment DAM Post Runoff Area=2.500 ac Runoff Depth>2.24" Tc=10.0 min CN=86 Runoff=8.56 cfs 0.468 of Subcatchment DA613: Post Runoff Area=3.050 ac Runoff Depth>2.16" Tc=10.0 min CN=85 Runoff=10.09 cfs 0.549 of Pond SF#1: Filter #1 Peak Elev=7.74' Storage=7,416 cf Inflow=7.54 cfs 0.425 of Discarded=0.00 cfs 0.000 of Primary=0.00 cfs 0.000 of Secondary=1.06 cfs 0.480 of Outflow=1.06 cfs 0.480 of 07063 Pre -Post 11-10-09 Type 1124-hr 07063 1 yr -24hr Rainfall=3.67" Prepared by {enter your company name here} HydroCAD® 7.10 s/n 000479 © 2005 HydroCAD Software Solutions LLC 11 /12/2009 Pond SF#2: Filter #2 Peak EIev=8.04' Storage=2,475 cf Inflow=3.61 cfs 0.196 of Discarded=0.00 cfs 0.000 of Primary=0.00 cfs 0.000 of Secondary=0.87 cfs 0.207 of Outflow=0.87 cfs 0.207 of Pond SF#3: Filter#3 Peak EIev=10.74' Storage=13,852 cf Inflow=12.92 cfs 0.709 of Discarded=0.00 cfs 0.000 of Primary=0.00 cfs 0.000 of Secondary=1.18 cfs 0.756 of Outflow=1.18 cfs 0.756 of Pond SF#4: Filter #4 Peak EIev=10.61' Storage=7,215 cf Inflow=8.27 cfs 0.448 of Discarded=0.00 cfs 0.000 of Primary=0.00 cfs 0.000 of Secondary=1.06 cfs 0.458 of Outflow=1.06 cfs 0.458 of Pond SF#5: Filter#5 Peak EIev=8.21' Storage=4,126 cf Inflow=5.33 cfs 0.290 of Discarded=0.00 cfs 0.000 of Primary=0.00 cfs 0.000 of Secondary=0.97 cfs 0.303 of Outflow=0.97 cfs 0.303 of Pond SF#6A: Filter 6A Peak EIev=13.65' Storage=8,057 cf Inflow=8.56 cfs 0.468 of Discarded=0.00 cfs 0.000 of Primary=0.00 cfs 0.000 of Secondary=1.05 cfs 0.494 of Outflow=1.05 cfs 0.494 of Pond SF#6B: Filter 6B Peak EIev=13.68' Storage=9,758 cf Inflow=10.09 cfs 0.549 of Discarded=0.00 cfs 0.000 of Primary=0.00 cfs 0.000 of Secondary=1.11 cfs 0.577 of Outflow=1.11 cfs 0.577 of Date Design Wilmington, NC NORRIS, KUSKE &TUNSTALL 9 Sheet �e 43r�g � tJ"� CONSULTING ENGINEERS, INc. Brunswick County, NC jc? Check Job For Job No. Poser. - qY,441 C.cs f;;c-- 1A "Crl • �SSW►at�? .:' "j L} p1JC lw. &L-- �.4-- C-rlar,�.� Iv Iu,,rnzorp L4,6z cjzcr. • /Iinp4ti01'r�0 G�a,2 �i�9-rr S��rri,T Srk� A�,s»gs f sp�.�5�•--�y Fes_ G!%sf•� piR�p.+� w�f►H-F filG�rt jc'- �vr3.c� If✓y N/c.3—. • l Stgrl 40VOL, c 4 Pvt. Li P101L W vvwr cwe S[S>yTss� 3' r f� fZb'� Ir.Yi ow.•i t r - / - i� r �3Gc' = IaEn�+h e• r-+.r�� "l Le p6%s'nf car SAC- - caar— pr ew 42•gf 1.6 kk z cam— M*M-9fr 17601ve prhv►�� N�+.Ni .. �� IF .rr 4 ..:f.;� .: � �.,.:�;: -��e a woMao ��K- k. ��►-. w�� is February 23, 2009 Norris; Kusek and Tunstall Attn: Amy Norris 902 Market Street Wilmington, NC 2840 S ,air p} I1 lti fib• y { Re: Storm Water Evaluation 'r• South Bridge S� [ " 9 , Snead's Ferry, Qnslow County, NC Mr. Tunstall, NKT O9CL3 Please find below a report referencing a soil and site evaluation for the above referenced site, located on Highway 172 In Snead's Ferry, North Carolina. 1.0 Introduction/Purpose The purpose of the soil and site evaluation was to determine the feasibility of disposing and/or storing storm water within appropriate storm water devices proposed on the site. 2.tl�Whods (Refer to Figures 1 and 2) The areas were evaluated using hand auger borings. Auger borings were made at locaations identified by Norris, Kuske & T unstall Consulting Engineers and staked in the field by Gairy Cannady Surveying. Soil borings were advanced to a depth of at least 48 inches and profile descriptions re rded. .The seas-onal high water table was determined by the indication of redoximorphic features and/or colors of chroma 2 or less ([ulunsell Color Book) at �2% of the soil volume in mottles or matrix of a horizon or horizon subdivision. The saturated hydraulic conductivity ( of the unsaturated portion of the soil profile was :measured usipg a Compact Constant Head Permeameter (CCHP). These in sou measurements of saturated .hydraulic conductivity were obtained in accordance with the Compact Constant Head Permeameter laser's Manual by Kw, Ific. Fiei!d work was conducted at the site between July 28, 2008 November 8, 2008. �Y7�.m}�5teacj. I - . - 3.0 Results/Findings (Refer to Table 1, Figure 1, 2 and Appendix A) February 23, 2009 The basin areas were characterized by soils with a seasonal high water tat.le that ranged from less than 12 inches from the natural soil surface to a depth of 62 inches from the natural soil surface as indicated by the presence of redoximorphic features and/or colors of chroma 2 or less ( unsell Color Book) at >2% of the soil volume in mottles or matrix of a horizon or horizon subdivision. In -situ saturated hydraulic conductivity (Ksat) measurements within the proposed areas ranged from 0.025 - 14.03 inches per Dour at the most limiting soil horizon in the unsaturated portion of the soil profile. A summary of the seasonal high water table determinations and saturated hydraulic conductivity readings for each boring location is provided in Table 1- South, Bridge Soil Bo riingl CCNP Results. A detailed profile description and data sheet for each boring location is in Appendix A. 4.0 Limitations The data contained in this report is limited to that information specifically requested by Norris, Kluske and Tunstall and may not be inclusive of all data. Analyses and conclusions of this report, interpretation between data points, and subjective subsurface interpretation, may not be completely representative of all subsurface conditions. This investigation, furthermore does not provide conclusive data on limits of impact or other interpolations where indicated by question marks or where otherwise qualified. Conclusions and recommendations of this investigation: and report are based on the best available data in an effort to assist in the understanding, control and/or site planning and preparation. No guarantee is expressed or implied that new or additional data and/or scientific measures will not be required for ultimate solution of the existing project. Should you have any questions or concerns please do not hesitate to contact me dt (910)270-2919. E-- Sincerely, ' 4 ''vya� 7 �f Walter D. Giese, LSS, Soil Scientist lea, p 501E •� .; 6 7274 �N RS ;al Scientist Booth Bridge Boil Boring/ CCHP Results Table 1 Location/SB #/CCHP# SHWT Ksat Depth Kg,t (in./hr) ARM BIISBIICCHP B1 54" 24" 10.25 ARM BIISB1/CCHP B1a 54" .58" 0.075 132/ SB2/ CCHP 132 26" 25" 0.032 B3/ S133/ CCHP 133 62" 38" 0.210 B4/ SB4/ CCHP B4 34" 20" 13.62 B5a/ SB5a/ CCHP 135a 48" 42" 0.026 B5b/ SB5b/ CCHPB 5b 54" 48" 0.149 1361 SB6/ CCHP B6 22" 18" 11.02 136/ SB6/ CCHP Na 22" 36" 0.1.5 B7/ S137/ CCHP B7 28" 26" 0.175 B8/ SB8/ CCHP B8 24" 25" 0.114 139al SB9a1 CCHP 139a <12" 20" 0.17 B9a/ SB9a/ CCHP 139aA <12" 32" 0.18 B9b/ SB9b/ CCHP 139b <12" 1891 0,04 B10/ SB10/ CCHP B10 52" 24" 14.03 B12/ SB12/ CCHP B12 45" 36" 4.71. B131 SB13/ CCHP B13 44" 18" 11.00 B14/ B14 <12" - - SB: Soil Boring. CCHP: Compact Constant Head Permeameter, SHWT= Seasanel High Water Table Location 814 could not perform test due to high static water level FIGURES m�' ZoN `y, `.• .e,,E LOCV.o 00Q to N C4NM LOQQ ` s +. PO N r•)if�4�j •onE6PNQ mmmmmmmmmmmmmmmm .. ,� / �� , _ —, '�� tip.• _ Aft Southbridge Stormwater Infiltration Study Soil Profile Description and K.at Data Sneads Ferry, North Carolina November 6, 2008 Logged By: Gene Young, R.S. Area ARM B1-SB 1 Soil Description Page 1 of 4 0 - 4 inches Gray (2.5Y 511) loamy sand, granular, very friable, non -expansive. 4 - 15 inches Light gray (2.5Y 7/1) sand, granular, very friable, non -expansive. 15 45 inches Yellowish brown (10YR 5/4) loamy sand, very friable, non - expansive. 45 - 50 inches Light yellowish brown (2.5Y 5/3) sand, granular, very friable, non - expansive with olive yellow (2.5Y 6/6) mottles. 50 - 54 inches Yellowish brown (10YR 5/6) sandy clay loam, sub -angular blocky, firm, slightly expansive with brownish yellow (10YR 616) mottles. 54 60 inches Yellowish brown (10YR 516) sandy clay loam, sub -angular blocky, firm, slightly expansive with gray (10YR 6/1) and brownish yellow (10YR 6/8) mottles. Seasonal High Water Table 54" Lf J bli E fn H , U 3 c3 � > o c C 5 L U C �r OQ C v O C C3 C r4 n 1-t Vt rn �n v z 3 O �O G 0 N � 4+ O � r+ C% N M 1c Gt Cl. ON C �t �F1 00 ht hl N (` N ht VS co r �!T • OC .--• -r OC 00 N N 00 a9 '4 O 6C O oc CC 00 h N N Sh CIS o N ID et It 00. w O O O st hJ N O O 00 O G` � rl- 00 C r.] C et 00 v1 N O N a o C; U N %0 N 4 `'t K}' O O h! CIS N N N ha h1 N N N N h! Q 0010 N N �O G` vOiinvCioaO '' oco�oo_ o in V1 C` W OC M = M = C` = C` 00 N O 00 Q. M N N N N N N N N M N hl hl C 0 0 O O O C O O C O O O O O O _O �tl- v It Wn rn I, v-> to w n v)an, 00t-11 rr "t d 0 oo eq ty In C% �t et co C- , M rn ao T en v n N t� t+i oo ti N M M N N •- M N N N r +� t o 0 0 0 0 o a o u o0 ooa0000:ao.000v ��;mw; O -- N y O c b O O C O G C p Q 6 6 0 c3 O o 0 c� CN M M ri M 00 00 00 OQ_ ram, 00 oc d d Chi N N cV N N M Cli N N C1 N N O C 0 0 0 0 C`d N N N N N N N N N N C'i 0 0 0 0 0 0 !^i I N I N N N N f~+��1`�t•�f` -7 , I c14--I m 'V♦ 10 .i,J co L 4w a� - O L N a E L vw a m U m 2 of Q N Q w O f N C`] 2 �cn F cn v 3 r c� � L > o G � V � N cl, < Q C, O ;3 G O — n d C> � a •� � c � L Q ca f �. 00 C: a M 00 M DD 00 0 00 00: 0 DO 0 3 l� O 00 �p tt1 o �n In �n c v, In .00 Iq In w1 � iO G\�C-iC-;NNNNN i N V7 DO M `n Cn kn to to In to C O O O O G O O Q C Q cocooc0000co a, C% O, 0% In v� cl] O�c ono oho oho oco Oro Li O G C G O C C J O� G L M O N 00 O 'J U o Q o o a c o o Q c o-G N N N N N N N ell N N N O �.J � w E - — — — — — — — — — — G G O C G G C G O p O Q - 000c N d M M C4 O Itr G1 00 J- "O M v. M M M M In In In In ui In In O C O C 0 0 0 C O O O O O O O O O Q O O C O O C I In In In Q C-- O Q O In Q F to C 0 0 C O C C C O Southbridge Stormwater Infiltration Study Soil Profile Description and Ksat Data Sneads Perry, North Carolina November 6, 2008 Logged By: Gene Young, R.S. ,i Area 132 - SB 2 Soil Description 0 - 4 inches Dark grayish brown (2.5Y 4/2) loamy sand, granular, very friable, non -expansive. 4 - 16 inches Light olive brown (2.5Y 5/4) loamy sand, granular, very friable, non -expansive. 16 - 38 inches Yellowish brown (10YR 5/6) sandy clay loam, sub -angular blocky, firm, slightly expansive. 38 - 48 inches Yellowish brown (10YR 5/6) sandy clay loam, sub -angular blocky, firm, slightly expansive with gray (10YR 6/1) and brownish yellow (10YR 6/8) mottles. Seasonal High Water Table 26" O G o 0 U E M Cal M M N 3 0 00 ed `C 0 G `y rJ U �- N Q a C ,r �O 100 00 In Vl r-• � c � �.a 4 r� tn r� � v cv 14 In C cs oll c O vc ,6 tri 'd'O C *D M vi M to t'1 vi M to CV N ri N ^ M N d' M .M M M. O O O O 0 0 0 s M M N 00 l- !— ll- l� oC N O M C O O C _^ 00 CT %,J O 00 OC 00 00 (*1 0 0 0 0 0 •;� O O Q O Q C C C a L O < M C, tl 00 OC 00 v C b C C C 0 0 O G (`3 N N rd N N N N V s %0 %o �o "o %o %C o .o 3 00 00 00 00 00 00 00 00 �� v �n v> >n v� �n v► �n �.ri a N C C O C C O cn ^ 00 r! tel �O G, o 0 0 0 0.0 o c 0 0 0 0 0 0 0 0 ao000CoC>0 `°oc o 00 Southbridge Stormwater infiltration Study Soil Profile Description and K,,t Data Sneads berry, Forth Carolina October 15, 2008 Logged By: Gene Young, R.B. Area B3 - SB 3 Soil Description Page 1 of 2 0 - 2 inches Gray (2.5Y 5/1) loamy sand, granular, very friable, non -expansive. 2 - 30 inches Light yellowish brown (2.5Y 6/4) loamy sand, granular, very friable, non -expansive. 30 - 46 inches Brownish yellow (10YR 6/6) sandy clay loam, sub -angular blocky, friable, slightly expansive. 46 62 inches Light yellowish brown (2.5Y 6/4) sandy loam/ sandy clay loam, sub -angular blocky, friable, slightly. 62 — 66 inches Light yellowish brown (2.5Y 6/4) sandy clay loam. sub -angular blocky, friable. slightly expansive with olive yellow (2.5Y 6/8) and light brownish gray (2.5Y 6/2) mottles. Seasonal High Water Table 62" 0 a m L i� N o ® N L. N W . a m E L ,0w. co I 3 4 c3 JL O � O U � i < o Q U a C7 v � :a Q �i U v s. al c ? a tJ y tL r �� C -O ri - C `n r! vz M -It M et r1 cri N d. N N N N > 00 C O C a a 1%0 0 0 Cl 0 O O C G'O O �+ ` N N 00 io� G Ili N ti0 N N Ili N N 4—�Ln to tr.vivnti �D �D M Men r1 M m r•, oo n --etnN cr NQ NOnCGOQ Mn 10.'0�-vs i 00 'cr M M N M N N O N Ci Q o co Q o® o Q Q C c o 0 o C C s G. Vi N kn M qtt M ^t M C1 - N IT N N N N .`O w n G� n x ^-- vn -» kn N M N - Cl N N N '4 cn ''O M M M M M M M M _. -M-t`c �P �o�--wc�nv��� % cV -- Q M oo n �c V1 cV oc m-N M oc Q M d' c �c eS- N et � d < O^ M l� w ' o = �o in fV - 000 in C kn C a N -- = v7 vi U Ir it tf1 tn. 'n ►F'1 to W, kn " W� to k'1 v'T 4n to v) to tr0 G a o o Q o a c Q O Q o 0 o Q c o T[ to vi nvsw�vyv,tnw inwionw�w)v,v,wn W U - - � �:�,aa�c�ca�� aa•a�a�o�occ� O vo: Cc � rG Cp n vi l n .tn 'Q V -- O C C C O C C C. O C C CC O a .1 Q; U rI 'cr ccMxn vivid•4 1 Ct ct d• M c ,, cn m M M M M M .M M e -0 to v v-, to Ln v} kn vt to to t , to i _ oo.ec,�r;c;00000000 CS to O N O xn C .vi a vi O to O to O U1 C _ O O N N M M d 'V r) Rn .Q O c`a O a o Q Q O Q Southbridge Stormwater Infiltration Study Soil Profile Description and K.,,t Data Sneads Ferry, North Carolina October 15, 2008 Logged By: Gene Young, R.S. Area B4 - SB 4 Soil Description Page 1 of 3 0 - 2 inches Grayish brown (10YR 5/2) loamy sand, granular, very friable, non - expansive. 2 - 26 inches Light yellowish brown (2.5Y 6/4) loamy sand, granular, very friable, non -expansive. 26 - 34 inches Pale yellow (2.5Y 7/3) sand/loamy sand, granular, very friable, non- expansive. 34 - 42 inches Pale yellow (2.5Y 713) sand, granular, very friable, non -expansive with light brownish gray (2.5Y 6/2) and olive yellow (2.5Y 6/6) mottles. 42 - 49 inches Light gray (2.5Y 711) sand, granular, friable, non -expansive with sandy loam lenses and olive yellow (2.5Y 616) mottles. 49 - 60 inches Light yellowish brown (10YR 6/4) sandy clay loam, sub -angular blocky, firm; slightly expansive with gray (2.5Y 6/1) and olive yellow (2.5Y 6/8) mottles. Seasonal High Water Table 34" L� a T" CJ vi OC O M kL Cal s t1 7 C3 C C L � V'S C^� C - � N tn � g o U Q , � C � Q U Z7 � G t- hl - CC O O N M OO O M �C O kn C-1 N= C C O i` M O O 00 C-i 'D 4 N "o ri N M %Q - 00 = et - - = C` v : - - - - C`i N N N N 00 Q Ln r- ,n N ,n N er :t ^f 00 t`i # A n N Cl C 111 00 v? M, N 0- -» M nt C� O C11 Cli kri C C t-- rel ! 1 C O M 00 V1 in -r vl Vt G, m tt V'f rf) 0 N in to C, N U `-' C r b CN vi t- in N ri N N ri - M N CV I M M cn R. = C O C Q C O C O C Q L O C O <3 00 N C t� 00 00 t- 00 -tN N 00 Z r N to 1C -C m Cl in �O C N 00 O N r- w n to et N N _c Q It N O Q et in U ri ri ri r1 <<l N - cn rV f+J M, en M M o -n v; v; v-, "n 'n ,n W W� v� ac o o Q c o a o o O le o coo C--0 J L to ,n ,n ,n +n ,n to an ,n to ,n ,n in v'i ,n. v - - 'C7 U d' et M M M N eY; M to r n C: -1 tq 00 V1 l� 00 d 00 c i N CA N ON N O - M N v 0 0 o c o 0 0 o c o 0 0 0.0 0 0 0 0 O a O d 0 F � o Co Cl Q o o d o 0 G O C O CI7 0 0 0 O CD O C3 0 0 Q O. O O Southbridge Stormwater Infiltration Study Soil Profile Description and Ksat Data Sneada Ferry, North Carolina August 26, 2006 Logged By: Gene Young, R.S. Area 135a SB 5a Soil Description Page 1 of 2 0 - 2 inches Gray (2.5Y 5/1) loamy sand, granular, very friable, non -expansive. 2 - 34 Inches Light olive brown (2.5Y 5/3) loamy sand, granular, very friable, non -expansive. 34 - 48 inches Yellowish brown (10YR 516) sandy loam/sandy clay loam, sub - angular blocky, firm, slightly expansive with pale brown (10YR 6/3) mottles. 48 - 60 inches Light yellowish brown (10YR 6/4) sandy loam/sandy clay loam, sub -angular blocky, firm, slightly expansive with grayish brown (10YR 5/2) and brownish yellow (10YR 6/8) mottles. Seasonal High Water Table 48" zz oc x E-- c v: u fl o 0 c U. O O t C v o U > O i^Y ins 3 , � o � s fl � fl � LLB M Q. j co cav �ClaC tn0% +mac �n vi v-i v-, SY f7 tt •� d' -� 1 fry M M rn N fli fV N t`i o 0 0 0�R c o o c c c o c o 0 0 o c o 0 r o c n c .t l� �t V �• �• �O vC o0 _O M O M M M M Y c ��oon�c"n���etio ®0000ccoO L Mr i f`i -t N O 00 C O O r. u 0 o c o 0 0 0 0 0 0 C N N N N N f-1 cs N N N N 'N fti CV f�i N N N N UC.1 O O O O O O O O O O o a n �n . =n. r "n 'O U L O O C O 0 0 0 0 0 ai. E d; oo -- v5 N 4� Q:C> 0 0 0 0 0 0 o c 0 0 0 0 0 Co 0 0 0 0 y cI? 000O000O _ E oc�aoc00000 v O O •— O N C eM O d' co n O O [�! M Southbridge Stormwater infiltration Study Soil Profile Description and K.,g Data Sneade Ferry, North Carolina August 26, 2008 Logged By; Gene Young, R.S. Area 135b - SB 5b Soil Description Page 1 of 2 0 - 2 inches Gray (2.5Y 5/1) loamy sand, granular, very friable, non -expansive. 2 - 40 inches Light yellowish brown (2.5Y 6/3) loamy sand, granular, very friable, non -expansive. 40 - 54 inches Yellowish brown (10YR 5/6) sandy loam/sandy clay loam, sub - angular blocky, firm, slightly expansive. 54 - 60 inches Light yellowish brown (10YR 6/4) sandy loam/sandy clay loam, sub -angular blocky, firm, slightly expansive with light brownish gray (10YR 6/2) and brownish yellow (10YR 6/6) mottles. Seasonal High Water Table 54" 0) 00 L O He CO) c ,O L AW N O ® N L � . a E L O #.# HE ih h1 v a y c G � L L V <1 Q E _O O J O > ^ r hl rZ 0 o c s= to c M � N C � � an �- arj oci oC vi arj arl �!i arl arj an ' v-i N N N N N N h! c'3 N N a o 0 0 0 o c c c c o 0 0 o� an n t• an �a an an an an v^, C O C i ar, an N 00 00 N N N N N N N N O -- O O O C C O C 0 0 0 'ch OC 00 M m 00 00 DO _w 00 OC 00 00 'y M 00 %C an%000 O 00 00 G C O d O C C < C J O 0 O O O C C C O O O C C Q O G es hl N N N N N N N N N N N N V an to an an an an an an an to an vn W) :- - - v M 00 M 00 cn 00 ."D .4 en--- O 00 !z an SF si M cn M m r1. M N N (14 L! an an. V) an to to an an an- an en an an 0 0 0 0 0 0 0 0 0 0 0 Co.0 a� 000a000aRcoQao O ail. to O an O Wi C) in C an O F " O Clh! _O N M cn "V: a� an O o 6 o c o 0 0 0 0 o b o- Southbridge Stormwater Infiltration Study Soil Profile Description and Hat Data Sneads Ferry, North Carolina July 2.8, 2008 Logged By: Gene Young, R.S. Area 136 - SS 6 Soil Description: Page 1 of 4 0 - 6 inches Light olive brown (2.5Y 5/3) foamy sand, granular, very friable, non -expansive. 6 - 22 inches Light yellowish brown (2.5Y 6/4) loamy sand, granular, very friable, non -expansive. 22 - 25 inches Light yellowish brown (2.5Y 6/3) loamy sand, granular, very friable, non- expansive. 25 - 48 inches Yellowish brown (10YR 5/8) sandy loam/sandy clay loam, sub - angular blocky, firm, slightly expansive with light brownish gray (IOYR 6/2) and strong brown (7.5YR 5/8) mottles. Seasonal High Water Table 22" 4w Lm s V' N L � Ri .♦r a E L � O v 3 H A � M CU A Cd o U ,t, cn � Uo O C O a O � r co a% a\ O � o o c a � � x v � r. w rn o 00 rn hvsvl►-,tn N N to N CAI O d\ M O M cc M M Cri (� er 'et Ict -- � d o cMd�'n o . o c r► oo o0 to oQ �n 00 o4 . in 0a C M 00 F . 00 -. to 0 ati E; .-. sn .-. ;n , , . vs et oc od 00 0o co . \0 0 N 00 . cn 0a - 00 00 .� oQ 00 �. co 1- N M N M NC-4 N M N M cl a a N to N M NCR ,_ M N M N M N M N � �oryryaoc�tnt aoero p�0000 rl Y n \D N N N N N otn%0C% Q vl N N N p N n N n wwCkClwoo In n "I. h +n � N d; Od O i a\o\a%o\ a; CT a1 Zvi N C+MNNNNN Oell in t- N NNN CV L M in o0 00 C 14 w cm O \O to v1 to to � C all NNQNCl M aanQ%0 M M 0 hw %C\o%0 N et M M M evi M M M V1 o V1 o >A o In o wl V1 a to un An t^ CD N tPi 0 in O In O O rn O 0Q 00 00 00 00 00 00 00 00 00 00 00 00 00 w 00 00 U a+ os a\ ON as a\ C% C% a% ON o\ a, o% Q M M f�i M M M M M M M C7 M M M en M M � t Q � '0 Lvi !'f \D -n V'} 'n 'n tn \O to N En on to vd MMNN+�� NN�a� CgC4 . �n v TIT —1-1 1 1 1 o o Q o=o 0 0 0 0 0 0 0 0 0 0 0 0 o a OZO • O O O N at0 O O \G C 0 0 0 0 0 0 O O O Q O O a m V in CP 13 O� L 0 U) s Loll c O 5® AMA m yL T O tr) L � (L E L w co m U U 46 m EU Q U C O dItt ^`a +C.. U' 3 � oc oho r L. L Q > <] O C U C •� O O — — oe 00 5 c C) c 9 9 ccd aj is C ca? ej bA ^ � A is t-.ed erg -- —. C`J. c* Ln to rn Cam] co) rl) M M -t V' It :� ♦ N t• V7 �- C C M f M to M M M M— •-- — m to C O C M C d1 CT C` vi �ri vi to M M N cli N rl] M N N N C11 N N c i C O O ir, L O O in I O -n �n v) to C) O Cl : N �� N � ' C t- CD r- r- ]- C- to to kn N fO,i _N O C C O C C O C O O O 0 0 sue. M N C` N w 00 r- l- v1 0% V) V', v) U1 N N N 0 0 'V O �O �D %C 1�0 M %C M M M M O00 O C _s N N 00 M M M et v1 cr -,rC M M M .^_. C 6- O C)C C O C C O O o C C C L Sr' c a o c O o Q o c Q o C a Q o 0 0 V Y '} M M r^ •� :f w N N 'r N 4t N C} %0 M %�J M V M ."i rJ 0 C O O "" CG O O C O J O O O C Q 0 0 0 r] rV fV N r`] N r4 C`J N N N N ra N N tN N N U E 4ntnkntn+ntnknininv)vinintnv;tnv�tn ..~ — — — v oO oc oe 00 «] w 00 00 00 oa w oa o0 00 w 00 00 oc ^ crt 0% 00 oC v', W) Cl] N tl- 00 ➢1- F-- C� tr d :0 � 0 O O C us ^ v7 M d: �D cn 00 �G C� — �f l� M l� �• Sri v kn d M N (D O Cs w M M M M M M r. iD N N N N N N N C] N> rV N N N N N N N' C O.o C C C o 0 0 0 0 0 o Cc _ o 0 0 0 C) 0 o a o 0 0 0 0 0 o a C a O N D oG O CV 4 �6 oc O fV d �6 CC C CV 4 O O O O Q N N cd N N to M .M 0 0 0 0 0 0 0 0 o.c o c o 0 0 0 0 0 C� N d N (`I f l N c"1 d I o I o I d a o 000l000 McIlIfIliellic,41cqoc o0 oc oc oc r+7 M M M f•'� �a—]0®EaC --1MFMIMIM w y N C1 N N N J G oocIxlohoIo= 00 'oi�I�I� 6 o c O G,lc+Sln.l-�ln 4 4 cn M N M t�'t M M cry N N N CV. el w V O d d O O O d O O O v7 a0 O N tF M N1 V: ': ^.r � 1 Southbridge Stour water Infiltration Study Soil Profile Description and K..t Data Sneads Ferry, North Carolina August 12, 2008 Logged By: Gene Young, R.S. Area B7 - SB 7 Soil Description Page 1 of 3. 0 - 6 inches Olive brown (2.5Y 4/3) loamy sand, granular, very friable, non - expansive. 6 - 14 inches Light olive brown (2.5Y 5/4) loamy sand, granular, very friable, non -expansive. 14 - 28 inches Olive yellow (2.5Y 6/6) sandy clay loam, sub -angular blocky, firm, slightly expansive. 28 - 48 inches Olive yellow (2.5Y 6/6) sandy clay loam, sub -angular blocky, firm, slightly expansive with light brownish gray (2.5Y 612) and brownish yellow (10YR 6/8) mottles. Seasonal High Water Table 28" cm 70 L O c 0 ■� L .� CO 4'. 4- = o N L � a E L co Q O L M Cl cis ai o U c3 iz > C O u U. B o c v o G ^.J ca O " -- 70 U— 3 1�0 o n Q ..r x :a .mot t` oo1'* r• t` .t• t� �i �. t` r•.l` � �n 3 O �t �o O .C% Gl O r.r r N N O O '-- cn M o �-ac C; o o C; v,.In C: C; VI: Ci m �L 06 tt i CV %C �D t- t - r�..cn r' r Cs Cs = N %O NT "d* d' le M M M M M 'tfi M N N 0% 0, to kn in a CN c 141 to t r` r` d N N N o Co 1t CF N t- r- v7 C? N N C`j CS1 CV C`1 N C-1 N c`1 tit N o:o o to 6 6 6 6 6 o c o 6 6 6 6 6 ^ N %D O O %c N N N C` C` V �O C`) in vi . ^ O C <D M M Q M M M 00 to M C� Chi en M t� r• r• 0 C O n V1 V's to V l ifl 'V v 1 St C O O d C N \0 �t �? o0 oC O O N N r', M C` � iD �.^+ :fl V'> v1 to et d' \C tiD to vl Q > o 0 0 0 o a o o c a c o c o c a a N N N N CV N N N N .N c`a N N N N N N N tntntnw',Anw Ln !2 In !2 In In in kn tn r _ ^ U �Q Vr ti0 ti0 \0 V' G :O G ;z V GO td \C V c 6-i v T 0� E %J, � U nio a0000 ooio Vs ^ \D to to -d; M M eh to �o w .-• t t— U 00 V 'fit 4 ri N O c 06 r; �� M M M c l — v �h d 'd ft d `� It cn M M M cn. cn tf1 N C`1 N N N N C14 Q] N N N N N N 0 0 0 0 0.o a.a o o a o a o 0 o a o O N er �O 00 C> N 'It Da O C-t et \D oo O: C-1 'c1' O --- r- -- 7: N .CV N N CV M M M v O O J[ i J Q G a a 0 0 o O 0 0 0 O o 0 � Southbridge Stormwater. Infiltration Study Soil Profile Description and Ksat Data Sneads Ferry, forth Carolina August 12, 2008 Logged By: Gene Young, R.S. Area 138 - SB 8 Soil Description Rage 1 of 2 0 - 4 inches Olive brown (2.5Y 4/3) loamy sand, granular, very friable, non - expansive. 4 - 11 inches Light olive brown (2.5Y 513) loamy sand, granular, very friable, non -expansive. 11 - 24 inches Olive yellow (2.5Y 6/6) sandy clay loam, sub -angular blocky, firm, slightly expansive. 24 - 48 inches Olive yellow (2.5Y 6/6) sandy clay loam, sub -angular blocky, firm, slightly expansive with gray (2.5Y 6/1) and yellowish brown (10YR 5/6) mottles. Seasonal High Water Table 24" At At y N U A � � O N N � � O o U O O a S 0 O `a A +U v L A OiD N cc Cal O M .-+ •-• v) N M N M a1 :0 .-• In to %0 O1 00 GO 00 00 %0 O 10 O %o O %.0 O *C . "o 'o �C 00 O l It �'C %R N O O O O (n M M M %C N C> cn N %0 N N CV N 0% O; cs ON C,% C+ ON D; L t, C4 t ON N GN 0, I %D "t, N o00000o .- c ooccoorsocic� �0 M 0% a,%o M %o �0 C O M M M M M M "I M �O -- 00 00 M — M CM %0 %0 w 00 00 00 00 00 00 00 L� �C — — O Vo a a d' et = w 00 00 0o w w w N N N N C7 0 o 0 oo 0 o c o 0 N 0 N 0 do 0 �o 0 o 0 CD 0 0 0 0 0 CD C 10 tX �! 1 W, M M M M M M M M M ri � O +- o0000000O.00000000O. Q N N N N N N N N N N N N r} N r7 N CV N �t�n�rrr t�t��nnr`r�rr-� A W) f^ Wl xn 4n v1 kn to vs ;n to to to vs rz 00 as kn v1 cn v1 'o QO~ C O C O O O O a 0 0 C? C:i Q- 0 O O �c d: Yl DD rn �0 �+i O� Q+ tt Ct et Q vi et M t,4 CD 0; oo rn t- �6 ,6 vi v? d- v M M M M M t a O C4 N N N N fV N N N N N N cV N N N N e o 0 o a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o a o o c o 0 0 0 o c o g o 0 0,�, CD (V 'a' G 00 <> N It %C 00 O N it ti0 00 O N d O O O 'n -n -r =� N N N N N M M M 0 0 0 0 0 0 o c CDo c o 0 0 0 0 0 0 r Southbridge Stormwater infiltration Study Soil Profile Description and K,.t Data Sneads Ferry, North Carolina July 29, 2008 Logged By: Gene Young, R.S. Area 139a - SB 9a Soil Description Page `i of 3 0 - 10 inches Dark grayish brown (2.5Y 4/2) sandy loam, sub -angular blocky, friable, slightly expansive. 10 - 24 inches Light yellowish brown (2.5Y 6/4) sandy clay loam, sub -angular blocky, firm, slightly expansive with gray (2.5Y 6/1) and yellowish brown (10YR 5/8) mottles. 24 - 48 inches Light yellowish brown (2.5Y 6/3) silty clay loam, sub -angular blocky, friable, slightly expansive with gray (2.5Y 6/1) and yellowish brown (10YR 5/8) mottles. Seasonal High Water Table <12" W7 C! r y 00 x c� o U F .:. C > O C c-I 1 x c E CZ U � �! O 0'c M. MM T � ly m .Z 1> O � � r O y c A � C o CS to vt G� N %0 10 %D I0 G% 0% CT C+ CT CT r` r- �o n In +n eri In v ; In 3 •- M Vr \0 et (y t? a o a x x 00 00 00 m C tiC 00 In C'i hi C'i C'i o0 06 06 ad cgi 06 �, G• �n �t �Y M M m M . M m N N N N N cV c% In 00 00 G\ o N N N N rI N lqt in > N N sue. qt r- N N x M 00 00 00 00 rn CO) M C" 1 M M '. kn t- M M OC M 00 00 00 00 M M M cn CO) M --0000000acoo6C:c.o O' Q C O O xNInC>a O G .^? ^ G O O O -dr C O E x 00CNF-t-t-\0'0\0��cInInInInIn C-D � 0 Y O O C: O O O O C+ G a C"I N N N [V N N: N N N N r l N N N N U L xxxoo000000.00000000xoox xoo �:. T 3 F M c-, M M M m M ell M) M M M M, M M M, per/ �t? Cr5 M N a�i O C+ G� ;+ `f --. d0 In Vl In try l� 00 Gx M M 00 N `V.r CI M M M M M CN�I M M N C'I -G u O N N N N N r4 N tV c`! Cni N N N r) N 0 0 C), O O C) Ck O C> O .O O G O C) a =� o 0 P. a o 0 0 0 0 o a o 0 0 0 0 :- onitit�,0000_C-4•r'cooN"�o006 O O O O o 7: 7 N CV N N N InI o o'0 0 0 0 0 0 C> 0 CDc o 0 0 0 �� O Lou #+ sur. zMENS 0 �. CO L 0 tm .di a cu E z. 1000 a m a U U CD m ca N Q E?i N 00 00 E d p c o v E- O O 4 u Cs. N <' E Q v O O > c 0 -- 3 x o as O � � n N C g � n►nNnnnnoNo�c00000 I 00 �D M o0 00 00 00 O N d 6 C O O C O c� -,t00nnnnNICNa+N raNNN Q 41 - N N. N N W M 00 En W 00 00 OC M et � rry C`� N N C•1 � — .- � � C O O 0 0 O C3 C O O C O O C C O n M 1.0 M M_ M_ M_ PQ� M � \0 No % � _M M _M n n n n G G Vl n n n - O O A O O O O Q O O O O O Q L I a Q O O 0 O 0 O 0 Q 0 O 00 O �C C 00 o N O 00 Q 0000 CD 0 00 < O N 00 '40 \0 �O 10 V M 'e Nt V '�t d' Tt x .�i v I.r O O C O Cl) G O O C O O O o C 0 0 C N N N. N N N N Cl N N N N N N N V L.. E\0%0+c\c\0LO%0%,D�0'D\0 4D�C\o�O - - - - - 3 �%0%%\0\0%%D\0%0\010O Q o nn nnnnnnnnt�nnnnn w 11- 00 00 00 00 'o �, - coocf�000 CA 00 00 00 00 00 �O C31 •� M V 1 n t> rt N O ON 00 t` %D N M M CV '-: O V Cf �t M M M M M M M M M M K1 r 'r ..f O N N N N N N N N N N N N N N N C O O Q O O O C CO O O C O O O O e) od coc?000OoddoOOO E �t �D oo N N N CV C11 M 1 Southbridge Stormwater Infiltration Study Soil Profile Description and K.,at Data Sneads Ferry, North Carolina July 28, 2008 Logged By: Gene Young, R.S. Area 139b - SB 9b Soil Description Page 1 of 2 0 4 inches Olive brown (2.5Y 4/3) sandy loam, sub -angular blocky, friable, slightly expansive. 4 - 48 inches Olive yellow (2.5Y 6/6) sandy clay foam, sub -angular blocky, friable, slightly expansive with light brownish gray (2.5Y 6/2) and brownish yellow 10YR 6/8). Seasonal High Water Table <12" C� ♦AMR a0 L. tote .� cV o ® CV L N E L. 0 4) N 0 E — M, %C ri 1--. (b U 1 coo U 3 H 0 _ _ CIS O O O g C U U. <� E O U Q > cli o - n v 3 o vt r C O � C ►� 75 (� . CA �i 1 Chi O c� trt 3 00 o�tnoc.xoo°occoaoc O oo '- oc ao 0o c,c ,� tic .o o c o 0 o c c o 0 0 o a d- 0--�?.ocoocgooc C c o C o C C d o o C C — tn N n C`i N N N O O C O O U O 0 0 0 C O C O C O O 4 N ZZ rq O 0 N N c o o a a o o c o 0 0 0 0 0 N C-1 N N N N N C 4 N N Cl C`3 � L• to tr. tr) to to to xn to to to to to .�.. - - Fz L✓ — [� 4 to tr,CD trt �J a v O - 1616 C C.0 O C O O 't -'R n � 'n m to N It Ict � 't c b to %n to to to to to xn to to to O .O G .0 C O O C O..O O Cl U O C O 0 0 .p a O C 0 0 C C to O to O to C in C to C vz C.. N C`S ^ Cl) in to v Cj0 O C�OtlO^.�C O O Q O Southbridge Stormwater Infiltration Study Soil Profile Description and Ksat data Sneads Ferry, North Carolina July 28, 2008 Logged By: Gene Young, R.S. Area 1310 - SIB 10 Soil Description Page 1 of 3 0 6 inches Light olive brown (2.5Y 5/3) loamy sand, granular, very friable. non -expansive. 6 - 48 inches Light yellowish brown (2.5Y 6/3) sand, granular, very friable, non - expansive. 48 - 52 inches Light yellowish brown (2.5Y 6/4) sand, granular, very friable, non - expansive. 52 - 58 inches Grayish brown (2.5Y 5i2) sand, granular, very friable, non - expansive. 58 - 60 inches Grayish brown (2.5Y 512) sandy loam, sub -angular blocky: friable, slightly expansive. Seasonal High Water Table 52" .0 L M 0 tmm N L A+ � W � CL E L C 4a 0 CO 0 Vr fr, (E r ` O u coo Cn C7 M M in trA cd ib 0 in C O w N � 0 � o � p C cy Q AN 00 M M to % t r C V � x O O _ C � O v V1 X O cq O. d CD to •-- + I pp O C sr o0 C? to N O %C %D % Q.00 c�a tn. N p -0-to M m vl C N 00 N N N N 0 .� 00 OO d N O p O C O C11 M M O OC -t ct O O G --� Loe Ic -t -,t 00 00 p N `� N] p M 00 U C4 M (,! ct O et fn J p kn to cV is M M M N M M: — na s c o 0 0 o c Qi N N O 00 In O p 0 � r- 1 � o � p to J ss �t N -fr — M Ld to -n eri to to t aG+ to to to tr; to 7d. , to to Ga 73 o 000000�00 00�.�.,oaoo:� 00 w Dd w Cfl w 00 00 00 00 00 00 v M M M c4'1 M M en M cll Cl) M to kn to to to to to to +n to to to en r- '�3 E � M as to tn.00 M ti0 O y d to v d M (V N -- p to to to to to t , to to to v. .p r 4 O O O 0 0 0 0 'O .,ococopopop00000000 +, p 0 0 O 0 0 0 O Q M p M C M O M O M N m 4 61 16 n oa 06 6; 64 O O N 0 0 O O^�C G�pfC r 9 O O O O O O O C, v c; c r1 00 x*0 cox'o 1c-rtio�c116%i v^. -; to In vi In �n -^ cV r4 N N N C•J �' C v O` C 1-11 N c`1 rd tit rl F4 O O O J O rJ Qt�00oca00o xo0 O C% c`1 N c11 N N N O n M m M rn M rn O cl %R C V.Y V V V to +r, In In In CV M M M rn M M C O O G O O N 1* `t et d eF r^, C M L In U In 0 'n 0 .+n C3 ,n O In O +n O 0 — CA cS 110 00 oc 2! o0 00 oc rn.. M M M M M M. In In v1 in In +n in — In �n�, In C-4 cM F rn M r l, N C cl)— O M — O In In v5 In In In U C O 0 0 O O O 0 0 O rn O rn O M O ell CQ c•1 M et d In In1C r L i� CO O C G O O O Southbridge Storrnwater Infiltration Study Soil Profile Description and Ksat Data Sneads Ferry, forth Carolina October 15, 2008 Logged By: Gene Young, R.S. Area B12 - SB 12 Soil Description Page 1 of 3 0 - 6 inches Dark gray (2.5Y 4/1) loamy sand, granular, very friable, non - expansive. 6 - 26 inches Light gray (2.5Y 7/1) sand, granular, very friable, non -expansive. 26 - 45 inches Light olive brown (2.5Y 5/4) loamy sand; granular, very friable, non- expansive. 45 - 52 inches Light yellowish brown (2.5Y 6/4) loamy sand, granular, very friable, non -expansive with light brownish gray (2.5Y 6/2) and brownish yellow (10YR 6/6) mottles. 52 - 60 inches Light yellowish brown (2.5Y 6/4) loamy sandisandy loam, sub - angular blocky, friable, slightly expansive with gray (2.5Y 6/1) and brownish yellow (10YR 6/8) mottles. Seasonal High Water Table 45" r+11� y / c i0 L o }i 0- E Lm AW 0 C � � M t Q 0o0 0o0 Li. ti � L > 'n A � � U N 4 Q U c A R� O N Q Q � a O G O Q G " 1 00 00 00 04 00 Cf 00 00 0c N 4*f t`+ cn cn try M M I{NN%0�C+ en�nw',usenCA'henOti . ooar•no4��;�;�t;qt�t�- �o�aticeri�tetvRt"gr't1 le lqr rvt d' qqr N Q cn a 00 00 00 00 00 to Oo 00 V } 00 0 0 o NO M to o in c� o. c, ON ON o+ CN 0% 0 o o �r o M lO 0� O� Cn cn cn M In �O M M ti0 M in tn In O O O O Ci 0 0 C 0 0 0 0 0 0 0 0 m G1 et %0 00 ' r M r` � M _G t n .� [� r-r E` .-r P1 00 O .r t� -� [� 00 O .r t� et er cn -- •-.• •-- C� Q O G G? O O G O O v � to in to w, en kn try to U- en to to o 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0 0 0 U rx V 1 V 1. en to to trt to in in in to en en in in en to N 4� Ao0 00 00 00 oa o0 00 00 00 00 00 00 00 00 co 00 00 00 't;3 a c�i cri cam[ c3 •. ,-K ..: — .-, .. .., .� IDS In in cc o0 Z mot' N Gi ' 4 v d' cn M cn cn N N N N. N 0 0 0 0 0 C7 O O O C Q:Cl Cl G 'O' O 0 0 O O O O O - O O G O 0 0 0 0 0 0 O O O cn tn %0 n 00 0% C �_ N M C C c o C C C C C'C 6.0 C c C o C C 0 0 n 0 0 co 0 0 O O O O 0 0 0 C0 O In ye) 't In in En to in In to In In +n to En In In In 00 00 tCCVcvc-ari�^��300 1 m 21, CT cn Ch h Ot h CT r` O {�.: C� t� C� n ON n G` r•• G� n ON n Os n n 4 M M d 00 n cn In n u ; u" t V'T �n =n n �3 an V"i to C S O OcltG,'�;no,n m n In — r. — — r-r: . w nr- — hr- nhr,nnr+ .-. r. �!'ti''�' O�ti�'�i-etd'Sf'��td'�t'�'ttStd'��'d'd• 00 00 In O 1p m 00 O M O a O O O O a 0 O O O CD CDCrONet oa In O, inOv�Inv1�n4nInIninInv�vsviv� oo�t otl- r- nnhnr- t- t- • M M tp M Ifl M O`. �O Q: CT O: O� O% ON O% O: O� Q: O� O. CT o fl o 0 o a o 0 0 0 o a o 0 o a o o a o ..,.�00 an zrr`��r-a-rlety M G` cn m m M m m M m cn Itst�t en cry mCD M � V) aoat�t V1 V'r � 4.� �n. oap0000pdooagoC> Y1 �1 v5 V1 �1 v01 1f : aP1 Q/'i tri V i �1'T vl i19 ui Ui CD V"3 M as �ntn�n o�n��n�nvs�nv-,vsv►viv,v3+nv,tnin nhh nnnr, nnc�'nnnr•nr-nnnnh oo 00 00 00 00 00 00 00 00 0o w 00 00 00 00 00 00 00 0o 00 00 r:r`.�cs�oa�oaoa000a0o0eoaex?craop00 M M M In r, O+ •- (M n .a` ._. m vt -- �D 'cr N O N n In M •-, O% rn men en N CV 0.o O o:o o 00 o O CD 0 0 0 0 0 Co 0 0 0 0 .� o 0 0.0.0 o O o 0 o c o 0 0 CD c g c o o a o 0 !. 00 0% a CV M It vi %c r� 00 0 . o ': N c%i et vi n a0 Q1 0 .-. — N cV cq N C4 N N N N N M M M en M M to to m M er G C7 O C7 d O�Q O O G O O O O O O O O p Southbridge Stormwater Infiltration Study Soil Profile Description and Ksat Data Sneads Ferry, North Carolina October 15, 2008 Logged By: Gene Young, R.S. Area B13 - SB 13 Soil Description Fags 1 of 3 0 - 6 inches Gray (2.5Y 5/1) loamy sand, granular, very friable, non -expansive. 6 - 28 inches Light olive brown (2.5Y 5/4) loamy sand, granular, very friable, non -expansive. 28 - 44 inches Light yellowish brown (2.5Y 6/3) sand/loamy sand, granular, very friable, non- expansive. 44 - 50 inches Ught gray (2.5Y 7/2) sand, granular, very friable, non -expansive. 50 - 60 inches. Olive yellow (2.5Y 6/6) sandy loam, sub -angular blocky, friable, slightly expansive with light brownish gray (2.5Y 6/2) and olive yellow (2.5Y 6/8) mottles. Seasonal High Water Table 44" Q� ■_ L y` cm = o N L N wit+ 0- E L. ,W Vi 7l� v 3 c N � O � � to o < � c � o O 9.> G � O C`1 1 rl --- 00 Vl to M to OO to to C* 07 0o CA .• - 00— C C C� C O a C C O Q O 3 o-,cis:6rlio. 00 ti^ zriNooc'i%,o c4cni c 1 •-- C- t� \0 [`- �C N i0 C� Vr i- � iO t- tG O 1� h - 1` os 00 �0 1— 00 C to trt trl x o'nD .�: N C OV' �': C O c t N N N cQ; C;04 34't+ C'cs. coo—.p �- Q 00 W) --» - tf) C) 00 00 a 00 to o 00 o 00 a to to to n •-- 07 �t r-I rl C'1 0 c'1 C c'1 C r N d t l N N r i O N N N N ri C N cr'1 O O O O O O O O C Q O O O C M N to G1 c �tr- trt ntRt a-o OC to 'Cr M M M m r`. M 't CT M GE M Q to -' to -t tr, d' a 1` N to E — c11 N c'1 C11 N N c^a C'1 ra N C11 [V N rq � L v1 to to to to .w, tr, in trl tn tr, w W, W, to to to to 000a0000000aG000000 u E to to to to try to tr: N to >n to to to to to to to J — C .M M M M CM M M l M M M M d 0 Ei M to 00 � M� M rr to 6fl M M v �} •�} � N 00 'eY C'1 1- cM � M G� tr, [� M .,� jen M N C11 M N jjyl N � q V o Q o a o 0 0 o fl o.o 0 0 0 0 o a o 0 O C O O O. i; 0000Qo�000 - "ac�cco ��: IDC$aoccot��oo 0 o o Coho22cCO110ohoW Ge �r; � cv - at - ai cxi o0 Q.o o t� Y; a o c o 0 = o O OC 00 M 06 DO 00 DO 00 O r- N r•1 csnnnnn N ell cV N rl CI O O CD C C O C a ti0 kD N n %C 'D tt � rt O Cr 3 r l rl N N c1l N (^l M � C� w of ocoo0ooc to to an to t� C-1 �. O fe _ F r 24 f 1 O O :p O ap0 O O O :� 00 O cs O C O C N (V O M Cl Gi d N 0 N N 0 b N O Southbridge Stormwrater Infiltration Study Soil Profile Description and Ksat Data Sneads Ferry, North Carolina October 15, 2008 _pad By: Gene Young, R.S. Area B14 - SB 14 Soil Description Rage I of I 0 - 15 inches Dark gray (2.5Y 4/1) loamy sand, granular, very friable, non - expansive. 15 - 26 inches Very dark gray (2.5Y 3/1) loamy sand, granular, very friable, non - expansive. 26 - 30 inches Dark grayish brown (2.5Y 4/2) loamy sand, granular, very friable, non- expansive. 30 - 48 inches Dark gray (2.5Y 4/1) sandy loam, sub -angular blocky, friable, slightly expansive. Seasonal High Water Table <12" Could not run Ksat test due to soil conditions FIELD OBSERVATION REPORT Project Name: South Bridge Subdivision Sneads Ferry, NC Project No. 07063 On July 31, 2009, we visited the site to determine the Seasonal High Water Table for the stormwater pond at Drainage Area #13 and stormwater pond at Drainage Area #14. As shown on the attached plan (8'/ x 11), in the area of Drainage Area #13, we bored two (2) holes and determined the Seasonal High Water Table was approximately elevation 18. As shown on the attached plan (8 % x 11), in the area of Drainage Area #14, we bored three (3) holes and determined the Seasonal High Water Table to be elevation 34 or below. JST/asn 07063 07-31-09-field observation for drainage areas #13 & #14 Attachment SEP Q 3 [009 BY: AMA NORRIS, KUSKE &TILINSTALL OM CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, NC 28401-4733 (910) 343-9653 Phone (910) 343-9604 Fax 14 -FOW- l t �, 1 ✓ sa&-Xlj W4S (Page 1 of 3) Thn,-rniar, Ihul ihrre ntk n',�, rt �{ � ad .uLL the m.%10.1....ut; ia,t,(li " �Kd�leF�AhiA tur r ° e 1(rfaiealiw�t■: ralvVIldfniilleatlaniV in r, 72 r Two i% aui a tertincali at at t 1 dakI Oil dnd dme r i Itrj �:C:Qelfltilf �i� to 10 STATE OF C9TRA, COUNTY OF ON.THIS Dbetween RAIFORD G. RAIFORD G. TRASK, JR., TRUS amendments thereto, dated May 23, 20W Wilmington, NC 28403, party of the second\ DEED i 111ir111rA1111 Doc ID: o02sa717o009 Type: CRP Recorded: t2JOB/ M at 04:07:07 PM Fee Amt• iZ0.00 Page i of 8 Exclee Tax: �0.00 Ons ov County. NC Mildred M Thoxas Register of needs 4784 P&70-72 this the3 —day of December, 2006 by and ual, party of the first part; and d ,,.Trask, Jr. Revocable Trust, and any W ITNESS,ETFY.- That the party of the first part in conside-rigi n of Dollars ($10.00) and other good and valuable considerations Eastwood Road, second part, the receipt of which hereby is acknowledged, has bang• 'nee presents does bargain, sell and convey unto the party of the second pa and assigns, the following described property, lying and being situate in Carolina, to wit: of n a d No/100 paid y the party of the sol�alr ti.py these Prepared by WPRDMDSm1TH, P.A., University Corporate Center, 127 Racine Drive, Post Office Box 7068, Wilmington, NC 28406-7068 Please return to WMDAmSmvnrH.P.A., University Corporate Center, 127 Racine Drive, Post Office Box 7068, Wilmington, NC 28406 7068 Attention: Thomas H. Johnson, Jr. No opinion on title is rendered by WARD mD Sna'rft, P.A., without a separate written opinion on title from WMD AND SmTx, P.A., iiook:2784,Page:70 (Page 2 of 3) t Bing that tract or parcel of land more particularly described in the Deed dated April 13, 2006, and being recorded in Book 2639, at Page 130 and the Deed dated April 13, 2006, and being recorded in B 2639, at Page 133, in the office of the Register of Deeds of Ons ounty, North Carolina, the descriptions in said Deeds be`in) inc porated herein by reference. pis co A�v anc . made subject to easements of record or on the on ,ffe g stri tine c venants of record, and ad valorem taxes for the curr nt y arwhi t es t arty of the second part, by accepting,thi. eed, TO HAVE AND TO HOl��isa p�r`t and all privileges and appurtenances thereunto belonging to the party of e s con part, °" a y successors and assigns forever. ;-f j And the party of the first OW cov6n� t a atd party is seized of said property in fee and has the right to convey same in fee'sillw6; that,.tltc w=e is free from encumbrances except any encumbrances or restrictions mention&4bdv %and t sa pill warrant and defend the title to the same against the lawful claims of a pe onFing, 'vei'. 1N TESTIMONY WHEREOF, the party of thir1 s caused this r { _ instrument to be executed under seal and in such form as to be bii - tr ap year first above written. ;�SiEAL) Raiford 6. Task, Jr. 2 Book:2784,Page:70 (Page 3 of 3) I first Date (O�cial COUNTY, NORTH CAROLINA following person personally appeared before me this day, o e that he signed the foregoing document for the purpose(s) :I, if -other than in an individual capacity, in the capacity indicated having been purr 'r�V ol eta z • O n;•• p� 6.: HAN4yzo\ 00V My Notary seal or stamp must appear within this box. WLMAINU51191\1 3 Notary Public i�4, Notary Public wd,yimae � TrzGl! �kpires: Book:2784,Page:70 (Page 1 of 4) q�12-�I5�1� !i STATE OF NORTH CAROLINA GENERAL WARRANTY DEED COUNTY OF ONSLDW Pl. TAKE NOTICE: The Attorney preparing this instrument has made no record sea or Me enwinstion as to do property hereto described, unless the some it shown by bea and signed ce rffkale. IL RECORDING TO: INSTR WAS PREPARED BY: ROBBRT W. KILROY, PC D ON FOR THE INDBX 60.64 ACRES. STUbe SOUND TOWNSHIP PA I.D. THIS DOCUMENT PRESENTED TO - REVEN THE ONSLOW CQUNTY i FFICE � !-r -► o.� cLER TMS DEED made $1H J and between GRANTOR: BRU C. N ' AND CAROL& - and RAHrORD G.TRASS GRANTEE: BCART, LLC ISO Old Ferry Rad Based, Ferry, NC 284 The deftudon Gnaw and Grantee as ivad I Book:1958,Page:79 (Page 2 of 4) EXMITA Property Description MOM 05110 88rbq @%p& Land Surveyors Englnoem land Planners 310 Walnut Street Wilmington. N.C. 26401 Phone: (910) 343.8002 Fart (910) 343-0941 Emer7: bygi.nom June 13, 2002 60.844crs Tract M 1958 BR080 i A owinin tract or parcel of lend king and boing In Stump Samd Tawnstdp. ,&sIOw Pgty, Norlh Catalina and being part of MUM kmmn as the 8ldbtay trct as losc#ed In dead book 356 page 6S6 records of Onslow County, and In a ract number 2 on a map surveyed by Hanover Design SaMoee. P�dt: In cry of 19118, and being more pedtulady described as fdkrws: �``tlis6fnn g at on the wastam right of way of N.C. H!phway 172 (100 ft publl ht orrwayy), s W Iron Is the southern most comer of tract number 1 of the 193 une , agld tron to also located 3 21-33-26W 898.87R from a PX nd at the IrNa�lse bfi of asAtedlt+e of NA Hghway 172 and S.R.1667. Prooesd from sold nt or Ing a d with the western right of way of N.C. Hlghvvey 172 and wah $ to �t A-0 a radius of 2a25.00 fL and a chord S 33- 52-20 W t 138.12 R, to a atterr most Comer Ora Ch0M tract, - thence wph said ch N 1 28 01ft loan kon, thsncs N 8S4S- 40 W 150.18 fl. >o an I Ihar ri1 ft to an kvn. thence N 82- 39 40 W 2t 0.001L to an Iron, S 0 W .40 ft.to an Iron, thence neap lines N 4848-00 W 260.1 R to an librr, N .57.0 W 143A7 ff. to an iron, thence N 20-2348 W 1 to 0 Iron. -21-48 W 88.42It. to an Iron, thence N 1"9-28 W 13 . iNto an N f-MA7 E 358.30 ft. to an iron. thence N 210 an . thence N 34-30- 21 E 141.22 fl. to an Iron, then N 11 ft.1p n Iron, thence down the nm of a crook (sad marsh) N 37.48 249A8 A thence N 03.21-M W $01.28 & to a point thence N 614 W O7 ft. to 'ROIK thence N 18.18-58 W 738.33 ft loan Iron. thence re I ofirpa, number 1 of the 1988 survey S 754"1 E 400.30 R. to a Iron f1 08 E 293.85 R to an Iron, thence S 14.18.26 E 229.04 It an f t S . 20.54 E 256.25 fL to an Iron, thence 8 48-27-04 E 287Ji4 fL . thence S 8132.19 E 196.7711. to an Iron, thence 3 01.64 29 W 109.10t an im r� Chance S 37-55.18 E 212.41 fl to an Iron, thence S ST-37.08 E 28 I fL Iron, thence S 35.31.28E 277.02 R loan Iron, the= S 14.23.08E 1 R tg an lror., thonoo S 53-57-36 4 246.22 ft to on iron, *9mo S 29-83-21 E 12 880, to or, bon, ihonce 6 $1.4045 E 189.21 fl. (o an lion. thenco 81212-31 E I R. to an Iron, thence S 20Q-41 E 148.09 It to the point of beginning and aontaining 6024 acres according to a survey by Hanover Design Services, PA it January of 1988 and June of 2002. Ali bearings are magnetic relative to dead book 786 page M. Wnuroiu lk Jonathan L. Wayne 183391 = a SIM 230deac �9jyAN L.'S Book:1958,Page:79 (Page 3 of 4) BBOt 1958 06E081 succasora, and assigns, and shall include singular, phnnal, masculine, feminine or neuter as . required by context. ' WffNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of kW situated in the city of Stump SMW Township Onslow County, North Carolina and more particularly described as follows: See attached Exhibit "A" which is incorporated by reference as if fogy set forth heroin. The property hereinabove described was acquired by Grantor by instrument recorded in Deed Book f at Page . Onsiow County Regisuy. A &uip Wing the above descrIW property is recorded in Plat Book. Page '(0 HAVE AND TO HOLD the afamsaid lot or parcel ofland and al privileges and ap�irFtena\ces thereto belonging to the Grates in fee simple. t�Sd the ter o slants with the Grao, that Grantor is seized of the premises in fee simpie kas to e9 the Same in fee simplk that tide is marketable and free and clear of all that Grantor wig warrant and defiasd the rite against the lawfid Claims of all persona whoms i exeZp�for the exceptions hereiaafier stated. Title to dwjO�mw hd nab�ve da� s subject to the following e,tceptwns. y' 1. Ad v�orel7riw= y+& 3 and subsequentyears. - Z. GenaflZttNlityse,4b use nd�tights of way of record. 3. Restrictive COVPOWS 0fggo4rd a g, einviromingist �m�aws or regulations rebtive to _ Per construction of the .Amect property. W WrrN[6SS WHEREOF. first above written. Book:1958,Page:79 (Page 4 of 4) ra 195810082 STATE OF NORTH CAROLINA COUNTY OF ' T i ( 1 D I\\ J • 'C'"y'N _ .'a Notary Pubic of the County and State aforesaid. certify that BRUCE C. CARLSON. Grantor, personally appeared before me this day and acknowledged the execution of the forgoing instrument. Witness my hand and official stamp or seal, this 5 day of January, 200 My Commission Expires: I0 o'�a0 Notary Public TATE FNOkTHC4ROkINA ; •. J ; CO (\ ) 0 J, a Notary Public ofthe County aad State iftlresaid, c(rtify (list f�AIFORD G. TRASK. JR.. Grantor, personally appeared before me this dkry and ack. ` o ledge��cution of the foregoing instrument. VA(n"css my-1 aa� -amd official stamp or seal, thisl5 day of January, 2003. My CommiuiaaExpts� OOS NotaryPublic STATE OF NO CAAPL`II IA 1,�J t =�'�J,. c Y j . COUNTY OF Ct�,is 1,tl6 5 �iotar j¢ JfuW; f the County and SfAre-.�oieswd, certify that CAROL - CARLSON, G?aator. pdsonallyapp`�a(edore me this day pd-......, acknowledged the execution of the foregoing instrur�Eht:` ''3, .,Ip % d of 1 2009 s t Witnessmy hand and official stamp or sent; tf>�1..._ �S� �rY. � � • ... ' Xal My Commission Expires: 41,/3 oor-__ Notary P It 1i 4<E The foregoing certificates) of To" J• Hardin & Caeolyn P:'sl "eertifi� to bye' correct. This instrument and this certificate are duly registered at the d to and tyriie arli rt>�e Book and Page shown on the first page hereof. y REGISTER OF DEEDS FOR ONSIAW BY: � _ Deputy/Assistant -Registe orDuds,� 13ook:1958,Page:79 3) NO(1957 PAGE 186 , wlxq� ee M owd/a s 223 !':. 16 I.i c: 26 $660.00 t?Q�jilltLl peel Esteeo rJ`"e Exelss To ARRAIV H u YI�JG� TAX PARCEC•NUMBER: GRANTEE'S ADDRESS: BC&RT, LLC 1511 Old Plerry Road Somas PREPAI10D BY; MARSHALL, WILLIAMS 8e GORHAM, LLP P.0.Drawer 2088.Wilminglon,NC 28402 BRIEF DESCRIPTIOOI ; ' 13ZA6 acres — N. C. Highway 112 —Stump Sound Township tea 138 TAX: SM.W. TFlIS �"kENT PRESENTED TO �1`JDR#E oN C ERK/ STATE OF NORTH CAROLINA WAkkADEED COUNTY OF ONSLOW THIS DEED. made and entered into this j day of im y;�2003, by and between MUTUAL MANAGEMENT LIMMD PARTNERSHIIP;`(n NWb'XsrPlhq limited partnership), heminafta called GRANTOR, and BC&kr, 4LC (i x6rt4P copplis,j, limped Ilsbility comPaaY). hereinafter called GRANTEE (tire designatipm drat' wwe Id�uN� as used herein shall include said parties and their hens, successors, and eas"shalt inckQe singular. phuai, masculine, tbminfim or neuter, as required by context). .f The GRANTOR, for a valuable comidemtion paid by the GRANTEE, the 4.je ! of whieb Is hereby acknowledged, has and by than presents does grant bargain, sell, and cone* GRANTEE in fee simple, all that certain real property located is Stump Sound Township, On#Tow County, North Carolina, and more particularly described on EXHIBIT A — PFAPEkT-y DESCRIPTION attached hereto and incorporated herein by this reference. ti TO HAVE AND TO HOLD the above granted and described property, togell►a with all privileges, easements, tenements and appurtenances thereto belonging, to the GRANTEE in fee simple. And the GRANTOR covenants with the GRANTEE, that the GRANTOR is seized of the premises in fee simple, has the right to convey the same in fec simple, that title is marin:tablc and fife and clear of all encumbrances, and that GRANTOR will warrant and defend the t&ie,glaina the lawful claims of all persons whomsoever, except for the exceptions hereinafter stated, i'itle to the property hereinabove described is subject to the following exceptions: Book: 1957,Page:186 (Page 2 of 3) f 90m 1951 PAR 187 ff PROPERTYDES Hanover Design Services, PA Land Surveyors Engineers Land Planners 319 Walnut Street Wilmington, N.C. 28401 Phone: (910) 343-8002 Fox (910) 343-9941 Email: Iwavne(hhdsilm.00m Owmber 12, 2002 °Re: 132.46-Acre Tract A certaia-tract or parcel of land lying and being in Stump Sound Township, Onsiaw County North Carolina and being part of that tract known as the Sidbury Victim described in deed book 356 page 50 records of Onslow County, and '--being partgftsst-Qumber 2 on a map surveyed by Hanover Design Services, PA in dusty of 1088, and being more particularly described as folkwa: Beginntrig atia(riron on ifie westam right of way of N.C. Highway 172 (100 ft- - public dghtolf Y), id iron is the •southerh most comer of a church Tract as shown on sai�fey, said"` n Is also located S 3148 59 W 2,048.67 IL from a PX naa at *a intermfo4 Yof f(ie centedine of N.C. Highway 172 and S.R.1557: Proceod• nr sald,polnt a brr pang and with the southwestern One of said church tract N 302�,28 M W 5 S:tQan;iron, thence leaving said church line and with a Ins surveyeby h}snoier' Design Services, PA. in June of 2002 N 46-36-W W 260.17 tC lean Irorf, thence N 30-57-06 W 143.47 R. to an Iron, thence N 29-23-18 W 156. fCfo an if&vfhence N 02-21-46 W 88.42 ft. to an Iron, thence N 16-69-28 W 137.721L tar art iron jWi ce N 17 E 358.39 it. to an iron, thence N 21-14.001N 120C ft to arl iron, thence 234-30-21 E 141.221 to an Iron, thence N 16.54-06 W 100.04.ft. to."a,`tltshco down the run of a creak (salt marsh) N 3748-00 W 249A.4�ft"�q�) a ptoint, thence N 03-2138 W 601.28 ft. to a point, thence N 51.47-06 W 458—W. 4 Ao a port{ ce N 16- 18-9 W 738.33 ft. to an Iron, thence with the waste(' ilnes bf u it 1 of the 1988 survey N 36-59-11 W 230.21 R to en irors, thence' Of 2 8 E'189A2-� 1 to a point in Everett's Creek, thence across Evorott's Creek Sa542-02> W 414.241 to an a)le, thence with the western lines of tract number 2 of" 1988 survey S 04-42-07 W 2441.00 R to an Iron, thence S 8SM49 E`SO.8 fLto an . Iron. thence S 04-56-11 W 1.933.60 fL to an iron, thence S 843-04 e2i0.0cm to a concrete monument, thence S 05-IMO W 388.18 ft. (passing ov0a concrete monument at 384.4911 thence with the noMem right of way 4N:C. 172 N 64-29-30 E 1,555.181 to an iron, thence with a curve to the left having a radius of 2A25.001 a chord bearing and distance of N 57-23-00 E 899.18 IL to the point of beginning and containing 132AS acres according to a survey by Hanover Design Services, PA in January of 1988 and June of 2002. Ail bearings are magnetic relative to deed book 786 page 760. paxmuaxgN 47' Jonathan L Wayne Pt.3 3391 $ S 230desc Q" �kee l �Nr� ` Book:1957,Page:186 8CO3 1951 PACE 18 8 i Ad mflo=tore for the year 2003 and subsxcium yam: 2. Utility easemerda mid mee rillids-of-way of record; 3. Applicable restrictive covenants of mmd; and 4. Local, county, state, and federal government laws and mplatfon; relative to coning, subdivision. occupancy, use mut uxxioq and developnem of the -Wet pmpnoy. IN TESTIMONY WHEREOF. the GRANTOR has caused this bstrumtu to le signed in its pattnership trams by its duly authorized Gemal Parma, who has hemamo set his head and seal; the day and year first above written. MUTUAL MANAGEMENT LIMITED f—' PARTNERSHIP By: Robert A. Little. Jr. A Gneial Pa;trier Alit Wr INURIit C_4%K • { f 1UNfY OF i. 'a-N0tinYPbbl4pf0e County and Stateahm aid, doom* t Robert A. Little, Jr., GeasrstNkaer of loii6l Management Limited Partmenblp (a rtb Carolina limited partnership). persortaUa�peatcd before me this day and acknowledged due execution ofthe foregoing Witness my hand and official stamp or seal, January. 2003. _ 190TARY Notary `—� xr , {p618Lt = My Commission ues: hrNrour ,—ti Aiing r. yer.■A.aoeu,pp Michelle A. Pyeche I I N■t■gpu) la p,.) � p 61l17-L iW Wu®rn r,. prwa■cN fa...ar,v.u■. ■d �.td In o: .Qm. sal n zy, a0 T6--Ls=dlq t . an. 6s 2� .•d d A r Book:1957,Page:186 rr+ • srti I ss i, t 6 l' I .f �".. xt = r r ,p, k . -r - y.:'1.•.,j {4�t �` i r-..., V s � �', r • `Y5 � S� � 4 � � �_ � i f r S-yI^++ � , �� C-.,. - � , `�� �,,;_� ` T -I � • {� � r"t�1 t f ��w.�r w.a�. 1 •{� \� M'',.. -_ %rE { i �.-._ .. �5.�:�,+..A�;` ty -�,. gip;,.[ y� �.. ' " .a _ J�- I• 1 �'°. 51+� :' tom` �° 3 fi.�-�"� is �: ..,,•,:.- _ . y 4/ r� lk Y, + t J{.'' � r cjt�l� `r'ev � �rMi `.-.� y' `•'r )+� ,�� !1 �y�'t� YYY � / # r rr �y ry� , �,'� i+)i FFFi � ,� .t -''�1 i� �-� ` ' " �c. �-,, .,rt` r \ • .; O 6\ ��1F5 ,.. �i ,.:ti1.`'I� � � - ��i�t•1ir _ -_ ,, �l fs!rr � � i ��" .` �_t�'�` ,thy �� .7 � ` S �\2 ///..✓11Y;:-�� ., ` � J� k jSh:e �~•,•� ';. � \ -..... �� _w- i is �� �•���', r j�` = "%''� \, l I`I l� +orw � � • � �a� eb � F t!�� t�t � � r.:�� t�la� t • A�` a X ,r✓ jk�:i �ti ��•.. ice. _ .^�._. Pt {Mi i ' a,\ \' .jti x+ q� r i� /r� w- �.t � .. � ,{ � f� j - �t �"•••.i!,1 As t K"v f` r � a :✓4 ',"l• `f+n�':. y O � Y�qf ' �,O::p � l s��� ��'�i t „� i r• �r 11. �. � o ;,,d . IVti.. `sc,. Y�., �I i�.—.�"'�"n ..""4�.+i I'F_C I `•'v,'Y ,C .:� ,.�i' �'r'i�._4'�� �a(r"ip ,•.•tr�. 't; �'`` ` ,+S . i yl ^-w. .� r_ ,ti.F• rr 'r•'.'_'tl�w'"''�*�" • [� ik 'YE...ci ' { ".ai' .� •�• �� 1• � � ii (/ i �'' `..i�' ��s.r � a� � I �di/ LLS U m af onoG3 North Carolina Secretary of State Page 1 of 1 01 O � ) °j CORPORATIONS North Carolina Elaine F. Marshall DEPARTMENT OF THE Secretary SECRETARY of STATE PO Box 29622 Raleigh, NC 27626-0622 (919)607-2000 Corporations Home Search By Corporate Name Search For New & Dissolved Search By Registered Agent Important Notice Resale of Tickets Online Corporations FAQ Homeowners' Association FAQ Tobacco Manufacturers Unincorporated Non -Profits Dissolution Reports Non -Profit Reports Verify Certification Online Annual Reports LINKS & LEGISLATION KBBE B20 Annual Reports SOSID Number Correction 2001 Bill Summaries 1999 Senate Bills Annual Reports 1997 Corporations 1997 Professional Corporations Register for E-Procurement Dept. of Revenue ONLINE ORDERS Start An Order New Payment Procedures CONTACT US Corporations Division TOOLS Secretary of State Home Secretary of State Site Map Printable Page Date: 4/612009 Click here to: View Document Filings I Sign Up for E-Notifications I Print sprs-populated Annual Report Form i Annual Report Count i File an Annual Report I Corporation Names Name Name Type NC BC&RT, LLC Legal Limited Liability Company Information SOSID: 0643994 Status: Current -Active Date Formed: 8/30/2002 Citizenship: Domestic State of Inc.: NC Duration: Perpetual Registered Agent Agent Name: Trask, Raiford G., Jr. Registered Office Address: 1202 Eastwood Road Wilmington NC 28403 Registered Mailing 1202 Eastwood Road Address: Wilmington INC 28403 Principal Office Address: 1202 Eastwood Road Wilmington NC 28403 Principal Mailing Address: 1202 Eastwood Road Wilmington NC 28403 http://www.secretary.state.nc.us/corporations/Corp.aspx?Pitemld=5522692 4/6/2009 �w i LIMITED LIABILITY COMPANY ANNUAL REPORT NAME OF LIMITED LIABILITY COMPANY: BC&RT, LLC SECRETARY OF STATE L.L.C. ID NUMBER: 0643994 NATURE OF BUSINESS: Land and T imber. REGISTERED AGENT: Trask, Raiford G. Jr. REGISTERED OFFICE MAILING ADDRESS: 1201 Eastwood Roars Wilmington, NC 28403 SOSID: 0643994 Date Filed: 5/112008 2:37:00 PM Elaine F. Marshall North Carolina Secretary of State C200812201541 STATE OF INCORPORATION: NC REGISTERED OFFICE STREET ADDRESS: 1202 Eastwood Road Wilmington, Ar 28403 New Hanover County PRINCIPAL OFFICE TELEPHONE NUMBER: (910) 313-07.95 PRINCIPAL OFFICE MAILING ADDRESS: 1202 Eastwood Road Wilmington, NC 28403 PRINCIPAL OFFICE STREET ADDRESS: 1201 Eastwood Road Wilmington, NC 28403 MANAGERS&MMBERS/ORGANIZERS: ,Yams: RwfimdG Trlaak✓r irtle: ,thoWer Address: 1202 Eastwood Road Wthnin ton NC 28403 CERTIFICATION OF ANNUAL RT MUST BE COMPLETED BY Raiford Trask V FORM MUST 131301106 BY A MANAOER/MFMBER Raiford Trask TYPE OR PRINT NAME ALL LIMITED LIABILITY COMPANIES 20080401 DATE Manager TYPE OR PRINT TITLE. ANNUAL REPORT FEE: &Paid Saaelwy or Slate • CwporWOW Division . Poo Office Box 29525 • Raleigh, NC 2762"525 SOSID: 643994 Date Filed: 8130120021:54 PM Elaine F. Marshall 22 243 9055 ARTICLES OF ORGANIZATION North Carolina Secretary of State OF BC&RT, LLC Pursuant to § 57C-2-20 of the General Statutes of North Carolina, the undersigned does hereby submit these Articles of Organization for the purpose of forming a limited liability company. 1. The name of the limited liability company is: BC&RT, LLC 2. The duration of the limited liability company is perpetual. 3. The name and address of the organizer executing these Articles of Organization is as follows: Frances Y. Trask 16 North Fifth Avenue Wilmington, NC 28401 4. The street address and county of the initial registered office of the limited liability company is: 1202 Eastwood Road Wilmington, NC 28403 New Hanover County 5. The mailing address of the limited liability company is the same as that stated in the preceding paragraph 4. 6. The name of the initial registered agent at such address is: Raiford G. Trask, Jr. 7. The limited liability company is member-nunaged, and the members of this limited liability company shall be managers by virtue of their status as members. 8. To the fidlest extent permitted by applicable law, as it now exists or may hereafter be amended, the limited liability company shall indemnify all members and managers of the limited liability company against all liability and litigation expense, including, but not limited to, reasonable attorneys' fees, arising out of their status as such or their activities in the foregoing capacity, regardless of when such status existed or activity occurred and regardless of whether or not they are members or managers of the limited liability company at the time such indemnification is sought or obtained. Without limiting the generality of the foregoing indemnity, such persons may also recover from the limited liability company all reasonable Xn3o costs, expenses and attorneys' fees in connection with the enforcement of rights to indemnification granted herein. The provisions of this paragraph are in addition to and not in limitation of the power of the limited liability company with respect to, and the rights of any manager or member of the limited liability company to receive the benefits of, any other or further indemnification, insurance, elimination of liability or the right or benefit which is either required by the North Carolina Limited Liability Company Act or permitted thereby and duly adopted by the limited liability company in accordance therewith. 9. To the fullest extent permitted by applicable law, as it now exists or may hereafter be amended, no member or manager of the limited liability company shall have any personal liability arising out of any action, whether by or in the right of the limited liability company or otherwise, for monetary damages for breach of his or her duty as a manager or member. This paragraph shall not impair any right to receive indemnity or insurance from the limited liability company or any third party which any member or manager may now or hereafter have. Any repeal or modification of this paragraph shall not impair or otherwise adversely affect any limitation on, or elimination of, the personal liability of a member or manager effected hereby with respect to the acts or omissions occurring prior to such repeal or modification. 10. These Articles of Organization will be effective upon filing. This thcj�day of August, 2002. 20730 2 &'Atav uX/ L�k�L, 4zl Soil Boring Information Label SHWT SHWT Bore Elevation SHWT Elevation rinI (�*I (fti i`ti 81 54 4.500 20.000 15.500 B2 26 2.167 8.000 5.833 B3 62 5.167 15.997 10.830 / B4 34 2.833 11.000 8.167 B5a 48 4.000 11.000 7.000 B5b 54 4.500 11.000 6.500 B6 22 1.833 7.833 6.000 B7 28 2.333 12.333 10.000 B8 24 2.000 8.000 6.000 B9a 32 2.667 8.997 6.330 B9b < 12 < 1.000 11.000 10.100 B10 52 4.333 18.003 13.670 B12 45 3.750 25.750 22.000 B13 44 3.667 14.997 11.330 ✓ B14 < 12 < 1.000 34.000 33.170 B15 50 4.167 28.167 24.000 B16 24 2.000 33.000 31.000 B17 12 1.000 35.000 34.000 B18 26 2.167 7.000 4.833 SEP 0 a 2009 SY: a l5r4O of c4- 0 - SE16 t W-5t4wT &V WeTLkAs)f M 14 "N z 7. 1 , . M9/A NJ Zk'- NA N - r-V NX q 41, .�X Bonng SHWIT Location (inchm) \31 'I• BI 54" 26'--"' orb 62a -1" r B3 IT .7 B4 34 6d' 48' B5b 540, 22"' 28--/ 24--,/ 32-:/ <12' 52" 45m 44'vv < 12" v/ SHM: Seasond High Water RIbL- Map adci0edf-tarn d9sign PlOn bV NOM KusKe & "unstaR Wed I o/6/08 Tffm.- Southbelde SIC? Snit Boang J CCHP Locciftons Fcaourcp- $Aamapmanz PC F-10. BOX 582. HCMPSM�001 w 25443 SCALE' DATE DRAV%N BY. (9101270-21MPAX 2702988 f 07078 1 2W 2 02/19/09 GY Fr --,ME: 2 I Johnson, Kell From: Johnson, Kelly Sent: Tuesday, August 18, 2009 7:45 AM To: Lewis,Linda; Bennett, Bradley; Patterson, Robert; Scott, Georgette; Vinson, Scott; Dumpor, Samir Subject: RE: SouthBridge Linda, returned this application on July 1. It was a long letter, but here is the sand filter underdrain section (SAWQSISTORMWATERIRETURN1South Bridge Phase 1.jun09): Sand filter underdrains: There are three options to establish that there is "no direct discharge" to SA waters per SL2008-211, Section 2(b), (1)(c). Paraphrasing, Option 1 is to infiltrate the design storm. Option 2 is to provide diffuse flow at a non -erosive velocity to an area capable of providing effective infiltration, and Option 3 is to have a wet pond with a secondary BMP. It appears that you intend to comply with the second o tion for the sand filters in this design. Is that correct? A sand filter with an un erdrain inside the liner can be used in SA waters under Option 2 if the underdrain is directed non - diffusely and non-erosively to an area capable of providing effective infiltration. One option would be to install level spreaders (for diffuse flow) with 50-ft filter strips (both designed for the 10-year peak and demonstrating non -erosive velocity), and to also provide calculations that "effective infiltration" exists. Because this is a new rule, we have not had many projects seek to comply with the "effective infiltration" option. The rule does not define this term, unfortunately. This is an area where the Division is in the process of developing more guidance for implementation. In the meantime, if it can be shown that either the entire design storm will be infiltrated in the vegetated filter or that the infiltration rate of the soil in the filter is greater than the rate of water flowing to the filter, then I believe "effective infiltration" could be established. It is also not clear from the information provided that the energy dissipaters in the current design provide diffuse, non -erosive flow or that °effective infiltration" is provided. Please provide a discussion and supporting calculations as to how this design complies with SL2008-211, Section 2(b), (1)(c). That is pretty much what you said in #1, 4, & 5. For the level spreader design storm (#4),1 think it should be the flow resulting from the 10yr Peak going through the sand filter (which would essentially be the result of a greater head in the sand filter) and then over the level spreader and filter stria b/c the filter strip has to be designed for the 1 n►►r peak nor .1008. Alternatively, we could ask for the LS/FS to be designed for the whole 10yr peak. But, I don't think that the LS/FS would ever have to accommodate that volume because it is being attenuated by the BMP. As for #2 & 3, 1 agree with what you have said below. KJ From: Lewis,Linda Sent: Monday, August 17, 2009 4:14 PM To: Bennett, Bradley; Patterson, Robert; Scott, Georgette; Vinson, Scott; Dumpor, Samir; Johnson, Kelly Subject: FW: SouthBridge Need some help on this proposal. A sand filter is located within '/ mile of SA waters — the underdrain makes it a discharging system. They plan to allow the underdrain to go into the 50' buffer and demonstrate "effective infiltration" but the buffer contains wetlands. I plan on asking for the following: 1. Demonstrate how a buffer that contains wetlands will provide effective infiltration of the design storm volume based on soils and slope, but not on a specific separation to the SHWT. 2. In order to find the WQV for this sand filter within 'h mile of SA waters, the designer would have to run the volume equation in Section 11.3.5 using a pre and post Rv value and the 1 year 24 hour precipitation depth, and take the difference in those volumes as the WQV and then 75% of that value is the Adjusted WQV to store above the sand in the sand filter. 3. Discharge rate leaving the underdrain is < 1 yr 24 hr predevelopment flowrate, but the sand filter must still draw down within 40 hours. 4. Flow into the buffer is "diffuse", i.e., a level spreader is needed. Since the level spreader is receiving runoff from an upstream BMP, what would be the design storm for this level spreader? 5. Flow into and through the wetlands within the buffer is non -erosive, i.e., less than 2 fps. Is this all we need to consider? Linda Please note my new email address is Linda.Lewis@ncdenr.gov Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: John Tunstall [mailto:jtunstall@nkteng.com] Sent: Monday, August 17, 2009 2:23 PM To: Lewis,Linda Subject: SouthBridge Linda We have a project that is within a % mile of SA waters and are using sand filters for our treatment of stormwater. Based on previous correspondence we understand that we are to "effectively Infiltrate" the discharge (<lcfs) from the under - drains from the sand filter. We propose to accomplish this by discharging the under drains at a non erosive velocity within a vegetated buffer. In accordance with the new rules (section 2(b)b.5) vegetated buffers can be located within wetlands. Therefore, we plan to discharge the underdrains at a non erosive velocity to the vegetated buffers and are using the USDA soils information on infiltration rates to calculate "effective Infiltration" within the vegetated buffers. Please advise if this is an acceptable means of secondary treatment for the underdrains. Thanks John S. Tunstall, P.E. Norris, Kuske & Tunstall Consulting Engineers, Inc. 902 Market Street Wilmington, NC 28401 910-343-9653 910-343-9604 (Fax) It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc. that this electronic information provides design information current as of the date of its release. It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested. In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data. Johnson, Kelly From: Johnson, Kelly Sent: Friday, July 17, 2009 2:01 PM To: 'Jody Bland' Cc: 'John Tunstall; Lewis,Linda Subject: RE: 07063 - Southbridge Comments Jody, I have addressed each of your questions below: 1. SA drainage area: I did not realize that you had received direction from our office in February that you would be able to drain an area within a half mile of SA to a pond outside of the half -mule line and design the pond for the non -SA volume. Since you had already received this guidance, we will not go back on that at this point and the current design will be allowed. However, please be advised for future projects that this philosophy was grounded in previous regulation preventing a pond from being installed within the half mile line. Under SL2008-211, ponds can be within the half -mile line. So, we have been directed by Raleigh that if the drainage area for a pond contains any area (in whole or in part) that is within the half mile line and if that pond then discharges to the SA, then that pond must be designed for SA. 2. Infiltration basins: a. Emergency overflows: Have you installed an overflow to meet a local requirement for a "large" storm? We do not encounter that very often. The State rules say that the excess volume above the design storm bypass to a level spreader/filter strip capable of handling the I Oyr peak. Since the level spreader/filter strip system can only handle the I Oyr peak, if there is a local requirement that requires storms above the 10yr storm to be treated in some way, and the bypass for the infiltration system will be overwhelmed by the "large" storm (above I Oyr peak) such that the water will enter the basin and then need somewhere to go, then you could use an emergency overflow in an infiltration basin. Perhaps that is your intention? If so, then that is acceptable. I had not thought of that possibility until this discussion because we do not encounter that often. In general, we do not permit emergency overflows in infiltration basins but perhaps there are some exceptions. Please clarify in your resubmittal why the overflows are necessary. b. SA waters: Additionally, in SA waters there can be no new point of discharge. You have to meet one of the three options in SL2008-211, a.) Infiltrate design storm, b.) Effective infiltration. or c.) Wet pond to 2"d BMP. The level spreader/filter strip already required can be used towards the "effective infiltration" option. However, in your resubmittal please provide some written justification as to the ability of the filter strip to provide effective infiltration. Unfortunately, this is an area where the Division is still developing guidance. In the future there will probably be some sort of calculation to demonstrate "effective infiltration", but in the meantime please provide some written justification as to how the water will infiltrate effectively in the filter strip in order to demonstrate your compliance with this requirement. c. Hydraulically connecting the upper and lower infiltration basins: Since the two areas are hydraulically connected as you have described below, I am sure that we can find a way to accommodate this unconventional design as long as it meets the SA requirement above. 3. Sand filters: a. Emergency overflow: Same discussion as for infiltration basins, but the excess volume of the design storm does not have to be treated by a level spreader/filter strip as is necessary for an infiltration basin (see the recent guidance document, httu://h2o.enr.state.nc.us/su/documents/Sandfilteroverflow-bvuass Original.ndfl. b. SA waters: There cannot be anew point of discharge from the design storm, which for sand filters, means that the underdrain flow has to be accounted for in one of the three options in SL1008-1 l 1. (The by water is not considered in this requirement) 4. Master permits: If this site is the only phase being proposed at this time, then no master plan is needed. However, please keep this requirement in mind for future phases that will be a "common plan of development" with this phase. Have a good weekend, Kelly From: Jody Bland [mailto:jbland@nkteng.com] Sent: Thursday, July 16, 2009 5:19 PM To: Johnson, Kelly Cc: 'John Tunstall' Subject: RE: 07063 - Southbridge Comments Hi Mrs. Johnson, Yes, there are specific questions that we would like answered. Specifically 1. Your guidance differs from the guidance that we originally received from Linda Lewis on this matter. Please advise as to which is the correct procedure 4. Infiltration supplements - Will the current method we are using; as stated below; be acceptable? 5. & 7. Please advise regarding the emergency spillways 8. Please advise regarding the discharge in excess of the design storm 12. Please advise regarding master permit requirements. Thanks, Jody Bland NORAIS.KUSKE&JUNSTALL Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 Mobile - 910-512-8148 From: Johnson, Kelly [mailto:kelly.p.johnson@ncdenr.gov] Sent: Thursday, July 16, 2009 1:10 PM To: Jody Bland Cc: 'John Tunstall' Subject: RE: 07063 - Southbridge Comments Jody, The information below appears to.be a summary of what you plan to resubmit. Did you have any specific questions for me, or is this just for my information? If you have specific questions I would be glad to answer them for you, but otherwise it will be best for me to go back through the submittal when it comes in. Thanks, Kelly From: Jody Bland [mailto:jbland@nkteng.com] Sent: Wednesday, July 15, 2009 2:20 PM To: Johnson, Kelly Cc: 'John Tunstall' Subject: 07063 - Southbridge Comments Good Afternoon Mrs. Johnson, John Tunstall asked me to review/ work through the comments that you provided for the Southbridge stormwater submittal. Below are statements identifying by what means some of the items will be corrected or comments/concerns regarding items you have identified. Please elaborate on items as needed; we would like to keep an open line of communication regarding some of the new regulations and the issues that have come out of the aforementioned new regulations since it is both new to NKT as well as NCDENR DWQ. We appreciate your time and input. 1. Please see the attached email correspondence between Linda Lewis and NKT prior to beginning design of drainage area 13 and its corresponding pond. This specific question regarding a drainage area being bisected by the'/ mile line and the placement of the stormwater pond outside of the Y2 mile line was discussed along with the specific discharge requirements that we would be required to adhere to. See highlighted areas 2. Coastal wetlands are identified as any salt marsh or other marsh subject to regular or occasional flooding by tides excluding hurricane or tropical storm tides. Additionally coastal wetlands will contain some if not all of the ten specified marsh plants species as identified in 15A NCAC 07H. 205 — Coastal Wetlands. Therefore; No; all wetlands onsite are not classified as coastal wetlands. 3.1 A summary table will be included within the revised submittal package 3.2 A site visit was performed with Mr. Lewis on 3/16/09. Mr. Lewis has not provided any documentation of this meeting at this time to NKT. 3.3 Additional data has been requested for the pond locations 4. The upper and lower infiltration basins work in series to provide ample area to infiltrate all stormwater from created from the drainage area. These areas are connected hydraulically through the storm drainage piping system utilizing weirs/ baffle walls within the catch basins. The upper basin is initially filled until the specified peak volume is reached then the remaining discharge from the design storm is treated within the lower basin. Any additional volume created above the design storm is bypassed utilizing the weir/ baffle wall within the lower basin's diversion box which then discharges into the vegetated filter. Since both basins are used in series to treat a singular drainage area; and not a portion thereof; if as directed each individual supplement sheet will result in numerous error messages contained within the comment lines of the supplement forms. In the past we have been directed to complete the supplement form by using the cumulative totals for both the area and volume requirements therefore identifying that together treatment requirements are reached. 5.& 7. We have major concerns regarding the direction to remove all emergency spillways from the basins within the '/2 mile line. Currently, the emergency spillways have been designed so that in the event of a major rainfall event (i.e. Hurricanes) then the emergency spillways would be utilized at that time. Additionally, in the event that wildlife were to create a blockage of the outlet structure or pipe the subsequent blockage would result in the use of the emergency until said blockage was removed. In either scenario without an emergency spillway in place the result would be overtopping of the basin. If such overtopping were to occur it would be a high probability that this would result in catastrophic failure of the basin resulting in the possibility of no treatment for the discharge from these scenarios. We offer to model the basins utilizing our HydroCadd software which would illustrate that no discharge through the spillway would result from the required design storm. Please advise 6. The level spreader and vegetated filter will be designed as requested 8. We will pursue option #2 to provide diffuse, non -erosive, & effective infiltration of the discharge from the under drain system. Are there any discharge requirements for discharges in excess of the design storm? Please advise 9. We will provide the requested data for the specific items contained in 9.1 - 9.3 10. & 11. Additional labeling will be provided 12. This project currently has no master permit. The original submitted documents are for Phase 1. Due to current economic conditions our client wishes only to pursue permitting and construction of the submitted Phase 1. We have a preliminary layout for a future Phase 2 but the construction of this phase is not guaranteed and NKT has not been released to perform designs for this portion. If all that is required to obtain a master permit is an approximate density, approximate overall impervious, and a possible use from this remaining property then we will be able to provide this information to meet your master permit guidance. If additional information is required or further design of the future Phase 2 area is required to meet the master permit guidance then please provide NKT with options to permit Phase 1 only. Please advise 13. & 14. The BUA tables will be updated. Thanks, Jody Bland NORRIS. KUSK£ 9,TUNSTA LL a• Wilmington Office - 910-343-9653 Brunswick Office - 910-287-5900 A � NCS& North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director July 1, 2009 Mr. Raiford G. Trask, Jr. BC & RT, LLC 1202 Eastwood Road Wilmington, NC 28403 Subject: APPLICATION RETURN Project Name: South Bridge Subdivision — Phase I Location/County: Onslow County Dear Mr. Trask: Dee Freeman Secretary On June 23, 2009, the Division received an incomplete stormwater application for the project listed above. The application and check number 27944, in the amount of $505 are being returned because the package lacked the necessary elements to accept it for review. The following information is needed to accept the application for review: 1. Pond 13, SA Waters: The receiving stream is SA/HQW. I see a summary in your calculations package comparing the 1.5" to the 1yr24hr storm volume, and that the volume for the 1 yr24hr storm is greater. I also see that the treatment volume for the 1yr24hr storm is used as the "design volume" for all of the sand filters on their supplements and the "volume provided" on the infiltration basin's supplement, which is correct. But, I am confused about the wet ponds. The SA sections of the two wet pond supplements (DAs 13 & 14) are not filled out, and the temporary pool volume reported on each supplement matches the non -SA volume values reported on the supplements. This may be because the outlet of each pond is outside of the half -mile radius for SA waters. However, a portion of the drainage area to Pond 13 is inside the half -mile line. Any BMP that has a drainage area (in whole or in part) within the half -mile line must meet the SA requirements. It appears that the entire drainage area for Pond 14 is outside of the half -mile line. If so, then Pond 14 is not subject to SA. Please correct any discrepancies related to this issue. 2. Coastal Wetlands: This project excludes 4.63 acres of coastal wetlands. Coastal wetlands are shown on the cover page (DA) of the plan set, and wetlands are shown throughout the plan set. It appears that all of the wetlands onsite are coastal wetlands. Is that correct? 3. SHWT: 1. All BMPs used in the design: The soils report indicates the SHWT depth. A map is provided as to the location of each bore, but I do not see a summary of the existing grade fmsl, the depth from that level to the SHWT, and the calculated SHWT fmsl. The boring markers on the plans show a center point, but the existing grade can only be estimated from this information. Please provide a summary table. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX 910-350-20041 Customer Service:1-877-623-6748 N� Carolina Internet www.ncwaterqualihrorg `' Y[�tura!! An Equal Opportunity \ Afirmative Action Employer South'Bridge Subdivision Phase I July 1, 2009 2. Infiltration basin: Has Vincent Lewis from our office been to the site to look at the soils? I do not see his report in the submittal package. Mr. Lewis' report must be submitted with any infiltration design before it is accepted for review. He can be reached at 910.796.7378. 1 took a quick look at the design, and it appears from the data provided that it will comply with the design requirements, but Vincent's report is still required for each infiltration basin project. (The soils report indicates that the SHWT at boring #10 in drainage area 7 is 52" (4.33') from the existing surface. The existing grade appears to be at 18 fmsl, which would put the SHWT at 13.66 fmsl. The bottom of the basin is at 16 fmsl, which would meet the BMP manual's requirement that the bottom of the basin be a minimum of 2ft above the SHWT.) 3. Wet Ponds: Both ponds are situated right next to wetland areas, which creates a potential for wetland impacts. You may be aware that the Division has issued wet pond SHWT guidance, which is available online at, http://h2o.enr.state.nc.us/su/documents/PondSHWT Original.pdf, outlining specific guidance for dealing with SHWT concerns. In general, the permanent pool must be set no lower than 6" below the SHWT. This accomplishes 2 things: one, it assures that the adjacent wetlands will not be adversely impacted and two, it assures that sufficient volume will be available in the pond to store the design storm volume. If the permanent pool is located more than 6" below the SHWT, calculations must be provided demonstrating compliance with the four criteria as outlined in the guidance. 1. DA14: From the soils report, it does not appear that a soil boring was done for this pond. The supplement also does not have a SHWT value reported. Please provide a SHWT determination for the pond. The bore(s) should show a SHWT that is representative of the entire wet pond. 2. DA13: Why was Boring B1 drilled outside of the pond? The SHWT was found to be 54" (4.33') below the existing grade, which appears to be 20 fmsl, which puts the SHWT at 15.66 fmsl. The SHWT reported on the supplement is 15.5 fmsl, which is in line with this value. The permanent pool is at 21 fmsl, which meets the 6" requirement. But, Boring B2 was drilled near (but outside of) the pond in a lower area also surrounded by wetlands. The SHWT was found to be 26" (2.17') below the existing grade, which appears to be 7.75 fmsl, which puts the SHWT at 5.58 fmsl. The SHWT level therefore varies greatly in this area. Please provide bore(s) that show a SHWT that is representative of the entire wet pond. 4. Infiltration basin upper and lower infiltration areas: Why are there two areas? Are these two infiltration basins? They do not appear to be hydraulically connected other than to share a vegetated filter strip for the bypassed volume. If there are two basins, please provide two supplements. 5. Infiltration basin emergency spillways: Infiltration basins should be designed such that the excess volume bypasses the basin as opposed to entering the basin and spilling over, per 15A NCAC 2H .1008. Please reconfigure the design such that the emergency overflows are eliminated. Additionally, the basin could be redesigned to comply with one of the four. options outlined in the infiltration policy document, found at http://h2o.enr.state.nc.us/su/documents/infiltrationoverflow-bypass Original.pdf, Page 2 of 4 South Bridge Subdivision Phase I July 1, 2009 6. Infiltration basin filter strip: Excess volume shall be evenly distributed across a vegetated filter. Please use the 10-year storm attenuated peak flow to determine the Level Spreader length, and consequently the Vegetated Filter Strip length, and provide a completed Level Spreader and Vegetated Filter Strip supplement and signed O&M. ?. Sand filter emergent, spillways: As similar to the previous comment about infiltration basins, the excess design storm in a sand filter must be bypassed. Please eliminate the emergency overflows in the sand filters. 8. Sand filter underdrains: There are three options to establish that there is "no direct discharge" to SA waters per SL2008-211, Section 2(b), (1)(c). Paraphrasing, Option 1 is to infiltrate the design storm. Option 2 is to provide diffuse flow at a non -erosive velocity to an area capable of providing effective infiltration, and Option 3 is to have a wet pond with a secondary BMP. It appears that you intend to comply with the second option for the sand filters in this design. Is that correct? A sand filter with an underdrain inside the liner can be used in SA waters under Option 2 if the underdrain is directed non -diffusely and non-erosively to an area capable of providing effective infiltration. One option would be to install level spreaders (for diffuse flow) with 50-ft filter strips (both designed for the 10-year peak and demonstrating non -erosive velocity), and to also provide calculations that "effective infiltration" exists. Because this is a new rule, we have not had many projects seek to comply with the "effective infiltration" option. The rule does not define this term, unfortunately. This is an area where the Division is in the process of developing more guidance for implementation. In the meantime, if it can be shown that either the entire design storm will be infiltrated in the vegetated filter or that the infiltration rate of the soil in the filter is greater than the rate of water flowing to the filter, then I believe "effective infiltration" could be established. It is also not clear from the information provided that the energy dissipaters in the current design provide diffuse, non -erosive flow or that "effective infiltration" is provided. Please provide a discussion and supporting calculations as to how this design complies with SL2008-211, Section 2(b), (1)(c). 9. Sand filter liners: If a sand filter is lined, it is considered a closed (as opposed to open) sand filter. 1. If the SHWT is as high as or higher than the bottom of the lined sand filter please provide anti -buoyancy calculations showing that the liner will be able to stay in place under the weight of the sand. 2. Please demonstrate that the liner will not contribute to draining the water table. 3. Please correct any applicable plan sheets that refer to lined open sand filters. 10. Wet Pond, DA14: Please label the wet pond on sheet C-4. 11. Wet Pond, DA13: Please label the wet pond on sheet C-5. 12. Master permit or plan: Is this project a part of a master permit or plan that was permitted for BUA previously? If so, what is the permit number? If not, please submit a master plan for this development showing both Phase I and Phase II. This will help us keep track of the development as a whole. Please see, htto://h2o.enr.state.ne.us/su/documents/MasterPlans Original odf, for further information. 13. Deed restrictions: The deed restriction for the commercial areas has an attachment of the BUA summary from the application package. This summary is missing the column Page 3 of 4 South Bridge Subdivision Phase I July 1, 2009 from the left side indicating what numbers are in each row. Please add the descriptive column. 14. Application BUA summary: Please also add the descriptive column to the application's BUA summary table. Please visit DWQ's website at http://h2o.enr.state.nc.us/su/bmp forms.htm to download the latest available forms. Please provide the requested information and return the package to the address below. If you have any questions, please do not hesitate to call me at (910) 796-7345 or email me at kelly.p.Johnson@ncdenr.gov. 2Sincer ly Since Johnson Environmental Engineer GDS/KPJ: S:1WQSISTORMWATERIRETURN1South Bridge Phase 1.jun09 cc: John S. Tunstall, PE, Norris, Kuske & Tunstall Wilmington „Regional Office File Page 4 of 4 C200912002008 SOSID: 0643994 Date Flied: 4/30/2009 2:02:00 PM LIMITED LIABILITY COMPANY (LLC) Elaine F. Marshall ANNUAL REPORT North Carolina Secretary of State C200912002008 NAME OF LIMITED LIABILITY COMPANY: BC & RT. LLC STATE OF FORMATION: NC FISCAL YEAR ENDING: 12 / 31 / 0 8 MONTH/DAYNEAR SECRETARY OF STATE L.L.C. ID NUMBER: 0 6 4 3 9 9 4 If this is the first annual report filing, YOU MUST COMPLETE THE ENTIRE FORM. If your LLC's information has not changed since the previous report, please check the box and complete line 7. 1. REGISTERED AGENT & REGISTERED OFFICE STREET ADDRESS -INCLUDE COUNTY: Must be a North Carolina address! Name: Address: 2. .REGISTERED OFFICE MAILING ADDRESS IF DIFFERENT FROM THE STREET ADDRESS: S. IF THE REGISTERED AGENT CHANGED, THE NEW AGENT MUST SIGN: SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 4.. ENTER PRINCIPAL OFFICE ADDRESS AND TELEPHONE NUMBER HERE: Address: Telephone Number, Including area code 5. BRIEFLY DESCRIBE THE NATURE OF BUSINESS: 6. ENTER NAME, TITLE, AND BUSINESS ADDRESS OF MANAGER(S)/MEMBER(S) OR IF THE LLC HAS NEVER HAD MEMBERS, ITS ORGANIZERS: (ATTACH ADDITIONAL PAGES IF NECESSARY) NAME- BUSINESS ADDRESS- RAWI - BUSINESS ADDRESS- NAME- BUSINESS ADDRESS- 7. CERTIFICATION OF ANNUAL REPORT MUST BE COMPLETED BY ALL LIMITED LIABILITY COMPANIES. FORM MUST BE S 48YAAGER/MEMB DATE RAIFORD G. TRASK, JR. MANAGER/MEMBER TYPE OR PRINT NAME TITLE ANNUAL REPORT FEE: $200 MAIL TO: Secretary of State • Corporations Division 0 Post Office Box 29525 • Raleigh, NC 27626-0525 669231, 02-12-09 DIVISION OF WATER QUALITY INFILTRATION SYSTEM INVESTIGATION NKT #07063 Complete and email this form to Vincent.Lewis@ncmail.net. If there are more than 7 areas to be tested, attach a second sheet. Scheduled Site Visit Date: Time: d b � � . �Yt� Project Name: South Bridge Subdivision County: Onslow Street Address: NC 172 — Sneads Ferry Directions from the nearest intersection of two major roads: Take US 17 (Market Street) towards Jacksonville for approximately 29 miles Turn right at NC 172 Go approximately 5.4 miles. The site is on the left, beside Yopp's Tire & Garage >1 acre being disturbed? ®YES ONO CAMA Major required? AYES ®NO Consultant Name: John S. Tunstall. P.E. Phone: 910-343-9653 Consultant Firm Name: Norris. Kuske & Tunstall Consulting Engineers, Inc Bore Number 1 2 3 4 5 6 7 a Existing Ground Elevation b Proposed Bottom Elevation c Difference a minus b d Add 2 ft. Min. Bore Depth) e Hardpan Depth? f Infiltration Rate OK? Approx. Elev. Of SHWT h Max. lowest bottom elev. Comments 1'0_ e h 4! 1414 /�8-- 61C se, 1 G 4,1 , Le Required Attachments: 1. Legible vicinity map. 2. Complete Soils Report. 3. PDF formatted site plan with the boring locations to be tested. Site plans should be emailed or hand -delivered only. Illegible faxed maps will not be accepted. All proposed infiltration areas and existing, active utility lines located within the proposed basin/trench must be marked and flagged. If these areas are not flagged, the Soils Scientist reserves the right to decline to do the investigation. If the pAposed infiltration system will be located in an area of existing pavement and there is no open area nearby, equipment capable of breaking through the impervious layer must be provided. The soils investigation does rot take the place of a soils report prepared by an appropriate professional. The Soils Scientist w1l only verify the soil conditions that are reported in the Soils Report, and make a determination as to the suitability of the site to meet the infiltration design requirements under NCAC 2H.1000, and assumes no liability should the system fail. S:1WQSISTORMWATERIFORMSIinfiltration site visit.for Revised 8.07 VNnO>Myvw'1' worwynw�xro g �HnL�OuN�xwA1NA00MO'1sm A.UNM W vLLm3amgu aaNNv id b 0616 a Vmw1 YOY! m (DIG) M IOWL '�N 'NN.'IMRIVI t,-m (Ole) Imm MILL11 m— W87BoalUSHLROS 'ONI 'Sb33NION3 2 v�wv°0°�� w ONii-inSNOO NV'Id3LSlldl13A0 -1t/1SNf11 �371Sf1>i 'SI2l2iON1,1 i � III �Il 19 �� ; �� • of X. AN dd �', '` '' y ,/.;:'�:::�::�:�• I' Ill !TI, fT �T 3 � L •O M Q 10 N N N M CD NM QLSI I., mO•Q• p a`O o m m m m cc cor� m Inm m m m m mIA h € - - i/ CN Tm 0, 6 a =U �� 9— 1 9 0 Qx co O _ O