Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0000884_Monitoring - 09-2022_20221027
Monitoring Report Submittal Permit Number #* WQ0000884 Name of Facility:* Butterball Month: * September Report Information Type * NDMR, NDAR-1, NDAR-2, NDMLR Year:* 2022 Upload Document* DMRsept.pdf PDF Only 4.05M B Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). Confirmation Email Address:* jbatchelor@butterball.com Name of Submitter: * josh batchelor Signature: ��eeaAq4l-6'" Date of submittal: 10/27/2022 This will be filled in automatically Initial Review Reviewer: Gerald, Wanda Is the project number correct?* WQ0000884 Is the monitoring report accepted?* Yes No Regional Office* Wilmington Reviewer: _anonymous Review Date: 11/14/2022 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NEAR-1) Page of Did the application rates exceed the limits in Attachment B of your permit? 0 Compliant Q Non -Compliant Were adequate measures taken to prevent effluent pending in or runoff from the sites? Ej Compliant ❑ Nora -compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? 0 Compliant 0 Non -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? [Z Compliant [_1 Non -compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? R] compliant ❑ Non -compliant If the facility is non -compliant, please explain in the space below the reasons) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective actlonts) itaKen. tatauft auuniuiiai sneers It Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Josh Batchelor Permittee: Bill Folk Certification No.: 991798, 987940 Signing Official: Jeff Shamblin Grade: WWIV, Sl Phone Number: 919-658-6743 ext 2291 Signing Official's Title: Plant manager Facilities/Wastewater Has the ORC changed since the previous NDAR-1? ❑ Yes I] No Phone — ber: 919-658-6743 ext 2267 Permit Exp.: 9/30/22 Signature Date Signature Da By this signature, t certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of taw, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of Did the mass loading rates exceed the limits in Attachment B of your permit? 121 Compl€ant E] Non -compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective +; - taken Attach additinmal -zh,--efq if n,-r-1-q1;arV. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC; Josh Batchelor Permittee: Bill Folk Certification Number: 991798,987940 Signing Official: Jeffry Sharriblin Grade: WW IV, SI Phone Number- 919-658-6743 ext 2291 Signing Official's Title: Plant Manager Has the ORC changed since the previous NDMLR? L] Yes 21 No Phone No.: 919-658-6743 ext 2267 Permit Exp.: 9/30/22 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. 12,b7und., penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete, 1 am aware that there are significant penalties for submitting false information, including the possibility of flues and imprisonment for knowing violations. MailOriginal and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page _ of Sampling Person(s) 11 Certified Laboratories Name: Jefferson Foy Name: Environmental Chemist Name: Josh Batchelor Name: Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? R compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Josh Batchelor Permittee: Bill Folk Certification No.: 991798,987940 Signing Official: Jeffry Shamblin Grade; WW IV, Sl Phone Number: 919-658-6743 ext 2291 Signing Official's Title: Plant Manager Has the ORC changed since the previous NDMR? ❑ Yes D No Phone Nu ber: 9 19-658-6743 ext 2267 Permit Expiration: 9130/2022 / 14 61 1, Signature Date Signature Date By this signature, f certify that this report is accurrale and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing vioiations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 NON -DISCHARGE APPLICATION REPORT (NDAR-1 ) Page of FORM: NDAR-1 08-11 Facility Name: Mt. Olive Turkey Processing Facility County Duplin Month: September p Year: 2022 WQ0000884 Permit No.: Field Name: 01B Field 1Vame 01C Field Name: 02A Field Name; 01A;, Did irrigation occur Area.:(acres) 26 75 Area (acres): 74.59 Area (acres) 11 48 Area (acres):18 61 at this facility? Laver Crop. Coastai Cover Crop Coastal Cover Crop: Coastal Cover Crop Coastal Hourly Rate din) Hourl Rate(in):H Y 1. ouriy Rate {'it) Hourly Rate (in): H YES ❑vo Annual Rate (�n) 50 Annual Rate (in): 50 Annual Rate (u) 50 Annual Rate (in): 50 Field Irrigated? I] YES ❑ No Fieid':irngatetl? [ YES N0 Field Irrigated? [] YES ❑ No Irrigated? 0 YEs ❑ No Weather Freeboard Field . a° m N� �'w m y.c ��c has m°�; ?� 3�� E°'AB °'m �'v E;�`v, Iw+o n E=n o ca Y rn nro �u E �a w� E::� a ,cam Erb: a� 3= a Em rn �v m Ego Kdro tea;rn oG. Fe �M C3:o om K a a Q° rn i `` ar o Kom Mxo �, y m O m gal min in in gal mir i"nCL �n gal min in in °F it ft min in �n in gal: 0.42 81,585 488.4 0.04 O.OD 89 956` 290 0 84 74,499 396 0A.0 1 CL 89 0 $4 64,586 334 8 0 09 0 Q2 60,793 397.$ 0.03 O.DO 100,37E 315 0.32 O.D6 2 C 90 0 81 74 987 396 0.1fl 0.02 116,284 764.4 0.06 0.00 109 307 352 0:35 0 Ofi" 3 PC 90 fl 82 74, f,07 395 4 0 1Q D 02 : 100,500 672 0.05 0.00 84,272 27 0.27 0 q.6 4 PC PC 88 87 0.03 84 77,609 396 0.11 0,02 65,309 427.8 0.03 om 104,554 344 0,34. 0.06 5 PC 88 0 88 79,294 396 0.11 0.02 115,194 732.E D.06 0.00 106 596 352 0..34 0 06 6 2.5 90 78,458 395.4 0.11 0 D2 '; 8D,122 533.4 0.04 0,00 48,174 154 D.15 0 06 7 PC 91 8 PC 81 0 78 91,298 642.6 0.05 0.00 100,41'7 332 0 32 0 06 D 76 68,704 337.8 0.09 0 D2 g PC pG 82 84 0.12 72 66,08q 337 8 ll fl9 Q.fl2 91,542 673.2 0.05 0.00 99,396 305 0 32 0 06 10 11 PC 84 0.35 72 74,1.44 364 8 D.10 0 02 98,822 733.8 0.05 0.00 1D6,674 351 Q 34 0 06 PC 87 0 70 74,545 399 0.1 D 0 02 94,148 733.8 0.05 0.00 104,865 347 0 34 0.06 12 85 0 68 98,951 49D.2 014 0 02 100,275 703.8 0.05 0.00 120,509 362 039. 0.06 13 C 67,719 337.8 0.09 D 02 91,287 673.8 0.05 0.00 100,229 321 q:32 0.06 82 D 66 14 C 0 66 74,949 396 0 i0 0.02 99,105 703.2 O.D5 O.DO 104,983 347 34 0A6 15 C 82 62 0 64 70,852 367.8 0.10 0.02 93,735 703.2 0.05 0.00 103,835 342 0,33 -0.06 16 C C 83 0 SD 66,526 33814 0,09 QD2 102,056 673.2 0.05 0,00 97 382 30Ei 0:31 0.06 17 0 61 84,733 429.E 0.12 0.02 105,218 733.2 0.05 0.00 1Q1,209 336 0.32 18 G 87 D 64 72,129 367.8 010 0,02 101,743 733.2 0.05 0.00 1D4,923 346 034 0.06 19 C 89 D 65 78015 399 0,11 0.02 123,414 703.2 0.06 0.01 99,53:1 721.2 032 0.03 20 C 92 0 65 78.039 399 0 11 0.02 118,32fl 750 0.06 0.00 108 21.4 358 0 35 0 06 21 C 93 95 0.55 65 77:153 399 0 11 0.02 109,220 706.2 0.05 0.D0 96 5fi1 8$fi 2 Q.3i 0 02 22 PC 0 64 75 574 399 0.10 0 02 '' 100,835 672 0.05 0.00 100 542 329 0 32 0.06 23 C 72 0 64 365 4 0.10 0.02 107,754 676.2 0,05 0.00 114,7.25 406 0 37 0.05 24 G 77 0 65 365 4 0.1 D 0.02 107,616 702.6 0,05 0.00 113,610 402 0 3fi D.05 25 26 C C 83 85 0 66 P$2 700.2 0.19 0.02 105,983 703.2 0.05 0.00 142,406 389 0.46 Q.07 395.4 0.26 0.04 27 C 78 0 68 730.8 0 20 ': D.02 113,466 735 0.06 0.00 40,784 130 0 13 13Q,273 84,874 274.2 0.17 0.04 28 C 72 0 70 570.8 018 0.02 107,973 7D3.2 0.05 0.00 125,033 396 0.25 0.04 29 PC 67 0 68 74,047 396 0.10 O.fl2 ' . 101,096 672.6 0.05 0.00 30 R 72 2.6 68 31 ' 3.14 2,784,693 1.37 2,604030 8 35 340,180 0.67 37.21 Monthly Loading: 2,281,3$6 12 Month Floating Total (in): 41 79 16.10 46.60.:. FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Montt,: September Year: 2022 Permit No.: Feld Name: 02B;: Field Name: 02G Field Name, 03 Field Name: 05 Did irrigation occur Area {acres): 12.01 Area (acres): 9.1E Area {acres): 17.28 Area {acres). 18 63 at this ,FaClllty? cover Grop: Coastal Cover Crop. Coastal Cover Crop Coastal Cover Crop. Coastal Wourly Rate in .............Hourly Rate {in): Hourly Rate (in) Hourly Rate (in): Q YES ❑ NO Annual,Rate (m) 86 8` Annual Rate (in): 50 Annual Rate (irtl 1.37 2 Annual Rate (in): 68.8 Weather Freeboard Flelcl irrigated? Q YES ❑ NO Field Irrigated? [f YES ❑ NO Fjeld.;irrigated? I] YES ❑ NO Field irrigated? j] YES ❑ NO v+. ° E =E a-o Ew Rto >, 'c `n U. L o c an E,M a E =� o E -,❑° °E o ❑ a o o _ o o o 7 6 0. OF in ft ft gal` min 1n to gal min in in gal inin in in gal min in in C 89 0 $4 43,485 223 0.17 0.05 90 667i 395.4 fl.19 0 03 90,622 297 0.18 0.D4 1 0 84 66,430 294.7 0.27 0.05 79,342' 334.8 0, 7 0,03 92,074 299.6 0.18 0.04 2 C 90 81 77,308 343.4 0,31 0,05 92 037: 395:4 D,20 0 03 '. 108,008 356.4 0.21 0.04 3 PC 90 0 75,526 335.9 0.30 0.05 71,915 3048 0.75 " 0 03 83,320 276.3 0.1E 0.04 82 4 PC 88 0 84 77,599 343.8 0.31 0.05 90829: 366 0.19T. 0.03. 110,721 366.9 0.22 0.04 5 PC 87 0.03 88 80,268 353.8 0.32 0.05 87 209. 364.8 0.19 0 03 99,967 331.5 0.20 0.04 © 6 PC 88 18,614 81.95 0.07 0.05 41% 19D8 0,09 0a3 i 51,637 168.2 0.10 0.04 7 PC 91 2.5 90 8 PC 81 0 78 82,249 3348 0.1$ 0.03 97,248 322.7 0.19 0.04 9 PC 82 0 76 TO PC 84 0.12 72 19,743 1248 0:04 0 02 i 11 PC 84 0,35 72 33,109 143 0.13 0.06 12 PG 87 0 70 13 C 85 0 68 31,264 105.25 0.06 0.04 14 C 82 a 66 87,170 285.E 0.17 a.04 15 C 82 a 66 99,511 334.5 0,20 0.04 16 C 82 0 64 91,319 300.5 0.18 0.04 17 C 83 0 60 78,883 365.4 0.17 0.03 18 C 87 0 61 38,779 182.4 0.08 0.03 98,492 321.75 0.19 0.04 19 C 89 0 64 76,611 342.2 0.31 0.05 11 525 124 2 002 0.01 115,725 379 a.23 0.04 0 65 20 C 92 0 65 80,495 358.4 0.32 0.05 14,668 912 0;03 0.02 104,511 338 0.21 0.04 21 C 93 65 82,554 367.5 0.33 0.05 132,9.1.8 520.2 D;28 0.03 '` 93,542 307.3 0.18 D.a4 22 PC 95 0.55 72 0 64 67,597 297.8 0.27 0.05 84,i32$ 33Z8 0;18 Q03 91,952 300.3 0.18 O.D4 23 C 64 71,727 319.4 0.29 0.05 85,01,E 3684 Q18 Dq3 95,503 313.3 0.19 a.04 0 24 C 77 73,672 328.E 0.3a 0.05 86,65.5 3654 0,18 403 ` 100,179 327.9 0.2a 0.04 0 65 25 C 83 66 63,549 291.2 0.26 0.05 170,1.1.7 700.2 0.36 0 03 125,403 420,2 0.25 0.04 0 26 G 85 68 79;i06 380 0.24 0.04 :: 70,691 320 0.28 0.05 82,669 366 0.18 D 03 97,831 326.1 0.19 0.04 C 78 0 27 70 89;970 427.E 0.28 0 04 51,092 234 0.21 0.a5 109.,844 466 6 :0:23 0 03 i 15Q2i3 507 0.30 0.04 72 D 28 C 68 63,294.308,1 0,19 ' ' 0A4 1.i 65,422 308.8 0,26 0.05 89 168 396 0,10 0 03 :: 104,452 354.8 a.21 0.03 29 PC 67 D 30 R 72 2.6 68 31 Monthly Loading 2&370 0.71 1,175,749 4.73 1,640,650 3.50 2,220,664 4.39 12 Month Floating Total (in): 49,91:.i! 39.80 64.72 .. 24.58 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: ............ . September Year: 2022 Field Name. 07 Field Name: 07A Field Name 0$A Field Name: 08B Did irrigation occur Area (acres] 14,$9 Area (acres): 6.12 Area (acres) 30 38 : Area (acres) 34.84 at this facility? Cover Crop: Coastal Cover Crop: Coastal Cover Corp: Coastal Cover Crop Coastal 0 YES ❑ No Hourly Rate in Hourly Rate (in}: Hourly Rate (ir}. Hourly Rate (in): Annual Rate:{�n}: 70.7 Annual Rate (in}: Annual Rate (iri} 111.3 Annual Rate (in): 72.2 Weather Freeboard Field ]rrigated7 ❑ YES:: ❑ NO. Field Irrigated? ❑ YES ❑ rvq Field,'irrigated? ❑YES ❑ tJq Field irrigated? ❑YES ElNo a ° ° m w m a` rn E w: T m o E v m_ cn E o� aE w v a E E ; d ;rn Lo Cro amE d E E o Ero0 M flm EE ;o am o zcms E •a U o o a L o ro a p ° >a mEX °° C cc EL °F in ft ft gal min In in gal min in in gal Min...Iri in gal min in in 1 C 89 0 84 66,171 298.6 0.16 0.03 108,125 364.8 0.13 0.02 2 C 90 0 84 68,175 3121 017 DA3 100,799 3348 0,12 0.02 3 PC 90 0 81 74,501 346.2 0.18 0.03 108,902 365,4 0,13 0.02 4 PC 1 88 0 82 72,709 337 0 98 O,fl3 83,779 2742 010 0.02 5 PC 87 0.03 84 $0.665 371.2 0.20 i 0,03 108,975 364.8 0;13 0,02 ` 6 PC 88 0 88 77,94E 349.3 0,19 0.03 106,955 3654 0:13 0.02 7 PC 91 2.5 90 76,243 346.2 a 19 ..:.0.03 46,538. 183' 0.:06 . 0.02 8 PC 81 0 78 9 PC 82 0 76 6711.50 310 T..1 0.17 0.03. 103.678 W54 011.3 0.02 101 PC 84 0,12 72 69,545 324.9 0.17 0.03. '' 100,984 365 4 012 0,02 III PC 1 84 0.35 72 68,650 318.7 017 ;. 0 03 1101535 395 0.13 0 02 121 PC 1 87 0 70 73,153 335 0.1$ 0.03 106,21E 3654 0.13 .D 02 131 C 1 85 0 68 69,170 312 8 '0 17 0.03 63,556.. 213 0 08 .. 0.02 14 C 82 0 66 73,655 235,6 0.18 0.03 106,923 3654 0.13 0 02 ': 151 C 82 D 66 74,962 3517 019 0.03. 82,342 337.8 0.50 0.09 109,118 365.4. 0.13 0.02 16 C 82 0 64 69,67.E 311,4. 0.17 0.03 ' 72,299 368.4 0.44 D.07 105,709 365€. 0.13 0.02 17 C 83 0 60 76,155 347 0.19 0.03 110,608 365 4 0.13 : 0.02 18 C 87 0 61 68,919 326.5 0 17 0.03 111,193 368.4 0.67 0.11 1 111,13E 39.5.4. 0;13 0.02 ` 19 C 89 0 64 7.4,421 3458 0.1$ i 0,03. 81,053 277.8 0,49 0.11 109,587 365:4 0113 O.D2 20 C 92 0 65 75 285 354 5 0.19 0.03 ` 104,714.1.365.4 0 13 0.02 45,436 305 0,05 0,01 21 C 93 0 65 77,302 360E '0.19 0.03 108,843 396 0.13 .. .. O.D2 53,221 350.2 0.06 0,01 22 PC 95 0.55 65 77,647 357.9 0.19 0,03 r 95,505. 335 4 0.12. 0.02 45,692 305.1 0.05 0.01 23 C 72 0 64 48,838 312.6 0.05 0.01 24 C 77 0 64 49,773 339A 0.05 0.01 25 C 83 0 65 48,459 327 0,05 1 0.01 26 C 85 0 66 61,045 420.1 0,06 0.01 27 C 78 0 68 77,836 508 0.08 0.01 28 C 72 0 70 94,188 639.4 0.10 0.01 29 PC 67 0 68 54,573 354.9 0.06 0.01 30 R 72 2.6 68 31 Monthly Loading: 1,532004 3.79 346,887 2.09 2 111185 256 '` 579,061 0.61 12 Month Floating Total (in): 42.78 9.27 24.20 ` 4.52 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR_1) Page of FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0000884 Facility Name: Mt, Olive Turkey Processing Facility County: Duplin Month: September Year: 2022 field Name 10B Field Name-!10C Field Name 11 Field Name: 12 Did irrigation occur Area (acres) 31.42: Area (acres). 19.8 Area (acres) 26.13 Area (acres). 17.78 at this faCllij/? Cover Crop Coastal Cover Crop: Coastal Cover Crop Coastal Cover Crop: Coastal Rate (in) Hourly Rate (in): Hourly Rate (in) Hourly Rate (in): YES E-]NOHourly Annual Rate (in) 30 Annual Rate (in): 35 Annual Rake (in):.32,36 Annual Rate (in): 6.42 Weather Freeboard Field irrigated? Q YEs ❑ ND ? Field Irrigated? (] YES ❑ NO F!eld,lrrigated? AYES ❑ ND Field Irrigated? YES ❑ NO ,a o ° v m ut r3 a, n m rn �, C E rn c- ar v E 2 d Y rn E E rn a� er E W a m 2 rn C E 0 c_ m o E 1 m y to C E cn C T m U d a a 7 E a i].� ;" E m �rn -O ro N . E v O 19 it 00 E '° LM i-c O {0 E a x 0 (9 a oa 1= 16 �.` cc 'o as o° E x .0 a 0 M E vt �.L m rt A E R >� O �+ a ° cn �a oa tea. N'� o �yo: �a Qo ,� a �a ��° �¢ `�T0 ©co � a. L0 OF in ft ft gal. min in in gal min in in gal '' min... iri in gal min in in 1 C 89 0 84 63,008 213 0.07 0 02 93,918 285.8 0.17 0.04 2 C 90 0 84 100,1.96 304.8 012::::.0.02:::.103,786 323.1 0.19 0.04 3 PC 90 0 81 1151930 365.4 0.14 0 02 ` 109,695 340.7 0.20 0.04 4 PC 88 0 82 91,472 304.2 0.11 0.D2 113,410 354 0.21 0.04 5 PG 87 0.03 84 121,878 365.4 0 14 0.02 111,985 347.2 0.21 0.04 6 PC 88 0 88 118515 365.4. 014 3 0.02 116,617 361.3 0.22 0.04 7 PC 91 2.5 90 51,649 152.4 0 06 0.02 118,347 366.7 0.22 0.04 $ PC 81 0 78 9 PC 82 0 76 117,o74 365.4 0.14 0.02 '', 101,385 308.2 0.19 0.04 10 PC 84 0.12 72 113,237 335 4 0.13 0.02 f 97,352 316.8 0.18 0.03 11 PG 84 0.35 72 117,699. 36..5.4 0.14 O.q2 115,40D 352.4 0.21 0.04 12 PC 87 0 70 114;970 . 335.4 0.13 0.02:..: 114,554 347.3 0,21 0.04 1 C 85 0 68 110,275 334.8. 0.13 0.02...... 127,612 393.9 0,24 0.04 14 C 82 0 66 113829 334.8 0.13 " 0.02. 1; 107,969 324.5 0.20 0.04 15 C 82 0 66 125344 396 0.15 0 02 108,608 331.85 0.20 0.04 16 G 82 0 64 115,479 364.8 0,14 0.02 110,964 334.6 0.21 0,04 17 C 83 0 60 110,065 334.8 0,13 0.02 113,554 347.8 0.21 0,04 18 C 87 0 61 119,451 395A . 0.14 0.02 >; 108,596 334.1 0.20 0.04 144,488 549 0.20 0.02 19 C 89 0 64 125931.. 399.6 015 0.02 106,231 318.5 0.20 0.04 139,927. 518.4 020 0.02 . 20 C 92 0 65 106,488 334.2 0 12 . ..: 0.02 104,565 330.85 0,19 0.04 158.468 580.2 0.22 0.02 21 C 93 0 65 119,7.89 396 0.14 0,02. 101,709 324.5 0,19 0.03 157,797 6402 `022 0.02 22 PC 95 0.55 65 102033 334.8 0.12 0,02 90,827 302.7 0,17 0.03 175,439 640 025 0.02 23 C 72 0 64 109;$fi0 365.4 0A3.. 0.02 86,390 307 0.16 0,03 100,092 549 0;14 0.02 24 C 77 0 64 106,789 334.8. `D 13 0.02 ': 93,855 344.1 0.17 0,03 25 C 83 0 65 109,799 365.4 0.13 0.02 `' 102,236 327.4 0.19 0.03 26 C 85 0 66 136,903 456.6 0.16 .. 0.02 127,973 417.5 0.24 0.03 27 C 78 0 68 104,373 .,334.8 012 0.02 128,576 409.3 0.24 0.44 28 C 72 0 70 84,414 243.6 0.10 0.02 136,587 639.4 0,25 0.02 29 67 0 68 127,585 396 0115 0-02.. 96,629 306 0.18 0.04 30 �R: 72 2 66 68 31 Monthly Loading: 3,054,035. 3,58 3,049,320 5.67 876,211 < 124 q 0.00 12 Month Floating Total (in): 25.15 31.03 30.58 5.89 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0000884 Facility Name: Mt, Olive Turkey Processing Facility County: Duplin Month: September Year: 2022 Field Name 13 Field Name: 14 Field Name 15C Field Name: 16 Did irrigation occur Area {acres}. 31.42 Area (acres) 12.07 Area (acres) 18 03 Area (acres): 12.95 at ti11S facility? Cover Crop. Coastal Cover Crop Coastal Cover Crop Coastal', Cover Crop: Coastal': [� YES El No Hourly Rate (in): Hourly Rate (in): hourly Rate (in):Hourly Rate (in): Annual Rake (in) 31 42 Annual Rate (in): 78.02 Annual Rate (in) 39 21 j Annual Rate (in): 65.38 Weather Freeboard Field Irrigated? Q YES ❑ NO...:. Field Irrigated? Q YES ❑ No Fleld;lrrigated? [] YES ❑ No Field Irrigated? YES ❑ NO O c N al m °' N .C1 m y E T. a rn 7+ G E M ` C- m a £ d zs N rn �+ G E rn 3 C m a £ ri m E rn E d z� E 21 a cn £ w A U m 0. +- fl E `�° ate ._ - a -.0. ya., £ �a m v E �'a �N O _a- n CL E �a a ❑ O E °fs T 0O a_ a. :: ° CL £ >- ro v p E.�ss: N T 0 = a O CL E a� 1- •C fin` �1 ° E O ° �. �. ° F �'� ❑ a �° - ° tx0 � : I�C y° ..mac CL u, °F in ft ft gal: min in An gal min in in gat mine in In gal min in in 1 C 89 0 84 260,733 548.4 0.31 0 03 2 C 90 0 84 270;788 48718 0,32. 0.04 52,332 397.8 0.16 0.02 3 PC 90 0 81 309;823 640.8 0,36 .. 0.03 53,310 397.8 0.16 0.02 4 PC 88 0 82342,215 610.2 0.40 0.04 59,230 427.8 0,18 0.03 5 PC 87 0.03 84 284,688 549.E 0.33 0.04 52,187 397.8 0,16 0.02 6 PC 88 0 88 340,005 641.4 0,40. > 0.04 46,916 367.2 0,14 0.02 7 PC 91 2.5 90 276,135 487 8 0,32 0.04 48,760 367.2 0,15 0,02 8 PC 1 81 0 78 9 PC 82 0 1 76 313,948 610.2 0.37 0.04 :: 39,386 337.2 0.12 0.02 10 PC 84 0.12 72 204,740 396 6 . : 0 24 0.04 ''; 13,788 122.4 0.04 0.02 11 PC 84 0.35 72 286,076 518.4. 0 34 0.04 45,166 397.8 0.14 0,02 12 PC 87 0 70 333,403 610.2 0.39 0,04.. 51,088 458.4 0.16 0,02 13 C 85 0 68 173221 549.... 0.20 0.02 110,275 334.8 0.34 0.06 14 C 82 0 66 344,307 610.2 0 40.:..0.04:..66,333 581.4 0.20 0.02 63,01:1 241.7. 013 0.03 15 C 82 0 66 300,817 548.4 0,35 0.04 :: 43,052 367.2 0.13 0.02 96,060 379.E 0 20 0.03 16 C 82 0 64 251,508 518.4 0,29 0.03..:: 33,240 305 0.10 0.02 84,787, 327.4 0.17 0.03 17 C 83 0 60 307,265 671.4 0.36 0,03 ..:`. 37,157 336.E 0.11 0.02 89,256! 344`.8 0.18 0,03 18 C 87 0 61 144;489 .549 0.17. .0.02. '. 40,810 337.2 0.12 0.02 75,120 29733 0.15 .0 03 . 19 C 89 0 64 139,927 518.4 0.16.. `:0.02 .< 44,593 397.8 0.14 0,02 85,567 339.E 017 0.03 `. 20 C 92 0 65 158,469 580,2 0.19 0.02:. ' 39,420 336.6 0.12 0,02 82,230: 32t35 0,17 :0.03 21 C 93 0 65 157,798 64U 0..18 0..02 i 43,118 398.4 0.13 0.02 89,683 345.3 0.1.8 0.03. ' 22 PC 95 0,55 65 175,440. 640 0.21..::0.02::::' 44,138 398.4 0.13 0.02 76,154 300.45 0 i6 "0.03 23 C 72 0 64 160,092 549 0 19 :0.02:..35,348 305.4 0.11 0.02 24 C 77 0 64 269,502 518.4 0.32 004.` 25 C 83 0 65 263,081.. 548.4 :0.3.1 0,03 62,965 335.5 0:17 0.03. 26 C 85 0 66 54,818 580.2 0.17 0.02 14.4,501 585 0,30 0.03 27 C 78 0 68 42,931 398.4 0.13 0.02 102,522 411`8 0;21... .'.0.03 61,006 239.4 0.17 0.04 28 C 72 0 1 70 125,869 5124 026 0.03 128,977 505.1 0.37 0.04 29 PC 67 0 68 162.444 66U 0.33 0.03 170,426 661.8 0.48 0.04 30 R 72 2.6 68 31 Monthly Loading: 6,067,470 7,11PM77597,396 3.35 11360,169 ;2,78 '. 360,409 1.03 12 Month Floating Total (in): 28,42 35.85 35.26 ' 48.07 FORM: NDARA 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: September Year: 2022 Field Name: 01A Field Name: 01B Field Name: 01C Field Name:: 02A Fie011a 02B Area (acres): 26.75 Aria (acres): 74.59 Area (acres): 11,48 Area (acres); 18 61 Are10.94 Cover Crop: Coastal Cover Crop Coastal Cover Crop: Coastal Cover Crops Coastal CoCoastal Load Type: PAN Load Type PAN Load Type: PAN Load Type: PAN LPAN FieldLoaded? B YES ❑No ` Field Loaded? Q YES ❑ NO Field :Loaded? [� YE5 ❑ No': Field L YES ❑ No Field Loaded? ❑ YES ❑No a W z z �+ c zo z �, v _ z p z m� d Z. c ¢o Z ¢ ,a m ¢ z o a z a cs ,� sy d° m ¢ o.. > Q p¢." ¢ .: a s 9 N o A ¢ 0¢ 0. a N o a 0.+ b T .. ;: m Q ¢ ° m 0 .o m o as a ¢ w 1 o i°_3 = ¢ d:y :G m .0 O ro - ¢ of w y �� (q m .0 O �J �' ¢ Gl �� W.. v r o .r, Z m °gym v o J GO �z E © N B t6 (D m Y C¢ E 7 y :: V m: c o Q _. a 3 U c -a o E c ': o.. G o ¢ U a:: 0 G o 7< U 7 Gv p (, 0. O Q(j U ¢u U 0.aU ¢U 7 gal mglL Ibslac Ibslac` gal mg/L Ibslac Ibslac gal mgll_; ibslac Ibslac gal mglL Ibslac Ibslac Ibslac lbslac Month gal 1,832,405 mg1L 47.77 27.3 27.3 3,215.1.83 . .47.77 1.7 2 17,.2 .: 1.029,351 47.77 35.7 35.7 21514,880 47,77' S5.1 . 55.1 ; 0 47.77 0.0 0.0 October November 2,939,890 47,69 43.7 71.0 660,832 4769 3,5 20.7 2,125,827 47.69 73.7 1094 1,64800 47.69: 35.2' 90.4: 428,965 47.69 15.6 15.6 December 3,946,690 64.63 79.5 150.5 51069 802 64.63 36.6 57 3 1,660,732 64.63 78.0 187.3 :1,585,34G 64,63 45 9 136.3. ; 1,fi30,$42 64.63 80.4 95.9 3,033,600 55.64 52.6 203.2 3,333,032 55,64 20.7 78.1 . 1,453,058 55.64 587 246.1 1.,370,785 55.64 34.2 170.5' 2,018,572 55.64 $5.6 181.6 January 4,316,612 58.95 79.3 282.5 `:3,910;929 58.95 25`8 1038' 137,083 58.95 5.9 252.0 f1,795,948 58,95. 47.4;. 217:9. 2,043,071 58.95 91.8 273.4 February 49.93 42.2 324.7 4,182;254 49.93 233 127.2'; 0 49.93 0.0 252.0 21103,448 49.93 471`f: 265,0: 1,334,507 49.93 50.8 324.2 March 2,711,977 2,957,081 57.85 53.3 378.0 31699458 57.i$5 239 151.`.:1:. 1,055,424 57.85 44A 296.3 2,178,228 57.35 5fi.5' 321.4: 1,349,915 57.85 59.5 383.7 April May 1,745,471 59.88 32.6 410.6 `2,279,034 59i88 153 166A.. 294,633 59,88 12.8 309.1 948120. 59,&8 254 346.9< 2,479,122 59.88 113.2 496.9 2,556,643 47.16 37.6 448.2 1,608,871. 47.16 8.5 174:9' 1,418,806 47.16 48.6 357.7 3,279,071 47,1.6 69.3: 416.2. 1,956,452 47.16 70.3 567.2 June July 2,642,006 46.64 38.4 486.E 3,539,856 46;64 18`5 193.3' 1,011,278 46.64 34.3 392.0 0 46:64 0.0; 416.2's 870,052 46.64 30.9 598.2 August 1,229,957 46.98 18.0 504.7 `1,611282 46.98 7,9 201,3. 2.763,639 46.98 94.3 486.3 3,555,575 46:98 .4.9 491.d' 1,930,019 4fi.98 69.1 fi67.3 September 2,281,386 55.96 39.8 544.5 '2;784,693 55 96 17.4 21.83 218'7s 2,604,030 55.96 105.9 592.2 592.2 ` 340;180 55 9fi 8.5 499,6: 499.6 232,370 55.96 9.9 677.2 677.2 12 Month Floating PAN Load 544.5 (lbslaclyr): Of Annual PAN Load Limit lll.�hrl.rrl• _ FORM: Nr1MLR 08-11 NON-D[SCHARGE MASS LOADING REPORT (NDMLR) Permit No.: Mt. Olive Turkey Processing Facility County: Duplin WQ0000884 Facility Name: Field Name: 03 Field Name: 05 Field Field Name: 02G 9.16 Area (acres). 15,66 Area (acres): 18.03 Area (i Area (acres): Cover Crop: Coastal Cover Crop. Coastal ' Cover Crop: Coastal Covet Load Type: PAN Load Type. PAN Load Type: PAN t oac Field Loadec3� YES ow:: , Field Loaded? ❑Yes ❑ NO Freld Lc Field Loaded? [] YES ❑ NO xs u c m i9� c� 4 °� p �J 1° © m roa° a Ez �' ��° EZ .d E �� �-1 �a E m n o � ;c p U o U CL o a a v U ? j ¢ ty € Ibslac Ibslac gal mglL lbslac Ibslac Month gal mglL lbslac lbslac gat mg1L [ October 11781,765 47.77 77.5 77.5 1,004,379 .47.77:: 25.6 26 6 0 47.77 0.0 0.0 1 409,439 November 405,853 47.69 17.6 95.1 5,183.540 47,69 1317 157.2 69,117 47.69 1.5 1.5 1,761,213. December 984,645 64.63 57.9 153.1 4;182,144 6463 143:9 301.2 545,224 64.63 16.3 17.8 889,953.: January 732.742 55.64 37.1 190.2 2,295 026 55.64 68a0 369.2` 619,865 55.64 16.0 33.8 1,541,375 February 859,822 68.95 46.1 236.3 3,054,519 58 95 95:9 465.1 0 58.95 0.0 33.8 1,697;237: March 936,566 49.93 42.6 278.9 2,595923 4993 690 534.1 ' 0 49.93 0.0 33.8 1776821 April 521,010 57.85 27.4 306.3 2 639;7:93 6785 81 `3 615 4: 0 57,85 0.0 33.8 1 964;892 May 1,398,890 59,88 76.3 382.E 1,682389 5988 53.7.669.1..1,968,619 59.88 54.5 88.3 21093229 ` June 1,596,527 47.16 68.6 451.2 2,928,138 47.16 735 742.6` 1,536,291 47.16 33.5 121.8 614,251 July 411,234 46.64 17.5 468.6 3,434,091 46,64 85 3 827.9 ` 3,825,914 46.64 82.5 204.4 1,247 563. August 875,409 46,98 37.4 506.1 729 397 46 98 18:2 8462. 1,644,726 46.98 35.7 240.1 2,176 865` September 1,175,749 55.96 59.9 566.0 1,640;650 55:96 48.9 895:1 ` 2,220,664 55.96 57.5 297.E 1,532;004; Floating PAN Load 566.0 12 Month 895.1 297.6 (lbslaclyr): PAN Load Limit Annual !lhclarlvr}• Page of Month: Septerttber Year: 2022 ne: 07 Field Name: 07A s): 9.57 Area (acres): 6.12 op Coastal..:... Cover Crop: Coastal pp., PAN Load Type: PAN ad? c' .0U 0 YES ❑ No ` z CL ti i tG of Field Loaded? cL CL j0 z r 0- 0r_ a V [2] YES z a -I o ❑ No m p J 3 U a ;!l lbslac lbslac gal mgM06.9 77 58.7 58.7 106,667 47. ,69 73.2 1319.;` 0 47.63 50.1 182 0; 73,800 64.64 747 256.7i 30,600 55, 95 R72 3439 465,884 58.95 37.4 53.2 93 77 3 421 r2 68,808 49,93 4.7 57.9 85 99 1 520 3 ; 133.365 57.85 10.5 68.4 88 1092 629,5 11.7 80.1 25 2 654.847.16 0.0 80.1 64 50.7 705.5 s'46.64 15.6 95.6 ; 98 89;1 794.6.46.98 g143,35459.88 2.3 98.0 .96 74,7 869.3''55.96 26.5 124A 9/1"n'o 124.4 FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of Permit No.: W00000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: September Year: 2022 Field Name: 08A Field Name: :08B Field Name: 08C Field Name: 09A Field Name: 0913-A1 Area (acres): 30.38 Area (acres): 34,84 Area (acres): 10.75 Area (acres). 30.38 Area (acres): 4.25 Cover Crop: Coastal Cover. crop: Coastal Cover Crop: Coastal Cover Crop Coastal Cover Crop: Coastal Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? (] YES ❑ No Field Loaded? El YES ❑ 9O Field Loaded? ❑ YES ❑ NO Field Loaded? ❑ YES ❑ N9 Field Loaded? [ YES ❑ No Gl Z C Z m 2 C a� Z :: ; N Z C a° Z f z a� Z. a ,�; W O a 41 3 ,n CL an El "' a 0. ��, CL d .12 a Q . +a 0. N o. Ia. f9 N Q) C u O 3 z Qi� .0 O +-' J N l` 91_ 7 Z E l`0 U J Z E U w J Z a ❑ j C J Q E a 3 U ] :G O - 7 LLB U ] O O '3 0. '� ] :_.:a C O Ci 0. 7 > O O V d a� U aU U au a" Month gal mglL Ibslac lbslac gal. mglL lbslac :Ibslac. gal mglL Ibslac Ibslac gal mglC Ibslac lbslac' gal mg1L Ibslac lbslac October 0 47.77 0.0 0.0 658,902 47:77 7;5. 7;5.?;i 1,726,929 47.77 64.0 64.0 3,293,21.9 47.77 43:2 43,2: 83,308 47.77 7.8 7.8 November 127,328 47.69 1.7 1.7 427 322 47,69 4 9. 12;4..' 2,576,950 47.69 95.3 159.3 2,582,889 47.69 33.8 77 0 171,224 47.69 16.0 23.8 December 0 64.63 0.0 1.7 455,440 64;63 7 0 19 5 ' 864,441 64.63 43,3 202.7 1,905 280 64 63 33.8 110 8 . 0 64.63 0.0 23.8 January 1,629,315 55.64 23.4 25.0 0 55.64 0.0 19 5 0 55.64 0.0 202.7 2,698,91:7 55.64 41.2. 152.0. 0 55.64 0.0 23.8 February 2,715,153 5&95 43.9 69.0 0 58;95 0 0 .. 19 5 0 58.95 0.0 202,7 3,046,687 58.95 49.3 201:.3:1 84,516 58.95 9.8 33.6 March 2,585.658 49.93 35.4 104.4 0 49,93 0;0 19.5: 0 49.93 0.0 202,7 2,9N,627 49.93 40,1. 2415 0 49.93 D.0 33.6 April 3,339,705 57.85 53.0 157.4 0 57c85 O Q 19.5 0 57.85 0.0 202.7 2,601,945 57 85 41.3 282., 8 0 57.85 0.0 33.6 May 3,557,123 59.88 58.5 215.9 245,962 :59:88 3 5 23.0 366,824 59,88 17.0 219.7 4.120,288 59.88 18.4 301 2 ; 0 59.88 0.0 33.6 June 0 47.16 0.0 215.9 1,007,062 4716 11:4 34.4 583,456 47,16 21.3 241.1 2,746,483 47:16 35:6 336`8 58,824 47.16 5.4 39.1 July 2,369,425 46.64 30.3 246,3 401,888 46.64 4:5 38 8.;:: 194,239 46,64 7.0 248.1 867,481 46.64 11.1 347.9. 929,697 46.64 85.1 124.1 August 3,171,421 46.98 40.9 287,2 1.176,073 46.98 13.2 521 3,412,422 46.98 124.4 372.5 11,406,750 46.98 181 :366.0.1 843,728 46.98 77.8 201.9 September 2,111,185 55.96 32.4 319.E 579,061 55.96 7:8 `59.8 ' 3,590,897 55.96 155.9 528.4 IL 0 i1 55 96 0.0. 366:0:` 103,462 55.96 11.4 213.3 12 Month Floating PAN Load 319.E 59.8 ` 528.4 366;0'. 213.3 (lbslac/yr): Annual PAN Load Limit f l bslaclvr}: FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of NON -DISCHARGE MASS LOADING REPORT (NDMLR) FORM: NDMLR 08-11 Mt. Olive Turkey Processing Facility County: Duplin Permit No.: WQ0000884 Facility Name: Field Name: 10i3 Field Name 10C Field Name: 11 Field: Area (acres): 31.42 Area (acres) 19,g Area (acres): 26.13 Area (; Cover Crop: Coastal ver CoCrop Coastal Cover Crop; Coastal Govei Load Type: PAN Load Type: PAN Load Type: PAN Loac Field Loaded? [AYES ❑ No Field Loaded? YES ❑ nb,'; Field Loaded? [] YEs ❑ NO Field Lc a a m Z c m v rn _j E s o .. a �, E �, �" � o _� 7a ro m O I^z d D 0 �. U a -. > p U a- aU a� aU Ibslac > gal mglL Ibslac Ibslac gal Month gal mg1L lbslac lbslac gal mg1L kbslae October 4,015,244 47.77 50.9 50.9 .1,364,509 47,77 27 5 27,5 1,256,272 47.77 19.2 19.2 251,155 November 4,134,402 47.69 52.3 103.2 ' 2,474.522 47 69 49,7 77 2 ' 989,660 47.69 15.1 34.2 0 December 1,416,194 64.63 24.3 127.5 52,030,578 6463 55.3 132.4: 1,255,650 64.63 25.9 60.1 0 January 467,526 55.64 6.9 134.4 1221261 55:64 28.6 161.1 2,236,514 55.64 39.7 99.8 528,294 February 965,697 58.95 15.1 149.6 "2 167460 5895 538 214.9'` 1,519,717 58.95 28.6 128.4 ' 283;133 March 1,929,748 49.93 25.6 175.1 21.381`,247 49.93 50;1 265.0 2,814,916 1 49.93 44.9 173.3 862,293 April 11513.145 57.85 23.2 198.4 1248,413 57.85 30.4 295.4 3,005,411 57.85 55.5 228.8 634,016 May 1,613,042 59.88 25.6 224.0 1,174 397 59.88 29;6 325.0 12,091,3971 59.88 40.0 268.8 0 June 1,86042 47.16 23.3 247.3 82,254 4716 1:6 326.6: 1,873,618 47.16 28.2 297.4 0 July 1,123,737 46.64 13.9 261.3 860,922 46764 16,9 343.6' 3,171,609 46.64 47.2 344.2 40,897 August 3,371,190 46.98 42.0 303.3 0' 46.98 0;i] 343.6': 1,860,310 46.98 27.9 372.1 477,889 September 3,054,035 55.96 45A 348.7 3,049,320 :55 96 71.9 4.15.4: 876,211 55,96 15.6 387.7 0 i1 12 Month Floating PAN Load 348.7 4)5.4, 387.7 (lbslaclyr): Annual PAN Load Limit 4993 207 5785 172 59,88 O.O.J. 4716 Q.0 46:64 0;9 .. ..46:98 105 55.96 0:0 76.6 Month: J Page of September Year: 2022 Field Name: 13 Area (acres): 23.26 Cover Crop: Coastal Load Type: PAN Field Loaded? 0 YES ❑ NO o Yas 9L T 0 9 N o °°ua mgIL Ibslac .2377,5 40.7 40.7 1,584,025 47.69 27.1 67.8 94.3 1,145,021 64.63 26.5 128.2 1,699,581 55.64 33.9 58.95 20.0 148.3 946,753 1,817,747 49.93 32.5 180.8 387,042 57.85 8.0 188.8 > 1,657,933 59,88 35.6 224.4 1,873,616 47.16 31.7 256.1 3,212,506 46.64 53.7 309.8 3,857,697 46,98 65.0 374.8 FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Field Name: 14 Field Name 15c Field Name: 16 Field.,: Area (acres): 12.07 Area (acres). .18.03. Area (acres): 12.95 Area Cover Crop: Coastal Confer Crop. Coastal Cover Crop: Coastal Cpiiei PAN Load Type: !PAN Load Type: PAN Leac ❑ NO Field Loaded? � YES ❑ too..; Field Loaded? ❑ YES ❑ No Fleid'Lc ❑ YES � d . ¢ > w rL Z a Z a ¢ ° a 0. d z� O0 uns teldaded 3 3 o :. a 0- � U a o UMonth gal mglL 1,123,071 47.77 lbslaclbslac: 24.8 24;8 gat 523,100 mglL 47.77 lbslac 16.1 lbslac 16.1 gal_October 113,945 ,,. lbslac 41.7 lbslac 41.7 November 1,164,542 47.69 38A 80.1 482,141 47 69 10 6 35:.5 `, 31,700 47.69 1.0 17.1 155;736 December 1,738,826 64.63 77.7 157.7 '1304,634 6463 39,0 74,5 0 64.63 0.0 17.1 256510. January 44,128 55.64 44.0 201.7 251.3 11762j696.55.64 2,069,793 '58.95 45:1 119;6. 56.4 1760'i 1,810,299 2,448,473 55.64 58,95 64.9 93.0 81.9 1749 `384,191.. `232,527 February 18,135 58.95 49,6 March r479.066 49,93 16.5 267.8 2,370,320 49.93 54 7 230,7. 2,265,627 49,93 72.9 247.7 219;775 ': Apfil 8,822 57,85 16.7 284.6 2,206;313 57.85 59.0 289 8: 2,523,626 57.85 94.0 341.8 291,497 May 68,314 59.88 64.9 349.5 2,171352 5988 60.1 349.9; 3,102,605 59.88 119.6 461A 299,568.: June 1,301,264 47.16 42.4 391.9 706,222 47.16 15:4 365:3:' 1,351,668 47.16 41.1 502.5 4 July 380,236 46.64 12.3 404,1 2,166,544 671667 46.64 46.98 46,.7 14.6 41.2;1: 426.6. 2,159,077 1,976,923 46.64 46.98 64.9 59.8 567.3 627.1 862,879 474,f14B' August 1,235,351 46.98 40.1 444.2 September 1,097,396 55.96 42.4 486.7 486.7 1,360169 55;96 35.2 461..9. 461.9`. 360,409 55.96 13.0 640.1 640A 12,395`>i 12 Month Floating PAN Load (lbslaclyr): Annual PAN Load Limit llhcfarlvri• ..... i.63 i;64 1.95 2:6 ." 643.2 Page of Month: September Year: 2022 3 Field Name: 5 Area (acres): stal Cover Crop: N d Type: ❑ k6..oaded? ❑ YES ❑ NO MFleld Lo.4 Jo Cfl Q: 7 E� a U 0. a c p c o U o 0 U Ihslac nal mglL lbslac Ebslac 0.0 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.: WQ0000884 -- .._ . ._ Facility Name: Mt. Olive Turkey Processing Facility . ... ... County: Duplin I Month: September Flow Measuring Point: influent Effluent No flow generated sonM � . ® r• 1 :� 'Ili � � - .I. D. 1 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplirt Month: September Year: 2022 PPI: 004 Flow Measuring Point: ❑ influent ❑� Effluent ❑ No flow generated Parameter Monitoring Point: ❑ influent ❑� Effluent ❑ Groundwater Lowering ❑ Surface Water Parameter Code 50050 00310 00916 00680 00940 50060 3'16'16 `:'' 00927 00630 00610 00625 00620 00556 00400 WQ09C . 00931 C N m O is m N m w O �_ 61 `1 ° C 0 tm fl- ++ o m a i= cn m Fo si o s ":. °= o� 0. 0) a a o 0 o 24-hr hrs 'GPD . mglL mglL mglL mglL .: mg1L moo mL` mg/L mg/L. `s mglL mg!L .. mg/L mg/.L su mg1L Ratio 1 06:30 8.5 1310;000; 162 151. `: 84.2 182..:1: 1.09 >24196': 6,9 0.77 75.2 122 `!: 0.31 <5.0 7.99 52.41 11.5 2 06:00 9.5 1,219,000 0.49 7.71 3 06:00 9 1,444,000 1.12 7.73 4 1,298,000 ` 0.87 7.74 E 5 06:00 9 1,394,000 0.56 7.76 6 06:30 8.5 1,359,000.: 0.22 7.65 7 06:30 8.5 946,000 0.19 7.74 8 06:30 8.5 0 9 06:30 8.5 1,127 000 0.16 7.39 10 06:30 8.5 949,000 0.81 7.55 11 1,078,000 0.52 7.43 12 06:30 8.5 1,027,000_. D.38 7.55 13 07:00 8.5 970,000 0.13 7.54 14 06:30 8.6 1115,000 0.92 7.7 15 06:30 8.5 11325,000. 0.39 7.61 16 06:30 8.5 1,225 000 0.33 7.56 17 06:00 9 1,182,000 0.61 7.64 18 1;411,000 0.43 7.56 19 06:30 8.5 1,349,000.: 0.33 7.68 20 06:30 8.5 1,452,000. 0.58 7.59 21 06:00 8.5 1,489,000 0.4 7.71 22 06:30 8.5 1.686,000 0.36 7.75 23 06:3D $.5 1,272,000. 167 13.6 75.2 0.58 41 6.25 0.1$ 63.1 155 <0.02 6 7.72 59.51 10.42 24 06:30 8.5 1,336,000 0.25 7.56 25 1`,420,000 0.47 7.45 26 06:30 8.5 1,637,000. 0.09 7.44 27 06:30 8.5 1,640,000, 0.3 7.62 28 06:30 8.5 1,640,000 2.2 7'$7 29 06:30 8.5 1,488,000 0.61 7.69 30 06:30 $.5 31 Average: 1,265,103. 164.50 14.35 79.70 18200 0.55 640 6,58 0.48 69.15 138.50. ' D.16 ; 3.00 55.96 10.96 Daily Maximum: 1 640,000. 167.00 .`15.10,: 84.20 182.00 :; 2,20 41 00 ... 6.90 0.77 .::. 75.20 155.00 0.31 6A0 7.99 59.51 11.50 Daily Minimum: 0 162,00 13.60 75.20 182.00" 0.09 41.0.0 6.25 0.18 63.10 122.00 ' 0.02 5.00 7.39 52:41 : 10.42 Sampling Type: 'Recordar Grab Grab::: Grab Grab.: r Grab Grab. ' Grab Grab Grab Grab'' ` Grab Grab Grab Calculated Calculated Monthly Limit: Daily Limit: Sample Frequency: Continuous 2 x Month 2 x Month 2 x Manth ' 3 x Year 5 x Week 2 x Month 2 x Month 2 x Month 2 x Month 2 x Month 2 x Month 2 x Month 5 x Week 2 x Month. 2 x Month r m 1. r fib —Daily11 ;•1 11 1# #1 rr 1 Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: September -• -. ■ ■ ■ -.. ..� ■ ■MINOR ME p - •.- = ki.:l ®' 11. i 11. Ik. 1 11.11 w w ' m__ ® /. 1 ® ® 1. k 1. 1 m Average: 1 11 ■. 1 11 ' � 10"N. INNER= ky, M.. I n e, III WE Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: September • r DUENWE ..................�. _. INEE ... ....... NONE NONE.......... INE ........ NNI ......�_...._11 .. MEINMENEM SEEK mmm ONE 1. 1 ME I. 1 INE 4• f SEEN NEE ® 1 fl 1. 1 m 1. IfEBEINEE EEINEEIE smmm= mmim mmimm _ m 1. 1 m 1. E NEINNEEN NONE ENIE 1 If E 11 •f ME INEWINNIMENI 1. E Daily ini ®. �f INEE NEI FORM: N©MR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.: WQ0000884 Fadilty Name: Mt. Olive Turkey Processing Facility County: Duplin Month: September ........ ...... a • m 1. 11 0 ®__ m 1. 1 m Average::1 1 11 1 it 1 !. • .- .. � -• �, -1' _� a -' Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: September ®__��