Loading...
HomeMy WebLinkAbout20100842 Ver 2_404 Jurisdiction Determination_20221109U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2008-03044 County: Onslow U.S.G.S. Quad: NC-Camp Lejeune NOTIFICATION OF JURISDICTIONAL DETERMINATION Requestor: John Odom Address: 501 W.B. Mclean Blvd. Cape Carteret, NC 28584 Telephone Number: 252-393-2129 E-mail: prestigesurveying@embarqmail.com Size (acres) 37.90 Nearest Town Piney Green Nearest Waterway Wallace Creek River Basin Onslow Bay USGS HUC 03020302 Coordinates Latitude: 34.715285 Longitude: -77.306063 Location description: The property is located north of NC 24 at approximately 34.715285 °. -77.306063° in Onslow County, North Carolina. Indicate Which of the Following Apply: A. Preliminary Determination ☐ There appear to be waters, including wetlands on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters, including wetlands have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. The approximate boundaries of these waters are shown on the enclosed delineation map dated. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. ☐ There appear to be waters, including wetlands on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters, including wetlands have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction over all of the waters, including wetlands at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters, including wetlands on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination ☐ There are Navigable Waters of the United States within the above described project area/property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ☒ There are waters, including wetlandson the above described project area/property subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ☐We recommend you have the waters, including wetlands on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. ☒The waters, including wetlands on your project area/property have been delineated and the delineation has been verified by the Corps. The approximate boundaries of these waters are shown on the enclosed delineation map entitled, “Wetland Delineation for Dennis Silvestor,” dated 01/26/2010. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to SAW-2008-03044 CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. ☐The waters, including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ☐ There are no waters of the U.S., to include wetlands, present on the above described project area/property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ☐ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Jordan E. Jessop at 910-251-4810 or Jordan.E.Jessop@usace.army.mil. C. Basis For Determination: Basis For Determination: See the approved jurisdictional determination form dated 2/22/2022. D. Remarks: Previous AJD issued 1/26/2010 E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps’ Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Mr. Philip A. Shannin Administrative Appeal Review Officer 60 Forsyth Street SW, Floor M9 Atlanta, Georgia 30303-8803 AND PHILIP.A.SHANNIN@USACE.ARMY.MIL In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by 04/17/2022. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: ______________________________________________________ Date of JD: 2/22/2022 Expiration Date of JD: 2/22/2027 SAW-2008-03044 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Copy furnished: Property Owner: WEG MANCOR, LLC Dwayne Brabble Address: 5902 Fayetteville Road Raleigh, NC 27603 Telephone Number: 252-637-8813 E-mail: building@dedevelopments.com NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: John Odom File Number: SAW-2008-03044 Date: 2/22/2022 Attached is: See Section below ☐ INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A ☐ PROFFERED PERMIT (Standard Permit or Letter of permission) B ☐ PERMIT DENIAL C ☒ APPROVED JURISDICTIONAL DETERMINATION D ☐ PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx or the Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the appeal process you may contact: District Engineer, Wilmington Regulatory Division Attn: Jordan E. Jessop Wilmington Regulatory Office U.S Army Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina 28403 If you only have questions regarding the appeal process you may also contact: MR. PHILIP A. SHANNIN ADMINISTRATIVE APPEAL REVIEW OFFICER CESAD-PDS-O 60 FORSYTH STREET SOUTHWEST, FLOOR M9 ATLANTA, GEORGIA 30303-8803 PHONE: (404) 562-5136; FAX (404) 562-5138 EMAIL: PHILIP.A.SHANNIN@USACE.ARMY.MIL RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15-day notice of any site investigation, and will have the opportunity to participate in all site investigations. ________________________________________ Signature of appellant or agent. Date: Telephone number: For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Jordan E. Jessop, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Philip Shannin, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 Page 1 of 8 Form Version 10 June 2020 APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION I: BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR APPROVED JURISDICTIONAL DETERMINATION (JD): 2/22/2022 B. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, Boyington Place, SAW-2008-03044 C. PROJECT LOCATION AND BACKGROUND INFORMATION: The property is located north of NC 24 at approximately 34.715285 °. - 77.306063° in Onslow County, North Carolina. State: NC County/parish/borough: Onslow City: Piney Green Center coordinates of site (lat/long in degree decimal format): Lat. 34.715285 , Long. -77.306063 Universal Transverse Mercator: Name of nearest waterbody: Wallace Creek Name of nearest Traditional Navigable Water (TNW) into which the aquatic resource flows: Name of watershed or Hydrologic Unit Code (HUC): 03020302 ☒Check if map/diagram of review area and/or potential jurisdictional areas is/are available upon request. ☐Check if other sites (e.g., offsite mitigation sites, disposal sites, etc…) are associated with this action and are recorded on a different JD form: D. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ☒Office (Desk) Determination. Date: 02/16/2022 ☐Field Determination. Date(s): SECTION II: SUMMARY OF FINDINGS A. RHA SECTION 10 DETERMINATION OF JURISDICTION. There are no “navigable waters of the U.S.” within Rivers and Harbors Act (RHA) jurisdiction (as defined by 33 CFR part 329) in the review area. [Required] ☐Waters subject to the ebb and flow of the tide. ☐Waters are presently used, or have been used in the past, or may be susceptible for use to transport interstate or foreign commerce. Explain: B. CWA SECTION 404 DETERMINATION OF JURISDICTION. There are “waters of the U.S.” within Clean Water Act (CWA) jurisdiction (as defined by 33 CFR part 328) in the review area. [Required] 1. Waters of the U.S. a. Indicate presence of waters of U.S. in review area (check all that apply):1 ☐TNWs, including territorial seas ☐Wetlands adjacent to TNWs ☒Relatively permanent waters 2 (RPWs) that flow directly or indirectly into TNWs ☐Non-RPWs that flow directly or indirectly into TNWs ☒Wetlands directly abutting RPWs that flow directly or indirectly into TNWs ☐Wetlands adjacent to but not directly abutting RPWs that flow directly or indirectly into TNWs ☐Wetlands adjacent to non-RPWs that flow directly or indirectly into TNWs ☐Impoundments of jurisdictional waters ☐Isolated (interstate or intrastate) waters, including isolated wetlands b. Identify (estimate) size of waters of the U.S. in the review area: Non-wetland waters: approximately 730 linear feet, wide, and/or acres. Wetlands: 12.06 acres. c. Limits (boundaries) of jurisdiction based on: OHWM, 1987 Corps Delineation Manual and regional supplement Elevation of established OHWM (if known): 1 Boxes checked below shall be supported by completing the appropriate sections in Section III below. 2 For purposes of this form, an RPW is defined as a tributary that is not a TNW and that typically flows year-round or has continuous flow at least “seasonally” (e.g., typically 3 months). Page 2 of 8 Form Version 10 June 2020 2. Non-regulated waters/wetlands (check if applicable):3 ☐Potentially jurisdictional waters and/or wetlands were assessed within the review area and determined to be not jurisdictional. Explain: SECTION III: CWA ANALYSIS A. TNWs AND WETLANDS ADJACENT TO TNWs The agencies will assert jurisdiction over TNWs and wetlands adjacent to TNWs. If the aquatic resource is a TNW, complete Section III.A.1 and Section III.D.1. only; if the aquatic resource is a wetland adjacent to a TNW, complete Sections III.A.1 and 2 and Section III.D.1.; otherwise, see Section III.B below. 1. TNW Identify TNW: Summarize rationale supporting determination: 2. Wetlandadjacent to TNW Summarize rationale supporting conclusion that wetland is “adjacent”: B. CHARACTERISTICS OF TRIBUTARY (THAT IS NOT A TNW) AND ITS ADJACENT WETLANDS (IF ANY): This section summarizes information regarding characteristics of the tributary and its adjacent wetlands, if any, and it helps determine whether or not the standards for jurisdiction established under Rapanos have been met. The agencies will assert jurisdiction over non-navigable tributaries of TNWs where the tributaries are “relatively permanent waters” (RPWs), i.e. tributaries that typically flow year-round or have continuous flow at least seasonally (e.g., typically 3 months). A wetland that directly abuts an RPW is also jurisdictional. If the aquatic resource is not a TNW, but has year-round (perennial) flow, skip to Section III.D.2. If the aquatic resource is a wetland directly abutting a tributary with perennial flow, skip to Section III.D.4. A wetland that is adjacent to but that does not directly abut an RPW requires a significant nexus evaluation. Corps districts and EPA regions will include in the record any available information that documents the existence of a significant nexus between a relatively permanent tributary that is not perennial (and its adjacent wetlands if any) and a traditional navigable water, even though a significant nexus finding is not required as a matter of law. If the waterbody 4 is not an RPW, or a wetland directly abutting an RPW, a JD will require additional data to determine if the waterbody has a significant nexus with a TNW. If the tributary has adjacent wetlands, the significant nexus evaluation must consider the tributary in combination with all of its adjacent wetlands. This significant nexus evaluation that combines, for analytical purposes, the tributary and all of its adjacent wetlands is used whether the review area identified in the JD request is the tributary, or its adjacent wetlands, or both. If the JD covers a tributary with adjacent wetlands, complete Section III.B.1 for the tributary, Section III.B.2 for any onsite wetlands, and Section III.B.3 for all wetlands adjacent to that tributary, both onsite and offsite. The determination whether a significant nexus exists is determined in Section III.C below. 1. Characteristics of non-TNWs that flow directly or indirectly into TNW (i) General Area Conditions: Watershed size: Choose an item. Drainage area: Choose an item. Average annual rainfall: inches Average annual snowfall: inches (ii) Physical Characteristics: (a) Relationship with TNW: ☐Tributary flows directly into TNW. ☐Tributary flows through Choose an item. tributaries before entering TNW. Project waters are Choose an item. river miles from TNW. Project waters are Choose an item. river miles from RPW. Project waters are Choose an item. aerial (straight) miles from TNW. Project waters are Choose an item. aerial (straight) miles from RPW. Project waters cross or serve as state boundaries. Explain: 3 Supporting documentation is presented in Section III.F. 4Note that the Instructional Guidebook contains additional information regarding swales, ditches, washes, and erosional features generally and in the arid West. Page 3 of 8 Form Version 10 June 2020 Identify flow route to TNW 5: Tributary stream order, if known: (b) General Tributary Characteristics (check all that apply): Tributary is: ☐Natural ☐Artificial (man-made). Explain: ☐Manipulated (man-altered). Explain: Tributary properties with respect to top of bank (estimate): Average width: feet Average depth: feet Average side slopes: Choose an item.. Primary tributary substrate composition (check all that apply): ☐Silts ☐Sands ☐Concrete ☐Cobbles ☐Gravel ☒Muck ☐Bedrock ☐Vegetation. Type/% cover: ☐Other. Explain: Tributarycondition/stability [e.g., highly eroding, sloughing banks]. Explain: Presence of run/riffle/pool complexes. Explain: Tributary geometry: Choose an item. Tributary gradient (approximate average slope): % (c) Flow: Tributary provides for: Choose an item. Estimate average number of flow events in review area/year: Choose an item. Describe flow regime: Other information on duration and volume: Surface flow is: Choose an item.. Characteristics: Subsurface flow: Choose an item.. Explain findings: ☐Dye (or other) test performed: Tributary has (check all that apply): ☐Bed and banks ☐OHWM 6(check all indicators that apply): ☐clear, natural line impressed on the bank ☐the presence of litter and debris ☐changes in the character of soil ☐destruction of terrestrial vegetation ☐shelving ☐the presence of wrack line ☐vegetation matted down, bent, or absent ☐sediment sorting ☐leaf litter disturbed or washed away ☐scour ☐sediment deposition ☐multiple observed or predicted flow events ☐water staining ☒abrupt change in plant community ☐other (list): ☐Discontinuous OHWM.7 Explain: If factors other than the OHWM were used to determine lateral extent of CWA jurisdiction (check all that apply): ☐High Tide Line indicated by: ☐Mean High Water Mark indicated by: ☐oil or scum line along shore objects ☐survey to available datum; ☐fine shell or debris deposits (foreshore) ☐physical markings; 5Flow route can be described by identifying, e.g., tributary a, which flows through the review area, to flow into tributary b, which then flows into TNW. 6A natural or man-made discontinuity in the OHWM does not necessarily sever jurisdiction (e.g., where the stream temporarily flows underground, or where the OHWM has been removed by development or agricultural practices). Where there is a break in the OHWM that is unrelated to the waterbody’s flow regime (e.g., flow over a rock outcrop or through a culvert), the agencies will look for indicators of flow above and below the break. 7Ibid. Page 4 of 8 Form Version 10 June 2020 ☐physical markings/characteristics ☐vegetation lines/changes in vegetation types. ☐tidal gauges ☐other (list): (iii) Chemical Characteristics: Characterize tributary (e.g., water color is clear, discolored, oily film; water quality; general watershed characteristics, etc.). Explain: Identify specific pollutants, if known: (iv) Biological Characteristics. Channel supports (check all that apply): ☐Riparian corridor. Characteristics (type, average width): ☐Wetland fringe. Characteristics: ☐Habitat for: ☐Federally Listed species. Explain findings: ☐Fish/spawn areas. Explain findings: ☐Other environmentally-sensitive species. Explain findings: ☐Aquatic/wildlife diversity. Explain findings: 2. Characteristics of wetlands adjacent to non-TNW that flow directly or indirectly into TNW (i) Physical Characteristics: (a) General Wetland Characteristics: Properties: Wetland size: acres Wetland type. Explain: Wetland quality. Explain: Project wetlands cross or serve as state boundaries. Explain: (b) General Flow Relationship with Non-TNW: Flow is: Choose an item. Explain: Surface flow is: Choose an item. Characteristics: Subsurface flow: Choose an item.. Explain findings: ☐Dye (or other) test performed: (c) Wetland Adjacency Determination with Non-TNW: ☐Directly abutting ☐Not directly abutting ☐Discrete wetland hydrologic connection. Explain: ☐Ecological connection. Explain: ☐Separated by berm/barrier. Explain: (d) Proximity (Relationship) to TNW Project wetlands are Choose an item. river miles from TNW. Project waters are Choose an item. aerial (straight) miles from TNW. Flow is from: Choose an item.. Estimate approximate location of wetland as within the Choose an item. floodplain. (ii) Chemical Characteristics: Characterize wetland system (e.g., water color is clear, brown, oil film on surface; water quality; general watershed characteristics; etc.). Explain: Identify specific pollutants, if known: (iii) Biological Characteristics. Wetland supports (check all that apply): ☐Riparian buffer. Characteristics (type, average width): ☐Vegetation type/percent cover. Explain: ☐Habitat for: Page 5 of 8 Form Version 10 June 2020 ☐Federally Listed species. Explain findings: ☐Fish/spawn areas. Explain findings: ☐Other environmentally-sensitive species. Explain findings: ☐Aquatic/wildlife diversity. Explain findings: 3. Characteristics of all wetlands adjacent to the tributary (if any) All wetland(s) being considered in the cumulative analysis: Choose an item. Approximately acres in total are being considered in the cumulative analysis. For each wetland, specify the following: Directly abuts? (Y/N) Size (in acres) Directly abuts? (Y/N) Size (in acres) Summarize overall biological, chemical and physical functions being performed: C. SIGNIFICANT NEXUS DETERMINATION A significant nexus analysis will assess the flow characteristics and functions of the tributary itself and the functions performed by any wetlands adjacent to the tributary to determine if they significantly affect the chemical, physical, and biological integrity of a TNW. For each of the following situations, a significant nexus exists if the tributary, in combination with all of its adjacent wetlands, has more than a speculative or insubstantial effect on the chemical, physical and/or biological integrity of a TNW. Considerations when evaluating significant nexus include, but are not limited to the volume, duration, and frequency of the flow of water in the tributary and its proximity to a TNW, and the functions performed by the tributary and all its adjacent wetlands. It is not appropriate to determine significant nexus based solely on any specific threshold of distance (e.g. between a tributary and its adjacent wetland or between a tributary and the TNW). Similarly, the fact an adjacent wetland lies within or outside of a floodplain is not solely determinative of significant nexus. Draw connections between the features documented and the effects on the TNW, as identified in the Rapanos Guidance and discussed in the Instructional Guidebook. Factors to consider include, for example: • Does the tributary, in combination with its adjacent wetlands (if any), have the capacity to carry pollutants or flood waters to TNWs, or to reduce the amount of pollutants or flood waters reaching a TNW? • Does the tributary, in combination with its adjacent wetlands (if any), provide habitat and lifecycle support functions for fish and other species, such as feeding, nesting, spawning, or rearing young for species that are present in the TNW? • Does the tributary, in combination with its adjacent wetlands (if any), have the capacity to transfer nutrients and organic carbon that support downstream food webs? • Does the tributary, in combination with its adjacent wetlands (if any), have other relationships to the physical, chemical, or biological integrity of the TNW? Note: the above list of considerations is not inclusive and other functions observed or known to occur should be documented below: 1. Significant nexus findings for non-RPW that has no adjacent wetlands and flows directly or indirectly into TNWs. Explain findings of presence or absence of significant nexus below, based on the tributary itself, then go to Section III.D: 2. Significant nexus findings for non-RPW and its adjacent wetlands, where the non-RPW flows directly or indirectly into TNWs. Explain findings of presence or absence of significant nexus below, based on the tributary in combination with all of its adjacent wetlands, then go to Section III.D: 3. Significant nexus findings for wetlands adjacent to an RPW but that do not directly abut the RPW. Explain findings of presence or absence of significant nexus below, based on the tributary in combination with all of its adjacent wetlands, then go to Section III.D: D. DETERMINATIONS OF JURISDICTIONAL FINDINGS. THE SUBJECT WATERS/WETLANDS ARE (CHECK ALL THAT APPLY): 1. TNWs and Adjacent Wetlands. Check all that apply and provide size estimates in review area: ☐TNWs: linear feet, wide, Or acres. ☐Wetlands adjacent to TNWs: acres. 2. RPWs that flow directly or indirectly into TNWs. Page 6 of 8 Form Version 10 June 2020 ☒Tributaries of TNWs where tributaries typically flow year-round are jurisdictional. Provide data and rationale indicating that tributary is perennial: the consultant made several visits during spring 2008 after an unusually dry year, and have seen tributary with flowing water on each occasion. ☐Tributaries of TNW where tributaries have continuous flow “seasonally” (e.g., typically three months each year)are jurisdictional. Data supporting this conclusion is provided at Section III.B. Provide rationale indicating that tributary flows seasonally: Provide estimates for jurisdictional waters in the review area (check all that apply): ☐Tributary waters: linear feet wide. ☐Other non-wetland waters: acres. Identify type(s) of waters: 3. Non-RPWs 8 that flow directly or indirectly into TNWs. ☐Waterbody that is not a TNW or an RPW, but flows directly or indirectly into a TNW, and it has a significant nexus with a TNW is jurisdictional. Data supporting this conclusion is provided at Section III.C. Provide estimates for jurisdictional waters within the review area (check all that apply): ☐Tributary waters: linear feet, wide. ☐Other non-wetland waters: acres. Identify type(s) of waters: 4. Wetlands directly abutting an RPW that flow directly or indirectly into TNWs. ☒Wetlands directly abut RPW and thus are jurisdictional as adjacent wetlands. ☒Wetlands directly abutting an RPW where tributaries typically flow year-round. Provide data and rationale indicating that tributary is perennial in Section III.D.2, above. Provide rationale indicating that wetland is directly abutting an RPW: the consultant observed water flowing in tributary during unusually dry season. Sediment deposits when highwater flows over edge of banks, observable high water mark in tributary, topographic break at wetland boundary. ☐Wetlands directly abutting an RPW where tributaries typically flow “seasonally.” Provide data indicating that tributary is seasonal in Section III.B and rationale in Section III.D.2, above. Provide rationale indicating that wetland is directly abutting an RPW: Provide acreage estimates for jurisdictional wetlands in the review area: acres. 5. Wetlands adjacent to but not directly abutting an RPW that flow directly or indirectly into TNWs. ☐Wetlands that do not directly abut an RPW, but when considered in combination with the tributary to which they are adjacent and with similarly situated adjacent wetlands, have a significant nexus with a TNW are jurisidictional. Data supporting this conclusion is provided at Section III.C. Provide acreage estimates for jurisdictional wetlands in the review area: acres. 6. Wetlands adjacent to non-RPWs that flow directly or indirectly into TNWs. ☐Wetlands adjacent to such waters, and have when considered in combination with the tributary to which they are adjacent and with similarly situated adjacent wetlands, have a significant nexus with a TNW are jurisdictional. Data supporting this conclusion is provided at Section III.C. Provide estimates for jurisdictional wetlands in the review area: acres. 7. Impoundments of jurisdictional waters.9 As a general rule, the impoundment of a jurisdictional tributary remains jurisdictional. ☐Demonstrate that impoundment was created from “waters of the U.S.,” or ☐Demonstrate that water meets the criteria for one of the categories presented above (1-6), or ☐Demonstrate that water is isolated with a nexus to commerce (see E below). 8See Footnote # 3. 9To complete the analysis refer to the key in Section III.D.6 of the Instructional Guidebook. Page 7 of 8 Form Version 10 June 2020 E. ISOLATED [INTERSTATE OR INTRA-STATE] WATERS, INCLUDING ISOLATED WETLANDS, THE USE, DEGRADATION OR DESTRUCTION OF WHICH COULD AFFECT INTERSTATE COMMERCE, INCLUDING ANY SUCH WATERS (CHECK ALL THAT APPLY):10 ☐which are or could be used by interstate or foreign travelers for recreational or other purposes. ☐from which fish or shellfish are or could be taken and sold in interstate or foreign commerce. ☐which are or could be used for industrial purposes by industries in interstate commerce. ☐Interstate isolated waters. Explain: ☐Other factors. Explain: Identify water body and summarize rationale supporting determination: Provide estimates for jurisdictional waters in the review area (check all that apply): ☐Tributary waters: linear feet, wide. ☐Other non-wetland waters: acres. Identify type(s) of waters: ☐Wetlands: acres. F. NON-JURISDICTIONAL WATERS, INCLUDING WETLANDS (CHECK ALL THAT APPLY): ☐If potential wetlands were assessed within the review area, these areas did not meet the criteria in the 1987 Corps of Engineers Wetland Delineation Manual and/or appropriate Regional Supplements. ☐Review area included isolated waters with no substantial nexus to interstate (or foreign) commerce. ☐Prior to the Jan 2001 Supreme Court decision in “SWANCC,” the review area would have been regulated based solely on the “Migratory Bird Rule” (MBR). ☐Waters do not meet the “Significant Nexus” standard, where such a finding is required for jurisdiction. Explain: ☐Other: (explain, if not covered above): Provide acreage estimates for non-jurisdictional waters in the review area, where the sole potential basis of jurisdiction is the MBR factors (i.e., presence of migratory birds, presence of endangered species, use of water for irrigated agriculture), using best professional judgment (check all that apply): ☐Non-wetland waters (i.e., rivers, streams):linear feet, wide. ☐Lakes/ponds: acres. ☐Other non-wetland waters: acres. List type of aquatic resource: ☐Wetlands: acres. Provide acreage estimates for non-jurisdictional waters in the review area that do not meet the “Significant Nexus” standard, where such a finding is required for jurisdiction (check all that apply): ☐Non-wetland waters (i.e., rivers, streams):linear feet, wide. ☐Lakes/ponds: acres. ☐Other non-wetland waters: acres. List type of aquatic resource: ☐Wetlands: acres. SECTION IV: DATA SOURCES. A. SUPPORTING DATA. Data reviewed for JD (check all that apply - checked items shall be included in case file and, where checked and requested, appropriately reference sources below): ☒ Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: Prestige Surveying. Original survey from 2010 used as the delineation sketch. ☒ Data sheets prepared/submitted by or on behalf of the capplicant/consultant. ☒Office concurs with data sheets/delineation report. Corps concurs with original submitted data sheets from 2010. ☐Office does not concur with data sheets/delineation report. ☐ Data sheets prepared by the Corps: ☐ Corps navigable waters’ study: 10Prior to asserting or declining CWA jurisdiction based solely on this category, Corps Districts will elevate the action to Corps and EPA HQ for review consistent with the process described in the Corps/EPA Memorandum Regarding CWA Act Jurisdiction Following Rapanos. Page 8 of 8 Form Version 10 June 2020 ☐ U.S. Geological Survey Hydrologic Atlas: ☐USGS NHD data. ☐USGS 8 and 12 digit HUC maps. ☒ U.S. Geological Survey map(s). Cite scale & quad name: Camp Lejeune ☒ USDA Natural Resources Conservation Service Soil Survey. Citation: SSURGO data layer, accessed January 2022: torhunta fine sandy loam, stallings loamy fine sand. ☒ National wetlands inventory map(s). Cite name: USFWS NWI data layer accessed January 2022 ☐ State/Local wetland inventory map(s): ☐ FEMA/FIRM maps: ☐ 100-year Floodplain Elevation is: (National Geodectic Vertical Datum of 1929) ☒ Photographs: ☒Aerial (Name & Date): ESRI basemap accessed January 2022 Or ☐Other (Name & Date): ☒ Previous determination(s). File no. and date of response letter: SAW-2008-03044. Dated January 26, 2010 ☐ Applicable/supporting case law: ☐ Applicable/supporting scientific literature: ☒ Other information (please specify): NCQL2 LiDAR B. ADDITIONAL COMMENTS TO SUPPORT JD: